9864.50 Red Sandstone ES Garage TAB Report UPDATED.PDF
Red Sandstone ES Parking Garage Test and Balance Report Prepared by r4`414041/, BG Buildingworks, Inc. 1626 Cole Boulevard, Suite 300 • Lakewood, CO 80401 • - P 303.278.3820 BG BUILDINGWORKS November 28, 2018 � ystems fulfilled IBG BLJI LU INC WORKS sysl,ems fulliIISd TABLE OF CONTENTS Test and Balance Test Instruments 3 General Notes/Current Open Issues 4 Exhaust Fan Units 5 Heating Recovery Ventilator 9 Pump 11 Cabinet Unit Heaters 12 Issues Logs 13 Markup Drawings 14 Page 2 Instrument Type Manufacturer Calibration/ Purchase Date ADM-860C Multi-meter Kit with Flowhood Kit Shortridge 7/27/2018 118" Pitot Tube Dwyer N/A I 148" Pitot Tube Dwyer N/A I 136" Pitot Tube Dwyer N/A I I 24" Pitot Tube Dwyer N/A 1561 Digital Infrared Thermometer Fluke 5/11/2018 I I Type J/K Hydronic Insertion Probe Oakton 4/10/18 I I Type J/K Air Temperature Probe Oakton 4/10/18 I I Type K Surface Probe Oakton 4/10/18 I Clamp Amp/Volt Multi-meter Model T5- 1000 Fluke 8/1/2018 I Laser Photo/Contact Tachometer Extech 2/5/2018 I I Alnor HM670 Hydronic Manometer Alnor 7/20/2018 I I I I I I I I Page 3 IBG BUILDINCWORK5 sysl#m3 fokrillld General Notes: 1. Equipment with non-unique names such as the rooftop units have been indicated on the Test & Balance report with room number identifiers for clarity. This naming documentation is indicated within the equipment data sheets as well as indicated on the attached floor plans. 2. A Test & Balance issues log indicating all issues found during the Test and Balance procedures is attached. Current Open Issues: 1. No open issues. Acronyms Used: NA - Not Applicable NG - Information Not Given NAC - Not Accessible Page 4 BG BUILDINGWORKS a systems fulfilled Fan Unit PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: EF-1A Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Greenheck Fan Model Number AER-E02C-325-VG7-X Motor Frame NG Fan Serial Number 15579589 Motor HP 3/4 HP Unit Location Wall Motor RPM 1670 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 650/3335 CFM Motor Hertz 60 Hz Total Airflow Actual 660/3401 CFM Motor FL Amps NG Amps Fan RPM Design 1670 RPM Actual Amps Amps Fan RPM Actual Speed 3/7.5 RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 1.0/2.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.35 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual NAC in.wc SYSTEM/UNIT: EF-1B Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Greenheck Fan Model Number AER-E02C-325-VG7-X Motor Frame NG Fan Serial Number 15579588 Motor HP 3/4 HP Unit Location Wall Motor RPM 1670 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 660/3335 CFM Motor Hertz 60 Hz Total Airflow Actual 669/3408 CFM Motor FL Amps NG Amps Fan RPM Design 1670 RPM Actual Amps Amps Fan RPM Actual Speed 3/7.5 RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 1.0/2.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.35 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual NAC in.wc BG Buildingworks Page 5 BG BUILDINGWORKS a systems fulfilled Fan Unit PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: EF-1C Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Greenheck Fan Model Number AER-E02C-325-VG7-X Motor Frame NG Fan Serial Number 15579582 Motor HP 3/4 HP Unit Location Wall Motor RPM 1670 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 660/3335 CFM Motor Hertz 60 Hz Total Airflow Actual 662/3356 CFM Motor FL Amps NG Amps Fan RPM Design 1670 RPM Actual Amps Amps Fan RPM Actual Speed 3/7.5 RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 1.0/2.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.35 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual NAC in.wc SYSTEM/UNIT: EF-1D Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Greenheck Fan Model Number AER-E02C-325-VG7-X Motor Frame NG Fan Serial Number 15579584 Motor HP 3/4 HP Unit Location Wall Motor RPM 1670 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 660/3335 CFM Motor Hertz 60 Hz Total Airflow Actual 665/3339 CFM Motor FL Amps NG Amps Fan RPM Design 1670 RPM Actual Amps Amps Fan RPM Actual Speed 3/7.5 RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 1.0/2.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.35 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual NAC in.wc BG Buildingworks Page 6 BG BUILDINGWORKS a systems fulfilled Fan Unit PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: EF-1E Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Greenheck Fan Model Number AER-E02C-325-VG7-X Motor Frame NG Fan Serial Number 15579587 Motor HP 3/4 HP Unit Location Wall Motor RPM 1670 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 660/3335 CFM Motor Hertz 60 Hz Total Airflow Actual 657/3402 CFM Motor FL Amps NG Amps Fan RPM Design 1670 RPM Actual Amps Amps Fan RPM Actual Speed 3/7.5 RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 1.0/2.