HomeMy WebLinkAboutB17-0340_E-016.75_1507837303.pdfFEEDER SCHEDULE
KEY CONDUCTORS "C
40.3 G 3 # 8 , 1 # 10 G 1
100.3 G 3 # 1 , 1 # 8 G 1 1/2
100.4 G 4 # 1/0 AL , 1 # 6 AL G 2
125.4 G 4 # 2/0 AL , 1 # 4 AL G 2
200.4 G 4 # 250 AL , 1 # 4 AL G 2 1/2
225.4 G 4 # 350 AL , 1 # 2 AL G 3
250.4 G 4 # 350 AL , 1 # 2 AL G 3
400.4 G 2 [ 4 # 250 AL , 1 # 1 AL G 2 1/2 ]
800.4 G 3 [ 4 # 500 AL , 1 # 3/0 AL G 3 ]
1000.4 G 4 [ 4 # 350 AL , 1 # 4/0 AL G 3 ]
1200.4 G 4 [ 4 # 500 AL , 1 # 250 AL G 3 ]
2000.4 G 6 [ 4 # 600 AL , 1 # 400 AL G 3 1/2 ]
3000.4 G 8 [ 4 # 750 AL , 1 # 600 AL G 4 ]
MEC SEE MECH'L EQUIPMENT SCHEDULE
XFMR SEE TRANSFORMER SCHEDULE
NOTE: ALUMINUM CONDUCTORS ARE BASED
ON TYPE XHHW-2 COMPACT 600V
TRANSFORMER SCHEDULE
KEY HV FLA LV FLA HV PROT HIGH VOLTAGE FEEDER LV PROT LOW VOLTAGE FEEDER GROUNDING DIMENSIONS WEIGHT BTUH NOTE
480 V 208 V CCT BRKR CONDUCTORS "C CCT BRKR CONDUCTORS "C CNDTRS "C HIGH WIDE DEEP OTPT
T25 52.1 120.2 70 A 2 P 2 # 4 , 1 # 8 G 1 150 A 2 P 3 # 3/0 AL , 1 # 4 AL G 2 1 # 4 AL 3/4 30.00 17.00 16.00 235
T15 18.0 41.6 25 A 3 P 3 # 10 , 1 # 10 G 3/4 60 A 3 P 4 # 6 , 1 # 10 G 1 1 # 8 3/4 27.00 20.13 16.00 310 2806
T30 36.1 83.3 45 A 3 P 3 # 6 , 1 # 10 G 1 100 A 3 P 4 # 1 , 1 # 8 G 1-1/2 1 # 6 3/4 30.00 20.13 16.00 370 5753
T45 54.1 124.9 70 A 3 P 3 # 4 , 1 # 8 G 1-1/4 150 A 3 P 4 # 3/0 AL , 1 # 4 AL G 2 1 # 4 AL 3/4 39.25 26.13 20.00 480 7425
T75 90.2 208.2 110 A 3 P 3 # 1 , 1 # 6 G 1-1/2 250 A 3 P 4 # 350 AL , 1 # 1/0 AL G 3 1 # 1/0 AL 3/4 39.25 30.00 20.00 675 10549
T150 180.4 416.4 225 A 3 P 3 # 350 AL , 1 # 2 AL G 2-1/2 500 A 3 P 2 [ 4 # 350 AL , 1 # 3/0 AL G 3 ] 1 # 3/0 AL 1 46.63 32.00 27.00 925 16592
NOTES: 1.) PRIMARY AND SECONDARY O.C. PROTECTION PER NEC 450.3.
2.) BONDING AND GROUNDING CONDUCTOR PER NEC 250.66.
3.) CONDUCTORS ARE COPPER UNLESS OTHERWISE NOTED. ALUMINUM CONDUCTORS ARE BASED ON TYPE XHHW-2 COMPACT 600V.
4.) SEE PLANS FOR INCREASED CONDUCTOR SIZES DUE TO VOLTAGE DROP ETC.
5.) DIMENSIONS, WEIGHTS & BTUH OUTPUT SHOWN ARE FOR REFERENCE ONLY. ACTUAL DIMENSIONS MAY VARY FROM MANUFACTURER TO MANUFACTURER.
6.) BRANCH CIRCUITS TO HAVE A DEDICATED NEUTRAL FOR EACH CIRCUIT ON K-RATED TRANSFORMERS.
7.) FOR K-RATED TRANSFORMERS, PROVIDE PARALLEL NEUTRAL CONDUCTORS LUGS AT TRANSFORMERS, LOW VOLTAGE PANELBOARD, DISCONNECTS AND/OR LOAD .
ALTERNATE TO REPLACE THIS BOARD
NONE SCALE:
PARTIAL ELECTRICAL ONE-LINE DIAGRAM - EAST -EMERGENCY POWER - EXISTING
BOILER ROOM
2nd FLOOR
TO PANEL "EH2E"
VIA 15KVA XFMR
SEE SHEET E3.3
TO PANEL "EDLBA"
TO PANEL "CDLBA"
SEE SHEET E3.4
ISCA=2,139
2ND
FLR
ELEC
ROOM
J
M
M ~ ~
~
~
~~~~~~~
4#4,#8G THHN-1"C.
1 2 3 4 5 6 7 8 9 10 11 12
DUPLEX
VACUUM
PUMPS
P-1 P-2 AHU-5 EF-20 P-4 AHU-1
LIFE SAFETY
PANEL
4#4,#8G THHN-1"C.
BASEMENT
STORAGE
BASEMENT
STORAGE
NURSES STATION
COND. UNIT
(ON ROOF)
AHU-4
IN BSMT.
BASEMENT
BOILER
ROOM
"EMCC" (SQUARE D QMB - SAFELEX)
120/208V, 3PH, 4W
50% NEUTRAL
400A
EC1B
225.4G1
225.4G1
150.4G1
50.4G
50.4G
EM1CA
100
100A3P
100.4G
EM1C
60.4G
EPB
30
30A3P
30.3
20.3
15
30A3P
7
30A3P
20.3
30A3P
20.3 30.3
25
30A3P
30.3
25
30A3P
30.3
30
30A3P
SPARE
30A3P
60.3
40
60A3P
40
60A3P
100
100A3P
100.4
EM1B
EM1A
EC1C
225.4G
EC1B
EC1A
225.4G
E1A
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
EAST WING ENABLING
6/30/2017
2:16:05 PM
15924.00
E-016.75
ELECTRICAL ONE-LINE
DIAGRAM - EAST
EMERGENCY POWER
06/30/17
PERMIT EAST
WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657