Loading...
HomeMy WebLinkAbout18430 Report 100 E Meadows Dr 11-27-18.pdf ,.:M i .y. Ii 1 4 IIi •� ': 1 Y I,♦ ♦i, S. AIR-RIGHT, INC. Precise.Accurate.Reliable. T.A. B . Report Project: Axel 100 E Meadow Drive, Unit 7A, 8, 21, 22 Vail, CO Prepared for: Climate Control Report issue date: November 27, 2018 Air-Right, Inc. Project Number 18430 747 Sheridan Blvd, Unit 8BAIM R R Lakewood, Colorado 80214 I'tI E . V V PFax:(303)232 1238hone:(303) 5 1 TEST1104.P.DAEITIM PAD 9AL.NCO BUREAU 0 e-mail:henry@air-rightinc.com THE P-ROF[BiIONAL,3 CHOICE' • ...,..::„:„.., .;..::.z .:::. ...„...::. rii‘ ...4...160_,:. •.:.::....,,.::•: AIR-RIGHT, INC. Precise.Accurate.Reliable. Test, Adjust, and Balance Report The data presented in this report is an exact record of system performance and was obtained in compliance with NEBB procedural standards. Any variance from the design requirements shall be documented in this report. The results shown and information presented in this report is certified to be accurate and complete to the extent possible by the equipment and procedures used to balance the project. The final air distribution system measurements are in compliance with NEBB Procedural Standards for testing, adjusting, and balancing of environmental systems, and the project specifications. CERTIFIED BY: �, � Date: November 27, 2018 Air-Right, Inc. warrants the air system presented in this report is operating at the specified levels as shown in this repot at and only at this time. Air-Right, Inc. makes no other warranties, stated or implied, concerning the continued performance, operation, or safety in the use of this equipment past this this time. wii ht, Inc NEBB Air and Hydronic Systems Certified Professional: Timothy A. Topping NEBB Number 2589 TIMOTHY A.TOPPING Certification Expiration/renewal date: 03/31/20 CERTIFICATION 2569 EYp.3/31/20:� web '7/\z,....,,_,./ VO,'Of11C� �\ NE I BB Air-Right, Inc. 747 Sheridan Blvd. Unit 8B, Lakewood, CO 80214, Phone: (303) 232 5145 Fax: (303) 232-1238 •'r AIR-RIGHT, INC. Precise.Accurate.Reliable. Table of Contents Document Page Cover page 1 NEBB TAB Certification 2 Table of Contents 3 Abbreviations 4 ERV Report 5-8 Fan Unit Report 9 Drawings 10-11 S a.....::: ..:.,: ... 2• :,..., •.1 AIR_-RIGHT, INC. ABBREVIATIONS Precise.Accurate.Reliable. ACU Air Conditioning Unit HWP Heating (Hot) Water Pump AHU Air Handling Unit Hx (HX) Heat Exchanger AMP(S) Amps Hz (HZ) Hertz ATMOS Atmosphere MAU (MUA) Make-Up Air Unit BAS Building Automation System Max Maximum CD Ceiling Diffuser Min Minimum CFM Cubic Feet per Minute NA Not Applicable CRAC Computer Room Air Conditioner NAC No Access CWP Chilled Water Pump NG None (Not) Given DD Direct Drive No Number DDB Dual Duct Box OSA Outside Air dP (DP) Differential Pressure PD Pressure Drop EF Exhaust Fan PDU Pool Dehumidification Unit EFF Efficiency PF Power Factor El Exhaust Inlet PH Phase ERV Energy Recovery Vessel PSI Pounds per Square Inch FCU Fan Coil Unit RF Return Fan FFU Fan Filter Unit RI Return Inlet FL Amps Full Load Amperage RPM Revolutions per Minute FLR Floor Register RTU Roof Top Unit FPM Feet per Minute SF Service Factor FPVAV Fan Powered Variable Air Volume SD Supply Diffuser FR Frame SF Supply Fan FT. HD. Feet of Head SWR Side Wall Register FUR Furnace TSTAT Thermostat GPM Gallons per Minute VAV Variable Air Volume HP Horse Power Volt Voltage HRV Heat Recovery Vessel VP Velocity Pressure i•�, •4ti TTS %WO AIR-RIGHT, INC. P ccisc.Accvrvie.Ba liv ble. LOCATION: PROJECT NUMBER: CONTACT: 18430 Jerald Bell ERV ERV-1A UNIT DATA Manufacturer RENEWAIRE Design Exhaust CFM 500 CFM Model Number NG Design Supply Static NG in.H2O Serial Number G186140L Design Exhaust Static NG in.H2O Design Supply CFM 500 CFM SUPPLY FAN MOTOR Manufacturer MARATHON Service Factor 1.00 Frame 48 Rated Volts 120-208/230 Horsepower 3/5 FL Amps 6.7/3.9-3.5 RPM 1625 Nom Efficiency NG Phase 1 Power Factor NG EXHAUST FAN MOTOR Manufacturer MARATHON Service Factor 1.00 Frame 48 Rated Volts 120/208-230 Horsepower 3/5 FL Amps 6.7/3.9-3.5 RPM 1625 Nom Efficiency NG Phase 1 Power Factor NG SUPPLY DRIVE DATA Motor Drive DIRECT DRIVE Fan Bore Motor Bore Number of Belts Fan Drive Belt Size EXHAUST DRIVE DATA Motor Drive DIRECT DRIVE Fan Bore Motor Bore Number of Belts Fan Drive Belt Size ERV-1A 2018-11-27 i•'4, •4ti• TT' AIR-RIGHT, INC. P•ec,sc.Accvrvie.Ba liv ble. LOCATION: PROJECT NUMBER: CONTACT: 18430 Jerald Bell SUPPLY FAN STARTER Manufacturer FACTORY Rated Amps Model Test at Size EXHAUST FAN STARTER Manufacturer FACTORY Rated Amps Model Test at Size SUPPLY TEST DATA Actual RPM DD Amps T1 5.9 Volts T1-T2 120 Amps T2 NA Volts T2-T3 NA Amps T3 NA Volts T1-T3 NA Actual Supply Air 525 EXHAUST TEST DATA Actual RPM DD Amps T1 6.1 Volts T1-T2 120 Amps T2 NA Volts T2-T3 NA Amps T3 NA Volts T1-T3 NA Actual Exhaust Air 540 ERV-1A 1 Summary SUMMARY Name Type Size Design CFM Prelim CFM Final CFM %of Design Outlet-001 A 10x5 150 155 103 Outlet-002 A 6x5 100 105 105 Outlet-003 A 6x5 50 50 100 Outlet-004 A 10x5 150 165 110 Outlet-005 A 6x5 50 50 100 Totals 500 0 525 ERV-1A 2018-11-27 .li•� Y 1 • AIR-RIGHT, INC. P'C c 15C.AGGVrgie.fl9 Ii ble, LOCATION: PROJECT NUMBER: CONTACT: 18430 Jerald Bell ERV-1B UNIT DATA Manufacturer RENEWAIRE Design Exhaust CFM 500 CFM Model Number NG Design Supply Static NG in.H2O Serial Number G186140L Design Exhaust