HomeMy WebLinkAboutB17-0340_M-103.75_1507837274.pdfFUEL OIL PIPING SCHEMATIC SCALE: NONE 1" 1" EMERGENCY GENERATOR FLEX CONNECTOR 1" 1" EMERGENCY GENERATOR FLEX CONNECTOR BOILER BOILER BOILER FUEL COOLER FUEL COOLER 22"∅ MANWAY. LIQUID TIGHT TANK CONTAINMENT SUMP; 48" BASE, 36" NECK, MANWAY 4" NPT HALF COUPLING (PLUG UNUSED FITTINGS). SLOPE TANK 1"/40 FT. LEAK SENSOR. INTERSTITIAL SPACE LEAK SENSOR. RISER PIPE, RISER PIPE CAP/FITTING. M.H./LID/RING. PAVING BY G.C. 36"∅ MANWAY WITH 4" NPT FITTINGS. TANK LADDER WITH SLIP LUGS. SUBMERGED FILLING TUBE, WITH OVERFILL PREVENTION VALVE WITH REMOTE FILL PORT WITH SPILL CONTAINMENT AND OVERFILL ALARM. NOT USED. 3" DOUBLE WALL FLEXIBLE PIPE. PIPING IN SECONDARY CONTAINMENT PIPING, TYPICAL OF ALL. NOT USED. LEVEL AND WATER SENSOR. BOTTOM OF BOILER FUEL OIL PUMP AT 28" ABOVE BOTTOM OF TANK. 4" RISER PIPE WITH CAP. LIQUID TIGHT TANK CONTAINMENT SUMP; 48" BASE, 42" NECK, MANWAY MATING RING, GASKETED LID. 4" INSERTION FITTING FOR DRY-INTERSTITIAL SENSING. VENT CAP, OPW #23. 2" VENT PIPE. SECONDARY CONTAINMENT RISER, 4" FRP PIPE. 1" ELECTRICAL COUPLINGS. GAUGE STICK BYPASS, OPW 61SO-1000. PREFERED UTILITIES MODEL 2. MATING RING, GASKETED LID. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 FOS/FOR/BFOR/BFOR - BELOW GRADE TANK TO BUILDING: UL 971 DOUBLE WALL FLEXIBLE PIPE; OPW "FLEXWORKS" NOTES FOS/FOR/BFOS/BFOR - INSIDE BUILDING: STEEL PIPE FOS/FOR/BFOS/BFOR - INSIDE CONTAINMENT SUMP AND TO GENERATOR: STEEL PIPE VENT PIPE (BELOW GRADE): SINGLE WALL FIBERGLASS REINFORCED PIPE (FRP): SMITH FIBERGLASS OR EQUAL VENT PIPE (ABOVE GRADE): STEEL PIPE, PRIMED AND PAINTED FILL PIPE: FIBERGLASS REINFORCED PIPE (FRP); SMITH FIBERGLASS OR EQUAL SENSOR RISER: FIBERGLASS REINFORCED PIPE (FRP); SMITH FIBERGLASS OR EQUAL DROP TUBE: ALUMINUM CONDUIT: ALL BELOW GRADE DOUBLE WALL FLEXIBLE PIPE TO BE RUN IN "TERTIARY" CARRIER PIPE; ENVIRON GEODUCT CONDUIT PLUG VALVE CHECK VALVE FOS FOR FOS FOR PLUG VALVE GENERATOR DAY TANK RETURN PUMP GENERATOR DAY TANK RETURN PUMP CHECK VALVE FOS FOR BFOS BFOR GFOS GFOR N.O. 1-1/2" N.C. BYPASS ENLARGED VIEW OF PUMP CONNECTIONS N.O. 18" DIA MONITOR MANHOLE 8 8 8 9 13 10 21 26 16 12 19 25 22 24 20 10 BFOP 1 GFOP 1 8 3 1 3 T 1 2" 6 4 18 6" 6" 5 4" J E J E 2 42" DIA. ACCESS 42" DIA. ACCESS 18" DIA. MONITOR MANHOLE TO MONITOR PANEL (TYPICAL) IN FACILITIES CONTROL ROOM STRIKE PLATE DROP TUBE PIPING TRANSITION SUMP TO MONITOR PANEL IN CUP CONTROL ROOM 1-1/2" 1-1/2" 1-1/2" BFOS FOR GFOS FOR PIPING MATERIALS CENTRAL PLANT 23 12' A.F.G. 2" BURIED VENT PIPING FUEL TANK SCHEDULE DESIG. MFR. MODEL LENGTH (IN.) DIAMETER (IN.) TANK CAPACITY (GALS) REMARKS FOT-1 XERXES DOUBLE WALL 47'-7" 10'-0" 25,000 ALL REMARKS: 1. TANK WILL BE INSTALLED IN ENABLING PHASE, ALONG WITH FUEL OIL PIPING TO EDGE OF FUTURE EAST WING. PIPING WILL BE CAPPED. PUMPS AND REMAINDER OF FUEL OIL EQUIPMENT WILL BE INSTALLED AS PART OF THE EAST WING PACKAGE. 2. INITIAL FUEL OIL FILL AND ADDITIVES FOR BALLAST WILL BE OWNER PROVIDED. 6/30/2017 11:57 FUEL OIL TANK XFMR FUEL OIL PIPING BFOP GFOP BURIED FUEL OIL TANK VENT CAP AND COIL REMAINDER OF FLEXIBLE PIPING FOR FUTURE CONNECTION TO TRANSITION SUMP. 1 FOT CAP FOR FUTURE CONNECTION. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 12:32:47 PM 15924.00 M-103.75 FUEL OIL TANK PLAN DETAIL AND SCHEDULE 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 SCALE: 1/8" = 1'-0" FUEL OIL TANK PLAN 10/12/17