Loading...
HomeMy WebLinkAboutB17-0014_ED-PA-100_1497477719.pdfDN DN DN DN DN DN UP T PNL "EPG1" PNL "LPM1" VFD-CT1 VFD-CT2 PNL "LPBR" PNL "LPBP" PNL "LPBH" PNL "LPBG" PNL "LPBF" SWBD - LSB 120/208V, 3Ø, 4W SWBD - LMB 120/208V, 3Ø, 4W PNL "LPBB" PNL "LPBA" CT-1 CT-2 CB T T T T T T T CBCBCB VFD VFD 225A CB MKT STORAGE 75kVA 75kVA 75kVA 45kVA 150kVA 150kVA 400A CB MKT DB1 T6 400A TO HR3 TO LL1 ELD SITE LTG CONTROL HP2 EM1 200A ATS DISC. EM2 DISC. EM DISC. EM3 EM4 2000A MCB 2000A MCB 2000A1200A1200A MS-1 VFD VFD VFD VFD OVERALL ELECTRICAL DEMOLITION PLAN LOWER LEVEL ED-PA-100 ACTIVITY Draw Design Manager BY Check P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S EST. 1915 DATE REVISIONS DESCRIPTION NO. FILE LOG STAMP 2017 © LEO A DALY Company Project No. 012-10378-000 AUGUST 19, 2016 5307 E. Mockingbird Lane, Suite 400 Dallas, TX 75206 USA Tel 214-526-1144 Fax 214-526-1411 GO, KA Monroe & Newell alibre VAIL CASCADE RESORT 1300 WESTHAVEN DRIVE VAIL, CO 81657 OWNER: VAIL HOTEL PARTNERS 1880 CENTURY PARK EAST SUITE 1016 LOS ANGELES, CA 90067 01/06/2017 DESIGN DEVELOPMENT / PROGRESS THIS DOCUMENT IS RELEASED FOR TH PURPOSE OF DESIGN DEVELOPMENT AND PROGRESS UNDER THE AUTHOR OF MARK B. MURPHY, PE #45799 ON JU 8, 2016. IT IS NOT TO BE USED FOR OTHER PURPOSES. 08/19/2016 DESIGN DEVELOPMENT / PROGRESS THIS DOCUMENT IS RELEASED FOR TH PURPOSE OF DESIGN DEVELOPMENT AND PROGRESS UNDER THE AUTHOR OF MARK B. MURPHY, PE #45799 ON JU 8, 2016. IT IS NOT TO BE USED FOR OTHER PURPOSES. 08/19/2016 09/09/2016 06/14/17