HomeMy WebLinkAboutB17-0340_M-002.75_1507837279.pdfPUMP SCHEDULE
MAX MOTOR VIBRATION INLET OUTLET SIZE (INCHES) OPER.
DESIG. MFR. MODEL PUMP TYPE SERVICE PUMP PROP GPM PRESSURE NPSH EFF. MIN. RPM VFD/ VFD ISOLATOR SIZE SIZE L W H WEIGHT REMARKS
OPER GLYCOL (FT HD) (FT HD) % HP AT RELAY/ BYPASS TYPE (IN.) (IN.) LBS.
°F (%) 60HZ STARTER (YES/
NO)
SMP-EW-1
BELL &
GOSSETT
IN-LINE SNOW MELT 190 50% 12 60 VFD INLINE ALL
APPLIES TO ALL:
> REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS.
REMARKS:
1. PUMPS OPERATING THRU VFDS: UPON SELECTING THE PUMP FOR THE SPECIFIED DUTY POINT, THE SUPPLIER SHALL PROVIDE THE PUMP WITH THE LARGEST IMPELLER SIZE AVAILABLE FOR THE CASING THAT DOES NOT EXCEED THE DUTY POINT MOTOR HP AT THE RIGHT END OF THE
CURVE. SUBMITTAL DATA SHALL SHOW ALL IMPELLER CURVES AVAILABLE FOR THE PUMP MODEL. THIS APPLIES TO ALL MANUFACTURERS.
2. UNLESS INDICATED BY PUMP MODEL NUMBER, VARIABLE FREQUENCY DRIVE (VFD) IS REMOTE-MOUNTED RATHER THAN PUMP MOUNTED WHEN REQUIRED.
3. PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.
5/24/2017 14:42 P:\VVMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 East Enabling.xlsx]EWE S932-4 Rf Hood
PLATE AND FRAME HEAT EXCHANGER SCHEDULE
HEAT PLATES HIGHER TEMPERAURE SIDE LOWER TEMPERATURE SIDE SIZE (INCHES)
DESIG. MFR. MODEL SERVICE TRANSFER MBH NUMBER FUTURE EWT LWT GPM PROP WATER EWT LWT GPM PROP WATER L W H OPER REMARKS
AREA TRANSFER FOR MAX °F °F GLYCOL P.D. °F °F GLYCOL P.D. WEIGHT
(SF) DESIGN NUMBER % (FT WC) % (FT WC) (LBS)
SMHX-EW1 ALFA LAVAL SNOWMELT 4 121 180 150 13 40% 5.0 100 125 12 50% 5.0
REMARKS:
1. PROVIDE INSULATED COVERING OVER PLATES WITH ALUMINUM COVER.
5/24/2017 14:42
8300
8300
ROOF HOOD SCHEDULE
CFM THROAT SIZE OVERALL SIZE AIR P.D. AT FREE DAMPER
DESIG. MFR. MODEL LOCATION SERVICE AT ELEV L W L W H AREA TYPE REMARKS
(IN) (IN) (IN) (IN) (IN) FEET SF (GRAVITY/
FEET (IN WC) MOTORIZED)
RH-1 GREENHECK WIH L2 PEAKED ROOF
L2 Multizone AHU
Intake
9000 96 24 124 40 34.75 .05 25.6 GRAVITY 1, 2
RH-2 GREENHECK WIH L2 PEAKED ROOF FC-3 4000 22 22 28 28 23.5 .065 7.06 GRAVITY
RH-3 GREENHECK WIH L2 PEAKED ROOF FC-3 4000 22 22 28 28 23.5 .065 7.06 GRAVITY
RH-4 GREENHECK WIH L2 PEAKED ROOF AHU-1 (LAB) 4000 22 22 28 28 23.5 .065 7.06 GRAVITY
REMARKS:
1. CUSTOM SIZE HOOD WILL BE REQUIRED - THE SIZE INDICATED IS NOT AVAILABLE IN CATELOG.
2. DUCTS WILL NEED TO BE SPLIT INTO (4) 24/20 DUCTS TO COORDINATE WITH EXISTING RAFTERS. RECOMBINE PRIOR TO CONNECTION TO ROOF HOOD.
