Loading...
HomeMy WebLinkAboutMicropile Test 11-23-2018.pdf Micropile Proof Test Project:814 Potato Patch Anchor No./Location:Test Anchor NW Corner Date:11/23/2018 Conducted By:Thorcon Time:11:10 Reviewed By: Jack Ram:60 TON#68 Hand Pump:Enterpac S/N:04099C Guage Power Team S/N:064 %of Design Test Load Converted Gauge Observed Gauge Readings Hold Time Time of Reading Test Load (Kips) Pressure(psi) Gauge 1 Gauge 2 Average Creep(inch) 5.0% 2.500 160 1 Minute 11:15 i######### ######### 17.0% 8.500 651 _ 1 Minutes 11:16 ######### ######### 33.0% 16.500 1304 1 Minutes 11:17 ######### ######### 50.0% 25.000 2000 1 Minutes 11:18 ######### ######### 67.0% 33.5002693 1 Minutes 11:19 ######### ######### 83.0% 41.500 3347 1 Minutes 11:20 ######### ######### 100.0% 50.000 4041 <Creep> *Maintain creep test load within 2%of the intended load. <0.08 inches 100.0% 50.000 4041 0 Min Creep 11:22 ######### ######### 100.0% 50.000 4041 1 Min Creep 11:23 ######### ######### 100.0% 50.000 4041 2 Min Creep 11:24 ######### ######### 100.0% 50.000 4041 _ 3 Min Creep 11:25 ######### ######### 100.0% 50.000 4041 4 Min Creep 11:26 ######### ######### 100.0% 50.000 4041 _ 5 Min Creep 11:27 ######### ######### 100.0% 50.000 4041 6 Min Creep 11:28 ######### ######### 100.0% 50.000 4041 10 Min Creep 11:33 ######### ######### 5.0% 2.500 160 1 Minutes 11:34 ######### ######### 0.000 -44 1 Minutes 0.000 -44 1 Minute Nail Size Hole Dia(in) Bar Yield Capacity Units Jack Ram Calibration(Load vs Gauge Pressure) 40mm 4" 99 Kips Load(Ib)= 12.2398 (Pressure) -536.4 ULT Bond Value ULT Capacity DTL _ Units _ Pressure(psi)= 0.0817 " (Load) • -43.8239 93.50 50.00 Kips Drilling Data Nail Data Drilling Method: Injection Anchor Test Length: 20' Drilling Depth: 20' Bonded Length: 19' Material: Clay/silt 0'-3'clay/gravel/sand 3'-8' Free Length: N/A Bedrock 8'-20' Tail Length: 5' Due to very wet ground conditions,our testing beam sunk into the ground during testing making the dial gauges move more than I feel they would have if we had drier conditions.With that being said,it was still a successful test.There was just more movement in the beginning of the test with that beam settling into the ground.