Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B17-0066_P-6_02-01_1498500462.pdf
10i OF go ..,„pAii*„ 4 E .1 X PLUMBING GENERAL NOTES PLUMBING SPECIE/CATIONS. PLUMBING L L GEND , p ' 1170716 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE 1. THE WORK OF THIS SECTION SHALL INCLUDE BUT NOT LIMITED TO: LATEST EDITIONS OF THE RULES, REGULATIONS AND CODES OF THE 1.a. DOMESTIC COLD, HOT AND RE-CIRCULATION WATER DISTRIBUTION SYSTEM PIPING SYMBOLS PLUMBING LAYERS PLUMBING ABBREVIATIONS 06/26/17 STATE OF COLORADO AND THE LOCAL JURISDICTIONAL AUTHORITY. TO SERVE ALL FIXTURES AND EQUIPMENT AS INDICATED SYMBOL DESCRIPTION ABBR. DESCRIPTION1.b. SANITARY SOIL WASTE AND VENT SYSTEMS TO SERVE ALL FIXTURES AND 2. PLUMBING CONTRACTOR SHALL PAY FOR ALL LABOR, MATERIAL, EQUIPMENT AS INDICATED OBD OPPOSED BLADE DAMPER EQUIPMENT PERMITS AND FEES REQUIRED FOR THE COMPLETE 1.c. NATURAL GAS DISTRIBUTION SYSTEM TO SERVE ALL GAS-FUELED BELOW GRADE SANITARY SEWER AC AIR COMPRESSOR OC ON CENTER INSTALLATION OF ALL SYSTEMS IN THIS SECTION ON WORK. EQUIPMENT. COORDINATE WITH LOCAL NATURAL GAS UTILITY PROVIDER TO DOMESTIC COLD WATER ADJ ADJUSTABLE OD OUTSIDE DIAMETER ESTABLISH GAS SERVICE COMPLETE WITH METER AND REGULATOR SET 0 PIPING UP 3. THIS CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL _ - DOMESTIC HOT WATER AFC ABOVE FINISHED CEILING P PUMP TOWN STAMP OTHER BUILDING TRADES TO ENSURE PROPER INSTALLATION OF 2. PIPING MATERIAL AND FITTINGS.• 0 PIPING DOWN AFF ABOVE FINISHED FLOOR PC PLUMBING CONTRACTOR SYSTEMS SHOWN ON THESE DOCUMENTS. 2.a. DOMESTIC WATER PIPING SHALL BE TYPE "L" COPPER DRAWN TEMPER G NATURAL GAS (11" W.C.) WITH WROUGHT COPPER FITTINGS OR PEX ABOVE FLOOR AND TYPE 'K" CONCENTRIC REDUCER AFG ABOVE FINISHED GRADE PD PRESSURE DROP 4. LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. COPPER, PEX OR AQUA THERM BELOW FLOOR. ALL COPPER JOINTS SHALL W SANITARY WASTE ABOVE GRADE AHU AIR HANDLING UNIT PH PHASE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF BE MADE WITH 95/5 TIN/ANTIMONY OR SILVER SOLDERED. NO LEAD BALANCING VALVE SANITARY WASTE BELOW GRADE AP ACCESS PANEL PLBG PLUMBING EXISTING UTILITIES BEFORE STARTING WORK OF THIS SECTION. MAKE ARCH ARCHITECT (URAL) PPM PARTS PER MILLION SOLDER ALLOWED. PVC CANNOT BE USED FOR DOMESTIC HOT WATER REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING UTILITIES. IF VENT AS AIR SEPARATOR PSF POUNDS PER SQUARE FOOT PIPING ENG. PSI POUNDS PER SQUARE INCH INDICATED