HomeMy WebLinkAboutB17-0340_S-001-1_1507837283.pdfSYMBOL DESCRIPTION
WINDOW WASHING DAVIT
FALL PROTECTION TIE-BACK
MECH UNIT (XX.Xk = MECH
UNIT OPERATING WEIGHT
IN KIPS INCLUDING INERTIA
BASE)
PAD THICKNESS
PENETRATION THRU
STRUCTURAL MEMBER
STRUCTURAL MAS WALL
CONTROL JOINT
PRECAST CONCRETE
OVERFRAMING
D
T
CAST-IN-PLACE CONCRETE
X
XX.Xk
X" EXTENT OF CONCRETE PAD
SYMBOL DESCRIPTION
YW1 WALLS, Y = (F)ND, (C)IP CONC,
(P)RECAST, (M)AS, (R)ETAINING,
CIP CONC (S)HEARWALL
FTG MARK (SF = STRIP FTG)
T/FTG EL
DRILLED PIER DIAMETER IN INCHES
PENETRATION INTO BEDROCK IN FEET
TYPE
T/DRILLED PIER ELEVATION
PIER DOWELS
DRILLED PIER CAP (IF PRESENT)
F1
XX'-X"
DPXXA-XX
XX'-X"
PD-1
DPC1
SYMBOL DESCRIPTION
FULL HEIGHT SHEAR CONNECTION, SEE [8/Z5.01]
MOMENT CONNECTION, SEE [11/Z5.01]
AXIAL DRAG CONNECTION, SEE [8/Z5.01]
BRACING ABOVE LEVEL
BRACING BELOW LEVEL
ABOVE DECK CONCRETE THICKNESS
TYPE
DECK TYPE
DESIGN AXIAL DRAG FORCE OR DETAIL
DECK SPAN DIRECTION
T/SLAB AT SLAB-ON-DECK
2VLIX.XXA
XXX'-XX"
XXk
XXk XXk
BEAM SIZE [XX]
c=X" (XXX'-XX")
CAMBER (INCHES)
EL OF T/STEEL
SHEAR STUD QUANTITY
ULTIMATE BM REACTION
USING LRFD LOAD
COMBINATIONS (KIPS)
STEEL BEAM
SYMBOL DESCRIPTION
ELEVATION CALLOUT
XXX'-XX"
STEP
SLOPE
KEY NOTE
SUBGRADE
FORM SAVER
DRAWING REVISION
NUMBER
CURRENT REVISION CLOUD
1
X
SERVICE LOAD PROVIDED FOR
SPECIALTY DESIGNER
WELDED-WIRE REINFORCEMENT
SECTION OR
DETAIL CUT
SHEET NUMBER
ELEVATION CUT
SHEET NUMBER
GRID LINES
X
XX
X
XX
-
SYMBOL DESCRIPTION
EP1
C1
B1
J1
TWS
SR1
YW1
EMBED PLATE
CONCRETE COLUMN
CONCRETE BEAM
CONCRETE JOIST
TWO-WAY CONCRETE SLAB
STUD RAIL
WALLS, Y = (F)ND, (C)IP CONC,
(P)RECAST, (M)AS, (R)ETAINING,
CIP CONC (S)HEARWALL
OWSXXA
XXX'-XX"
BAR SIZE
LOC IN SLAB, SEE [ ]
ADDITIONAL REINFORCING
SLAB THICKNESS
TYPE
T/SLAB
(n)#bTx
(n)#bBx
NUMBER OF BARS ADDED IN STRIP
SPAN DIRECTION (IF ONE-WAY)
OWS ONE-WAY CONCRETE SLAB
SLAB TYPE
SOGXXA
XXX'-XX"
SLAB THICKNESS
TYPE
T/SLAB
SLAB TYPE
CXX
BP-X
COLUMN SIZE OR MARK
BASE PLATE TYPE
ROUGHENED SURFACE,
INTENTIONALLY ROUGHEN TO 1/4"
AMPLITUDE, UNO
NOTES:
1. ITEMS NOT DESIGNED BY M/M ARE SHOWN HALFTONED,
2. ITEMS INCLUDE:
- EXISTING CONSTRUCTION
- PERFORMANCE SPECIFIED ITEMS (STAIRS, RAILINGS, ETC.)
