Loading...
HomeMy WebLinkAboutB17-0038_A6.1.pdf Z 0.,� NEN (I) LAYER TYVEK COMMERIALWRAP 1 \ r,, (2ND LAYER) �� EXISTING 2X6 FRAME WALL W/ INSULATION ` ' m: _ FLASHING W/DRIP EDGE, osi.•n� NEN (I) LAYER TYVEK DRAINWRAP 1 RE: FLASHING DETAIL (IST LAYER) �..., NEN BITUTHENE, RE: SPEC., NOTES 4 SPEC W EXTEND 3b UP WALL .., . NEN STUCCO SYSTEM, RE: SPEC. - - NEW 2X6 R.S. CEDAR, t''. a NEW 1/2" 05B SHEATHING WINDOW HEAD TRIM A�2 :;; NEN ::::::::I:: SPEC. 'TYVEKI PRA INRAP RE: SPEC.. 1 NEW 2X6 R.S. CEDAR,„....._ . WINDOW JAMB TRIM VICTOR MARKNEN CASING WINDOW D O N A L D S O N % ...J / IL RE: SPEC - r' NEW STONE VENEER, RE: SPEC. / „NEW STUCCO SYSTEM, RE: SPEC. it...... _' NEW 2"X3" METAL FLASHING, RE: SPEC = _• NEW SELF-FURRED WOVEN WIRE, RE: SPEC. m \ NEN 2” SNAPPED EDGE STONE CAP, — 111 1 NEW 2X6 R.S. CEDAR, I • SLOPE TO DRAIN MIN. WINDOW SILL TRIM �• 4 NEN 1/2" 055 SHEATHING PLACE NAILS 50 THE NAILS _. ARE COVERED BY THE STONE NEW 1/2" OSB SHEATHING 1 _NEN (I) LAYER TYVEK GOMMERGIALWRAP ! NEW I"X3" METAL FLASHING / R ETA EXPANDED METAL LATHRE: SPEC I Pi 1 LAYER) (At) 1 i 7---1 Oi. W/ DRIP EDGE, RE: SPEC. / , 0.0,1000 NEW (1) LAYER TYVEK COMMERCIALWRAP NEW LAYER TYVEK DRAINWRAP / y NEN 8" GONTINIOUS METAL ) 4//111■11. \ SCALE: I 1/211 = I'-0" z •,, -4. (2ND LAYER) . (IST LAYER) FLASHING, RE: SPEC _ \ mir 1 NEW METAL STANDING I \ ARCHITECTURE 4 \ .- NEW (I) LAYER TYVEK DRAINWRAP �� 1 @ SEAM ROOF BY OWNER > r� __• (IST LAYER) • EXISTING 2 FRAME WALL INSULATION = \ 1 PLANNING III ' ps . : 411i ,\ �. \ ------------------------ ; \ „� 1RE8 SP1=CHANNEL LAP CEDAR SIDING, INTERIORS t . �— NEW R-13 INSULATION =: . \ NEW ICE 4 WATER SHIELD SINCE 1977 N �S � NEN PT CANT STRIP, 45 DEGREE " • NEW (I) LAYER TYVEK MAIM/RAP w (7 � EXISTING 2X6 FRAME WALL W/ INSULATION ANGLE NEW ROOF SHEATHING, (I5T LAYER) 2� ;