Loading...
HomeMy WebLinkAboutB17-0340_M-103.75_1507837260.pdf 1 2 3 4 5 6 Is u -ligon 10/12/17 PIPING MATERIALS CENTRAL PLANTFOS/FOR/BFOR/BFOR-BELOW GRADE TANK TO BUILDING: UL 971 DOUBLE WALL FLEXIBLE PIPE;OPW"FLEXWORKS" I■■ I U BOILER O BOILER O BOILER O FOS/FOR/BFOS/BFOR-INSIDE BUILDING: STEEL PIPE UI I■ E FOS/FOR/BFOS/BFOR-INSIDE CONTAINMENT SUMP AND TO GENERATOR: STEEL PIPE E 11111110 VENT PIPE(BELOW GRADE): SINGLE WALL FIBERGLASS REINFORCED PIPE(FRP):SMITH FIBERGLASS OR EQUAL VENT PIPE(ABOVE GRADE): STEEL PIPE,PRIMED AND PAINTED 1111 . U • g— • FORT mos •11 FILL PIPE: FIBERGLASS REINFORCED PIPE(FRP);SMITH FIBERGLASS OR EQUAL SENSOR RISER: FIBERGLASS REINFORCED PIPE(FRP);SMITH FIBERGLASS OR EQUAL DROP TUBE: ALUMINUM DAVIS CONDUIT: ALL BELOW GRADE DOUBLE WALL FLEXIBLE PIPE TO BE RUN IN"TERTIARY"CARRIER PIPE;ENVIRON FOS GEODUCT CONDUIT PARTNERSHIP ARCHITECTS ?901 Blake Street, Suite 100 Denver Denver, CO 80205 303.861.8555 N.o. Consultant NOTES BFOR D —BFOS O 22"0 MANWAY. GFOR 1-1/2"N.C. O LIQUID TIGHT TANK CONTAINMENT SUMP;48"BASE,36"NECK,MANWAY GFOS BYPASS MATING RING,GASKETED LID. FUEL COOLER -1" ` PLUG VALVE O 4"NPT HALF COUPLING(PLUG UNUSED FITTINGS). N.O. CATO R I RUMA O SLOPE TANK 1"/40 FT. F E til ►�� �I FOS " 23 ENLARGED VIEW OF & ASSOCIATES , C O . ® PUMP CONNECTIONS FOR 896 Tabor Street 420 W.Lincolnway O5 LEAK SENSOR. Lakewood,CO 80401 Cheyenne,WY 82001 O6 INTERSTITIAL SPACE LEAK SENSOR. FLEX 1"- 303.232.6200(P) 307.274.3830(P) 18"DIA MONITOR MANHOLE 303.233.3701(F) 303.233.3701(F) CONNECTOR 1 0 -CHECK www.catorruma.com O7 RISER PIPE,RISER PIPE CAP/FITTING. D v v VALVE N 2"BURIED VENT PIPING 13 BFOP D O8 M.H./LID/RING. 42"DIA.ACCESS / 1 42"DIA.ACCESS 18"DIA.MONITOR MANHOLE O PAVING BY G.C. EMERGENCY GENERATOR GENERATOR DAY TANK RETURN PUMP GFOP 08 O OO O 0 10 36"- MANWAY WITH 4"NPT FITTINGS. FUEL COOLER _ 1„ PLUG VALVE ffiiima_ miEMINalailla wO 11 TANK LADDER WITH SLIP LUGS. O 16 O\\i\ �� u " . 1 1/2" O i\�\\�\ `�, 10 III 12 SUBMERGED FILLING TUBE,WITH OVERFILL PREVENTION VALVE WITH Irl - -1 W. I�I FOS 1-1/2" O\�i\\/\\\ E- 0 O E- GAUGE STICK BYPASS,OPW 6150-1000. T FOR - \� 'r 13 REMOTE FILL PORT WITH SPILL CONTAINMENT AND OVERFILL ALARM. 8\ tat. '����� ' ~ '��•�� NM v _, CD1 N ��i��l1t111! (1if11! PREFERED UTILITIES MODEL 2. FLEX 1 NE ® TO MONITOR PANEL(TYPICAL) � ' p�B Lle. • CONNECTOR 4- IN h� 3 -_ 22 IN FACILITIES CONTROL ROOM �� 'C" •• •• "61_,. CHECK -1-1/2" �l ___ � --- --� iO .