Static NG in.H2O Design Supply CFM 500 CFM SUPPLY FAN MOTOR Manufacturer MARATHON Service Factor 1.00 Frame 48 Rated Volts 120/208-230 Horsepower 3/5 FL Amps 6.7/3.9-3.5 RPM 1625 Nom Efficiency NG Phase 1 Power Factor NG EXHAUST FAN MOTOR Manufacturer MARATHON Service Factor 1.00 Frame 48 Rated Volts 120/208-230 Horsepower 3/5 FL Amps 6.7/3.9-3.5 RPM 1625 Nom Efficiency NG Phase 1 Power Factor NG SUPPLY DRIVE DATA Motor Drive DIRECT DRIVE Fan Bore Motor Bore Number of Belts Fan Drive Belt Size EXHAUST DRIVE DATA Motor Drive DIRECT DRIVE Fan Bore Motor Bore Number of Belts Fan Drive Belt Size ERV-1B 2018-11-27 i•�, •4ti TT' AIR-RIGHT, INC. P•ec,sc.Rccvrvie.Ba liv ble. LOCATION: PROJECT NUMBER: CONTACT: 18430 Jerald Bell SUPPLY FAN STARTER Manufacturer FACTORY Rated Amps Model Test at Size EXHAUST FAN STARTER Manufacturer FACTORY Rated Amps Model Test at Size SUPPLY TEST DATA Actual RPM DD Amps T1 5.6 Volts T1-T2 120 Amps T2 NA Volts T2-T3 NA Amps T3 NA Volts T1-T3 NA Actual Supply Air 485 EXHAUST TEST DATA Actual RPM DD Amps T1 5.5 Volts T1-T2 120 Amps T2 NA Volts T2-T3 NA Amps T3 NA Volts T1-T3 NA Actual Exhaust Air 460 ERV-1B 2018-11-27 .li•� 4.1,41•00' AIR-RIGHT, INC. P'C c i5e.AGGVr ie.fl9 IIgble, LOCATION: PROJECT NUMBER: CONTACT: 18430 Jerald Bell Exhaust Fan EF-1 UNIT DATA Manufacturer PANASONIC Design CFM 70 Model FV-05-11VKS1 Design Static 0.25 Serial Number 711 MOTOR DATA Manufacturer ALL INFO TAKEN FROM FAN HOUSING S.F. 1 Motor HP NG Volts 120 RPM NG Amps 0.27 Phase 1 TEST DATA CFM 70 Volts 120 RPM DD Amps 0.1 Fan In ATMOSPHERE Fan Out NAC EF-1 2018-11-27 0 v co E--- m J CC — O y.$ a 0 — ~u- rn se- O - LL 0 c Z N- w -3 1A 0 J E — D a+ o m 4- ›, Si 00 N 0 N imi Q N 00 M Q 7 ! SEAL �\ M iiii°Pa00 rRECj' ALL PLUMBING FIXTURES TO BE INSTALLED y .. o=_ WITH ISOLATION VALVES PER IPC. a 9 c' CEILING EXHAUST FAN INSTALLED IN DROPPED 2 FS �> BALANCING VALVE CALEFFI 116240A OR EQUIV. •R „f`r r CEILING PER MANUFACTURER'SWlIae4lpllplJP•41P41101P41)tt$ WATER RECIRCULATION SYSTEM BALANCING. PROVIDYE$ REQUIREMENTS. AS NEEDED TO ENSURE ALL FIXTURES RECEIVE HOT WATER.„ ��WASTE AND VENT SYSTEMS FOR NEWWITHIN 10 SECONDS OF FIXTURE OPERATION. '�BATHROOM GROUP TO BE DESIGNBUILD BYEXISTING HWS/HWR FROM EAST MECHANICAL ROOM.TEE �' �' OUTSIDE AIR DUCT FROM ABOVE. ROUTED IN1CONTRACTOR. j rqt OFF FOR LOWER LEVEL BASEBOARD ZONES. SEE DETAIL ON / s DROPPED CEILING SPACE TO LOWER LEVEL ERV. N. (c-/� SHEEP M201. \ Sp ,,, CW, HW,AND HVI/C LINES FOR LOVNER LEVEL BATHROOM AND • O - `_ MAIN LEVEL COFFEE BAR FIXTURES.SYSTEMS TO BE p ///�G \I FA q � \ DESIGN/BUILDING BY CONTRACTOR. ��U�� NEW GAS LINE ROUT FROM MECHANICAL ROOM.CONTRACTOWOWNER ' ��� 3 m. �� Z G TO CONFIRM MEC. ICAL ROOM TIE IN LOCATION AND ATTAIN �/ ��3iq"""L+it CW,HW,AND HWC ROUTED TO EXISTING LINES SUPPLYING C' AUTHORIZATION FRO luy/BUILDING AUTHORITY. 