Loading...
HomeMy WebLinkAboutB17-0114_P-602_1501879560.pdf z ec 15:0 ir TOWN OF VAIL ADOPTED BUILDING CODES PLUMBING SPECIFICATIONS: PLUMBING LEGEND � '� 1. THE WORK OF THIS SECTION SHALL INCLUDE BUT NOT LIMITED TO: �8I0411P INTERNATIONAL BUILDING CODE (2015) 1.a. DOMESTIC COLD, HOT AND RE-CIRCULATION WATER DISTRIBUTION ONO C NATIONAL ELECTRICAL CODE (2014) SYSTEM TO SERVE ALL FIXTURES AND EQUIPMENT AS INDICATED PIPING SYMBOLS PLUMBING LAYERS PLUMBING ABBREVIATIONS _o INTERNATIONAL FUEL GAS CODE (2015) 1.b. SANITARY SOIL WASTE AND VENT AND GREASE WASTE AND VENT ABBR. DESCRIPTION c CO 0) INTERNATIONAL ENERGY CONSERVATION CODE (2015) SYSTEMS TO SERVE ALL FIXTURES AND EQUIPMENT AS INDICATED SYMBOL DESCRIPTION INTERNATIONAL FIRE CODE (2015) 1.c. STORM DRAIN SYSTEM. SD STORM DRAIN - ABOVE GRADE OBD OPPOSED BLADE DAMPER INTERNATIONAL MECHANICAL CODE (2015) 1.d. NATURAL GAS DISTRIBUTION SYSTEM TO SERVE ALL GAS-FUELED STORM DRAIN - BELOW GRADE AC AIR COMPRESSOR OC ON CENTER18v)." 3 INTERNATIONAL PLUMBING CODE 2015 EQUIPMENT. COORDINATE WITH LOCAL NATURAL GAS UTILITY SS BELOW GRADE SANITARY SEWER ADJ ADJUSTABLE OD OUTSIDE DIAMETER 0 ( ) PROVIDER TO ESTABLISH GAS SERVICE COMPLETE WITH METER AND 10 PIPING UP in INTERNATIONAL RESIDENTIAL CODE (2015) COMBINED FIRE AND DOMESTIC WATER AFC ABOVE FINISHED CEILING P PUMP - •- ALL ASSOCIATED LOCAL AMENDMENTS REGULATOR SET I0 PIPING DOWN COMBINATION WASTE AND VENT AFF ABOVE FINISHED FLOOR PC PLUMBING CONTRACTOR (111) - O2. PIPING MATERIAL AND FITTINGS: -D CONCENTRIC REDUCER - DOMESTIC COLD WATER AFG ABOVE FINISHED GRADE PD PRESSURE DROP N O» » AHU AIR HANDLING UNIT PH PHASE N2.a. DOMESTIC WATER PIPING SHALL BE TYPE L COPPER HARD DRAWN DOMESTIC HOT WATER o `nBALANCING VALVE AP ACCESS PANEL PLBG PLUMBINGWITH WROUGHT COPPER FITTINGS OR PEX ABOVE FLOOR AND TYPE O DIRECT OSMOSIS FILTERED WATER ARCH ARCHITECT (URAL) PPM PARTS PER MILLION PLUMBING GENERAL NOTES 'K" COPPER, PEX OR AQUATHERM BELOW FLOOR. ALL COPPER _ _ _ DOMESTIC HOT WATER RECIRC. AS AlR SEPARATOR PSF POUNDS PER SQUARE FOOT aD 0O1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE JOINTS SHALL BE MADE WITH 95/5 TlN/ANTIMONY OR SILVER H�J PLUG VALVE GREASE WASTEENG. PS/ POUNDS PER SQUARE INCH SOLDERED. NO LEAD SOLDER ALLOWED. PVC CANNOT BE USED FOR ASTM AMERICAN SOCIETY OF TESTING & PSIG POUNDS PER SQUARE INCH GAUGE WITH THE LATEST EDITIONS OF THE RULES, DOMESTIC HOT WATER PIPING O IND/RECT WASTEMATERIALS PVC POLYVINYL CHLORIDE REGULAT/ONS AND CODES OF THE STATE OF2.b. WASTE, VENT AND STORM DRAIN PIPING SHALL BE DWV SCHEDULE PRESSURE GAUGE G NATURAL GAS (11" W.C.) AVG AVERAGE *IA OF kt COLORADO AND THE