1) CODES AND STANDARDS:
-- International Building Code 2015
2) SEISMIC LOADS
- SEISMIC DESIGN CATEGORY = C
- RISK CATEGORY = IV
- EARTHQUAKE IMPORTANCE FACTOR, le = 1.50
- MAPPED SPECTRAL RESPONSE ACCELERATION, Ss = 25.60 %g
- MAPPED SPECTRAL RESPONSE ACCELERATION, S1 = 7.30 %g
- DESIGN SPECTRAL RESPONSE COEFFICIENT, SDs = 0.205
- DESIGN SPECTRAL RESPONSE COEFFICIENT, SD1 = 0.083
- SOIL SITE CLASS = C
3) WIND LOADS
- RISK CATEGORY = IV
- BASIC ULTIMATE WIND SPEED, Vult = 120 mph
- BASIC NOMINAL WIND SPEED, Vasd = 93 mph
- EXPOSURE CATEGORY = C
- INTERNAL PRESSURE COEFFICIENT, Gcpi = +/-0.18
4) DRIFTING, SLIDING AND UNBALANCED SNOW
- GROUND SNOW LOAD = 119.0 psf
- SNOW EXPOSURE FACTOR, Ce = 1.0
- SNOW LOAD IMPORTANCE FACTOR, ls = 1.2
- THERMAL FACTOR, Ct = 1.00
- FLAT ROOF SNOW LOAD, Pf = 100.0 psf
DESIGN CRITERIA
GENERAL NOTES
1) GENERAL:
1A)ENGINEER: REFERENCES ON THE STRUCTURAL DRAWINGS TO ‘ENGINEER’ MEAN THE STRUCTURAL
ENGINEER OF RECORD. OTHER ENTITIES ARE SPECIFICALLY NOTED AS “CONTRACTOR’S ENGINEER”,
“MECHANICAL ENGINEER”, ETC.
1B)THESE NOTES SUPPLEMENT THE SPECIFICATIONS, WHICH SHALL BE REFERENCED FOR ADDITIONAL
REQUIREMENTS.
1C)UNDERGROUND UTILITIES: LOCATE EXISTING UTILITIES AND NOTIFY ARCHITECT OF EXISTING
UTILITIES OR SUBGRADE CONDITIONS WHICH INTERFERE WITH WORK.
1D)STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINE INTERSECTIONS UNLESS
DIMENSIONED OTHERWISE.
THE FOLLOWING SECTION IS INTENDED TO ADDRESS UNKNOWN CONDITIONS IN REMODELS AND
ADDITIONS TO EXISTING BUILDINGS.
2) EXISTING STRUCTURES:
2A)CONTRACT DOCUMENTS HAVE BEEN PREPARED USING AVAILABLE DRAWINGS AND SITE
OBSERVATION AS PERMITTED BY ACCESS RESTRICTIONS DURING DESIGN.
2B)DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH ARE NOT
NOW KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION. CONTRACTOR SHALL NOTIFY THE
ARCHITECT IN WRITING OF ALL CONDITIONS NOT PER THE CONTRACT DOCUMENTS. EXAMPLES INCLUDE:
- SIZES OR DIMENSIONS OTHER THAN THOSE SHOWN
- DAMAGE OR DETERIORATION TO MATERIALS AND COMPONENTS
- CONDITIONS OF INSTABILITY OR LACK OF SUPPORT
- ITEMS NOTED AS EXISTING ON THE DRAWINGS BUT NOT FOUND IN THE FIELD
2C)PREPARE DIMENSIONAL DRAWINGS OF ALL DISCOVERED ITEMS.
2D)CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL CONDITIONS PRIOR TO SUBMITTING
SHOP DRAWINGS.
