Loading...
HomeMy WebLinkAboutB17-0114_Project Markups Listing_GLA Notes_1498843844.pdfFile Name Markup Name Markup Text Markup Date Created by C-102.pdf tkassmel 06/19/2017 Tom Kassmel C-102.pdf tkassmel As commented during the DRB process, a 2' shoulder at no more than 6%, and ditch slopes at no more than 2:1 must be maintained at culvert ends. This shows culvert invert at 79.5. Show in detail how this will workon both ends; extension of pipe until it works or inlet box may be necessary. 06/19/2017 Tom Kassmel B17-0114 Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by C-102.pdf tkassmel 06/19/2017 Tom Kassmel C-102.pdf tkassmel 06/19/2017 Tom Kassmel C-102.pdf tkassmel 06/19/2017 Tom Kassmel Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by C-502.pdf tkassmel Engineer of Record to provide stamped letter confirming all boulder (Rockery) walls have been built per plan and detail prior to issuance of any Certificate of Occupancy. 06/19/2017 Tom Kassmel S-102.pdf whellwig 06/16/2017 Wayne Hellwig S-102.pdf whellwig Provide calculations for portal frame design. 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by S-103.pdf whellwig 06/16/2017 Wayne Hellwig S-103.pdf whellwig Indicate location and provide calculations for shear walls that do not meet the presciptice requirements of IBC 2308. 06/16/2017 Wayne Hellwig A-202.pdf whellwig 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-202.pdf whellwig Provide intermediate rail spacing. R312.1.3 06/16/2017 Wayne Hellwig A-501.pdf whellwig 06/16/2017 Wayne Hellwig A-501.pdf whellwig Provide garage/dwelling fire separation. R302.6 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-501.pdf whellwig 06/16/2017 Wayne Hellwig A-501.pdf whellwig Provide fire protection for floor/ceiling in crawl space. R302.13 06/16/2017 Wayne Hellwig A-502.pdf whellwig 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-502.pdf whellwig It appears that the wood framed wall is retaining earth. Please clarify. 06/16/2017 Wayne Hellwig M-601.pdf whellwig 06/16/2017 Wayne Hellwig M-601.pdf whellwig Electrical plan lists the Wolf/Sub Zero VW36G as having an exhaust rate of 600 CFM. Makeup air is required for kitchen hoods in excess of 400 CFM. 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by ResCheck.pdf whellwig 06/16/2017 Wayne Hellwig ResCheck.pdf whellwig The gross floor area outside the building envelope does not appear to coincide with the area shown on the floor plans. Please clarify. 06/16/2017 Wayne Hellwig A-002.pdf whellwig 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-002.pdf whellwig The Town of Vail has adopted the 2015 Colorado Plumbing Code and the 2015 Colorado fuel Gas code 06/16/2017 Wayne Hellwig A-002.pdf whellwig 06/16/2017 Wayne Hellwig A-002.pdf whellwig A Geo Hazard report is required. Show location of stub out for radon mitigation. Provide documetation for lighting compliance per the IECC. 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-301.pdf whellwig 06/16/2017 Wayne Hellwig A-301.pdf whellwig Provide 20 minute rated self closing door. 06/16/2017 Wayne Hellwig A-301.pdf whellwig 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-301.pdf whellwig Provide crawl space access and ventilation details. 06/16/2017 Wayne Hellwig A-301.pdf whellwig 06/16/2017 Wayne Hellwig A-301.pdf whellwig Provide opening spacing for stair guard. R312.1.3 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by A-301.pdf whellwig 06/16/2017 Wayne Hellwig A-301.pdf whellwig Provide window designations for determining required natural light and ventilation/ emergency egress/ safety glazing and fall protection. 06/16/2017 Wayne Hellwig P-105.pdf whellwig 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by P-105.pdf whellwig Size of drainage piping shall not be reduced in size in the direction of flow. P3005.1.6 06/16/2017 Wayne Hellwig S-001.pdf whellwig 06/16/2017 Wayne Hellwig S-001.pdf whellwig Submit referenced soils report. 06/16/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by S-001.pdf whellwig 06/16/2017 Wayne Hellwig S-001.pdf whellwig Provide live load criteria for exterior decks. 06/16/2017 Wayne Hellwig E-107.pdf whellwig 06/15/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by E-107.pdf whellwig Several locations do not call out GFCI protection. Provide GFCI protection per NEC 210.8. Typical all plans. 06/15/2017 Wayne Hellwig E-108.pdf whellwig 06/15/2017 Wayne Hellwig E-108.pdf whellwig Provide exterior outlet. 06/15/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by E-601.pdf whellwig 06/15/2017 Wayne Hellwig E-601.pdf whellwig Panel P2 is shown in the laundry. Please clarify. 06/15/2017 Wayne Hellwig S-101.pdf whellwig 06/15/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by S-101.pdf whellwig Unvented crawl spaces with mechanical ventilation shall have insulated walls per N1102.2.11 and a vapor retarder over exposed earth. 06/15/2017 Wayne Hellwig M-101.pdf whellwig 06/15/2017 Wayne Hellwig M-101.pdf whellwig Ventilation is shown terminating in the adjacent crawl space. Unvented crawl spaces with mechanical ventilation shall have insulated walls per N1102.2.11 06/15/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by C-101.pdf whellwig 06/15/2017 Wayne Hellwig C-101.pdf whellwig Provide calculations to comply with R404.4. Typical all unrestrained retaining walls. 06/15/2017 Wayne Hellwig E-105.pdf whellwig 06/15/2017 Wayne Hellwig Current Project - Project Markups Listing File Name Markup Name Markup Text Markup Date Created by E-105.pdf whellwig Label panels and show all locations of smoke alarms and carbon monoxide alarms. Typical all sheets. 06/15/2017 Wayne Hellwig A-201.pdf C Neubecker Siding material at Master Bedroom needs to be consistent, and shall not change materials at an outside corner. Revise Horiz. Corr. Mtl Light Bronze to 1x6 T&G Western Red Cedar, Lt. Brown Stain, per computer rendering. 06/14/2017 Chris Neubecker Current Project - Project Markups Listing