Loading...
HomeMy WebLinkAboutB17-0340_M-001.75_1507837277.pdfHVAC LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION LOW PRESSURE CONDENSATE RETURN PIPING HOT WATER SUPPLY PIPING HOT WATER RETURN PIPING HIGH TEMPERATURE HOT WATER SUPPLY PIPING HIGH TEMPERATURE HOT WATER RETURN PIPING CHILLED WATER SUPPLY PIPING CHILLED WATER RETURN PIPING SUPPLY DUCT UP / SUPPLY DUCT DOWN RETURN DUCT UP / RETURN DUCT DOWN FLEXIBLE DUCT CONNECTION BACKDRAFT DAMPER TEMP. CONTROL DAMPER-OPPOSED BLADE LOUVER WITH SCREEN MANUAL VOLUME DAMPER MOTOR OPERATED DAMPER SPIN-IN FITTING WITH MVD CONDENSER WATER SUPPLY PIPING LOW PRESSURE STEAM SUPPLY PIPING (0 - 15#) ROUND DUCT UP / ROUND DUCT DOWN INDICATES FLAT OVAL DUCTWORK ABBR. SYMBOL COOLING COIL DRAIN PAN PIPING TEMP. CONTROL DAMPER- PARELLEL BLADE LPS LPC MPS MVD MPC BBD BF RL RS RHG TT MEDIUM PRESSURE STEAM SUPPLY PIPING (16# - 60#) MEDIUM PRESSURE CONDENSATE RETURN PIPING HIGH PRESSURE STEAM SUPPLY PIPING (61# - 125#) HIGH PRESSURE CONDENSATE RETURN PIPING PUMPED CONDENSATE PIPING BOILER BLOWDOWN PIPING REFRIGERANT SUCTION PIPING BOILER FEED WATER PIPING FLOAT AND THERMOSTATIC STEAM TRAP REFRIGERANT LIQUID PIPING REFRIGERANT HOT GAS PIPING TCD FD FSD SD DAD TEMPERATURE SENSOR DUCT FIRE DAMPER COMBINATION DUCT SMOKE & FIRE DAMPER DUCT SMOKE DAMPER DUCT SMOKE DETECTOR DUCT ACCESS DOOR ELECTRIC-PNEUMATIC CONTROL VALVE TURNING VANES IN DUCT ELBOW WALL MOUNTED THERMOSTAT PNEUMATIC-ELECTRIC CONTROL SWITCH LOUVER HUMIDISTAT DUCT RISE UNIT MOUNTED THERMOSTAT UNDERCUT DOOR THERMOSTATIC STEAM TRAP DUCT DROP HWS HWR HTWS HTWR CWS CWR D C CR HPS HPC PC F&T IBT TCV MAV AAV FS EJ BJ RSV DPS (2 OR 3-WAY) TEMPERATURE CONTROL VALVE INVERTED BUCKET STEAM TRAP VENTURI METER CALIBRATED BALANCING VALVE REFRIGERANT SERVICE VALVE AUTOMATIC AIR VENT DIFFERENTIAL PRESSURE SWITCH MANUAL AIR VENT FLOW SWITCH EXPANSION JOINT CONDENSER WATER RETURN PIPING BALL JOINT EXPANSION COMPENSATOR LPS LPC MPS MPC BBD BF RL RS RHG HWS HWR HTWS HTWR CWS CWR D C CR HPS HPC PC SUPPLY & RETURN BRANCH PIPING TO TERMINAL UNIT CWR,HWR CWS,HWS CWS,CWR/HWS,HWR ~ ~~ ACOUSTICALLY LINED DUCTWORK TEMPERATURE CONTROL OUTSIDE AIR DAMPER TEMPERATURE CONTROL RETURN AIR DAMPER TEMPERATURE CONTROL EXHAUST AIR DAMPER STATIC PRESSURE IN INCHES WATER COLUMN SUPPLY AIR DEVICE RETURN AIR DEVICE M TS F ~~ T T ~~ H U L R D SD RG SP IN WC TCEAD TCRAD TCOAD A.L. 48F12 TCD BDD EP PE DOUBLE/SINGLE LINE DUCT LEGEND 45° TEE (ROUND) FLEX DUCT 90° RADIUS ELBOW RIGID FLEX 45° TEE (RECTANGULAR) 90° TEE (ROUND) MANUAL VOLUME DAMPER 90° ELBOW DUCT SPLIT REDUCER 45° ELBOW GRD RUNOUT 90° TEE (RECTANGULAR) SEE DUCT TAKE-OFF DETAIL CONICAL TEE VOLUME DAMPER PLUMBING LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION ACID RESISTANT WASTE