Loading...
HomeMy WebLinkAboutB18-0058_DRB17-0266 Villa Cortina_1520610631.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Uya-Uya Holdings LLC 2017 Application Number:DRB17-0266 Application Type:Exterior Alteration Date Applied:06/26/2017 Project Description:Removal of exterior patio doors, addition of skylights, patio doors, and a window. CONTACTS Contact Type:Applicant Full Name:S3 Architectural Group, LLC (Amy Salter) Address:0891 Second Street Eagle, CO 81631 Phone:9703611393 Contact Type:Property Owner Full Name:UYA-UYA HOLDINGS LTD S&P HOME SERVICES LLC Address:PO BOX 2476 355 EDWARDS, CO 81632-2476 Phone:None Contact Type:Property Owner Full Name:UYA UYA Holdings, LTD (Alejandro Ballesteros) Address:Phone:011-521-55 15101763 Project Address:22 W MEADOW DR 355 (210107108048) Job Site Location:355 Legal Description:Subdivision:VAIL VILLAGE FILING 2 Lot:H Block:No Data Parcel Number:210107108048 BOARDS/STAFF ACTION Motion By:Kjesbo Action:Approved Second By:Cahill Vote:3-1 (Pierce Oppsed)Date:07/19/2017 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Prior to application for a building permit, the applicant shall revise the west elevation drawings to show that the sill heights for all windows will be consistent. Planner: Chris Neubecker