6/30/2017 11:59
SNOWMELT HEAT EXCHANGER
SNOWMELT HEATING WATER PUMP (EACH PUMP)
COMPUTER ROOM AIR CONDITIONING UNITS
BUILDING AUTOMATION SYSTEM CONTROL MATRIX
IN ADDITION TO THE DDC POINTS LISTED BELOW, THE
CONTRACTOR SHALL CAREFULLY REVIEW ALL
DRAWINGS, ALL SPECIFICATIONS, & ALL SEQUENCES
OF OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE
& COMPLIMENTARY TO EACH OTHER. THE PROJECT
SHALL INCLUDE ANY AND ALL NECESSARY DDC
POINTS TO SUPPORT THE REQUIREMENTS OF ALL THE
DOCUMENTS.
POINT TYPE
STATUS
ALARM
NETWORK
COMMUNICATIONS
NO. OF UNITS
DIGITAL
INPUT
DIGITAL
OUTPUT
ANALOG
INPUT
ANALOG
OUTPUT
REMARKS
EQUIPMENT, SYSTEM & POINT
SNOWMELT HEATING WATER RETURN TEMPERATURE X
SNOWMELT HEATING WATER SUPPLY TEMPERATURE X
SNOWMELT HEATING WATER SUPPLY TEMPERATURE
SETPOINT
X
SNOWMELT HEATING WATER SUPPLY TEMPERATURE,
HIGH
X
BUILDING HEATING WATER SUPPLY TEMPERATURE,
HIGH
X
BUILDING HEATING WATER SUPPLY TEMPERATURE,
LOW
X
BUILDING HEATING WATER RETURN TEMPERATURE X
BUILDING HEATING WATER SUPPLY TEMPERATURE X
HEATING WATER VALVE POSITION X
START/STOP X
ON/OFF STATUS X X CURRENT SWITCH
SNOWMELT HEATING PUMP FAILURE X
SNOWMELT HEATING PUMP RUNNING IN HAND X
SNOWMELT HEATING PUMP RUNTIME EXCEEDED X
SNOWMELT HEATING PUMP START/STOP X
SNOWMELT HEATING PUMP STATUS X
MFR FACTORY BAS INTERFACE
MODULE REQUIRED
SPACE RELATIVE HUMIDITY X X
SPACE TEMPERATURE X
UNIT ALARM CONDITION X X
NOTES:
1. ALWAYS REFER TO DRAWINGS FOR QUANTITY.
2. PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.
3. BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO DETERMINE WHICH ONES REQUIRE IMMEDIATE
ATTENTION.
6/30/2017 10:20 P:\VVMC\2015-459 Phase
II\Cad\Mech\Mschedules\[M-2015-459 East
Enabling.xlsx]EWE S932-4 Rf Hood
5400 5400
COMPUTER ROOM PACKAGED AIR CONDITIONING UNIT SCHEDULE
FAN DATA COIL DATA HUMIDIFIER CONDENSER FILTER DATA INDOOR CRAC DIMENSIONS OUTDOOR CONDENSER DIMENSIONS
CFM ESP MIN FACE EAT DESIGN L W H OPER L W H OPER
DESIG. MFR. MODEL AT ELEV (IN. W.C.) FAN AREA MBH MBH REFR. NO. KW LBS/ MODEL AMBIENT CFM REFR. AREA MERV-A (IN.) (IN.) (IN.) WEIGHT (IN.) (IN.) (IN.) WEIGHT CONTROL REMARKS
KW (SF) °F °F SENS. TOTAL ROWS HR °F (SF) (LBS) (LBS)
FEET FEET
CRAC-1 LIEBERT PDX PX023UA1AD 3500 0 0.99 10 72 48.9 62.9 70.5 R-410A 4 4.8 7.7 MCM040E1 100 3500 R-410A 5.8 8 34 34 95 670 58 58 62 310
PER CONTROL
SCHEDULE
REMARKS:
