HomeMy WebLinkAboutB17-0340_L-000_1507837309.pdfLANDSCAPE SYMBOLS LEGEND
?
?
?
SECTION REFERENCE
EXTERIOR ELEVATION
REFERENCE
DIMENSION LINE
CENTERLINE
8'-2"
NORTH ARROW
0' 10' 20' 40' 80'
GRAPHIC SCALE
?
?
?
REVISION CLOUD
AND TAG
NOTE AND LEADER CALLOUT
DETAIL CALLOUT
?
? ?
? ?
?
?
? ?
DETAIL NUMBERING
BATTLESHIP GRID ORDER
A
B
C
D
E
1 2 3 4 5 6
HATCHED DETAIL
LOCATION WOULD BE
NUMBERED "A2" ON
THE DETAIL SHEET
℄
GORE CREEK
PROJECT SITE
I - 70
W MEADOW DR
S FRONTAGE RD
FOREST RD
ABBREVIATIONS
AND SYMBOLS
KEY NAME
NOTE: FOR ADDITIONAL ABBREVIATIONS; REFER TO SPECIFICATION 01 4200
FOR COMPLETE INDUSTRY STANDARD ABBREVIATION LIST
A
ADD ADDENDUM
ALT ALTERNATE
APPROX APPROXIMATE(LY)
ARCH ARCHITECT or ARCHITECTURAL
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
B
BLDG BUILDING
C
CD CONSTRUCTION DOCUMENTS or CONTRACT DOCUMENTS
CJ CONSTRUCTION JOINT or CONTROL JOINT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
D
DEMO DEMOLISH or DEMOLITION
DIA DIAMETER
DIM DIMENSION or DIMENSIONAL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
EOC EDGE OF CONCRETE
EQ EQUAL
F
FDC FIRE DEPARTMENT CONNECTION
FFE FINISH FLOOR ELEVATION
G
GA GAUGE
GALV GALVANIZED
H
HB HOSE BIBB
HORIZ HORIZONTAL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
J
JT JOINT
L
LOW APPROXIMATE LIMITS OF WORK
M
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL and PLUMBING
MIN MINIMUM
MISC MISCELLANEOUS
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
O
O.C. ON-CENTER
P
PL PROPERTY LINE
POB POINT OF BEGINNING
POC POINT OF CURVATURE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POST-TENSIONED SLAB
Q
QTY QUANTITY
R
R RADIUS
RD ROOF DRAIN
RE REFER TO or REFERENCE
REV REVISE, REVISED or REVISION
ROW RIGHT-OF-WAY
S
SAN SANITARY
SF SQUARE FOOT (FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
T
TOC TOP BACK OF CURB
TOW TOP OF WALL
TYP TYPICAL
STANDARD ABBREVIATIONS
COMMENTS
Not To Scale
1
VICINITY MAP
NORTH
1. THE DEMOLITION PLAN IS BASED ON EXISTING CONDITION SITE INFORMATION OBTAINED
FROM THE OWNER. DAVIS PARTNERSHIP HAS NOT FIELD VERIFIED EXISTING CONDITIONS.
REMOVAL ITEMS SHOWN ARE BASED ON BEST AVAILABLE INFORMATION AND ARE SHOWN
SCHEMATICALLY. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID TO BE FULLY
FAMILIAR WITH THE EXTENT OF THE REMOVAL ITEMS. THE CONTRACTOR IS RESPONSIBLE
FOR ALL REMOVALS NECESSARY TO COMPLETE CONSTRUCTION. QUESTIONS REGARDING
ITEMS TO BE REMOVED SHALL BE DIRECTED TO DAVIS PARTNERSHIP PRIOR TO
DEMOLITION ACTIVITIES.
2. CAREFULLY PRESERVE AND MAINTAIN EXISTING BENCHMARKS, HORIZONTAL/VERTICAL
CONTROL MONUMENTS, PROPERTY LINE PIPES AND PINS AND OTHER REFERENCE POINTS.
CONTRACTOR TO RESTORE OR REPLACE AT OWN EXPENSE.
