Loading...
HomeMy WebLinkAboutApproved PlansScale Date Drawn By Project Number 9/15/2017 5:38:43 PMG100 COVERSHEETSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 GENERAL NOTES: 1. DO NOT SCALE DRAWINGS. 2. VERIFY ALL DIMENSIONS, CONDITIONS, AND UTILITY LOCATIONS PRIOR TO BEGINNING ANY WORK OR ORDERING ANY MATERIALS. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES IN THE DOCUMENTS IMMEDIATELY. 3. AREAS OF CONFLICTS OR DISCREPANCIES MUST BE FULLY RESOLVED WITH WRITTEN APPROVAL FROM THE ARCHITECTS BEFORE CONSTRUCTION CONTINUES IN THESE PARTICULAR AREAS. 4. PLAN DIMENSIONS ARE TO FACE OF STUD, CENTERLINE OF STEEL, TIMBER, STUD COLUMNS, OR FACE OF CONCRETE UNLESS OTHERWISE NOTED. SECTION AND ELEVATION DIMENSIONS ARE TO TOP OF CONCRETE, TOP OF PLYWOOD, OR TOP OF WALL PLATES OR BEAMS UNLESS OTHERWISE NOTED. 5. PROVIDE ALL NECESSARY BLOCKING IN STUD WALLS AND CEILINGS. LOCATIONS INCLUDE BUT ARE NOT LIMITED TO CEILING AND WALL MOUNTED FIXTURES, TOILETS, TOILET ACCESSORIES, CABINETRY, COUNTERTOPS, SHELVES, CLOSET RODS AND FALSE BEAMS. 6. REFER TO FLOOR PLANS FOR DOOR LOCATIONS. REFER TO DOOR SCHEDULE FOR DOOR TYPES. 7. REFER TO FLOOR PLANS FOR WINDOW LOCATIONS. REFER TO WINDOW SCHEDULE FOR WINDOW TYPES. 8. COORDINATE ALL ELECTRICAL AND MECHANICAL FIXTURES TO FIT WITHIN CEILING FLOOR AND WALL SPACES. VERIFY WITH ARCHITECT WHEN DIVERTING FROM DRAWINGS. 9. IN THE EVENT THAT ADDITIONAL DETAILS OR GUIDANCE IS NEEDED BY THE CONTRACTOR FOR CONSTRUCTION OF ANY ASPECT OF THE PROJECT, THEY SHALL IMMEDIATELY NOTIFY THE ARCHITECT. FAILURE TO GIVE 10 DAY NOTICE TO ARCHITECT SHALL NOT CONSTITUTE A DELAY IN THE PROJECT. 10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL APPLICABLE CODES AND OBTAINING ALL PERMITS AND REQUIRED APPROVALS. THIS PROJECT IS GOVERNED BY THE IBC, IFC, IMC, IPC, NEC, ET AL. 2012 EDITIONS . COMPLIANCE IS MANDATORY. THE CONSTRUCTION DOCUMENTS SHALL NOT PERMIT WORK THAT DOES NOT CONFORM TO ALL RELEVANT CODES INCLUDING IN IBC AND ALL LOCAL AND REGIONAL CODES. 11. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FIELD COORDINATE AND OBTAIN APPROVALS FROM THE ARCHITECT/ENGINEER BEFORE ANY CUTTING, NOTCHING, OR DRILLING OF ANY CAST-IN-PLACE CONCRETE, STRUCTURAL FRAMING, OR ANY OTHER STRUCTURAL ELEMENTS WHICH MAY AFFECT THE STRUCTURAL INTEGRITY OF THE CONSTRUCTION. 12. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING GRADES AND SCALE OUT THE BUILDING FOOTPRINT FOR OWNER AND ARCHITECT APPROVAL PRIOR TO BEGINNING ANY SITE WORK. 13. THE OWNER HAS BEEN ADVISED THAT DUE TO HARSH WINTER CONDITIONS, ROOF & DECK SURFACES MUST BE MAINTAINED REASONABLE FREE OF ICE & SNOW TO ENSURE MINIMAL PROBLEMS WITH THESE SURFACES. 14. SUBSTITUTIONS OF "EQUAL" PRODUCTS WILL BE ACCEPTABLE WITH ARCHITECT'S WRITTEN APPROVAL. 15. IT IS THE INTENT AND MEANING OF THESE DOCUMENTS THAT THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR PROVIDE ALL LABOR, MATERIALS TRANSPORTATION, SUPPLIES, EQUIPMENT, ETC. TO OBTAIN A COMPLETE JOB WITHIN THE RECOGNIZED STANDARDS OF THE INDUSTRY. 16. ALL CONSTRUCTION IS TO FIT WITHIN THE BUILDING ENVELOPE AND/OR OUTSIDE SETBACKS WITHOUT CREATING EASEMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. 17. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. ALL UTILITIES SHALL BE LOCATED TO MINIMIZE EXCAVATION AND VEGETATION IMPACTS TO THE SITE. 18. THE GENERAL CONTRACTOR SHALL MINIMIZE THE LIMITS OF EXCAVATION AND TAKE ADEQUATE MEASURES TO PROTECT ALL VEGETATION BEYOND THE LIMITS OF EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED LANDSCAPE EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED LANDSCAPE. 19. THE SOILS REPORT IS AVAILABLE FROM OWNER'S SOILS ENGINEER. 20. GENERAL CONTRACTOR SHALL VERIFY ALL SITE DEVELOPMENT WITH LANDSCAPE CONSTRUCTION DOCUMENTS. THE SITE PLAN IS FOR GRADING AND LANDSCAPE PLAN IS FOR LAYOUT; ANY DISCREPANCIES VERIFY WITH ARCHITECT. ARCHITECT: K.H. WEBB ARCHITECTS P.C. 710 WEST LIONSHEAD CIR., SUITE A VAIL, CO 81657 PH. 970.477.2990 FX. 970.477.2965 heather@khwebb.com CONTACTS: KYLE H. WEBB / HEATHER BARRIE CODE: INTERNATIONAL BUILDING CODE 2015 ZONING: SKI BASE/RECREATION-2 OCCUPANCY CLASSIFICATION: CLUB: GROUP B, CONDOMINIUMS: R-2 BUILDING FULLY SPRINKLED CONSTRUCTION TYPE: TYPE II-A SEPARATION: 1 HOUR FIRE BARRIER GENERAL NOTES: PROJECT SUMMARY: PROJECT TEAM: SKI AND SNOWBOARD CLUB VAIL PERMIT CORRECTIONS - SEPTEMBER 15, 2017 CONTRACTOR: J.L. VIELE CONSTRUCTION 2111 N Frontage Road West SUITE E VAIL, CO 81657 PH. 970.476.3082 FX. 970.476.3423 DAVID VIELE/ LYN FARLEY LANDSCAPE ARCHITECT: DENNIS ANDERSON LANDSCAPE ARCHITECTURE PO BOX 1387 EDWARDS, CO 81632 PH. 970.926.7200 FX. 970.926.7201 CIVIL ENGINEER: MARTIN/MARTIN, INC. 225 MAIN STREET SUITE C101 EDWARDS, CO 81632 PH: 970.926.6007 CONTACT: MARK LUNA / JUSTIN YARNELL/ RYAN JOHNSON STRUCTURAL ENGINEER: MONROE & NEWELL ENGINEERS 70 BENCHMARK ROAD SUITE 204 PO BOX 1597 AVON, CO 81620 PH. 970.949.7768 CONTACT: HANNES SPAEH 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 P.E.C.03 P.E.C. RESUBMITTAL 9-26-14 MEP ENGINEER: RADER, INC PO BOX 8610 40690 HIGHWAY 6 SUITE E1 AVON, CO 81620 PH. 970.845.7910 CONTACT: BRYAN HOULE SHEET LIST SHEET # SHEET NAME 07.01.15 PERMIT09.15.2017 CORRH205 ROOF LEVEL HVAC PLAN X X P200U UNDERGROUND PIPING PLAN X X P200 GARAGE LEVEL PIPING PLAN X X P201 CLUB LEVEL ONE PIPING PLAN X X P202 CLUB LEVEL TWO PIPING PLAN X X P203 CONDO LEVEL THREE PIPING PLAN X X P204 CONDO LEVEL FOUR PIPING PLAN X X P205 ROOF LEVEL PIPING PLAN X X M300 MECHANICAL SCHEMATICS X X M301 MECHANICAL SCHEMATICS X X M302 MECHANICAL SCHEMATICS X X M400 MECHANICAL ZONING PLANS X X M500 1/4" SCALE DETAIL PLANS X X M600 MECHANICAL SPECIFICATIONS X X M601 SEQUENCE OF OPERATION X X ELECTRICAL E0.0 