Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
new doc 2018-12-19 10.24.32-20181219102725.pdf
TEST, ADJUST AND BALANCE REPORT PROJECT VAIL RITZ LOUNGE #1388 PREPARED FOR R&H MECHANICAL REPORT ISSUE DATE 12/14/2018 PREPARED BY HVAC TAB lic P.O. BOX 1926 VAIL, CO 81658 PHONE: 970-376-5198 E-MAIL: mrichardson@hvactab.co Scanned with CamScanner HVAC TAB Iic TEST, ADJUST AND BALANCE REPORT THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN COMPLIANCE WITH NBC PROCEDURAL STANDARDS. ANY VARIANCES FROM THE DESIGN REQUIREMENTS ARE NOTEI) THROUGHOUT THIS REPORT. THE RESULTS SHOWN AND INFORMATION PRESENTED IN THIS REPORT IS CERTIFIED TO BE ACCURATE AND COMPLETE, TO THE EXTENT POSSIBLE BY EQUIPMENT AND PROCEDURES USED THROUGH- OUT THIS SURVEY. THE FINAL AIR DISTRIBUTION SYSTEM MEASUREMENTS ARE IN COMPLIANCE WITH NBC PROCEDURAL STANDARDS FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS AND THE PROJECT SPECIFICATIONS. 72,1 /, ���.e' CERTIFIED BYr� / G DATE: 41 � i THE FINAL HYDRONIC DISTRIBUTION SYSTEM MEASUREMENTS ARE IN COMPLIANCE WITH NBC PROCEDURAL STANDARDS FOR TESTING, ADUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS AND THE PROJECT SPECIFICATIONS. CERTIFIED BY: DATE: HVAC TAB 1k WARRANTS THAT THE AIR AND HYDRONIC SYSTEM EVALUATED DURING THIS SURVEY IS OPERATING AT THE SPECIFIED LEVELS AS SHOWN WITHIN THIS REPORT, AT AND ONLY AT THIS TIME. HVAC TAB IIc MAKES NO OTHER WARRANTIES, STATED OR IMPLIED, CONCERNING THE CONTINUED PERFORMANCE, OPERATION OR SAFETY IN THE USE OF THIS EQUIPMENT PASS THIS TIME. CERTIFIED Michael?Richa son Page: I HVAC TAB,LLC I 13-06443 Expires 2/73/2019 NATIM1 FnIANCING COUNCIL Scanned with CamScanner HVAC TAB IIc INSTRUMENT CALIBRATION REPORT DATE: 12/11/2018 PROJECT ; VAIL RITZ LOUNGE PROJECT ALTITUDE: "HG INSTRUMENT/SERIAL# APPLICATION DATE OF USE CALIBRATION CALIBRATION DATE DUE DATE SHORTRIDGE ADM-870C I#M0921 I AIR FLOW READINGS 12/11/2018 6/20/2018 6/20/2019 ANEMOMETER 0757251515001 AIR FLOW READINGS 12/11/2018 6/13/2018 6/13/2019 SHORTRIDGE FLOW HOOD AIF FLOW READINGS NOT USED TH-720 HYGROMETER/#TH7200950003 AIR TEMP/HUMIDITY NOT USED 6/9/2018 6/9/2019 PITOT TUBE 18" PRES. READINGS NOT USED N/A N/A PITOT TUBE 24" PRES.READINGS NOT USED N/A N/A PITOT TUBE 36" PRES.READINGS NOT USED N/A N/A PITOT TUBE 48" PRES.READINGS NOT USED NA NA SHIMPO TACHOMETER /#CI05B0010 RPM READINGS NOT USED 6/9/2018 6/9/2019 FLUKE 3751#21290229 VOLT/AMP 12/11/2018 06/14/2018 6/14/2019 SHORTRIDGE HDM-250/#WI1037 WATER PRES.READINGS NOT USED 6/20/2018 6/20/2019 ASCROFT/0-100 PSI/#D068332-06 WATER PRES. READINGS NOT USED * FLUKE 52 Il THERMOMETER/99780167 TEMP. READINGS NOT USED 6/21/2018 6/21/2019 REFRACTOMETER RHA-100 /#RHA- GLYCOL%READINGS NOT USED N/A N/A 100 +CHECKED TO CALIBRATED METER REMARKS: ALL READINGS WITH SHORTRIDGE INSTRUMENTS ARE CORRECTED