Loading...
HomeMy WebLinkAboutB16-0490_REV10 Approved Plans_1534371697.pdf08/15/18 08/15/18 08/15/18 4 E1 2 A430 4 TRASH METER CL GAS METER LOCATION CLEAR 5'-9 1/2"OVERHANG1'-0 1/4"A430 2 A430 3 6 A430 7 A430 11'-1" 1 1/2" 4" 5'-11 3/16" 3 13/16" 64 GL. 64 GL. A430 8 2 HR FIRE RATED WALL (2) LAYERS 5/8" TYPE 'X' GYP. BOTH SIDES 4" 1'-8" 4" 1'-1"PLANTING BED DOUBLE 2'-8" DOORS 5'-4" CLEAR 5'-0" MIN. BELOW GRADE TRASH LIFT T.O.S. EL. 71'-7" T.O.W. EL. 78'-1 3/4"3'-3" GATE 8" VAULT LENGTH 111 1/2" 8" 8"VAULT WIDTH33 1/2" 8" 30" 8" 1" PLATFORM 71 1/2" 1"FIELD VERIFIED76 1/2"1" PLATFORM31 1/2" 1"6'-0 1/2" 12'-10" FIELD VERIFIED 30"x30" VAULT ACCESS PLANTING BED 3'-0" 2 - STREET LEVEL 8,178' - 1 3/4" 3 42 6 A430 6'-0" DOOR2 1/8"INT. CLEAR6'-6" MIN.1 1/2" INT. CLEAR 5'-9 1/2" 1" 5'-4" DOOR CONCEALED 4" 6'-0" 3"3 1/2"6'-8 1/8"6'-1 9/16"E1 4"FLASHING 8,171' - 7" T.O.S. 8" VAULT WIDTH 33 1/2" 8" 31 1/2" PLATFORM WIDTH LOWERED15" 65 3/8" TRAVEL60 3/4" CLEARANCE3 4 2 1 1/2" CLEAR 5'-9 1/2" 1" GAS METER LOCATION ROOF OVERHANG 6'-0" CLEARPLANTING BED 3" 6'-0" 4"6'-8 1/8" 3 1/2"6'-0 1/2" 1" 71 1/2" PLATFORM LENGTH 1" 8" 30" ACCESS 111 1/2" VAULT LENGTH 8"60" CLEAR15" 65 3/8" TRAVEL30"x30" ACCESS HATCH SLAB W/ ELECT. CONDUIT 3"30" 3" 4" 3"2 - STREET LEVEL 8,178' - 1 3/4" 1/2" SHEATHING; REF. STRUCT. 4" MTL. STUD AIR/WEATHER BARRIER 1/4" DRAINAGE METAL PLATE ROOF FINISH TRENCH DRAIN; REF. CIVILCLEAR6'-7 9/16" MIN.1X4 ACCOYA HORIZONTAL WD. SIDING (2) LAYERS GRACE ULTRA; WRAP LOWER LAYER DOWN SHEATHING AND OVER AIR/WEATHER BARRIER; LAP UPPER 1'-1" 4" 1'-8" 4" 2 HR FIRE RATED WALL (2) LAYERS TYPE 'X' GYP. BOTH SIDES 2 HR FIRE RATED CEILING (2) LAYERS TYPE 'X' GYP. METAL "D" STYLE DRIP EDGE FLASHING TAPERED POLY-ISO 2X4 LVL ROOF FRAMING, REF. STRUCT. 1/4" / 12" 8,185' - 3 11/16" T.O.S.7'-1 15/16"6'-0" 1'-0"3 - SECOND LEVEL 8,188' - 3 5/8" ED E1D1 6 A400 1X4 ACCOYA HORIZONTAL WD. SIDING TYP. METAL PANEL WALL ASSEMBLY; REF. DETAIL 2/A500 VERIFY CONFIGURATION AND DIMS OF DIVISIONS UPON WINDOW INSTALL WITH ARCHITECT. 1 1/4" OPP. WALL MATCH 1 1/4" V.I.F. 1 1/4" 1 1/4" V.I.F. 1 1/4" PLANTING BEDV.I.F.1'-11 3/8" 2"V.I.F.1'-11 3/8" 2"A430 6 Scale Date Drawn By Project Number As indicated 8/8/2018 2:37:51 PMA430 UTILITY / TRASH ENCLOSUREROW HOUSE 12VAIL ROWHOUSES, VAILCOLORADOAuthor 08/01/2018 1/2" = 1'-0"1 UTILITY / TRASH PLAN 1/2" = 1'-0"2 UTILITY / TRASH SOUTH ELEVATION 1/2" = 1'-0"3 UTILITY / TRASH WEST ELEVATION 1/2" = 1'-0"4 UTILITY / TRASH NORTH ELEVATION 3" = 1'-0"6 TYP. UTILITY CL. WALL SECTION No. Description Date 4 CONSTRUCTION II 24 SEPT 17 10 CONTSTRUCTION III 01 FEB 18 12 CONSTRUCTION IV 07 MAY 