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.35 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual NAC in.wc SYSTEM/UNIT: EF-1F Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Greenheck Fan Model Number AER-E02C-325-VG7-X Motor Frame NG Fan Serial Number 15579583 Motor HP 3/4 HP Unit Location Wall Motor RPM 1670 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 660/3335 CFM Motor Hertz 60 Hz Total Airflow Actual 671/3988 CFM Motor FL Amps NG Amps Fan RPM Design 1670 RPM Actual Amps Amps Fan RPM Actual Speed 3/7.5 RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 1.0/2.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.35 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual NAC in.wc BG Buildingworks Page 7 BG BUILDINGWORKS a systems fulfilled Fan Unit PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: EF-2A Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Mcmillian Electric Fan Model Number SP-A510-QD Motor Frame NG Fan Serial Number 15557093 Motor HP 1/12 HP Unit Location Mech Room Motor RPM 1070 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 500 CFM Motor Hertz 60 Hz Total Airflow Actual 482 CFM Motor FL Amps 3.3 Amps Fan RPM Design 1070 RPM Actual Amps Amps Fan RPM Actual Direct Drive RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 3.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.125 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual 0.10 in.wc SYSTEM/UNIT: EF-2B Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Fan Manufacturer Greenheck Motor Manufacturer Mcmillian Electric Fan Model Number SP-A510-QD Motor Frame NG Fan Serial Number 15557098 Motor HP 1/12 HP Unit Location Mech Room Motor RPM 1070 RPM Motor Rated Volts 120 Volts Test Data Motor Phase 1 Total Airflow Design 500 CFM Motor Hertz 60 Hz Total Airflow Actual 484 CFM Motor FL Amps 3.3 Amps Fan RPM Design 1070 RPM Actual Amps Amps Fan RPM Actual Direct Drive RPM Motor Service Factor NG Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Sheave Data Motor Amps T1 3.0 Amps Motor Sheave MFG Direct Drive Test Pressures External SP Design 0.125 in.wc External SP In Actual Atmosphere in.wc External SP Out Actual 0.10 in.wc BG Buildingworks Page 8 BG BUILDINGWORKS a systems fulfilled Energy Recovery Unit PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: HRV-01 Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Unit Manufacturer Fantech HRV-01/Exhaust Fan Unit Model Number SHR26ORD Motor Manufacturer Fantech Unit Serial Number NG Motor Frame NG Unit Type Air to Air Motor HP NG HP Unit Size NG Motor RPM NG RPM HRV-01/EF Filter Motor Rated Volts 120 Volts Filter Manufacturer Fantech Motor Phase 1 Ph Filter Type Washable Motor Hertz 60 Hz Filter Quantity 2 Motor Service Factor NG Filter Size 12x12x1/8 Motor Rated FL Amps NG Amps Filter Bank P.D NAC in.wc Mtr Amps Actual Averaged Amps HRV-01/SF Filter Mtr Volts Actual Averaged Volts Filter Manufacturer Fantech BHP Actual BHP Filter Type Washable Corrected FLA Amps Filter Quantity 2 Motor Power Factor NG Filter Size 12x12x1/8 Nominal Efficiency NG Filter Bank P.D NAC in.wc HRV-01/Supply Fan Motor Manufacturer Fantech Starter Data Motor Frame NG HRV-01/Exhaust Fan Motor HP NG HP Starter Manufacturer NA Motor RPM NG RPM Starter Model No. NA Motor Rated Volts 120 Volts Starter Size NA Motor Phase 1 Ph Installed Thermal Internal Motor Hertz 60 Hz Rating(Amps) NA Amps Motor Service Factor NG Required Thermals NA Motor Rated FL Amps NG Amps Required Amps NA Amps Motor Power Factor NG Nominal Efficiency NG Design Data HRV-01/Exhaust Fan Test Pressures Design Motor HP NG SF Fan SP In -0.41 in.wc Design Motor RPM NG SF Fan SP Out 0.20 in.wc Fan RPM Design NG RPM SF HEX SP In -0.24 in.we Design BHP NG SF HEX SP Out -0.41 in.we Design Motor Voltage 120 EF Fan SP In -0.20 in.we HRV-01/Supply Fan EF Fan SP Out -0.45 in.we Design Motor HP NG Design Motor RPM NG EF HEX SP In -0.45 in.we Fan RPM Design NG RPM EF HEX SP Out -0.32 in.we Design BHP NG Design Motor Voltage 120 Test Data SF Total CFM Design 300 CFM SF Total CFM Actual 300 CFM SF OA CFM Design 300 CFM SF OA CFM Actual 300 CFM EF Total CFM Design 280 CFM EF Total CFM Actual 289 CFM EF OA CFM Design 280 CFM EF OA CFM Actual 289 CFM BG Buildingworks Page 9 BG BUILDINGWORKS a systems fulfilled Energy Recovery Unit PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: HRV-01 Tested By: Brad stayer Date: 11/15/2018 Test Data HRV-01/Exhaust Fan Fan Motor Actual NG HP Fan RPM Actual