2E)CONTRACTOR SHALL MAKE ALLOWANCE FOR THE RESOLUTION OF SUCH DISCOVERIES IN THE
CONSTRUCTION SCHEDULE.
2F) SUBMIT A DIMENSIONED DRAWING OF ALL NEW OPENINGS THROUGH EXISTING STRUCTURE AND
SECURE APPROVAL PRIOR TO CUTTING. DRAWING SHALL SHOW VERTICAL & HORIZONTAL LOCATION AND
SIZE OF PROPOSED OPENING.
3) USE OF DRAWINGS:
3A)DO NOT SCALE DRAWINGS.
3B)WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL NOTES AND SPECIFICATIONS,
THE MORE STRINGENT REQUIREMENTS SHALL GOVERN. DETAILS ON DRAWINGS TAKE PRECEDENCE
OVER GENERAL NOTES AND TYPICAL DETAILS. DETAILS NOTED TYPICAL APPLY TO ALL SIMILAR
CONDITIONS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR
WORK ELSEWHERE ON THE PROJECT.
4) TEMPORARY CONDITIONS:
4A)THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. THE CONTRACTOR IS
RESPONSIBLE FOR FURNISHING ALL TEMPORARY BRACING AND/OR SUPPORT THAT MAY BE REQUIRED
AS THE RESULT OF THE CONTRACTOR’S CONSTRUCTION METHODS AND/OR SEQUENCES. REFER TO
“LATERAL LOAD RESISTING SYSTEM DESCRIPTION” IN DESIGN CRITERIA FOR ADDITIONAL INFORMATION.
4B)CONTRACTOR’S CONSTRUCTION AND/OR ERECTION SEQUENCES SHALL RECOGNIZE AND CONSIDER
THE EFFECTS OF THERMAL MOVEMENTS OF STRUCTURAL ELEMENTS DURING THE CONSTRUCTION
PERIOD.
4C)FOUNDATION WALLS SHALL NOT BE BACKFILLED UNTIL THE SLABS-ON-GRADE AND UPPER SLABS ARE
IN-PLACE AND REACH FULL STRENGTH UNLESS ADEQUATE BRACING IS PROVIDED. USE ONLY HAND
OPERATED TOOLS FOR COMPACTION ADJACENT TO FOUNDATION WALLS AND GRADE BEAMS. GRADE
BEAMS SHALL BE BACKFILLED EVENLY ON BOTH SIDES.
5) SUBMITTALS AND SUBSTITUTIONS:
5A)SUBMITTALS: REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS.
- IF THE CONTRACTOR REQUESTS A CHANGE FROM THE STRUCTURAL DRAWINGS, IT SHALL BE
APPROVED BY THE ARCHITECT AND DESIGNED BY MARTIN/MARTIN, INC. PRIOR TO SUBMITTING SHOP
DRAWINGS. VARIATION SHALL BE INDICATED ON THE SHOP DRAWINGS. CONTRACTOR SHALL
COMPENSATE MARTIN/MARTIN, INC. FOR MAKING THE CHANGE.
- CONSTRUCTION DOCUMENTS SHALL NOT BE REPRODUCED FOR USE IN SUBMITTALS
- ALL SHOP DRAWINGS SHALL REFERENCE THE STRUCTURAL DRAWING NUMBER AND DETAIL USED TO
PREPARE THE SUBMITTAL
5B)SUBSTITUTIONS: ARCHITECTS APPROVAL SHALL BE SECURED FOR ALL SUBSTITUTIONS
5C)NONCONFORMANCE: NOTIFY ARCHITECT OF CONDITIONS NOT CONSTRUCTED PER THE CONTRACT
DOCUMENTS PRIOR TO PROCEEDING WITH CORRECTIVE WORK. SUBMIT PROPOSED REPAIR TO THE
ARCHITECT FOR ACCEPTANCE. CONTRACTOR SHALL COMPENSATE MARTIN/MARTIN, INC. FOR
DESIGNING THE REPAIR.
