HomeMy WebLinkAboutB17-0340_M-090.75_1507837279.pdfNEW BULK O2 PAD
BURIED 2" O2 PIPING INSTALLED PER NFPA 99
AND BELOW THE FROST LINE IN A PREVIOUS
PHASE CAPPED BELOW GRADE
BURIED 2" O2 PIPING INSTALLED PER
NFPA 99 AND BELOW THE FROST LINE
IN A PREVIOUS PHASE CAPPED BELOW
GRADE
CONNECT TO VENDOR PROVIDED BULK O2
EQUIPMENT AND CERTIFY PER NFPA 99
EXISTING 2" O2 PIPING
INTO BUILDING. REFER
TO WEST WING PROJECT
DOCUMENTATION FOR
CONTINUATION.
2901 Blake Street, Suite
100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
O2 ENCLOSURE
6/30/2017
12:32:07 PM
15924.00
M-090.75
O2 ENCLOSURE
MECHANICAL SITE PLAN
06/30/17
PERMIT EAST
WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657
SCALE: 1" = 20'-0"
O2 ENCLOSURE MECHANICAL SITE PLAN
10/12/17