NAC RPM Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Motor Amps 0.7 Amps Motor Amps T1 0.70 Amps HRV-01/Supply Fan Fan Motor Actual NG HP Fan RPM Actual NAC RPM Motor Volts Actual 121 Volts Motor Volts T1-T2 121 Volts Motor Volts T2-T3 NA Volts Motor Volts T1-T3 NA Volts Motor Amps 0.7 Amps Motor Amps T1 0.70 Amps Motor Amps T2 NA Amps Motor Amps T3 NA Amps HRV-01 Supply Outlet Summary System/Unit Area Served Outlet Type Size LXW AK Factor Design Prelim Final %Final Reading Reading Reading Deviation Outlet-01 7 A 6x8 150 165 151 101 Outlet-02 6 A 6x8 150 140 149 99 Totals: - - - - 300 305 300 100 HRV-01 Exhaust Inlet Summary System/Unit Area Served Outlet Type Size LXW AK Factor Design Prelim Final %Final Reading Reading Reading Deviation Inlet-A 7 B 8x6 140 144 144 103 Inlet-B 6 B 8x6 140 145 145 104 Totals: - - - - 280 289 289 103 BG Buildingworks Page 10 BG BUILDINGWORKS a systems fulfilled Hydronic Pump PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: P-01 Tested By: Brad stayer Date: 11/15/2018 Unit Data Motor Data Pump Manufacturer Grundfos Motor Manufacturer Grundfos Pump Model Number Comfort PM Motor Frame NG Pump Size NG Motor HP NG HP Design Flowrate(GPM) 2.0 GPM Motor RPM NG RPM Required TDH 2.0 ft. Motor Rated Volts 115/230 Volts Motor Phase 1 Final Test Data Motor Hertz 60 Hz Final DP NA PSI Motor F.L.Amps 1/.07 Amps Final SP NA PSI Motor S.F. NG Final Motor Speed 100%HZ Pump Impeller Diam. NG in. Final Press Diff PSI NA PSI Nominal Efficiency NG Final GPM 2.0 GPM Power Factor NG Final TDH NA Ft. Hd. Motor Volts T1-T2 NAC Volts Measured Data Motor Volts T2-T3 NA Volts Pump Off Pressure NA PSI Motor Volts T1-T3 NA Volts Valve Shut DP NA PSI Motor Amps T1 NAC Amps Valve Shut SP NA PSI Motor Amps T2 NA Amps Valve Shut Diff. NA Ft Hd. Motor Amps T3 NA Amps Valve Open DP NA PSI Brake Horse Power BHP Valve Open SP NA PSI Valve Open Diff. NA Ft. Hd. Valve Open GPM 2.0 GPM Ind.Valve Sett. 100% Ind. Imp. Diam. NA in. Log: P-01 11/15/2018 Brad stayer No P/T ports installed. P-01 11/15/2018 Brad stayer No access to take amps and volts with current installation. BG Buildingworks Page 11 BG BUILDINGWORKS a systems fulfilled Unit Heater PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/16/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: SYSTEM/UNIT: CUH-1-RM6 Unit Data Air Test Data Unit Manufacturer Intertek Design Airflow 310 CFM Model Number 81RCH2A1 Actual Airflow NA CFM Unit Design Voltage 208 Volts Ent Air Temp DB 63.0 Deg F Unit Phase Design 1 Ph LV Air Temp DB 115.0 Deg F Unit Voltage Actual 211 Volts Delta T Design Deg F Unit Amps Actual 0.7 Amps Delta T Actual Deg F Unit Phase Actual 1 Ph Unit KW Design 2.0 KW Unit KW Actual 2.0 KW SYSTEM/UNIT: CUH-1-RM7 Unit Data Air Test Data Unit Manufacturer Intertek Design Airflow 310 CFM Model Number 81RCH2A1 Actual Airflow NA CFM Unit Design Voltage 208 Volts Ent Air Temp DB 63.0 Deg F Unit Phase Design 1 Ph LV Air Temp DB 115.0 Deg F Unit Voltage Actual 211 Volts Delta T Design Deg F Unit Amps Actual 0.7 Amps Delta T Actual Deg F Unit Phase Actual 1 Ph Unit KW Design 2.0 KW Unit KW Actual 2.0 KW BG Buildingworks Page 12 BG BUILDINGWORKS a systems fulfilled Deficiency Report PROJECT: Red Sandstone Elementary-Parking Structure DATE: 11/28/2018 LOCATION: Vail, CO CONTACT: Brad stayer PROJECT#: 9864.50 AUTHOR: Issue ID: 0001 Status: 1111 Fixed Issue Priority: Equipment: HRV-01 Created Date: 15-Nov-18 Completed Date: 28-Nov-18 Issue Description: Duct heating coil has power but will not turn on. Issue Type: Not Assigned Job Tag: Repair Estimate: Role Assignment: My Company Users Cross Ref#: Replacement Cost: User Assignment: Comments/Signature: 11/28/2018 Duct coil is now functioning and issue is closed BG Buildingworks Page 13 PLUMBING FIXTURE SCHEDULE HEAT RECOVERY VENTILATOR SCHEDULE SCHEDULE NOTES: SEQUENCE OF CONTROL: 1. NOT ALL EQUIPMENT REQUIRED UNDER THIS ELECTRICAL AIR CONDITIONS CONTRACT IS NECESSARILY SPECIFIED ON THE MANUFACTURER* FAUCET TRIM MFR.