Loading...
HomeMy WebLinkAboutB17-0340_M-002.75_1507837260.pdf Oki OF go 1 2 3 4 5 6 4,,RAinie: Z' o V COMPUTER ROOM PACKAGED AIR CONDITIONING UNIT SCHEDULE PUMP SCHEDULE ao MAX MOTOR VIBRATION INLET OUTLET SIZE(INCHES) OPER. 1 10/12/17 FAN DATA COIL DATA HUMIDIFIER CONDENSER FILTER DATA INDOOR CRAC DIMENSIONS OUTDOOR CONDENSER DIMENSIONS DESIG. MFR. MODEL PUMP TYPE SERVICE PUMP PROP GPM PRESSURE NPSH EFF. MIN. RPM VFD/ VFD ISOLATOR SIZE SIZE L W H WEIGHT REMARKS CFM ESP MIN FACE EAT I DESIGN L W H OPER L W H OPER OPER GLYCOL (FT HD) (FT HD) % HP AT RELAY/ BYPASS TYPE (IN.) (IN.) LBS. DESIG. MFR. MODEL AT ELEV (IN.W.C.) FAN AREA MBH MBH REFR. NO. KW LBS/ MODEL AMBIENT CFM REFR. AREA MERV-A (IN.) (IN.) (IN.) WEIGHT (IN.) (IN.) (IN.) WEIGHT CONTROL REMARKS °F (%) 60HZ STARTER (YES/ 5400 5400 KW (SF) °F °F SENS. TOTAL ROWS HR °F (SF) (LBS) (LBS) NO) FEET FEET SMP-EW-1 BELL& IN-LINE SNOW MELT 190 50% 12 60 VFD INLINE ALL CRAC-1 LIEBERT PDX PX023UA1AD 3500 0 0.99 10 72 48.9 62.9 70.5 R-410A 4 4.8 7.7 MCM040E1 100 3500 R-410A 5.8 8 34 34 95 670 58 58 62 310 PER CONTROL GOSSETT SCHEDULE _ I ■■ . . APPLIES TO ALL: II I REMARKS: > REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. 1. REFER TO ELECTRICAL PLANS FOR POWER REQUIREMENTS. IIIIIIIII E2. SELF CONTAINED UPFLOR SYSTEM WITH 2OWAY TOP SUPPLY PLENUM AND LOWER FRONT RETURN. REMARKS: E 3. PROVIDE WITH COLOR TOUCHSCREEN CONTROLLER,SMOKE DETECTOR AND CONTROL,LEAK DETECTOR,CONDENSATE PUMP,INFRARED HUMIDIFIER,INTERFACE DIGITAL SCROLL COMPRESSOR WITH SOUND JACKET,AND BAS CONTROL INTERFACE 1. PUMPS OPERATING THRU VFDS:UPON SELECTING THE PUMP FOR THE SPECIFIED DUTY POINT,THE SUPPLIER SHALL PROVIDE THE PUMP WITH THE LARGEST IMPELLER SIZE AVAILABLE FOR THE CASING THAT DOES NOT EXCEED THE DUTY POINT MOTOR HP AT THE RIGHT END OF THE • 111 3. PROVIDE LEGS/CURB FOR MINIMUM 36"HEIGHT OF CONDENSER ABOVE ROOF. CURVE.SUBMITTAL DATA SHALL SHOW ALL IMPELLER CURVES AVAILABLE FOR THE PUMP MODEL.THIS APPLIES TO ALL MANUFACTURERS. U 5. SIZE REFRIGERANT LINES PER MANUFACTURER'S INSTRUCTIONS 2. UNLESS INDICATED BY PUMP MODEL NUMBER,VARIABLE FREQUENCY DRIVE(VFD)IS REMOTE-MOUNTED RATHER THAN PUMP MOUNTED WHEN REQUIRED. • 111111 ■ 3. PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES. 6/30/2017 10:20 P:\VVMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 East Enabling.xlsx]EWE S932-4 Rf Hood 5/24/2017 14:42 P:\VVMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 East Enabling.xlsx]EWE S932-4 Rf Hood . = = = = = I =1 DUCT PRESSURE CLASSIFICATION SCHEDULE _ _ _ 1.