18 14 CONSTRUCTION V 01 AUG 18 1/2" = 1'-0"8 PRIVACY WALL ELEVATION 08/15/18 3 1 F 3 4 E E1 2 E 2 EXTENT OF PARKING PAVERS PROPERTY LINE PROPERTY LINE METAL GRATE OVER WINDOW WELL METAL GRATE OVER WINDOW WELL 6'-0" 5'-0 1/4" 6'-0" 6'-3" 6'-3" 6'-0" 6'-3"3'-0 9/16" 5'-2 1/2" PROPERTY LINEPROPERTY LINEPROPERTY LINEPROVIDE FOOTER AND POWER FOR HYDRAULIC BOLLARDS: (8) COUNT GATE TRENCH DRAINTRENCH DRAIN 7'-8"1'-9"ENTRY PEDESTAL TRASH METER CL METER CL TRASH 30" x 30" VAULT ACCESS HATCH D D 4'-5 5/8"5'-10" V.I.F. VAULT WIDTH2'-9 1/2" 8" 3'-0 1/2" 6'-1 1/2" 8" 6'-0 1/2" 4'-8" V.I.F. 12'-10" V.I.F. PLANTED AREA RAISED PLANTER PLANTED AREA 7 1/2" 6'-1 1/2" VAULT LENGTH 8" 5'-9 13/16" 2'-11 1/2" 8" VAULT WIDTH2'-9 1/2" 8" 3'-4"TRASH VAULT ACCESS IN WINDOW WELL ENTRY CONTROLS 111"60"OIL & SAND INTERCEPTOR BELOW 111"60"OIL & SAND INTERCEPTOR BELOW PLANTED AREAPLANTED AREA 8" 9'-3 1/2" VAULT LENGTH 8" VERIFY 1'-3" PARKING BOLLARDS 29 11/16" 29 11/16" 29 11/16" 29 11/16" 29 11/16" 29 11/16" 29 11/16" 24 9/16" 6" 27 11/16" 29 11/16" 29 11/16" 27" 27"SLOPE SLOPE SLOPE BOLD DASHED LINE INDICATES EXTENT OF SLAB ON GRADE SLOPE SLAB SLOPESLABSLOPE SLAB SLOPESLABSLOPESLABSLOPESLABCATCH BASIN CATCH BASIN CATCH BASIN 2'-6" 8" 1" TRASH LIFT 5'-11 1/2" 1"1" TRASH LIFT2'-7 1/2" 1"3 1 F E 2 GUTTER 21'-10 3/8" V.I.F.4'-2 3/4" V.I.F.8 1/4"8 1/4"8 1/4"8 1/4"8 1/4"7 7/8"45 7/16" 85" 85" 46 15/16" 2 15/16" 4 7/16" Scale Date Drawn By Project Number 1/2" = 1'-0"8/8/2018 2:31:28 PMA113 ENLARGED SOUTH PARKING / COURYARDROW HOUSE 12VAIL ROWHOUSES, VAILCOLORADOBRM 08/01/2018 No. Description Date 1/2" = 1'-0"1 STREET LEVEL - SOUTH PARKING PLAN 1/2" = 1'-0" 2 SECOND LEVEL - SOUTH BALCONY PAVING PLAN 08/15/18 UPUP UP 1 A 3 4 3 A502 FIRE PIT GRILLE3 3/4"8" SPA EQUIP. VAULT BELOW SLAB ON GRADE DASHED LINE REPRESENTS FOUNDATION WALLS BELOW UNIT 11 UNIT 12 2 A112 1/4" / 12"5/16" / 12"1/4" / 12" 5/16" / 12"1/4" / 12"1/4" / 12" 5/16" / 12"5/16" / 12" A112 5 D D 8,168' - 1 1/8" T.O.S. 8,168' - 3 1/4" T.O.S.1'-7 11/16"8,168' - 1 5/16" T.O.S. A112 6 T.O.W. EL. 72'-9 1/4" T.O. FIRE PIT 1'-0" A.F.F. T.O. COUNTER 3'-0" A.F.F. + EL. 72'-0" + EL. 71'-0" GAS H.B.GAS 1/4" / 12" 1/4" / 12"8" 12'-0" 8"PLANTERON GRADE(NO SLAB)RAISED PLANTER SUMP PUMP AT BOTTOM OF VAULT RAISED PLANTER RAISED PLANTER VAULTACCESS36"x36" MIN.1 - CREEK LEVEL 8,168' - 3 1/4" A A502 3 A112 3 A112 4 0 - VAULT SLAB 8,162' - 5 1/8" 8,163' - 0" 100 YEAR FLOOD PLANE 8,168' - 1 1/8" T.O. PATIO SLAB 8,168' - 1 5/16" T.O.S.2 1/8"1/4" / 12"1/4" / 12" 1/4" / 12"1/4" / 12" SLOPE SLAB SLOPE SLAB SLOPE SLABSLOPE SLAB T.O. EXIST. FOOTER 5'-0" MAX.8,164' - 6" 1 - CREEK LEVEL 8,168' - 3 1/4" A A502 3 SPA EQUIP. VAULT 0 - VAULT SLAB 8,162' - 5 1/8"2 1/8"1/4" / 12" 8,163' - 0" 100 YEAR FLOOD PLANE 8,168' - 1 1/8" 1/4" / 12" T.O. EXIST. FOOTER EXIST. FOUNDATION WALL, REF. STRUCT. NEW FOUNDATION WALL & SLAB, REF. STRUCT. NEW PATIO SLAB, REF. STRUCT. 