ELECTRICAL COVER SHEET X X E0.1 ELECTRICAL SITE PLAN X X E1.0 ELECTRICAL POWER PLAN - GARAGE X X E1.1 ELECTRICAL POWER PLAN - 1ST FLOOR X X E1.2 ELECTRICAL POWER PLAN - 2ND FLOOR X X E1.3 ELECTRICAL ROOF PLAN X X E2.0 ELECTRICAL LIGHTING PLAN - GARAGE X X E2.1 ELECTRICAL LIGHTING PLAN - 1ST FLOOR X X E2.2 ELECTRICAL LIGHTING PLAN - 2ND FLOOR X X E4.0 ELECTRICAL ONE-LI NE X X E5.0 ELECTRICAL SCHEDULES X X E6.0 ELECTRICAL SCHEDULES X X FIRE PROTECTION F000 FIRE PROTECTION & ALARM COVER SHEET X X F100 GARAGE FIRE PROTECTION PLAN X X F101 CLUB LEVEL ONE FLOOR PLAN X X F102 CLUB LEVEL TWO FLOOR PLAN X X F103 CONDOMINIUM LEVEL THREE FLOOR PLAN X X F104 CONDOMI NIUM LEVEL FOUR FLOOR PLAN X X SHEET LIST SHEET # SHEET NAME 07.01.15 PERMIT09.15.2017 CORRA404 WALL SECTIONS X X A405 WALL SECTIONS X X A406 WALL SECTIONS X X A407 WALL SECTIONS X X A408 WALL SECTIONS X X A501 EXTERIOR DETAILS X X A502 FOUNDATION DETAILS X X A503 EXTERIOR DETAILS X A504 EXTERIOR DETAILS X X A505 FLOOR TRANSITION DETAILS X X A550 INTERIOR DETAILS X A551 INTERIOR DETAILS X A570 PARTITION TYPES X X A571 BUILDING ASSEMBLIES X X A601 WINDOW TYPES X X A602 WINDOW TYPES AND SCHEDULES X A603 WINDOW DETAILS X X A701 ENLARGED EHU PLANS X X A702 ENLARGED CLUB LEVEL 1 PLANS X X A703 ENLARGED CLUB LEVEL 2 PLANS X X A704 TRASH ENCLOSURE X X A750 BALCONY PLANS AND DETAILS X X A751 EXTERIOR BALCONY DETAILS X A850 DOOR TYPES AND SCHEDULES X X A851 DOOR DETAILS X X A901 WEST STAIR PLANS AND SECTIONS X X A902 EAST STAIR PLANS AND SECTIONS X X A903 CENTRAL STAIR PLANS AND SECTIONS X X A904 STAIR PLANS AND SECTIONS X X A950 ELEVATOR 01 PLANS AND SECTIONS X X A951 ELEVATOR 02 PLANS AND SECTIONS X X A952 ELEVATOR 03 PLANS AND SECTIONS X X ARCHITECTURE A506 STANDARD MOUNTING HEIGHTS X X STRUCTURAL S200 GARAGE FOUNDATION AND FRAMING PLAN X X S201 CLUB LEVEL ONE FRAMING PLAN X X S202 CLUB LEVEL TWO FRAMING PLAN X X S203 CONDOMINIUM LEVEL THREE FRAMING PLAN X X S204 CONDOMINIUM LEVEL FOUR FRAMING PLAN X X S205 UPPER ROOF FRAMING PLAN X X S300 GENERAL NOTES X X S301 DETAILS X X S302 DETAILS X X S401 DETAILS X X S501 DETAILS X X S502 DETAILS X X S601 DETAILS X X S602 DETAILS X X S701 WALL LOADING DIAGRAM X X MECHANICAL/PLUMBING M000 MECHANICAL COVER SHEET X X M001 MECHANICAL SITE PLAN X X M100 MECHANICAL SCHEDULES X X M101 MECHANICAL SCHEDULES X X M102 MECHANICAL SCHEDULES X X H200 GARAGE LEVEL HVAC PLAN X X H201 CLUB LEVEL ONE HVAC PLAN X X H202 CLUB LEVEL TWO HVAC PLAN X X H203 CONDO LEVEL THREE HVAC PLAN X X H204 CONDO LEVEL FOUR HVAC PLAN X X SHEET LIST SHEET # SHEET NAME 07.01.15 PERMIT09.15.2017 CORRGENERAL G100 COVERSHEET X X G200 CODE SUMMARY X X G201 LIFE SAFETY PLANS X X G202 LIFE SAFETY PLANS X X G300 AREA PLANS X G400 COMCHECK REPORTS X G401 COMCHECK REPORTS X G402 COMCHECK REPORTS X G403 COMCHECK REPORTS X CIVIL C-01 GENERAL NOTES & LEGEND X X C-10 OVERALL SITE PLAN X X C-11 EXISTING COND'NS & DEMO PLAN X X C-12 EXISTING COND'NS & DEMO PLAN X X C-21 EROSION CONTROL PLAN (INITIAL) X X C-22 EROSION CONTORL PLAN (FINAL) X X C-31 DETAILED GRADING PLAN X X C-32 DETAILED GRADING PLAN X X C-33 DRIVE PLAN AND PROFILE X X C-50 OVERALL UTILITY PLAN X X C-61 STORM SEWER PLAN & PROFILE X X C-62 STORM SEWER PLAN & PROFILE X X C-63 PERIMETER DRAIN PLAN X X C-81 HORIZONTAL CONTROL PLAN X X C-82 HORIZONTAL CONTROL PLAN X X C-83 LINE & CURVE TABLES X X C-91 SIGNAGE, STRIPING & PAVING PLAN X X C-101 SITE DETAIL X X C-102 EROSION CONTROL DETAILS X X LANDSCAPE L-1 LANDSCAPE CONSTRUCTION PLAN X X L-2 LANDSCAPE CONSTRUCTION DETAILS X X L-3 PLANTING PLAN X X L-4 PLANTING NOTES AND DETAILS X X ARCHITECTURAL A100 GARAGE FLOOR PLAN X X A101 CLUB LEVEL ONE FLOOR PLAN X X A102 CLUB LEVEL TWO FLOOR PLAN X X A103 CONDOMINIUM LEVEL THREE FLOOR PLAN X X A104 CONDOMINIUM LEVEL FOUR FLOOR PLAN X X A105 ROOF PLAN X X A110 GARAGE LEVEL RCP X X A111 CLUB LEVEL ONE RCP X X A112 CLUB LEVEL TWO RCP X X A113 CONDOMINIUM LEVEL THREE RCP X A114 CONDOMINIUM LEVEL FOUR RCP X A150 GARAGE LEVEL DIMENSION PLAN X X A151 CLUB LEVEL ONE DIMENSION PLAN X X A152 CLUB LEVEL TWO DIMENSION PLAN X X A153 CONDOMINIUM LEVEL THREE DIMENSION PLAN X A154 CONDOMINIUM LEVEL FOUR DIMENSION PLAN X A201 NORTH AND WEST ELEVATIONS X X A202 SOUTH AND EAST ELEVATIONS X X A203 MISC. EXTERIOR ELEVATIONS X X A301 BUILDING SECTIONS X X A302 BUILDING SECTIONS X X A401 WALL SECTIONS X X A402 WALL SECTIONS X X A403 WALL SECTIONS X X 04 COORDINATION SET 4-24-15 05 PERMIT 7-1-15 No. Description Date FIRE SAFETY: SHANER LIFE SAFETY PO BOX 1073 FRISCO, CO 80443 PH: 970.409.9082 CONTACT: DEBORAH SHANER DSHANER@SHANERLIFESAFETY.COM 06 BLDG.PERMIT CORR. 9-15-17 ELECTRICAL ENGINEER: AE DESIGN 1900 WAZEE ST. #205 DENVER, CO 80202 PH.720.683.6861 CONTACT: BRYAN JASS PW Conditions of Approval: -Revocable ROW permit will be required for all private improvements in the Town ROW. -Public Way permit and staging plan will be required for all work/staging/access in the Town ROW. This shall inlcude how ski club Vail will operate during construction. -Town of Vail Snowmelt Maintenance Agreement shall be signed prior to issuance of a CO/TCO. 10/24/17 Scale Date Drawn By Project Number 9/15/2017 5:22:24 PMG200 CODE SUMMARYSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 04 COORDINATION SET 4-24-15 05 PERMIT 7-1-15 No. Description Date 06 BLDG.PERMIT CORR. 9-15-17 Fire sprinkler system and monitored fire alarm system required to be installed IFC 2015, NFPA 72 and NFPA 13. 