Loading...
HomeMy WebLinkAboutB17-0340_S-002-1_1507837284.pdfSTATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TESTING QUALITY ASSURANCE GENERAL NOTES 1) GENERAL: 1A)SCOPE OF WORK - THE OWNER WILL ENGAGE A QUALIFIED INSPECTION AND TESTING AGENCY(S) TO PERFORM SPECIAL INSPECTIONS AND TESTING FOR ALL STRUCTURAL MEMBERS AND ASSEMBLIES AS NOTED HEREIN. - [SPECIAL INSPECTIONS AND TESTING INCLUDE THE ADDITIONAL STRUCTURAL SPECIAL INSPECTION AND TESTING REQUIREMENTS FOR SEISMIC AND/OR WIND RESISTANCE.] - SPECIAL INSPECTIONS ARE IN ADDITION TO INSPECTIONS BY THE AUTHORITY HAVING JURISDICTION REQUIRED BY IBC 2015 SECTION 110. - REFER TO THE SPECIFICATIONS FOR REPORTING AND PROCEDURAL REQUIREMENTS FOR QUALITY ASSURANCE AND QUALITY CONTROL. - REFER TO ARCH/MECH/ELEC/CIVIL SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL SPECIAL INSPECTION AND TESTING THAT MAY BE REQUIRED. - SPECIAL INSPECTIONS AND TESTING ARE APPLICABLE TO ALL REVISIONS AND/OR FUTURE WORK ADDED BY AMENDMENTS TO THESE DOCUMENTS. 1B)DEFINITIONS - SPECIAL INSPECTOR: THE AGENCY ENGAGED BY THE OWNER AND APPROVED BY THE AUTHORITY HAVING JURISDICTION TO ACT AS THE DESIGNATED REPRESENTATIVE TO PERFORM INSPECTIONS. - SPECIAL INSPECTION: INSPECTION PERFORMED BY THE SPECIAL INSPECTOR ACCORDING TO IBC 2015 SECTION 1704 TO ENSURE COMPLIANCE WITH APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS. - (P) PERIODIC INSPECTION: THE PART-TIME OR INTERMITTENT OBSERVATION BY THE SPECIAL INSPECTOR OF WORK BEING PERFORMED. SPECIAL INSPECTOR SHALL BE PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. OBSERVATION OF ALL WORK (100% VISUAL) SHALL BE MADE AT THE COMPLETION OF THE WORK. - (C) CONTINUOUS INSPECTION: THE FULL-TIME OBSERVATION BY THE SPECIAL INSPECTOR OF WORK BEING PERFORMED. SPECIAL INSPECTOR SHALL BE PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. OBSERVATION OF ALL WORK (100% VISUAL) SHALL BE MADE AT THE COMPLETION OF THE WORK. 1C)DEFICIENCIES IN WORK - CORRECT DEFICIENCIES IN WORK THAT TESTS AND INSPECTIONS INDICATE DO NOT COMPLY WITH THE CONTRACT DOCUMENTS AND REFERENCED STANDARDS. - ALL COST OF ADDITIONAL TESTING AND/OR INSPECTIONS FOR CORRECTIVE WORK SHALL BE BORNE BY THE CONTRACTOR. 