8,164' - 6" 1 - CREEK LEVEL 8,168' - 3 1/4" 1/2" DRAINAGE MAT, CONTINOUS OVER SLAB AND DOWN FOUNDATION WALL AMERICAN HYDROTECH 6125FR WATERPROOFING MEMBRANE; REINFORCE ALL JOINTS & TRANSITIONS W/ UNCURED NEOPRENE 1 1/4" SAND SET BASALT PAVER W/ HYDRONIC SNOW MELT NEW PATIO SLAB, REF. STRUCT. 15 MIL STEGOWRAP UNDERSLAB VAPOR RETARDER. TURN UP SIDES OF WALL & SEAL W/ STEGOWRAP TAPE. 0 - VAULT SLAB 8,162' - 5 1/8" NEW FOUNDATION WALL, REF. STRUCT 8,168' - 1 5/16" T.O.S. MUD SET FIRST COURSE WATERSTOP, GCP ADCOR ES 2" XPS INSULATION 1/4" / 12" DRAINAGE LAYER SPA EQUIP. VAULT 1 - CREEK LEVEL 8,168' - 3 1/4" 2 - STREET LEVEL 8,178' - 1 3/4" A 8,172' - 9 1/4" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16"24"12" 59 1/16" 78 3/4"3'-1 5/16" 2 1/2"1'-1 5/16" 2 1/2"T.O. BASALT PAVER T.O.S. 2 1/2" 4'-6 1/16" 2 1/2" 6'-4 1/4" 2 1/2"1 11/16"36"3 3/8" 30" 2" 20 5/16" 3 3/8" 8,172' - 7 7/16" 8,171' - 0" GRADE GRADE 4'-6" 2 1/8"2 1/2"2 1/2" 18'-0 13/16" 3 3/4" 1 - CREEK LEVEL 8,168' - 3 1/4" A 3 3/4" 18'-0 13/16" 6'-7" 11'-5 13/16" 2 1/2" 6'-4 1/4" 2 1/2" 8,171' - 0 3/4" 2 3/4" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16" 19 11/16"1'-0"2 1/2"1'-1 5/16" 2 1/2"2'-9 1/2" 1 11/16"2 1/8" 8,170' - 6 3/8" GRADE T.O.W. Scale Date Drawn By Project Number As indicated 8/8/2018 2:33:47 PMA112 ENLARGED NORTH PATIOROW HOUSE 12VAIL ROWHOUSES, VAILCOLORADOAuthor 08/01/2018 No. Description Date 14 CONSTRUCTION V 01 AUG 18 1/2" = 1'-0" 1 CREEK LEVEL - NORTH PATIO PLAN 1/2" = 1'-0"2 NORTH PATIO WALL SECTION 1 1/2" = 1'-0"3 WALL SECTION PATIO CRAWL SPACE 1 1 1/2" = 1'-0" 4 WALL SECTION AT PATIO CRAWL SPACE 2 1/2" = 1'-0"5 EAST SITE WALL ELEVATION 1/2" = 1'-0"6 WEST SITE WALL ELEVATION 08/15/18 3 1 AA 2 1 A504 A1A1 8"11'-9 1/2" 8" 2'-10 1/8" 8" 3'-0 7/8" 1'-3 7/16" 8" 1'-1 1/2" 8" 10'-8 1/2" 8" 12'-0" BENCH SPA VAULT BELOW EDGE OF BALCONY ABOVE EQ. 1'-6" 5'-2 1/2" 1'-6" EQ.1'-6"6'-3 1/2" 1'-6" FIRE PITBALCONY OVERHANG5'-3 3/16"FIRE PIT GRILLEPLANTERON GRADE(NO SLAB)18'-0 13/16"3 3/4" 8"5'-11" 12'-1 13/16"T.O. FIRE PIT 1'-0" A.F.F. 1'-0" 8'-8 1/2" 1'-0" 1'-0" 9'-9 1/2" 1'-0"SPA EQUIP. VAULT BELOW SLAB ON GRADE SLAB ON GRADE DASHED LINE REPRESENTS STRUCT. FOUNDATION WALLS BELOW UNIT 11 UNIT 12 4 A111 1/4" / 12" 1/4" / 12"1/4" / 12"2-TIERED PERIMETER TRENCH DRAIN HATCHED AREA INDICATES SPA PLATFORM AREA 5 A111 VAULTACCESS36"x36" MIN.18'-0 