HomeMy WebLinkAboutB18-0058_DRB17-0266 Villa Cortina_1520610631.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Uya-Uya Holdings LLC 2017 Application Number:DRB17-0266
Application Type:Exterior Alteration Date Applied:06/26/2017
Project Description:Removal of exterior patio doors, addition of skylights, patio doors, and a window.
CONTACTS
Contact Type:Applicant
Full Name:S3 Architectural Group, LLC (Amy Salter)
Address:0891 Second Street Eagle, CO 81631 Phone:9703611393
Contact Type:Property Owner
Full Name:UYA-UYA HOLDINGS LTD S&P HOME SERVICES LLC
Address:PO BOX 2476 355 EDWARDS, CO 81632-2476 Phone:None
Contact Type:Property Owner
Full Name:UYA UYA Holdings, LTD (Alejandro Ballesteros)
Address:Phone:011-521-55
15101763
Project Address:22 W MEADOW DR 355 (210107108048)
Job Site Location:355
Legal Description:Subdivision:VAIL VILLAGE FILING 2 Lot:H Block:No
Data
Parcel Number:210107108048
BOARDS/STAFF ACTION
Motion By:Kjesbo Action:Approved
Second By:Cahill
Vote:3-1 (Pierce Oppsed)Date:07/19/2017
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Prior to application for a building permit, the applicant shall revise the west elevation drawings to show that
the sill heights for all windows will be consistent.
Planner: Chris Neubecker