Loading...
HomeMy WebLinkAboutB16-0490_REV8 Approved Plans _1530026445.pdf06/26/18 06/26/18 Miscellaneous Upper level patio fix, creek level post correction.Placement Location: Structure Type: General Contractor: Steel Erector/Fabricator: SRE AG Welding Performed by: Barry Bowland As directed by Steve Stone with SRE.Summary Comments: Name Company On-Site Notifications Steve Stone SRE Discrepancies The following discrepancies were added as a result of services performed. It is the contractor's responsibility to resolve reported discrepancies and schedule retesting. A list of open discrepancies can be provided upon request. Number Description Structural Steel (Field) 4 Welds at the Upper level patio fix, and the creek level post correction were non compliant due to slag not being removed from the welds. Visual Special Inspections Other Connection Types: Plate to Beam. Connection Comments: Visual Welding at the Upper level patio fix, and creek level post correction was found non compliant due to slag not being removed from welds. It was noted at the creek level post correction where a partial weld was exposed that the weld appeared to be undersized. Steve Stone with SRE was advised. Discrepancy #4 was added. Visual Non-Compliance Description of Non-Compliance: Discrepancy #4-Welds at the Upper level patio fix, and the creek level post correction were non compliant due to slag not being removed from the welds. Photograph attached. Photos Discrepancy #4-Welds at the Upper level patio fix, and the creek level post correction were non compliant due to slag not being removed from the welds. SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: May 30, 2018 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0009; ver: 1Report Date: May 29, 2018 Reviewed by: Austin Nicodemus Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1 06/26/18 Miscellaneous Creek side column fix.Placement Location: Structure Type: General Contractor: Steel Erector/Fabricator: SRE Building Associates AG Welding Performed by: Barry Bowland As directed by Steve Stone with SRE Building Associates.Summary Comments: Name Company On-Site Notifications Steve Stone SRE Building Associates Visual Special Inspections Other Connection Types: Plate to Beam Connection Comments: Visual Discrepancy #5-Ground reinspected non compliant welds and found them to be in general conformance with the email from the EOR dated 5/8/2018. This item is now closed. Visual Non-Compliance SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Jun 21, 2018 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0011; ver: 1Report Date: Jun 19, 2018 Reviewed by: Austin Nicodemus Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1 06/26/18 Miscellaneous Upper level patio fix, Creek level post correction.Placement Location: Structure Type: General Contractor: Steel Erector/Fabricator: SRE AG Welding Performed by: Barry Bowland As directed by Steve Stone with SRE.Summary Comments: Name Company On-Site Notifications Steve Stone SRE Building Associates Discrepancies The following discrepancies were added as a result of services performed. It is the contractor's responsibility to resolve reported discrepancies and schedule retesting. A list of open discrepancies can be provided upon request. Number Description Structural Steel (Field) 5 Creek level post correction welds were found non-compliant due to undersized welds, excessive undercut, and lack of fusion. Visual Special Inspections Other Connection Types: Plate to Beam. Connection Comments: Visual Welds for the upper level patio fix were found to be in general conformance with project plans and revised detail from the EOR dated 5/23/18. Welds for the creek level post fix were found to be non compliant. Discrepancy #5 was added. Discrepancy #4-Reinspected and all weld slag had been removed. This item is now closed. Visual Non-Compliance Description of Non-Compliance: Discrepancy #5-Creek level post correction welding was found non compliant due to excessive undercut, porosity, lack of fusion, and undersized welds. Photos Discrepancy #5. Discrepancy #5. SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Jun 6, 2018 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0010; ver: 1Report Date: Jun 5, 2018 Reviewed by: Austin Nicodemus Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1 06/26/18 Row house #12, Footing, at gridlines J.0-C.0/1.0Placement Location: Documents Used: Installation Contractor: Performed by: Matt Raczewski Hedrick General Contractor: SRE Plans Epoxy Used: Hilti and Sika HIT-HY 200-A and Pro Select AnxhorFix-2 Weather / Temperature: Clear / 47 ºF Drilled Holes Orientation: Distance to Edge: Hole Diameter: Hole Depth: 0.75 6.0 to 8.5 Hole Spacing: 12” Horizontal 0 Concrete Thickness: 0 Reinforcement Reinforcement Type: Rebar Reinforcement Size: #5 Reinforcement Length: 51 in Epoxy Epoxy Expiration: 9/2018 and 4/2019 Means and Methods Drilling