7./.2.,,.424, RETAIL SPACE IN LOWER LEVEL DROPPED CEILING. BB 1 HWS HWS APPROXIMATE L• /ON OF "P.>. B 1 ' 'Pi " CONTRACTOR TO COORDINATE IN FIELD. ��% HWR EXISTING SERVI E PIPING. / •••if / ..-v, \ G� O HWC—^` --- HWC Ct ASO SWITCH WITH OCCUPANCY SENSOR/TIMER FOR / THERMOSTAT FOR / \ �0� lay BATHROOM LIGHTING. INTERLOCK SWITCH WITH OFFICE/STORAGE / ' N 0 / ':«, r 0 CEILING EXHAUST FAN. / BASEBOARD CONTROL. 2p; / N t Ct ,/. \— THERMOSTAT FOR LOWER / ERV-1 0 N c \ \� 0 BASERETAIBOARD CONTROL.L-AND <�� // CO O DC-1 O THERMOSTAT FOR LOWER "- ':\ G U W Q PHOTO STUDIO BASEBOARD i o / 0 CONTROL �� �k OFFICE/STORAGE \ LL H S THERMOSTAT FOR LOWER FIRE RATED WALL PENETRATIONS TO COMPLY WITH f Z Q \- ,J OFFICE BASEBOARD 3 co D > APPLICABLE BUILDING CODES.COORDINATE LOCATIONS U ^ CONTROL. �- I — WITH ARCHITECT. V V ! O ,/ GAS FIREPLACE SPEC BY ARCH/CLIENT. pp \'\ '` —, ERV INSTALLED IN OFFICE/STORAGE ROOM.UNIT W / _ (\ FIREPLACE FLUE ROUTED 49 0� ��� \ CONCEALMENT BY OTHERS. CONCEALMENT DETAIL TO MEET //i� TO ROOF.SEE ROUTING '`� MANUFACTURER'S MAINTENANCE/ACCESS REQUIREMENTS. 0 ON LEVEL ABOVE. RETAIL SUPPLY GRILLE 0 #11111\0•111‘40‘...-_ SEE DETAIL ON M201. O % . \ INSTALLED HIGH ON WALL. T— ON/OFF SWITCH FORG FIREPLACE CONTROL. / GASFIREPLACE FLUEANDMAKE-UP AIR TO BE ERV EXHAUST DUCT INSTALLED INOFFICE/STORAGE SPACE. / �� \' INSTALLEDPERNUFACTURER'S ENTRY TO REMAIN OPEN FOR TRANSFER AIR PATHWAY. / 7 \ 1 REQUIREMENTS. ,Oki/ ,P.,, ,, /' r NEW GAS LINES FOR FIREPLACES ROUTED IN 1 . / BB 1 \ �l DROPPED CEILING. ROUTING TO EXISTING f ----„ . - /. ®, C G SYSTEM TO BE COORDINATED. L. tae PHOTO STUDIO - /` x_. o 5 ° 0 \ \ "-T` . Current Issue: r / / • „ `ter _ 0so LOWER RETAIL `' Y�/ PERMIT g \ \, `1Y s+s C I 11 r, .Y�. F ______ C-1 O L l- Uj o WALL-MOUNTED SPLIT-SYSTEM FAN •'_ -°_�� 0 COIL UNITS.INSTALL UNITS PER Issued: Z MANUFACTURER'S REQUIREMENTS. \ TYPICAL ALL UNITS. O���j \ PERMIT 04.13.18 Cr -11 iiiii/// , _ H J-♦ 110 0 BB1 • 10 o BB-1 w %r- ■P'l I(Tilllli`9I11 I, IL■ �'� .;c..u.... ■_%_ V r . _ , [ Fn (7-- /W 0 0 Sheet Tine: o BB-2 LOWER LEVEL I rvt " MECHANICAL H H 0 PLAN w 0 CC 0_ I Date: 4/13/18 oi LOWER LEVEL MECHNICAL PLAN ;Designed: SMS 1 • Reviewed: SMS SCALE: 1/4"= 1'-0" ,Project No: 9949.00 2 Sheet No: CO N MIOl 00r CO r icf Scale: As Shown tt/j o z E '2 m 3 8 OY o LL V 0 7 -2 ZN- ? $' 0 u+ o 1 D a+ o CCI 4-. a rn — AriaT w no y c7 � 1 C7 n � N m � J � Q it i %, �*1 `. PLUMBING CONTRACTOR TO PROVIDE GAS LINES FOR GAS ��5� LANTERNS. / /1' l PLU44AWNGCONTRACJ %VID:LDOME:TIC ANTERS. _ SEAL �� 1-'- :- .