10/24/17 ROUTE A ROUTE AROUTE BROUTE AROUTE A ROUTE B ROUTE AROUTE AROUTE AROUTE AROUTE B ROUTE B ROUTE BROUTE A ROUTE A ROUTE AROUTE A ROUTE A ROUTE A ROUTE A / B ROUTE A ROUTE B ROUTE A ROUT E A ROUTE AROUTE B ROUTE B ROUTE B ROUTE A ROUTE A 172' TO WEST PROTECTED EGRESS 243' TO NORTH PUBLIC WAY 122' TO EAST PROTECTED EGRESS 194' TO NORTH PUBLIC WAY VAN PARKING RT A - 220' TO PUBLIC WAY RT B - 166' TO PUBLIC WAY RT A - 130' TO PUBLIC WAY RT B - 144' TO PUBLIC WAY RT A - 230' TO PUBLIC WAY RT B - 150' TO PUBLIC WAY PROTECTED EGRESS FROM GARAGE, CONDO AND CLUB LEVELS PROTECTED EGRESS FROM GARAGE CLUB AND CONDO LEVELS PROTECTED EGRESS FROM CONDO AND CLUB LEVELS34' - 8 3/8"8' - 7" 44' TO PROTECTED EGRESS 102' TO PROTECTED EGRESS RT A - 102' TO PROTECTED EGRESS RT B - 64' TO PROTECTED EGRESS RT A - 125' TO PROTECTED EGRESS RT B - 146' TO PROTECTED EGRESS EGRESS EXIT EGRESS PATH 1HR ASSEMBLY: 2HR ASSEMBLY: LIFE SAFETY LEGNED 45 MIN. DOORS WITH SELF OR AUTOMATIC CLOSING AND LATCHING 90 MIN. DOORS WITH SELF OR AUTOMATIC CLOSING AND LATCHING RT B - 138' TO PROTECTED EGRESS FROM LEVEL 4 RT A - 32' TO PROTECTED EGRESS RT B - 112' TO PROTECTED EGRESS RT A - 124' TO PROTECTED EGRESS RT B - 162' TO PROTECTED EGRESS RT A - 179' TO PROTECTED EGRESS FROM LEVEL 4 Scale Date Drawn By Project Number 3/32" = 1'-0"9/15/2017 5:23:16 PMG201 LIFE SAFETY PLANSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/32" = 1'-0" 1 GARAGE CODE PLAN 04 COORDINATION SET 4-24-15 3/32" = 1'-0" 2 CLUB LEVEL 1 CODE PLAN 05 PERMIT 7-1-15 3/32" = 1'-0" 3 CLUB LEVEL 2 CODE PLAN 3/32" = 1'-0" 4 CONDOMINIUM LEVEL 3 CODE PLAN No. Description Date 06 BLDG.PERMIT CORR. 9-15-17 10/24/17 ROUTE AROUTE B ROUTE AROUTE BROUTE ART A - 98' TO PROTECTED EGRESS RT B - 138' TO PROTECTED EGRESS RT A - 69' TO PROTECTED EGRESS RT B - 179' TO PROTECTED EGRESS LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" CONDOMINIUM 3B 245 RECEPTION HALL 201 BOARD ROOM 202 BREEZEWAY 101 ALPINE TUNING 126 TECH SHOP G04 GARAGE G01 S-2 / S-1 / R-2 B / S-1 B / A-2 R-2 R-2 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" S-2 / S-1 / R-2 B / S-1 B / A-2 R-2 R-2 EGRESS EXIT EGRESS PATH 1HR ASSEMBLY: 2HR ASSEMBLY: LIFE SAFETY LEGNED 45 MIN. DOORS WITH SELF OR AUTOMATIC CLOSING AND LATCHING 90 MIN. DOORS WITH SELF OR AUTOMATIC CLOSING AND LATCHING Scale Date Drawn By Project Number As indicated 9/15/2017 5:24:53 PMG202 LIFE SAFETY PLANSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/32" = 1'-0" 3 CONDOMINIUM LEVEL 4 CODE PLAN 1/8" = 1'-0" 1 CODE SECTION 01 1/8" = 1'-0" 2 CODE SECTION 02 01 PERMIT 07.01.15 No. Description Date 06 BLDG.PERMIT CORR. 9-15-17 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" C E F H JB G A C .1 MECH. 140' - 0" B.3 S-2 / S-1 / R-2 B / S-1 B / A-2 R-2 R-2 1HR SEPARATION 2HR SEPARATION D LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" Level 5 139' - 0" 1 4 5 63 1.1 1.20.1 T.O. CHIMNEY 149' - 0" MECH. 140' - 0" GARAGE G01 BOILER ROOM G09 EAST STAIR ES0 CENTRAL STAIR CS1BREEZEWAY 101 CLUB ROOM 207 EAST STAIR ES1 ALPINE COACHES WORK STATIONS 102 MECH 209 ELEV. VEST. 152 CONDOMINIUM 3A 167 CONDO 4 169 ACROBATICS WORK 137 RR 212 RR 213 COACH LOUNGE 223 ADMIN AND WORKSPACES 214 MECH G02 EL. VEST 237 CONDOMINIUM 3B 245 WEST BREEZEWAY 116 EAST ELEV VEST 235 S-2 / S-1 / R-2 B / S-1 B / A-2 R-2 R-2 1HR SEPARATION 2HR SEPARATION 2 Scale Date Drawn By Project Number 1/8" = 1'-0"8/17/2016 3:25:07 PMG203 LIFE SAFETY SECTIONSSKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/8" = 1'-0"1 Transverse Section - CODE 1/8" = 1'-0" 2 Longitudinal Section - CODE 05 PERMIT 7-1-15 No. Description Date 10/24/17 UP DN UP DNUP UP DN DN UP DN DN UP DN DN UP UP UP DN DN UP UP A202 1 1 4 5 63 4.1 1.1 1.2 0.1 C E F H J B G 10662 SF Area C .1 B.3A704 3 A704 6 A704 5 2 D 1 4 5 63 4.1 1.1 1.2 0.1 C E F H B G 7371 SF Area C .1 2564 SF CLUB ROOM B.3 2 D 1 4 5 63 4.1 1.1 1.2 0.1 C E F H B G C .1 3097 SF UNIT B 2912 SF UNIT A B.3 2 D 1 4 53 1.1 1.2 0.1 C E F G 2241 SF UNIT B C .1 1747 SF UNIT A B.3 2 D GARAGE AREA CALCULATIONS 13,482 SF CLUB LEVEL ONE CLUB LEVEL TWO CONDOMINIUM LEVEL THREE CONDOMINIUM LEVEL FOUR 10,626 SF 9926 SF 2,816 SF 1,747 SF UNIT A UNIT B 3,096 SF 2,241 SF CONDOMINIUM TOTALS CLUB TOTAL 22,552 SF 4,663 SF 5,537 SF RESIDENTIAL TOTAL 10,000 SF BUILDING TOTAL 45,447 SF EHUs 572 SF 1,213 SF 641 SF 1 4 5 63 4.1 1.1 1.2 0.1 C E F H J B G C .1 13483 SF GARAGE 572 SF EHU B641 SF EHU A B.3A704 3 A704 5 2 Scale Date Drawn By Project Number As indicated 8/17/2016 3:26:08 PMG300 AREA PLANSSKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 3/32" = 1'-0" 2 LEVEL 1 3/32" = 1'-0"3 LEVEL 2 3/32" = 1'-0" 4 LEVEL 3 3/32" = 1'-0"5 LEVEL 4 3/16" = 1'-0" AREA CALCULATIONS 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 3/32" = 1'-0"1 GARAGE 03 P.E.C. RESUBMITTAL 9-26-14 04 COORDINATION SET 4-24-15 05 PERMIT 7-1-15 No. Description Date 10/24/17 Scale Date Drawn By Project Number 8/17/2016 3:26:32 PMG400 COMCHECK REPORTS SKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 01 PERMIT 07.01.15 No. Description Date 10/24/17 Scale Date Drawn By Project Number 8/17/2016 3:26:59 PMG401 COMCHECK REPORTS SKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 01 PERMIT 07.01.15 No. Description Date 10/24/17 Scale Date Drawn By Project Number NOT FOR CONSTRUCTION 7/21/2015 10:36:23 AMG402 COMCHECK REPORTSSKI ANDSNOWBOARDCLUB VAIL 598 VAIL VALLEY DRIVEAuthor 07.01 .15 000000 No. Description Date 01 PERMIT 07.01.15 10/24/17 Scale Date Drawn By Project Number 8/17/2016 3:27:44 PMG403 COMCHECK REPORTS SKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 01 PERMIT 07.01.15 No. Description Date 10/24/17 UP UP UP DN DN REF.REF. A2022 A202 A201 A201 1 2 1 1 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A A GARAGE G01 ELEV. EQUIP G14 BOILER ROOM G09 EAST STAIR ES0 2 A301 2 A301 CLUB ELEVATOR VAN PARKING C .1 C .1 81' - 10 3/4" 48' - 8 1/4" 4 5 6 7 89 COMPACT 10 11 12 13 14 15 16 17 18 19 20 21 22 23 COMPACT 24 COMPACT 18' - 0" MECH G02 CLUB STORAGE