2) SHOP FABRICATIONS: 2A)GENERAL - PERFORM INSPECTIONS AND TESTING FOR ALL SHOP FABRICATED STRUCTURAL MEMBERS AND ASSEMBLIES AS NOTED HEREIN. SPECIAL INSPECTOR SHALL PERFORM SPECIAL INSPECTIONS AND TESTING UNLESS THE FABRICATOR IS REGISTERED AND APPROVED BY THE AUTHORITY HAVING JURISDICTION TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION OR FABRICATION HAS A CURRENT ICC-ES EVALUATION REPORT. THE AUTHORITY HAVING JURISDICTION HAS APPROVED FABRICATORS PARTICIPATING IN THE AISC CERTIFICATION PROGRAM AND DESIGNATED AS AN AISC CERTIFIED PLANT, CATEGORY STD. - SPECIAL INSPECTOR SHALL VERIFY THE FABRICATOR MAINTAINS AND FOLLOWS DETAILED SHOP FABRICATION AND QUALITY CONTROL PROCEDURES, UNLESS FABRICATOR IS REGISTERED AND APPROVED. - AT THE COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE AUTHORITY HAVING JURISDICTION ACCORDING TO IBC 2015 SECTION 1704.2.5.1. - APPROVED FABRICATORS MAY PERFORM TESTING NOTED HEREIN EXCEPT THAT NONDESTRUCTIVE TESTING (NDT) SHALL ONLY BE PERFORMED BY PERSONNEL WITH QUALIFICATIONS THAT MEET OR EXCEED THE CRITERIA OF AWS D1.1 SUBCLAUSE 6.14.6 AND AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT) SNT-TC-1A OR ASNT CP-189. 2B)SHOP FABRICATIONS INCLUDED - SHOP FABRICATED METAL WALL PANELS 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant EAST WING ENABLING 6/30/2017 2:53:45 PM 16.0188.S.01 S-002-1 QUALITY ASSURANCE 06/30/17 PERMIT VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 2.SEE CIVIL DRAWINGS AND/OR SPECIFICATIONS FOR CLASSIFICATION AND TESTING REQUIREMENTS FOR COMPACTED FILL AND/OR CONTROLLED LOW-STRENGTH MATERIAL. 1.SEE CIVIL DRAWINGS AND/OR SPECIFICATIONS FOR ADDITIONAL EARTHWORK AND UTILITY INSPECTION REQUIREMENTS. SOILS SPECIAL INSPECTION NOTES: - PLACEMENT C -VERIFY USE OF PROPER MATERIALS, DENSITIES, COMPACTION, AND LIFT... - PRIOR TO PLACEMENT P -VERIFY SUBGRADE HAS BEEN PROPERLY PREPARED CONTROLLED FILL - BEARING MATERIAL P SOILS REPORT VERIFY BEARING MATERIAL IS ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY - EXCAVATION P - VERIFY EXCAVATIONS ARE EXTENDED TO THE PROPER DEPTH AND HAVE REACHED THE PROPER BEARING MATERIAL SUBGRADE ITEM FREQUENCY STANDARD` CRITERIA SOILS SPECIAL INSPECTIONS - SHORE/FORM REMOVAL P ACI 318 6.2 FOR BEAMS AND STRUCTURAL SLABS - CURING P ACI 318 5.11-5.13 - - PLACEMENT OF CONCRETE C ACI 318 5.9-5.10 - - FORMWORK PRIOR TO PLACEMENT OF CONCRETE P ACI 318 6.1.1 INSPECT FIRST POUR OF EACH TYPE (GRADE BEAM, COLUMN, STRUCTURAL SLAB, SLAB-ON-DECK, ETC.) - MIX DESIGN EACH TRUCK -VERIFY USE OF APPROVED DESIGN MIXTURE FOR EACH TRUCK LOAD CONCRETE - WELDING - - INSPECT PER THE STRUCTURAL STEEL TABLE - PRIOR TO PLACEMENT OF CONCRETE 100% - VERIFY TYPE, FINISH, DIAMETER, LENGTH, QUANTITY, EMBEDMENT LENGTH, SPACING AND EDGE DISTANCES. VERIFY