Loading...
HomeMy WebLinkAbout823415ML01DAL - Ritz Vail - Lounge Renovation - Bldg Dept Comments Ventilation - Signed.pdf BG BUILDINGWORKS systems fulfilled ALBUQUERQUE • AVON • DENVER • FORT COLLINS December 29, 2018 Brian Judge Founding Principal Judge and Associates P.O. Box 1734 Vail, Colorado 81658-1734 e. brianj@judge-associates.com RE: Ritz Carlton -Vail - Lounge Remodel - Test and Balance Results Project No. 8234.15 Dear Brian, This letter is in response to the Town of Vail Building Department (TOV) Inspection Summary dated 20 December 2018 for the Vail Ritz - Lounge Remodel Project. It is our understanding that the building department reviewed the test and balance (TAB) report for the project provided by HVAC-TAB, Inc. and noted the deviations between the measured air flow and the maximum design air flow listed for the VAV boxes serving the renovated areas. The TOV has provided a temporary certificate of occupancy (CO) for the project but will not provide a final CO until they receive stamped calculations from a design professional verifying minimum ventilation rates are satisfied. As requested, BG Buildingworks (BG) has completed the ventilation calculations based on chapter 4 of the 2015 International Mechanical Code. The following table lists the minimum required ventilation airflow for each space along with the original design airflow requirements and the TAB airflow results: Design (CFM) Minimum Space VAV TAB Required Comments: Box Min Max (CFM) Ventilation (heat) (cool) (CFM) Private The TAB value exceeds the required Lounge FPB-8 1500 3600 2032 392 ventilation rate and the minimum VAV 118 box requirement Library The TAB value exceeds the required 116 FBP-9 600 3500 1967 308 ventilation rate and the minimum VAV box requirement The TAB value exceeds the required FPB-10 400 2150 542 285 ventilation rate and the minimum VAV Main box requirement Lounge 117 The TAB value exceeds the required FPB-11 400 2150 2270 285 ventilation rate and the minimum VAV box requirement ALBUQUERQUE • AVON • DENVER • FORT COLLINS www.bgbuildingworks.com Brian Judge Vail Ritz - Lounge Remodel Test and Balance Results 29 December 2018 Page - 2 - For each VAV system, the measured TAB airflow exceeds the design minimum airflow requirement and exceeds the code minimum ventilation airflow rate. Therefore, all areas are receiving more than the code minimum ventilation airflow and are receiving more than the design minimum airflow for heating. Please contact me with any questions. Since - , , P.0O REG/sl p F13 ' fo b,ir '1fic''' 34666 c IA. Lyle, P..i -4Q`'''%0NAL E Cc: Todd Goulding - Blackline Group Steve Habaradas, Jack Diemar, Jansen Brown - Ritz Tony Stetson - Construction One 222 Chapel Place, Unit AC-201 P.O. Box 9650 Avon, CO 81620 P 970. 949. 6108 www.bgb ui ldi ngworks.co m