G13 TECH ENTRANCE G03 EHU G16 EHU STUDIO - TYPE A UNIT G15 OFFICE G07 CLUB STORAGE G08 A701 1 A701 2 1 A401 1 A402 2 A402 2 A403 3 A403 1 A404 2 A404 1 A406 3 A407 A950 1 A901 1 A951 1 A902 1 MECH / JANITOR G05 LOCKERS G06 1 A407 3 A408 2 A407 G07 G03 G09 G14A G04 G08 ES-G G11 G01B G01A WEST STAIR WS0 30' - 8 5/8"2' - 0"19' - 9"28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8"48' - 2 5/8" 8' - 9" 17' - 2 1/8" 170' - 5 1/4" ELEV VEST G10 ELEV. EQ. G11 F.D. F.D. F.D. F.D. 7 A704 HOT BOX BELOW CHECK-IN 24' - 11 3/8"16' - 3 3/8"22' - 4 5/8"13' - 11 3/4" WATER ENTRY G12 EL. VEST 237 EL. MA. 238 35 80 80 80 80 33 33 73 73 73 80 80 80 80 80 73 73 73 80 TECH SHOP G04 F1 G05 G08 108N 108I D17 FDFD FD 4X8 WORK TABLE 4X8 WORK TABLE 4X8 WORK TABLE 4X8 WORK TABLE 4X8 WORK TABLE 4X8 WORK TABLE FUTURE TRIM S RS350 RACE NC FD FD FD FD A952 1 FD FD FD FD B.3 A704 3 A7044 A704 5 KS KS 88' - 0" 88' - 0" BOLLARD BOLLARD BOLLARD BOLLARD BOLLARD 24' - 10"23' - 8"2 12 3 0' - 9 5/8"7' - 4"5' - 9" FUTURE MAT'LS LIFT Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:56:20 PMA100 GARAGE FLOOR PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 GARAGE FLOOR PLAN 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 0' 2' 8' 16' 32' 4' 05 PERMIT 7-1-15 No. Description Date 1 Revision 1 Date 1 06 9-15-17BLDG.PERMIT CORR. 10/24/17 UP UP UP DN UP DN UP UP DN DN A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 2 A405 1 A406 3 A407 CENTRAL STAIR CS1 WEST STAIR WS1 BREEZEWAY 101 OLD PROPERTY LINE NEW PROPERTY LINE NEW PROPERTY LINE OLD PROPERTY LINE 42"H STEEL GUARDRAIL 42"H STONE COLUMN BASE PROPERTY LINE 10'-8""W DRIVE LANE STEEL COLUMNS EAST STAIR ES1 GAS AND ELEC. METERS ALPINE COACHES WORK STATIONS 102 RR 128 MECH. 150 ELEV. VEST. 152 STORAGE 134 ELECTRICAL 151 ACROBATICS WORK 137 TRASH/RECYLCING 154 STORAGE ELEV. VEST. STORAGE VENUE EQUIP. 132 SNOWBOARD / BOOT STORAGE 131 TUNING 130 RR 129 GATE SERVICE 119 TECH FITTING AND DROP-OFF 121 ALPINE STORAGE 124 TECH SERVICE CARTS 120 BOOT / SKI STORAGE 125 ALPINE TUNING 126 HALL 127 RR 135 RR 136 TEAM HUDDLE FILES FILES DETENTION VAULT A901 2 A950 2 A904 5 A903 1 A951 2 A904 1 A902 2 A952 2 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 44' - 8" 26' - 7 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0"19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" A201 1 A2022 121' - 0 1/8"3 A408 WMNS ACRO LOCKERS 148 MENS ACRO LOCKERS 145 F.D. F.D.F.D. F.D. F.D. F.D. F.D. F.D. F.D. F.D.F.D. F.D. 7 A704 2 A408 3X12 WORKBENCHCUBBIES 2X10 WORKBENCH F.D. MECH. 122 A702 1 80 4343 80 43 34 34 36 36 34 33 34 33 A702 3 F.D. F.D. JAN. 123 34 B.3 A501 8 A501 8 A501 4 1 A409 A704 1 MENS ALPINE LOCKERS 111 WMNS ALPINE LOCKERS 114 BREEZEWAY 101 SHOWERS SHOWERS 2 D D 3 A406 ALPINE DIRECTOR OFFICE 103 CONF 104 CONF. 105 OFFICE 106 OFFICE 107 CONF. 108 ATHLETIC DIR.OFFICE 109 SNOWBOARD OFFICE 138 CONF. 139 F.ST./F.SK. OFFICE 140 FREE SKI/STYLE DIR. OFFICE 142 F.ST./F.SK. OFFICE 141 Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:56:33 PMA101 CLUB LEVEL ONE FLOOR PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/8" = 1'-0" 1 CLUB LEVEL 1 FLOOR PLAN 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 DN DN REF. REF.REF. REF. DN UP DN DN UP 3 A301 3 A3011 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A CLUB ROOM 207 BOARD ROOM 202 WEST STAIR WS2 2 A301 2 A301 2 A302 2 A302 C .1 C .1 CONF. 218 TREATMENT 204 MECH 209 CONF. 226 DEV. MNGR. OFFICE 227 FINANCE OFFICE 219 G.M. OFFICE 220 BOOK KEEPER OFFICE 221 TRAVEL OFFICE 222 STOR/MECH 206 GYM 203 KITCHEN 205 KITCH. 216 RECEPTION HALL 201 RR 212 RR 213 MEETING 215 ADMIS. OFFICE 217 EXEC. OFFICE 225 EXEC. ASSIST. OFFICE 228 OPERATIONS MANAGER 229 COACH LOUNGE 223 ADMIN AND WORKSPACES 214 EVENT STOR 234 STORAGE 211 RR 224 EVENTS 230 COMPETITION OFFICE 231 RACE INFO DESK 233 STORAGE 208 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 2 A405 1 A408 1 A406 3 A407 A904 6 A901 3 A950 3 A903 2 A951 3 A902 3A952 3 A904 2 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"121' - 0 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 2 A408 MECH 232 2 A505 2 A505 22 A505 27 A505 JAN 210 36 X28 X28 33 33 33 3333 33 43 43 73 36 B.3 2 A406 3 A406 1 A409 2 A409 5' - 10 3/8"PATIO STAIR EAST 236 CLUB TERRACE 239 G1 G2 G10 G8 G9 G3 2 D Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:56:48 PMA102 CLUB LEVEL TWO FLOOR PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 1/8" = 1'-0" 1 CLUB LEVEL 2 FLOOR PLAN 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 DN DN UP UP UP A2022 A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H B G G A 2 A301 2 A301 2 A302 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 1 A405 1 A408 1 A406 3 A407 A203 4 A750 1 A750 2 A901 4 A950 4 A903 3 A951 4 A952 4 A902 4 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" A750 8 12570 12528 12485 12395 12396 12571 A750 6 A203 5 A602 3 2 A4088' - 9 1/4"CONDOMINIUM 3B 245 B.3 4" / 12" 4" / 12" 4" / 12" 4" / 12" 1 A409 2 A409 CONDOMINIUM 3A 167 2 D Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:56:58 PMA103 CONDOMINIUM LEVEL THREE FLOOR PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 1/8" = 1'-0" 1 CONDOMINIUM LEVEL 3 FLOOR PLAN 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 DN UPDN 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 C C E E F H H B G G A C .1 C .1 OPEN TO BELOW . . .. . . BALCONY BALCONY BALCONY 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" A750 3 A750 5 A750 4 A903 4 A952 6 A950 5 OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW B.3 36 36 36 26 26 2 D A2022 A202 A201 A201 1 2 1 3 A301 3 A301 1 A301 1 A301 2 A301 2 A301 2 A302 2 A302 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 2 A404 