Loading...
HomeMy WebLinkAboutB17-0327_Galatyn Lodge Snowmelt-Galatyn Lodge Snowmelt_1503956580.pdfSnow Melt Design:121 Btu/hr·ft² Backloss:33.5 Btu/hr·ft² Total:110.5 Btu/hr·ft² Circuit A-1 249 ft Flow: 2.27 USGPM ΔT: 25 °F Circuit A-2 241 ft Flow: 2.20 USGPM ΔT: 25 °F Circuit A-3 267 ft Flow: 2.45 USGPM ΔT: 25 °F Circuit A-4 246 ft Flow: 2.26 USGPM ΔT: 25 °F Circuit A-5 253 ft Flow: 2.31 USGPM ΔT: 25 °F Circuit A-6 254 ft Flow: 2.28 USGPM ΔT: 25 °F Circuit A-7 238 ft Flow: 2.19 USGPM ΔT: 25 °F Circuit A-8 250 ft Flow: 2.31 USGPM ΔT: 25 °F Circuit A-9 222 ft Flow: 2.05 USGPM ΔT: 25 °F Manifold 1 (123.7 °F) PAGE NO. CUSTOMER: PROJECT: DRAWN BY: DRAWING NAME: PROJECT NO.: SCALE: DATE: DISCLAIMER: P1 (Snow Melt) 1/4"=1' 7/17/2017 Zach DeVoy Galatyn Lodge Snowmelt Note: Details of the tubing bend radius have been simplified for clarity. Consult tubing manufacturer for specific bend radius recommendations. Created Using LoopCAD 2017 17.0.0094 (7/24/2017) REVISIONS No Desc Date 1 if metal welded wire is used to tie down heat lines, and elctrical pemrit will be required for bonding requirements 08/28/17