FOR TEMPERATURE AND ALTITUDE. PAGE Scanned with CamScanner HVAC TAB IIC AIR TERMINAL TEST REPORT DATE: 12/11/2018 PROJECT: VAIL RITZ LOUNGE SYSTEM: FPB-8/FPB-9 SYSTEM TERMINAL DESIGN INITIAL FINAL NOTES NO TYPE SIZE AK VEL CFM VEL CFM VEL CFM FPB-8 1 SR 70.5/3 650 366 375 2 SR 70.5/3 650 232 251 DAMPER 100% OPFN 3 SR 70.5/3 650 369 382 4 SR 70.5/3 650 404 389 5 SR 80/3 500 344 309 6 SR 80/3 540 336 326 3600 2051 2032 TOTAL FPR 100%OPEN . FPB-9 1 SR 59/3 530 380 327 2 SR 70.5/3 635 437 344 3 SR 70.5/3 635 328 358 4 SR 70.5/3 640 85 383 5 SR 46.5/3 420 65 263 6 SR 70.5/3 640 209 292 DAMPER 100%OPEN 3500 1504 1967 TOTAL . FPB 100%OPEN NOTES: PAGE: Scanned with CamScanner HVAC TAB lic AIR TERMINAL TEST REPORT DATE: 12/11/2018 PROJECT: VAIL RITZ LOUNGE SYSTEM: FP13-10 /FPB-11 /EF-1 SYSTEM TERMINAL DESIGN INITIAL FINAL NOTES NO TYPE SIZE AK MIN MAX MIN MAX MIN MAX CFM CFM CFM CFM CFM CFM FPB-10 1 SR - I16 130 2 SR - 137 134 3 SR - 144 138 4 SR 148 140 2150 545 542 TOTAL FPR 100%OPFN FPB-11 I SR - 1113 763 2 SR - 970 755 3 SR - 759 752 2150 2842 2270 TOTAL FPR 80%OPEN EF-1 1 ER EF-1 351 229 229 TOTAL ON HI SUED NOTES: PAGE: Scanned with CamScanner til ' �V �1i i • ('y 1 -• s I{! 1 ., , •S} • 1 [i'1 104141/ 1. 13 : , ••••• ...r , ._. . . _..... ..1.....____. 1 ...., 4:_. „..........: r41,...._.....0 : r, 6 1 .1 , • , \_\. Vit— laini �� P. .moP' i �w i _ _ . _ .,;:-.1x.,ve:,,, • . .„ c' rm4 I ! I 1i J. J i , {i - ��w.r�E"� r. I 1 ` i awl • I 4 . RIR IR� .._zi`K 11 `�1)44C ! I4 I Ent Qin t ` .. 44 N , 0 ., 1 .... ,.„. ... .,,,, .-,.. : i i t "•14- Li.• lit-.7--, ill 7,:j ........ i , ,r,i „..- I I `- 11•J -E�.. 1 -_..aft • I -IM , ' i1 ' I � i I. rA Qi ` j 0.4 .f1 }( c , © Cit 1 11 : nim 1r F 6z I # ,.T 1 1 0 : • • i . .. ., i , ... , . • i : i. i ,I , ......,...7,„ _ _ __ _.. .„... .....,....... . . _....::..,.. ,._ .___.,-,-.4,.,.. ---,N. - ---1!...., ••••• : P A f-i- 1 e i x. C I '',7-1...,:--' J cj 1 il :'t ... i __... .._.... 0.1 • r . I 1.MI w• 'I,.t r';'). Fo!' + .\ sr - I _"_ ' (X% _, 4 :. _ t `_=�;f;',.".:1 '� '!` Y; '.1 .�1S L i' `.! © of m 'IF. i. ti'•. ! 0 \' I ` a k • I a + ..1 I • \ .,41] Z m....._' ....r. 1 j�._w .. iii1° �'1i:P` sem' '',' _ _ -1 MI '.:y!:.:=Ir 4.1 * 1.12 -'? 1.'""1'T .... •••1•H 6 •-r i• , .40 ' 4_ ,r. 11 .444141113J1 a a zi 9Z . I !0 :,---c r -{ B ____M•.r r. ..J1�` f .� ; : , V malt 1 ,.."•_:.__..,.5.•�'' '_ �L I f :I,) I ' i,.l S.1 E1 r. ,..,:i. f 1 � r _ i } r —,,,,-,..i./-,•..�E, } I rZq 'rr ./' 1 , l r.w•rw .,.nw..:i +'` ... ,' s•,�•__. r'-- .ss s smnuvr I i, o_;'.i ,J 6 r' , • r . 11 wr., 1 .,IRIV • Fif,, Sti i- •• s•t)W I I ;iwr+rr.r..-•I•,�v, �~ • �.c:r, 'F_ ...-;a. �3 - - �F �— fj 1 I 1' - , s y (I -I1 +T W� IN irYr "11i,"T j f;�"' 4..-,�jIl ; �lh• ., t...' �ij r`•.T ! r' � fl _ .. Ifr .. M , f I i �immem�..."•... :k '- • .7 I k' I.I [1 .,w,.._ar�,1, - rL_�...