HomeMy WebLinkAboutrow_app_Lionsway_Circle.pdf MUST BE SUBMETTED MIN 3 BUSINESS DAYS PRIOR TO Pt:WIT ISSUANCE
APPLICATION FOR
RIGHT of WAY USE-STREET CUT PERMIT
MA: Town of Vail
PW# _ Public Works Dept
Parcel 44:7J-71 LION HEAD PIR � 1 1 1309 Elkhorn Dr
61dg Perini##; B- -18-0475 Vail,GO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use-Beet Cut
Permit and lorfeiture of appication fees. By signing this permit, the applicant declares he/she has read all contents of this document,
Town of Vail Roadway Standards and chapters of Tide 8--Pubtic Ways and Property,of the Vail Mu*icipal Code and is fully aware of
its requirements and agrees to pay all applicable fees. Application Fee:$100.00
Company
Company Name: VES( �, ra Pnone:
214 763 6337
'(. . Gori T1 41 1 . City/State/
Company Address: ft, -.2 = 3— Zip:
Contractor , . C - W,.-)
License Number: Email: paco@pierasolutions.com
Contact
Contact Name: FRANCISCO MEZA Phone: 4 763 6337 C/E k4.,
ROW Use Location: 210 W L;ONSIIEAD CIRCL.E VAIL CD 81657
Requested ROWRequestetl a7
Use Dates: to Work Times: a PM l `rD i
Purpose for Request: Street Cut Dimension(it applicable):
L. Underground Utility Installation
U Landscaping Length'-� -- -. -
ernp Site Access �f c.[l . ••
t�onstruction Staging Width (min 4"):_
ID Roadway Construction
❑ Other(explain): CRAEaE Total Square Footage:
Requested ROW Use: Pi R. if i-i i ze,c pr ay9ry {�
Single Lane Closure--Ift of closure(including taper) r• rot E FoF r
Tao I ane Closure-tit of closure(including taper)
❑ Three Lane Closure-itt of closure(including taper)
0 SidewalkiBike Path-fit of closure
❑ Other(explain):
1. Applicant shall submit a traffic control plan,and work site/staging plan with this application. Traffic Contra/
Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections,
advanced warning signage,taper lengths, buffer space and work zone dimensions. No full sfreef closures
are allowed.
2. Applicant must contact Public Works Department at 479-2198 24 hours prior to commencing of work. Failure
to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line xririthin The
project site, applicant has option ot routing application through the Public Works office to obtain the
necessary Town ot Vail signatures, Pled allow up to one week to process.
Xcel l,nery (800.922-t9$7) Owest(200-922-1987)
Comcast(5006.922-1987) I-foly Gross f'lecirie(800-922-1987),-__-_--
Eagle River Water&Sanitation District(970477-5453). —.-- - -
Town of Vail Electric(970.479-2158) t Town of Vail Irrigation(970479.2158} -.
F AiUCt CO ME2A 1 /fel20 .
PrintApptirArrtNanta Apptiliot Sigraiture []aw