� Y 10 r . • 14 NOT USED. VALVE — — + "T- * CV aD�- U v O TO MONITOR o 0 ©, . '�: w 15 3"DOUBLE WALL FLEXIBLE PIPE. PIPING TRANSITION SUMP0 PANEL IN CUP <\ • 16 PIPING IN SECONDARY CONTAINMENT PIPING,TYPICAL OF ALL. EMERGENCY GENERATOR GENERATOR DAY TANK ; ROOM CONTROL Q �� RETURN PUMP 17 NOT USED. 12 v ��.{� �1`�011•J'��� 18 LEVEL AND WATER SENSOR. ® II �2" 44/„.,ONAL. \\��� 19 BOTTOM OF BOILER FUEL OIL PUMP AT 28"ABOVE BOTTOM OF TANK. - - nillino 20 4"RISER PIPE WITH CAP. O O 21 LIQUID TIGHT TANK CONTAINMENT SUMP;48"BASE,42"NECK,MANWAY 1 MATING RING,GASKETED LID. 6" 6" d Issuance 22 4"INSERTION FITTING FOR DRY-INTERSTITIAL SENSING. DROP TUBE O STRIKE 4 PLATE PERMIT 06/30/17 23 VENT CAP,OPW#23. 24 2"VENT PIPE. 25 SECONDARY CONTAINMENT RISER,4"FRP PIPE. Revisions Date 26 1"ELECTRICAL COUPLINGS. FUEL OIL PIPING SCHEMATIC C SCALE:NONE /, C Project Information FUEL TANK SCHEDULE DESIG. MFR. MODEL LENGTH(IN.) DIAMETER(IN.) TANK CAPACITY(GALS) REMARKS FOT-1 XERXES DOUBLE WALL 4T-7" 10'-0" 25,000 ALL I` LO REMARKS: 1. TANK WILL BE INSTALLED IN ENABLING PHASE,ALONG WITH FUEL OIL PIPING TO EDGE OF FUTURE EAST WING.PIPING WILL BE CAPPED. Z N- PUMPS AND REMAINDER OF FUEL OIL EQUIPMENT WILL BE INSTALLED AS PART OF THE EAST WING PACKAGE. O OO CD 2. INITIAL FUEL OIL FILL AND ADDITIVES FOR BALLAST WILL BE OWNER PROVIDED. 11 O B 6/30/2017 11:57 – ____ _ 311 IW ,4 w r . : ,1 _ _ _ _ I J, ....„ //, \, 0 a r__A r._____..1 i.1 I-1 4a J 0 CC MM o a > -1 QZ 1= w 0 0 III-1 I I— III i 'I - - ,• z, o 7] -r CAP FOR F T RE r� r_— r CONNECTIe 1. 0) CO • l'IP E [>< O 44 O '110 _....ow-diggliCAP AND COIL Q 0 CO „^ .AIN.k r,,4� —� REMAINDER OF (0 MI L_ 4 . O 4 �� ��� — FLEXIBLE PIPING FOR i o O ��� � D N110 FUTURE CONNECTION U) ,,�. l �,0. 1 _ TO TRANSITION SUMP. LU cp co 1 XFMR �� ,� r __ ��� e � � I it 1 w Or .. P - �i _sem � � • A_ *Z��__ FUEL OIL PIPING --- ' .....E1111\ AIILN-'''' <111111111r1::2 44411,471& IL.1,411 Alavc‘f -iialimk--- .0 - 'VbWffttfirtragrAN A A k bffiti I KM IA 1M 4 iv, + - •,,� — - � _ � it -� ,� �� � -. ` ` �rANIMEly � i� _- r % 1 ' !• BFOP / Sheet Information 416. *#,4# •• GFOP Aik‘ FUEL OIL TANK (TT) 4\ A\ Sheet Title: A 4111111 .. BURIED FUEL OIL TANK VENT A �� _� .� % * #S FUEL OIL TANK PLAN DETAIL AND SCHEDULE Sheet Number: FUEL OIL TANK PLAN M - 1 7 5 N 1 0 3 03 . 75 ,:i SCALE: 1/8” = 1'-0" 0 m DPA Project: 15924.00 za COPYRIGHT -DAVIS PARTNERSHIP, 1 2 1 3 1 4 1 5 6