HomeMy WebLinkAboutB17-0340_E-100.75_1507837312.pdfPROVIDE (4) 1" CONDUITS WILL PULL STRINGS FROM THE FUEL TANK PUMPS AND CONTROLS TO THE FUTURE EAST CENTRAL UTILITY PLANT. CAP CONDUITS FOR FUTURE EXTENSION TO EAST. NEW UTILITY XFMR INSTALLED UNDER EAST ENABLING TO SERVE THE TEMPORARY SERVICE IN 2ND FLOOR ELECTRICAL ROOM SWITCHBOARD 'TMDS' TEMPORARY FEEDER TO NEW DISTRIBUTION PANEL 'NDH2A' IN THE 2ND FLOOR ELECTRICAL ROOM. CONDUIT TO BE ROUTED ALONG ROOF AND DROP DOWN INTO 2ND FLOOR ELECTRICAL ROOM. PROVIDE (3) 1" CONDUITS WITH PULL STRINGS TO LOWER LEVEL WEST ELECTRICAL ROOM. LOCATE ALONGSIDE O2 PIPING. PROVIDE 120V CONNECTION FOR CONVENIENCE POWER EXISTING TRANSFORMER TO BE REMOVED DURING EAST WING PHASE T NLEA NLEA-1,3,5 TRASH COMPACTOR EXISTING TRANSFORMER AND DISCONNECT T 100A3P 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 2:16:38 PM 15924.00 E-100.75 ELECTRICAL SITE PLAN - ENABLING 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 SCALE: 1" = 20'-0" ELECTRICAL SITE PLAN - ENABLING 10/12/17