+7 = DUCT TYPE MATERIAL PRESSURE REMARKS PLATE AND FRAME HEAT EXCHANGER SCHEDULE PARTNERSHIP NERSHIP CLASS HEAT PLATES 1 HIGHER TEMPERAURE SIDE LOWER TEMPERATURE SIDE SIZE(INCHES) ARCH I T E C T S MEDIUM PRESSURE SUPPLY GALVANIZED STEEL +4" BETWEEN SYSTEM FAN&TERMINAL BOX DESIG. MFR. MODEL SERVICE TRANSFER MBH NUMBER FUTURE EWT LWT GPM PROP WATER EWT LWT GPM ' PROP WATER L W H OPER REMARKS AREA TRANSFER FOR MAX °F °F GLYCOL P.D. °F °F GLYCOL P.D. WEIGHT X901 Blake Street, Suite 100 LOW PRESSURE SUPPLY GALVANIZED STEEL +2" BETWEEN TERMINAL BOX&ROOM (SF) DESIGN NUMBER % (FT WC) % (FT WC) (LBS) Denver Denver, CO 80205 303.861.8555 LOW PRESSURE EXHAUST GALVANIZED STEEL -2" SMHX-EW1 ALFA LAVAL SNOWMELT 4 121 180 150 13 40% 5.0 100 125 12 50% 5.0 Consultant OUTSIDE AIR DUCTWORK GALVANIZED STEEL -2" REMARKS: RELIEF DUCTWORK GALVANIZED STEEL +2" 1. PROVIDE INSULATED COVERING OVER PLATES WITH ALUMINUM COVER. TRANSFER AIR GALVANIZED STEEL +/-2" 5/24/201714.42 CATO R RUM A & ASSOCIATES , CO . 896 Tabor Street 420 W.Lincolnway Lakewood,CO 80401 Cheyenne,WY 82001 ROOF HOOD SCHEDULE 303.232.6200(P) 303.233.370(F) 303.233.37012620(F) 303.233.3701(F) CFM THROAT SIZE OVERALL SIZE AIR P.D.AT FREE DAMPER www.catorruma.com D DESIG. MFR. MODEL LOCATION SERVICE AT ELEV L W L W H 8300 AREA TYPE REMARKS D 8300 (IN) (IN) (IN) (IN) (IN) FEET SF (GRAVITY/ AIR DEVICE SCHEDULE FEET (IN WC) MOTORIZED) RH-1 GREENHECK WIH L2 PEAKED ROOF L2 Multizone AHU 9000 96 24 124 40 34.75 .05 25.6 GRAVITY 1,2 Intake DESIG. FUNCTION MFR. MODEL FRAME MATERIAL FINISH REMARKS RH-2 GREENHECK WIH L2 PEAKED ROOF FC-3 4000 22 22 28 28 23.5 .065 7.06 GRAVITY STYLE RH-3 GREENHECK WIH L2 PEAKED ROOF FC-3 4000 22 22 28 28 23.5 .065 7.06 GRAVITY C SIDEWALL SUPPLY TITUS 300RL SURFACE MOUNT STEEL WHITE ALL RH-4 GREENHECK WIH L2 PEAKED ROOF AHU-1 (LAB) 4000 22 22 28 28 23.5 .065 7.06 GRAVITY ��i���llll! Ilfif�/ . . ��p,8 A1C- • REMARKS: � V 10 r +';��( i� REMARKS: 1. CUSTOM SIZE HOOD WILL BE REQUIRED-THE SIZE INDICATED IS NOT AVAILABLE IN CATELOG. * / �*� GENERAL-APPLIES TO ALL AIR DEVICES: MANUAL VOLUME DAMPERS SHALL BE ACCEPTABLE IN DUCTWORK AT THE BRANCH POINT OF THE 2. DUCTS WILL NEED TO BE SPLIT INTO(4)24/20 DUCTS TO COORDINATE WITH EXISTING RAFTERS. RECOMBINE PRIOR TO CONNECTION TO ROOF HOOD. w RUNOUT DUCT OR IN-LINE TO THE AIR DEVICE BY THE CONTRACTOR INSTALLING DUCTWORK.A DAMPER LOCATED AT THE AIR DEVICE SHALL BE ACCEPTABLE WHEN PERMITTED BY ENGINEER ON A CASE-BY-CASE BASIS OR WHEN THE MANUFACTURER REQUIRES AN INTEGRAL 6/30/2017 11:59 S - MANUAL VOLUME DAMPER. :� O �J�f'�J �' = 6/30/2017 10:20 P:\WMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 East Enabling.xlsx]EWE S932-4 Rf Hood �� .....'