HomeMy WebLinkAboutVAILNARRATIVECCD05.pdf askervil DoubleTree, Vail, CO. CCD5 Revision 9 Narrative T001 Title Sheet- list of drawings change to reflect CCD5, Rev. 9, 07-03-2017 A030 DOOR, FRAME AND HARDWARE TYPES & SCHEDULES Schedule Door- added door 152 to schedule A040 INTERIOR STOREFRONT DETAILS Detail —Bottom Rail @ Pony Wall 6A added header note for pony wall A050 FINISHES Legend - Toilet Accessories added tag TA-26 ADA Shower Seat added tag TA-27 ADA Tub Seat revised material callouts PLAM-003, PLAM-004 and PNT-006 added grout selection to CT-006 and CT-004 Alll OVERALL PLAN— 1ST FLOOR Plan 6A- revised made market coffee bar layout and dimensions added room 142- kitchen storage revised men's and women's employee locker room layout and dimensions added gyp board surround at existing pipe in retail space revised lobby fireplace dimensions to accommodate new fireplace selection added baby changing station to women's pool restroom added furring walls in hallway to conceal existing structural elements A121 REFLECTED CEILING PLAN—1ST FLOOR PLAN Plan 6A- revised made market ceiling layout and dimensions added room 142—kitchen storage and modified ceiling layout added gyp board surround at existing pipe in retail space revised ballroom east wall recessed lighting locations revised lobby fireplace dimensions to accommodate new fireplace selection revised hallway ceiling width to accommodate addition of furring walls J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx June 20, 2017 The Widewaters Group Page 2 of 3 added soffits for linear diffusers at windows in lobby/lounge A122 REFLECTED CEILING PLAN—2ND & 3RD FLOORS deleted detail 4E Plan 6A - deleted section reference to detail 4E Plan 6D - deleted section reference to detail 4E A131 1St FLOOR—FINISH PLAN Finish Plan 6A - revised made market coffee bar layout and dimensions added room 142—kitchen storage added gyp board surround at existing pipe in retail space revised men's and women's employee locker room layout and dimensions removed ceiling finish tag WD-004 in the lobby bar area revised lobby fireplace dimensions to accommodate new fireplace selection added baby changing station to women's pool restroom added furring walls in hallway to conceal existing structural elements added ATM machine in Room 105 A141 1st FLOOR—FF&E PLAN Overall Plan 6A - revised made market coffee bar layout and dimensions added room 142—kitchen storage revised men's and women's employee locker room layout and dimensions added baby changing station to womens's pool restroom added furring walls in hallway to conceal existing structural elements added ATM machine in Room 105 A401A ENLARGED FLOOR PLAN—LOBBY/LOUNGE/BAR Enlarged Floor Plan 6A- revised made market coffee bar layout and dimensions added gyp board surround at existing piping in retail space revised fireplace dimensions to accommodate new fireplace selection J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx June 20, 2017 '• , The Widewaters Group Page 3of3 A401B ENLARGED FURNITURE PLAN—LOBBY/LOUNGE/BAR Enlarged Furniture Plan 6A - revised made market coffee bar layout and dimensions added gyp board surround at existing piping in retail space revised fire place dimensions to accommodate new fireplace selection A401C ENLARGED REFLECTED CEILING PLAN—LOBBY/LOUNGE/BAR Enlarged Reflected Ceiling Plan 4A - revised made market coffee bar ceiling layout and dimensions to reflect plan changes added gyp board surround at existing piping in retail space added soffits for linear diffusers at windows in lobby/lounge revised dimensions of recessed lighting to accommodate soffit change added soffit details 6A and 6B to sheet A403 ENLARGED PLANS—MEETING ROOMS Enlarged Floor Plan 3A - added furring walls in hallway to conceal existing structural elements A404 ENLARGED PLANS—BACK OF HOUSE Enlarged Floor Plan 6A - added room 142—kitchen storage revised men's and women's employee locker room layout and dimensions Enlarged Reflected Ceiling Plan 4B - revised ceiling layout to reflect plan changes of men's and women's employee locker room Elevation 2D - revised elevation to show addition of room 142 Enlarged Floor Plan—Employee Breakroom & Locker Room 4A- added furring walls in hallway to conceal existing structural elements A405 ENLARGED PLANS—BALLROOM Reflected Ceiling Plan 5A - revised east wall recessed lighting locations J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx June 20, 2017 The Widewaters Group Page 4 of 3 A406 ENLARGED ACCESSIBLE GUEST ROOM PLANS—KARI (ROOM 237) Elevation 6D - removed coffee bar wing wall at made market A410 ENLARGED TOILET PLAN Plan - Pool Restrooms 4A - added baby changing station to women's pool restroom and added tag TA-12 added shower seat tag TA-26 Elevation 3C - added baby changing station to women's pool restroom elevation Elevation 5C— added shower seat tag TA-26 A432 ENLARGED ACCESSIBLE GUEST ROOM PLANS—KARI (ROOM 237) Furniture Plan 5A - added accessory tag TA-26 Elevation 2C - added accessory tag TA-26 A434 ENLARGED ACCESSIBLE GUEST ROOM PLANS—QQARI(ROOM 235) Furniture Plan 5A - added accessory tag TA-26 Elevation 4C - added accessory tag TA-26 A437A ENLARGED