DoubleTree, Vail, CO. CCD5 Revision 9 Narrative
T001 Title Sheet- list of drawings change to reflect CCD5, Rev. 9, 07-03-2017
A030 DOOR, FRAME AND HARDWARE TYPES & SCHEDULES
Schedule Door-
added door 152 to schedule
A040 INTERIOR STOREFRONT DETAILS
Detail —Bottom Rail @ Pony Wall 6A
added header note for pony wall
A050 FINISHES
Legend - Toilet Accessories
added tag TA-26 ADA Shower Seat
added tag TA-27 ADA Tub Seat
revised material callouts PLAM-003, PLAM-004 and PNT-006
added grout selection to CT-006 and CT-004
Alll OVERALL PLAN— 1ST FLOOR
Plan 6A-
revised made market coffee bar layout and dimensions
added room 142- kitchen storage
revised men's and women's employee locker room layout and dimensions
added gyp board surround at existing pipe in retail space
revised lobby fireplace dimensions to accommodate new fireplace selection
added baby changing station to women's pool restroom
added furring walls in hallway to conceal existing structural elements
A121 REFLECTED CEILING PLAN—1ST FLOOR PLAN
Plan 6A-
revised made market ceiling layout and dimensions
added room 142—kitchen storage and modified ceiling layout
added gyp board surround at existing pipe in retail space
revised ballroom east wall recessed lighting locations
revised lobby fireplace dimensions to accommodate new fireplace selection
revised hallway ceiling width to accommodate addition of furring walls
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
The Widewaters Group
Page 2 of 3
added soffits for linear diffusers at windows in lobby/lounge
A122 REFLECTED CEILING PLAN—2ND & 3RD FLOORS
deleted detail 4E
Plan 6A -
deleted section reference to detail 4E
Plan 6D -
deleted section reference to detail 4E
A131 1St FLOOR—FINISH PLAN
Finish Plan 6A -
revised made market coffee bar layout and dimensions
added room 142—kitchen storage
added gyp board surround at existing pipe in retail space
revised men's and women's employee locker room layout and dimensions
removed ceiling finish tag WD-004 in the lobby bar area
revised lobby fireplace dimensions to accommodate new fireplace selection
added baby changing station to women's pool restroom
added furring walls in hallway to conceal existing structural elements
added ATM machine in Room 105
A141 1st FLOOR—FF&E PLAN
Overall Plan 6A -
revised made market coffee bar layout and dimensions
added room 142—kitchen storage
revised men's and women's employee locker room layout and dimensions
added baby changing station to womens's pool restroom
added furring walls in hallway to conceal existing structural elements
added ATM machine in Room 105
A401A ENLARGED FLOOR PLAN—LOBBY/LOUNGE/BAR
Enlarged Floor Plan 6A-
revised made market coffee bar layout and dimensions
added gyp board surround at existing piping in retail space
revised fireplace dimensions to accommodate new fireplace selection
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
'• , The Widewaters Group
Page 3of3
A401B ENLARGED FURNITURE PLAN—LOBBY/LOUNGE/BAR
Enlarged Furniture Plan 6A -
revised made market coffee bar layout and dimensions
added gyp board surround at existing piping in retail space
revised fire place dimensions to accommodate new fireplace selection
A401C ENLARGED REFLECTED CEILING PLAN—LOBBY/LOUNGE/BAR
Enlarged Reflected Ceiling Plan 4A -
revised made market coffee bar ceiling layout and dimensions to reflect plan changes
added gyp board surround at existing piping in retail space
added soffits for linear diffusers at windows in lobby/lounge
revised dimensions of recessed lighting to accommodate soffit change
added soffit details 6A and 6B to sheet
A403 ENLARGED PLANS—MEETING ROOMS
Enlarged Floor Plan 3A -
added furring walls in hallway to conceal existing structural elements
A404 ENLARGED PLANS—BACK OF HOUSE
Enlarged Floor Plan 6A -
added room 142—kitchen storage
revised men's and women's employee locker room layout and dimensions
Enlarged Reflected Ceiling Plan 4B -
revised ceiling layout to reflect plan changes of men's and women's employee locker room
Elevation 2D -
revised elevation to show addition of room 142
Enlarged Floor Plan—Employee Breakroom & Locker Room 4A-
added furring walls in hallway to conceal existing structural elements
A405 ENLARGED PLANS—BALLROOM
Reflected Ceiling Plan 5A -
revised east wall recessed lighting locations
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
The Widewaters Group
Page 4 of 3
A406 ENLARGED ACCESSIBLE GUEST ROOM PLANS—KARI (ROOM 237)
Elevation 6D -
removed coffee bar wing wall at made market
A410 ENLARGED TOILET PLAN
Plan - Pool Restrooms 4A -
added baby changing station to women's pool restroom and added tag TA-12
added shower seat tag TA-26
Elevation 3C -
added baby changing station to women's pool restroom elevation
Elevation 5C—
added shower seat tag TA-26
A432 ENLARGED ACCESSIBLE GUEST ROOM PLANS—KARI (ROOM 237)
Furniture Plan 5A -
added accessory tag TA-26
Elevation 2C -
added accessory tag TA-26
A434 ENLARGED ACCESSIBLE GUEST ROOM PLANS—QQARI(ROOM 235)
Furniture Plan 5A -
added accessory tag TA-26
Elevation 4C -
added accessory tag TA-26
A437A ENLARGED ACCESSIBLE GUEST ROOM PLANS—KCONAL (ROOM 424)
Demolition Plan 2A -
