HomeMy WebLinkAboutB17-0340_M-103.75_1507837274.pdfFUEL OIL PIPING SCHEMATIC
SCALE: NONE
1"
1"
EMERGENCY GENERATOR
FLEX
CONNECTOR
1"
1"
EMERGENCY GENERATOR
FLEX
CONNECTOR
BOILER BOILER BOILER
FUEL COOLER
FUEL COOLER
22"∅ MANWAY.
LIQUID TIGHT TANK CONTAINMENT SUMP; 48" BASE, 36" NECK, MANWAY
4" NPT HALF COUPLING (PLUG UNUSED FITTINGS).
SLOPE TANK 1"/40 FT.
LEAK SENSOR.
INTERSTITIAL SPACE LEAK SENSOR.
RISER PIPE, RISER PIPE CAP/FITTING.
M.H./LID/RING.
PAVING BY G.C.
36"∅ MANWAY WITH 4" NPT FITTINGS.
TANK LADDER WITH SLIP LUGS.
SUBMERGED FILLING TUBE, WITH OVERFILL PREVENTION VALVE WITH
REMOTE FILL PORT WITH SPILL CONTAINMENT AND OVERFILL ALARM.
NOT USED.
3" DOUBLE WALL FLEXIBLE PIPE.
PIPING IN SECONDARY CONTAINMENT PIPING, TYPICAL OF ALL.
NOT USED.
LEVEL AND WATER SENSOR.
BOTTOM OF BOILER FUEL OIL PUMP AT 28" ABOVE BOTTOM OF TANK.
4" RISER PIPE WITH CAP.
LIQUID TIGHT TANK CONTAINMENT SUMP; 48" BASE, 42" NECK, MANWAY
MATING RING, GASKETED LID.
4" INSERTION FITTING FOR DRY-INTERSTITIAL SENSING.
VENT CAP, OPW #23.
2" VENT PIPE.
SECONDARY CONTAINMENT RISER, 4" FRP PIPE.
1" ELECTRICAL COUPLINGS.
GAUGE STICK BYPASS, OPW 61SO-1000.
PREFERED UTILITIES MODEL 2.
MATING RING, GASKETED LID.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
FOS/FOR/BFOR/BFOR - BELOW GRADE TANK TO BUILDING: UL 971 DOUBLE WALL FLEXIBLE PIPE; OPW "FLEXWORKS"
NOTES
FOS/FOR/BFOS/BFOR - INSIDE BUILDING: STEEL PIPE
FOS/FOR/BFOS/BFOR - INSIDE CONTAINMENT SUMP AND TO GENERATOR: STEEL PIPE
VENT PIPE (BELOW GRADE): SINGLE WALL FIBERGLASS REINFORCED PIPE (FRP): SMITH FIBERGLASS OR EQUAL
VENT PIPE (ABOVE GRADE): STEEL PIPE, PRIMED AND PAINTED
FILL PIPE: FIBERGLASS REINFORCED PIPE (FRP); SMITH FIBERGLASS OR EQUAL
SENSOR RISER: FIBERGLASS REINFORCED PIPE (FRP); SMITH FIBERGLASS OR EQUAL
DROP TUBE: ALUMINUM
CONDUIT: ALL BELOW GRADE DOUBLE WALL FLEXIBLE PIPE TO BE RUN IN "TERTIARY" CARRIER PIPE; ENVIRON
GEODUCT CONDUIT
PLUG VALVE
CHECK
VALVE
FOS
FOR
FOS
FOR
PLUG VALVE
GENERATOR DAY TANK
RETURN PUMP
GENERATOR DAY TANK
RETURN PUMP
CHECK
VALVE
FOS
FOR
BFOS
BFOR
GFOS
GFOR
N.O.
1-1/2" N.C.
BYPASS
ENLARGED VIEW OF
PUMP CONNECTIONS
N.O.
18" DIA MONITOR MANHOLE
8 8
8
9
13
10
21
26
16
12
19
25
22
24
20
10
BFOP
1
GFOP
1
8
3
1 3
T
1
2"
6
4
18
6" 6"
5
4"
J
E
J
E
2
42" DIA. ACCESS 42" DIA. ACCESS 18" DIA. MONITOR MANHOLE
TO MONITOR PANEL (TYPICAL)
IN FACILITIES CONTROL ROOM
STRIKE
PLATE
DROP TUBE
PIPING TRANSITION SUMP TO MONITOR
PANEL IN CUP
CONTROL
ROOM
1-1/2"
1-1/2"
1-1/2"
BFOS
FOR
GFOS
FOR
PIPING MATERIALS
CENTRAL PLANT
23 12' A.F.G.
2" BURIED VENT PIPING
FUEL TANK SCHEDULE
DESIG. MFR. MODEL LENGTH (IN.) DIAMETER (IN.) TANK CAPACITY (GALS) REMARKS
FOT-1 XERXES DOUBLE WALL 47'-7" 10'-0" 25,000 ALL
REMARKS:
1. TANK WILL BE INSTALLED IN ENABLING PHASE, ALONG WITH FUEL OIL PIPING TO EDGE OF FUTURE EAST WING. PIPING WILL BE CAPPED.
PUMPS AND REMAINDER OF FUEL OIL EQUIPMENT WILL BE INSTALLED AS PART OF THE EAST WING PACKAGE.
2. INITIAL FUEL OIL FILL AND ADDITIVES FOR BALLAST WILL BE OWNER PROVIDED.
6/30/2017 11:57
FUEL OIL TANK
XFMR
FUEL OIL PIPING
BFOP
GFOP
BURIED FUEL OIL TANK VENT
CAP AND COIL
REMAINDER OF
FLEXIBLE PIPING FOR
FUTURE CONNECTION
TO TRANSITION SUMP.
1
FOT
CAP FOR FUTURE
CONNECTION.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
EAST
WING
ENABLING
6/30/2017
12:32:47 PM
15924.00
M-103.75
FUEL OIL TANK PLAN
DETAIL AND SCHEDULE
06/30/17
PERMIT EAST
WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657
SCALE: 1/8" = 1'-0"
FUEL OIL TANK PLAN
10/12/17