3 A404 1 A405 2 A405 1 A408 1 A406 3 A407 A203 4 A203 5 4 A408 Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:57:07 PMA104 CONDOMINIUM LEVEL FOUR FLOOR PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0"1 CONDOMINIUM LEVEL 4 FLOOR PLAN 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 05 PERMIT 7-1-15 No. Description Date 06 9-15-17 BLDG.PERMIT CORR. 10/24/17 REF. REF.REF. REF. A2022 A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 2 A302 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 1 A405 2 A405 1 A408 1 A406 3 A407 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"121' - 0 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12"4" / 12"4" / 12" 4" / 12" 4" / 12" A602 3 2 A408 4 A408 B.3 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 4" / 12" 1 A409 2 A4094" / 12"4" / 12" D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. R.D. R.D. R.D. R.D. R.D. R.D. R.D. 3" / 12"3" / 12" 4" / 12"4" / 12"MAN-CABLE TIE-OFF POST, TYP. RE: STRUCTURAL SNOWGUARD GUTTER SNOWGUARD GUTTER SNOWGUARD GUTTER SNOWGUARD GUTTER 45' - 2 7/8" 53' - 0 1/4" 44' - 0 7/8" 36' - 10 3/8" 36' - 10 1/2" 41' - 8 1/2" 45' - 2 3/4" 44' - 2 5/8" 52' - 11 3/4" 52' - 11 3/4" 52' - 11 3/4" 49' - 5 1/8" 2 D Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:57:23 PMA105 ROOF PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 1/8" = 1'-0" 1 ROOF PLAN 0' 2' 8' 16' 32' 4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 A201 1 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 C E E F H H J J B G A 2 A301 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 1 A405 1 A406 3 A407 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"19' - 9"42' - 9" 25' - 9 1/2" 3 A408 7 A704 B.3 A704 3 A7044 A704 6 A704 596' - 2 1/2" 97' - 7 1/2" 96' - 0" 97' - 4" 96' - 0" 97' - 2 1/2" 97' - 8 1/2"97' - 7 1/2" 96' - 2 1/2" 96' - 2 1/2" 96' - 7" 96' - 7" 96' - 3" 96' - 6 1/2" 96' - 3" 96' - 3" 98' - 7 1/2" 99' - 5 1/2" 99' - 5 1/2" 98' - 7 1/2" 2 D RCP LEGEND SKYLIGHT- LEVEL 4 ONLY RECESSED FLUORESCENT DOWNLIGHT FIXTURE FLUORESCENT WALL MOUNTED FIXTURE SURFACE MOUNTED FLUORESCENT FIXTURE LAY-IN FLUORESCENT FIXTURE DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE RE" MECH VINYL FACED ACOUSTICAL TILE GYP BOARD SOFFIT (INTERIORS) GYP SOFFIT BOARD (EXTERIORS)- ASTM -C931 EXPOSED CONCRETE DECK OR FIRE RATED LID SURFACE MOUNTED FLUORESCENT FIXTURE PAINT CUSTOM COLOR - P21 DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE FOIL FACED BATTS PINNED TO STRUCTURE; R-19. TAPE JOINTS DRYER AND TOILET VENT LAYOUT PATH Scale Date Drawn By Project Number As indicated 9/15/2017 4:57:46 PMA110 GARAGE LEVEL RCPSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 GARAGE REFLECTED CEILING PLAN 02 P.E.C. RESUBMITTAL AUG 25, 2014 0' 2' 8' 16' 32' 4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) RCP NOTES 1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT FIXTURES, AND ASSOCIATED ITEMS. REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL ELECTRICAL, HVAC, SPRINKLER AND LIFE SAFETY. IN THE EVENT OF DISCREPANCIES BETWEEN THE DESIGNER'S REFLECTED CEILING PLAN AND THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE DESIGNER IN WRITING BEFORE ORDERING MATERIALS OR PROCEEDING WITH WORK. 2. COORDINATE ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON THE DESIGNERS' DRAWINGS. 3. ANY ACCESS HATCHES NOT SHOWN ON THE CEILING PLAN BUT REQUIRED BY PLUMBING, MECHANICAL, OR ELECTRICAL SYSTEMS SHALL BE REVIEWED WITH ARCHITECT FOR LOCATION. 4. CONTRACTOR TO COORDINATE LOCATION OF FIRE SPRINKLER HEADS. 5. NEW CONSTRUCTION: ALL LIGHT FIXTURES, EXIT SIGNS, SPRINKLER HEADS & OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.O.N. 6. CENTER ALL NEW ACOUSTICAL CEILING GRID WITHIN THE ROOM UNLESS OTHERWISE NOTED. 7. ALL NEW GYPSUM BOARD SOFFITS AND CEILINGS ARE TO BE PAINTED P22 UNLESS OTHERWISE NOTED. 8. PAINT ALL EXPOSED CEILING STRUCTURE & DUCTWORK P22. 9. DIMENSIONS OF SPECIALTY LIGHT FIXTURES ARE TO CENTER OF FIXTURE, U.O.N. 10. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 11. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 12. REFER TO ELECTRICAL DRAWINGS FOR SWITCHING AND OR POWER/ZONE 1/4" = 1'-0" RCP LEGEND 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 1 A406 3 A407 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"7 A704 8' - 6 1/4" 8' - 0 3/4" 9' - 0 7/8" 8' - 6 1/4" 8' - 0 3/4" 8' - 6 1/4" 9' - 9 3/4" 9' - 9 5/8" B.3 8' - 6 1/4" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0"8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 7 1/2"8' - 11 3/8" 8' - 9" 8' - 5 3/8" 8' - 11 1/2" 8' - 5 1/2" 1 A409 A704 3 A7044 A704 6 2 A409 2 D RCP LEGEND SKYLIGHT- LEVEL 4 ONLY RECESSED FLUORESCENT DOWNLIGHT FIXTURE FLUORESCENT WALL MOUNTED FIXTURE SURFACE MOUNTED FLUORESCENT FIXTURE LAY-IN FLUORESCENT FIXTURE DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE RE" MECH VINYL FACED ACOUSTICAL TILE GYP BOARD SOFFIT (INTERIORS) GYP SOFFIT BOARD (EXTERIORS)- ASTM -C931 EXPOSED CONCRETE DECK OR FIRE RATED LID SURFACE MOUNTED FLUORESCENT FIXTURE PAINT CUSTOM COLOR - P21 DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE FOIL FACED BATTS PINNED TO STRUCTURE; R-19. TAPE JOINTS DRYER AND TOILET VENT LAYOUT PATH Scale Date Drawn By Project Number As indicated 9/15/2017 4:57:58 PMA111 CLUB LEVEL ONE RCPSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 CLUB LEVEL 1 RCP 02 P.E.C. RESUBMITTAL AUG 25, 2014 0' 2' 8' 16' 32' 4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) RCP NOTES 1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT FIXTURES, AND ASSOCIATED ITEMS. REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL ELECTRICAL, HVAC, SPRINKLER AND LIFE SAFETY. IN THE EVENT OF DISCREPANCIES BETWEEN THE DESIGNER'S REFLECTED CEILING PLAN AND THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE DESIGNER IN WRITING BEFORE ORDERING MATERIALS OR PROCEEDING WITH WORK. 2. COORDINATE ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON THE DESIGNERS' DRAWINGS. 