5D)ALL SHOP DRAWINGS SHALL BE SUBMITTED IN 24x36, 11x17 AND 8-1/2x11 FORMAT ONLY.
5E)ALL SHOP DRAWINGS SHALL BE SUBMITTED IN ELECTRONIC FORMAT ONLY.
6) OSHA STANDARDS:
6A)THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. NOTHING SHOWN ON THE
STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS ELIMINATING THE NEED FOR THE CONTRACTOR TO
COMPLY WITH ALL OSHA REQUIREMENTS.
6B)THE CONTRACTOR SHALL ADD ALL NECESSARY BOLTS, ANCHOR BOLTS, PLATES, STIFFENER PLATES,
STABILIZER PLATES, BRIDGING, BRACING, BEARING SEATS, COLUMN SPLICES, ETC., AS WELL AS
CLOSURES FOR OPENINGS. IN ADDITION, FIELD WELD ANYTHING THAT MAY BE CONSIDERED A TRIP
HAZARD, SUCH AS SHEAR STUDS, AFTER PROTECTIVE DECKING IS INSTALLED.
6C)WASHERS OR RINGS MAY BE WELDED TO COLUMNS TO PROVIDE FOR SAFETY CABLES. HOLES IN
COLUMNS FOR SAFETY CABLES SHALL BE SHOP INSTALLED, AND SHALL BE INDICATED ON SHOP
DRAWINGS. ADJUST COLUMN SPLICE LOCATIONS OR ADD COLUMN SPLICES AS NECESSARY TO COMPLY
WITH OSHA REQUIREMENTS. SUBMIT PROPOSED LOCATIONS.
6D)ALL METAL JOISTS REQUIRED BY OSHA TO BE BOLTED SHALL HAVE ERECTION BOLTS INSTALLED
REGARDLESS OF FINAL CONNECTION SHOWN ON THE STRUCTURAL DRAWINGS.
6E)WHERE THE STRUCTURAL DRAWINGS APPEAR TO CONFLICT WITH OSHA REQUIREMENTS, THE
STRUCTURAL DRAWINGS REPRESENT FINAL CONDITIONS ONLY. THE CONTRACTOR SHALL ADD ALL
ERECTION FRAMING NECESSARY TO COMPLY WITH OSHA.
7) CONSTRUCTION ENGINEERING:
7A)THE STRUCTURE DEFINED ON THE CONTRACT DOCUMENTS HAS BEEN DESIGNED ONLY FOR LOADS
ANTICIPATED ON THE STRUCTURE DURING ITS SERVICE LIFE. PROVIDE ALL REQUIRED ENGINEERING AND
OTHER MEASURES TO ACHIEVE THE MEANS, METHODS, AND SEQUENCES OF WORK. SUCH ENGINEERING
MAY INCLUDE, BUT IS NOT LIMITED TO:
- LAYOUT
- DESIGN FOR FORMWORK, SHORING, AND RESHORING
- DESIGN OF CONCRETE MIXES
- ERECTION PROCEDURES WHICH ADDRESS STABILITY OF THE FRAME DURING CONSTRUCTION
- WELD PROCEDURES
- DESIGN OF TEMPORARY BRACING OF WALLS FOR WIND, SEISMIC, OR SOIL LOADS
- SURVEYING TO VERIFY CONSTRUCTION TOLERANCES
- EVALUATION OF TEMPORARY CONSTRUCTION LOADS ON STRUCTURE DUE TO EQUIPMENT AND
MATERIALS
- STRUCTURAL ENGINEERING TO RESIST ANY OTHER LOADS NOT IDENTIFIED ON DESIGN DRAWINGS
8) COORDINATION:
8A)STRUCTURAL DRAWINGS ARE NOT STAND-ALONE DOCUMENTS AND ARE INTENDED TO BE USED IN
CONJUNCTION WITH CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND DRAWINGS FROM OTHER
DISCIPLINES. THE CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF THE CONTRACT
DOCUMENTS INTO SHOP DRAWINGS AND WORK.