Equipment: Hammer drill Method to Clean Hole: Wire brush and compressed air Epoxy Placement: Epoxy Gun from the bottom of hole Reinforcement Placement: Hand placed Weather Protection: N/A The following individuals were notifed of all results while on-site. Name Company Notifications Steve Stone SRE Conformance Reinforcement: Epoxy: Hole Depth and Diameter: Spacing of Drilled Holes: Drilling and Cleaning: Not ObservedNot Applicable Does Not Conform Conforms SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Report Date: Work Order No.: Drill and Epoxy 17-6510.DrillandEpoxy.0016; ver: 1Apr 30, 2018 Work Order Date: Apr 30, 2018 Reviewed by: Chris Hutto Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 2 06/26/18 Photos Cleaning with compressed air. Contractor using a hammer drill to get a series of holes to the correct depth. Cleaning with wire brush. Placement of reinforcing steel. SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Report Date: Work Order No.: Drill and Epoxy 17-6510.DrillandEpoxy.0016; ver: 1Apr 30, 2018 Work Order Date: Apr 30, 2018 Reviewed by: Chris Hutto Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 2 of 2 06/26/18 January 18, 2018 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending January 18, 2018, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 1-18-2018 Concrete Field Observation Reports/ Compressive Strength 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameJanuary 4, 2018 17-6510 SRE Justin 4 1 Matt Raczewski 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: January 11, 2018 17-6510 January 4, 2018 SRE Justin Hedrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 4.0 Clear/40s Line pump Hand Column footing extension and stem wall footing Column pad footing extension at grid lines A.5/3.0 Stem wall footing at grid lines E.0/3.0-3.7 4,000 N/A 4 +- 1 50-90 15 Footing at grid lines E.0/3.1 142 314187 11:18am 12:50pm 4 3/4 3.2 67 140.4 5 314187 4 5007 4.00 12.57 57,160 4,550 1/11/18 7 4.00 12.57 2/1/18 28 4.00 12.57 2/1/18 28 4.00 12.57 2/1/18 28 Matt Raczewski 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameJanuary 5, 2018 17-6510 SRE Justin 4 1 Matt Raczewski 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: January 12, 2018 17-6510 January 5, 2018 SRE Justin Hedrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 2.00 of 2.00 Cloudy/40s Line pump Hand Stem wall Stem wall at grid lines E.0/3.0-3.7 4,000 N/A 4 +- 1 50-90 16 Stem Wall at gridlines E.0/3.1 136 314214 12:51pm 2:17pm 4 1/4 3.4 58 139.4 7 314214 4 5013 4.00 12.57 52,560 4,180 1/12/18 7 3 4.00 12.57 2/2/18 28 4.00 12.57 2/2/18 28 4.00 12.57 2/2/18 28 Matt Raczewski 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameJanuary 12, 2018 17-6510 SRE Justin 4 1 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: January 12, 2018 17-6510 January 12, 2018 SRE Justin Hedrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 6 Snow/ 20’s Pump truck Hand Foundation footing Foundation footing along GL E.0/2.0-3.0 and E.0/3.7-E.0/4.0-D1.0/4.0 4,000 N/A 4 +/- 1 50-90 17 E.0/3.9 146 314272 12:41 am 2:00 pm 5 3.2 67 145.7 5 314272 4 4.00 12.57 1/19/18 7 4.00 12.57 2/9/18 28 4.00 12.57 2/9/18 28 4.00 12.57 2/9/18 28 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameJanuary 16, 2018 17-6510 SRE Justin 4 1 Matt Raczewski 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: January 16, 2018 17-6510 January 16, 2018 SRE Justin Hedrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 4.50 of 4.50 Clear, 30F Line pump Hand, vibrated Stem walls Stem wall at grid lines E.0/2.1-3.0 and at E.0/3.6-4.0 x C.5-E.0/4.0 4,000 N/A 4 +- 1 50-90 18 D.0/4.0 140 314296 11:46am 1:17pm 4 1/2 3.3 60 140.5 3 314296 4 4.00 12.57 1/23/18 7 4.00 12.57 2/13/18 28 4.00 12.57 3/13/18 28 4.00 12.57 3/13/18 28 Matt Raczewski 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 1-18-2018 Reinforcing Steel Field Observation Reports 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Concrete Reinforcing Cover Report Date: Job NameJob Number: As scheduled, a representative visited the project site to perform special inspections on reinforcing steel at locations requested. General Contractor: Rep. Notified: January 4, 2018 17-6510 SRE Justin 1 Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Y Description of Non-Conformance Items: Additional Comments/Clarification: No., Spacing, Size of Embed Plates, Headed Anchor Studs, Stud Rails: Anchor Bolts; Number of, diameter, embed length: Initial Conformance Non- Conformance Not Applicable Report Date: General Contractor: Job Number: Rep. Notified: Date Job Name Job Number General Contractor Rep Notified Rebar Installer: Rep. Notified: Documents Used: Structure Type: Placement Location: Earthwork Contractor Form Length, Width, Depth: Number and Spacing of Form Savers Installed: Dowels to Adjacent Structure; wall, slab or other: Embeds and Anchors Clearance and Lap Length: Number and