HomeMy WebLinkAboutB05-0104TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
qck
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PROJECT TITLE:
NEW (SFR,P/S,DUP) PERMIT Permit B05-0104
Job Address: 1807 ALPINE DR VAIL Status . ..: FINAL
Location.....: 1807 ALPINE DR Applied ..: 05/17/2005
Parcel No...: 210312307014 Issued . .. 06/20/2005
Project No PRJ05-0005 Expires . .: 07/10/2007
OWNER RAIOLA, MILDRED J.
C/O MJ RAIOLA
2448 GARMISCH AVE 11
VAIL
CO 81657
APPLICANT RAIOLA,M. JAY
2448 GARMISCH #11
VAIL
COLORADO 81657
License: 345-L
CONTRACTOR RAIOLA,M. JAY
2448 GARMISCH #11
VAIL
COLORADO 81657
License: 345-L
Desciption: RAIOLA NEW SFR
Occupancy Type
Dwellings Zone 1 V-N
Totals...
Number of Dwelling Units: I
05/17/2005 Phone: 471-0618
05/17/2005 Phone: 477-1984
05/17/2005 Phone: 477-1984
Factor Sq Feet Valuation
81.50 4,112 $335,128.00
4,112 $500,000.00*
Town of Vail Adjusted Valuation: $500,000.00
Fireplace Information: Restricted: Y # of Gas Appliances: 1 # of Gas Logs: 2 # of Wood Pallet: 0
*r*?t**************a******r*t******t**s*r*ts?**r**+********r**** FEE S UMMARY t**t*s*+****+*s**+*****,****rr***t***a**s*r*******rr+******
Building ----- -> $3,233.75 Restuarant Plan Review--> $0.00 Total Calculated Fees-----> $5,955.49
Plan Check ---> $2,101.94 Recreation Fee------------ > $616.80 Additional Fees ------------- > $0.00
Investigation-> $0.00 TOTAL FEES---- $5,955.49 Total Permit Fee------------ > $5,955.49
Will Call-----> $3.00 Payments -------------------- > $5,955.49
BALANCE DUE--------- > $0.00
**?*rs***??***?****r+«*t****«****r?**r******r?***s**r*?*t**?*********?**r**********a**??*****s**s?********:v.??***¦**a**s¦*rv*:**a*?s*:r**s?s*?r+***
Approvals:
Item: 05100 BUILDING DEPARTMENT
06/08/2005 cgunion Action: CR comments in
F:\cdev\CHRIS\PERMIT.COMMENTS\B05-0104.DOC
06/17/2005 cgunion Action: AP corrected plans approved.
03/17/2006 cdavis Action: AP As built structural plans appoved with eng:
record letter
Item: 05400 PLANNING DEPARTMENT
06/02/2005 ee Action: COND
Item: 05600 FIRE DEPARTMENT
05/27/2005 mvaughan Action: AP Require stairs for access ott street side
access and monitored fire alarm system
Item: 05500 PUBLIC WORKS
06/20/2005 gc Action: COND Must have staging plan that is approved by
NO road closuers.
Item: 05550 ENGINEERING CIVILS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
PAGE 2
CONDITIONS OF APPROVAL
Permit #: B05-0104 as of 02-24-2009 Status: FINAL
Permit Type: NEW (SFR,P/S,DUP) PERMIT
Applicant: RAIOLA,M. JAY
Job Address: 1807 ALPINE DR VAIL
Applied: 05/17/2005
Issued: 06/20/2005
Location: 1807 ALPINE DR
Parcel No: 210312307014
CONDITIONS
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT SURVEY. SUCH SURVEY SHALL
BE SUBMITTED AND APPROVED PRIOR TO REQUEST FOR A FRAME INSPECTION.
Entry: 06/02/2005 By: ee Action: COND New foundation plan sheet
approved on 060205 shall be stamped by an architect and engineer if
required by the building department
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
03/14/2006 16.28 FAX 7194868220
DALE I WIBBENM EYE R.