POINTS OF CONNECTION CANNOT BE MADE TO EXISTING I PLUG VALVE VENT 2.b. WASTE, VENT AND STORM DRAIN PIPING SHALL BE DWV SCHEDULE 40 UTILITIES AS FOUND, THE CONTRACTOR SHALL NOTIFY THE ASTM AMERICAN SOCIETY OF TESTING & PSIG POUNDS PER SQUARE INCH GAUGE PVC W/SOLVENT WELDED JOINTS, NON-CELLULAR CORE. ARCHITECT PRIOR TO INSTALLING ANY WORK WHICH MAY BE 2.c. NATURAL GAS PIPING 3" AND SMALLER SHALL BE THREADED SCHEDULE O -RADON MATER/ALS PVC POLYVINYL CHLORIDE AFFECTED. PRESSURE GAUGE AVG AVERAGE 40 BLACK STEEL WITH SCREWED MALLEABLE IRON FITTINGS. P/PING 4" AUX AUXILIARY QTY QUANTITY 359 5. PLUMBING CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL AND LARGER SHALL BE WELDED SCHEDULE 40 BLACK STEEL. ALL II UTILITY METERS AND UTILITY CONNECTIONS. OUTDOOR EXPOSED PIPING SHALL BE PAINTED WITH OUTDOOR ENAMEL B BOILER RAT RETURN AIR TEMPERATURE POLYETHYLENE PLASTIC PIE (PE) SHALL BE USED ONLY FOR OUTSIDE THERMOMETER BAS BUILDING AUTOMATION RE REFERENCE,SYSTEMS REFLECTED CEILING REFER D E S I G N 6. THE PLUMBING CONTRACTOR SHALL REVIEW NEW AND/OR EXISTING UNDERGROUND INSTALLATIONS WITH WARNING TAPE AND/OR TRACER WIRE BAS BELOW FINISHED FIELD CONDITIONS PRIOR TO THE PURCHASE AND INSTALLATION OF INSTALLED ABOVE THE PIPE. PE SHALL CONFORM TO ASTM D2513 /� SECT/ON LETTER BLDG BUILDING READ REQUIRED ANY EQUIPMENT, MATERIAL, ETC., AND SHALL INFORM THE 2.d. CONDENSATE PIPING AND INDIRECT DRAIN PIPING SHALL BE TYPE leT PRESS. AND TEMP RELIEF A BOS BOTTOM OF STRUCTURE REV REVISION, or REVISE VALVE SECTION DRAWN THIS SHEET - ARCHITECT OR GENERAL CONTRACTOR OF ANY DISCREPANCIES FOR COPPER UP TO 1',' TYPE DWV TUBING AND COPPER FITTINGS FOR 1 %4" Mr r BTU BRITISH THERMAL UNIT RH RELATIVE HUMIDITY RESOLUTION. SUBMISSION OF A BID ACKNOWLEDGES FULL AND LARGER SIZES AND 95-5 SOLDER JOINTS REDUCED PRESSURE BFP RLA RUNNING LOAD AMPS RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL DETAIL SHOWN ON THIS SHEET CFM CUBIC FEET PER MINUTE RPM REVOLUTIONS PER MINUTE SYSTEM, AND THAT UNDERSTANDS THOROUGHLY THE SCOPE OF THE 3. INSULATION IS REQUIRED ON ALL WATER SUPPLY PIPING (HOT AND COLD) -N N- DOUBLE CHECK BFP CH CHILLER/WATER COOLED CHILLER RTU ROOFTOP UNIT ---...S0'` ', WORK INVOLVED, AND HAS INCLUDED ON THE BID ALL THE ABOVE FINISHED FLOOR. INSULATION TO BE EQUAL TO ARMAFLEX'(K=0.27 A DETAIL LLI/ER DESIGNATION CIRC CIRCULATING ' LIC4 �%� NECESSARY ITEMS TO CARRY OUT THIS SECTION OF WORK. * / * *• LESS) X GATE VALVE CL CENTER LINE SCHED SCHEDULE "O .. .c-Niy*•.:- t� BTU IN H SQFT F OR PIPE INSULATION WITH SEALED OR TAPED SEAMS. iETAIL DRAWN THIS SHEET SF SQUARE FEET eV". 