Loading...
HomeMy WebLinkAbout18-7-555 (11-10-18) week ending.pdf H-P KU mAR5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone:(970)945-7988 Materials Testing I Environmental Fax:(970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker,Glenwood Springs, and Silverthorne, Colorado CONSTRUCTION OBSERVATION REPORT Client: Paragon Homes Denver Project No.: 18-7-555 Day: Monday Attn: Ed Venerable Date: 11/5/18 6460 S. Quebec Street#400 Page: 1 of 1 Englewood, Colorado 80111 Project: Proposed New Eastern Half Duplex Addition, Lot 27, Block 7, Vail Village 1st Filing, 175 Forest Road, Vail, Colorado Weather: Cloudy, light wind, light snow Temperature: 32°F at 12:00 pm Construction Activities Observed: The contractor was performing snow removal. Equipment in Use: H-P/Kumar's Site Activities: As scheduled, we visited the site to perform an epoxy dowel inspection. The contractor was not ready for an inspection. Verbal Communication: Jim Meehan with Mountain Home Construction requested we return the following day 11-6-18. • distribution: Paragon Homes Denver-Ed Venerable(ed(aparagonhomesdenver.com) Jay Nobrega(javevailconstructiongroup.com) Mountain Home Construction—Jim Meehan(imeehan-mhcacomcast.net) Justin Orgill David A. Young, P.E. /ljf Field Technician Reviewed By H-P KU mAR5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Fax: (970)945-8454 Email: hokglenwood(a�kumarusa.com Office Locations: Parker, Glenwood Springs,and Silverthorne, Colorado REINFORCEMENT STEEL INSPECTION REPORT Client: Paragon Homes Denver Project No.: 18-7-555 Day: Tuesday Attn: Ed Venerable Date: 11/6/18 6460 S. Quebec Street#400 Page: 1 of 1 Englewood, Colorado 80111 Project: Proposed New Eastern Half Duplex Addition, Lot 27, Block 7, Vail Village 1st Filing, 175 Forest Road, Vail, Colorado Area of Inspection: Epoxied Dowels into existing Foundation wall. Reference Documents Structural Drawings provided by the contractor. Used: Inspection Notes: Dowel holes were correct diameter and met minimum depth required and were blown free of debris prior to application of HILTI HIT-RE 500 V3 as per manufactures specifications. Inspection Status: ❑ Preliminary ® Final ® Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. ❑ Exceptions Noted: Verbal The contractor was informed of our inspection results. Communication: Distribution: Paragon Homes Denver-Ed Venerable(ed anparagonhomesdenver.com) Jay Nobrega(java vailconstructionproup.com) Mountain Home Construction—Jim Meehan(imeehan-mhc(a comcast.net) nif Justin Orgill David A. Young, P.E. Field Technician Reviewed By