Loading...
HomeMy WebLinkAbout14095-Comcheck Report-091217COMcheck Software Version 4.0.7.0 Envelope Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Vertical Glazing / Wall Area:30% Location:Vail, Colorado Climate Zone:6b Construction Site: 598 Vail Valley Drive Vail, CO 81657 Owner/Agent:Designer/Contractor: K.H. Webb Architecs, PC 710 West Lionshead Circle Suite A Vail, CO 81657 Project Information Energy Code: Ski & Snowboard Club of Vail Building Area Floor Area 1-Office : Nonresidential 43554 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]6374 ---30.0 0.032 0.032 Roof Deck: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]11052 ---30.0 0.032 0.032 AG Walls: Steel-Framed, 16" o.c., [Bldg. Use 1 - Office]18603 13.0 7.5 0.064 0.064 Windows: Metal Frame:Fixed, Perf. Specs.: Product ID na, SHGC 0.40, [Bldg. Use 1 - Office] (b) 4813 ------0.290 0.360 Glass Doors: Glass (> 50% glazing):Metal Frame, Non-Entrance Door, Perf. Specs.: Product ID na, SHGC 0.40, [Bldg. Use 1 - Office] (b) 771 ------0.290 0.770 Solid Doors: Wood, Swinging, [Bldg. Use 1 - Office]518 ------0.290 0.370 BG Walls: Solid Concrete:8" Thickness, Normal Density, Furring: None, Wall Ht 11.0, Depth B.G. 11.0, [Bldg. Use 1 - Office] 7082 ---7.5 0.113 0.108 Garage Slab: Slab-On-Grade:Unheated, Horizontal without vertical 2 ft., [Bldg. Use 1 - Office] (c) 66 ---10.0 0.700 0.540 Floor Above Outside Air: Steel Joist, [Bldg. Use 1 - Office]3324 38.0 0.0 0.032 0.033 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Notes Calcs by: Joey Brenner - Rader Engineering (970)-845-7910 Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 281 ofPage 9/12/17 Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 0.1% better than code Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 282 ofPage Joey Brenner - Mechanical Engineer 9/12/17 COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Location:Vail, Colorado Climate Zone:6b Construction Site: 598 Vail Valley Drive Vail, CO 81657 Owner/Agent:Designer/Contractor: K.H. Webb Architecs, PC 710 West Lionshead Circle Suite A Vail, CO 81657 Project Information Energy Code: Ski & Snowboard Club of Vail Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package Mechanical Systems List Quantity System Type & Description Heating: 1 each - Radiant Heater, Hot Water, Capacity = 107 kBtu/h No minimum efficiency requirement applies Fan System: None 1 PR-1 2 Panel Radiators (Single Zone): Heating: 1 each - Hydronic or Steam Coil (FC-1), Hot Water, Capacity = 80 kBtu/h No minimum efficiency requirement applies Fan System: FC-1 | Club Room -- Compliance (Motor nameplate HP method) : Passes Fans: FC 1 Supply, Constant Volume, 2250 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade 1 FC-1 Fan Coil (Single Zone): Heating: 1 each - Hydronic or Steam Coil (FC-2), Hot Water, Capacity = 75 kBtu/h No minimum efficiency requirement applies Fan System: FC-2 | Gym -- Compliance (Motor nameplate HP method) : Passes Fans: FC 2 Supply, Constant Volume, 1500 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade 1 FC-2 Fan Coil (Single Zone): Heating: 1 each - Hydronic or Steam Coil (FC-3), Hot Water, Capacity = 29 kBtu/h No minimum efficiency requirement applies Fan System: FC-3 | Board Room -- Compliance (Motor nameplate HP method) : Passes Fans: FC 3 Supply, Constant Volume, 700 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade 1 FC-3 Fan Coil (Single Zone): Heating: 1 each - Hydronic or Steam Coil (MAU-1), Hot Water, Capacity = 190 kBtu/h No minimum efficiency requirement applies Fan System: MAU-1 | Ski Tuning Make-Up Air -- Compliance (Motor nameplate HP method) : Passes Fans: MAU 1 Supply, Constant Volume, 2200 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade 1 MAU-1 Make-Up Air Unit (Single Zone): Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 283 ofPage Quantity System Type & Description Heating: 5 each - Unit Heater (GUH-1), Hot Water, Capacity = 52 kBtu/h No minimum efficiency requirement applies Fan System: GUH-1 Fan | Garage -- Compliance (Motor nameplate HP method) : Passes Fans: GUH 1 Fan Supply, Constant Volume, 2200 CFM, 0.3 motor nameplate hp, 0.9 fan efficiency grade 1 GUH-1 Garage Unit Heater (Unknown): Heating: 3 each - Unit Heater (UH-1), Hot Water, Capacity = 7 kBtu/h No minimum efficiency requirement applies Fan System: UH-1 | Mechanical Rooms, Storage -- Compliance (Motor nameplate HP method) : Passes Fans: UH 1 Supply, Constant Volume, 395 CFM, 0.0 motor nameplate hp, 0.0 fan efficiency grade 1 UH-1 Unit Heater (Unknown): Heating: 4 each - Unit Heater (UH-2), Hot Water, Capacity = 15 kBtu/h No minimum efficiency requirement applies Fan System: UH-2 | Mech Shop & Storage -- Compliance (Motor nameplate HP method) : Passes Fans: UH 2 Supply, Constant Volume, 550 CFM, 0.0 motor nameplate hp, 0.0 fan efficiency grade 1 UH-2 Unit Heater (Unknown): Heating: 1 each - Unit Heater (UH-3), Hot Water, Capacity = 64 kBtu/h No minimum efficiency requirement applies Fan System: UH-3 | Boiler Room -- Compliance (Motor nameplate HP method) : Passes Fans: UH 3 Supply, Constant