13/16"3 3/4" 1'-7 11/16"1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 1'-7 11/16" 2 3/4" 1/4" / 12" 3/8" / 12" 8,168' - 1 1/8" 8,168' - 1 1/8" T.O.S. T.O.S. 8,168' - 3 1/4" T.O.S. 8,168' - 3 1/4" T.O.S.1/4" / 12"5/16" / 12"1/4" / 12" 1/4" / 12"1/4" / 12" 5/16" / 12" 5/16" / 12" 5/16" / 12"D D 8,168' - 1 5/16" T.O.S.3'-3 3/8"3'-3 3/8" 4"4" 1/4" / 12"1/4" / 12"8"8" DASHED LINE REPRESENTS INSIDE FACE OF SPA VAULT CONC. WALL 8,171' - 0 3/4" T.O.W.+ EL. 72.62'+ EL. 71.02' EL. 70.53' + EL. 70.53' + T.O.W. T.O. FIRE PIT 1'-0" A.F.F. T.O. COUNTER 3'-0" A.F.F. D STEEL PLATE EDGING RAISED PLANTER 8,172' - 9 1/4" SUMP PUMP AT BOTTOM OF VAULT RAISED PLANTER RAISED PLANTER GAS H.B.GAS GAS 1 - CREEK LEVEL 8,168' - 3 1/4" 1'-0" 2" 9'-5 1/2" 2" 1'-0"1'-0" 2'-11" 1'-9" 1'-9" 6"T.O. STRUCT. VAULT SLAB 8" STRUCTURAL VAULT WIDTH 11'-9 1/2" 8" WATER LINE SPREAD FOOTING, REF. STRUCT. STRUCTURAL VAULT FOUNDATION WALL, REF. STRUCT. SPA WALL BY COLORADO POOL & SPA SPA SLAB FLOOR BY COLORADO POOL & SPA2"2'-9" 1" GAP 1" GAP 1" GAP 1" GAP 8,160' - 6 1/4" 1'-6" 6'-3 1/2" 1'-6" 5 A111 DRAIN BOWL IN STRUCT. SLAB, COVERED W/ WIRE MESH 8,168' - 1 5/16" T.O.W. 8,161' - 6 1/4" 1 - CREEK LEVEL 8,168' - 3 1/4" 1 2 4 A111 1" GAP 1" GAP 1" GAP 1" GAP 1'-6" 5'-2 1/2" 1'-6"6"1'-9" 1'-9"2'-11" 1'-0"2"2'-9" 8" STRUCTURAL VAULT WIDTH 10'-8 1/2" 8" 1'-0" SPA VAULT WIDTH 8'-8 1/2"1'-0" 2" FINISH SPA WIDTH 8'-4 1/2" 2" SPA EQUIP. VAULT A111 6 DRAIN BOWL IN STRUCT. SLAB, COVERED W/ WIRE MESH 8,163' - 0" 100 YEAR FLOOD PLANE T.O. EQUIP. VAULT SLAB1'-0"T.O.W. 8,160' - 6 1/4" T.O. STRUCT. SPA VAULT SLAB WATERLINE 8,171' - 0 3/4" 8,170' - 6 3/8" GRADE A111 2 10"8,162' - 5 1/8" 8,161' - 6 1/4" 2 1/2" 8" 2 1/2" 8,168' - 4 15/16" FINISH PATIO 5'-0" MAX.7'-7 5/8"6'-4 1/8"7/8" 8,161' - 7 1/8" SLAB COMPRESSION STRUCTURAL CONCRETE FOUNDATION WALL, REF. STRUCT. CONCRETE SPA SLAB BY COLORADO POOLSCAPES FLEXCRETE WATERPROOFING BY COLORADO POOLSCAPES AMERICAN HYDROTECH 6125FR WATERPROOFING MEMBRANE; REINFORCE ALL PLYWOOD JOINTS & TRANSITIONS W/ UNCURED NEOPRENE; WRAP VERT. W.M. 12" ONTO ADJACENT WALLS, TERMINATION BAR ALONG VERT. EDGE 15 MIL STEGOWRAP UNDERSLAB VAPOR RETARDER. TURN UP SIDES OF BLOCK-OUT & SEAL W/ STEGOWRAP TAPE. STRUCTURAL CONC. SLAB, REF. STRUCT. 