HomeMy WebLinkAboutB17-0340_M-100.75_1507837282.pdfREFER TO ENLARGED FUEL OIL PLAN ON M-101.75
BULK O2 PAD
RELOCATE EXISTING NATURAL GAS
MAIN AND METER TO ALLOW EAST
WING CONSTRUCTION
REVIEW EXISTING NATURAL GAS
METER SERVING AMBULANCE
GARAGE. IT MAY NEED TO BE
RELOCATED OR REFED AS PART OF
THE UTILITY PROVIDER
RELOCATION OF THE EXISTING
MAIN AND METER SERVING THE
HOSPITAL.
PROVIDE 170 BTUH/SF SNOWMELT
WITHIN HATCHED AREA
RELOCATE (E) AMBULANCE EXHAUST
TAILPIPE CONNECTIONS TO COORDINATE
WITH NEW VEHICLE PARKING
ORIENTATION. EXISTING SYSTEM
UTILIZES PLYMOVENT VEHICLE EXHAUST
SYSTEM.COORDINATE WITH EXISTING
SYSTEM VENDOR: AIRPRO (303) 320-8400.
(E) NG GENERATOR
FOR AMBI BARN TO
BE RELOCATED
(E) AMBI BARN NG METER
LOCATION
RELOCATE NG GENERATOR FOR AMBI BARN O
THIS APPROXIMATE LOCATION AND EXTEND
NATURAL GAS TO NEW GENERATOR
LOCATION
2
M-107.75
APPROXIMATE LOCATION OF
NEW TEMPORARY GAS METER
FOR HOSPITAL. COORDINATE
WITH UTILITY COMPANY.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
EAST
WING
ENABLING
6/30/2017
12:32:18 PM
15924.00
M-100.75
MECHANICAL/PLUMBING
SITE PLAN - ENABLING
06/30/17
PERMIT EAST
WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657
SCALE: 1" = 20'-0"
MECHANICAL/PLUMBING SITE PLAN - ENABLING
KEYNOTES
Q5 PROVIDE SNOWMELT SYSTEM FOR RAMP AT TEMPORARY DOCK
ENTRANCE IN ENABLING PHASE. SNOWMELT EXTENTS ARE
INDICATED ON ENABLING SITE PLAN. SNOWMELT EQUIPMENT AND
POINT OF CONNECTION TO EXISTING SYSTEM IS IS INDICATED ON
ENABLING LEVEL 1 PIPING PLAN. PROVIDE SNOWMELT
CONTROLLER, PUMP, AND FLAT PLAT HEAT EXCHANGER FOR
SYSTEM WITHIN LEVEL 1 STORAGE ROOM AS INDICATED.
SCALE: 1/8" = 1'-0"
MECHANICAL/PLUMBING PLAN - AMBULANCE BARN
10/12/17