LOCAL JURISDICTIONAL 40 PVC W SOLVENT WELDED JOINTS OR STANDARD WEIGHT CAST AUX AUXILIARY QTY QUANTITY AUTHORITY. / G(10PSI) NATURAL GAS (10 PSI) , ,. .IRON SOIL PIPE WITH BELL AND SPIGOT OR NO-HUB CONNECTIONS sG 1» G2PSI NATURAL GAS (2 PSI) B BOILER RAT RETURN AIR TEMPERATURE C .74 2. PLUMBING CONTRACTOR SHALL PAY FOR ALL 2.c. NATURAL GAS PIPING 3 AND SMALLER SHALL BE THREADED THERMOMETER P(1OPSI) PROPONE GAS (10 PSI) BAS BUILDING AUTOMATION SYSTEMS RCP REFLECTED CEILING PLAN ,M •.. **;.,01Cic c5' �0,LABOR, MATERIAL, EQUIPMENT, PERMITS AND FEES SCHEDULE 40 BLACK STEEL WITH SCREWED MALLEABLE IRONPPROPANE GAS (7" W.C.) BFG BELOW FINISHED GRADE RE REFERENCE, or REFER4.0 ',: ' ��$ REQUIRED FOR THE COMPLETE INSTALLATION OF FITTINGS. PIPING 4" AND LARGER SHALL BE WELDED SCHEDULE 40 BLDG BUILDING READ REQUIRED t - I PRESS. AND TEMP RELIEF SAND AND OIL WASTE ' -�. I, ALL SYSTEMS IN THIS SECTION ON WORK BLACK STEEL. ALL OUTDOOR EXPOSED PIPING SHALL BE PAINTED VALVE 1 P-PIPE-SSFM BOS BOTTOM OF STRUCTURE REV REVISION, or REVISE # WITH OUTDOOR ENAMEL POLYETHYLENE PLASTIC PIPE (PE) SHALL FM BTU BRITISH THERMAL UNIT RH RELATIVE HUMIDITY REDUCED PRESSURE BFP STORM PIPE FORCE MAIN RLA RUNNING LOAD AMPS 17'43.! 3. THE CONTRACTOR IS RESPONSIBLE FOR BE USED ONLY FOR OUTSIDE UNDERGROUND INSTALLATIONS WITH �r,"� f��,y COORDINATING WITH ALL OTHER BUILDING TRADES WARNING TAPE AND/OR TRACER WIRE INSTALLED ABOVE THE PIPE. CFM CUBIC FEET PER MINUTE RPM REVOLUTIONS PER MINUTE , / �� �� DOUBLE CHECK BFP W SANITARY WASTE ABOVE GRADE CH CHILLER/WATER COOLED CHILLER RTU ROOFTOP UNIT 1 .e;'..+..a4*r.c , r TO ENSURE PROPER INSTALLATION OF SYSTEMS PE SHALL CONFORM TO ASTM 02513 SANITARY WASTE BELOW GRADE CIRC CIRCULATING S/DNALV SHOWN ON THESE DOCUMENTS 2.d. CONDENSATE PIPING AND INDIRECT DRAIN PIPING SHALL BE TYPE X GATE VALVE VENT CL CENTER LINE SCHED SCHEDULE � �� "M" COPPER UP TO 1'; TYPE DWV TUBING AND COPPER FITTINGS CLG CEILING SF SQUARE FEET 4. LOCATIONS OF EXISTING UTILITIES SHOWN ARE FOR 1 %4" AND LARGER SIZES AND 95-5 SOLDER JOINTS X GLOBE VALVE CMU CONCRETE MASONRY UNIT SH SENSIBLE HEAT APPROXIMATE. CONTRACTOR SHALL VERIFY EXACTSIM SIMILAR i CONN CONNECTION LOCATIONS AND DEPTHS OF EXISTING UTILITIESCHECK VALVE SECTION LEI IER SP STATIC PRESSURE 3. INSULATION IS REQUIRED ON ALL WATER SUPPLY PIPING (HOT AND A CONT CONTINUOUS, CONTINUATION BEFORE STARTING WORK OF THIS SECTION. MAKE COLD) ABOVE FINISHED FLOOR. INSULATION TO BE EQUAL TO SECTION DRAWN THIS SHEET CO CLEANOUT SPEC SPECIFICATION REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING 'ARMAFLEX"(K=0.28 BTU*lN/H*SQFT*°F OR LESS) PIPE INSULATION WITH I BUTTERFLY VALVE ®� CPVC CHLORINATED POLYVINYL CHLORIDE SS SANITARY SEWER UTILITIES. IF INDICATED POINTS OF CONNECTION DETAIL SHOWN ON THIS SHEET CT COOLING TOWER SQ SQUARE CANNOT BE MADE TO EXISTING UTILITIES AS SEALED OR TAPED SEAMS. 