Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
18-7-657 (11-19 11-20-18) Micropile Obs.pdf
H P Ii(tJ I'/LR 5020 County Road 154 ood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone:(970)945-7988 Materials Testing I Environmental Fax:(970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker, Glenwood Springs,and Silverthorne,Colorado MICROPILE OBSERVATION REPORT Client: Meadow Mountain Homes Project No.: 18-7-657 Day: Monday P.O. Drawer 1977 Date: 11/19/2018 Edwards, CO 81632 Page: 1 of 1 Project: 814 Potato Patch Drive, Lot 3, Block 1, Potato Patch Micropile Contractor: Thorcon Pier Manufacturer: Equipment: TEJ Limited Access Rig Pile Type: 4" Diameter Hollow Stem Micropile Weather Conditions: Clear, light breeze, dry Temperature: 35°F at 1 pm Penetration Pile Batter/ Ground Depth of into Total Hole No./ Dir Elevation Overburden Bearing Depth Notes Grid (ft.) (ft.) Materials (ft.) (ft.) 19' from Pile bracketed to existing 1 Plum ±2 Below 10 from ground; footing. Hollow bar with 4" Footing E-8 b Elevation ground 9 20' below diameter bit, 1.25" diameter footing bar 19' from Pile bracketed to existing 2' Blow 2 Plum +Footeng 7 from ground 12 ground; footing. Hollow bar with 4" F-3d b Elevation 20' below diameter bit, 1.25" diameter footing bar Notes: 1. Contractor drilled and grouted Pile 1 adjacent to the existing main entrance. 2. Contractor drilled Pile 2 adjacent to existing garage and plans to grout tomorrow. cc: Meadow Mountain Homes-Alex Dammeyer(ilex@meadowmountainhomes.com) /kac Shane Robat Steven L. Pawlak, P.E. Field Technician Reviewed By H P Ku mAR 5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone:(970)945-7988 Materials Testing I Environmental Fax:(970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker, Glenwood Springs,and Silverthorne, Colorado MICROPILE OBSERVATION REPORT Client: Meadow Mountain Homes Project No.: 18-7-657 Day: Tuesday P.O. Drawer 1977 Date: 11/20/2018 Edwards, CO 81632 Page: 1 of 1 Project: 814 Potato Patch Drive, Lot 3, Block 1, Potato Patch Micropile Contractor: Thorcon Pier Manufacturer: Equipment: TEJ Limited Access Rig Pile Type: 4" Diameter Hollow Stem Micropile Weather Conditions: Clear, light breeze, dry Temperature: 15°F at 8 am Penetration Total Pile Batter/ Ground Depth of into Hole No. Dir. Elevation Overburden Bearing Depth Notes (ft.) (ft.) Materials (ft.) (ft.) Test Existing B.O. Pile Plumb Footing 5 15 20 Hollow bar with 4" diameter bit, Elevation 1.25" diameter bar Notes: 1. Contractor drilled sacrificial test pile to the west of Pile 1 (near existing entrance). 2. Grouted test pile and Pile 2 (drilled yesterday). 3. Grout samples (G-1) obtained. cc: Meadow Mountain Homes-Alex Dammeyer(alex@meadowmountainhomes.com) /kac Shane Robat Steven L. Pawlak, P.E. Field Technician Reviewed By