�;.�..-.. .y � ��' rt_f,t . J F ,_ _ a itp rJ _ r f' Loom en , . , ,„ �.. _ 4, -■��+ — .8I I ti - :j :!1I.. ir --'moi ' f r, !r 1 Scanned with CamScanner C�1 BG BUILDINGWORKS J systems fulfilled SHOP DRAWING REVIEW Corrections or comments made on the shop drawings during this review do not relieve JOB: Vail Ritz- Lounge Remodel the contractor from compliance with the g requirements of the drawings and specifications. This check is only for review BG JOB NO: 8234.15 of general conformance with the design concept of the project and genera! DATE RECEIVED: 12/14/2018 compliance with the information given in the contract documents. The contractor is responsible for: confirming and correlating DATE RETURNED: 12/19/2018 all quantities and dimensions; selecting fabrication processes and techniques of REV - Reviewed construction, coordinating their work with that of all other trades and performing his REtR - Revise and Resubmit work in a satisfactory manner. REJ - Rejected FAC - Furnish as Corrected (no Resubmittal required UNO) Date: 12/19/2018 By: David Lyle NR- Not Reviewed BG Buildingworks, Inc. ITEM ACTION REMARKS General 1. The scope of this project included moving some supply air diffusers and deleted one supply air diffuser to accommodate the remodel. 2. The base HVAC systems and controls were not modified and are operating in the same condition as they were prior to the remodel. 3. The purpose of the TAB report is to provide the owner with an understanding of how the existing systems are performing compared to the original design documents. 4. The Owner will use the TAB report to inform the scope of work for a future project to recommission the HVAC system to resolve any airflow and/or control issues. 1. The fan powered box is below the original design airflow for Parallel Fan cooling but is providing adequate air flow for code required powered VAV REV ventilation and heating. Box - FBP-8 2. Space comfort in cooling mode will be an issue under peak load conditions until resolved. 1. The fan powered box is below the original design airflow for Parallel Fan cooling but is providing adequate air flow for code required Powered VAV REV ventilation and heating. Box - FBP-9 2. Space comfort in cooling mode will be an issue under peak Load conditions until resolved. 1. The fan powered box is below the original design airflow for cooling but is providing adequate air flow for code required Series Fan ventilation and heating. Powered VAV REV 2. Space comfort in cooling mode will be an issue under peak load Box - FBP 10 conditions until resolved. 3. Based on the extremely low air flow, the Internal fan does not appear to be working and may need to be repaired or replaced. ALBUQUERQUE • AVON • DENVER • FORT COLLINS www.bgbuildingworks.corn Scanned with CamScanner