1c5H SSSC SOLID STATE SPEED CONTROL 3.a. DOMESTIC COLD WATER: BALL VALVE STD STANDARD FOUND, THE CONTRACTOR SHALL NOTIFY THE A DETAIL LL l lER DESIGNATION DB DRY BULB TEMPERATURE ARCHITECT PRIOR TO INSTALLING ANY WORK WHICH 3.a.a. PIPE SIZE: 1/2" TO 1 1/2" MIN. INSULATION THICKNESS. 1/2" DQ HOSE END DRAIN VALVE DDC DIRECT DIGITAL CONTROL MAY BE AFFECTED. 3.a.b. PIPE SIZE: 2" TO 6" MIN. INSULATION THICKNESS: 1" Mir PETAL DRAWN THIS SHEET DIA DIAMETER TC TEMPERATURE CONTROL 3.b. DOMESTIC HOT WATER: HI UNION DHW HOT WATER - DOMESTIC TF TRANSFER FAN 5. PLUMBING CONTRACTOR SHALL ARRANGE FOR AND 3.b.a. PIPE SIZE: 1/2" TO 1 1/2" MIN. INSULATION THICKNESS. 3/4" > ACCESS DOOR DCW COLD WATER - DOMESTIC DN DOWNTSP TOTAL STATIC PRESSURE PAY FOR ALL UTILITY METERS AND UTILITY 3.6.6. PIPE SIZE: 2" TO 6" MIN. INSULATION THICKNTHICKNESS: 1" -0- PUMP W TSV THERMOSTAT DWG DRAWING TXV THERMOSTATIC EXPANSION VALVE CONNECTIONS. 3.c. CONDENSATE PIPING: 3/B" FOAM PLASTIC TYP TYPICAL 6. THE PLUMBING CONTRACTOR SHALL REVIEW NEW . CONNECT NEW TO EXIST'G TAGS E EXISTING 4. ALL PIPE INSULATION SHALL RUN CONTINUOUSLY THROUGH FLOORS, SYMBOL DESCRIPTION EA EACH UCD UNDERCUT DOOR AND/OR EXISTING FIELD CONDITIONS PRIOR TO THE WALLS AND PARTITIONS. PIPE INSULATION SHALL BE MITERED AT ELECTRICAL CONTRACTOR UH UNIT HEATER PURCHASE AND INSTALLATION OF ANY EQUIPMENT, ELBOWS AND TEES TO ENSURE COMPLETE COVERAGE OF P/PING. OT THERMOSTAT P ECC ECCENTRIC UL UNDERWRITERS LABORATORIES, INC. MATER/AL, ETC., AND SHALL INFORM THE v EQUIPMENT TAG EFF EFFICIENCY UNO UNLESS NOTED OTHERWISE ARCHITECT OR GENERAL CONTRACTOR OF ANY Ts TEMPERATURE SENSOR ELEC ELECTRICAL 5. PROVIDE 1 " THICK INSULATION WITH A VAPOR BARRIER EQUAL TO ENGR ENGINEER VAV VARIABLE AIR VOLUME DISCREPANCIES FOR RESOLUTION. SUBMISSION OF ARMAFLEX PIPE INSULATION WITH SEALED OR TAPED SEAMS FOR THE Ts O3 KEY NOTE EQ EQUAL VERT VERTICAL A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FIRST 15' OF HORIZONTAL STORM DRAIN PIPE CONNECTED TO THE PIPE MOUNTED TEMP SENSOR EQUIP EQUIPMENT VFD VAR/ABLE FREQUENCY DRIVE FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM, ROOF DRAIN. INSULATION SHALL ALSO BE PROVIDED TO THE ROOF ET EXPANSION TANK VTR VENT THROUGH ROOF AND THAT UNDERSTANDS THOROUGHLY THE SCOPE DRAIN BODY. FCO 0 0 FLOOR CLEANOUT ETR EXISTING TO REMAIN OF THE WORK INVOLVED, AND HAS INCLUDED ON W WASTE PIPE THE BID ALL THE NECESSARY ITEMS TO CARRY ERWSD EAGLE RIVER WATER AND SANITATION OUT THIS SECTION OF WORK. 6. SHUTOFF VALVES SHALL BE INSTALLED AS PER SECTION 606.2 OF THE WCO I WALL CLEANOUT DISTRICT W/ WITH 2015 IPC CODE. VALVES INSTALLED IN LOCATIONS NOT ADJACENT TO W/O WITHOUT J THE FIXTURE SHALL BE IDENTIFIED, INDICATING THE FIXTURE OR F DEGREES FAHRENHEIT WB WET BULB TEMPERATURE 7. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE APPLIANCE SERVED. GCO O GRADE CLEANOUT FCO FLOOR CLEANOUT WC WATER COLUMN AND DO NOT SHOW EVERY PIPING OFFSET FLA FULL LOAD AMPS WCO WALL CLEANOUT 6 REQUIRED. THE CONTRACTOR SHALL COORDINATE SA FLEX FLEXIBLE WG WATER GAUGE 7. BRANCH HOT WATER & COLD WATER PIPE SIZE TO FIXTURE SHALL FT FAN TERMINAL, OR FEET WPD WATER PRESSURE DROP WITH THE EXISTING AND/OR NEW STRUCTURE MATCH VALVE SIZE. I.E., 3/4�� SHOWER VALVE SHALL HAVE A 3/4" _O SHOCK ABSORBER AND WITH OTHER TRADES TO AVOID CONFLICTS HOT & COLD WATER PIPE CONNECTION. © U AND TO MINIMIZE INTERRUPTION OF SERVICES. GAL GALLON XFER TRANSFER Q c 8. ANY PLUMBING FIXTURES WITH A COMMON SHUT OFF VALVE (l.E. SOLENOID VALVE GALV GALVANIZED GC GENERAL CONTRACTOR I) 8. DO NOT SCALE DRAWINGS FOR MEASUREMENTS. © ._ PRE-RINSE , KITCHEN SINK, MOP SINK) ARE TO INCLUDE A CHECK GPH GALLONS PER HOUR •Cl) 9. THE WORK SHALL BE ACCOMPLISHED IN A VALVE ON THE HOT & COLD WATER VALVES TO PREVENT MOTORIZED VALVE GPM GALLONS PER MINUTE Q) THOROUGH AND WORKMANLIKE MANNER INTERCONNECTION OF HOT & COLD WATER LINES 4 H HEIGHT SATISFACTORY TO AND MEETING THE APPROVAL OF HD HEAD 9. VALVES SHALL BE NIBCO, JENKINS, POWELL, STOCKHAM, WATTS, HOSE BIB E i THE ARCHITECT. HORIZ HORIZONTAL WALWORTH OR EQUIVALENT APPROVED BY ENGINEER. ALL SHUT-OFF HP HORSEPOWER, or HEAT PUMP D O VALVES SHALL BE FULL PORT s 10. ALL MATERIALS, APPLIANCES & EQUIPMENT, SHALL HSTAT HUMIDISTAT BE NEW AND FREE FROM ALL DEFECTS AND OF O FLOOR DRAIN HWC HOT WATER CIRCULATING- DOMESTIC O CD E a m THE MAKE, BRAND AND QUALITY SPECIFIED OR 10. ACCESS DOORS TO BE PROVIDED FOR ALL VALVES AND DEVICES HX HEAT EXCHANGER U o APPROVED SIMILAR REQUIRING ACCESS WHEN LOCATED IN WALLS OR ABOVE INACCESSIBLE fri CEILING CONSTRUCTIONS. ACCESS DOORS TO BE RATED WHERE FLOOR SINK IN 11. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF INSTALLED IN RATED ASSEMBLIES. NAS-BUILT SET OF PLANS AT THE COMPLETION OF Q THE PROJECT WITH ALL CHANGES NOTED. 