3. ONSITE BLASTING AND BURNING IS NOT ALLOWED. EMPLOY JACK HAMMERING AND
OTHER LOUD NOISES AND METHODS SPARINGLY AND ONLY DURING TIME PERIODS
APPROVE BY OWNER.
4. CONTRACTOR SHALL ARRANGE FOR DISPOSITION OF REMOVAL ITEMS IN ACCORDANCE
WITH LOCAL REQUIREMENTS. LOCATION OF DUMP, LENGTH OF HAUL, AND DISPOSAL
EXPENSES ARE CONTRACTOR'S RESPONSIBILITY.
5. MATERIALS ENCOUNTERED THAT ARE SUSPECTED OF CONTAINING HAZARDOUS
MATERIALS SHALL NOT BE DISTURBED. CONTACT ARCHITECT OR OWNER IMMEDIATELY.
6. SALVAGED ITEMS ARE TO BE CLEANED, PACKED OR CRATED IN CLEARLY IDENTIFIED
CONTAINERS, AND STORED IN A SECURE AREA UNTIL DELIVERED TO OWNER.
CONTRACTOR TO PROTECT ITEMS FROM DAMAGE DURING TRANSPORT AND STORAGE.
7. THE CONTRACTOR SHALL CONTACT OWNER TO ARRANGE THE STORAGE OF ANY
REMOVED SIGNS, LIGHTING, OR OTHER OBJECTS THAT ARE IDENTIFIED ON THE PLAN AS
BEING RETURNED TO OWNER.
8. REFER TO THE CIVIL DRAWINGS FOR UTILITY DEMOLITION INFORMATION.
9. ALL EXISTING PLANTS TO REMAIN ARE TO BE PROTECTED FROM DAMAGE BY
CONSTRUCTION OPERATIONS. DO NOT OPERATE EQUIPMENT, STORE, STOCKPILE, OR
PARK WITHIN DRIP LINE OF PLANTS. REMOVE SOD OVER PROMINENT ROOTS BY HAND TO
MINIMIZE DAMAGE TO ROOT SYSTEM. CONTRACTOR IS RESPONSIBLE FOR HEALTH AND
LIFE OF ALL PLANTS TO REMAIN OR BE RELOCATED THROUGHOUT CONSTRUCTION AND
WARRANTY PERIOD.
10. THE CONTRACTOR SHALL LOCATE AND PROTECT EXISTING IRRIGATION MAINLINE
PRIOR TO DEMOLITION ACTIVITIES. IRRIGATION TO EXISTING LANDSCAPE AREAS SHALL BE
PROTECTED AND MAINTAINED DURING CONSTRUCTION.
11. MINIMIZE DISTURBANCE IN CONSTRUCTION STAGING AREAS. REPLACE/RESTORE ALL
LANDSCAPE, HARDSCAPE, IRRIGATION, LIGHTING, ETC. WHICH IS DISTURBED BY
CONSTRUCTION.
12. CONTRACTOR TO CONDUCT SELECTIVE DEMOLITION AND DEBRIS-REMOVAL
OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS,
WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES.
13. CONTRACTOR TO PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTIONS
REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND
FACILITIES TO REMAIN.
14. CONTRACTOR SHALL NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.
CONTRACTOR TO REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT
SPILLAGE ON ADJACENT SURFACES AND AREAS.
15. CONTRACTOR TO COMPLY WITH ALL APPLICABLE LAWS FOR MATERIALS
TRANSPORTATION DURING ONSITE AND OFFSITE HAULING.
16. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS
CAUSED BY SELECTIVE DEMOLITION OPERATIONS. RETURN ADJACENT AREAS TO EXISTING
CONDITION BEFORE SELECTIVE DEMOLITION OPERATIONS BEGAN.
17. THE LIMITS OF WORK DESCRIBED IN THE DRAWINGS ARE APPROXIMATE. WORK
REQUIRED OUTSIDE THESE LIMITS WHICH IS NEEDED TO MEET THE INTENT OF THE
DRAWING IS THE RESPONSIBILITY OF THE CONTRACTOR.
