HomeMy WebLinkAboutB17-0340_A-721-1_1507837260.pdf 056.0 OF b
1 2 3 4 5 6
),z o- -4%
411
4.
cl-dgrbj .055.S"
11170J11
I —r T 1 10/12/17
LOWER PRIORITY HIGHER PRIORITY I PARTITION PRIORITY LEGEND
PARTITIONS TO TERMINATE PARTITIONS TO RUN '
HIGHER PRIORITY INTO HIGHER PRIORITY CONTINUOUS PAST A LOWER r
HIGHER PRIORITY PARTITIONS TO RUN PARTITIONS PRIORITY PARTITION
PARTITIONS TO CONTINUOUS PAST A LOWER ALIGN
RUN PRIORITY PARTITION DISCRIPTION PRIORITY RANKINGMTL.
LOWER PRIORITY CONTINUOUS ,���Q STUDS ALL
PAST A LOWER Ilu . .
PARTITIONS T - PRIORITYlig 3 HOUR FIRE RATED WALLS PRIORITY 1 - HIGHEST -1:1_TERMMINATE INTO iiIi
HIGHER PRIORITY z
0 , , ,‘ „ , 1 !Mr /
E PARTITIONS in 2 HOUR FIRE RATED SHAFTWALLS PRIORITY 2 E I U
II I 1111
2 HOUR FIRE RATED PARTITIONS PRIORITY 3 I iA Ail
— �` U I° I
1 HOUR FIRE RATED SHAFTWALLS PRIORITY 4
LI:Q I
IMPII ROOF OR FLOOR ASSEMBLY ABOVE MIME■
I Am
PLAN UCS ° I
1 HOUR FIRE RATED PARTITIONS PRIORITY 5 >- i �
Et z \ !Milw — — - ��
Et
O MINERAL WOOL FLUTE FLUTE DECK -
LOWER PRIORITY HIGHER PRIORITY SMOKE PARTITIONS PRIORITY 6
U_ FILL \ `/ 3
PARTITIONS TO TERMINATE PARTITIONS TO RUN INTO HIGHER PRIORITY CONTINUOUS PASTA LOWER SOUND PARTITIONS PRIORITY 7 FIRE STOP CONTINUOUS FLUTE COVER a : `_ '�
PARTITIONS PRIORITY PARTITION DEFLECTION TRACK ' - �rix ix H I
NON-FIRE RATED; NON-SOUND PRIORITY 8 - LOWEST - (1) LAYER OF GYP. BOARD ARCHITECT S
w FOR 1-HOUR FIRE RATING-
LOWER PRIORITY - - RATED \/ w ATTACH PER UL DESIGN. STEEL STUD 2901 Blake Street, Suite 100
Q PARTITIONS TO TERMINATE
o Denver Denver, CO 80205
INTO HIGHER PRIORITY z 303.861.8555
' \ ' PARTITIONS CONT. HORIZONTAL BRIDGING AS
HIGHER PRIORITY "" RECOMMENDED BY MFR. LOCATE Consultant
PARTITIONS TO LOWER _ _ 18" FROM
RUN CONTINUOUS PRIORITY ° •• OTHERWISE.
CK UNLESS NOTED
PAST A LOWER PARTITIONS
PRIORITY TO
PLAN PARTITION TERMINATE 18 GA. METAL RUNNER TRACK
PLAN LEG NOTCHED AROUND STUD,
PLAN EXTEND TO ONE SEE PARTITION SCHEDULE NOTE:
INTO HIGHER
PRIORITY DO NOT ATTACH
I- PARTITIONS _L 1 L -I
STUD BEYOND ATTACHMENT FOR WIDTH OF POINT _ GYPSUM BOARD TO TOP
NOTES:
/\109 HEAD OF WALL (RATED - SEE SPECIFICATION 07
1. REFER TO PARTITION PLANS FOR 2. THE HIGHER PRIORITY PARTITION MUST 3. TAPE AND SEAL JOINTS IN GYP. BOARD IN SCALE:3"= 8443 FOR MORE INFORMATION)
PARTITION TYPES, NUMBER OF LAYERS OF PASS THROUGH THE LESSER PRIORITY PARTITION BEHIND INTERSECTING
GYP, STUD SIZE, UL LISTING ETC. PARTITION. THE COMPLETE WALL PARTITIONS.