�A �1 iiillinin too' Issuance PERMIT 06/30/17 BUILDING AUTOMATION SYSTEM CONTROL MATRIX Revisions Date IN ADDITION TO THE DDC POINTS LISTED BELOW,THE CONTRACTOR SHALL CAREFULLY REVIEW ALL POINT TYPE DRAWINGS,ALL SPECIFICATIONS,&ALL SEQUENCES OF OPERATION.THE DOCUMENTS ARE ALL INCLUSIVE INSTALLATION NOTE: &COMPLIMENTARY TO EACH OTHER.THE PROJECT M.C. SHALL PROVIDE& INSTALL SHALL INCLUDE ANY AND ALL NECESSARY DDC F- co C ADDITIONAL STEEL MULLIONS PER POINTS TO SUPPORT THE REQUIREMENTS OF ALL THE mF a 0 C PROVIDE SLEEVE GAUGE MFR INSTALLATION INSTRUCTIONS DOCUMENTS. 1- a m Z D v STEEL FIRE DAMPER FOR MULTIPLE FIRE DAMPER Z Z p - 0 Yz SLEEVE, THICKNESS PER ASSEMBLIES. u. MFR'S INSTALLATIONn d a Z � g UJ o INSTRUCTIONS /41 . MAINTAIN EXPANSION CLEARANCE PER MFR'S REFRIGERANT RECLAIM z Et < < rn a z o REMARKS INSTALLATION INSTRUCTIONS � SERVICE VALVE EQUIPMENT,SYSTEM&POINT cI\ RL SNOWMELT HEAT EXCHANGER FILTER DRYER 2 BREAKAWAYJOINTSBOTH X SOLENOID VALVE SNOWMELT HEATING WATER RETURN TEMPERATURE X 2 SIDES OF DAMPER SLEEVE - - SIGHT GLASS SNOWMELT HEATING WATER SUPPLY TEMPERATURE X FIRE DAMPER �-- _ EQUALIZER LINE PROVIDE MULTIPLEt t EXPANSION VALVE SESNOWMELT HEATING WATER SUPPLY TEMPERATURE X AIR FLOW ACCESS DOORS FOR _ DUCTWORK 60"OR X M SNOWMELT HEATING WATER SUPPLY TEMPERATURE, WIDER OR ON SIDE OF m • • •:. HIGH x Project Information DUCT WHEN REQUIRED I BUILDING HEATING WATER SUPPLY TEMPERATURE, TO PROVIDE ADEQUATE HIGH X ACCESS TO FIRE DAMPER - I- ' DX ( ,) ,R, ,9 �, - COCO COOLING BUILDING HEATING WATER SUPPLY TEMPERATURE, X LOW CC CC MOUNTING/•ETAINING COIL ANGLES INSTALLED PER MFR'S \ FOR • HORIZONTAL FIRE DAMPERS AIR COOLED ■ BUILDING HEATING WATER RETURN TEMPERATURE X INSTALLATION INSTRUCTIONS LOCATE DUCT ACCESS DOOR CONDENSING UNIT X" FROM ABOVE TO ACCESS CD NEGATOR CLOSURE SPRINGI 0. BUILDING HEATING WATER SUPPLY TEMPERATURE X ow NOTE: I- 1 HEATING WATER VALVE POSITION X VERTICAL TYPE FIRE DAMPER SHOWN. FOROki/ `f HORIZONTAL TYPE, TURN ASSEMBLY 90°AND Ln PROVIDE W/NEGATOR CLOSURE SPRING. REFRIGERANT CO CHARGE SERVICEZ VALVE THERMAL BULB, LOCATE SNOWMELT HEATING WATER