* & 1. EF-1, PARKING GARAGE EXHAUST FANS: SCHEDULE SHEETS. PLAN& DIAGRAM NOTATIONS SYMBOL TYPE A.D.A. FINISH ACCESSORIES REMARKS MIN. MANUFACTURER* & MODEL# MODEL# THE FANS SHALL BE EQUIPPED WITH VARIABLE SPEED, EC MOTORS AND 2-STAGE CONTROLS FROM THE MANUFACTURER.THE LOW SPEED SHALL BE CONTAIN EQUIPMENT SPECIFICATIONS AS WELL. MARK SERVICE TYPE OUTSIDERFLA MOCP VOLT/PH FAN CFM SP & MODEL# ACCESSORIES REMARKS BALANCED TO 650 CFM(MINIMUM IMC VENTILATION RATE)AND THE HIGH SPEED SHALL BE BALANCED TO 3,335 CFM(1/3 MAXIMUM IMC VENTILATION AIR (CFM) (IN WC) 2. NOT ALL CAPACITIES, CHARACTERISTICS,AND WHITE/ KOHLER SLOAN RATE). KP1> WATER CLOSET YES POLISHED KINGSTON ECOS - CONSTRUCTION FEATURES REQUIRED ARE CHROME K-4325-0 S3370420 — EACH GARAGE LEVEL WILL BE MONITORED AND CONTROLLED INDEPENDENTLY. NECESSARILY INDICATED IN THE EQUIPMENT SEE DUCT HEATER SCHEDULES. RE: PLANS AND SPECIFICATIONS WHITE/ SLOAN SUPPLY 300 0.2 (DC-1)BELOW FOR FOR ADDITIONAL REQ'MTS. \ LOWER GAS DETECTION SYSTEMS:THE PARKING GARAGE EXHAUST FANS ARE CONTROLLED BY THE GAS DETECTION SYSTEMS TO MEET THE IMC KP2) URINAL YES POLISHED WEUS-1000.1301 STATIC INCOMING AIR z CHROME COMBINATION PACKAGE HRV-1 LEVEL BATHROOMS PLATE 300 2.5 15 120/1 FANTECH SHR 3205RD PREHEAT.WASHABLE - VENTILATION REQUIREMENTS FOR ENCLOSED PARKING GARAGES(ONLY THE LOWER TWO LEVELS QUALIFY AS"ENCLOSED").THE FANS ON EACH O EXHAUST 280 0.3 ELECTROSTATIC LEVEL WILL BE STAGED ON IN THE FOLLOWING MANNER: KOHLER FILTERS. -NO CALL FOR VENTILATION FROM THE GAS DETECTION SYSTEM: EF-1 OPERATES ON LOW SPEED. P3> LAVATORY YES WHITE CAXTON DELTA - WIKINS ATIC MIXING V C -1ST STAGE VENTILATION CALL:EF-1 FANS ON RESPECTIVE FLOOR WILL OPERATE ON HIGH SPEED.CONTROL SYSTEM RELAY 1 USED. K 2209 590LF-HGMHDF THERMOSTATIC MIXING VALVE. MANUFACTURERS: -2ND STAGE VENTILATION CALL:ON RESPECTIVE FLOOR,ACTIVATE STROBE AND SIREN ALARMS TO WARN OCCUPANTS OF DANGEROUS CONDITIONS. U H COOK,GREENHECK,ALOES,ANNEXAIR,VENMAR, FANTECH,CARRIER,TRANE CO,CARBON MONOXIDE(CO)SENSORS:KZ \ FLORESTONE MSR-3624 GENERAL NOTES: A: STAGE 1 RISING TRIP POINT:>25 PPM. P4) MOP SINK PER ARCH STAGE 1 FALLING TRIP POINT:<15 PPM. 12 Lll STAGE 2 RISING TRIP POINT:>35 PPM. I- B: STAGE 2 FALLING TRIP POINT:<25PPM. POLISHED NO2, NITROGEN DIOXIDE(NO2)SENSOR: (1) D CP5) FLOOR DRAIN N/A NICKEL ZURN 24156-NH-ZN-P BRONZE - - SURE SEAL TRAP PRIMER STAGE 1 RISING TRIP POINT:>2.5 PPM. Z U STAGE 1 FALLING TRIP POINT:<1.2 PPM. 0 0 \ POLISHED SUPPLY/EXHAUST FAN SCHEDULE STAGE 2 RISING TRIP POINT:>5 PPM. KP6) PARKING DECK N/A NICKEL ZURN Z556 STAGE 2 FALLING TRIP POINT:<2.5 PPM. U Q DRAIN BRONZE INSTALL PER FAN MOTOR 2. EF-2, MECH/IT ROOM EXHAUST FAN: Cl DRINKING ELKAY SWIRLFLO MANUFACTURER'S THE MESH/IT ROOM EXHAUST FAN SHALL BE EQUIPPED WITH A VARIABLE SPEED, EC MOTOR AND 2-STAGE CONTROL FROM THE MANUFACTURER.THE P7> FOUNTAIN YES STAINLESS EDFPB117FPK - - INSTRUCTIONS TO ENSURE FREEZE RESISTANCE. MARK TYPE ESP HP/ VOLT/ MANUFACTURER* ACCESSORIES REMARKS FAN SHALL OPERATE BASED ON THE ROOM COOLING THERMOSTAT.THE FAN WILL OPERATE ON LOW SPEED DURING NO CALL FOR COOLING.THE CFM SONES & MODEL# FAN WILL OPERATE ON HIGH SPEED DURING CALLS FOR COOLING. rrrr rryrni- n'�R, IN WC) (WATT) PHASE ,,.ir"� REe`DUCTILE IRON ( •••.�rJ'( P8> TRENCH DRAIN N/A CAST IRON ZURN Z882-HDG-DGC - SLOTTED GRATE- - 3. HRV-1, BATHROOM HEAT RECOVERY VENTILATOR: :, � 44.4 E� CLASS C HRV-1 WILL BE ACTIVATED BY BATHROOM OCCUPANCY SENSORS(INTEGRATION WITH THE BATHROOM LIGHTING CONTROLS IS EXPECTED).THE HRV t .�- SIDEWALL = s: 2-SPEED CONTROL, DIRECT GREENHECK WILL OPERATE UNTIL 20 MINUTES AFTER THE LAST OCCUPANCY DETECTION.AFTER THE OCCUPANCY DETECTION TIME HAS PASSED THE HRV WILL = : POLISHED EF-1 3,335 19.8 0.35 3/4 HP 115/1 BACKDRAFT DAMPER, A srt � = P9> CURB DRAIN N/A NICKEL ZURN Z189-ZN DRIVE AER-E20C-325-VG e<' r '''7, SHORT WALL HOUSING DE ACTIVATE. �, ••'..i� BRONZE INLINE ''�.,r�'s/��ALl�t,,,,A IN ORDER TO MAINTAIN POSITIVE OR NEUTRAL AIR PRESSURE IN THE BATHROOMS, HRV-1 WILL NOT USE THE MANUFACTURER'S PROVIDED DEFROST AUMINUM GRILLE; MECHANISM. DEACTIVATE THIS FEATURE IN THE FIELD. FOR COLD WEATHER OPERATION,THE HRV CONTROLS FOR DEFROST WILL ACTIVATE THE ENGINEER'S STAMP KP10> FLOOR SINK N/A CAST IRON ZURN Z1900 - - WATER ENTRY DRAIN EF-2 CEILING 500 4.5 0.125 224 W 115/1 GREENHECK VIBRATION - HRV PREHEAT DUCT HEATER INSTEAD. SP-A510 ISOLATORS;ROUND MANUFACTURERS: DUCT CONNECTION DC-1, HRV PREHEAT DUCT COIL: Frontage Vail, FIXTURE: AMERICAN STANDARD, UNIVERSAL RUNDLE, FIAT STERN WILLIAMS THE DUCT COIL WILL BE PROVIDED WITH A DUCT THERMOSTAT AND MODULATING CONTROL.THE DUCT COIL WILL OPERATE DURING DEFROST CALLS CO 81657 FAUCET: SPEAKMAN, DELTA,AMERICAN STANDARD,CHICAGO FROM THE HRV. DURING CALLS FOR DEFROST,THE DUCT COIL WILL PREHEAT THE HRV OUTSIDE AIR TO 32°F.THE DUCT HEATER WILL DEACTIVATE WHEN THE HRV DEFROST CALL IS SATISFIED. DRAIN: JOSAM,WADE SMITH GENERAL NOTES: MANUFACTURERS: 4. CUH-1, BATHROOM CABINET UNIT HEATERS: w A: ACME,COOK,GREENHECK, PANASONIC, PENNr , THE BATHROOM UNIT HEATERS WILL BE CONTROLLED BY THEIR RESPECTIVE THERMOSTATS.THE HEATERS WILL OPERATE DURING CALLS FROM v B: GENERAL NOTES: THEIR RESPECTIVE THERMOSTATS.THE HEATERS WILL NOT OPERATE WHEN THERE IS NO CALL FOR HEATING.THERMOSTATS TO BE 7-DAY EF-1 &EF-2 HAVE THE SAME SPEC.ALTERNATE UNIT TAG TO DIFFERENTIATE CONTROLS AND UNIT LOCATIONS.VG MOTOR AND 2-SPEED CONTROL PROGRAMMABLE