Loading...
HomeMy WebLinkAboutB17-0340_M-090.75_1507837279.pdfNEW BULK O2 PAD BURIED 2" O2 PIPING INSTALLED PER NFPA 99 AND BELOW THE FROST LINE IN A PREVIOUS PHASE CAPPED BELOW GRADE BURIED 2" O2 PIPING INSTALLED PER NFPA 99 AND BELOW THE FROST LINE IN A PREVIOUS PHASE CAPPED BELOW GRADE CONNECT TO VENDOR PROVIDED BULK O2 EQUIPMENT AND CERTIFY PER NFPA 99 EXISTING 2" O2 PIPING INTO BUILDING. REFER TO WEST WING PROJECT DOCUMENTATION FOR CONTINUATION. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant O2 ENCLOSURE 6/30/2017 12:32:07 PM 15924.00 M-090.75 O2 ENCLOSURE MECHANICAL SITE PLAN 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 SCALE: 1" = 20'-0" O2 ENCLOSURE MECHANICAL SITE PLAN 10/12/17