Spacing of Ties, Stirrups, Corner Bars: Number of Bars, Size, Length, Grade, Spacing: Reinforcing Steel Final Reinforcing Steel Rep Notified Conformance January 4, 2018 17-6510 SRE Justin Hendrick Jesus Plans Column pad footing extension and stem wall footing Column pad footing extension at grid lines A.5/3.0 Stem wall footing at grid lines E.0/3.0-3.7 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Concrete Reinforcing Cover Report Date: Job NameJob Number: As scheduled, a representative visited the project site to perform special inspections on reinforcing steel at locations requested. General Contractor: Rep. Notified: January 5, 2018 17-6510 SRE Justin 1 Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Y Description of Non-Conformance Items: Additional Comments/Clarification: No., Spacing, Size of Embed Plates, Headed Anchor Studs, Stud Rails: Anchor Bolts; Number of, diameter, embed length: Initial Conformance Non- Conformance Not Applicable Report Date: General Contractor: Job Number: Rep. Notified: Date Job Name Job Number General Contractor Rep Notified Rebar Installer: Rep. Notified: Documents Used: Structure Type: Placement Location: Earthwork Contractor Form Length, Width, Depth: Number and Spacing of Form Savers Installed: Dowels to Adjacent Structure; wall, slab or other: Embeds and Anchors Clearance and Lap Length: Number and Spacing of Ties, Stirrups, Corner Bars: Number of Bars, Size, Length, Grade, Spacing: Reinforcing Steel Final Reinforcing Steel Rep Notified Conformance January 5, 2018 17-6510 SRE Justin Hendrick Jesus Plans Stem wall Stem wall at grid lines E.0/3.0-3.7 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Concrete Reinforcing Cover Report Date: Job NameJob Number: As scheduled, a representative visited the project site to perform special inspections on reinforcing steel at locations requested. General Contractor: Rep. Notified: January 12, 2018 17-6510 SRE Justin 1 Chris Leeper/ Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Y Description of Non-Conformance Items: Additional Comments/Clarification: No., Spacing, Size of Embed Plates, Headed Anchor Studs, Stud Rails: Anchor Bolts; Number of, diameter, embed length: Initial Conformance Non- Conformance Not Applicable Report Date: General Contractor: Job Number: Rep. Notified: Date Job Name Job Number General Contractor Rep Notified Rebar Installer: Rep. Notified: Documents Used: Structure Type: Placement Location: Earthwork Contractor Form Length, Width, Depth: Number and Spacing of Form Savers Installed: Dowels to Adjacent Structure; wall, slab or other: Embeds and Anchors Clearance and Lap Length: Number and Spacing of Ties, Stirrups, Corner Bars: Number of Bars, Size, Length, Grade, Spacing: Reinforcing Steel Final Reinforcing Steel Rep Notified Conformance January 12, 2018 17-6510 SRE Justin Hendrick Jesus Plans Foundation footing/ stem wall Lower level along GL E.0/2.0-3.0 and E.0/3.7-E.0/4.0-D1.0/4.0 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Concrete Reinforcing Cover Report Date: Job NameJob Number: As scheduled, a representative visited the project site to perform special inspections on reinforcing steel at locations requested. General Contractor: Rep. Notified: January 16, 2018 17-6510 SRE Justin 1 Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Y Description of Non-Conformance Items: Additional Comments/Clarification: No., Spacing, Size of Embed Plates, Headed Anchor Studs, Stud Rails: Anchor Bolts; Number of, diameter, embed length: Initial Conformance Non- Conformance Not Applicable Report Date: General Contractor: Job Number: Rep. Notified: Date Job Name Job Number General Contractor Rep Notified Rebar Installer: Rep. Notified: Documents Used: Structure Type: Placement Location: Earthwork Contractor Form Length, Width, Depth: Number and Spacing of Form Savers Installed: Dowels to Adjacent Structure; wall, slab or other: Embeds and Anchors Clearance and Lap Length: Number and Spacing of Ties, Stirrups, Corner Bars: Number of Bars, Size, Length, Grade, Spacing: Reinforcing Steel Final Reinforcing Steel Rep Notified Conformance January 16, 2018 17-6510 SRE Justin Hendrick Jesus Plans Stem wall Stem wall at grid lines E.0/2.1-3.0 and at E.0/3.6-4.0 x C.5-E.0/4.0 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 1-18-2018 Drilled & Epoxied Reinforcing Steel Field Observation Reports 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Drill and Epoxy Cover Report Date: Date Job NameJob Number: Job Number As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. General Contractor: General Contractor Rep. Notified: Rep Notified January 3, 2018 17-6510 SRE Justin 1 Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Location: 1.) 2.) 3.) 4.) Orientation (vertical/horizontal): 1.) 3.) 2.) 4.) Hole Diameter (inches): 1.)Length (inches): 1.) 2.) 2.) 3.) 3.) 4.) 4.) Hole Spacing (inches): 1.) 3.) 2.) 