Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B17-0014_M-PA-110_1497477725.pdf
DN DN SERVICE DN DN DN DN UP LOADING DOCK TUNNEL TO CONFERENCE CENTER DN DN SERVICE DN DN DN DN UP LOADING DOCK TUNNEL TO CONFERENCE CENTER OVERALL MECHANICAL PIPING FLOOR PLAN LOWER LEVEL M-PA-110 1. --- 1. REFER TO M-PA-001 FOR CONSTRUCTION NOTES. ACTIVITY Draw Design Manager BY Check P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S EST. 1915 DATE REVISIONS DESCRIPTIONNO. FILE LOG STAMP 2017© LEO A DALY Company Project No.012-10378-000 AUGUST 19, 2016 5307 E. Mockingbird Lane, Suite 400 Dallas, TX 75206 USA Tel 214-526-1144 Fax 214-526-1411 GO, KA Monroe & Newell alibre VAIL CASCADE RESORT 1300 WESTHAVEN DRIVE VAIL, CO 81657 OWNER: VAIL HOTEL PARTNERS 1880 CENTURY PARK EAST SUITE 1016 LOS ANGELES, CA 90067 ACTIVITY Draw Design Manager BY Check P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S EST. 1915 DATE REVISIONS DESCRIPTION NO. FILE LOG STAMP 2017 © LEO A DALY Company Project No. 012-10378-000 AUGUST 19, 2016 5307 E. Mockingbird Lane, Suite 400 Dallas, TX 75206 USA Tel 214-526-1144 Fax 214-526-1411 GO, KA Monroe & Newell alibre VAIL CASCADE RESORT 1300 WESTHAVEN DRIVE VAIL, CO 81657 OWNER: VAIL HOTEL PARTNERS 1880 CENTURY PARK EAST SUITE 1016 LOS ANGELES, CA 90067 06/14/17