12" TERMINATION BAR CONTINUOUS AH6125 ONTO LOWER SLAB 3/4" X 3/4" KEYWAY; FILL WITH WPM CONCRETE SPA WALL BY COLORADO POOLSCAPES; SLOPE TOP OF WALL 1/4"/12" DRAIN BOWL IN STRUCT. SLAB, COVERED W/ WIRE MESH DRAINAGE MAT, CONTINOUS OVER STRUCT. VAULT SLAB TO DRAIN BOWL T.O. STRUCT. VAULT SLAB 8,161' - 7 1/8" SPA 8,160' - 6 1/4"12"SLAB COMPRESSION 1 - CREEK LEVEL 8,168' - 3 1/4" CONC. SLAB EDGE, REF. STRUCT. AMERICAN HYDROTECH 6125FR WATERPROOFING MEMBRANE; REINFORCE ALL PLYWOOD JOINTS & TRANSITIONS W/ UNCURED NEOPRENE; WRAP VERT. W.M. 12" ONTO ADJACENT WALLS, TERMINATION BAR ALONG VERT. EDGE 4" TRENCH DRAIN, CUSTOM DURA TRENCH SAND SET BASALT PAVER W/ HYDRONIC SNOW MELT 1/2" DRAINAGE MAT (LOW DRAINAGE) CONTINUOUS DOWN STRUCT. WALL & OVER STRUCT. SLAB MUD SET BASALT PAVER W/ HYDRONIC SNOW MELT (SURFACE DRAINAGE) CONCRETE SPA WALL BY COLORADO POOLSCAPES; SLOPE TOP OF WALL 1/4"/12" 1/4" / 12" 1/4" / 12"4" 10"5"4 5/8" Scale Date Drawn By Project Number As indicated 8/8/2018 2:28:53 PMA111 ENLARGED NORTH PATIO / SPAROW HOUSE 12VAIL ROWHOUSES, VAILCOLORADOBRM 08/01/2018 No. Description Date 1/2" = 1'-0" 1 CREEK LEVEL - NORTH PATIO PLAN 1/2" = 1'-0"4 SPA SECTION 1 1/2" = 1'-0"5 SPA SECTION 2 3" = 1'-0"6 SPA FOUNDATION DETAIL 3" = 1'-0" 2 SPA EDGE DETAIL Locking Cover req'd at spa 30 Min shut off req'd for fire pit 08/15/18 1 A5.01 1 A5.11 SHEET DRAWING SHEET DRAWING SHEET DRAWING BUILDING SECTION WALL SECTION 1 A9.01 SHEET DRAWING DETAIL INTERIOR ELEVATION 1 A6.01 SHEET DRAWING ENLARGED DETAIL AREA OF DRAWING TO BE ENLARGED SECTION MATERIAL GRAPHICS 23A 76H PARTITION TYPE; RE: PARTITION TYPE SCHEDULE PARTITION TYPE; RE: PARTITION TYPE SCHEDULE PARTITION TYPE IDENTIFICATION ACOUSTICAL PARTITION TYPE IDENTIFICATION 308 DOOR NUMBER DOOR IDENTIFICATION ROOM NAME 314 876.00 SF ROOM NUMBER ROOM/SPACE/AREA IDENTIFICATION ROOM NAME ROOM AREA A 1 COLUMN LETTER COLUMN LETTER COLUMN REFERENCE GUIDE STRUCTURAL GRID ELEVATION LEVEL NAME BATT INSULATION CONCRETE UNDISTURBED OR COMPACTED EARTH POROUS FILL (GRAVEL) STEEL ALUMINUM MASONRY - BRICK MASONRY - CONCRETE BLOCK RIDGID INSULATION GYPSUM PLASTER PLYWOOD FINISH WOOD EXTERIOR ELEVATION 1 A4.01 A7.01 99 99 99 99 C1 WINDOW TYPESHEET DRAWING ? WINDOW IDENTIFICATION KEYNOTE IDENTIFICATION NOTE NUMBER 001 ASI REVISION IDENTIFICATION REVISION NUMBER REVISION DESCRIPTION ELEVATION DATUM IDENTIFICATION Scale Date Drawn By Project Number 3" = 1'-0"8/8/2018 2:42:16 PMA000 COVER SHEETROW HOUSE 12VAIL ROWHOUSES, VAILCOLORADOBRM 08/01/2018 1. DO NOT SCALE DRAWINGS. 2. VERIFY ALL DIMENSIONS, CONDITIONS, AND UTILITY LOCATIONS PRIOR TO BEGINNING ANY WORK OR ORDERING ANY MATERIALS. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES IN THE DOCUMENTS IMMEDIATELY. 3. AREAS OF CONFLICTS OR DISCREPANCIES MUST BE FULLY RESOLVED WITH WRITTEN APPROVAL FROM THE ARCHITECTS BEFORE CONSTRUCTION CONTINUES IN THESE PARTICULAR AREAS. 