Loading...
HomeMy WebLinkAboutE16-0141 Permit_Scope of Work_Elec.pdfDoubletree Conversion – Vail, Colorado Building Permit Application – Guestrooms and Public Spaces Detailed Scope and Location of Work: Guestrooms: Remove and/or relocate SPST toggle switch at entry and replace with new rocker switch with built-in LED night-lite. Remove (4) and (5) lamp incandescent sconce lighting over vanities and replace with LED back-lit electric mirror. Remove and/or relocate wall mounted hearing impaired devices in newly configured ADA guest bathrooms. Relocate GFCI receptacles at 44” AFF as required for new ADA Guest bathrooms reusing the existing circuit. Remove (2) and (3) lamp incandescent sconce lighting and associated switching above niche counter. No new lighting to be installed. Remove and relocate receptacle from above niche counter to standard 18” AFF. Remove and relocate bathroom light switches from outside of ADA bathrooms to bathroom interior door strike side wall. Lighting and fan activation to be combined on relocated / new switch. Existing fire alarm and smoke detection on guest bed side of wall being removed to be reused / relocated on new guest bed side wall. All existing to remain recessed lighting at guestroom entry is to have all incandescent flood light lamping removed and replaced with new LED lamping. Typical for all guestrooms. Guestrooms with lofts and stair relocation are to have 3-way switching added to bottom and top of new stairs. Incandescent wall sconces are being replaced with new LED sconces Guestrooms with kitchen wall work are reusing the existing circuits at same locations with installation of horizontal receptacles and no load changes. 2nd floor guest laundry is being converted back into a guestroom. It still has the original receptacles/circuits in addition to the multiple (2) pole washer and dryer circuits being removed in their entirety back to the panels. Guestroom Corridors All (2) lamp incandescent wall mounted sconces, incandescent wall pack egress lighting and wire along 2nd, 3rd and 4th floor Guestroom corridors is to be removed back to source. All 1’x2’ (2) lamp recessed fluorescent and 6” recessed 75w incandescent lighting above guestroom doors and wire is to be removed back to source. Circuits are to be reused for new 4” LED over guestroom doors and 6” LED along corridors. New wall mounted LED egress fixtures are to be installed along 2nd, 3rd and 4th floor corridors at approximately 20’ on center connected ahead of any switching. All 6” recessed 75w incandescent lighting in vending areas is to be replaced with recessed LED lighting. All vending area receptacles are to be replaced with GFCI receptacles. Public Spaces: All lighting and receptacles are being removed from timber frame structure being removed. Lighting circuits are being transferred to new LED lighting on existing porte- cochere drive-up structure. All incandescent lighting and receptacle loads are being removed from the front of house areas to include the vestibule, check-in, existing ski shop, lobby area, offices, lounge, restaurant, public restrooms, as this will now be an open lounge seating area. Large meeting room sconces and (4) 2’x4’ fluorescent lighting is to be removed and replaced with new recessed and cove LED lighting with Lutron controls. All lighting and receptacles loads are being removed from the Spa / bathroom/ shower and Sauna areas. 200A steam generator is being removed as the Sauna is being demolished and not relocated. Indoor hot tub is being removed and relocated to outdoor area. Circuits are being extended and reused. All lighting, receptacles and mechanical equipment is being removed from existing Fitness, Spa/Therapy, Maintenance and storage areas. Lounge, lobby, game room, made market and bar area to have new 6” recessed LED lighting and vacancy/occupancy controls. Main 1st floor corridor to have new recessed 6” LED lighting. New Spa/Therapy, Boardroom, Meeting room and back-of house office areas are to have new receptacles, data outlets, 4” / 6” recessed LED lighting and vacancy/occupancy controls and/or dimming panels. New public restrooms, fitness, maintenance, employee breakroom and employee locker room areas are to have new recessed 6” or 2’x2’ LED lighting on vacancy / occupancy controls with only single lighting fixtures in each area ahead of controls to act as night lighting during periods of no use.