1. REFER TO ELECTRICAL PLANS FOR POWER REQUIREMENTS.
2. SELF CONTAINED UPFLOR SYSTEM WITH 20WAY TOP SUPPLY PLENUM AND LOWER FRONT RETURN.
3. PROVIDE WITH COLOR TOUCHSCREEN CONTROLLER, SMOKE DETECTOR AND CONTROL, LEAK DETECTOR, CONDENSATE PUMP, INFRARED HUMIDIFIER,INTERFACE
DIGITAL SCROLL COMPRESSOR WITH SOUND JACKET, AND BAS CONTROL INTERFACE
3. PROVIDE LEGS/CURB FOR MINIMUM 36" HEIGHT OF CONDENSER ABOVE ROOF.
5. SIZE REFRIGERANT LINES PER MANUFACTURER'S INSTRUCTIONS
6/30/2017 10:20 P:\VVMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 East Enabling.xlsx]EWE S932-4 Rf Hood
DUCT PRESSURE CLASSIFICATION SCHEDULE
DUCT TYPE MATERIAL
PRESSURE
CLASS
REMARKS
MEDIUM PRESSURE SUPPLY GALVANIZED STEEL +4" BETWEEN SYSTEM FAN & TERMINAL BOX
LOW PRESSURE SUPPLY GALVANIZED STEEL +2" BETWEEN TERMINAL BOX & ROOM
LOW PRESSURE EXHAUST GALVANIZED STEEL -2"
OUTSIDE AIR DUCTWORK GALVANIZED STEEL -2"
RELIEF DUCTWORK GALVANIZED STEEL +2"
TRANSFER AIR GALVANIZED STEEL +/-2"
AIR DEVICE SCHEDULE
DESIG. FUNCTION MFR. MODEL FRAME MATERIAL FINISH REMARKS
STYLE
C SIDEWALL SUPPLY TITUS 300RL SURFACE MOUNT STEEL WHITE ALL
REMARKS:
GENERAL - APPLIES TO ALL AIR DEVICES: MANUAL VOLUME DAMPERS SHALL BE ACCEPTABLE IN DUCTWORK AT THE BRANCH POINT OF THE
RUNOUT DUCT OR IN-LINE TO THE AIR DEVICE BY THE CONTRACTOR INSTALLING DUCTWORK. A DAMPER LOCATED AT THE AIR DEVICE SHALL
BE ACCEPTABLE WHEN PERMITTED BY ENGINEER ON A CASE-BY-CASE BASIS OR WHEN THE MANUFACTURER REQUIRES AN INTEGRAL
MANUAL VOLUME DAMPER.
6/30/2017 10:20 P:\VVMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 East Enabling.xlsx]EWE S932-4 Rf Hood
~
~
~ ~ 530-3
DX COIL PIPING DETAIL RL
RS
SCALE: NONE
REFRIGERANT
CHARGE SERVICE
VALVE
AIR COOLED
CONDENSING UNIT X"
X"
X"
THERMAL BULB, LOCATE
45° ABOVE BOTTOM OF
PIPE AS CLOSE AS
POSSIBLE TO COIL OUTLET
DX
COOLING
COIL
SOLENOID VALVE
SIGHT GLASS
FILTER DRYER
RS
EXPANSION VALVE
EQUALIZER LINE
REFRIGERANT RECLAIM
SERVICE VALVE
RL
11-18-11
(15530)
~~
~
~
PRESSURE GAUGE
1/2" TUBING OR
IPS. SAME
MATERIAL AS
MAIN PIPING.