4.) Drilling Equipment: Method to Clean Hole: Epoxy Type: Epoxy Expiration: Placement Method: Type (rebar/bolt/anchor):1.)Size: 1.) Length (inches) 1.) 2.)2.)2.) 3.)3.)3.) 4.) 4.) 4.) Placement Method: Additional Reinforcing Steel: Field Representative: Comments: Reinforcement Epoxy Documents Used: Drill and Epoxy Drilling Subcontractor: Rep. Notified: pGeneral Contractor: Rep. Notified: p Job Number: Report Date: January 3, 2018 17-6510 SRE Justin Hedrick Jesus Plans Dowels into Unit 12 Pad Column Footing on the Basement Level at A.5/3.0 North Face Dowels into Unit 12 Pad Column Footing on the Basement Level at A.5/3.0 East Face Dowels into Unit 12 Pad Column Footing on the Basement Level at A.5/3.0 South Face Horizontal Horizontal Horizontal 3/4 5 3/4 5 3/4 5 12” horz., 3” vert.12” horz., 3” vert. 14” horz. Hammer drill Compressed air and wire brush HILTI HIT-200A 9/2018 Epoxy gun Rebar 5 38 Rebar 5 14 Rebar 5 14 Hand set NA Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Drill and Epoxy Cover Report Date: Date Job NameJob Number: Job Number As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. General Contractor: General Contractor Rep. Notified: Rep Notified January 4, 2018 17-6510 SRE Justin 1 Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Location: 1.) 2.) 3.) 4.) Orientation (vertical/horizontal): 1.) 3.) 2.) 4.) Hole Diameter (inches): 1.) Length (inches): 1.) 2.) 2.) 3.) 3.) 4.) 4.) Hole Spacing (inches): 1.) 3.) 2.) 4.) Drilling Equipment: Method to Clean Hole: Epoxy Type: Epoxy Expiration: Placement Method: Type (rebar/bolt/anchor):1.) Size: 1.) Length (inches) 1.) 2.) 2.) 2.) 3.) 3.) 3.) 4.) 4.) 4.) Placement Method: Additional Reinforcing Steel: Field Representative: Comments: Reinforcement Epoxy Documents Used: Drill and Epoxy Drilling Subcontractor: Rep. Notified: pGeneral Contractor: Rep. Notified: p Job Number: Report Date: January 4, 2018 17-6510 SRE Justin Hedrick Jesus Plans Basement level stem wall at grid lines E.0/3.0-3.7 Vertical 3/4 4 12 Hammer drill Compressed air and wire brush HILTI HIT-200A 9/2018 Epoxy gun Rebar 5 49 Hand set NA Matt Raczewski / Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Yes No Discrepancies Reported this Date? No. of Pages Attached: Field Representative: Drill and Epoxy Cover Report Date: Date Job NameJob Number: Job Number As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. General Contractor: General Contractor Rep. Notified: Rep Notified January 12, 2018 17-6510 SRE Justin 1 Chris Leeper/ Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Location: 1.) 2.) 3.) 4.) Orientation (vertical/horizontal): 1.)3.) 2.)4.) Hole Diameter (inches): 1.)Length (inches): 1.) 2.) 2.) 3.) 3.) 4.) 4.) Hole Spacing (inches): 1.)3.) 2.)4.) Drilling Equipment: Method to Clean Hole: Epoxy Type: Epoxy Expiration: Placement Method: Type (rebar/bolt/anchor):1.) Size: 1.) Length (inches) 1.) 2.) 2.) 2.) 3.) 3.) 3.) 4.) 4.) 4.) Placement Method: Additional Reinforcing Steel: Field Representative: Comments: Reinforcement Epoxy Documents Used: Drill and Epoxy Drilling Subcontractor: Rep. Notified: pGeneral Contractor: Rep. Notified: p Job Number: Report Date: January 12, 2018 17-6510 SRE Justin Hedrick Jesus Plans Dowels into existing wall along GL E.0/2.0-3.0 and E.0/3.7-E.0/4.0-D1.0/4.0 Dowels into existing wall at GL D1.0/4.0 Vertical Horizontal 3/4 7 3/4 6 12 12 Hammer drill Compressed air and wire brush HILTI HIT-200A 8/2018 Epoxy gun Rebar 5 48 Rebar 5 30 Hand set NA Chris Leeper/ Shane Sorensen 06/26/18 November 9, 2017 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending November 9, 2017, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 11-9-2017 Concrete Field Observation Reports/ Compressive Strength 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameOctober 5, 2017 17-6510 SRE Justin 4 1 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: November 2, 2017 17-6510 October 5, 2017 SRE Justin Hendrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 15 Sunny/65 Line pump Hand Foundation walls Unit 12 Foundation walls on N and S side of house 4,000 N/A N/A 50-90 13 N end of N foundation wall 145 312667 1:50pm 3:45pm 4 2.0 78 142.6 0 312667 4 5712 4.00 12.57 41,130 3,270 10/12/17 7 3 4.00 12.57 65,250 5,190 11/2/17 28 5 4.00 12.57 63,610 5,060 11/2/17 28 5 4.00 12.57 60,710 4,830 11/2/17 28 5 5,030 Matty Baldwin Pour scheduled for 1:00pm started at 3:40pm. 06/26/18 November 20, 2017 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending November 20, 2017, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 11-20-2017 Concrete Field Observation Reports/ Compressive Strength 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameOctober 5, 2017 17-6510 SRE Justin 4 1 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: November 2, 2017 17-6510 October 5, 2017 SRE Justin Hendrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 15 Sunny/65 Line pump Hand Foundation walls Unit 12 Foundation