HomeMy WebLinkAboutGround Eng - Masonry Inspections.pdf Vail Valley Medical Center—Phase 1 -Materials Testing/Special Inspection
Eagle County,Colorado
Masonry
Field Observation Reports/ Laboratory Analysis
Job#15-6565 GROUND Engineering Consultants,Inc. Period Ending 11-16-2017
RDJI.IIDClient: Mr.Chris Knight
U Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
ENGINEERING CONSULTFINTS Englewood,CO 80112
Vail Valley Medical Center - Phase 1
Masonry Cover Report
Date: October 17,2017 Job Number: 15-6565
General Contractor: GE Johnson Rep. Notified: Jake
As scheduled, a representative visited the project site to perform special inspections on masonry at locations
requested.
Comments or Photos:
s .
A ,a, .
Y
`� a �
4' +- it '...
• - •• , 1, _ _._ : r_.,,,,,AL,{
I nr �, „ I 1 •1 P
fl I x
jfir . - latile....,11. /P:a•r-r---- ,, iti. . ,, ". . IIIIIIM
iir
OM,'11
•
i .•
•
i. a
w l,`' OMI
I
lilt i
Yes No
Discrepancies reported this date?
No. and Type of Samples Cast: 3 mortar cylinders
No. of Pages Attached: 1
Field Representative: Shane Sorensen
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
D Client: Mr.Chris Knight
E R v
Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
ENGINEERING CONSULTFINTS Englewood,CO 80112
Vail Valley Medical Center - Phase 1
Report Date: October 17,2017 Job Number: 15-6565
General Contractor: GE Johnson Rep. Notified: Jake
Masonry Contractor: Gallegos Rep. Notified: Andreas
Documents Used: Plans
Structure Type: 10"exterior CMU walls
Placement Location Oxygen Enclosure walls at A.0-B.0/1.0(109.3'),B.0/1.0-2.0(111.3')
and Elevations:
Masonry
Initial Final
CMU Conformance Non- Not Conformance
Conformance Applicable
Reinforcing from foundation;size,grade and spacing: 1
Vertical Reinforcing Size,Grade,Spacing, Lap and Clearance: 1 1
Horizontal(bond beam,ties);Size, Grade,Spacing: 1 1
Horizontal(bond beam,ties);Lap,Clearance,Other: 1 1
Horizontal(durawall or ladur);Size,Spacing, Lap: 1 1
Mortar and Grout
Grout Space;Cleanliness and Grout Block Placement: �/ 1
Grout Lift Height,Consolidation Method,Cleanouts:
Mortar/Grout Temperature(°F): 55/N/A
Average Approx.Mortar Joint Thickness(in.)/Finish: 3/8 tooled/flush
Proportions of Site Prepared Grout or Supplier/Mix ID: N/A
Air Temperature and Weather: Clear/30s-60s
Methods Employed for Weather Protection: Concrete blankets
Description of Non-Conformance Items:
Vertical bars are to be placed after wall is completed prior to grout.
Additional Comments/Clarification:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
RDJI.IIDClient: Mr.Chris Knight
U Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
ENGINEERING CONSULTFINTS Englewood,CO 80112
Vail Valley Medical Center - Phase 1
Masonry Cover Report
Date: October 19,2017 Job Number: 15-6565
General Contractor: GE Johnson Rep. Notified: Jake
As scheduled, a representative visited the project site to perform special inspections on masonry at locations
requested.