P.O. Box 1005
Leadville, CO 80461
Date: March 14, 2006
To: Charlie Davis, Town of Vail Community Development Department
From: Dale Wibbenmeyer, Engineer
Re: Raiola Residence, 1807 Alpine Drive, Vail, Pen-nit #1305-0104
?001/001
The following addresses item 10 of the Framing Inspection Report dated 3/1/06 and also
the support for the 3-ply truss in the garage:
10) Furred wall in lower level is bearing wall.
The 2" x 4" furred wall in the lower level is acceptable to support the floor framing for
the master suite. b t t ? c ? 1 O to ?c tf I
446 C. 14 C'N $-I W yn, fir
Provide (2) - 2" x 6" studs under each end of the 3-ply truss in the garage roof.
nu.
olol
R
J W (0 TU Izzs
6001 W: F
* = ?nrk tic. + r7 E.
•
6W ST "t 1.
u,s/ 1 1/zwb 14.01 rnx r 1d4bbuzzv
d4q
DALE J. WIBBENMEYER
P.O. Box 1005
Leadville, CO 80461
Date: March 11, 2006
To: Charlie Davis, Town of Vail Community Development Department
From: Dale Wibbenmeyer, Engineer
Re: Raiola Residence, 1807 Alpine Drive, Vail, Permit #B05-0104
10001/001
The following addresses items 2., 3., 9. and 10. of the Framing Inspection Report dated
3/1/06:
2. Roof framing in study, kitchen, dining not per plan. ,
The roof framing is adequate without the collar ties in the study and with the collar ties ?/
raised in the kitchen and dining room.
3) Ladder framing shown at 16" OC, as built is 24" OC. /
The 2"x6" lookout ladder framing at 24" OC is adequate. zl
9) TJl's spect BCI's as built.
T..h&ACI 450's are acceptable. ZZ
10) F ed wall in lower level is bearing wall-
urred wall in the lower level is acceptable to support the floor framing for the master
suite as shown in Section - A on Drawing 7 of 14.
m ?i
;n 11-0 6
3 16
7//z/
S r)-? Cc
C'Lt(F
'Z- ?-e
Mar 03 06 03:40p Mildred Raiola 970-477-1984 p.2
TOV Framine Insnection Report 3/1/06 #BO5-0104
1) Truss shops do not reflect as built, loading on trusses is 40 psf, 3-ply girder truss not
shown. . I/
New truss drawings on site. Will note change on plans.
2) Roof framing in study, kitchen, dining not per plan.
Can I install collar ties above beam?
3) Ladder framing shown at 16" OC. as built`is 24" OC.
Where? On roof overhangs?--- C U (S Jfl. f
4) In bedroom 4 add 2x6 to fully bear eeTbeam. How is 16 %a GL attached to column &
steel beam in corner? L) C11 q
Add 2x6 where along beam?
5) At stairs, 11 7/8 LVL spect, 9 % LVL as built & nowhed.
Will note change on plans. 4-111? '•1 V4
*6) Check all sill plate anchor bolts, some not tight, add bolts as needed in lower level.
Will do. -1)(,Iq C
7) I joists at Dbl LVL require hangers.
Where? In hall outside MA BR?
*8)13end &-nai1 tabs of hangers at 14".1.VT, MA RR. 'iV t. L. NCI
Will do.
9) TJI's spect BCI's as built. --, L. 1,4 C;, / 4)1' 0t -?-9
Aren't these the same? If not, shall I just note change on plans?
10) Furred wall in lower level is bearing wall. ?. . t
Can I add 2x4's to strengthen existing framing? `, i /z- c-
11) Deck at MA BR is not per plan.
Will note change on plans. f L
* 12) Grout column base. PCfi-
Where? L C
* 13) House is not dried in, roof leaking.
Corrected.
* 14) Deck framing requjms insnee iu
*All items required to be addressed by engineer, except 6,8,12,13,14.
a