ACCESSIBLE GUEST ROOM PLANS—KCONAL (ROOM 424) Demolition Plan 2A - revised connecting door and 6"of demising wall to show as demo to accommodate 36" accessible door J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx June 20, 2017 ", ,The Widewaters Group Page 5 of 3 A437B ENLARGED GUESTROOM PLANS—KCONL LOFT (ROOM 524) Construction Plan 3A - added wing wall to conceal fire sprinkler piping Finish Plan 4A- added wing wall to conceal fire sprinkler piping Furniture Plan 3A - added wing wall to conceal fire sprinkler piping Reflected Ceiling Plan 6A- added wing wall to conceal fire sprinkler piping Elevation 5B - added wing wall to conceal fire sprinkler piping A441 ENLARGED GUEST ROOM PLANS—K1L (ROOM 208) Construction Plan 3A- revised closet layout to reflect as-built condition Finish Plan 4A - revised closet layout to reflect as-built condition Finish Plan 5A - revised closet layout to reflect as-built condition A442 ENLARGED GUEST ROOM PLANS—QQ1L (ROOM 205) Construction Plan 3A - revised closet layout to reflect as-built condition Finish Plan 4A- revised closet layout to reflect as-built condition Finish Plan 5A - revised closet layout to reflect as-built condition A444 ENLARGED GUEST ROOM PLANS—KEX(ROOM 439) Construction Plan 3A - J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx June 20, 2017 The Widewaters Group Page 6 of 3 revised closet layout to reflect as-built condition Finish Plan 4A - revised closet layout to reflect as-built condition Finish Plan 5A - revised closet layout to reflect as-built condition A445A ENLARGED GUEST ROOM PLANS—KKCON (ROOM 405) Demolition Plan 2A— revised view title Construction Plan 3A- revised view title Finish Plan 4A - revised view title Finish Plan 5A - revised view title Reflected Ceiling Plan 6A- revised view title A445B ENLARGED GUEST ROOM PLANS—KKCON(ROOM 505) Demolition Plan 2A— revised view title Construction Plan 3A - revised view title Finish Plan 4A- revised view title Finish Plan 5A - revised view title Reflected Ceiling Plan 6A- J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx June 20, 2017 , TheNWidewaters Group Page 7 of 3 revised view title A446A ENLARGED GUEST ROOM PLANS—KKCONR(ROOM 403) Demolition Plan 2A— revised view title Construction Plan 3A - revised view title Finish Plan 4A- revised view title Finish Plan 5A - revised view title Reflected Ceiling Plan 6A - revised view title A446B ENLARGED GUEST ROOM PLANS—KKCONR LOFT (ROOM 503) Demolition Plan 2A— revised view title Construction Plan 3A - revised view title Finish Plan 4A- revised view title Finish Plan 5A - revised view title Reflected Ceiling Plan 6A- revised view title A501 GUESTROOM MILLWORK DETAILS & CONDO STAIR DETAIL Enlarged Plan Detail 4D— revised closet detail to reflect as-built condition J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx June 20, 2017 The Widewaters Group Page 8 of 3 A502 FIREPLACE DETAILS Enlarged Plan- Fireplace 5A— revised fireplace layout to show new fireplace selection Section Detail—Hearth 6A— revised details to show new fireplace hearth requirements Section Detail—Head 6B revised detail to show new fireplace head requirements Plan Detail—Fireplace 2B revised detail to show new fireplace dimensions Section —Fireplace 5C revised section to show new fireplace details and dimensions A601 MILLWORK - COFFEE BAR Plan 2A— revised made market coffee bar layout and dimensions Reflected Ceiling Plan 2C— revised made market reflected ceiling plan to reflect plan changes Elevation 5D— revised elevation to reflect plan changes in made market coffee bar D111 DEMOLITION PLAN—1st FlOOR Demo Plan 6A— added demolition of portion of existing wall for new door at Storage Room 142 D113 DEMOLITION PLAN—4TH FLOOR& LOFT Demo Plan 6A— modified connecting door and 6" of demising wall between room 422 and room 424 to show as demo J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx June 20, 2017 The Widewaters Group Page 9of3 M201 1ST FLOOR DUCTWORK PLAN 1ST FLOOR EQUIPMENT AND DUCTWORK PLAN 6A— Added thermostat locations for first floor equipment. Increased AHU-5 ventilation airflow rate to 400 CFM. E121 1ST FLOOR PLAN Added(3)pole 400A circuit breaker in available switchgear space. Added (42)pole 400A panel `LLF' in meeting room storage 153 being fed from new 400A breaker. E131 1ST FLOOR PLAN—MECHANICAL POWER Added recessed unit heater in vestibule. E401 COMPACTOR ENCLOSURE LIGHTING AND POWER Changed circuit designation feeding enclosure load center to new 400A panel LLF'. E403 ENLARGED PLANS—MEETING ROOMS Added digital event reader board power and communication outlets outside of meeting rooms at 48" AFF. E405 ENLARGED PLANS—BALLROOM Adjusted recessed lighting to avoid mechanical ductwork. Added new panelboard schedule for new 400A panel `LLF' E406 ENLARGED PLANS —FITNESS, GUEST LAUNDRY AND MADE MARKET Added new receptacle and data outlet in made market for new ATM. E430 thru E434 ENLARGED GUESTRROM PLANS Added switching in guestroom bathrooms to separate lighting and vent fans. Reposition GFCI receptacles to accommodate new plumbing chase wall for ADA compliant toilets. J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx " sas