HomeMy WebLinkAboutB17-0340_E-100.75_1507837312.pdfPROVIDE (4) 1" CONDUITS WILL PULL STRINGS FROM
THE FUEL TANK PUMPS AND CONTROLS TO THE
FUTURE EAST CENTRAL UTILITY PLANT. CAP
CONDUITS FOR FUTURE EXTENSION TO EAST.
NEW UTILITY XFMR INSTALLED UNDER EAST
ENABLING TO SERVE THE TEMPORARY
SERVICE IN 2ND FLOOR ELECTRICAL ROOM
SWITCHBOARD 'TMDS'
TEMPORARY FEEDER TO NEW
DISTRIBUTION PANEL 'NDH2A' IN
THE 2ND FLOOR ELECTRICAL
ROOM. CONDUIT TO BE ROUTED
ALONG ROOF AND DROP DOWN
INTO 2ND FLOOR ELECTRICAL
ROOM.
PROVIDE (3) 1" CONDUITS
WITH PULL STRINGS TO
LOWER LEVEL WEST
ELECTRICAL ROOM. LOCATE
ALONGSIDE O2 PIPING.
PROVIDE 120V CONNECTION
FOR CONVENIENCE POWER
EXISTING TRANSFORMER TO
BE REMOVED DURING EAST
WING PHASE
T
NLEA
NLEA-1,3,5
TRASH
COMPACTOR
EXISTING TRANSFORMER
AND DISCONNECT
T
100A3P
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
EAST WING ENABLING
6/30/2017
2:16:38 PM
15924.00
E-100.75
ELECTRICAL SITE PLAN -
ENABLING
06/30/17
PERMIT EAST
WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657
SCALE: 1" = 20'-0"
ELECTRICAL SITE PLAN - ENABLING
10/12/17