walls on N and S side of house 4,000 N/A N/A 50-90 14 N end of N foundation wall 145 312667 1:50pm 3:45pm 4 2.0 78 142.6 0 312667 4 5712 4.00 12.57 41,130 3,270 10/12/17 7 3 4.00 12.57 65,250 5,190 11/2/17 28 5 4.00 12.57 63,610 5,060 11/2/17 28 5 4.00 12.57 60,710 4,830 11/2/17 28 5 5,030 Matty Baldwin Pour scheduled for 1:00pm started at 3:40pm. 06/26/18 October 16, 2017 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending October 16, 2017, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 10-16-2017 Concrete Field Observation Reports/ Compressive Strength 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameSeptember 8, 2017 17-6510 SRE Justin 4 1 Alex Schultz/Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: October 6, 2017 17-6510 September 8, 2017 SRE Justin Hendrick N/A United 37610449 20+ Overcast/50s Line pump Hand Slab on grade Unit 12 Creek Level and Crawl Space SOG 4,000 N/A 4 max 50-90 13 5' S 5'E of NW corner of Creek Level SOG 56397 33213271 6:49 am 8:45 am 4 3/4 3.6 70 140.3 15 33213271 4 5640 4.00 12.57 46,140 3,670 9/15/17 7 5 4.00 12.57 72,470 5,770 10/6/17 28 5 4.00 12.57 72,170 5,740 10/6/17 28 5 4.00 12.57 74,830 5,950 10/6/17 28 3 5,820 Alex Schultz/Shane Sorensen Justin wth SRE accepted placement of concrete with high slump. Placement scheduled for 8:00 began at 8:40. 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameOctober 5, 2017 17-6510 SRE Justin 4 1 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: October 12, 2017 17-6510 October 5, 2017 SRE Justin Hendrick Jesus Casey Concrete 7.0 3/8 GR 70/30 2 15 Sunny/65 Line pump Hand Foundation walls Unit 12 Foundation walls on N and S side of house 4,000 N/A N/A 50-90 13 N end of N foundation wall 145 312667 1:50pm 3:45pm 4 2.0 78 142.6 0 312667 4 5712 4.00 12.57 41,130 3,270 10/12/17 7 3 4.00 12.57 11/2/17 28 4.00 12.57 11/2/17 28 4.00 12.57 11/2/17 28 Matty Baldwin Pour scheduled for 1:00pm started at 3:40pm. 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 10-16-2017 General Comments Field Observation Reports 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Job No: Date: Field Representative: General Comments As scheduled, a representative arrived on-site to perform the below discussed services and we have the following comments. Matty Baldwin 17-6510 September 27, 2017 ***STRUCTURAL BACKFILL*** We observed compacted native material as structural fill for interior footers. At the time of our visit no dirt crew was on site. Since the material used contains greater than 30% rock retained on the 3/4" sieve, according to ASTM D698/1557, nuclear moisture-density testing should not be used for acceptance testing. Upon visual observation, the material appeared moist, dense, and generally unyielding. Justin Marschalk with SRE Building Associates was notified of our observations. 06/26/18 September 21, 2017 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending September 21, 2017, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 9/21/2017 Concrete Field Observation Reports/ Compressive Strength 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameJuly 10, 2017 17-6510 SRE Justin 4 1 Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No. Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: August 7, 2017 17-6510 July 10, 2017 SRE Justin Hendrick N/A Casey Concrete 7.0 3/8F 70/30 2" 15 Partly cloudy/80s Line pump Hand Foundation footings Footings for north half of Unit 12 3,000 NA 4 +/- 1 50-90 10 Center of lower east side footing 133 311144 12:30 pm 1:45 pm 3 3/4 2.9 83 141.8 5 311144 4 5362 4.00 12.57 52,740 4,200 7/17/17 7 5 4.00 12.57 75,410 6,000 8/7/17 28 5 4.00 12.57 72,610 5,780 8/7/17 28 5 4.00 12.57 76,710 6,100 8/7/17 28 5 5,960 Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameJuly 20, 2017 17-6510 SRE Justin 4 1 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: August 17, 2017 17-6510 July 20, 2017 SRE Justin Hendrick Jesus Casey 7.0 3/8 F 70/30 2" 10 Sunny, 70's Pump truck Vibration Foundation walls Unit 12 South foundation walls 4,000 N/A 4" max 50-90 11 E end of N foundation Wall 113 311342 10:00am11:15 am 5 3.9 82 143.9 7 311342 4 5401 4.00 12.57 56,130 4,470 7/27/17 7 5 4.00 12.57 79,350 6,310 8/17/17 28 3 4.00 12.57 77,530 6,170 8/17/17 28 3 4.00 12.57 72,420 5,760 8/17/17 28 5 6,080 Matty Baldwin Slump accepted by SRE 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameAugust 4, 2017 17-6510 SRE Justin 4 1 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No. Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: September 1, 2017 17-6510 August 4, 2017 SRE Justin Hendrick Jesus Casey 7.0 3/8 F 70/30 2" 3 Sunny partly Cloudy, 75° Line pump Hand Foundation walls Unit 12 footers and elevator pad 3,000 N/A N/A 50-90 12 N footer 134 311628 11:59am 1:05 4 3.0 74 144.7 3 311628 4 5447 4.00 12.57 58,450 4,650 8/11/17 7 3 4.00 12.57 77,890 6,200 9/1/17 28 3 4.00 12.57 79,130 6,300 9/1/17 28 5 4.00 12.57 81,510 6,480 9/1/17 28 3 6,330 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameSeptember 8, 2017 17-6510 SRE Justin 4 1 Alex Schultz/Shane Sorensen 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: September 15, 2017 17-6510 September 8, 2017 SRE Justin Hedrick N/A United 37610449 20+ Overcast/50s Line pump Hand Slab on grade Unit 12 Creek Level and Crawl Space SOG 4,000 N/A 4 max 50-90 13 5' S 5'E of NW corner of Creek Level SOG 56397 33213271 6:49 am 8:45 am 4 3/4 3.6 70 140.3 15 33213271 4 5640 4.00 12.57 46,140 3,670 9/15/17 7 5 4.00 12.57 10/6/17 28 4.00 12.57 10/6/17 28 4.00 12.57 10/6/17 28 Alex Schultz/Shane Sorensen Justin wth SRE accepted placement of concrete with high slump. Placement scheduled for 8:00 began at 8:40. 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 9/21/2017 Structural Steel Field Observation Report & Discrepancy List 06/26/18 Building - Steel Foundation level A-C/1-3 and 2nd floor at grids A.2/1-3Placement Location: Structure Type: General Contractor: Steel Erector/Fabricator: SRE Building AG Welding Performed by: Lee Royse As directed by Justin Marschalk with SRE building:Summary Comments: The following individuals were notifed of all results while on-site. Name Company Notifications Justin Marschalk SRE Building Associates Discrepancies The following discrepancies were added as a result of services performed. It is the contractor's responsibility to resolve reported discrepancies and schedule retesting. A list of open discrepancies can be provided upon request. Number Description Structural Steel (Field) 1 GROUND has not received Welder Qualification Test Records (WQTRs), Weld Procedure Specifications (WPS) for welds performed and continuity logs if the WQTRs are over six months old for AWS D1.1 from AG Welding. Structural Steel (Field) 2 Inspected anchored connections of column base plates to foundation throughout grids A-C/1-3. At three locations there is lack of projection through the nut and exposed holes in the column base plates. These connections were marked with orange paint. The remaining connections were found in the snug tight condition and in general compliance with the project plans. Structural Steel (Field) 3 The Horizontal beam at the second floor between grid A.2/1-3 has high strength bolts ASTM A325 tacked at the bolt holes. This grade of steel is not a pre approved base material per AWS D1.1:15 C3 table 3.1. Visual Special Inspections Building - Steel, Connection Types: Beam to Column Connection Comments: Inspected high strength bolted connections of beam to column at the corners at second floor at grids A.2/1 and A.2/3. These connections were found to be in the snug tight condition with plies in firm contact. Visual Non-Compliance Building - Steel, Non-Compliant Connection Types: Description of Non-Compliance: Anchored Connection of Plate GROUND has not received Welder Qualification Test Records (WQTRs), Weld Procedure Specifications (WPS) for welds performed and continuity logs if the WQTRs are over six months old for AWS D1.1 from AG Welding. Inspected anchored connections of column base plates to foundation throughout grids A-C/1-3. At three locations there is lack of projection through the nut and exposed holes in the column base plates. These connections were marked with orange paint. The remaining connections were found in the snug tight condition and in general compliance with the project plans. The Horizontal beam at the second floor between grid A.2/1-3 has high strength bolts ASTM A325 tacked at the bolt holes. This grade of steel is not a pre approved base material per AWS D1.1:15 C3 table 3.1. 1) WPS - Welding Procedure Specification : The detailed methods and practices including all joint welding procedures involved in the production of weldments. All prequalified WPS's shall be written. WPS's should be assigned an identification #. 2) WQTR - Welder Qualification Test Record : Performance qualification test to determine a welder's ability to produce sound welds. This shall be performed in conformance with a WPS. Identification # of the WPS shall be displayed on the WQTR. 3) Continuity Record : Clause 4.2.3 Period of Effectiveness. A welder's qualification is considered remaining in effect provided; the period of time that the welder does not engage in the given process does not exceed 6 months, the contract documents state differently, or there is a specific reason to question a welder's ability to produce sound welds. The welder's employer should maintain records of each welder's use of qualified welding processes. 4) Common Processes : SMAW - Shielded Metal Arc Welding, commonly referred to as stick welding. Weld Certification Submittal Information SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Aug 29, 2017 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0001; ver:Report Date: Aug 28, 2017 Reviewed by: Paul Gustafson Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 2 06/26/18 FCAW - Flux Cored Arc Welding, commonly referred to as wire feed. GMAW - Gas Metal Arc Welding, commonly referred to as wire feed. SW - Stud Welding, commonly referred to as headed anchor studs (HAS), threaded anchor studs (TAS), and deformed anchor studs (DAS). 