Comments or Photos:
x r fir. it ti' , 4 ,
..,. •%'mow
} , A - f j
4P„ 4 -4:-=.-. . j all iiiii - N '
4. - '
•i `." 7s
•
H .1 r
- see _ P l` )
I �"
.r . ?S
• 4 ... 1 4-7 10,-
4
I , f- I h 74 iii
Yes Nog
Discrepancies reported this date? r `-
No. and Type of Samples Cast: (3)grouted prisms,(4)grout blocks
No. of Pages Attached: 1
Field Representative: Shane Sorensen
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
D Client: Mr.Chris Knight
E R v
Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
ENGINEERING CONSULTFINTS Englewood,CO 80112
Vail Valley Medical Center - Phase 1
Report Date: October 19,2017 Job Number: 15-6565
General Contractor: GE Johnson Rep. Notified: Jake
Masonry Contractor: Gallegos Rep. Notified: Andreas
Documents Used: Plans
Structure Type: 10"exterior CMU walls
Placement Location Oxygen Enclosure walls at A.0-B.0/1.0,B.0/1.0-2.0(113.3')
and Elevations:
Masonry
Initial Final
CMU Conformance Non- Not Conformance
Conformance Applicable
Reinforcing from foundation;size,grade and spacing: 1
Vertical Reinforcing Size,Grade,Spacing, Lap and Clearance: 1 1
Horizontal(bond beam,ties);Size, Grade,Spacing: 1 1
Horizontal(bond beam,ties);Lap,Clearance,Other: 1 1
Horizontal(durawall or ladur);Size,Spacing, Lap: 1 1
Mortar and Grout
Grout Space;Cleanliness and Grout Block Placement: �/ 1
Grout Lift Height,Consolidation Method,Cleanouts: �/ 1
Mortar/Grout Temperature(°F): N/A/60
Average Approx.Mortar Joint Thickness(in.)/Finish: 3/8 tooled/flush
Proportions of Site Prepared Grout or Supplier/Mix ID: Casey Concrete/7 SK.20%3/8 BLOC
Air Temperature and Weather: Clear/50s
Methods Employed for Weather Protection: Concrete blankets
Description of Non-Conformance Items:
Cleanouts were not provided at bottom of reinforced cells and some vertical rebar was even with or protruding above the top course at initial
observation. Gallegos provided cleanouts,cleaned mortar droppings,and adjusted rebar to have adequate cover prior to grouting.
Additional Comments/Clarification:
Grout placement scheduled for 11:30 am began at 12:45 pm.
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
IiROUND
ENGINEERING CONSULTRNTS
MORTAR PROPERTIES
Project: Vail Valley Medical Center- Phase 1 Date: October 17, 2017
Job Number: 15-6565
Client: Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
Englewood, CO 80112
Attn: Me. Chris Knight Specimen Set Number: 1
Compressive Strength of Mortar Specimens
Cast Date: 10/17/2017 Laboratory ID #: 2032
Placement Location: Oxygen Enclosure walls at A.0-B.0/1.0 (109.3'), B.0/1.0-2.0 (111.3')
Unit Type: 2" x 4" cylinder
Supplier/ Mix ID: Spec Mix Type S Mortar
Specifications
Temperature (°F): 55 40-90
Initial Cure: 48 hr Standard Initial Cure
Final Cure: ASTM C31
Compressive Strength Test Data (ASTM C 780)
Specimen Set Number 1 A 1 B 1 C
Height (in.) 4.07 4.10 4.08
Diameter 1 (in.) 1.98 2.01 2.01
Diameter 2 (in.) 1.98 2.01 2.00
Cross Sectional Area (in. `) 3.08 3.17 3.16
Maximum Load (Ibt) 11480 12450 11870
Compressive Strength (psi) 3730 3920 3760
Specified Strength (psi) 1500 1500 1500
Test Date 11/14/17 11/14/17 11/14/17
Age (days) 28 28 28
Average Strength (psi) 3800
Corporate North Denver