USE OF PLACING TEMPLATE WHERE SPECIFIED BOLTS AND EMBEDMENTS - MECHANICAL CONNECTORS C ICC-ES REPORT - - COATED REINFORCING P ACI 301 3.2.1.2 - - FIELD BENDING P ACI 301 3.3.2.8 - - WELDING C AWS D1.4 VERIFY ASTM A706 REINFORCING STEEL - PRIOR TO PLACEMENT OF CONCRETE 100% - DURING PLACEMENT P ACI 318 3.5, 7.1-7.7 VERIFY GRADE, FINISH, SIZE, BAR QUANTITY, LOCATION, SPACING, COVER, HOOK LENGTHS, SPLICE LENGTH, SPLICE LOCATIONS, BEND DIAMETERS, COATING, SURFACE CONDITION,... REINFORCING STEEL ITEM FREQUENCY STANDARD CRITERIA STRUCTURAL CONCRETE SPECIAL INSPECTIONS (ACI 318-08/11) 2.REPORTS OF COMPRESSIVE STRENGTH TESTS SHALL CONTAIN THE FOLLOWING INFORMATION: DATE OF CONCRETE PLACEMENT, LOCATION OF CONCRETE BATCH IN WORK, DESIGN 28-DAY COMPRESSIVE STRENGTH, CONCRETE SUPPLIER AND MIXTURE ID NUMBER, TIME OF BATCH AND PLACEMENT, AMBIENT AIR TEMPERATURE, SITE ADDED WATER AND ADMIXTURES, UNIT WEIGHT, AND AS REQUIRED BY ASTM C39. 1.NONDESTRUCTIVE TESTING MAY BE PERMITTED BY THE ARCHITECT, BUT WILL NOT BE USED AS SOLE BASIS FOR APPROVAL OR REJECTION OF DEFICIENT CONCRETE. STRUCTURAL CONCRETE TESTING NOTES: - COMPRESSIVE STRENGTH EACH COMPOSITE SAMPLE ASTM C31 ASTM C39 EITHER: (4)6x12 OR (6)4x8 CYLINDERS TEST PER SCHEDULE BELOW: - 7 DAYS: (1)6x12 OR (1)4x8 - 28 DAYS: (2)6x12 OR (3)4x8 - 56 DAYS: (1)6x12 OR (2)4x8 (IF 28 DAY TESTS DO NOT ACHIEVE SPECIFIED 28 DAY STRENGTH) ACCEPTANCE CRITERIA PER ACI 318 - COLD WEATHER CURING - ASTM C1074 RECORD MAXIMUM AND MINIMUM CONCRETE TEMPERATURE DURING CURING PERIOD, WHEN DAILY AVERAGE AIR TEMPERATURE OF 40 °F OR BELOW IS EXPECTED FOR 3 SUCCESSIVE DAY... - UNIT WEIGHT FOR STRUCTURAL LIGHTWEIGHT EACH COMPOSITE SAMPLE ASTM C138 - - TEMPERATURE EACH COMPOSITE SAMPLE AND 60 MINUTE... ASTM C1064 REQUIRED WHEN AIR TEMPERATURE IS 40 °F AND BELOW OR 80°F AND ABOVE - AIR CONTENT WHEN AIR ENTRAINMENT IS SPECIFIED AND LIGHTWEIGHT CONCRETE EACH COMPOSITE SAMPLE ASTM C231 PRESSURE METHOD (NWC) OR ASTM C173 VOLUMETRIC... - - SLUMP/SLUMP FLOW EACH COMPOSITE SAMPLE ASTM C143 (SLUMP) OR ASTM C1611 (SLUMP FLOW) SPECIFIED SLUMP SHALL BE AS SUMBITTED IN THE MIX DESIGN ± 1 1/2". PERFORM ADDITIONAL TESTS WHEN CONCRETE CONSISTENCY APPEARS TO CHANGE 3. DRILLED PIERS EACH SHAFT 2. f'c ≥ 5000 PSI AND SHOTCRETE 50 CY/MIX/DAY 1. f'c < 5000 PSI 100 CY/MIX/DAY - COMPOSITE SAMPLE ASTM C172 OBTAIN AT POINT OF PLACEMENT. FOR DRILLED PIERS OBTAIN NEAR BEGINNING OF LOAD PRIOR TO PLACEMENT IN SHAFT. ADJUST FREQUENCY AS REQUIRED TO PROVIDE