PUMP (EACH PUMP) 45°ABOVE BOTTOM OF O B FIRE DAMPER PIPEASCLOSEAS B Z co 0 POSSIBLE TO COIL OUTLET START/STOP X INSTALLATION DETAIL DX COIL PIPING DETAIL ON/OFF STATUS X X CURRENT SWITCH Q SCALE: NONE (15530) SCALE: NONE CO 'CO 910-1 11-18-11 530-3CI SNOWMELT HEATING PUMP FAILURE X Q Z HDPE LANDSCAPE VALVE SNOWMELT HEATING PUMP RUNNING IN HAND X W BOX. SIZE TO I� ♦^ HIGH ACCOMMODATE MANIFOLD V AND FITTINGS. SNOWMELT HEATING PUMP RUNTIME EXCEEDED X ZZ Ct CAPACITY AUTO AIR HANGER ROD WITH TYPE 6 SNOWMELT SUPPLY HEADER ' VENT VIBRATION ISOLATOR AND CLEVIS HANGER 1 1/2"TEE SNOWMELT HEATING PUMP START/STOP X 5 SUPPORTING PIPING AS MANUAL AIR VENT 1 1/4" SNOWMELT HEATING PUMP STATUS X C 0) CO CLOSE TO PUMP AS SIMILAR TO A PRACTICAL DRAIN 1 1/4" OTHER SIDE Q 0 L \ - VALVE WITH - - < W LI_ CAP i- SM' II SMR TO SYSTEM - _ MODULE REQUIRED PRESSURE GAUGE SNOWMELT COMPUTER ROOM AIR CONDITIONING UNITS MFR FACTORY BAS INTERFACE W O AIR SEPARATOR 0 I OPTION: TUBING FE �� ® ® i7 CO 1 �'111 3/4" FEMALE HOSE TAPS FOR T.C. SPACE RELATIVE HUMIDITY X x ITI 1/2"TUBING OR VALVE + + SPACE TEMPERATURE X N O CONNECTION FOR 0 IPS. SAME PROVIDED WITH OUTLET SIZE n FILL AND MATERIAL AS MANIFOLD BLOW DOWN /0"- HOSE END < MAINTENANCE. VALVE WITH DRAIN GLYCOL AND FILL - MAIN PIPING. SNOWMELT f 9 9 9 9 _ _ ff UNIT ALARM CONDITION X X qq HOSE END AYR ICHVVEEARGING WILL BE RETURN PORT MAINTAINED P/T ] C1 P/T HEADER -�-_ r MANUALLY. ` _ . DRAIN VALVE -*9'eljt NOTES: L J WITH CAP - _1 _ 1. ALWAYS REFER TO DRAWINGS FOR QUANTITY. I - PUMP SHAPE MEMORY 2. PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER. PUMP FITTING 3. BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO DETERMINE WHICH ONES REQUIRE IMMEDIATE FLOOR _*_=-d PROVIDE FLOW ATTENTION. Sheet Information I I I 1 MEASURING DEVICE AND 1 1/2"THREADED BALANCING COCK PER SNOWMELT TUBING VALVES. PLUG END DIAPHRAGM TYPE SEE PUMP DETAIL SPEC. OR CIRCUIT SETTER 6/30/201710:20 P:\VVMC\2015-459 Phase A FOR ADDITIONAL FOR FUTURE. A Sheet Title: EXPANSION TANK (FOR PIPING 1 1/2"AND nG,nr1, bling.n,tl_I alp 1932- ICV Hood Enabling.xlsx]EWE S932-4 Rf Hood DATA SMALLER) NOTE: SEE PLANS FOR NUMBER OF MANIFOLDS AND CIRCUITS. MECHANICAL SCHEDULES AND DETAILS SNOWMELT EXPANSION TANK DETAIL IN-LINE PUMP PIPING DETAIL SNOWMELT MANIFOLD DETAIL Sheet Number: SCALE: NONE SCALE: NONE SCALE: NONE 770-1 540-10 770-2 M -002 . 75 Co N_ N. O M DPA Project: 15924.00 zb COPYRIGHT -DAVIS PARTNERSHIP, 1 2 3 4 5 6