SELECTIVE DEMOLITION NOTES
1. THE SURVEY FOR THIS WORK HAS BEEN PROVIDED BY THE OWNER FOR USE IN THE
DESIGN AND CONSTRUCTION OF THE PROJECT. THE ARCHITECT ASSUMES NO
RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF THIS SURVEY.
2. THE LANDSCAPE DRAWING SERIES (L-SHEETS) SHALL BE USED IN CONJUNCTION WITH
THE CIVIL, ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS TO
PROVIDE COMPLETE INFORMATION REGARDING SITEWORK.
3. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SITE CONDITIONS
PRIOR TO COMMENCING ANY WORK. INSPECT EXISTING SITE CONDITIONS AFFECTING
WORK FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. PRIOR TO COMMENCING
LANDSCAPE WORK ADVISE THE PROJECT LANDSCAPE ARCHITECT OF ANY
INCONSISTENCIES WITH SAID CONDITIONS FOR RESOLUTION.
4. COORDINATE LANDSCAPE WORK WITH OTHER CONSTRUCTION TO ENSURE PROPER
SEQUENCING OF WORK, TO MINIMIZE CONFLICTS, AND TO PROTECT IN-PLACE WORK FROM
DAMAGE.
5. MINIMIZE DISTURBANCE OUTSIDE APPROXIMATE LIMITS OF WORK. DAMAGED WORK
SHALL BE REPLACED OR REPAIRED BY THE CONTRACTOR, TO A LIKE NEW CONDITION, AT
NO ADDITIONAL COST TO THE OWNER.
6. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF ALL
EXISTING UNDERGROUND UTILITIES PRIOR TO BEGINNING CONSTRUCTION.
7. THE CONTRACTOR MUST COORDINATE UTILITY CAPPING OR ABANDONMENT WITH THE
UTILITY COMPANY AND OWNER.
8. THE CONTRACTOR IS RESPONSIBLE FOR MEETING ALL APPLICABLE EROSION CONTROL
STANDARDS.
9. EXISTING AND NEW UTILITIES SHOWN FOR REFERENCE ONLY. REFER TO CIVIL FOR
UTILITY PLANS.
10. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING IRRIGATION WATER
SOURCE, ZONES, CONTROLS, COVERAGE, ETC. TO ENSURE THAT CONSTRUCTION DOES
NOT IMPACT IRRIGATED LANDSCAPE AREAS THAT ARE TO REMAIN. ALL IRRIGATION AND
LANDSCAPE DISTURBED BY THE WORK OF THIS PROJECT ARE TO BE RESTORED TO A LIKE
NEW CONDITION ACCEPTABLE TO THE OWNER AND ARCHITECT.
11. EXCAVATION AND OTHER GROUND DISTURBANCE IS NOT ALLOWED WITHIN THE
DRIP-LINE OF TREES TO REMAIN UNLESS SPECIFICALLY NOTED. CONTRACTOR SHALL
PROTECT TREES TO REMAIN WITH FENCE.
12. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED
FOR THE PROPER EXECUTION, INSTALLATION, OR PERFORMANCE OF THE WORK, SHALL BE
PROVIDED BY THE CONTRACTOR.
13. ALL CONSTRUCTION DEBRIS SHALL BE REMOVED EACH DAY AND THE SITE SHALL BE
MAINTAINED IN A NEAT, CLEAN CONDITION. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PHASES OF SECURING, HANDLING, TRANSPORTATION, AND DISPOSAL OF DEBRIS.
14. CONTRACTOR SHALL PROVIDE PROTECTION FOR NEWLY INSTALLED WORK AND
FINISHES.
15. THE LIMITS OF WORK DESCRIBED IN THE DRAWINGS ARE APPROXIMATE. WORK
REQUIRED OUTSIDE THESE LIMITS WHICH IS NEEDED TO MEET THE INTENT OF THE
DRAWING IS THE RESPONSIBILITY OF THE CONTRACTOR.