540-10
OPTION:
IN-LINE PUMP PIPING DETAIL
HANGER ROD WITH TYPE 6
VIBRATION ISOLATOR AND
CLEVIS HANGER
SUPPORTING PIPING AS
CLOSE TO PUMP AS
PRACTICAL
SCALE: NONE
PROVIDE FLOW
MEASURING DEVICE AND
BALANCING COCK PER
SPEC. OR CIRCUIT SETTER
(FOR PIPING 1-1/2" AND
SMALLER)
PUMP
P/T P/T
TAPS FOR T.C.
770-2
SNOWMELT MANIFOLD DETAIL
NOTE: SEE PLANS FOR NUMBER OF MANIFOLDS AND CIRCUITS.
SHAPE MEMORY
FITTING
SCALE: NONE
SNOWMELT TUBING
BALANCING
VALVE
PROVIDED WITH
MANIFOLD
DRAIN VALVE
WITH CAP
SNOWMELT
RETURN
HEADER
SNOWMELT
TUBING
DRAIN
VALVE WITH
CAP
SNOWMELT SUPPLY HEADER
MANUAL AIR VENT
1 1/2" THREADED
VALVES. PLUG END
FOR FUTURE.
SIMILAR TO
OTHER SIDE
1 1/4"
HDPE LANDSCAPE VALVE
BOX. SIZE TO
ACCOMMODATE MANIFOLD
AND FITTINGS.
1 1/2" TEE
1 1/4" ~
~
HOSE END
DRAIN
VALVE
AIR CHARGING
PORT
770-1
SNOWMELT
EXPANSION TANK DETAIL
SCALE: NONE
FLOOR
DIAPHRAGM TYPE
EXPANSION TANK
OUTLET SIZE
BLOW DOWN
VALVE WITH
HOSE END
SMR
AIR SEPARATOR
SEE PUMP DETAIL
FOR ADDITIONAL
DATA
PUMP
3/4" FEMALE HOSE
CONNECTION FOR
FILL AND
MAINTENANCE.
GLYCOL AND FILL
WILL BE
MAINTAINED
MANUALLY.
N.O.
SMR TO SYSTEM
HIGH
CAPACITY
AUTO AIR
VENT
910-1
FIRE DAMPER
INSTALLATION DETAIL
SCALE: NONE
MOUNTING/RETAINING
ANGLES INSTALLED PER MFR'S
INSTALLATION INSTRUCTIONS
NOTE:
VERTICAL TYPE FIRE DAMPER SHOWN. FOR
HORIZONTAL TYPE, TURN ASSEMBLY 90° AND
PROVIDE W/NEGATOR CLOSURE SPRING.
AIR FLOW
PROVIDE SLEEVE GAUGE
STEEL FIRE DAMPER
SLEEVE, THICKNESS PER
MFR'S INSTALLATION
INSTRUCTIONS
FOR HORIZONTAL FIRE DAMPERS
LOCATE DUCT ACCESS DOOR
FROM ABOVE TO ACCESS
NEGATOR CLOSURE SPRING
BREAKAWAY
JOINTS, BOTH
SIDES OF DAMPER
SLEEVE
PROVIDE MULTIPLE
ACCESS DOORS FOR
DUCTWORK 60" OR
WIDER OR ON SIDE OF
DUCT WHEN REQUIRED
TO PROVIDE ADEQUATE
ACCESS TO FIRE DAMPER
FIRE DAMPER
INSTALLATION NOTE:
M.C. SHALL PROVIDE & INSTALL
ADDITIONAL STEEL MULLIONS PER
MFR INSTALLATION INSTRUCTIONS
FOR MULTIPLE FIRE DAMPER
ASSEMBLIES.
MAINTAIN EXPANSION
CLEARANCE PER MFR'S
INSTALLATION INSTRUCTIONS
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
EAST
WING
ENABLING
6/30/2017
12:31:59 PM
15924.00
M-002.75
MECHANICAL SCHEDULES
AND DETAILS
06/30/17
PERMIT EAST
WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657
10/12/17