Volume, 2600 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade 1 UH-3 Unit Heater (Unknown): Heating: 15 each - Unit Heater (CUH-1), Hot Water, Capacity = 9 kBtu/h No minimum efficiency requirement applies Fan System: CUH-1 | Club Level -- Compliance (Motor nameplate HP method) : Passes Fans: CUH 1 Supply, Constant Volume, 230 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade 1 CUH-1 Cabinet Unit Heater (Unknown): Heating: 1 each - Unit Heater (CUH-2), Hot Water, Capacity = 17 kBtu/h No minimum efficiency requirement applies Fan System: CUH-2 | Reception Hall -- Compliance (Motor nameplate HP method) : Passes Fans: CUH 2 Supply, Constant Volume, 430 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade 1 CUH-2 Cabinet Unit Heater (Unknown): Heating: Hot Water Boiler, Capacity 2000 kBtu/h, Gas Proposed Efficiency: 92.00 % Et, Required Efficiency: 80.00 % Et 2 B-1 & B-2 Boilers (Common): Heating: Hot Water Boiler, Capacity 600 kBtu/h, Gas Proposed Efficiency: 97.00 % Et, Required Efficiency: 80.00 % Et 2 B-3 & 4 Boilers (Club): Gas Storage Water Heater, Capacity: 113 gallons, Input Rating: 75 kBtu/h w/ Circulation Pump Proposed Efficiency: 90.00 EF, Required Efficiency: 0.46 EF 3 WH-1, 2, & 3 Water Heaters: Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 284 ofPage Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 285 ofPage Joey Brenner - Mechanical Engineer 9/12/17 Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.7.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C103.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable C103.2 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 286 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO2]2 Below-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C402.1.4 [FO1]2 Below-grade wall insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.5 [FO3]2 Slab edge insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [FO12]3 Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C403.2.4. 5, C403.2.4. 6 [FO9]3 Snow/ice melting system sensors for future connection to controls. Freeze protection systems have automatic controls installed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 287 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.4 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 2.2 [FR20]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and average assembly air leakage <= 0.04 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.2, C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable C402.5.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 288 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 289 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.6.1, C404.6.2 [PL3]1 Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2810 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2811 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2812 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2813 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2814 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.2.6 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable C402.5.5, C403.2.4. 3 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable C403.2.12 .1 [ME65]3 HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.12 .3 [ME117]2 Fans have efficiency grade (FEG) >= 67. The total efficiency of the fan at the design point of operation <= 15% of maximum total efficiency of the fan. Complies Does Not Not Observable Not Applicable C403.2.13 [ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable C403.2.3 [ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.5. 1 [ME114]2 Hot water boilers supplying heat via one- or two-pipe systems include outdoor setback control. Complies Does Not Not Observable Not Applicable C403.2.5. 1 [ME114]2 Hot water boilers supplying heat via one- or two-pipe systems include outdoor setback control. Complies Does Not Not Observable Not Applicable C403.2.6. 1 [ME59]1 Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable C403.2.6. 2 [ME115]3 Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. Complies Does Not Not Observable Not Applicable C403.2.7 [ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.7(1) and C403.2.7(2). Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2815 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.8 [ME116]3 Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Complies Does Not Not Observable Not Applicable C403.2.9 [ME60]2 HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C403.2.9 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2816 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.9. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.4.2 [ME69]3 Temperature reset by representative building loads in pumping systems for chiller and boiler systems >500,000 Btu/h. Complies Does Not Not Observable Not Applicable C403.4.2 [ME69]3 Temperature reset by representative building loads in pumping systems for chiller and boiler systems >500,000 Btu/h. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2817 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.2. 1 [ME50]2 Three-pipe hydronic systems using a common return for hot and chilled water are not used. Complies Does Not Not Observable Not Applicable C403.4.2. 2 [ME64]2 Two-pipe hydronic systems using a common distribution system have controls to allow a deadband >=15 ºF, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 ºF. Complies Does Not Not Observable Not Applicable C403.4.2. 2 [ME64]2 Two-pipe hydronic systems using a common distribution system have controls to allow a deadband >=15 ºF, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 ºF. Complies Does Not Not Observable Not Applicable C403.4.2. 4 [ME68]3 Hydronic systems greater than 500,000 Btu/h designed for variable fluid flow. Complies Does Not Not Observable Not Applicable C403.4.2. 4 [ME68]3 Hydronic systems greater than 500,000 Btu/h designed for variable fluid flow. Complies Does Not Not Observable Not Applicable C403.4.2. 5 [ME107]3 System turndown requirement met through multiple single-input boilers, one or more modulating boilers, or a combination of single-input and modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has 3:1 turndown ratio, boiler input between 5.0 MBtu/h and 10 MBtu/h has 4:1 turndown ratio, boiler input > 10.0 MBtu/h has 5:1 turndown ratio. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2818 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable C403.4.2. 6 [ME26]3 Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2819 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2820 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C403.4.5 [ME31]3 Condenser heat recovery system that can heat water to 85 ºF or provide 60% of peak heat rejection is installed for preheating of service hot water. Complies Does Not Not Observable Not Applicable C404.2.1 [ME111]2 Gas-fired water-heating equipment installed in new buildings: where a singular piece of water-heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water-heating equipment serve the building with combined rating >= 1,000 kBtu/h, the combined input- capacity-weighted-average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 100 kBtu/h. Complies Does Not Not Observable Not Applicable C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2821 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable C408.2.2. 2 [ME54]3 HVAC hydronic heating and cooling coils have means to balance and have pressure test connections. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2822 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2, C402.2.4 [IN9]2 Floor insulation installed per manufacturer’s instructions. Cavity or structural slab insulation installed in permanent contact with underside of decking or structural slabs. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C402.2.1 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable C402.2.3 [IN6]1 Above-grade wall insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.5 [IN8]2 Floor insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C402.4.2. 2 [IN2]1 Roof R-value. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2823 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 3 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C402.5.3 [FI51]3 Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms are sealed and insulated. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo doors. Complies Does Not Not Observable Not Applicable C402.5.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable C403.2.2 [FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2824 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1.2 [FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable C403.2.4. 1.3 [FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable C403.2.4. 2 [FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable C403.2.4. 2.1, C403.2.4. 2.2 [FI40]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2825 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C404.3 [FI11]3 Heat traps installed on supply and discharge piping of non-circulating systems. Complies Does Not Not Observable Not Applicable C404.4 [FI25]2 All piping insulated in accordance with section details and Table C403.2.10. Complies Does Not Not Observable Not Applicable C404.6.1 [FI12]3 Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2826 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C408.2.1 [FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.3. 1 [FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable C408.2.3. 2 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable C408.2.4 [FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.5. 1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.2.5. 3 [FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable C408.2.5. 4 [FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2827 ofPage Project Title: Data filename: Ski & Snowboard Club of Vail J:\Jobs\2014 - Jobs\14095.00 - SS Club Vail\Mechanical\Calculations\COMCheck\14095-Comcheck- JCB.cck 09/12/17Report date: 2828 ofPage