revised connecting door and 6"of demising wall to show as demo to accommodate 36"
accessible door
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
", ,The Widewaters Group
Page 5 of 3
A437B ENLARGED GUESTROOM PLANS—KCONL LOFT (ROOM 524)
Construction Plan 3A -
added wing wall to conceal fire sprinkler piping
Finish Plan 4A-
added wing wall to conceal fire sprinkler piping
Furniture Plan 3A -
added wing wall to conceal fire sprinkler piping
Reflected Ceiling Plan 6A-
added wing wall to conceal fire sprinkler piping
Elevation 5B -
added wing wall to conceal fire sprinkler piping
A441 ENLARGED GUEST ROOM PLANS—K1L (ROOM 208)
Construction Plan 3A-
revised closet layout to reflect as-built condition
Finish Plan 4A -
revised closet layout to reflect as-built condition
Finish Plan 5A -
revised closet layout to reflect as-built condition
A442 ENLARGED GUEST ROOM PLANS—QQ1L (ROOM 205)
Construction Plan 3A -
revised closet layout to reflect as-built condition
Finish Plan 4A-
revised closet layout to reflect as-built condition
Finish Plan 5A -
revised closet layout to reflect as-built condition
A444 ENLARGED GUEST ROOM PLANS—KEX(ROOM 439)
Construction Plan 3A -
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
The Widewaters Group
Page 6 of 3
revised closet layout to reflect as-built condition
Finish Plan 4A -
revised closet layout to reflect as-built condition
Finish Plan 5A -
revised closet layout to reflect as-built condition
A445A ENLARGED GUEST ROOM PLANS—KKCON (ROOM 405)
Demolition Plan 2A—
revised view title
Construction Plan 3A-
revised view title
Finish Plan 4A -
revised view title
Finish Plan 5A -
revised view title
Reflected Ceiling Plan 6A-
revised view title
A445B ENLARGED GUEST ROOM PLANS—KKCON(ROOM 505)
Demolition Plan 2A—
revised view title
Construction Plan 3A -
revised view title
Finish Plan 4A-
revised view title
Finish Plan 5A -
revised view title
Reflected Ceiling Plan 6A-
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
, TheNWidewaters Group
Page 7 of 3
revised view title
A446A ENLARGED GUEST ROOM PLANS—KKCONR(ROOM 403)
Demolition Plan 2A—
revised view title
Construction Plan 3A -
revised view title
Finish Plan 4A-
revised view title
Finish Plan 5A -
revised view title
Reflected Ceiling Plan 6A -
revised view title
A446B ENLARGED GUEST ROOM PLANS—KKCONR LOFT (ROOM 503)
Demolition Plan 2A—
revised view title
Construction Plan 3A -
revised view title
Finish Plan 4A-
revised view title
Finish Plan 5A -
revised view title
Reflected Ceiling Plan 6A-
revised view title
A501 GUESTROOM MILLWORK DETAILS & CONDO STAIR DETAIL
Enlarged Plan Detail 4D—
revised closet detail to reflect as-built condition
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
The Widewaters Group
Page 8 of 3
A502 FIREPLACE DETAILS
Enlarged Plan- Fireplace 5A—
revised fireplace layout to show new fireplace selection
Section Detail—Hearth 6A—
revised details to show new fireplace hearth requirements
Section Detail—Head 6B
revised detail to show new fireplace head requirements
Plan Detail—Fireplace 2B
revised detail to show new fireplace dimensions
Section —Fireplace 5C
revised section to show new fireplace details and dimensions
A601 MILLWORK - COFFEE BAR
Plan 2A—
revised made market coffee bar layout and dimensions
Reflected Ceiling Plan 2C—
revised made market reflected ceiling plan to reflect plan changes
Elevation 5D—
revised elevation to reflect plan changes in made market coffee bar
D111 DEMOLITION PLAN—1st FlOOR
Demo Plan 6A—
added demolition of portion of existing wall for new door at Storage Room 142
D113 DEMOLITION PLAN—4TH FLOOR& LOFT
Demo Plan 6A—
modified connecting door and 6" of demising wall between room 422 and room 424 to
show as demo
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\170703 CCD05\CCD05 elec Narrative.docx
June 20, 2017
The Widewaters Group
Page 9of3
M201 1ST FLOOR DUCTWORK PLAN
1ST FLOOR EQUIPMENT AND DUCTWORK PLAN 6A—
Added thermostat locations for first floor equipment. Increased AHU-5 ventilation
airflow rate to 400 CFM.
E121 1ST FLOOR PLAN
Added(3)pole 400A circuit breaker in available switchgear space.
Added (42)pole 400A panel `LLF' in meeting room storage 153 being fed from new
400A breaker.
E131 1ST FLOOR PLAN—MECHANICAL POWER
Added recessed unit heater in vestibule.
E401 COMPACTOR ENCLOSURE LIGHTING AND POWER
Changed circuit designation feeding enclosure load center to new 400A panel LLF'.
E403 ENLARGED PLANS—MEETING ROOMS
Added digital event reader board power and communication outlets outside of meeting
rooms at 48" AFF.
E405 ENLARGED PLANS—BALLROOM
Adjusted recessed lighting to avoid mechanical ductwork.
Added new panelboard schedule for new 400A panel `LLF'
E406 ENLARGED PLANS —FITNESS, GUEST LAUNDRY AND MADE MARKET
Added new receptacle and data outlet in made market for new ATM.
E430 thru E434 ENLARGED GUESTRROM PLANS
Added switching in guestroom bathrooms to separate lighting and vent fans.
Reposition GFCI receptacles to accommodate new plumbing chase wall for ADA
compliant toilets.
J:\The Widewaters Group\2.160036.0-TWG-DoubleTree Vail,CO Conversion\Record\1 70703 CCD05\CCD05 elec Narrative.docx
"