Loading...
HomeMy WebLinkAboutB18-0430_Approved Plans_1540229061.pdf / ' F 15'-1 „ 4/ ,0\ EXISTING CONDITIONS OWNER: SHERRI AND ERIC HYNDEN — SITYNDEN@COMCAST.NET 239-292-7574 OR 239-292-7573 / CONTRACTOR: ,? ti '% BURKE HARRINGTON CONSTRUCTION CO. k-1 -41 / QOM .Q PO BOX 2943 / / Ty VAIL,CO 81658 10/22/18 SPRING POINT @ 8'8" / 970-376-2256 EAST WALL / BHCCO@COMCAST.NET // c / BUILDING MANAGEMENT: / / THE WREN AT VAIL BY VAIL MOUNTAIN LODGING i lo 970-476-0052 TODD MOSSA MANAGER / / TAX PARCEL#-210108117016 / LIVING 39"WALL AT SPRING POINT THIS ZONING:HIGH DENSITY MULTIPLE FAMILY i 0 AREA,STORAGE BEHIND WALL. LAND USE:VILLAGE MASTER PLAN OCCUPANCY CLASS:R-2 0 \ 0 0 LOFT 'is— 0 GENERAL PROJECT DISCRIPTON • NEW PLUMBING AND ELECTRICAL AS REQ'D FOR NEW W/D. ` • ADDITION OF INTERIOR WALLS AS REQ'D TO CREATE 0 I CLOSETS. ALSO NEW WALL AT LOFT AREA. o • NEW INTERIOR DOORS THROUGHOUT. aKITCHEN 5 T • NEW FLOORS AND TRIM THROUGHOUT. z • MINOR MPROVEMENTS TO ELECTRICL SYSTEM INCLUDING LU - NEW LIGHTING,REPLACEMENT OF HEATERS AND ADDITIONAL OUTLETS AS REQ'D,PERMITTED SEPERATELY 9'-10" / VIA ELECTRICIAN. • NO MODIFICATIONS TO EXTERIOR OR STRUCTURAL 's— N _\ I WALLS. O • KITCHEN AND BATHS TO REMAIN AS-IS. 7'4-WALL AT SPRING PDR.BATH 2-0' POINT THIS AREA,FORA I- 9'-1i" - 15'HT ABOVE LL FF.EST. o II 5:12 PITCH CEILING @ z in - 0 LIVING AND LOFT. AGENERAL PROJECT NOTES i • NEW CORETEC FLOORING(OR SIM.)THROUGHOUT UNIT w \ INCLUDING ALL CLOSET AREAS AND LOFT STORAGE. TO \ BE INSTALLED OVER EXISTING TILE OR SUB-FLOOR. 0 7'CEILING HT. ? FLUSH CARPETED AREAS WITH TOP OF TILE SO AS TO Z BATHROOMS AND (40 CREATE A SMOOTH SURFACE FOR NEW WOOD FLOORING. w CLOSETS. 0 • NEW INDIRECT LED STRIP LIGHTING AT KITCHEN, 0 o / • NEW SCONCES AT ENTRY HALL(3)OR 3 LED PUCK LIGHTS Q MSTR.BATH IN DROPPED HALL CEILING,PREFERRED. 6'-73" X • NEW DOORS,BASE AND CASE THROUGHOUT. UJ LA • ADD NEW STACKABLE MEILE NON-VENTING LAUNDRY IN 1 Q CLOSET.INCLUDE ALL REQUIRED PLUMBING AND ELEC. \ • NEW STORAGE CLOSET UNDER STAIRS. z O p Mo • • NEW PRIVACY WALL AT LOFT,WITH OUTLET,INSTALLED UJ N I • FLUSH TO ADJACENT STORAGE WALL. 0 11 9 J \ s'-o" `/ - HALL • NEW EXT.SKI LOCKER AT ALTERNATE BEDROOM DOOR. =O O V FLIP DOOR TO MAKE THIS WORK. • ELIMINATE MANTEL AND LOWER TV. ELIMINATE HEARTH, / ADD FLOOR TO CEILING TILE FROM WINDOW,ACROSS FP WALL AND UP TO LANDING AT LOFT. • NEW HOMEDEPOT WOOD CEILING FINISH AT SLOPED CEILINGS,RUN NORTH TO SOUTH. PROJECT: NA DRAWN BY: SRD • NEW DROPPED GWB CEILING AT BEDROOM AND ENTRY i HALL. DATE: 9418 • NEW CEILING FAN IN BEDROOM AND LIVING ROOM REVISIONS: `o , BEDROOM • (POSSIBLE LIGHTS). BURY ELECTRICAL AND SMOKE ALARM CONDUIT WHERE POSSIBLE. • NO ALTERATION TO EXISTING WALLS. ' `2 • NEW LIGHT AT NW CORNER OF LOFT,CONTROL SWITH ON � NEW LOFT PRIVACY WALL. • NEW WALL TEXTURE AND PAINT THROUGHOUT. • NEW WOOD ACCENT WALL @ BEDROOM EAST WALL. EXISTING • NEW PAINTED CEILING TEXTURE AT MASTER. °" • ADD PLYWOOD TO LOFT FLOOR TO STIFFEN. CONS I TI O N S AND PROD. DISC. I I 11'-5" 3'-3r .