5) Most commonly used welding codes: AWS D1.1 - Structural Welding Code, covers carbon or low alloy steels 1/8-inch or thicker. AWS D1.3 - Structural Welding Code Sheet Steel, covers structural sheet/strip steels including cold formed members (Metal Studs) equal to or less than 3/16-inch. Decking usually requires single and double sheet certification. AWS D1.4 - Structural Welding Code Reinforcing Steel, covers reinforcing steel to reinforcing steel and reinforcing steel to carbon or low alloy steels, this includes A706 weldable bar. Photos Tacked A325 high strength bolts. Lack of projection through nut and exposed slots. Typical at all three locations. SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Aug 29, 2017 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0001; ver:Report Date: Aug 28, 2017 Reviewed by: Paul Gustafson Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 2 of 2 06/26/18 Building - Steel Project SitePlacement Location: Structure Type: General Contractor: Steel Erector/Fabricator: SRE Builders AG Welding Performed by: Lee Royse As directed by Justin Marschalk with SRE Building: GROUND arrived on site for scheduled inspection and was informed by Justin that he needed to reschedule the inspection as he is not ready on this date. Summary Comments: The following individuals were notifed of all results while on-site. Name Company Notifications Justin Marschalk SRE Building Associates Visual Special Inspections Visual Non-Compliance SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Sep 1, 2017 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0002; ver:Report Date: Aug 31, 2017 Reviewed by: Paul Gustafson Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1 06/26/18 Building - Steel Project SitePlacement Location: Structure Type: General Contractor: Steel Erector/Fabricator: SRE Builders AG Welding Performed by: Lee Royse As directed by Justin Marschalk with SRE Builders: Reinspected discrepancy numbers 1, 2 and 3 and added tracking to these items. Received EOR email dated 31 August 2017. Summary Comments: The following individuals were notifed of all results while on-site. Name Company Notifications Justin Marschalk SRE Building Associates Visual Special Inspections Visual Non-Compliance SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Sep 6, 2017 Work Order Date: Work Order No.: Structural Steel 17-6510.StructuralSteel(Field).0003; ver:Report Date: Sep 5, 2017 Reviewed by: Austin Nicodemus Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1 06/26/18 Structural Steel (Field) 1 GROUND has not received Welder Qualification Test Records (WQTRs), Weld Procedure Specifications (WPS) for welds performed and continuity logs if the WQTRs are over six months old for AWS D1.1 from AG Welding. Lee Royse 8/28/2017 Per conversation with Justin Marschalk with SRE Builders stated that he is working on getting these documents and will forward to GROUND when received. 9/5/2017Lee Royse Structural Steel (Field) 2 Inspected anchored connections of column base plates to foundation throughout grids A- C/1-3. At three locations there is lack of projection through the nut and exposed holes in the column base plates. These connections were marked with orange paint. The remaining connections were found in the snug tight condition and in general compliance with the project plans. Lee Royse 8/28/2017 Two HSS columns were found moved and anchors were found in the snug tight condition. The remaining column base plate anchors with lack of projection were found welded per EOR email dated 31 August 2017 item three. This discrepancy is now closed. 9/5/2017 Lee Royse Per Structural EOR Email Structural Steel (Field) 3 The Horizontal beam at the second floor between grid A.2/1-3 has high strength bolts ASTM A325 tacked at the bolt holes. This grade of steel is not a pre approved base material per AWS D1.1:15 C3 table 3.1. Lee Royse 8/28/2017 Justin Marschalk with SRE Builders stated that he is getting approval from the EOR on this condition. 