8B)COORDINATE DIMENSIONS OF ALL OPENINGS, BLOCKOUTS, DEPRESSIONS, ETC., WITH
ARCHITECTURAL DRAWINGS, DRAWINGS FROM OTHER DISCIPLINES, AND FIELD CONDITIONS PRIOR TO
SHOP DRAWING SUBMITTAL.
SEE ARCHITECTURAL PLANS FOR INTERIOR PARTITIONS. PARTITION FRAMING SHALL BE CONNECTED TO
THE PRIMARY STRUCTURE IN SUCH A WAY SO AS TO ALLOW FOR VERTICAL LIVE LOAD DEFLECTIONS OF
SPAN/360 OF THE FLOOR FRAMING. DO NOT MAKE RIGID VERTICAL AND HORIZONTAL CONNECTIONS TO
THE PRIMARY STRUCTURE IN THE PLANE OF THE PARTITION.
GENERAL NOTES
EXISTING GRID LINES
X
SYMBOL DESCRIPTION
EXISTING FRAMING (HALFTONE)
X'-XX"
DIMENSIONS TO EXISTING STRUCTURE,
FIELD VERIFY (ITALICS)
X'-XX"
DIMENSIONS TO FOR NEW STRUCTURE
NEW FRAMING
EXISTING WIDE LINE
EXISTING MEDIUM LINE
EXISTING THIN LINE
EXISTING HIDDEN LINE
(E) TEXT
EXISTING TEXT - OPAQUE
(E) TEXT
EXISTING TEXT - OPAQUE W/ DOT
SYMBOL DESCRIPTION
FOUNDATION NOTES
FOUNDATION DESIGN CRITERIA – LINKED TO STRUWARE DESIGN CRITERIA
REVIEW CAREFULLY DUE TO VARYING GEOTECHNICAL REPORT REQUIREMENTS
AND POSSIBLE ADDITIONS AND/OR DELETIONS.
DELETE MANUAL INPUT SECTION BELOW
1) DESIGN CRITERIA:
1A)THE GEOTECHNICAL REPORT PREPARED BY CESARE, INC, NUMBER13.277.A,
DATED MARCH 13, 2015 PROVIDED CRITERIA FOR THE FOUNDATION DESIGN FOR
THE PROJECT.
2) FOOTINGS:
2A)FOOTING DESIGN CRITERIA:
- MAXIMUM TOTAL LOAD BEARING PRESSURE = 6000 PSF
- MINIMUM CONTINUOUS FOOTING WIDTH = 1.3 FT
- MINIMUM SPREAD FOOTING WIDTH = 2 FT
- ULTIMATE COEFFICIENT OF FRICTION TO RESIST LATERAL LOADS = 0.6
- FROST DEPTH TO BOTTOM OF FOUNDATION = 48 IN
4) FOUNDATION WALLS:
4A)EQUIVALENT FLUID PRESSURES USED FOR WALL DESIGN:
- "ACTIVE” CONDITION = 40 PCF
- "AT REST” CONDITION = 60 PCF
- "PASSIVE” CONDITION = 300 PCF
- ULTIMATE COEFFICIENT OF FRICTION TO RESIST LATERAL LOADS = 0.6
FOUNDATION NOTES
POST-INSTALLED ANCHOR NOTES
1) PERSONNEL REQUIREMENTS:
1A)THE CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER’S REPRESENTATIVE TO
PROVIDE ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED.
SUBMIT DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR’S PERSONNEL WHO
INSTALL ANCHORS HAVE PASSED THE TRAINING COURSE PRIOR TO THE COMMENCEMENT OF
INSTALLING ANCHORS.
1B)PERSONNEL WHO WILL INSTALL HORIZONTAL OR UPWARDLY INCLINED ADHESIVE ANCHORS
IN CONCRETE THAT SUPPORT SUSTAINED TENSION LOADS SHALL BE CERTIFIED BY THE ACI/CRSI
ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM. THESE ANCHORS ARE DESIGNATED
WITH A (CERT) AFTER THE ANCHOR CALL OUT. SUBMIT DOCUMENTED CONFIRMATION THAT
PERSONNEL HAVE PASSED THE TRAINING COURSE PRIOR TO THE COMMENCEMENT OF
INSTALLING ANCHORS.