MINIMUM 5 TOTAL TESTS PER MIX BUT NOT MORE THAN ONE SAMPLE PER TRUCK LOAD CONCRETE - WELDING - - PER STRUCTURAL STEEL TESTING REINFORCING STEEL, BOLTS AND EMBEDMENTS ITEM FREQUENCY STANDARD CRITERIA STRUCTURAL CONCRETE TESTING - CURE TIME 100% VISUAL -VERIFY FULL CURE TIME HAS ELAPSED PRIOR TO APPLICATION OF TORQUE OR LOAD TO... - AFTER INSTALLATION OF ATTACHED ASSEMBLY 100% VISUAL - VERIFY NUMBER, EDGE DISTANCES, AND ANCHOR FLUSH WITH AND PERPENDICULAR TO THE RECEIVING SURFACE - DURING INSTALLATION OF ANCHOR C ICC-ES REPORT CONTINUOUS INSPECTION REQUIRED REGARDLESS IF PERIODIC INSPECTION IS PERMITTED BY ICC-ES REPORT. VERIFY HOLE DIMENSIONS, HOLE CLEANING, ANCHOR... - PRIOR TO INSTALLATION OF ANCHOR EACH ANCHOR ICC-ES REPORT VERIFY TYPE, DIAMETER, LENGTH, FINISH, AND BASE MATERIAL. VERIFY SOLID GROUTED AREA AROUND ANCHORS IN GROUTED MASONRY - PRIOR TO START OF WORK - ICC-ES REPORT REVIEW CONTRACTOR'S INSTALLATION PROCEDURE ADHESIVE ANCHORS, REINFORCING STEEL ANCHORED INTO HARDENED CONCRETE - AFTER INSTALLATION OF ATTACHED ASSEMBLY 100% VISUAL - VERIFY NUMBER, EDGE DISTANCES, AND ANCHOR FLUSH WITH AND PERPENDICULAR TO THE RECEIVING SURFACE - DURING INSTALLATION OF ANCHOR C ICC-ES REPORT CONTINUOUS INSPECTION REQUIRED REGARDLESS IF PERIODIC INSPECTION IS PERMITTED BY ICC-ES REPORT. VERIFY HOLE DIMENSIONS, HOLE CLEANING, ANCHOR... - PRIOR TO INSTALLATION OF ANCHOR EACH ANCHOR ICC-ES REPORT VERIFY TYPE, DIAMETER, LENGTH, FINISH, AND BASE MATERIAL. VERIFY SOLID GROUTED AREA AROUND ANCHORS IN GROUTED MASONRY. VERIFY MAXIMUM IMPACT WRENCH TORQUE... - PRIOR TO START OF WORK - ICC-ES REPORT REVIEW CONTRACTOR'S INSTALLATION PROCEDURE EXPANSION ANCHORS, SLEEVE ANCHORS, SCREW ANCHORS ITEM FREQUENCY STANDARD CRITERIA POST-INSTALLED ANCHORS/REINFORCING STEEL SPECIAL INSPECTIONS - TENSION TEST FIRST 3 AND 1% OF REMAINING ASTM E488 STATIC TENSION TEST THE INSTALLATION OF THE FIRST 3 OF EACH TYPE, BASE MATERIAL, AND POSITION (DOWN, HORIZONTAL, OVERHEAD). OBSERVE ASTM E488 MINIMUM EDGE DISTANCES FOR DETERMINING TEST LOCATIONS. SUBMIT PROPOSED TEST LOCATIONS AND REQUESTS FOR REQUIRED... ADHESIVE ANCHORS, REINFORCING STEEL ANCHORED INTO HARDENED CONCRETE - TORQUE TEST 100% - TEST ANCHOR WITH CALIBRATED TORQUE WRENCH TO 100% OF THE INSTALLATION TORQUE NOTED IN ICC-ES REPORT. ATTAIN SPECIFIED TORQUE WITHIN 1/2 TURN OF THE... EXPANSION ANCHORS, SLEEVE ANCHORS, SCREW ANCHORS ITEM FREQUENCY STANDARD CRITERIA POST-INSTALLED ANCHOR/REINFORCING STEEL TESTING 6/30/17 10/12/17