UNITS WITH OCCUPIED/UNOCCUPIED SETPOINTS.SCHEDULE AND SETPOINTS PER OWNER. Z A. INCLUDED ON ALL UNTIS FOR CONTROL REDUNDANCY. B: 5. UH-1, MECHANICAL AND ELECTRICAL ROOM UNIT HEATER: I 1 J a) WATER HEATER SCHEDULE (ELECTRIC) THE UNIT HEATER WILL BE CONTROLLED BY ITS BUILT-IN THERMOSTAT.THE HEATER WILL OPERATE DURING CALLS FROM ITS THERMOSTAT.THE S HEATER WILL NOT OPERATE WHEN THERE IS NO CALL FOR HEATING. ROOM SETPOINT TO BE 60°OR PER OWNER. STORAGE WATER ELECTRICAL MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE 6. WH-1,WATER HEATER: 0 MARK TYPE CAPACITY RECOVERY TEMP. VOLT/ MANUFACTURER* ACCESSORIES REMARKS r , (GAL.) (GPH) RISE (°F) KW PH & MODEL# THE WATER HEATER WILL UTILIZE THE BUILT-IN CONTROLS TO MAINTAIN THE TANK WATER TEMPERATURE AT 110°F.WHEN THE TANK WATER w V ELECTRICAL MANUFACTURER* TEMPERATURE FALL BELOW THE CONTROL SETPOINT(MINUS DIFFERENTIAL-5°F)THE TANK HEATING ELEMENT(S)WILL BE ACTIVATED.WHEN THE MARK SERVICE TYPE CAPACITY POWER VOLT/ & MODEL# ACCESSORIES REMARKS TANK WATER TEMPERATURE EXCEEDS THE CONTROL SETPOINT THE HEATING ELEMENT(S)WILL BE DEACTIVATED. WH-1 ELECTRIC 20 61 80 12 208/3 STATE SSE-20 - - PH L. 7. PP=1, HOT WATER RECIRC PUMP: 2 ZONES AND 3 RELAYS (f) (11) GAS GARAGE MAIN TO MEET CONTROL THE HOT WATER RECIRC PUMP WILL UTILIZE ITS BUILT-IN CONTROLS TO KEEP THE DOMESTIC HOT WATER PIPING PRIMED DURING OCCUPIED DETECTION CONTROL - - 208/1 MACURCO DVP-120M ONE SYSTEM PER FLOOR - - - - SYSTEM VENTILATION PANEL SEQUENCE.SPACE HOURS.COORDINATE OCCUPANCY SCHEDULE WITH OWNER.SET AQUASTAT RETURN WATER TEMPERATURE TO 95°(PUMP MINIMUM SETPOINT)OR FOR 20 SENSORS. PER OWNER. 0 01) MANUFACTURERS: FED PROVIDE GUARD TO INSTALLED AT-5FT ABOVE * A.O.SMITH, RUUD OR STATE EQUIVALENT CO VENTIRLAT ON AGE CO SENSOR - FROM �N 12-24 VAC MACURCO CM-6 PROTECT AGAINST FINISHED FLOOR.SEE PLANS. GENERAL NOTES: PANEL OCCUPANT TAMPERING FIELD CALIBRATED. A: FED PROVIDE GUARD TO INSTALLED AT-5FT ABOVE B: NO2 GARAGE NO2 FROM - 12-24 VAC MACURCO TX-6-ND PROTECT AGAINST FINISHED FLOOR.SEE PLANS. Z VENTILATION SENSOR MAIN OCCUPANT TAMPERING FIELD CALIBRATED. L. PANEL O O. PUMP SCHEDULE XT-1 DOM WATER TANK vSTIC EXPANSION 2 GALLONS - - STATE ETC-2X - - r , MOTOR MANUFACTURERS: 0 MARK SERVICE GPM TDH (FT) FLUID MANUFACTURER* ACCESSORIES REMARKS * POWER VOLT/PH & MODEL# GENERAL NOTES: Z A: (13 P-1 DHW 2.0 2.0 WATER 25 115/1 GRUNDFOS UP 10-16 B5 BUILT-IN AQUASTAT - B: RECIRC AND TIMER (/^ A ° - - - - - - - - - - HEATER SCHEDULE W C MANUFACTURERS: J * B&G,GRUNDFOS,TACO OR AURORA EQUIVALENT ELECTRICAL MARK TYPE CFM SENSIBLE MANUFACTURER* ACCESSORIES REMARKS GENERAL NOTES: MBH POWER VOLT/ & MODEL# D E A: PH 0 B. DC-1 DUCT COIL 300 14.0 4.1 KW 208/3 GREENHECK IDHC DUCT THERMOSTAT HRV-1 PREHEAT COIL. W WITH SCR CONTROL. Ill CEILING REZNOR PROGRAMMABLE CUH-1 RECESSED 310 6.8 2 KW 208/1 ECR-2 T-STAT W/TAMPER - r ) PROOF GUARD. V CEILING REZNOR UH-1 HUNG 300 7.7 3.7 KW 208/1 EGW-5 INTEGRAL T-STAT - 0 J }� U) 0 73 MANUFACTURERS: * TRANE, MCQUAY,QMARK, REZNOR, BERKO, INDEECO,OR MODINE EQUIVALENT GENERAL NOTES: CIO A: I C11) 0 73 GRILLE, REGISTER, DIFFUSER & LOUVER w 2 11 SYMBOL USE PATTERN FINISH MANUFACTURER* & ACCESSORIES REMARKS MODEL# O A CEILING SUPPLY ADJUSTABLE LINEAR BAR PER ARCH TITUS 301 ADJUSTABLE PROVIDE OPTIONAL © CEILING EXHAUST LINEAR BAR ' PER ARCH TITUS 350 OPPOSED DAMPER FROM - MANUFACTURER. O © OSA INTAKE HORIZONTAL PER ARCH GREENHECK ESD-202 - - O Q N o CO r • o ct MANUFACTURERS: GRD KRUEGER, METALAIRE,TITUS LOUVER GREENHECK, L&D, RUSKIN Iii GENERAL NOTES: 1:_ A: .. G) B: a) ti 2: .1.-P Iia o „..7 ILIJ — ■ x; •I5 ~o ...J f-, i:] N- ILIJ `5: 06' COIT In r m> ICC r Gqi cv .Cr_ Chi < CO _I_ Chi Co `'3 glp ��1 C r-_ - 1.. 4IIi (a �1 i^ - 12 j IIIA w I- hi lib w z o i O o w (0 � as L' w C — w 1Y ., C x co C7 0 C C E Lu CO �. CO cc a 0 0 g OC a L co co Lii 45 o w CD 2 CDCD g C U U Ce w co 0 0 Q Lo U-6121 Q CISC N 0© BUOLDDOWOR[ S 0 n 2 U _U 1 w www b bui din works corna 0 a`) 0 303.278.3820 bgbuildingworks ■ U ,� D N — Project No.9864.00 Copyright 2017 i o U c� ALBUQUERQUE I AVON I DENVER I FORT COLLINS Q p Page 14 INSTALL ERV PER MANUFACTURER'S LITERATURE INCLUDING FLEXIBLE DUCT CONNECTIONS, CONDENSATE DRAIN,CHAIN/SPRING MOUNTING SYSTEM, MAINTENANCE AND OPERATIONAL Z CLEARANCES, ELECTRICAL/CONTROLS WIRING, L 0 0 3 ETA 4 0 6 8 9 10 EXHAUST VENTS TERMINATE IN VOID BETWEEN I— F. GARAGE WALL AND RETAINING WALL.TYPICAL EXHAUST FANS INSTALLED IN GARAGE WALL 2" \ ' ` LEVELS 1 AND 2. CO AND NO2 SENSORS INSTALLED BELOW BOTTOM OF TEE FLANGES(IN BETWEEN TEE v WHERE SHOWN.INSTALL AT-5 FEET WEBS).CONFIRM WALL PENETRATION HEIGHT WITH D Z ABOVE FINISHED FLOOR AND MASTINTAIN 1�2L ENGINEER MINIMUIOR TO M BETWEEN INST FAATION. PROVIDE TAMPER-PROOF GUARD. IJ. TERMINATION AND RETAINING WALL IN VOID SPACE. 