3. ANY ACCESS HATCHES NOT SHOWN ON THE CEILING PLAN BUT REQUIRED BY PLUMBING, MECHANICAL, OR ELECTRICAL SYSTEMS SHALL BE REVIEWED WITH ARCHITECT FOR LOCATION. 4. CONTRACTOR TO COORDINATE LOCATION OF FIRE SPRINKLER HEADS. 5. NEW CONSTRUCTION: ALL LIGHT FIXTURES, EXIT SIGNS, SPRINKLER HEADS & OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.O.N. 6. CENTER ALL NEW ACOUSTICAL CEILING GRID WITHIN THE ROOM UNLESS OTHERWISE NOTED. 7. ALL NEW GYPSUM BOARD SOFFITS AND CEILINGS ARE TO BE PAINTED P22 UNLESS OTHERWISE NOTED. 8. PAINT ALL EXPOSED CEILING STRUCTURE & DUCTWORK P22. 9. DIMENSIONS OF SPECIALTY LIGHT FIXTURES ARE TO CENTER OF FIXTURE, U.O.N. 10. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 11. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 12. REFER TO ELECTRICAL DRAWINGS FOR SWITCHING AND OR POWER/ZONE 1/4" = 1'-0" RCP LEGEND 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 2 A405 1 A408 1 A406 3 A407 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"2 A408 B.3 8' - 6" 7' - 6" 8' - 6" 8' - 0" 8' - 6" 8' - 6" 8' - 6" VAULTED 8' - 6" 8' - 0" 8' - 0" 8' - 6" 8' - 0" 8' - 0" 8' - 6" 8' - 0" 8' - 6" VAULTEDVAULTED 8' - 0" 9' - 0" 1 A409 2 A409 2 D RCP LEGEND SKYLIGHT- LEVEL 4 ONLY RECESSED FLUORESCENT DOWNLIGHT FIXTURE FLUORESCENT WALL MOUNTED FIXTURE SURFACE MOUNTED FLUORESCENT FIXTURE LAY-IN FLUORESCENT FIXTURE DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE RE" MECH VINYL FACED ACOUSTICAL TILE GYP BOARD SOFFIT (INTERIORS) GYP SOFFIT BOARD (EXTERIORS)- ASTM -C931 EXPOSED CONCRETE DECK OR FIRE RATED LID SURFACE MOUNTED FLUORESCENT FIXTURE PAINT CUSTOM COLOR - P21 DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE FOIL FACED BATTS PINNED TO STRUCTURE; R-19. TAPE JOINTS DRYER AND TOILET VENT LAYOUT PATH Scale Date Drawn By Project Number As indicated 9/15/2017 4:58:19 PMA112 CLUB LEVEL TWO RCPSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 CLUB LEVEL 2 RCP 02 P.E.C. RESUBMITTAL AUG 25, 2014 0' 2' 8' 16' 32' 4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) RCP NOTES 1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT FIXTURES, AND ASSOCIATED ITEMS. REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL ELECTRICAL, HVAC, SPRINKLER AND LIFE SAFETY. IN THE EVENT OF DISCREPANCIES BETWEEN THE DESIGNER'S REFLECTED CEILING PLAN AND THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE DESIGNER IN WRITING BEFORE ORDERING MATERIALS OR PROCEEDING WITH WORK. 2. COORDINATE ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON THE DESIGNERS' DRAWINGS. 3. ANY ACCESS HATCHES NOT SHOWN ON THE CEILING PLAN BUT REQUIRED BY PLUMBING, MECHANICAL, OR ELECTRICAL SYSTEMS SHALL BE REVIEWED WITH ARCHITECT FOR LOCATION. 4. CONTRACTOR TO COORDINATE LOCATION OF FIRE SPRINKLER HEADS. 5. NEW CONSTRUCTION: ALL LIGHT FIXTURES, EXIT SIGNS, SPRINKLER HEADS & OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.O.N. 6. CENTER ALL NEW ACOUSTICAL CEILING GRID WITHIN THE ROOM UNLESS OTHERWISE NOTED. 7. ALL NEW GYPSUM BOARD SOFFITS AND CEILINGS ARE TO BE PAINTED P22 UNLESS OTHERWISE NOTED. 8. PAINT ALL EXPOSED CEILING STRUCTURE & DUCTWORK P22. 9. DIMENSIONS OF SPECIALTY LIGHT FIXTURES ARE TO CENTER OF FIXTURE, U.O.N. 10. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 11. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 12. REFER TO ELECTRICAL DRAWINGS FOR SWITCHING AND OR POWER/ZONE 1/4" = 1'-0" RCP LEGEND 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 2 A404 3 A404 1 A405 2 A405 1 A408 1 A406 3 A407 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 2" 48' - 4" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"B.3 1 A409 2 A409 2 D RCP LEGEND SKYLIGHT- LEVEL 4 ONLY RECESSED FLUORESCENT DOWNLIGHT FIXTURE FLUORESCENT WALL MOUNTED FIXTURE SURFACE MOUNTED FLUORESCENT FIXTURE LAY-IN FLUORESCENT FIXTURE DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE RE" MECH VINYL FACED ACOUSTICAL TILE GYP BOARD SOFFIT (INTERIORS) GYP SOFFIT BOARD (EXTERIORS)- ASTM -C931 EXPOSED CONCRETE DECK OR FIRE RATED LID SURFACE MOUNTED FLUORESCENT FIXTURE PAINT CUSTOM COLOR - P21 DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE FOIL FACED BATTS PINNED TO STRUCTURE; R- 19. TAPE JOINTS DRYER AND TOILET VENT LAYOUT PATH Scale Date Drawn By Project Number As indicated 8/17/2016 3:33:09 PMA113 CONDOMINIUM LEVEL THREE RCPSKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 CONDOMINIUM LEVEL 3 RCP 02 P.E.C. RESUBMITTAL AUG 25, 2014 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) RCP NOTES 1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT FIXTURES, AND ASSOCIATED ITEMS. REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL ELECTRICAL, HVAC, SPRINKLER AND LIFE SAFETY. IN THE EVENT OF DISCREPANCIES BETWEEN THE DESIGNER'S REFLECTED CEILING PLAN AND THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE DESIGNER IN WRITING BEFORE ORDERING MATERIALS OR PROCEEDING WITH WORK. 2. COORDINATE ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON THE DESIGNERS' DRAWINGS. 3. ANY ACCESS HATCHES NOT SHOWN ON THE CEILING PLAN BUT REQUIRED BY PLUMBING, MECHANICAL, OR ELECTRICAL SYSTEMS SHALL BE REVIEWED WITH ARCHITECT FOR LOCATION. 4. CONTRACTOR TO COORDINATE LOCATION OF FIRE SPRINKLER HEADS. 5. NEW CONSTRUCTION: ALL LIGHT FIXTURES, EXIT SIGNS, SPRINKLER HEADS & OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.O.N. 6. CENTER ALL NEW ACOUSTICAL CEILING GRID WITHIN THE ROOM UNLESS OTHERWISE NOTED. 