� A / 0 ,, 15'-11" / I OF Al/ e. 4,4 14010 N— DEMO PLAN AND NOTES - CONSTRUCTION PLAN AND 7 , . ' / �.° Q001 J �provide smoke and carbon monoxide ,� w detectors throughout existing per 10'2'"$ = b code x , CO ' / gyp req'd Xd on wal - / / and soffit under stair in LIVING new-"` N@losed storage \ I 7 , space o I CREATE FLUSH FINISH / GUARDRAIL r) NEW GWB AT NORTH SIDE OF OUTLET&SWITCH@.52 W/USE CHARGING / \ LOFT STO-1 PORT(S) / / / -moi - / 7'-4" 76j, 2'-6" / o not / D `I. 4141h m I LOFT / STORAGE LOFT I \ /i _ .f, 3' 9" j, 2'-61 y I KITCHEN / KITCHEN Z 1r — UJ CC _ EXIST.CLNG. I 0 CNIO '— I I I TRANS 9,-1 PDR.BATH \ 2'-4" PDR.BATH 2.-0" O o / N a min 100sq/inch of opening req'd for make up air to dryer closet I —A CON'TRUC ION NATES z I CDRE-INSTALL IN EXISTING RO. I p =�\ • FRAME FOR NEW DOORS,WALLS AND LAUNDRY NITCH. W ". AREMOVE HEADER AT LAUNDRY ROOM NITCH,CREATE 90 0 I -,- I A CORNER.DIMENSIONS ARE TO FRAMING. z C • (P&E)INSTALL ALL READ.ROUGH PLUMBING AND ELEC.FOR Z / il o NEW W/D AT HALL CLOSET. o DEMO NOTES: I • (E)WIRE FOR NEW LIGHTS AND FANS. 0 o • REPLACE SMOKES WITH CONST.HEAT DETECTORS BY N MSTR.BATH MSTR.BATH • (E)WIRE FOR NEW BEDROOM AND LOFT OUTLETS co p 6'-73" SERVICE PROVIDER. • (E)WIRE FOR NEW HEATER LOCATIONS AND THERMOSTAT / • COORDINTE ALL REQUIRED DRYWALL CUTS WITH LU PLUMBER,ELECTRICIAN AND ALARM SERVICE. AT BEDROOM w • (E)WIRE FOR W LOCATIONS AT BED AND LIVING. I: Q �` • HAVE ELECTRICIAN KILL POWER TO HEATERS AND LIGHTS \ / • (E)PROVIDE NEW J BOX AND OUTLET @ FP BEHIND z O .`�� is¶ 9 TO BE REMOVED.. z O o M o z o REMOVEABLE TRIM SURROUND. Q • PROVIDE DUST PROTECTION FOR EXISTING KITCHEN, W 1 N I • • NEW ACCENT TILE WALL AROUND FP,FLOOR TO CEILING WITH ZIP WALL. CABINETS TO REMAIN STOCKED. = S IN s'-0- AND UP TO LOFT,SEE DRAWING LAYOUT.TILE FROM SELECT \ — • EXISTING TOILETS AND VANITIES TO REMAIN. PROTECT – O HALL • SURFACES. Z \ AS REQ'D.PULL TOILETS FOR NEW FLOORING INSTALL `/ • NEW WOOD CEILING AT SLOPED LOCATIONS(LOFT AND 0 AND RE-INSTALL IMMEDIATELY AFTER. LIVING). Lo - 4 • REMOVE LIVING ROOM TV BRACKET AND STORE ON SITE • NEW FLOORING AND BEDROOM ACCENT WALL BY RUGS 7 �' • FOR FUTURE RE-INSTALL. ti BENEDICT. DEMO ALL CARPET,TILE TO REMAIN.USE CARPET TO / • ALL NEW INTERIOR DOORS AND CASEWORK,BASE AND AT PROTECT EXTERIOR HALLS. -H_ PROJECT: NA DEMO ALL INTERIOR DOORS,CASING AND TRIM.NOTE BEDROOM HALL MASTER ONLY WINDOW TRIM.PROVIDED BY SUN MOUNTAIN, DRAWN BY: SRD / • AND INSTALLED THROUGHOUT. BEDROOM BI-FOLDS FROM SAVE KEYPAD AT OWNER STORAGE CLOSET FOR FUTURE HD STAINED TO MATCH. DATE: 9-4-18 USE. STRIP ALL DOOR HARDWARE FOR RECYCLING. 