16. SEALED EXPANSION JOINTS SHALL BE INSTALLED WHERE NEW CONCRETE PAVING
MEETS EXISTING PAVING, BUILDING WALL, SITE WALLS, COLORED CONCRETE, AND WHERE
NOTED ON PLAN.
17. ALL CONNECTIONS TO EXISTING WORK SHALL BE SMOOTH AND CONTINUOUS, AND
MAINTAIN POSITIVE DRAINAGE, RE: CIVIL.
18. DIMENSIONS ARE FROM BACK OF CURB (BOC) UNLESS OTHERWISE NOTED.
19. ALL CONTROL JOINTS ARE TO BE SAW CUT.
20. SCORE JOINTS IN SIDEWALKS SHALL BE LOCATED AT CRITICAL POINTS AND SPACED
EVENLY BETWEEN THOSE CRITICAL POINTS AS SHOWN ON THE PLAN.
21. ALL RAMPS SHALL BE STIFF BROOM FINISHED PERPENDICULAR TO PEDESTRIAN FLOW.
22. 1:12 MAXIMUM SLOPE ON ALL HANDICAP RAMPS.
23. ALL CONCRETE IS STANDARD GRAY WITH A MEDIUM BROOM FINISH, UNLESS
OTHERWISE NOTED.
24. POINTS OF TANGENCY FOR ALL RADII TO BE SMOOTH AND CONTINUOUS, FIELD ADJUST
IF NECESSARY.
25. REFER TO CIVIL AND GEOTECHNICAL REPORT FOR ASPHALT AND CONCRETE PAVING
THICKNESS.
26. ALL SIDEWALK RADII ARE 5.00' UNLESS OTHERWISE NOTED ON THE PLAN.
27. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE SPECIFICATIONS AND DETAILS.
HORIZONTAL CONTROL FOR EACH FIXTURE IS LOCATED ON L-SHEETS. REFER TO CIVIL
DRAWINGS FOR VERTICAL CONTROL OF EACH FIXTURE
28. BIKE RACKS AND BOLLARDS SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR.
OTHER SITE FURNISHINGS (BENCHES, TRASH/ASH RECEPTACLES, ETC.) WILL BE PROVIDED
AND INSTALLED BY OWNER AND ARE SHOWN ON THESE SHEETS FOR THEIR REFERENCE.
LAYOUT AND MATERIAL NOTES
PLANTING NOTES
1. THIS PLAN DESCRIBES THE LANDSCAPE PORTION OF THE PROJECT ONLY. SEE OTHER
SHEETS FOR SITE IMPROVEMENT INFORMATION.
2. THE CONTRACTOR SHALL LOCATE AND VERIFY THE EXISTENCE OF ALL UTILITIES PRIOR
TO STARTING WORK. THE CONTRACTOR SHALL CONTACT THE UTILITIES NOTIFICATION
CENTER OF COLORADO (UNCC) AND ANY LOCAL UTILITIES NOT IN THE UNCC SYSTEM AT
LEAST 48 HOURS BEFORE ANY EXCAVATION OR CONSTRUCTION TO REQUEST EXACT FIELD
LOCATIONS OF ALL UTILITIES.
3. MINIMIZE DISTURBANCE OUTSIDE SCOPE OF WORK . ANY DAMAGE OUTSIDE SCOPE OF
WORK INCURRED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR TO
LIKE NEW CONDITION.
4. CONTRACTOR SHALL MAINTAIN IRRIGATION TO EXISTING SOD AND OTHER PLANT
MATERIAL TO REMAIN.
5. CONTRACTOR SHALL SUBMIT IRRIGATION DESIGN BUILD SHOP DRAWINGS FOR
ARCHITECT'S REVIEW AND APPROVAL PRIOR TO INSTALLING IRRIGATION SYSTEM. THE
IRRIGATION SYSTEM DESIGN WILL CONSIST OF DRIP IRRIGATION IN ALL PLANTING BEDS
AND PLANTER POTS, UNLESS SPECIFIED OTHERWISE. ALL SOD AND NATIVE SEED AREAS
SHALL BE IRRIGATED WITH POP-UP OR SPRAY HEADS. ANY INSTALLED ITEMS PRIOR TO
IRRIGATION SHOP DRAWING APPROVAL MAY REQUIRE REMOVAL AND REPLACEMENT AT
CONTRACTOR'S EXPENSE.
6. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN QUANTITIES SUFFICIENT TO
COMPLETE THE PLANTING SHOWN ON ALL PLANTING PLANS. SHOULD DISCREPANCIES
EXIST BETWEEN THE QUANTITIES OR S.F. AREAS PROVIDED IN THE LABEL AND THOSE
DRAWN ON THE PLAN, THE PLAN SHALL GOVERN.
7. ALL MATERIAL SHALL CONFORM TO THE GUIDELINES ESTABLISHED BY THE CURRENT
AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION
OF NURSERYMEN, AND THE COLORADO NURSERY ACT, OR EQUIVALENT.
8. NO PLANT SHALL BE INSTALLED BEFORE ROUGH GRADING HAS BEEN FINISHED AND
APPROVED BY THE PROJECT LANDSCAPE ARCHITECT, OR EQUAL.
9. ALL PLANTS SHALL HAVE THE SAME RELATIONSHIP TO FINISHED GRADE AS THE PLANT'S
ORIGINAL GRADE BEFORE DIGGING, UNLESS OTHERWISE SPECIFIED OR DETAILED.
10. ALL PLANTS SHALL BE BALLED AND WRAPPED OR CONTAINER GROWN AS SPECIFIED.
NO CONTAINER GROWN STOCK WILL BE ACCEPTED IF IT IS ROOT BOUND. ALL ROOT
WRAPPING MATERIAL SHALL BE REMOVED COMPLETELY AT TIME OF PLANTING.
11. WITH CONTAINER GROWN STOCK, THE CONTAINER SHALL BE REMOVED AND THE
CONTAINER BALL SHALL BE CUT THROUGH THE SURFACE IN AT LEAST TWO VERTICAL
LOCATIONS.
12. ALL TREES SHALL BE REVIEWED AND APPROVED AT NURSERIES BY THE PROJECT
LANDSCAPE ARCHITECT. CONTRACTOR SHALL PROVIDE A MAXIMUM OF 2 NURSERIES
WHERE A SELECTION OF PLANT MATERIAL IS AVAILABLE TO CHOOSE FROM. CONTRACTOR
SHALL VISUALLY INSPECT AND TAG THE BEST SPECIMENS OF PLANT MATERIAL PRIOR TO
LANDSCAPE ARCHITECT REVIEW AND APPROVAL.
13. THE DAY PRIOR TO PLANTING, THE LOCATION OF ALL TREES SHALL BE STAKED AND
SHRUBS LOCATED, STILL IN CONTAINERS, PER PLAN LAYOUT FOR APPROVAL BY THE
PROJECT LANDSCAPE ARCHITECT. NOTIFY LANDSCAPE ARCHITECT ONE WEEK PRIOR TO
DATE OF SITE VISIT.
14. CONTRACTOR SHALL HAVE EXISTING AND NEW UTILITY LOCATIONS MARKED, FOR
REFERENCE, DURING APPROVAL OF FINAL TREE PLANTING LAYOUT.
15. DO NOT PLANT TREES WITHIN 10 FEET OF CENTERLINE OF UTILITIES OR WITHIN WATER
EASEMENTS.
16. REFER TO THE DETAILS AND THE CONTRACT SPECIFICATIONS FOR REQUIRED PLANTING
METHODS, SOIL PREPARATION, AND OTHER INFORMATION REGARDING PLANTING.