L _ASSEMBLY MUST BE CONTINOUS THROUGH _ J
INTERSECTION.
D � PARTITION PRIORITY D4 EQUIPMENT / ACCESSORIES MOUNTING D
MTL SILL TRACK
r
/1----tir---Cbto s"'N,
MTL. / ;_. I! \ , k
TRACK TO BE CUT, BENT MTL TRACK AT _�
AND THEN SCREWED TO 1M/M\_ _
-
° ° � STUDS / +TT
HDS MTL STUD SCREW AS �� ,� MICHAEL
TRACK TO BE CUT, BENT HDS STUD OR DOUBLE AT BOTH JAMBS ; / 1"ALLOWABLE NEVINAND THEN SCREWED TOI> g rill MTL STUDS AT / ANCHOR TO DECK / DEFLECTION *
ROOF OR FLOOR ASSEMBLY ABOVESTUDS MTL. BOTH JAMBS; JOINOR STRUCTURE II !I
CONTINUOUS2"WIDEX20GA. 202 +'.STUD OR CLIP ANGLESI MTL. STUDS WITH 2" LONG I IMETAL STRAP. ATTACH Ct
J AS REQ'D FOR
INTERMITTENT WELDS GYPSUM BOARD TO STRAP AT <1/414.
I 1 BOTH SIDES; LOCATE @ f ' I 8" O.C. MAXIMUM. 8ED Ak
DOUBLE 3 5/8" OR MEV MTL. TOP AND BOTTOM OF T / SCREW AS SEALANT, TYP. BOTH SIDES
6" ° ° STUDS, @ ALL DOOR
_� TRACK TO BE CUT, FRAME HINGE POINT DEFLECTION TRACK TO MATCH WALL
6/20/7-P/7
BENT AND THEN LOCATIONS AND @
MTL. TRACK TO BE CUT, SCREWED TO REMAINING PORTION OF RATING
BENT AND THEN 1
Issuance
STUDS NOT TO EXCEEDET CONTINUOUS 20 GA. 2-1/2"X 2-1/2" METAL
SCREWED TO 48" n C. ANGLE WITH 2-1/2"WIDE PIECE OF GYPSUM
TRACK TO BE CUT, BENT MTL TRACK AT BOARD USED FOR THE WALL ATTACH TO PERMIT 06/30/17
AND THEN SCREWED TO PLATE OR STEEL DECK AT 12" O.C. MAXIMUM.
STUDS
4 I
6"TYP.
1� I� I I1 CONT. HORIZONTAL BRIDGING AS Revisions Date
/ RECOMMENDED BY MFR. LOCATE 18" FROM
DECK UNLESS NOTED OTHERWISE.
SEE PARTITION SCHEDULE SEE PARTITION SCHEDULE SEE PARTITION SCHEDULE SEE PARTITION SCHEDULE SEE PARTITION SCHEDULE SEE PARTITION SCHEDULE SEE PARTITION SCHEDULE
NOTE:
FOR WIDTH OF FOR WIDTH OF FOR WIDTH OF FOR WIDTH OF
FOR WIDTH OF FOR WIDTH OF FOR WIDTH OF SEE PARTITION SCHEDULE DO NOT ATTACH
C — - FOR WIDTH OF GYPSUM BOARD TO TOP C
01 DOUBLE DOOR/ LARGE OPENING 02 DOOR OPENING 03 OPENING 04 LARGE OPENING JAMB 05 DOOR OPENING JAMB 06 CORNER 07 WALL INTERSECTION 08 HEAD OF WALL (NON-RATED)
SCALE 3"= SCALE:3"= SCALE 3"= SCALE:3"= SCALE:3"= SCALE 3"= SCALE:3"= C� SCALE:3"=
PARTITION FRAMING - PHASE 1 .75
all 3"= 1'-0"
TYPICAL CONTROL VINYL OR METAL CONTROL TYPICAL CONTROL VINYL OR METAL CONTROL
JOINT FOR PARTITION BACKER ROD & FIRE STOP SEALANT, JOINT FOR PARTITION BACKER ROD & FIRE STOP SEALANT,
TYPE REQUIRING (1) / I CONTINUOUS. TYPE REQUIRING (1)LAYER
I CONTINUOUS.
