Loading...
HomeMy WebLinkAboutB17-0340_M-102.75_1507837276.pdf~ ~ T T T T U T T 10 B 350 350 CFM AC 1 EHC 2-1 FTR FTR FTR FTR BF 2 BF 1 VP 1 26/18 3/4" B.B.D. SEPARATOR F.S. 2000 CFM 500 CFM D D A 8"∅ 150 8"∅ 80 8/8 160 15/15 - 8"∅ 200 A 8"∅ 200 A 8/8 150 8/8 80 8"∅ 150 A A D B 18/10 16/10 10/10 10/10 10/10 E.A. UP UP TO FAN COIL UNIT CAP DUCT 10/10 CUH H H T T BF 2 BF 1 VP 1 26/18 3/4" B.B.D. SEPARATOR F.S. 2000 CFM 500 CFM D A 8"∅ 150 ∅ 8/8 160 15/15 - 8/8 80 8"∅ 150 A D B 16/10 UP TO FAN COIL UNIT CAP DUCT 10/10 CUH H H 5 MD-107.75 (E)4 SB (E)3 SB (E)2 SB (E)1 SB (N) 10" FLUE (N) 14" FLUE (E) RAYPAK BOILERS (E) WATER HEATERS (E) AHU TO BE MODIFIED (E) RETURN FAN (N) O.A. UP (E) MED VAC 3 M-107.75 2 M-107.75 H6 5 MD-107.75 (E) 10" FLUE (E) 14" FLUE (E) OA INTAKE LOUVER (E) EXHAUST FAN EF-1 AND LOUVER (E) OA INTAKE LOUVER (D) RELIEF LOUVER (D) OUTSIDE AIR LOUVER (E) RAYPAK BOILERS (E) WATER HEATERS (E) AHU TO BE MODIFIED (E) RETURN FAN (E) MED VAC 3 M-107.75 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 12:32:38 PM 15924.00 M-102.75 LEVEL 2 HVAC AND HVAC DEMO PLAN - EAST WING ENABLING 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 KEYNOTES H6 NEW OUTSIDE AIR AND RELIEF AIR DUCTWORK UP THROUGH STRUCTURE CONTINUING IN PEAKED ROOF. PROVIDE NEW MODULATING DAMPERS AND REPLICATE EXISTING SEQUENCE. SCALE: 1/8" = 1'-0" OVERALL HVAC PLAN - LEVEL 2 SCALE: 1/8" = 1'-0" OVERALL DEMOLITION HVAC PLAN - LEVEL 2 10/12/17