7. ALL NEW GYPSUM BOARD SOFFITS AND CEILINGS ARE TO BE PAINTED P22 UNLESS OTHERWISE NOTED. 8. PAINT ALL EXPOSED CEILING STRUCTURE & DUCTWORK P22. 9. DIMENSIONS OF SPECIALTY LIGHT FIXTURES ARE TO CENTER OF FIXTURE, U.O.N. 10. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 11. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 12. REFER TO ELECTRICAL DRAWINGS FOR SWITCHING AND OR POWER/ZONE 1/4" = 1'-0" RCP LEGEND 05 PERMIT 7-1-15 No. Description Date 10/24/17 A202 A201 A201 1 2 1 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 2 A302 E E E E E E C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 2 A404 3 A404 1 A405 2 A405 1 A408 1 A406 3 A407 A203 4 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 2" 48' - 4" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"A203 5 4 A408 B.3 2 D RCP LEGEND SKYLIGHT- LEVEL 4 ONLY RECESSED FLUORESCENT DOWNLIGHT FIXTURE FLUORESCENT WALL MOUNTED FIXTURE SURFACE MOUNTED FLUORESCENT FIXTURE LAY-IN FLUORESCENT FIXTURE DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE RE" MECH VINYL FACED ACOUSTICAL TILE GYP BOARD SOFFIT (INTERIORS) GYP SOFFIT BOARD (EXTERIORS)- ASTM -C931 EXPOSED CONCRETE DECK OR FIRE RATED LID SURFACE MOUNTED FLUORESCENT FIXTURE PAINT CUSTOM COLOR - P21 DECORATIVE FLUORESCENT PENDANT FIXTURE PROVIDE $500 ALLOWANCE PER FIXTURE FOIL FACED BATTS PINNED TO STRUCTURE; R- 19. TAPE JOINTS DRYER AND TOILET VENT LAYOUT PATH Scale Date Drawn By Project Number As indicated 8/17/2016 3:33:25 PMA114 CONDOMINIUM LEVEL FOUR RCPSKI ANDSNOWBOARD CLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 CONDOMINIUM LEVEL 4 RCP 02 P.E.C. RESUBMITTAL AUG 25, 2014 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) RCP NOTES 1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT FIXTURES, AND ASSOCIATED ITEMS. REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL ELECTRICAL, HVAC, SPRINKLER AND LIFE SAFETY. IN THE EVENT OF DISCREPANCIES BETWEEN THE DESIGNER'S REFLECTED CEILING PLAN AND THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE DESIGNER IN WRITING BEFORE ORDERING MATERIALS OR PROCEEDING WITH WORK. 2. COORDINATE ALL TRADES INVOLVED IN THE CEILING WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEMS, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED ON THE DESIGNERS' DRAWINGS. 3. ANY ACCESS HATCHES NOT SHOWN ON THE CEILING PLAN BUT REQUIRED BY PLUMBING, MECHANICAL, OR ELECTRICAL SYSTEMS SHALL BE REVIEWED WITH ARCHITECT FOR LOCATION. 4. CONTRACTOR TO COORDINATE LOCATION OF FIRE SPRINKLER HEADS. 5. NEW CONSTRUCTION: ALL LIGHT FIXTURES, EXIT SIGNS, SPRINKLER HEADS & OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.O.N. 6. CENTER ALL NEW ACOUSTICAL CEILING GRID WITHIN THE ROOM UNLESS OTHERWISE NOTED. 7. ALL NEW GYPSUM BOARD SOFFITS AND CEILINGS ARE TO BE PAINTED P22 UNLESS OTHERWISE NOTED. 8. PAINT ALL EXPOSED CEILING STRUCTURE & DUCTWORK P22. 9. DIMENSIONS OF SPECIALTY LIGHT FIXTURES ARE TO CENTER OF FIXTURE, U.O.N. 10. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 11. PROVIDE RATED FIXTURES AT ALL CONDITIONS WHERE FIXTURE PENETRATES RATED FLOOR ASSEMBLY 12. REFER TO ELECTRICAL DRAWINGS FOR SWITCHING AND OR POWER/ZONE 1/4" = 1'-0" RCP LEGEND 05 PERMIT 7-1-15 No. Description Date 10/24/17 UP UP UP DNDN REF.REF. 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J G G A A C .1 C .1 GARAGE G01 ELEV. EQUIP G14 BOILER ROOM G09 EAST STAIR ES0 CLUB ELEVATOR MECH G02 CLUB STORAGE G13 TECH ENTRANCE G03 EHU G16 EHU STUDIO - TYPE A UNIT G15 OFFICE G07 CLUB STORAGE G08 A950 1 A901 1 A951 1 A902 1 MECH / JANITOR G05 LOCKERS G06 WEST STAIR WS0 170' - 5 1/4"30' - 8 5/8"2' - 0"19' - 9"28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8" 170' - 5 1/4" ELEV VEST G10 ELEV. EQ. G11 F.D. F.D. F.D. F.D.24' - 11 3/8"WATER ENTRY G12 EL. VEST 237 EL. MA. 238 TECH SHOP G04 FD FD FD FD FD FD FD A952 1 FD FD FD FD 5' - 0 5/8"8' - 11 5/8" 28' - 8 3/4" 5' - 2 5/8"ALIGN3' - 4"0' - 4"6' - 2 7/8" 9' - 8"ALIGNALIGN4' - 7 5/8" 8' - 0" 39' - 11 3/4" 8' - 0" 28' - 3 1/2" 23' - 0 5/8" 28' - 7" 6' - 6" 26' - 4" 26' - 10 3/4" 16' - 2 3/4" 26' - 10 5/8" 27' - 0" 27' - 0" 36' - 0" 11' - 4 3/4" 16' - 7" 71' - 11 5/8"ALIGN3' - 5 5/8"8' - 10 3/8"7' - 6" 8' - 7" 10' - 6"2' - 1 1/2" 2' - 1 1/2"5' - 0"9' - 3" 9' - 5 3/8" 9' - 9 1/2"24' - 7 1/4" 18' - 1 3/4" 6' - 6 3/8" 13' - 2 5/8"15' - 7 1/8" 5' - 8" 3' - 4" 1' - 4" ALIGN 2' - 1 1/2"2' - 1 1/2" 9' - 4 3/4" 16' - 5" 17' - 11"1' - 2 1/8"30' - 11 5/8" 15' - 5"3' - 8" 4' - 4" 2' - 9" 5' - 3"0' - 8"2' - 3"3' - 4"1' - 2"ALIGN15' - 5"15' - 1"15' - 0 3/4"ALIGN ALIGN 7' - 9 3/4"8' - 11"5' - 7 3/4" 5' - 6" 12' - 0 1/8" 15' - 1 1/8"ALIGN1' - 11"2' - 4" 1' - 11" 4' - 4 7/8" 8' - 10 1/8" 6' - 9" ALIGN 4' - 2 3/8"1' - 3 1/2" ALIGN 15' - 0 3/4"0' - 8 5/8" 3' - 4" 39' - 8 3/8"32' - 8 5/8"19' - 1"24' - 10 3/8"9 9 . 1 4 °32' - 8 5/8"0' - 11 5/8"VERIFY W/ DOOR R.O. 18' - 6" 6' - 6 3/8"EQ EQ10' - 7" EQ EQ2' - 2 1/4"1' - 9 1/4" 1' - 10"1' - 11"24' - 11 3/8"3' - 4" 24' - 2"8' - 2 1/2"7' - 6 1/4" 2' - 6 5/8"5' - 1 3/4"11' - 5 1/2" 5' - 9" 5' - 4 7/8"1' - 11"8' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 8' - 10 3/4" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 18' - 0" 8' - 0" 3' - 4 3/4"10' - 1 3/8"6' - 4 5/8" 6' - 2 5/8" 5' - 3 5/8"6' - 9"15' - 0 1/2" 14' - 11 1/2" 8' - 7 1/8" 2 Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:58:50 PMA150 GARAGE LEVEL DIMENSION PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 1/8" = 1'-0" 1 GARAGE LEVEL HORIZONTAL CONTROL PLAN 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 UP UPUP DN UP DN UP UP DN DN 1 1 4 5 6 63 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A C .1 C .1 B.3 CENTRAL STAIR CS1 WEST STAIR WS1 BREEZEWAY 101 OLD PROPERTY LINE NEW PROPERTY LINE 42"H STEEL GUARDRAIL 42"H STONE COLUMN BASE PROPERTY LINE 10'-8""W DRIVE LANE TIMBER COLUMNS EAST STAIR ES1 GAS AND ELEC. METERS ALPINE COACHES WORK STATIONS 102 RR 128 MECH. 150 ELEV. VEST. 152 STORAGE 134 ELECTRICAL 151 ACROBATICS WORK 137 TRASH/RECYLCING 154 STORAGE ELEV. VEST. STORAGE VENUE EQUIP. 