TYPICAL CONTROL BOARDAYER OF GYPSUM 1/2"GAP MAX. 5/8"TYPE "X" GYPSUM OARDOF GYPSUM .
1/2"GAP MAX5/8"TYPE "X" GYPSUM
CEILING GRID LINE OF JOINT FOR PARTITION, VINYL OR METAL CONTROL BACKER ROD AND FIRE
j TYPE REQUIRING (1) / STOP SEALANT
PARTITIO SUSPENSION SYSTEM LAYER OF GYPSUM BACKER ROD & FIRE STOP SEALANT, CONTINUOUS AT RATED
2 3/4" GYPSUM BOARD SUSPENDED
CONTINUOUS AT RATED CONSTRUCTION. / I Project Information
CEILING SYSTEM CASTING SEALANT AND BACKER BOARD CONSTRUCTION �I� ft
IAIIIIIIIHH1I��II111111 PARTITION 1/2"GAP MAX. 5/8"TYPE "X" GYPSUM 1/2" GAP MAX.
mommiiiiiimisminsEammEsso
711111115/8" GAP 1.1.0111.1.1111 MOINIZEINIMMEMEIMMIEMISMIll
11115/8" GAP
[PM
riN1111 1/8" EACH — iiimin ',
1 ImENIMEMMI �I CONTINUOUS 2"WIDE 1 ' 1C4 itI 5/8" MAX. �11 ; �'1'1 NEOPRENE FILLER 1M����M I 1I ICe
CONTROL I Tauss
I--"LC" PARTITIO24' 0"24' 0" 1 IiI . T„ ,r - , _. . 5/8"TYPE X GYPSUM 5/8"TYPE �X" GYPSUM tiMAX. MAX. 1 SOLID ATTENUATION 1 f UJ Lo
1 BACKER ROD & FIRE STOP SEALANT, BACKER ROD & FIRE STOP SEALANT,
SEALAN BLANKET I NOTE: LOCATE CONTROL JOINTS IN CONTINUOUS. NOTE: LOCATE CONTROL JOINTS IN CONTINUOUS.
5/8"TYPE "X" GYPSUM
COMPRESSED TO FILL UNINTERRUPTED WALL SPANNING UNINTERRUPTED WALL SPANNING VINYL OR METAL CONTROL Z Co
DOUBLE 20 GAUGE METAL STUDS METAL GYPSUMVINYL OR METAL CONTROL MORE THAN 30"-0" &WHERE
OPENING AT MORE THAN 30"-0" &WHERE
WITH 1"X226A METAL STRAP BOARD CONTROL INDICATED ON DRAWINGS, OR AT A INDICATED ON DRAWINGS, OR AT A W 0
L- PLATES AT 3'-6" O.C. EACH SIDE CHANGE IN MATERIALS, FINISH, CHANGE IN MATERIALS, FINISH,
BACKING, OR INSIDE FACE OF BACKING, OR INSIDE FACE OF 0 0
B CJ 1 CJ CJ CJ CJ CJ BRICK EXPANSION JOINT. CJ BRICK EXPANSION JOINT. CJ B J Z '-
CO
INTERIOR PARTITION CONTROL JOINT FOR GYPSUM BOARD PARTITION ATTACHMENT TO CEILING CONTROL JOINT AT INTERSECTION /CHANGE IN DOOR CONTROL JOINT 1 HOUR PARTITIONASSEMBLY GA-WH1651 0318.1 1 HOUR PARTITION J
NON-EXPOSED EDGE (PROVIDE MINIMUN ONE JOINT ASSEMBLY GA WH1651-0318.1 CONTROL JOINT CONTROL JOINT Q /
CO
AT ALL DOORS AND (I) (�!)^
CONTROL JOINTS - PHASE 1 .75 0 w
B 1 1/2"= 1'-0" W
2 Z co
0
Et
PARTIAL HEIGHT WALL FULL HEIGHT WALL � nCZ
a
PROVIDE FULL HEIGHT CONTROL JOINTS ON CEILING LINE PROVIDE FULL HEIGHT CONTROL JOINTS ON W
CEILING LINE STRIKE SIDE OF DOORS 3'-0"WIDE AND UNDER, STRIKE SIDE OF DOORS 3'-0"WIDE AND UNDER, Q L