0 • PAINT THROUGHOUT. REVISIONS: 0 BEDROOM • DEMO BASEBOARD THROUGHOUT • (E)NEW HALL PUCK LIGHTS(3) • DEMO WALL AS NEEDED TO PROVIDE ACCESS AND • (E)NEW CEILING FAN AT LIVING AND BEDROOMS,W/LIGHTS. SERVICES TO NEW W/D. • (E)NEW LED STRIP LIGHT SYSTEM IN KITCHEN.COLOR TO 2' • DEMO TRACK LIGHTS IN HALL AND KITCHEN. 2'-4" 2; s eA MATCH UNDER CAB.LIGHTING. • DEMO HEATER ON WEST WALL ACROSS FROM KITCHEN. 1 • (E)ALL NEW LIGHTS TO DIM. il • DEMO HEATERS IN BEDROOM. N— • (E)NEW HEATER UNDER BEDROOM WINDOW W/WALL • DEMO BATHROOM TOWEL BARS,MASTER AND PDR. MOUNTED THERMOSTAT. • PROVIDE SHOE CLEANER AT ENTRY TO UNIT TO CONTROL co IL co �A • o DUST AND DEBRIS IN PUBLIC AREAS. OJ ,0 �\ DEMO A N D / z 0 o CONST. PLANS NEW HEATER )- I 1 ` -v1 EXIST WITCH, TE A / 0 / 11'-5" 1. 3'-31" TOCONTROL EXISTING / / EXT.LIGHT&NEW CLOSET LIGHT. ,siti iv 15-1 :.r\ OF Al/ e. 1' 'i.',4110.1, • L j TILE TO FINISH PLAN AND NOTES m EDGE OF ^z WINDOW X47 OFT STORAGE, NEW , Tq FLOORING BUT NO NEW ��� CEILING 10/22/18 r r r XST. � ibil SOFFIT r T � ASSUMED io % I ,� � , _� 4YR STRUCT. r r ,‘ j LOW ED SPROTRIPFILE LIGHT IN / 5LUMINUO TRACK. 3 5' SECTIONS. irN TILE TO EDGE OF LOFT FLOOR HALL FRIDGE s PENINSULA ��� LOFT FI z .i, f LLJ CC sr,— ___IN – O i d- ........,/ Z Ps W I ms's' I i FINISHV NOTES: ` , NEW FLOORING THROUGHOUT,SEE HATCHED AREA+ D rdoSTORAGE AREA IN LOFT.644 SQ-FT MAIN FLOOR.101 SQ-FT. z �.�/ Co •,,,r LOFT+STORAGE AREA,745 TOTAL+STORAGE AT LOFT. w �/ \ INSTALLER TO CONFIRM DIMENSIONS PRIOR TO ORDERING 0 o I AND VERIFY FEASIBILITY OF INSTALLING OVER TILE. a I : ,. _INSTALLER TO PROVIDE SUB FLOOR BUILDUP AS NEEDED (i) O 0 TO CREATE A SMOOTH SURFACE. PROVIDED AND INSTALLED BY RUGS BENEDICT) w \ • NEW BASEBOARD THROUGHOUT BY SUNMOUNTAIN. z O :=i4- j INCLUDING LOFT.APROX 207 LIVING AREA,1• NEW HD CEILING FINISH AT VAULTED 13 LOTS 320 w I / / _A / TOTAL(NOT ACCOUNTING FOR WASTE). = O LT g N / ,/ • NEW FINISH AT UPPER NORTH WALL OF LIVING ROOM 0 11 J �%�` ADJACENT TO LOFT TO MATCH EXISTING THROUGHOUT. z O V �., • NEW TILE SURROUND AT FIREPLACE(FLOOR TO CEILING) > ° AND ALONG WEST WALL,UP STAIRS JUST INTO LOFT AREA, _ �, > PROVIDED BY SELECT SURFACES 2-3 WEEK LEAD TIME.USE 4 BRUSHED NICKEL SCHLUTER L TRIM AT OUTSIDE EDGES. • 2 NEW 24"TOWEL BARS PER ELEVATION DRAWINGS @ PROJECT: NA MASTER. AT 30"&60"AFF,STACKED EAST SIDE OF WALL TO DRAWN BY: SRD ALLOW FOR FUTURE SHOWER DOOR TO OPEN. DATE: 9-4-18 • 2 NEW 30"TOWEL BARS INSTALLED AT POWDER BATH — 0 LINEAR. REVISIONS: `o • NEW DOOR HARDWRE THROUGHOUT. I :.•-its,* • RE-INSTALL EXISTING KEYPAD FROM OWNER CLOSET AT SKI �%�, LOCKER. 2 NEW KEYPAD LOCKS AT OWNER STORAGE � CLOSETS. !�`. •`-. • STAIN INSIDE OF ENTRY DOOR TO MATCH?STAIN HD LOUVERED CLOSET DOORS TO MATCH. • NEW PAINT THROUGHOUT,SAND LOFT STORAGE WALL AS // READ.FOR PROPER FINISH. AFo �\o • NEW WOOD ACCENT WALL EAST WALL OF MASTER FINISH 4 <- PROVIDED AND INSTALLED BY RUGS BENEDICT. / • INSTALL BEDROOM TV BRACKET,GET FROM PROPERTY PLAN ). '/ MANAGER. X 9'-63" )'-10ii4 3'-3r / / 0