11. AN APPROVED BACKFLOW PREVENTER SHALL BE INSTALLED UPSTREAM M OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY DECK DRAIN 71- 12. ALL EQUIPMENT, MATERIAL AND INSTALLATION SHALL AND SOURCE OF CONTAMINATION. NO INSULATION /5 PERMITTED ON BE GUARANTEED TO BE FREE OF DEFECTS FOR A BACKFLOW PREVENTER ASSEMBLY. PERIOD ON ONE (1) YEAR AFTER FINAL 12. VACUUM BREAKERS SHALL BE PROVIDED FOR ALL FIXTURES TO WHICH 0 OVERFLOW ROOF DRAIN Zi ACCEPTANCE OF WORK OR IN ACCORDANCE WITH HOSES MAY BE ATTACHED. VACUUM BREAKERS SHALL BE �► THE MANUFACTURER'S STANDARD GUARANTEE, IF PERMANENTLY ATTACHED. r FPHB FREEZEPROOF HOSE BIBB LONGER. EXISTING EQUIPMENT IS EXCLUDED FROM E �a WARRANTY REQUIREMENT. 13. WATER HAMMER PROTECT/ON DEVICES SHALL BE INSTALLED ON ALL 'DWATER DISTRIBUTION P/PING SERVING EQUIPMENT WITH QUICK CLOSING 13. CATALOG INFORMATION AND CUTS SHEETS OF ALL VALVES (ICE MAKERS, DISHWASHERS, FLUSH VALVES, WASHING O- EQUIPMENT AND DEVICES SHALL BE SUBMITTED MACHINES, WATER COOLERS, ETC.) N FOR REVIEW. 14. PLUMBING CONTRACTOR IS TO EMPLOY THE 14. INSTALL AN APPROVED WATER PRESSURE REDUCING VALVE SERVICES OF THE G.C. FOR CUTTING AND CONFORMING WITH ASSE 1003 PATCHING OF WALLS, FLOORS & CEILINGS RELATED 15. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET TO THE INSTALLATIONS OF PLUMBING EQUIPMENT & SYSTEMS FROM OR AT LEAST THREE FEET ABOVE ANY WINDOW, DOOR, OPENING, 'o AIR INTAKE OR VENT SHAFT. 15. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE k 16. CLEANOUTS SHALL BE INSTALLED AS PER SEC. 708 OF THE 2015 /PC a FOR PROTECTING ALL PLUMBING EQUIPMENT FROM cd FOREIGN MATERIAL DURING CONSTRUCTION. UPON CODE. CLEANOUTS SHALL BE PLACED IN READILY ACCESSIBLE c COMPLETION OF THE WORK UNDER THIS SECTION LOCATIONS. THE CONTRACTOR SHALL REMOVE ALL SURPLUS 17. PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR MATERIALS, EQUIPMENT & DEBRIS AND SHALL Z E CLEAN AND WASH ALL ITEMS AND EQUIPMENT. WALLS, FLOORS, CEILINGS AND ROOFS. 0 m 18. ENSURE PIPING LOCATED ON EXTERIOR WALLS (OR OTHER WALLS W cc 1- EXPOSED TO FREEZING CONDITIONS) IS INSTALLED ON WARM-SIDE OFm o WALL INSULATION. y a 19. PROVIDE U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THRU FIRE RATED WALLS, FLOORS AND CEILINGS. o 20.PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR W .._ PADS AT ALL PIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE E P/PING COMES IN CONTACT WITH ANY PORTION OF THE STRUCTURE. o v APPLIES TO ALL WATER AND WASTE PIPING. 1 DRAWN BY: IB N- 21. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING N- 1 STRUCTURE TO A GREAT EXTENT AS POSSIBLE. ALL LINES NOT CHECKED BY: BC o CONCEALED TO BE SECURED 6" OFF FLOOR AND 3/4" FROM WALL N AND CEILINGS USING OFFSET BRACKETS. N 22. SUPPORT ALL PIPING IN ACCORDANCE WITH 2015 /PC. ANY SCALE:NONE F2 SUSPENDED MATER/ALS SHALL BE DIRECTLY SUPPORTED BY THE BUILDING STRUCTURE. 0 Q. Plumbing Legends a Specs & Notes 0 0 i ,) P-602