PROVIDE FULL HEIGHT CONTROL JOINTS ON PROVIDE FULL HEIGHT CONTROL JOINTS ON BOTH METAL STUD WITH FULL HEIGHT LL
SLIP BOTH SIDES OF DOORS WIDER THAN 3'-0". SLIP N SIDES OF DOORS WIDER THAN 3'-0". GYPSUM WALL BOARD (GWB) BOTH
SIDES. (I)
\ r 03 03 I NOTES:
I I00
.5
ABOVE CEILING LARGE ABOVE CEILING_ 1. CONTROL DOOJOIIN PARTITIONS.STALLED ON
OPENING _ - OPENING- _
I I ] \- ___ _L / J \ L J 1 J 2. CONTROL JOINTS SHALL BE INSTALLED EVERY
01 I 01 03 I 02 I I 01 01 20'-0" ON BOTH SIDES OF ALL CURVED WALL
0203
PARTITIONS, AND EVERY 30'-0" ON BOTH SIDES OF
I r I I I �- - \ I I I T STRAIGHT PARTITIONS. ALIGN CONTROL JOINTS
\ 'LARGE BELOW CEILING- BELOW CEILING \ 'LARGE BELOW CEILINGS BELOW CEILING WITH EDGE OF CLOSEST ARCHITECTURAL
N / I o \ /
\ / '' ,OPENING OPENING \ / ,OPENING OPENING FEATURE.
DOOR N DOUBLE M -- DOOR \ DOUBLE /
'� OPENIN / DOOR I J OPENIN/ DOOR i X
051 'OPENIN / i / \ \ / 051 OPENIN / 0513. PROVIDE FULL HEIGHT HDS STUDS AT ALL
-- -- i
\ / I - / N OPENINGS AND DOOR LOCATIONS. ALTERNATE: Sheet Information
b X N / / \ X \ / - - / \ I STUDS DESIGNATED AS "16 GAUGE PAIR" SHALL
_ __ _ / \ 051 i / \ I .- - ti / N ' ` EXTEND FULL HEIGHT FROM FLOOR TRACK TO
/ \ / N / \ / N Sheet Title:
A %� I I TRACK AT STRUCTURE ABOVE AND SHALL BE A
- i# / \ / N _ \ / N STITCH WELDED 1/8" FLARE BEVEL STITCH WELD -
.1 ,
- 4A# , / \ \ N / N I I / \ /\ , / N I 3/4" PER 24", BOTH SIDES. FRAMING DETAILS
OR--. CONTRACTONOTE:
1BOTTOM TRACK 4' 6" MAX. 8' 6" MAX. 8' 6" MAX. 4' 6" MAX. BOTTOM TRACK(TYP.) 4' 6" MAX. 8' 6" MAX. 4'-6" MAX. 8' 6" MAX. 8' 6" MAX. 4' 6" MAX. CD IN WRO CASE SHALL DOUBLE STUDS OR HDS
7/ / / /- / / / / / /7/ // STUDS AT SIDES OF OPENING BE CUT FOR
PROVIDE BLOCKING AS REQ. DUCTWORK R OTHE// ,
R MECHANICAL, ELECTRICAL,
TO SUPPORT CABINETS, 1' 6"TYP. UNO. 16 GA. DOUBLE STUDS 16 GA. DOUBLE STUDS 1' 6" TYP. UNO. 16 GA. DOUBLE STUDS DU MI I InnRK cvcT�nnc
Sheet Number:
SHELVING, EQUIPMENT, OR HDS SINGLE STUD OR HDS SINGLE STUD PROVIDE BLOCKING AS REQ.TO SUPPORT CABINETS, OR HDS SINGLE STUD
AND DECORATIVE SHELVING,EQUIPMENT,AND DECORATIVE PANELING.
NOTE: ALL PARTITIONS NOT EXTENDING TO DECK TO HAVE DIAGONAL
KICKER FRAMING EVERY 48" O.C. MAX. BOTH SIDES OF PARTITION.
m A_ 7 2 1 _ 1a
PH0M TYPICAL PARTITION FRAMING ELEVATIONS
1/4" = 1'-0"
a DPA Project: 15924.00
COPYRIGHT 2017-DAVIS PARTNERSHIP,
1 1 2 3 1 4 1 5 6