4. PLAN DIMENSIONS ARE TO FACE OF STUD, CENTERLINE OF STEEL, TIMBER, STUD COLUMNS, OR FACE OF CONCRETE UNLESS OTHERWISE NOTED. SECTION AND ELEVATION DIMENSIONS ARE TO TOP OF CONCRETE, TOP OF PLYWOOD, OR TOP OF WALL PLATES OR BEAMS UNLESS OTHERWISE NOTED. 5. PROVIDE ALL NECESSARY BLOCKING IN STUD WALLS AND CEILINGS. LOCATIONS INCLUDE BUT ARE NOT LIMITED TO CEILING AND WALL MOUNTED FIXTURES, TOILETS, TOILET ACCESSORIES, CABINETRY, COUNTERTOPS, SHELVES, CLOSET RODS AND FALSE BEAMS. 6. REFER TO FLOOR PLANS FOR DOOR LOCATIONS. REFER TO DOOR SCHEDULE FOR DOOR TYPES. 7. REFER TO FLOOR PLANS FOR WINDOW LOCATIONS. REFER TO WINDOW SCHEDULE FOR WINDOW TYPES. 8. COORDINATE ALL ELECTRICAL AND MECHANICAL FIXTURES TO FIT WITHIN CEILING FLOOR AND WALL SPACES. VERIFY WITH ARCHITECT WHEN DIVERTING FROM DRAWINGS. 9. IN THE EVENT THAT ADDITIONAL DETAILS OR GUIDANCE IS NEEDED BY THE CONTRACTOR FOR CONSTRUCTION OF ANY ASPECT OF THE PROJECT, THEY SHALL IMMEDIATELY NOTIFY THE ARCHITECT. FAILURE TO GIVE 10 DAY NOTICE TO ARCHITECT SHALL NOT CONSTITUTE A DELAY IN THE PROJECT. 10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL APPLICABLE CODES AND OBTAINING ALL PERMITS AND REQUIRED APPROVALS. THIS PROJECT IS GOVERNED BY THE INTERNATIONAL BUILDING CODE AND THE INTERNATIONAL RESIDENTIAL CODE. COMPLIANCE IS MANDATORY. THE CONSTRUCTION DOCUMENTS SHALL NOT PERMIT WORK THAT DOES NOT CONFORM TO ALL RELEVANT CODES INCLUDING IN UBC AND ALL LOCAL AND REGIONAL CODES. 11. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FIELD COORDINATE AND OBTAIN APPROVALS FROM THE ARCHITECT/ENGINEER BEFORE ANY CUTTING, NOTCHING, OR DRILLING OF ANY CAST-IN-PLACE CONCRETE, STRUCTURAL FRAMING, OR ANY OTHER STRUCTURAL ELEMENTS WHICH MAY AFFECT THE STRUCTURAL INTEGRITY OF THE CONSTRUCTION. 12. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING GRADES AND SCALE OUT THE BUILDING FOOTPRINT FOR OWNER AND ARCHITECT APPROVAL PRIOR TO BEGINNING ANY SITE WORK. 13. THE OWNER HAS BEEN ADVISED THAT DUE TO HARSH WINTER CONDITIONS, ROOF & DECK SURFACES MUST BE MAINTAINED REASONABLE FREE OF ICE & SNOW TO ENSURE MINIMAL PROBLEMS WITH THESE SURFACES. 14. SUBSTITUTIONS OF "EQUAL" PRODUCTS WILL BE ACCEPTABLE WITH ARCHITECT'S WRITTEN APPROVAL. 15. IT IS THE INTENT AND MEANING OF THESE DOCUMENTS THAT THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR PROVIDE ALL LABOR, MATERIALS TRANSPORTATION, SUPPLIES, EQUIPMENT, ETC. TO OBTAIN A COMPLETE JOB WITHIN THE RECOGNIZED STANDARDS OF THE INDUSTRY. 16. ALL CONSTRUCTION IS TO FIT WITHIN THE BUILDING ENVELOPE AND/OR OUTSIDE SETBACKS WITHOUT CREATING EASEMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. 17. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. ALL UTILITIES SHALL BE LOCATED TO MINIMIZE EXCAVATION AND VEGETATION IMPACTS TO THE SITE. 18. THE GENERAL CONTRACTOR SHALL MINIMIZE THE LIMITS OF EXCAVATION AND TAKE ADEQUATE MEASURES TO PROTECT ALL VEGETATION BEYOND THE LIMITS OF EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED LANDSCAPE EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED LANDSCAPE. 19. THE SOILS REPORT IS AVAILABLE FROM OWNER'S SOILS ENGINEER. 20. GENERAL CONTRACTOR SHALL VERIFY ALL SITE DEVELOPMENT WITH LANDSCAPE CONSTRUCTION DOCUMENTS. THE SITE PLAN IS FOR GRADING AND LANDSCAPE PLAN IS FOR LAYOUT; ANY DISCREPANCIES VERIFY WITH ARCHITECT. GENERAL NOTES: Code: INTERNATIONAL RESIDENTIAL CODE 2015 Zoning: VAIL VILLAGE TOWNHOUSE DISTRICT Occupancy Classification: TYPE R DIV. 3 (SPRINKLERED) PROJECT SUMMARY: PROJECT TEAM: ARCHITECTS: K.H. WEBB ARCHITECTS 710 W. LIONSHEAD CIRCLE, UNIT A VAIL, CO 81657 PH. 970.477.2990 CONTACTS: KYLE H. WEBB kyle@khwebb.com BRANDON MEYER brandon@khwebb.com DESIGN CONSULTANT: TREACY & EAGLEBURGER ARCHITECTS 3335 CONNECTICUT AVENUE, NW WASHINGTON, DC 20008 PH. 202.362.5226 CONTACTS: PHILLIP EAGLEBURGER phil@treacyeagleburger.com GENERAL CONTRACTOR: SRE BUILDING ASSOCIATES 23698 HIGHWAY 24, SUITE D-2 MINTURN, COLORADO 81645 MAIL: PO BOX 6376 VAIL, COLORADO 81658 PH. 970.845.6359 CONTACT: STEVE ELICKER steve@srebuilds.com STRUCTURAL ENGINEER: MONROE-NEWELL ENGINEERS, INC. 70 BENCHMARK ROAD, SUITE 204 AVON, COLORADO 81620 MAIL: PO BOX 1567 AVON, COLORADO 81620 PH: 970-949-7768 CONTACT: PETER MONROE pmonroe@monroe-newell.com GEOTECHNICAL ENGINEER: HP KUMAR GEOTECHNICAL, INC 5020 COUNTY ROAD 154 GLENWOOD SPRINGS, CO 81601 PH: 970-945-7988 CONTACT: STEVE PAWLAK, P.E. hpkglenwood@kumarusa.com MECHANICAL/ELECTRICAL ENGINEER: BG BUILDING WORKS 222 CHAPEL PLACE, UNIT AC-201 AVON, COLORADO 81620 PH: 970-949-6108 CONTACTS: DAN KOELLIKER LANDSCAPE ARCHITECT: CERES LANDSCAPE ARCHITECTURE PO BOX 2134 EAGLE, CO 81631 PH: 970-949-3286 CONTACT: SCOTT SONES SURVEYOR: EAGLE VALLEY SURVEYING P.O. BOX 1230 EDWARDS, CO 81632 970.949.1406 PH: 303-565-4963 CONTACT: STAN HOGFELDT VAIL ROW HOUSES - NUMBER 12 303 GORE CREEK DRIVE, UNIT 12 VAIL, COLORADO 81657 CONSTRUCTION V 08.01.18 Sheet Number Sheet Name PERMIT ISSUE - 1 JAN 2016CONSTRUCTION - 1 SEPT 17CONSTURCTION III - 02 FEB 18CONSTRUCTION IV - 04 MAY 18CONSTRUCTION V - 01 AUG 18S3.0 FRAMING DETAILS X X X X S5.0 NORTH PATIO FRAMING PLAN X MECHANICAL M1 MECHANICAL - LOAD CALCS X X M2 MECHANICAL - RESCHECK - ENVELOPE ASSEMBLY X X M0.0 MECHANICAL COVER SHEET X M0.1 MECHANICAL SCHEDULES X M0.2 MECHANICAL SPECIFICATIONS X M1.0 MECHANICAL SITE PLAN X M2.0H CREEK & STREET