10"OSA FROM ABOVE DC-1 100 EXH LJJ (TYP) SEE DETAIL ON M2.00. I Z v UH 1 6"WASTE STACK FOR ] M/ \ '� E -1 - ° III EF-1 I� °I] A O O FUTURE CONSTRUCTION. la ■[ i PIPE CAPPED IN I-0 0 0 MECHANCIAL ROOM. UNIT HEA ER HUNG FROM W'LL STRUCTURE. 1101,,• ---- SING M NUFAC�ER'S 36' DEGREE WALL u Ipp /l I _ OUNT. IOORDI TE UNIT HEIGHT WITH P10 'RCHITEI T PRIO Tbb INSTA LATION. 4"COTG INSTALLED AT BASE OF STACK IN 11 1 """ II 1 i" I CO&NO2 GAS DETECTION S STEM CONTROL MECHANICAL ROOM. EF-2 ■ „„�s+ tryrnn,�y ■�100 i�\ PANELS 'TACKED ON WALL, •NE SYSTEM PER ``t,,El I .e.1 FIRE AND DOMESTICll Q LEVEL. PANELS INSTALLED P R `,a`�ti,� �', .� MANUFACTURER'S LITERATU'E.COORDINATE ��= WATER ENTRY RISERS. P4 o I UNIT LOCA TION WITH ARCHI ECT AND y - • J• _ NH I - MAINTEN A NCE STAFF PRIOR 0 INSTALLATION. `•. '1 �- MECH�ANICALr _a- n P9 TRENCH DRAIN F•R � e. lib 4.'- uuunuuuuuuuuuuuuuuuuiiiiiiii FUTURE TOV STR:ET SWEEPER GARAG' . I 4 ' NA t*F. - - - - - - - - - - - - - - - - - - - - - - ENGINEER'S STAMP d” - " J B ( ) INSTALL WATER HEATER I—FACP, RE:FIRE PROTECTION PLANS FOR 4 PER MANUFACTURER'S I Il �� Ili DETAILS. DIAGRAM ON M2.LITERATURE 00. CO 81657 ELECTRICAL PANELS,DUCTS AND PIPES SHALL 551 N Frontage Rd W, Vail, 100 Q I NOT BE ROUTED DIRECTLY OVERTOP. ■I - TERMINATE 10"EXH IN IT �nUH-1 E I Level 1 INTERSITITAL SPACE WITH 9 P3 © 10 DAMPER,AND INSECT 17 WALL CAP,BACK DRAFT L SUPPLY GRILLES TO BE LOCATED ABOVE DOORS T AS SHOWN TO REDUCE GARAGE AIR INFILTRATION SCREEN.TYP,2. P3 - P5 ^ INTO SPACES.TYPICAL ALL SUPPLIES. _ - ,...� 6x8 w _IGII� I TYP.2 STOBE AND ALARM FOR GARAGE MALE o0 ini UH-1 80 I 140 : VENTILATION SYSTEM. St S v I 8x6 Q CEILING UNIT HEATERS RECESSED INTO 6 P1 TYP. BATHROOM CEILINGS.INSTALL PER ) n e P3. MANUFACTURER'S LITERATURE.COORDINATE _i r° _ FINAL LOCATIONS WITH ARCHITECT,LIGHTING, V1iF•:' -, m° � : / - ' -I I� FEMALE � � tl°,�►j �� � STRUCTURE,ETC. - - - - - I - - - - - - - - I - - - - - /� - - + - - - -- C� _ V II 1 (( �l ,., E \, PLUMBING LINES ROUTED TO BATHROOM / r II 7 —1I --_. I FIXTURES.SEE ISOMETRIC DRAWING 1&2 � I =__MT SHEET M2.00 FOR DETAIL. o L. ___,I . \ SHUT-OFF VALVE WITH ACCESS PANEL. O IL , BELOW GRADE STORM �� _ P5 CUH 1 80� s� PIPING ,ROUTED AS I I 7___" - i (1) ------ _---i .-=- • P3 ® P3 4./mi \ 8"COT 1___I • 6" ST (opo W IN. 0- - - - i i I -6" ST- - ,1 - I ---„, -6" ST I -4" ST- i i O \ P5 I P7«�P7«, I / - -3" ST- -I—I- - _ o❑I \\ ■ — P6 ^ pg \ a i I �� •. O.. P6 sy2 oo O - - / L. i ,1 EN r- a I I®• I °I A - - D C� \� - - E - - I - — - ❑0 - - - - - s� N0- PARKING DECK DRAIN.4"DIAMETER STORM \ DRAIN CONNECTION(TYPICAL LOWER riri-nri-Nri-11-----ii LEVEL FOR USE AS STORM CLEANOUT). II 1 II 11 II II Ni' II II I II II II II II 11 II II\11FLOOR DRAIN 6"WASTE.CONTINUATION I II II II II II II II II II\ ;14,..--- I 6"COMBINATION I BY CIVIL. WATER/FIRE MAIN FROM 4"STORM DRAIN ROUTED DOWN IL Jl JI_IL T JI_Llil UTILITY.PIPING ROUTED J. PLOTSNG COLUMN.FROM PROVIDE o 711 1 III I BELOW FROST DEPTH RE: PROTECTION VEHICLE linI,I, „„ u O II CIVIL FOR CONTINUATION. DAMAGE. 8"STORM DRAIN \ / a P5 II PER CIVIL TO CONTINUATION �/ ° -1 IIIIIII a II :-.7, SAND&OIL _ I I W �• INTERCEPTOR. PERSTORM CIVIL DRAINS REQU REQUIRED). ENTRANCE MECHANICAL PLAN LEVEL 1 1 a) SCALE: 1/8" = 1'-0" . ❑ [ 1 W / .1 E u) a) Z 0 0 0 (44 06 0 (84 9 10 13)C EXHAUST FANS INSTALLED IN GARAGE WALL 2" J 0 BELOW BOTTOM OF TEE FLANGES(IN BETWEEN TEE DUCT ROUTED THROUGH GARAGE WEBS).CONFIRM WALL PENETRATION HEIGHT WITH CO AND NO2 SENSORS INSTALLED SPACE(INCLUDING LEVEL FLOOR STRUCTURAL ENGINEER PRIOR TO INSTALLATION. I ABOVE SHOWN. INSTALL AND-5 FEET r(I) AND CEILING).REFER TO ARCH FOR MAINTAIN 12"CLEAR MINIMUM BETWEEN FAN ' ` DUCT GUARD. TERMINATION AND RETAINING WALL IN VOID SPACE. PROVIDE TAMPER-PROOF GUARD. [ ] SEE DETAIL ON M2.00. (TYP) V 73 NI EF 1lill I E� 1 r] !ro%1 J EF-1 Ld- /� CO ii' iia \� OE E _ ((11) 0 -a W 4) 2 11 1 , ., _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ EE° V CONTROL WIRING ROUTED TO Com' I CONTROL PANEL IN MECHANICAL O ROOM ON LEVEL BELOW. O . STOBE AND ALARM FOR GARAGE VENTILATION SYSTEM. USE FIRE N- CO o I 1>10 PROTECTION ALARMS/STOBES IF N o VL^J POSSIBLE. o ct ti IC= 1 1° ° 1.V ti ;EC CIO o ILLI .�, 91:: - IC.] SPACE RESERVED FOR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � ■LLI ii: FUTURE GAS METER, -• •, • - I ° N- 0 VALVES,ETC. , - ' '.' 0 s - = 113 ..,, ,_. 1�I3 r > ICC 12 — - - m cv ..