Loading...
HomeMy WebLinkAboutB17-0340_M-107.75_1507837285.pdfPROVIDE MIN. 25 FT SEPERATION FROM OUTSIDE AIR TO ANY VENT OR EXHAUST 6" G 6" G (E) VAC PUMP EXHAUST (E) NG TO L2 STEAM BOILER ROOM (E) NG TO L2 HYDRONIC BOILERS (N) MULTIZONE AHU RELIEF W/GOOSENECK (N) MULTIZONE AHU O.A. INTAKE (E) CONDENSING UNITS (E) STEAM AND CONDENSATE RACKED ON WALL TO WEST WING (E) CONDENSING UNITS RELOCATE (E) PLUMBING VENT WEST TO CLEAR OA CIRCLES (E) TRANE EXHAUST FAN AND ENERGY RECOVERY COIL (E) 8" DOWN TO EF-2-1 (E) 10" DOWN TO HOOD (E) DX COIL AC-1 (E) AHU FAN AND FURNACE (E) SA DOWN OUTSIDE AIR (E) EF-2-3 (E) FC-3 AND HEATING COIL (E) 22/22 RA DOWN (E) DX COIL (E) 24/22 SA DOWN 22"x24" (E) 10/10 EXH DOWN (E) 14/14 EXH DOWN (E) EXHAUST FAN (E) 14/14 EXH UP TO GOOSENECK TERMINATION (E) RETURN DOWN (E) 14/14 EXH DOWN (E) AHU-1 WITH ENERGY RECOVERY AND DX COILS 14"x14" 22"x16" 22"x16" (E) 18/18 SA DOWN (E) FC-2 (E) 20/18 RA DOWN (E) 20/18 SA DOWN (E) DX COIL 20"x20" 24"x24" (E) CONDENSING UNIT H1 H1 4 ACC 5 ACC 3 M-107.75 (N) FC-3 AHU O.A. INTAKE (N) FC-2 AHU O.A. INTAKE (N) LAB AHU O.A. INTAKE 1 RH 2 RH 4 RH 3 RH 6" G NATURAL GAS DROP TO NEW METER LOCATION. COORDINATE NEW METER LOCATION AND REQUIREMENTS WITH UTILITY COMPANY. 2 M-107.75 SUPPORT FROM FACE OF BUILDING 6" G 6" G 6" G 37"x24" 96"x24" CRAC CU OFFSET (E) 6"NG AROUND ROOF HOOD H13 H24 H24 H25 H24 H23 21"x37" 6" G NATURAL GAS DROP TO NEW METER LOCATION. COORDINATE NEW METER LOCATION AND REQUIREMENTS WITH UTILITY COMPANY. PROVIDE PIPE STAND SUPPORTS AND BRACING FOR NATURAL GAS PIPING ABOVE EXISTING CONNECTOR ROOF. EXISTING AMBULANCE GARAGE BUILDING PROVIDE UNISTRUT AND PIPE CLAMP SUPPORTS FOR MOUNTING TO FACE OF BUILDING EXTERIOR. NATURAL GAS PIPING INDICATED FOR THIS ROUTING IS TEMPORARY AND WILL BE REMOVED AT COMPLETION OF EAST WING. 37"x21" 1 RH 2 RH 3 RH 4 RH TURN RELIEF DOWN AND TERMINATE WITH SCREEN 37"x21" 6" G 24"x96" 22"x22" EXISTING AHU 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 12:32:57 PM 15924.00 M-107.75 ROOF MECHANICAL PLAN - ENABLING 06/30/17 PERMIT EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657 SCALE: 1/8" = 1'-0" OVERALL MECHANICAL PLAN - ROOF - EAST ENABLING 1/8" = 1'-0" 2 NEW GAS LINE ACROSS AMBI BARN SECTION 1/8" = 1'-0" 3 ROOF SECTION SHOWING OUTSIDE AIR HOODS KEYNOTES H1 RELOCATE EXISTING DX SPLIT SYSTEM CONDENSER. INCLUDE REPLACEMENT OF LINESETS ALL THE WAY BACK TO THE EVAPORATOR IN STEADMAN IT CENTER. H13 SPLIT 96/24 OUTSIDE AIR DUCT INTO (4) 20/24 DUCTS TO TRANSITION THROUGH EXISTING RAFTERS. RECOMBINE AT ENTRY TO RH-1. H23 ABANDONED BOILER/WATER HEATER FLUE H24 OFFSET EXISTING WATER HEATER FLUE / BOILER ROOM EXHAUST IF REQUIRED TO MAINTAIN CODE REQUIRED 25'-0" CLEARANCE FROM OUTSIDE AIR INTAKE. H25 EXISTING BOILER ROOM INTAKE HOOD TO REMAIN. 10/12/17