9/5/2017Lee Royse SRE Building Associates PO Box 6376 Vail, CO 81658 Justin Marschalk 303 Gore Creek Drive, Unit 12 Client: Date: Project No. Project Discrepancy Log 17-6510 September 06, 2017 Number Description Reported By Date Resolution Type www.groundeng.com Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1 It is the responsibility of the contractor to schedule our office to perform retesting once the necessary corrective action has been made or provide our office with documentation that resolves the discrepancy. Resolved Discrepancy follow up commentaryNOT resolved 06/26/18 June 20, 2017 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending June 20, 2017, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 6/20/2017 General Comments Field Observation Reports 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Job No: Date: Field Representative: General Comments As scheduled, a representative arrived on-site to perform the below discussed services and we have the following comments. Matty Baldwin 17-6510 June 13, 2017 ***CANCELLED OR RESCHEDULED VISIT*** Upon arrival we were notified by Justin Marschalk with SRE Building Associates that our services were not needed at the scheduled time. Future testing will be scheduled with our office. 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 6/20/2017 Concrete Field Observation Reports/ Compressive Strength 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameApril 11, 2017 17-6510 SRE Justin 4 1 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: May 9, 2017 17-6510 April 11, 2017 SRE Justin Hendrick Rogelio Casey 7.0 3/8 F 70/30 2" 8 Cloudy, 40's Pump Vibration Foundation footings Foundation footing along west wall, 5' to 15' N of SW corner and north wall footing 3,000 N/A 4 +/-1 50-90 7 35' N, 5' W of SE corner of lower level 43 309845 12:41 pm 2:10 pm 5 1.8 65 142.7 0 309845 4 5062 4.00 12.57 52,540 4,180 4/18/17 7 5 4.00 12.57 67,100 5,340 5/9/17 28 5 4.00 12.57 69,410 5,520 5/9/17 28 5 4.00 12.57 65,710 5,230 5/9/17 28 5 5,360 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameApril 19, 2017 17-6510 SRE Justin 4 1 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: May 17, 2017 17-6510 April 19, 2017 SRE Justin Hendrick Rogelio Casey 7.0 3/8 F 70/30 2" 10 Cloudy, 40's Pump Vibration Foundation walls Foundation walls along west wall, 5' to 15' N of SW corner and north wall footing 3,000 N/A 4 +/-1 50-90 8 10' S, 5' W of NE corner of lower level 46 309924 9:44 am 11:15 am 4 1/2 2.2 70 143.1 0 309924 4 5075 4.00 12.57 54,020 4,300 4/26/17 7 5 4.00 12.57 73,810 5,870 5/17/17 28 5 4.00 12.57 72,100 5,740 5/17/17 28 5 4.00 12.57 72,190 5,740 5/17/17 28 5 5,780 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor: General Contractor Rep. Notified: Rep Notified Job Number Concrete Cover Report Date: Date Job Number: Job NameMay 3, 2017 17-6510 SRE N/A 4 1 Chris Leeper 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor: Earthwork Contractor Rep. Notified: Rep Notified Report Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F) (pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No. Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: May 31, 2017 17-6510 May 3, 2017 SRE N/A Hendrick Rogelio Casey 7.0 3/8 F 70/30 2" 6.5 Cloudy, 50's Pump Vibration Foundation footing Unit 11 north foundation footing and east wall footing 3,000 N/A 4 +/-1 50-90 9 3' E of NW corner of Unit 11 146 310080 10:16 am11:30 am 5 1.7 63 144.4 6 310080 4 5103 4.00 12.57 45,810 3,640 5/10/17 7 3 4.00 12.57 68,100 5,420 5/31/17 28 5 4.00 12.57 67,640 5,380 5/31/17 28 5 4.00 12.57 69,100 5,500 5/31/17 28 5 5,430 Chris Leeper Concrete arrived 30 minutes late. 06/26/18 Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 6/20/2017 Soils: Waterline Field Observation Reports 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Outstanding Discrepancies Reported this Date? Density / Moisture Nuclear Gauge Number: Standard Counts: No. of Samples Collected: Lab Sample Location: Lab Sample Location: No. of Pages Attached: Field Representative: Soil Cover Report As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. No Date: Job Number: General Contractor: Rep. Notified: Date Yes June 14, 2017 17-6510 SRE Building Associates Justin Marschalk 63 2041/704 0 N/A N/A 1 Matty Baldwin 06/26/18 Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 to Standard Proctor Field Technician: Modified Proctor Comments: of Optimum Moisture ContentSpecifications: Min. % Max. Dry Density and from Nuclear Soil Density and Moisture Content Test No.Test Location Elevation Field Wet Density Field Dry Density Field Moisture Content Proctor Max Dry Density Proctor Optimum Moisture Comp- action Pass or Fail Soil Type (feet) (pcf) (pcf) (%) (pcf) (%) (%) Equipment Utilized: Equipment Utilized Area Represented: Area represented Earthwork Contractor: Earthwork Contractor Rep. Notified: Rep Notified Date: Date Job Number: Job Name General Contractor: General Contractor Rep. Notified: Rep Notified Job NumberReport Type: June 14, 2017 17-6510 Waterline Backfill SRE Building Associates Justin Marschalk Ewing Trucking & Construction Rigo Excavator, Sheeps foot roller, jumping jack 10' S of front door to waterline tie-in 95 -2 +2 1 4' N of waterline 8' BG 137.1 127.8 7.3 134.4 6.8 95.1 Pass Class 6 2 5' N of waterline 6' BG 136.1 128.3 6.1 134.4 6.8 95.5 Pass Class 6 3 6' N of waterline 4' BG 136.9 129.3 5.9 134.4 6.8 96.2 Pass Class 6 4 5' N of waterline 2' BG 135.7 128.5 5.6 134.4 6.8 95.6 Pass Class 6 Matty Baldwin 06/26/18