1i 3.a. DOMESTIC COLD WATER: CLG CEILING i i , 7. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT X GLOBE VALVE CMU CONCRETE MASONRY UNIT SH SENSIBLE HEAT i [i.e.. i. SHOW EVERY PIPING OFFSET REQUIRED. THE CONTRACTOR SHALL 3.a.a. PIPE SIZE: %2" TO 1 %2" MIN. INSULATION THICKNESS: %2" ; ACCESS DOOR CONN CONNECT/ON SIM SIMILAR11'#.•: i 3.a.b. PIPE SIZE: 2" TO 6" MIN. INSULATION THICKNESS: 1" i ' COORDINATE WITH THE EXISTING AND/OR NEW STRUCTURE AND CHECK VALVE CONT CONTINUOUS, CONTINUATION SP STATIC PRESSURE '+ • .,Ta\;,,pzt..e,\- .' 3.b. DOMESTIC HOT WATER: WITH OTHER TRADES TO AVOID CONFLICTS AND TO MINIMIZECO CLEANOUT SPEC SPECIFICATION �� INTERRUPTION OF SERVICES. 3.b.o. PIPE SIZE: 1/2" TO 1 /2 MIN. INSULATION THICKNESS: 1" I l- BUTTERFLY VALVE TAGS CPVC CHLORINATED POLYVINYL CHLORIDE SS SANITARY SEWER � � _�=3.b.b. P/PE SIZE.: 2" TO 6" MIN. INSULATION THICKNESS.: 1 %2" CT COOLING TOWER SQ SQUARE � 8. DO NOT SCALE DRAWINGS FOR MEASUREMENTS. 3.c. CONDENSATE P/PING: 3/a" FOAM PLASTIC SYMBOL DESCRIPTION SSSC SOLID STATE SPEED CONTROL BALL VALVE STD STANDARD 9. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND 4. ALL PIPE INSULATION SHALL RUN CONTINUOUSLY THROUGH FLOORS, WALLS P DB DRY BULB TEMPERATURE DISCIPLINE STAMP WORKMANLIKE MANNER SATISFACTORY TO AND MEETING THE AND PARTITIONS. PIPE INSULATION SHALL BE MITERED AT ELBOWS AND TEES DQ HOSE END DRAIN VALVE v DIADIAMETER EQUIPMENT TAG DDC DIRECT DIGITAL CONTROL APPROVAL OF THE ARCHITECT TO ENSURE COMPLETE COVERAGE OF PIPING H TC TEMPERATURE CONTROL -I I UNION DHW HOT WATER - DOMESTIC TF TRANSFER FAN 10. ALL MATERIALS, APPLIANCES & EQUIPMENT, SHALL BE NEW AND 6. SHUTOFF VALVES SHALL BE INSTALLED AS PER SECTION 606.2 OF THE 2015 O KEY NOTE DCW COLD WATER - DOMESTIC TSP TOTAL STATIC PRESSURE ON DOWN TSTAT THERMOSTAT FREE FROM ALL DEFECTS AND OF THE MAKE, BRAND AND QUALITY IPC CODE. VALVES INSTALLED IN LOCATIONS NOT ADJACENT TO THE FIXTURE -0-- PUMP DWG DRAWING TXV THERMOSTATIC EXPANSION VALVE SPECIFIED OR APPROVED SIMILAR SHALL BE IDENTIFIED, INDICATING THE FIXTURE OR APPLIANCE SERVED. TYP TYPICAL 11. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT SET 7 BRANCH HOT WATER & COLD WATER PIPE SIZE TO FIXTURE SHALL MATCH 4 CONNECT NEW TO EX/ST'G E EXISTING OF PLANS AT THE COMPLETION OF THE PROJECT WITH ALL VALVE SIZE. I.E., 3/4" SHOWER VALVE SHALL HAVE A 3/4" HOT & COLD EA EACH UCD UNDERCUT DOOR CHANGES NOTED. WATER PIPE CONNECTION. O THERMOSTAT EC ELECTRICAL CONTRACTOR OH UNIT HEATER ECC ECCENTRIC UL UNDERWRITERS LABORATORIES, INC. 12. ALL EQUIPMENT, MATERIAL AND INSTALLATION SHALL BE GUARANTEED 8. ANY PLUMBING FIXTURES WITH A COMMON SHUT OFF VALVE (l.E. PRE-RINSE , Ts TEMPERATURE SENSOR EFF EFFICIENCY CLEC ELECTRICALUNO UNLESS NOTED OTHERWISE TO BE FREE OF DEFECTS FOR A PERIOD ON ONE (1) YEAR AFTER KITCHEN SINK, MOP SINK) ARE TO INCLUDE A CHECK VALVE ON THE HOT & ENGR ENGINEER VAV VAR/ABLE AIR VOLUME FINAL ACCEPTANCE OF WORK OR IN ACCORDANCE WITH THE COLD WATER VALVES TO PREVENT INTERCONNECTION OF HOT & COLD WATER Ts EQ EQUAL VERT VERTICAL MANUFACTURER'S STANDARD GUARANTEE, IF LONGER. EXISTING LINES PIPE MOUNTED TEMP SENSOR EQUIP EQUIPMENT VFD VAR/ABLE FREQUENCY DRIVE a EQUIPMENT IS EXCLUDED FROM WARRANTY REQUIREMENT. ET EXPANSION TANK VTR VENT THROUGH ROOF 9. VALVES SHALL BE NIBCO, JENKINS, POWELL, STOCKHAM, WATTS, WALWORTH FCO O FLOOR CLEANOUT ETR EXISTING TO REMAIN 13. CATALOG INFORMATION AND CUTS SHEETS OF ALL EQUIPMENT AND OR EQUIVALENT APPROVED BY ENGINEER. ERWSD EAGLE RIVER WATER AND SANITATION W WASTE PIPE DEVICES SHALL BE SUBMITTED FOR REVIEW. DISTRICT W/ WITH 10. ACCESS DOORS TO BE PROVIDED FOR ALL VALVES AND DEVICES REQUIRING WCO WALL CLEANOUT W/O WITHOUT 14. PLUMBING CONTRACTOR IS TO EMPLOY THE SERVICES OF THE G.C. ACCESS WHEN LOCATED IN WALLS OR ABOVE INACCESSIBLE CEILING F DEGREES FAHRENHEIT WB WET BULB TEMPERATURE FOR CUTTING AND PATCHING OF WALLS, FLOORS & CEILINGS CONSTRUCTIONS. ACCESS DOORS TO BE RATED WHERE INSTALLED IN RATED FCO FLOOR CLEANOUT WC WATER COLUMN RELATED TO THE INSTALLATIONS OF PLUMBING EQUIPMENT & ASSEMBLIES. GCO O GRADE CLEANOUT SYSTEMS FLA FULL LOAD AMPS WCO WALL CLEANOUT 11. AN APPROVED BACKFLOW PREVENTER SHALL BE INSTALLED UPSTREAM OF ANY SA FLEX FLEXIBLE WG WATER GAUGE O 15. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND SOURCE OF 0 SHOCK ABSORBER FT FAN TERMINAL, OR FEET WPD WATER PRESSURE DROP ALL PLUMBING EQUIPMENT FROM FOREIGN MATERIAL DURING CONTAMINATION. NO INSULATION IS PERMITTED ON BACKFLOW PREVENTER 0 © GAL GALLON XFER TRANSFER o CONSTRUCTION. UPON COMPLETION OF THE WORK UNDER THIS ASSEMBLY SOLENOID VALVE GAL V GALVANIZED SECTION THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, 4 GC GENERAL CONTRACTOR E EQUIPMENT & DEBRIS AND SHALL CLEAN AND WASH ALL ITEMS 12. VACUUM BREAKERS SHALL BE PROVIDED FOR ALL