•- C:i Cr) GAS LINE ROUTED TO BUILDING C'�� �1 C EXTERIOR FROM UTILITY FOR ' -'- :. - 00 Ip� FUTURE USE.TERMINATE AND -" " -" <� 8 6,, Ai � CAP PIPING ABOVE GRADE. '•_'• •- , __-__ - I 01 PIPING CONTINUATION AND =Il-___ �• co SIZING PER CIVIL. vi L[Tire 1-1J-(5 0�pg pPPI P 41 � � W No. Z I .Q D° N W U 1_, PARKING DECK DRAIN.3"DIAMETER 1 ' O a) ❑0 STORM DRAIN CONNECTION(TYPICAL .0 LEVELS 2&3). rEC ca 4"STORM DRAIN ROUTED DOWN C w C) co ALONG COLUMN.PROVIDE 1 1 1 '1 - : - - w C PROTECTION FROM VEHICLE 1 1 ' 1, I. 1 ,1 •1 -1 1 -1 L NOTCH CURB TO ALLOW WATER 1 1 1 '1 -I' ,I -1 '1-* 1 - - F DRAINAGE TO STORM DRAIN. DAMAGE. 1 1 I' I, '1- 1 1 1-,1 "1 •- i • I- I- 1, 1 .1 1 CI C E CO STORM DRAINS AT GARAGE ENTRANCE PER CIVIL(IF REQUIRED).Lu 1 a I 1 1 ,1 ,1 'I I ;,- - a Q \CC n Y 1 6 I h h -•, - a o o a .i 1 'I" L I � 1 '1, I• I - - 0) .i, 0.a (0 O •C Q a) ❑co a) 8 CDCD Co o Q 2MECHANICAL PLAN LEVEL 2 - - Ce w0 SCALE: 1/8" = 1,-0" - ci CD N- C.) _0 n 2U 1 w www b bui din works corna o `m o 303.278.3820 bgbuildingworks ■ U ,� D N I Project No.9864.00 Copyright 2017 i o U c-z-, ALBUQUERQUE I AVON I DENVER I FORT COLLINS Q p Page 15 Z 0 0 0 4 0 6 0 8 9 10\ 10"OSA THROUGH GARAGE SPACE TO LOUVER PLENUM. REFER TO Z ARCH FOR DUCT GUAD. LOUVER TO TERMINATE HIGH ON EXHAUST LLI WALL(-35'PROJECT ELEVATION). I o❑ I I Cn D —, 1— Z 0 >� co U ❑o U D E E (_.\17 i,v, , ,„,414., : 0 • 041,-;& (Do I %sec*, ibi ' 1 B ENGINEER'S STAMP d_ \ 551 N Frontage Rd W, Vail, CO 81657 I re — �+ d - . (,...) , , _ , . _ ,, , _ , , _ ___ . _, , _ „ ___ " ---- _,. „ —, ._, „ 1 (/) -, , r, - ,- . _- ____ , __,. _. „_ _ ___ , :____,___ 0) 1 c . _ _, P5 (i,_5)(` P5^ P5 _, 4, . k , v I \ _."°,J r. 1 L e i \ 1- °I I —_- - — D PARKING DECK "DIAMETER 1 1 STORM DRAIN COCO NNECTION(TYPICAL 1 1 1 1 1 1 — LEVELS 2&3). gr 0. 4"STORM DRAIN ROUTED DOWN r I, I I I rf I 'I I;I. ' , I- 'I' I' L ",I ,I-I I 1 ALONG COLUMN. PROVIDE - • I 6 I' 'I I 'I •I' PROTECTION FROM VEHICLE DAMAGE. PROVIDE HEAT TAPE ON ALLI•. 1 1 - a 1-'1 - ' STORM DRAIN PIPING ABOVE I_' 1 i_ 1 1 ,1 , t 1' FROST DEPTH TO PREVENT 1 1 ,1t-1 t -1 1 -r t . - - FREEZING. , '-'1 I, , ,- ‘, 1._,- CZ �1 W �--+ \ C MECHANICAL PLAN LEVEL 3 \ /L.J CD I SCALE: 1/8" = 1-0" J E u) la) z w 0 0 0 (4) (5) 6 C!) 9-- 10 li ID 1 Q U —0 1 I 1 1 1 1 o❑ 1 I - - A Z CO ❑oi (1) 0 W 0 2 12 1 Oo �� -- B O • 0co2 M r..: - 0 COMa) r O Ct 1k) 1 IC= ISI} o ID ti ;ECr I^ r I co c�a o w :ei c co IC.] c: - �1: � o ....1 f-, ' ' 0 = ti ILIA 2: ,- - _ 113 rn ICI f U) > rC Gqi ,,--- - U) m nc= Chi IC1C a) co Nam Cil _ - Co co 0 1II� ,11 co -- , c..)l DOWNSPOUT FOR STAIR ROOF GUTTER BY g 12 co ARCH.ROOF GUTTER ROUTED INDIRECT �`, TO LEVEL 4 DECK DRAIN.PROVIDE HEAT IJJ J TRACE PER ELECTRICAL. �!: W U Q — — MN I — 0 .■ I D 12 11 1 .\ 1 I — 1— ° w 0 N PARKING DECK DRAIN.4"DIAMETER STORM ct co DRAIN CONNECTION(TYPICAL TOP LEVEL). L' w 1 1 I.f 1_'I f;L co a) OPENING IN W LL FOR OVERFLOW. PROVIDE HEAT TAPE ONr 1Y ., COORDINATE LOCATIONS WITH ALL STORM DRAIN PIPING •1,-1• 1 1 'I -1' ,1 -I 'I-.I• I - - - ' I- co ARCHITECT.2 SQ. FT. FREE AREA.(TYP) ABOVE FROST DEPTH TO 1 1. 1 -1'H• "1 L l' L,1 1_ •- PREVENT FREEZING. '•_ •- I 1 l 'I- I I- I I'-I 'I I . ' ' - W PRIMARY DECK DRAINS I '1 I -I b, I 1' I I TYP.SECONDARY DRAINAOGE THROUGH STORM TEM, a Q 1- i 1- 1 ,I .1't r PERIMETER WALL OPENINGS/SCUPPERS. 1-1 ,I 1 '1 -1' r c o -� I_ I I 'I .•1_'I. 1'-� _ ,- '• - O .o C o co co MECHANICAL PLAN LEVEL 4 .. \ \ i— ? 2 SCALE: 1/8" = 1'-0" vC7 CD o U w O ccCe 0 Q U N 3@ BUOLJ NGWOR[ S C) n = v _U 1 w www b bui din works corna 0 `w• o303.278.3820 bgbuildingworks ■ U r- cv A Project No.9864.00 Copyright 2017 i o U M ALBUQUERQUE I AVON I DENVER I FORT COLLINS Q CI Page 16 ACP6C FD �+, STRUCTURAL TEE FLANGE/CEILING. MOUNT BELOW A \ FLANGES IN BETWEEN TEE (P6) WEBS.CONFIRM WALL ACP6> \////////////// PENETRATION WITH FD FD STRUCTURE PRIOR TO Z INSTALLATION. O 6"TAP FOR FIRE PROTECTION.CONFIRM SIZE WITH FIRE 9PROTECTION SYSTEM DESIGNER. CURB (pg ��(P6) SCREEN. 6"WATER ENTRY INTO MECHANICAL ROOM. U I— C(P6) DP6C DRAIN \ A FD 0 0 Ct z igo \ Ct � A P9) A CURB CP8 40(P6) ‘..--------1 _ ►4 ►moi . ►1 MMWM FCO DRAIN TRENCHFD EXHAUST FAN. t/r P - - /1 J DRAIN C _ 1 b DOMESTIC WATER SERVICE SHUT-OFF VALVE 7 ' ` �.,� ) n A \ GRAVITY BACKDRAFT DAMPER. L 0 �� g PRESSURE REDUCING VALVE,WATTS '� 2 1 LF223, 1-1/2"SET TO 60 PSI. O O A \ UD FD P6 ,,i ,� 1"WATER METER WITH REMOTE READOUT. \\ \ 1-1/2"REDUCED PRESSURE ZONE ASSEMBLY,WATTS 009. ACP6C (P6) CP6C k,, ` 1-1/2"CW TO BUILDING FAN TERMINATION TO FD FD FDA E - ) BE 12"MINIMUM FROM 21)` • �i LEVEL 2&3 LEADERS DOWNPIPE FROM STAIR ROOFN RETAINING WALL. ```,,1`,•:�At,I � o.,.6. riuuuv TO BE 3". (TYP). GUTTER ROUTED TO LEVEL 4 DRAIN. /////////////////, NOTES: , +..ote- 'ii �i 1. WATER METER AND REDUCED PRESSURE ZONE ASSEMBLY `•, • J..0 1E , INSTALLED PER MANUFACTURER'S REQUIREMENTS. - S% FD(P6) ',I' FLUSH WALL HOUSING / t } WITH OSHA GUARD. = ' / 2. INSTALL UNIONS AND VALVES AS NEEDED TO FACILITATE A A - INSTALLATION AND FUTURE MAINTENANCE. (P6) (P6) SECURELY MOUNT FAN IN WALL. 