HomeMy WebLinkAboutB17-0340_M-100.75_1507837282.pdfREFER TO ENLARGED FUEL OIL PLAN ON M-101.75 BULK O2 PAD RELOCATE EXISTING NATURAL GAS MAIN AND METER TO ALLOW EAST WING CONSTRUCTION REVIEW EXISTING NATURAL GAS METER SERVING AMBULANCE GARAGE. IT MAY NEED TO BE RELOCATED OR REFED AS PART OF THE UTILITY PROVIDER RELOCATION OF THE EXISTING MAIN AND METER SERVING THE HOSPITAL. PROVIDE 170 BTUH/SF SNOWMELT WITHIN HATCHED AREA RELOCATE (E) AMBULANCE EXHAUST TAILPIPE CONNECTIONS TO COORDINATE WITH NEW VEHICLE PARKING ORIENTATION. EXISTING SYSTEM UTILIZES PLYMOVENT VEHICLE EXHAUST SYSTEM.COORDINATE WITH EXISTING SYSTEM VENDOR: AIRPRO (303) 320-8400. (E) NG GENERATOR FOR AMBI BARN TO BE RELOCATED (E) AMBI BARN NG METER LOCATION RELOCATE NG GENERATOR FOR AMBI BARN O THIS APPROXIMATE LOCATION AND EXTEND NATURAL GAS TO NEW GENERATOR LOCATION 2 M-107.75 APPROXIMATE LOCATION OF NEW TEMPORARY GAS METER FOR HOSPITAL. COORDINATE WITH UTILITY COMPANY. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 12:32:18 PM 15924.00 M-100.75 MECHANICAL/PLUMBING SITE PLAN - ENABLING 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 SCALE: 1" = 20'-0" MECHANICAL/PLUMBING SITE PLAN - ENABLING KEYNOTES Q5 PROVIDE SNOWMELT SYSTEM FOR RAMP AT TEMPORARY DOCK ENTRANCE IN ENABLING PHASE. SNOWMELT EXTENTS ARE INDICATED ON ENABLING SITE PLAN. SNOWMELT EQUIPMENT AND POINT OF CONNECTION TO EXISTING SYSTEM IS IS INDICATED ON ENABLING LEVEL 1 PIPING PLAN. PROVIDE SNOWMELT CONTROLLER, PUMP, AND FLAT PLAT HEAT EXCHANGER FOR SYSTEM WITHIN LEVEL 1 STORAGE ROOM AS INDICATED. SCALE: 1/8" = 1'-0" MECHANICAL/PLUMBING PLAN - AMBULANCE BARN 10/12/17