Loading...
HomeMy WebLinkAboutSoils Report_2.pdf PA/1 iTElg—cel 10 RECEIVED Ku 5020 County Road 154 MAY 15 2018 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Town of Vail Fax: (970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Denver(HQ), Parker, Colorado Springs, Fort Coffins, Glenwood Springs, Summit County,Colorado May 14, 2018 Integrated Landscape Management Attn: Shelly Mello P. O. Box 115 Avon, Colorado 81620 shelly@integrated-land.com Project No. 18-7-253 Subject: Observation of Backhoe Pit, Proposed Site Retaining Wall, Olson Residence, Lot 6, Lia Zneimer Subdivision, 1726 Buffehr Creek Road, Vail, Colorado Dear Shell As requested, a representative of H P/Kumar observed a backhoe excavated at the subject site on May 1, 2018 to evaluate the soils exposed for foundation support. The findings of our observations and recommendations for the foundation design are presented in this report. The services were performed as part of our agreement for professional engineering services to Integrated Landscape Management dated April 5, 2018. The site wall will provide for a stairway to provide access from the garage/parking area to the upper exterior deck dining level. The wall will be about 10 to 12 feet tall with up to about 6 feet of wall above grade and about 4 to 6 feet below grade. It is desired to found the wail on a spread footing. The stairway steps will be covered with stone and somewhat sensitive to settlement. At the time of our site visit, one backhoe pit (Pit 1) had been excavated in the area of the wall. The soils exposed in the pit, below about 51/2 feet of fill and topsoil, consisted of medium dense, clayey silty sand with scattered gravel to the pit depth of 6 feet. Results of swell-consolidation testing performed on a sample of the natural soils obtained from the bottom of the pit, shown on Figure 1, indicate the soils are moderately compressible under conditions of loading and wetting. No free water was encountered in the excavation and the soils were moist to very moist. Considering the conditions exposed in the pit and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for an allowable bearing pressure of Integrated Landscape Management May 14, 2018 Page 2 1,500 psi can be used for support of the proposed wall. The soils may tend to compress some when loaded and should be further evaluated at the time of excavation to determine if any removal and replacement with coarse granular soils is needed. The footing(s) should be a niininiurn width of 2 feet. Prior to the footing construction, all fill, topsoil and any loose or soft soils removed and the bearing level extended down to firm undisturbed natural soils and the subgrade compacted. Soft and very moist soils may require subexcavation and replacement with coarse granular soils to stabilize the subgrade and reduce settlement potential. Continuous foundation walls should he reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. The cantilevered retaining wall, which we understand will he separate from the residence, is expected to deflect sufficiently to mobilize the full active earth pressure condition and should he designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcf for imported granular backfill. Surcharge pressure from loading other than the soil backfill should be added to lateral earth pressure value if needed. An underdrain should be provided to prevent hydrostatic pressure buildup behind wall. The drain can be placed above footing grade, about 1 foot below exterior grade, to allow gravity flow to outlet. The drain should consist of 4 inch diameter PVC drain pipe surrounded by drain gravel (11/2 feet deep) and sloped at a minimum 1/2% to outlet. The wall backfill. should consist of road base (CD(Yl' Class 2, 5 or 6 material) compacted to at least 98% of standard Proctor density (SPT:)) at a moisture content near optimum. Miscellaneous backfill should be compacted to at least 90% SPD and the surface graded to prevent ponding within at least 10 feet of the wall or building foundation. Landscape that requires regular heavy irrigation, such as sod, and sprinkler heads should not be located within 5 feet of the foundation. This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pit excavated at the location and to the depth indicated. If conditions encountered during construction appear different from those described in this report, we should H-PKUMAR Project No. 18-7-253 Integrated Landscape Management May 14, 2018 Page 3 be notified at once so re-evaluation of the recommendations may be made. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. We recommend on-site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. If you have any questions or need further assistance, please call our office. Sincerely, H-P K LJ M 4 ,s, ,,,, ,,,-;;,,%,,,. � _;.' a m ..- ei , sy 1 .. . r�, -:. i Eit9 Q.• �, 4 ‘ i1tai y 'gw David A. Young, P.L0,o .l / . , DAY/kac ':7:-';,.:,' bg,7 , '�/ y�[ t,'iN,{.9,,r%-ktA f 4 attachment Figure 1, Swell-Consolidation Test Results H-P�DNMAR Project No. 18-7-253 • 1 SAMPLE 01: Gary- Silty Sand E{2Oh�9: C?ri(rirn of Pit 1 6; 5.5' INC25 5 %, PD 85.4 per} ADDITIONAL COMPRES.;fON UNDER CONSTANT PRESSURE D ~_ DUE TO WETTING 017. \. 0 --3 , z I O (-) —4 • � t i • --G t Cr ( ( trort,ao[ t r z �.' a 3- N .Io a ,..r i ( yry,r-Icrr, d r riortr 1,514 I?— 4, 0 .. APPLIED PRESSURE — KSF 10 100 is • 18—7-253 '' SWELL--CONSOLIDATION TEST RfaSULTS Fig. 1