FIXTURES TO WHICH HOSES �a AND EQUIPMENT. MAY BE ATTACHED. VACUUM BREAKERS SHALL BE PERMANENTLY ATTACHED. GPH GALLONS PER HOUR N MOTORIZED VALVE GPM GALLONS PER MINUTE 13N . WATER HAMMER PROTECTION DEVICES SHALL BE INSTALLED ON ALL WATER 4CE DISTRIBUTION P/PING SERVING EQUIPMENT WITH QUICK CLOSING VALVES (ICE H HEIGHT N MAKERS, DISHWASHERS, FLUSH VALVES, WASHING MACHINES, WATER COOLERS, HOSE BIB HD HEAD ETC.) / HORIZ HORIZONTAL HP HORSEPOWER, or HEAT PUMP O HSTAT HUMIDISTAT N 14. INSTALL AN APPROVED WA TER PRESSURE REDUCING VALVE CONFORMING WITH FLOOR DRAIN HWC HOT WATER CIRCULATING- DOMESTIC ASSE 1003 IF INCOMING WATER PRESSURE TO THE BUILDING EXCEEDS 80 PSI HX HEAT EXCHANGER STATIC qi 15. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM OR FLOOR SINK o AT LEAST THREE FEET ABOVE ANY WINDOW, DOOR, OPENING, AIR INTAKE OR C VENT SHAFT. E � 16. CLEANOUTS SHALL BE INSTALLED AS PER SEC. 708 OF THE ADOPTED IRC 0 DECK DRAIN ISSUE N CODE. CLEANOUTS SHALL BE PLACED IN READILY ACCESSIBLE LOCATIONS. 17. PROTECT ROOF RECEPTOR ON ROOF FROM RAIN WATER BY ELEVATING THE Town of Vail Permit Set RIM 2-1/2" ABOVE ROOF SURFACE. tg) OVERFLOW ROOF DRAIN 18. PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR WALLS, FPHB N FLOORS, CEILINGS AND ROOFS. r FREEZEPROOF HOSE BIBB CONSULTANT 4 19. ENSURE PIPING LOCATED ON EXTERIOR WALLS (OR OTHER WALLS EXPOSED TO a FREEZING CONDITIONS) IS INSTALLED ON WARM-SIDE OF WALL INSULATION. a ° 6SG M 20. PROVIDE U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THRU FIRE RATED o, WALLS, FLOORS AND CEILINGS. 1 18 West Sixth Street, Suite 200 21. PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS Glenwood Springs, CO 81601 cl AT ALL PIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES 970.945. 1004 www.s m inc.com IN CONTACT WITH ANY PORTION OF THE STRUCTURE APPLIES TO ALL WATER g AND WASTE PIPING. o' DRAWN BY: TC I 22. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE CHECKED BY: BC TO A GREAT EXTENT AS POSSIBLE. ALL LINES NOT CONCEALED TO BE SECURED 6" OFF FLOOR AND 3/4" FROM WALL AND CEILINGS USING OFFSET SHEET TITLE BRACKETS. ci N 23. SUPPORT ALL P/PING IN ACCORDANCE WITH THE ADOPTED IRC. ANY Plumbing Notes & cnSUSPENDED MATERIALS SHALL BE DIRECTLY SUPPORTED BY THE BUILDING Specification s o STRUCTURE. m c h 0 C 1.)--, REVISION iNo. Description Date o, k ° I J t U N I 0 .k C O E O U O O k C O O I c) U 1 PROJECT NUMBER 2016-453.001 ") ISSUE DATE 05/24/17 d- I CO 0 N SHEET NO. P-6 . 02-01