HomeMy WebLinkAboutB17-0114_Project Markups Listing_GLA Notes_1498843844.pdfFile Name Markup Name Markup Text Markup Date Created by
C-102.pdf tkassmel
06/19/2017 Tom
Kassmel
C-102.pdf tkassmel As commented during the DRB process, a 2' shoulder
at no more than 6%, and ditch slopes at no more
than 2:1 must be maintained at culvert ends.
This shows culvert invert at 79.5.
Show in detail how this will workon both ends;
extension of pipe until it works or inlet box may be
necessary.
06/19/2017 Tom
Kassmel
B17-0114
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
C-102.pdf tkassmel
06/19/2017 Tom
Kassmel
C-102.pdf tkassmel
06/19/2017 Tom
Kassmel
C-102.pdf tkassmel
06/19/2017 Tom
Kassmel
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
C-502.pdf tkassmel Engineer of Record to provide stamped letter
confirming all boulder (Rockery) walls have been built
per plan and detail prior to issuance of any Certificate
of Occupancy.
06/19/2017 Tom
Kassmel
S-102.pdf whellwig
06/16/2017 Wayne
Hellwig
S-102.pdf whellwig Provide calculations for portal frame design.
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
S-103.pdf whellwig
06/16/2017 Wayne
Hellwig
S-103.pdf whellwig Indicate location and provide calculations for shear
walls that do not meet the presciptice requirements
of IBC 2308.
06/16/2017 Wayne
Hellwig
A-202.pdf whellwig
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-202.pdf whellwig Provide intermediate rail spacing. R312.1.3
06/16/2017 Wayne
Hellwig
A-501.pdf whellwig
06/16/2017 Wayne
Hellwig
A-501.pdf whellwig Provide garage/dwelling fire separation. R302.6
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-501.pdf whellwig
06/16/2017 Wayne
Hellwig
A-501.pdf whellwig Provide fire protection for floor/ceiling in crawl space.
R302.13
06/16/2017 Wayne
Hellwig
A-502.pdf whellwig
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-502.pdf whellwig It appears that the wood framed wall is retaining
earth. Please clarify.
06/16/2017 Wayne
Hellwig
M-601.pdf whellwig
06/16/2017 Wayne
Hellwig
M-601.pdf whellwig Electrical plan lists the Wolf/Sub Zero VW36G as
having an exhaust rate of 600 CFM. Makeup air is
required for kitchen hoods in excess of 400 CFM.
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
ResCheck.pdf whellwig
06/16/2017 Wayne
Hellwig
ResCheck.pdf whellwig The gross floor area outside the building envelope
does not appear to coincide with the area shown on
the floor plans. Please clarify.
06/16/2017 Wayne
Hellwig
A-002.pdf whellwig
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-002.pdf whellwig The Town of Vail has adopted the 2015 Colorado
Plumbing Code and the 2015 Colorado fuel Gas code
06/16/2017 Wayne
Hellwig
A-002.pdf whellwig
06/16/2017 Wayne
Hellwig
A-002.pdf whellwig A Geo Hazard report is required.
Show location of stub out for radon mitigation.
Provide documetation for lighting compliance per the
IECC.
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-301.pdf whellwig
06/16/2017 Wayne
Hellwig
A-301.pdf whellwig Provide 20 minute rated self closing door.
06/16/2017 Wayne
Hellwig
A-301.pdf whellwig
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-301.pdf whellwig Provide crawl space access and ventilation details.
06/16/2017 Wayne
Hellwig
A-301.pdf whellwig
06/16/2017 Wayne
Hellwig
A-301.pdf whellwig Provide opening spacing for stair guard. R312.1.3
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
A-301.pdf whellwig
06/16/2017 Wayne
Hellwig
A-301.pdf whellwig Provide window designations for determining required
natural light and ventilation/ emergency egress/
safety glazing and fall protection.
06/16/2017 Wayne
Hellwig
P-105.pdf whellwig
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
P-105.pdf whellwig Size of drainage piping shall not be reduced in size in
the direction of flow. P3005.1.6
06/16/2017 Wayne
Hellwig
S-001.pdf whellwig
06/16/2017 Wayne
Hellwig
S-001.pdf whellwig Submit referenced soils report.
06/16/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
S-001.pdf whellwig
06/16/2017 Wayne
Hellwig
S-001.pdf whellwig Provide live load criteria for exterior decks.
06/16/2017 Wayne
Hellwig
E-107.pdf whellwig
06/15/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
E-107.pdf whellwig Several locations do not call out GFCI protection.
Provide GFCI protection per NEC 210.8. Typical all
plans.
06/15/2017 Wayne
Hellwig
E-108.pdf whellwig
06/15/2017 Wayne
Hellwig
E-108.pdf whellwig Provide exterior outlet.
06/15/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
E-601.pdf whellwig
06/15/2017 Wayne
Hellwig
E-601.pdf whellwig Panel P2 is shown in the laundry. Please clarify.
06/15/2017 Wayne
Hellwig
S-101.pdf whellwig
06/15/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
S-101.pdf whellwig Unvented crawl spaces with mechanical ventilation
shall have insulated walls per N1102.2.11 and a vapor
retarder over exposed earth.
06/15/2017 Wayne
Hellwig
M-101.pdf whellwig
06/15/2017 Wayne
Hellwig
M-101.pdf whellwig Ventilation is shown terminating in the adjacent crawl
space. Unvented crawl spaces with mechanical
ventilation shall have insulated walls per N1102.2.11
06/15/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
C-101.pdf whellwig
06/15/2017 Wayne
Hellwig
C-101.pdf whellwig Provide calculations to comply with R404.4. Typical all
unrestrained retaining walls.
06/15/2017 Wayne
Hellwig
E-105.pdf whellwig
06/15/2017 Wayne
Hellwig
Current Project - Project Markups Listing
File Name Markup Name Markup Text Markup Date Created by
E-105.pdf whellwig Label panels and show all locations of smoke alarms
and carbon monoxide alarms. Typical all sheets.
06/15/2017 Wayne
Hellwig
A-201.pdf C Neubecker Siding material at Master Bedroom needs to be
consistent, and shall not change materials at an
outside corner. Revise Horiz. Corr. Mtl Light Bronze to
1x6 T&G Western Red Cedar, Lt. Brown Stain, per
computer rendering.
06/14/2017 Chris
Neubecker
Current Project - Project Markups Listing