PIPING (ABOVE FLOOR IN BUILDING) DOMESTIC COLD WATER PIPING DOMESTIC HOT WATER PIPING DOMESTIC HOT WATER CIRC. PIPING SOFTENED DOMESTIC COLD WATER PIPING SOFTENED DOMESSTIC HOT WATER PIPING DOMESTIC HOT WATER PIPING @ TEMPERATURE SHOWN SURFACE CLEANOUT FLOOR CLEANOUT LINE CLEANOUT FIXTURE OR DRAIN P-TRAP AREA DRAIN FLOOR SINK (SQUARE GRATE) ROOF DRAIN OR OVERFLOW DRAIN GAS PRESSURE REDUCING VALVE ATMOSPHERIC VACUUM BREAKER ACID RESISTANT VENT PIPING WASTE PIPING (ABOVE FLOOR IN BUILDING) WASTE PIPING (BELOW FLOOR IN BUILDING) WALL CLEANOUT CLEANOUT TEE ABBR. SYMBOL VENT PIPING FLOOR DRAIN (ROUND GRATE) HW HWC C-SW 140° HW V H-SW AV W W AW AW CW FS RD / OD VB AV W W AW AW GD IW S ST SSD SD SD OD OD A G G ACID RESISTANT WASTE PIPING (BELOW FLOOR IN BUILDING) IW S ST SSD SD GD SD OD OD A COMPRESSED AIR GREASE DRAIN (WASTE LINE TO GREASE INTERCEPTOR) INDIRECT WASTE PIPING SANITARY SEWER PIPING (OUTSIDE BUILDING) STORM SEWER PIPING (BELOW GRADE OUTSIDE BUILDING) SUB-SURFACE DRAIN PIPING OVERFLOW DRAIN PIPING (ABOVE FLOOR IN BUILDING) STORM DRAIN PIPING (ABOVE FLOOR IN BUILDING) STORM DRAIN PIPING (BELOW FLOOR IN BUILDING) OVERFLOW DRAIN PIPING (BELOW FLOOR IN BUILDING) FCO WCO COT AD LCO FD SCO BFP SA GC FC WH HB YH MH CI MANHOLE DOUBLE CHECK BACKFLOW PREVENTER SHOCK ARRESTOR W / ISOLATION VALVE GAS SHUT-OFF VALVE STOP AND DRAIN VALVE HOSE BIBB HWC BALANCING VALVE CAST IRON WALL HYDRANT YARD HYDRANT INVERT ELEVATION CATCH BASIN POLYVINYL CHLORIDE VITRIFIED CLAY PIPE VENT THRU ROOF VCP CB VTR IE PVC SW SW 140° FUEL OIL PIPING LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION FUEL OIL SUPPLY PIPING FUEL OIL RETURN PIPING FUEL OIL FILL PIPING FUEL OIL VENT PIPING FUEL OIL OVERFLOW PIPING DAY TANK PUMP OUT PIPING PRESSURE RELIEF VALVE VACUUM GAUGE W/ COCK VALVE FUEL OIL HAND PUMP GENERATOR FUEL OIL RETURN PIPING PRESSURE GAUGE W/ COCK VALVE FUSIBLE LINK VALVE ABBR. SYMBOL GENERATOR FUEL OIL SUPPLY PIPING FOR FOF FOV DPO GFOS FOO GFOR FOS FOR FOF FOV DPO GFOS FOO GFOR FOS V F P FIRE PROTECTION LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION FIRE SERVICE PIPING FIRE SPRINKLER PIPING WET STANDPIPE O.S.&Y. VALVE W/ TAMPER SWITCH FLOW SWITCH POST INDICATOR VALVE NEW SPRINKLER HEAD EXISTING SPRINKLER HEAD DRY SPRINKLER HEAD (SHAFT) FIRE HOSE CABINET FIRE VALVE CABINET FIRE DEPARTMENT CONNECTION RELOCATED SPRINKLER HEAD SIDEWALL SPRINKLER HEAD ABBR. F SYMBOL FIRE HYDRANT AUTOMATIC FIRE SPRINKLER FS WSP PIV FH FS FDC F FS N20 FHC FVC A/S D24 LABORATORY / MEDICAL SERVICES LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION LABORATORY COMPRESSED AIR PIPING OXYGEN PIPING VACUUM PIPING NITROUS OXIDE PIPING NITROGEN PIPING MEDICAL AIR PIPING CARBON DIOXIDE OXYGEN SERVICE OUTLET VACUUM SERVICE INLET