41 Inverness Dr East 7393 Dahlia Street
Englewood, CO 80112 Commerce City,CO 80022
Tel:(303)289 1989 Tel:(303)289 1989
Fax:(303)289 1686 Offices: Denver, Loveland,Western Slope,Granby,Casper WY Fax:(303)289 6742
GROUND
ENGINEERING CDNSULTRNTS
GROUT PROPERTIES
Project: Vail Valley Medical Center- Phase 1 Date: October 19, 2017
Job Number: 15-6565
Client: Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
Englewood, CO 80112
Attn: Mr. Chris Knight Specimen Set Number: 1
Compressive Strength of Grout Specimens
Cast Date: 10/19/2017 Laboratory ID #: 2037
Placement Location: Oxygen Enclosure walls at A.0-B.0/1.0, B.0/1.0-2.0 (113.3')
Unit Type: 3" x 6" block
Supplier/ Mix ID: Casey Concrete / 7 SK. 20% 3/8 BLOC
Specifications
Slump (inches): 10 8-11
Temperature CF): 60 40-90
Initial Cure: Standard Initial Cure
Final Cure: ASTM C31
Compressive Strength Test Data (ASTM C 1019)
Specimen Set Number 1 A 1 B 1 C 1 D
Width Measurement#1 (in.) 3.24 3.26 3.25 3.27
Width Measurement#2 (in.) 3.31 3.35 3.25 3.31
Width Measurement#3 (in) _ 3.33 _ 3.38 3.34 3.29
Width Measurement#4 (in.) 3.29 3.39 3.31 3.20
Height Measurement#1 (in.) 6.35 6.22 6.18 6.21
Height Measurement #2 (in.) 6.36 6.25 6.20 6.24
Height Measurement#3 (in.) 6.36 6.24 6.20 6.25
Height Measurement#4 (in.) 6.34 6.25 6.19 6.22
Cross Sectional Area (in.2) 10.84 11.19 10.81 10.68
Height to Width Ratio 1.93 1.87 1.88 1.91
Load (Ibf) 43,090 61,490 61,070 61,390
Strength (psi) 3940 5440 5590 5690
Specified Strength (psi) - 2000 2000 2000
Test Date 10/26/2017 11/16/2017 11/16/2017 11/16/2017
Age (days) 7 28 28 28
Average Strength (28 day) (psi) 5570
Corporate North Denver
41 Inverness Dr East 7393 Dahlia Street
Englewood, CO 80112 Commerce City,CO 80022
Tel:(303)289 1989 Tel:(303)289 1989
Fax:(303)289 1686 Offices: Denver, Loveland,Western Slope,Granby,Casper WY Fax:(303)289 6742
GROUND
ENGINEERING CDNSULTRNTS
MASONRY PRISM PROPERTIES
Project: Vail Valley Medical Center - Phase 1 Date: October 19, 2017
Job Number: 15-6565
Client: Project One Integrated Services, LLC
88 Inverness Circle East, Building G, Suite 101
Attn: Mr. Chris Knight Prism Set Number: 1
Compressive Strength of Masonry Prisms
Cast Date: 10/19/2017 Laboratory ID #:
Placement Location: Oxygen Enclosure walls at A.0-B.0/1.0, B.0/1.0-2.0 (113.3')
Unit Type: Grouted Prism
Supplier/ Mix ID: Casey Concrete / 7 SK. 20% 3/8 BLOC
Compressive Strength Test Data (ASTM C 1314)
Prism Set Number 1 A 1 B 1 C
Prism Height (in.) 15.75 15.81 15.78
Prism Width (in.) 7.72 7.73 7.73
Prism Length (in.) 9.68 9.67 9.69
Height/Thickness Ratio 2.04 2.05 2.04
Correction Factor 1.00 1.00 1.00
Net Cross Sect. Area (in.2) 74.73 74.75 74.90
Gross Cross Sect. Area (in.2) 74.73 74.75 74.90
Maximum Load (Ibf) 244830 238730 253320
Compressive Strength (psi) 3290 3200 3390
Specified Strength (psi) 1500 1500 1500
Test Date 11/16/17 11/16/17 11/16/17
Age (days) 28 28 28
Average Strength (psi) 3290
Grand Junction Gypsum
379 Indian Road Corporate Office P.O. Box 464
Grand Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637
P:(970)242-4300 Englewood, CO 80112 P:(970)524-0720
F:(970)524-0721 F:(303)289-1989 F:(970)524-0721