---7_01): ERV EXHAUST LOUVER. LOUVER INSTALLED 4 HIGH ON WALL.CONTRACTOR TO COORDINATE O PENETRATION WITH ROOF LINES.SEE DETAIL uunm„„ ` I Gpp� u. ON SHEET M201. tq0 RE i r FC 1 . o�..•••A •,d' ALL PLUMBING FIXTURES TO BE INSTALLED --0 ; 21p� INSTALL 36x36”ACCESS HATCH FROM RETAIL = � �`_ WITH ISOLATION VALVES PER IPC. �' 4x1 ° _ *4 0r_'p . 8 SPACE FOR MAINTENANCE/SERVICE ACCESS. =9 ` COORDINATE PLUMBING FIXTURES WITH _ _ 1 . ERV OUTSIDE AIR AND EXHAUST AIR �� ARCH. PROVIDE WASTE AND WATER i1- „ SRr6L E;- FROM PIPING BELOWAS REQUIRED. DUCTS 12x8 EACH)ROUTED I UP/DOWN EXTERIOR WALL TO UNIT ! f l r � _! I BELOW. I EXHAUST FAN DUCT FROM BELOW ROUTED T + 1 !; El TO EXHAUST GRILLE. INSTALL EXHAUST ?t : ::: 1 . i O 0 1000 A int si h. p \ 24x8 ;AL �II SEE INSTALLATION DETAIL ON SHEET M201. // , ' 1 j • ERV-1 INSTALLED IN CEILING SPACE.MAINTAIN MANUFACTURERS _ REQUIRED CLEARANCES FOR UNIT ACCESS.SEE DETAIL ON W EAST RETAIL SHEETM201. I t 12 IEitWALL-MOUNTED SPLIT-SYSTEM FAN I Ptir ir�J / COIL UNITS. INSTALL UNITS PER N 0 MANUFACTURER'S REQUIREMENTS. = r Q TYPICAL ALL UNITS. F 1 O cilki," C‘i CC ,i/J/ // -. r'-- 14111111.1 I 0 0 /h4 = W Q O BASEBOARD FLTSTOB 1, . i , ____ T I— Z -I , CONFIRMED I FIELD. RELOCATE, EFURBISH f `^ Q PI`Sp AND/OR REP EAS REQUIRED BY OWNER. � • Cn r IIiihiL j .i. W , _ , itri. CD "1111111W 4 real , CD r I / „, „ / \ • �\ GAS FIREPLACE SPEC ARCH/C� 'ii,NT. lik_ai GAS FIREPLACE FLU \\,�\�� UP AIR I 4AC-1 TO BE INSTALLED PE MANt`dFACTURER'S i -, REQUIREMENTS. _ _ I I I 11 I I I ___I___ FIREPLACE FLUE ROUTED UP ! ; I FC 1 1 -J p CLOSET TO ROOF ABOVE. ROOF - No VENT PER MANUFACTURER'SL__,,rw...fimi.,77,77,.. . ... , I 1 Current Issue: REQUIREMENTS. �_ AC UNITS INSTALLED IN TRENCH ALONG o EXISTING BASEBOARD HEATERS TO REMAIN AS INSTALLED. /' i BUILDING.INSTALLATION TO COMPLY WITH PERMIT aiIlliMANUFACTURER'S UNIT CLEARANCE rn CLEAN, REPAIR AND REFURBISH UNITS AS REQUIRED. HEATER y; o CONCEALMENT PER ARCH, MAINTAIN CURRENT AIR FLOW _7 -.WI. St#4.411111 AC-1 REQUIREMENTS FOR AIR FLOW AND in CONVECTION PATHWAYS. LENGTHS/LOCATIONS MAY VARY ). -- MAINTENANCE/SERVICE.TRENCH DETAILING z FROM WHAT IS SHOWN HERE. I BY ARCH. Issued: Q ---1-1.- PERMIT 04.13.18 o I I FC-1 I I J i- @gull ON/OFF SWITCH FOR w ! _ >rt -- -____ FIREPLACE CONTROL. - -1 _:_. _.. __ - - - w Cr ,I 0 NEW GAS UNE FOR FIREPLACE ROUTED UP O FROM DROPPED CEILING OF FLOOR BELOW. I .w g v co~ U w w __ o' Sheet The: o PLAZA LEVEL MECHANICAL co CO PLAN U w l O ce — Date: 4/13/18 co 1 PLAZA LEVEL MECHANICAL PLAN ÷ Designed: SMS Reviewed: SMS SCALE: 1/4"= 1'-0" ,Project No: 9949.00 M Q Sheet No: 0 v ,_ M102 A: co M .,_ o Scale: As Shown