NITROGEN SERVICE OUTLET NATURAL GAS SERVICE OUTLET LABORATORY/MEDICAL AIR SERVICE OUTLET ZONE VALVE BOX MEDICAL GAS OUTLET AREA ALARM PANEL MASTER ALARM PANEL DEIONIZED WATER PIPING HYDROGEN PIPING LIQUID NITROGEN PIPING NATURAL GAS PIPING WASTE ANESTHESIA GAS DISPOSAL INLET NITROUS OXIDE SERVICE OUTLET ABBR. 02 SYMBOL WASTE ANESTHESIA GAS DISPOSAL CARBON DIOXIDE SERVICE OUTLET VAC N2O N CO2 WAGD MA DI H NL LA G O2 ZVB MGO AAP MAP VAC N WAGD DI H NL LA G N20 MA CO2 GENERAL LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION NEW SECTION DESIGNATION SECTION DRAWN ON THIS SHEET SECTION CUT ON THIS SHEET RISER DIAGRAM NUMBER SHEET RISER IS DRAWN ON EQUIPMENT UNIT IDENTIFICATION CAP END OF PIPE PITCH DOWN IN DIRECTION OF ARROW UNION OR FLANGE CONCENTRIC PIPE REDUCER ECCENTRIC PIPE REDUCER PRESSURE AND/OR TEMPERATURE RELIEF VALVE PLUG VALVE GATE VALVE VERTICAL PIPE VALVE DIFFUSER IDENTIFICATION DIFFUSER NECK DIAMETER DIFFUSER CFM EXISTING PIPE ANCHOR PIPE ALIGNMENT GUIDE ABBR. SYMBOL EQUIPMENT UNIT NUMBER PRESSURE REDUCING VALVE (E) (N) (R) PTRV (F) DIA WAD NIC AFF GC MC EC RELOCATED FUTURE POINT OF CONNECTION, NEW TO EXISTING DIRECTION OF FLOW IN PIPE DUCTWORK, PIPING AND EQUIPMENT TO BE REMOVED DIAMETER ABOVE FINISHED FLOOR WALL ACCESS DOOR ELECTRICAL CONTRACTOR NOT IN CONTRACT GENERAL CONTRACTOR PRV GLV BFV BV CV P/T STRAINER W/ BLOWDOWN GLOBE VALVE BUTTERFLY VALVE BALL VALVE CHECK VALVE SOLENOID VALVE PRESSURE / TEMPERATURE TAP BUTTERFLY SOLENOID VALVE FLEXIBLE PIPE CONNECTOR HOSE END DRAIN VALVE STRAINER CEILING ACCESS PANEL PRESSURE GAUGE PUMP THERMOMETER SIGHT GLASS C.A.P. TB MECHANICAL CONTRACTOR # UNIT M-X X X.X X.X X GV THRUST BLOCK XX P/T DETAIL SHEETS PLAN SHEETS XX NATURAL GAS PIPING (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) NECK CFM X EXHAUST DUCT UP / EXHAUST DUCT DOWN WALL MOUNTED CARBON DIOXIDE SENSOR C EXHAUST AIR DEVICE EG KEYNOTE SINGLE LINE DOUBLE LINE DOUBLE LINE SINGLE LINE SINGLE LINE FLEX RIGID SINGLE LINE DOUBLE LINE DOUBLE LINE (Not all symbols listed below are used on these drawings) DP T IBT F&T TT RND REC 45° TAKEOFF SPIN IN X RETURN AIR DEVICE WITH SOUND BOOT RG ~~ POINT OF DISCONNECTION (DEMO) 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 12:31:55 PM 15924.00 M-001.75 MECHANICAL LEGENDS & NOTES 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 1. 2. 3. 4. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 1. 2. 3. 4. GENERAL NOTES: 1. 2. 3. 4. 5. 6. 7. 8. WORK INCLUDED IN THE CONTRACT IS DENOTED IN BOLD. EXISTING CONDITIONS TO REMAIN ARE DENOTED LIGHTLY. A DETAILED METHOD OF PROCEDURE IS REQUIRED WHEN A CONSTRUCTION ACTIVITY AFFECTS THE SAFETY OF THE OCCUPANTS, OWNER'S EQUIPMENT OR VALUABLE CONTENTS OR ANY SYSTEM WHICH SUPPORTS THESE SYSTEMS; OR ESSENTIALLY AFFECTS THE BUILDING MANAGEMENT, OPERATIONS OR SECURITY. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY THE ENGINEER/ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION. COORDINATE WORK WITH ALL TRADES. CONTRACTOR IS RESPONSIBLE FOR SECURING AND WEATHERPROOFING ANY ROOF OPENING NOT COMPLETED DURING WORKING HOURS. COORDINATE ALL DUCTWORK AND PIPING WITH EQUIPMENT, STRUCTURE, ETC. CONTRACTOR SHALL BE RESPONSIBLE FOR DEACTIVATION OF ROOF- MOUNTED EQUIPMENT AND ASSOCIATED INDOOR EQUIPMENT. ONLY ONE UNIT SHALL BE TAKEN OUT OF SERVICE AT ANY TIME, WITH REMAINDER OF UNITS LEFT OPERATIONAL. CONTRACTOR SHALL NOT SHUT DOWN / TAKE OUT OF SERVICE ANY SYSTEMS WITHOUT FIRST COORDINATING WITH OWNER AND PREPARING M.O.P. DEMOLITION GENERAL NOTES: 1. 2. 3. 4. 5. 6. 7. 8. EXISTING ITEMS TO REMAIN ARE DENOTED LIGHTLY UNLESS OTHERWISE NOTED. ALL ITEMS SHOWN HATCHED SHALL BE REMOVED UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS OR SERVICE WITHOUT FIRST COORDINATING WITH THE OWNER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE AND UNDERSTAND THE EXTENT OF THE REMODEL WORK REQUIRED PRIOR TO BID. NO EXTRAS WILL BE ALLOWED FOR WORK REQUIRED TO ACHIEVE THE END RESULT AS INDICATED BY THE CONTRACT DOCUMENT. CONTRACTOR SHALL DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION TO FACILITATE ALL WORK INDICATED BY THE CONTRACT DOCUMENT. PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK, VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR RESOLUTION. ALL ITEMS IDENTIFIED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY UNLESS OTHERWISE NOTED. REMOVED ITEMS SHALL BE TURNED OVER TO THE OWNER UNLESS OTHERWISE NOTED AND STORED IN THE AREA DESIGNATED BY THE OWNER. REMOVE FROM SITE AND LEGALLY DISPOSE OF ALL ITEMS THE OWNER CHOOSES NOT TO ACCEPT. WHERE EXISTING PIPING, T.C. TUBING/WIRING ETC. ARE TO BE REMOVED FROM WALLS WHICH ARE REMAINING, THE WALLS SHALL BE REPAIRED TO MATCH ORIGINAL CONDITIONS. WHERE EXISTING PIPING TO BE REMOVED PASSES THROUGH FLOORS, THEY SHALL BE CUT BACK TO WITHIN CONCRETE AND FILLED WITH GROUT TO ACHIEVE A SMOOTH AND EVEN FINISH WITH CONCRETE SURFACE. HVAC PLAN NOTES: 1. 2. 3. 4. DUCT SIZE OF BRANCH DUCT TO AIR DEVICE SHALL BE THE SAME SIZE AS NECK SIZE OF AIR DEVICE UNLESS NOTED OTHERWISE. UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY WRAPPED TO THICKNESS AS STATED IN SPECIFICATIONS. RETURN AND EXHAUST DUCTWORK IS NEITHER LINED NOR WRAPPED. PROVIDE ROOM AIR BALANCE TO ACHIEVE POSITIVE (+) OR NEGATIVE (-) AT THE DIFFERENTIAL PRESSURE INDICATED ON THE DRAWINGS. PROVIDE MANUAL VOLUME DAMPER FOR ALL AIR DEVICES. SPIN-IN DAMPERS ARE REQUIRED FOR LOW PRESSURE SUPPLY TAKEOFFS. REFER TO DETAILS. PLUMBING NOTES: CONTRACTOR SHALL NOT SHUT-OFF/PUT OUT OF SERVICE ANY SYSTEMS/SERVICES WITHOUT FIRST COORDINATING WITH OWNER. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOR RESOLUTIONS. THIS CONTRACTOR SHALL COORDINATE LOCATIONS OF PIPING WITH OTHER TRADES AND ADVISE ARCHITECT/ENGINEER OF ANY POSSIBLE CONFLICTS. VERIFY EXACT LOCATIONS, ELEVATIONS AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS. SEE SPECIFICATIONS FOR WATER HAMMER ARRESTOR SIZING. ALL FLUSH VALVES AND SOLENOID OPERATED EQUIPMENT SHALL HAVE A WATER HAMMER ARRESTOR. SEE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZING TO INDIVIDUAL PLUMBING FIXTURES. ALL EXISTING FIXTURES AND EQUIPMENT TO BE REMOVED SHALL HAVE ALL ASSOCIATED PIPING CONTROLS, HANGERS, SUPPORTS AND ANY MISCELLANEOUS ASSOCIATED SERVICE OR PART REMOVED COMPLETELY. REFER TO ARCHITECTURAL DRAWINGS FOR ROOF PENETRATION DETAILS. REFER TO ARCHITECTURAL DRAWINGS FOR FIXTURE ELEVATIONS AND LOCATIONS. SEE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR DIMENSIONED LOCATION OF PLUMBING FIXTURES AND WALLS. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS PER THE PROJECT SPECIFICATIONS AND LOCAL PLUMBING CODES. FIRE PROTECTION PLAN NOTES: FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF A COMPLETE AND PROPERLY FUNCTIONING FIRE PROTECTION SYSTEM. THE FIRE PROTECTION WORK INVOLVES ENGINEERING AND DESIGN BY THE CONTRACTOR TO DETERMINE THE EXTENT OF NEW WORK AND THE MODIFICATION AND EXTENSION OF EXISTING SYSTEMS TO PROVIDE FULL COVERAGE TO THE PROJECT AREA SHOWN ON THESE AND THE ARCHITECTURAL PLANS. THE INFORMATION PRESENTED ON THESE DRAWINGS IS DIAGRAMMATIC. IT DOES NOT NECESSARILY REPRESENT ALL ELBOWS, OFFSETS, HANGERS, ETC., REQUIRED FOR A COMPLETE WORKING SYSTEM. ALL FIRE PROTECTION SYSTEMS INSTALLED SHALL BE IN ACCORDANCE WITH NFPA-13, 14, 20, ETC. AND LOCAL BUILDING CODES AND ORDINANCES. FIRE PROTECTION CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW FIRE PROTECTION EQUIPMENT AND PIPING WITH ALL OTHER TRADES PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND SYSTEM INSTALLATION, SO AS NOT TO INTERFERE WITH THE ROUTING OF NEW DUCTWORK, PLUMBING PIPING, ETC. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM-OVERS, HANGERS, ETC. TO MAINTAIN CONFORMANCE WITH APPLICABLE STANDARDS AND TO POSITION THE SPRINKLERS IN THE PROPER LOCATIONS. SEAL ALL PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS WITH FIRE STOPPING MATERIALS AS REQUIRED. FOR REMODEL AREAS NEW SPRINKLERS SHALL MATCH EXISTING SPRINKLERS. PROVIDE WORKING DRAWINGS AND HYDRAULICALLY CALCULATE THIS FIRE SPRINKLER SYSTEM PER NFPA-13 WHERE REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION. PROVIDE FIELD COORDINATION OF PIPING AND SPRINKLER INSTALLATIONS WITH DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 10/12/17