LEVEL HVAC PLANS X M2.0P CREEK & STREET LEVEL PIPING PLANS X M2.1H 2ND LEVEL HVAC PLAN X M2.1P 2ND LEVEL PIPING PLAN X M3.1 MECHANICAL DIAGRAMS X M3.2 MECHANICAL DIAGRAMS X ELECTRICAL E1 ELECTRICAL LOAD CALCS X X E0.0 ELECTRICAL COVER SHEET X E0.1 ELECTRICAL ONE-LINE DIAGRAM X E0.2 ELECTRICAL SPECIFICATIONS X E2.0 CREEK & STREET LEVEL ELECTRICAL POWER PLANS X E2.1 2ND FLOOR ELECTRICAL POWER PLAN X E2.2 ROOF ELECTRICAL PLAN X E4.0 ELECTRICAL DIAGRAMS X Sheet Number Sheet Name PERMIT ISSUE - 1 JAN 2016CONSTRUCTION - 1 SEPT 17CONSTURCTION III - 02 FEB 18CONSTRUCTION IV - 04 MAY 18CONSTRUCTION V - 01 AUG 18A505 EXTERIOR DETAILS X X A506 WINDOW WELL DETAILS X X INTERIOR I1 INTERIOR PLANS X X X I2 POWER AND LIGHTING X X X I3 SCHEDULES, DOOR TYPES AND DETAILS X X X I4 INTERIOR ELEVATIONS X X X I5 INTERIOR ELEVATIONS X X X I6 INTERIOR ELEVATIONS X X X I7 INTERIOR ELEVATIONS X X X I8 INTERIOR ELEVATIONS X X X I9 INTERIOR ELEVATIONS X X X I10 INTERIOR ELEVATIONS X X I11 INTERIOR ELEVATIONS X X I12 INTERIOR DETAILS X X X STRUCTURAL S1.0 GENERAL NOTES X X X X S1.1 FOUNDATION DETAILS X X X X S2.0 FOUNDATION PLAN X X X X S2.1 MAIN LEVEL FRAMING PLAN X X X X S2.2 SECOND FLOOR FRAMING PLAN X X X X S2.3 ROOF FRAMING PLAN X X X X Sheet Number Sheet Name PERMIT ISSUE - 1 JAN 2016CONSTRUCTION - 1 SEPT 17CONSTURCTION III - 02 FEB 18CONSTRUCTION IV - 04 MAY 18CONSTRUCTION V - 01 AUG 18GENERAL A000 COVER SHEET X X X X X A001 ARCHITECTURAL SITE PLAN X X X X X LANDSCAPE L1 SITE PLAN X X L1.1 SITE PLAN & DETAILS X X L1.2 FIRE PIT DETAILS X X L2 PLANTING PLAN X X X ARCHITECTURE A100 FLOOR PLANS X X X X X A103 ROOF PLAN X X X X X A110 ENLARGED EXTERIOR SHELL PLANS X X X X A111 ENLARGED NORTH PATIO X A112 ENLARGED NORTH PATIO X X A113 ENLARGED SOUTH PARKING / COURTYARD X A120 RCP / ACOUSTIC PLANS X X X A130 SOFFIT RCP X A200 EXTERIOR ELEVATIONS X X X X X A210 ENLARGED EXTERIOR ELEVATIONS X X X X A211 ENLARGED EXTERIOR ELEVATIONS X X X X A300 BUILDING SECTIONS X X X X X A400 WALL SECTIONS X X X X X A410 STAIR DRAWINGS X X X A411 RAILINGS X X A420 CHIMNEY X X A430 UTILITY / TRASH ENCLOSURE X X X A500 EXTERIOR DETAILS X X X X A501 EXTERIOR DETAILS X X X A502 EXTERIOR WINDOW/DOOR DETAILS X X X X A503 EXTERIOR WINDOW/DOOR DETAILS X X X X A504 INTERIOR WINDOW/DOOR DETAILS X X X X No. Description Date 2 AMENDED 20 APR 17 3 CONSTRUCTION 01 SEPT 17 4 CONSTRUCTION II 24 SEPT 17 10 CONTSTRUCTION III 01 FEB 18 12 CONSTRUCTION IV 07 MAY 18 14 CONSTRUCTION V 01 AUG 18 INTERIOR DESIGNER: GREGGA JORDAN SMIESZNY 314 WEST INSTITUTE PL. CHICAGO, ILLINOIS 60610 PH. 312.787.0017 CONTACT: JEROME GRIFFIN jerome@gjsinc.com 08/15/18