2) INSTALLATION REQUIREMENTS:
2A)ALL POST-INSTALLED ANCHORS SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTIONS AND PER MANUFACTURER'S ON-SITE TRAINING.
2B)ALL ADHESIVE ANCHORS AND ADHESIVE ANCHORED REINFORCEMENT DESIGNS ARE FOR
INSTALLATION IN THE FOLLOWING CONDITIONS, UNLESS NOTED OTHERWISE. WRITTEN
APPROVAL MUST BE RECEIVED FROM ENGINEER PRIOR TO INSTALLATION IN ALTERNATE
CONDITIONS.
- DRY CONCRETE, UNLESS NOTED OTHERWISE.
- CONCRETE TEMPERATURE AT TIME OF INSTALLATION THROUGH CURE TIME MUST BE WITHIN
THE TEMPERATURE RANGE SPECIFIED IN MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTION FOR ADHESIVE GEL AND CURE TIMES.
- ANCHOR HOLES TO BE HAMMER DRILLED AND CLEANED.
- CONCRETE MUST BE AT LEAST 21 DAYS OLD BEFORE INSTALLATION OF ANCHORS.
- HOLES TO BE CLEANED AND PREPARED IN STRICT ACCORDANCE WITH MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTIONS AND EVALUATION REPORT PRIOR TO ADHESIVE
INJECTION.
2C)THE POSITION OF EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE SHALL BE
LOCATED PRIOR TO INSTALLING POST INSTALLED ANCHORS OR REINFORCEMENT. EXISTING
REINFORCEMENT SHALL BE LOCATED USING A SCANNER, GPR, X-RAY, CHIPPING OR OTHER
MEANS. DO NOT DAMAGE OR CUT EXISTING REINFORCEMENT.
3) SUBSTITUTION REQUESTS:
3A)SUBSTITUTION REQUESTS FOR ALTERNATE PRODUCTS MUST BE APPROVED IN WRITING BY
THE STRUCTURAL ENGINEER PRIOR TO USE. CONTRACTOR SHALL PROVIDE CALCULATIONS AND
PRODUCT DATA DEMONSTRATING THAT THE SUBSTITUTED PRODUCT IS IN COMPLIANCE WITH
THE RELEVANT BUILDING CODES, LOAD RESISTANCE, INSTALLATION CATEGORY, CREEP
APPROVAL, IN-SERVICE TEMPERATURE AND INSTALLATION TEMPERATURE OF THE SPECIFIED
PRODUCT.
POST-INSTALLED ANCHOR NOTES
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
EAST
WING
ENABLING
6/30/2017
2:53:39 PM
16.0188.S.01
S-001-1
GENERAL NOTES
06/30/17
PERMIT VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
STRUCTURAL DRAWING LIST
SYMBOLS LEGEND
ABBREVIATIONS
DWL(s) Dowels(s)
DWG(s) Drawing(s)
DTL(s) Detail(s)
DT Precast Double Tee
DP Drilled Pier or Deep
DO Ditto
DN Down
DIM Dimension
DIAG Diagonal
DIA or Ø Diameter
Di Gravity Ice Load
DFS Deferred Submittal
DCW Demand Critical Weld
DBL Double
DAS Deformed Anchor Stud
D or DL Dead Load
d Penny
CTR(D) Center(ed)
CSJ Construction Joint
COORD Coordinate
CONTR Contractor
CONT Continue or Continuous
CONST Construction
CONN Connection
CONC Concrete
COL Column
CMU Concrete Masonry Unit
CLR Clear
CLMS
Ceiling/ Light/ Mechanical/
Superimposed Load
CLG Ceiling
CL Centerline
CJP
Complete Joint
Penetration
CJ Control Joint
CIP Cast-In-Place
CG Center of Gravity
CF Cold Formed
CC Center to Center
BTWN Between
BSMT Basement
BRG Bearing
BOT or B Bottom
BOS Bottom of Steel
BN Boundary Nail
BM Beam
BLKG Blocking
BLDG Building
BL Brick Ledge
BG Backgouge
BF Braced Frame
BD Board
BAL Balance
B/ or BO Bottom of
ARCH Architect or Architectural
APPROX Approximate
APA
American Plywood
Association
ALUM Aluminum
ALT Alternate
AFF Above Finished Floor
AESS
Architecturally Exposed
Structural Steel
ADDNL Additional
ACI
American Concrete
Institute
AB Anchor Bolt
@ At
/ Per
k Kip
JT Joint
JST Joist
IT Precast Inverted Tee Beam
INT Interior
IN Inch
ID Inside Diameter
i.F. Inside Face
HVAC Heating-Ventilating and...