17. ALL PLANTS AND STAKES SHALL BE SET PLUMB, WITH THE GREEN SIDE UP, UNLESS
OTHERWISE SPECIFIED. LANDSCAPE CONTRACTOR SHALL PROVIDE DONUTS FOR ALL
ATTENDEES OF THE LANDSCAPE PRE-CONSTRUCTION MEETING UNLESS NOTIFICATION OF
READING THIS NOTE IS SENT TO PROJECT LANDSCAPE ARCHITECT.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING NECESSARY FOR INITIAL
ESTABLISHMENT OF LANDSCAPE. ALL PLANTS SHALL BE WATERED THOROUGHLY TWICE
DURING THE FIRST 24-HOUR PERIOD AFTER PLANTING. ALL PLANTS SHALL THEN BE
WATERED WEEKLY OR MORE OFTEN, IF NECESSARY, DURING THE FIRST GROWING
SEASON. CONTRACTOR SHALL ALSO BE REQUIRED TO MAINTAIN LANDSCAPE THROUGH
SUBSTANTIAL COMPLETION AND FOR 1 YEAR AFTER SUBSTANTIAL COMPLETION.
MAINTENANCE SHALL INCLUDE (BUT IS NOT LIMITED TO) WATERING, MOWING, PRUNING,
AND WEEDING.
19. THE LANDSCAPE CONTRACTOR SHALL REFER TO SPECIFICATIONS FOR SEASONAL
REQUIREMENTS AND OTHER RESTRICTIONS RELATED TO THE TIME OF PLANTING.
20. PLANT MATERIAL SHALL NOT BE PRUNED UNLESS OTHERWISE INDICATED IN PLANTING
SCHEDULE.
21. ALL PLANTING AREAS TO BE COVERED 4" DEEP WITH A MIXTURE OF 1-1/2" SMOOTH
LOCAL RIVER STONE MULCH, BEIGE IN COLOR, PLACE OVER WEED CONTROL FABRIC,
UNLESS OTHERWISE NOTED.
22. AREAS TO RECEIVE LANDSCAPE SHALL BE TILLED TO A DEPTH OF 12-INCHES. THEN
APPLY SPECIFIED SOIL AMENDMENT OVER SURFACE AT A RATE OF FOUR CUBIC YARDS PER
THOUSAND SQUARE FEET. TILL AREAS AGAIN TO A MINIMUM DEPTH OF 8- INCHES.
23. FINISH GRADES IN PLANTING AREAS SHALL BE SET TO INCLUDE THE APPLICATION OF
TOPSOIL IN MEETING SPOT ELEVATIONS ON CONTOURS SHOWN ON PLANS. SLOPES SHALL
BE SMOOTH AND WORKED. SOIL SHALL NOT BE LEFT IN CLUMP FORM. HOLD FINISHED
GRADE OF MULCH A MINIMUM OF 4" BELOW EDGE OF WALK, EDGING, OR CURB.
24. PROVIDE AT LEAST (2) 4" DIAMETER SCHEDULE 40 PVC SLEEVES UNDER ALL WALKS AND
DRIVES FOR IRRIGATION PIPING AND WIRING, PRIOR TO INSTALLATION OF WALKS AND
DRIVES. SITE CONTRACTOR SHALL COORDINATE INSTALLATION OF SLEEVES WITH
LANDSCAPE CONTRACTOR. REFER TO APPROVED IRRIGATION PLANS FOR LOCATIONS
WHERE SLEEVES ARE REQUIRED.
25. STEEL EDGER WITH A ROLLED TOP SHALL SEPARATE ALL SODDED AREAS, BED AREAS,
MINERAL MULCH AREAS, NATIVE SEED AREAS, AND AREAS OF POLYMER BOUND
AGGREGATE SURFACES.
26. ANY PLANT SPECIES SUBSTITUTIONS MUST BE APPROVED BY THE PROJECT LANDSCAPE
ARCHITECT AND THE JURISDICTION HAVING AUTHORITY PRIOR TO INSTALLATION.
27. TRANSPLANTED TREES SHALL HAVE THE SAME ASPECT IN FINAL LOCATION (I.E.
EXISTING NORTH ASPECT SHALL FACE NORTH IN FINAL LOCATION).
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
VAIL VALLEY
MEDICAL
CENTER
180 S. Frontage Road W. Vail, CO 81657
Issuance Date
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
COPYRIGHT 2017 - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Consultant
15924.00
06/30/17
PERMIT
EAST WING
ENABLING
L-000
10/12/17