'F��"4 '��1;•N`iniriniiiiiiitIto � FD FD18"VOID BETWEEN PARKING GARAGE EXHAUST FAN DIAGRAM EAGLE RIVER WATER ENTRANCE DIAGRAM ENGINEER'S STAMP , 9GARAGE WALL AND RETAINING WALL. O NO SCALE O !' NO SCALE 551 N Frontage Rd W, Vail, LOWER LEVEL AFD( P6) \ + L CO 81657 EASDRAINS/LEADERS TO B4FOR A WALL. 1^ -- \ USE AS CLEANOUTS. (TYP). \ (P6> COLD WATER SUPPLY. FD / MANUFACTURER'S WALL HANGER 1 \ ____ ,Sc TTE. T I _ S 9 HOT WATER TO � N HOT WATER CIRC. 8"STORM DRAIN. '..,:.• 'IFROM FIXTURES. CONTINUATION BY CIVIL. AFD( P6 > o 1 \ I \ \ / 1 I DIAPHRAGM TYPEa)I PIPE RELIEF VALVE INDIRECT TO FLOOR FCO \ \ EXPANSION TANK. EXTR.��� \� A \ DRAIN. I EQUIVOALENT. OR ELECTRIC WATER �__ DOMESTIC HW PARKING GARAGE \ HEATER. __ 4. \ RECIRC PUMP. ♦ , � � - rL p_1 v 3 STORM ISOMETRIC 'I SCALE: NOT TO SCALE CFD 6) C i-1-4 / 11° 0-) Hoi— DOMESTIC HOT,COLD HOT WATER RECIRC LINES TO/FROMAND C7 SUPPORT FROM MECHANICAL ROOM. FLOOR. C 1/2"HWR MOP BASIN FLOOR ■ 11/1"2mmmEm "CW DRINKING FOUNTAIN MOUNTING \v - , ° '� _ - \ il " DIAGRAM & ISOMETRIC DOMESTIC WATER HEATER DIAGRAM s. � NO SCALE CD NO SCALE ( ELECTRIC) U CO 0.DOMESTIC WATER TO MOP SINK EXPOSED, ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSURE WITH ANCHOR 1/2"HWR ROUTED DOWN WALL. FLANGE,HEAVY DUTY TOP,AND VANDAL PROOF FASTENERS,ZURN, Z-1400-HD-KBRASS CLEANOUT PLUG W/COUNTER SUNK HEAD. 1"HW 1 1/2"CW 16"CONC. PAD TROWEL awl SMOOTH&EDGE. EXACT PIPING DIAGRAM,TO BE VERIFIED AT \ o TIME OF FUTURE ADDITION WITH ADJUSTABLE CLEANOUT APPLICABLE CODES, UTILITY MS FLOOR LINE 7 AND ACCESS COVER ZURN FINISHED GRADE REQUIREMENTS ETC. CO / / ZB-1400.TOP OF COVER TO o o BE FLUSH W/TOP OF FLOOR. 6 D o _ GAS METER, UNIONS, PRESSURE o 0 0 = D 0 p o �� REDUCING VALVE, ETC.TO BE INSTALLED IN I>o1> r ' o D p _ FUTURE.PROVIDE ADEQUATE SPACE FOR t,'o '' '0 0 FUTURE INSTALLATION. E LAV .---- � 0 ops � o o p _ 5 11/4"CW \ �/ G \ _ -4_ e 1/8 C.I. BEND \ LAV _ 1/8 C.I. BEND .= BALANCE OF PIPING SAMEC.I.WASTE LINE. // METER AS CLEANOUT TO GRADE. LGTH TO SUIT. ,� GRADE SLOPE DN 1/4"/L.F. \ \ \ \ \ \ \ \ \ \ 0 111 (1)< 1/2° . ' FLOOR CLEANOUT (FCO) \ \ \ \ \ \\ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ WC IIII aillWASTE LINE ` \ \\ \\ \\ \\ \\ \\ \\ \\\ \ \ 121 C PROVIDE VALVE AND CAP FOR GAS 0 DRINKING FOUNTAINS TO LAN/ URN OCCURS AT ELND EANOUT OF LINE. PIPING TERMINATION ABOVE GRADE. J }, BE FROST PROTECTED \ FOR YEAR ROUND GAS PIPING ROUTED BELOW '/� OPERATION. DF" LAV CLEANOUT TO GRADE (COTG) GRADE PER CIVIL. v, DF i° U 73 MEN'S AND WOMEN'S RESTROOM CLEANOUT DIAGRAMS FUTURE GAS ENTRANCE DIAGRAM DOMESTIC WATER ISOMETRIC NO SCALE G NO SCALE C \ zco 2 \ SCALE: NOT TO SCALE -.-4'-- --,t-- 1 (41) WASTE MAY EXTORIEND VENT. v AS A j r , CHROME WALLCOVER TRACE ENTIRE LENGTH OF EXTERNAL w AND SCREW. EXPOSED PIPING WITH 12 WATTS PER LINEAL FOOT HEAT TAPE. PROVIDE 7.3 a) STRAP ON STAT TO LOCKOUT RE: ELECTRICAL HEATING ABOVE 32°F AMBIENT TEMP. 2 i: 6"WASTE STUBBED UP IN �� PLUGGED TEE WITH FOR CONT. PROVIDE COLD LEADS TO MECHANICAL ROOM FOR CLEANOUT. ELECTRICAL CONNECTION. FUTURE USE WITH 2"V. 0 _ THERMOSTAT UNDER COVER. ALUMINUM JACKET. V TERMINATES 12"ABOVE STAIR WALL. WELL ROOF. FCO 7o L o , 3"THICK PIPE O ���������������������� INSULATION(1)PIPE SIZE 4:20 V ROUTED UP IN STAIRWELL. LARGER THAN PIPE. (OoO?, FLOOR LINE. • S CP10CNI o . o co 0 > ~ 0 0 0 vo v v v;JT o o N r A FS o o v v ° a p (0 o > 4(P4I - v o v o , Mo Y o MS / 1/8 C.I. BEND. > "------5) f EXTERNAL EXPOSED N BALANCE OF PIPING PIPING REQUIRING FREEZE PROTECTION . F; SAME AS CLEANOUT NOTE: I� � TO GRADE. MECHANICAL CONTRACTOR PROVIDE 1:: AND INSTALL, ELECTRICAL CONTRACTOR TO POWER. r. LAV WALL CLEANOUT or) CP3C ino LAV 3,.W ;, DIAGRAM HEAT TAPE DIAGRAM �.a oizt ILLI •IF a c.i ¢:� ai CP3) J NO SCALE0 NO SCALE CD •+`, > O CP1> Iw] = N- ILLI 2 N we 113 ' ICI f CP2C ^� m N •• C14 hi LAV URN .•,-,••• rl01 Cr) ap cfl ..•� cii _ 11 6 �CP3) P1 DRINKING FOUNTAINS TO ���r 1II' LAV C C WC 7,,,(-) (P5 ��` o ms ms BE FROST PROTECTED CP3C aw A F'� OU ,►. 'lll coil FOR YEAR ROUND DF �P1> C FD co vi OPERATION. or _g -2 410 DF DF yr LI 1 LU ctj CP7)41110/ A(Ps) 4'WV Ji, CO W Z FD / w 2"WV U 2"CW&V 0 (1) .C 0 W CD a) oy��a ;,% CC C6 CO w W 0 CC x 0- C 0 CO _. CO -J a ..71.-1 o CONTINUATION BY\CIVIL `, ' o fl o \ C3) F2 y p C o co MEN'S AND WOMEN'S RESTROOM CD WASTE AND VENT ISOMETRIC c o CeLIJ co a, N SCALE : NOT TO SCALE g BUILJGWO\[ S N \ IN0 n 2 �' CD _U w www b bui din works corna a cn o 303.278.3820 bgbuildingworks ■ U r-- cv I Project No.9864.00 Copyright 2017 L o U c---,) ALBUQUERQUE I AVON I DENVER I FORT COLLINS Q 0 Page 17