HT Height
HORIZ Horizontal
HK Hook
HDG Hot Dipped Galvanized
HDAR Headed Anchor Rod
HD Headed or Holdown
HAS or
HDAR
Headed Anchor Stud
H Soil Lateral Load
GR BM Grade Beam
GR Grade or Grind
GL Glu-lam
GC General Contractor
GALV Galvanized
GA Gage or Gauge
FV Field Verify
FTG Footing
FT Foot or Feet
FS Far Side
FRAM Framing
FP
Full Penetration or Fire
Proofing
FO Face of
FND Foundation
FLR Floor
FLG Flange
FIN Finish(ed)
FF Finished Floor
FD Footing Dowel
FAB Fabricate
Fa Flood Load
F Fluid Load
EXT Exterior
EXP... Expansion Anchor
EXP Expansion
EW Each Way
ES Each Side
EQUIP Equipment
EQ SP Equally Spaced
EQ Equal
EOR Engineer-of-Record
ENGR Engineer
EN Edge Nail
EMBED Embedded
ELEV Elevator
EL Elevation
EJ Expansion Joint
EF Each Face
EE Each End
EC Epoxy Coated
EA Each
E-W East-West
E Earthquake Load
(E) or
EXIST
Existing
PT
Point or Post-Tension or
Pretensioned
PSI Pounds Per Square Inch
PSF Pounds Per Square Foot
PS Prestressed
PRELIM Preliminary
PREFAB Prefabricated
PLF Pounds Per Lineal Foot
PL Plate (Steel)
PERP Perpendicular
PEN Penetration
PD Pier Dowel
PCA
Portland Cement
Association
PC Precast
PAF Power Actuated Fastener
OWS One-Way Slab
OVS Oversized
OPP Opposite
OPNG Opening
OH Opposite Hand
OD Outside Diameter
OC On Center
OAE Or Approved Equivalent
O.F. Outside Face
NWC Normal Weight Concrete
NTS Not To Scale
NS Non-Shrink or Near Side
NOM Nominal
NO or # Number
NM Non-Metallic
NIC Not in Contract
N-S North-South
N North
MTL Metal
MO Masonry Opening
MNFR Manufacturer
mm Millimeter
MLS Masonry Lap Splice
MIL Micro-Lam
MISC Miscellaneous
MIN Minimum
MEP Mech/Elect/Plumb
MECH Mechanical
MCJ Masonry Control Joint
MBS Metal Building Supplier
MAX Maximum
MATL Material
MAS Masonry
MACH RM Machine Room
MACH Machine
LWC Light Weight Concrete
LVL
Level or Laminated Veneer
Lumber
LTWT Lightweight
LTS Tension Lap Splice Length
LTE Tension Embedment
LT Light
LSL Laminated Strand Lumber
Lr Roof Live Load
LONG Longitudinal
LOC(s) Location(s) or Locate
LLV Long Leg Vertical
LLH Long Leg Horizontal
LL Live Load
LG Length
LDH Hook Development Length
LCS Compression Lap Splice
LCE Compression Embedment
LB(S) Pound(s)
LB Precast L-Shaped Beam
L Lenght or Live Load
WxH Width x Height
WWR Welded Wire Reinforcing
WT Weight
WP
Working Point or
Waterproofing
Wi Wind-on-Ice Load
WF Wide Flange
WD Width or Wood
W/O Without
W/ With
W Wind Load
Vult
Ultimate Design Wind
Speed
VIF Verify in Field
VERT Vertical
Vasd
Service Level/ Nominal
Design Wind Speed
UNO Unless Noted Otherwise
ULT Ultimate
TYP Typical
TWS Two-Way Slab
TRANS Transverse
TOW Top of Wall
TOS Top of Steel
TOP Topping
TOM Top of Masonry
TOF Top of Footing
TOC Top of Concrete
TL Total Load
THK Thick or Thickness
T/ or T.O Top of
T&B Top and Bottom
T Top or Thermal Load
SYM Symmetrical
SW Shearwall
STR Structural
STL Steel
STIFF Stiffener
STD Standard
SS Stainless Steel
SPRT Support
SPECS Specifications
SP @ Space at
SP Space(s)
SOG Slab on Grade
SLV Short Leg Vertical
SLRS
Seismic Load Resisting
System
SLH Short Leg Horizontal
SL Snow Load
SIM Similar
SECT Section
SCHED Schedule
SC Slip Critical
S South
(S) Salvaged
ROF Random Oriented Fiber
RO Rough Opening
RET Return
REQT(s) Requirement(s)
REQD Required
REINF Reinforce(ing)(d)(ment)
RE: or... Refer to (Reference)
RC Reinforced Concrete
RB Precast Rectangular Beam
RAD Radius
R Radius or Rain Load
QTY Quantity
SHEET NUMBER SHEET TITLE
S-001-1 GENERAL NOTES
S-001-2 GENERAL NOTES
S-001-D GENERAL NOTES
S-002-1 QUALITY ASSURANCE
S-002-2 QUALITY ASSURANCE
S-002-D GENERAL NOTES
S-003-D QUALITY ASSURANCE
S-004-D QUALITY ASSURANCE
S-101-B LEVEL 1 - RAMP PLAN
S-101-C LEVEL 1 - AMBULANCE BARN PLAN
S-101-D LEVEL 1 - OXYGEN ENCLOSURE PLANS
S-103-A LEVEL 3 - ED ROOF PLAN
S-200-1 CONCRETE DETAILS
S-201-1 MASONRY AND LIGHT GAUGE DETAILS
S-202-A ED ROOF DETAILS
S-203-B RAMP DETAILS
S-204-D O2 ENCLOSURE DETAILS
SCREW ANCHORS
HILTI KWIK HUS-EZ
- -SUBMIT CALCULATIONS
FOR SUBSTITUTIONS
EXPANSION ANCHORS
(IN GROUTED MASONRY) HILTI KWIK BOLT 3
- -SUBMIT CALCULATIONS
FOR SUBSTITUTIONS
EXPANSION ANCHORS
(IN CONCRETE) HILTI KWIK BOLT TZ
- -SUBMIT CALCULATIONS
FOR SUBSTITUTIONS
ADHESIVE ANCHOR RODS
-36
MIN
58
MIN
THREADED ROD,
UNGREASED
ADHESIVE
(IN GROUTED OR HOLLOW... HILTI HIT-HY 70 - -SUBMIT CALCULATIONS
FOR SUBSTITUTIONS
ADHESIVE
(IN CONCRETE W/>12" EMBEDMENT) HILTI HIT-RE 500 SD - -SUBMIT CALCULATIONS
FOR SUBSTITUTIONS
ADHESIVE
(IN CONCRETE) HILTI HIT-HY 200 - -SUBMIT CALCULATIONS
FOR SUBSTITUTIONS
ANCHOR TYPE PRODUCT
Fy
(KSI)
Fu
(KSI)
COMMENT
POST-INSTALLED ANCHOR TABLE
6/30/17
10/12/17