132 SNOWBOARD / BOOT STORAGE 131 TUNING 130 RR 129 GATE SERVICE 119 TECH FITTING AND DROP-OFF 121 ALPINE STORAGE 124 TECH SERVICE CARTS 120 BOOT / SKI STORAGE 125 ALPINE TUNING 126 HALL 127 RR 135 RR 136 FILES FILES A901 2 A950 2 A904 5 A903 1 A951 2 A904 1 A902 2 A952 2 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"30' - 8 5/8"2' - 0"19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8"WMNS ACRO LOCKERS 148 MENS ACRO LOCKERS 145 F.D. F.D. F.D. F.D. F.D. F.D. F.D. F.D. F.D. F.D.F.D. F.D. F.D. MECH. 122 A702 1 --- - F.D. F.D. JAN. 123 A501 8 A501 8 A501 4 0' - 4"R 2 ' - 7 5 / 8 " 5' - 1 1/2" 5' - 4 1/2" 12' - 9 1/8" 25' - 7 3/4" 25' - 8 1/4"15' - 3 3/4" 9' - 7 3/4"21' - 9" 20' - 11" 20' - 11 1/2" 16' - 4 1/2" 4' - 5 1/4" 19' - 7 1/4" 19' - 4 1/8" 4' - 5 1/4" 8' - 11 5/8" 19' - 3 3/8" 12' - 8 1/2"12' - 2 3/8" 6' - 6 1/8" 6' - 3" 18' - 3 3/4" 6' - 3 1/2"18' - 1 3/4"50' - 4 3/4" 11' - 7 7/8" 5' - 9 5/8" 2' - 6"5' - 0" 10' - 3 1/2" 14' - 2 3/4" 6' - 10 5/8" 24' - 5 3/4" 6' - 7 3/8"8' - 7 1/2" 5' - 8 1/8" 6' - 7 1/2" 4' - 6" 7' - 6" 5' - 3" 4' - 9"1' - 11 5/8"3' - 0"4' - 1 1/2" ALIGN ALIGN 7' - 4 1/4"17' - 2"2' - 0"3' - 0"4' - 1 1/2" 19' - 4 3/8" 6' - 3 3/8" 6' - 1" 7' - 3 3/4"16' - 11 3/4" 9' - 2 1/4" 19' - 8 3/8" 4' - 10 1/4" 5' - 1 7/8" 19' - 10 1/4"16' - 10" 7' - 11 3/8"4' - 10" 6' - 6" 5' - 6"8' - 1 3/4" 52' - 1" 8' - 3 5/8" 6' - 11 3/4" 4' - 9" 3' - 0" 6' - 0" 3' - 0" 2' - 8 3/4" 8' - 2 7/8" 2' - 8 3/4" 3' - 0" 6' - 0" 4' - 4 1/4" 7' - 6 3/4" 4' - 0"5' - 0 5/8"8' - 11 5/8" 7' - 7 3/4" 27' - 1 5/8" 18' - 10 7/8" 6' - 1"3' - 10 3/4"ALIGN 6' - 4 1/2" 27' - 3 3/4" 7' - 3" A702 3 1' - 8 3/4"32' - 8 5/8"7' - 9 1/8" 8' - 3 1/4"5' - 6" 2' - 0" 9' - 11" 9' - 11" 9' - 11" 9' - 10 7/8" 7' - 8 5/8" 9' - 5" 9' - 5" 9' - 5" 9' - 5" 4' - 3" 3' - 10" 6' - 0" 3' - 0"3' - 0 1/2" 7' - 11 1/8" 2' - 8 7/8" 3' - 0" 6' - 0" 4' - 10 1/8" 9' - 6 7/8" 9' - 7 1/2" 9' - 7 1/2" 8' - 8 7/8" 6' - 6 3/4"7' - 5 1/4"16' - 8 1/8" 4' - 4 7/8" 14' - 5 3/4" 9' - 7 3/8" 12' - 2 3/8"14' - 0 3/8" 4' - 4 7/8"9' - 9 1/2"9' - 2" 4' - 3 5/8"2' - 1"13' - 3 1/4" 5' - 1 3/4" 5' - 1 5/8" 2 D Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:59:04 PMA151 CLUB LEVEL ONE DIMENSION PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 1/8" = 1'-0" 1 CLUB LEVEL 1 HORIZONTAL CONTROL PLAN 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 REF. REF.REF. REF. DN DN DN UP DN DN UP 3 A301 3 A301 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 1 A301 1 A301 C C E E F H H J J B G G A 2 A301 2 A301 2 A302 2 A302 C .1 C .1 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A404 2 A405 1 A408 1 A406 3 A407 2 A408 B.3 1 A409 2 A409 CLUB ROOM 207 BOARD ROOM 202 WEST STAIR WS2 CLUB ELEVATOR CONF. 218 TREATMENT 204 MECH 209 CONF. 226 DEV. MNGR. OFFICE 227 FINANCE OFFICE 219 G.M. OFFICE 220 BOOK KEEPER OFFICE 221 TRAVEL OFFICE 222 TR DISPLAY COLLABORATION WORK SPACES ELEV VESTIBULE ELEV. VESTIBUILE STOR/MECH 206 GYM 203 KITCHEN 205 KITCH. 216 RECEPTION HALL 201 UP DISPLAY DISPLAY RR 212 RR 213 MEETING 215 ADMIS. OFFICE 217 EXEC. OFFICE 225 EXEC. ASSIST. OFFICE 228 OPERATIONS MANAGER 229 COACH LOUNGE 223 ADMIN AND WORKSPACES 214 EVENT STOR 234 STORAGE 211 KITCHENETTE RR 224 EVENTS 230 COMPETITION OFFICE 231 RACE INFO DESK 233KITCHKITCH TV TVTV PRINTER / COPIER AV AV COC TO RACE SEC. STRETCHING / LIFTING STORAGE 208 SLIDING GLASS WALL AWARDS PODIUM - SEE LANDSCAPE FOR BOULDER ARRANGEMENTA904 6 A901 3 A950 3 A903 2 A951 3 A902 3A952 3 A904 2 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 8' - 9" 17' - 2 1/8"121' - 0 1/8"30' - 8 5/8"2' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" M.W.O. MECH 232 VENT CHASE FROM BELOW D.W. 22 A505 22 A505 22 A505 27 A505 JAN 210 36 X28 X28 33 33 209 201 33 33 33 43 43 73 36 2 A406 3 A406 5' - 10 3/8"RATED FIRELITE GLASS OR SIM. PATIO STAIR EAST 236 CLUB TERRACE 239 10' - 6 7/8" 11' - 6" 11' - 11 1/2"20' - 10 3/4" 16' - 7"8' - 1 5/8" 10' - 2"5' - 10 3/4"5' - 7 5/8"9' - 5 1/4" 11' - 4 3/8" 11' - 0 5/8" 11' - 0" 11' - 0" 6' - 8 3/4" 5' - 5 1/2"5' - 2 5/8"1 G202 1 G202 2 D 7 A505 7 A505 19 A505 7 A505 7 A505 7 A505 7 A505 10 A505 17 A505 32 A505 SIM. 19 A505 7 A505 12 A505 12 A505 19 A505 19 A505 19 A505 12 A505 7 A505 Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 4:59:21 PMA152 CLUB LEVEL TWO DIMENSION PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 0' 2' 8' 16' 32'4' GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF KNOX BOX WITH FIRE DEPT AND ARCH, RE: HW SCHEDULE 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. PROVIDE ROOF HATCH ACCESS FROM CENTRAL STAIR TO ROOF, PER FIRE CODE 12. RE: SPECS FOR DOOR HARDWARE SETS. 13. RE: A8.50 FOR DOOR SCHEDULE. 14. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICAL TYPE 56E U.N.O., RE: A570 15. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 16. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER 13/A570. 17. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATED RE: 18/A570. 18. RE: A505 FOR TYPICAL AND SPECIFIC FLOOR TRANSITIONS 19. RE: 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 20. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 21. RE: A701-A703 FOR ENLARGED PLANS 22. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBLY (REVISE?) 1/8" = 1'-0"1 CLUB LEVEL 2 HORIZONTAL CONTROL PLAN 05 PERMIT 7-1-15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" 3 A301 1 4 5 6 3 4.1 1.1 1.2 0.1 T.O. CHIMNEY 149' - 0" 1 A301 2 A301 1 A401 2 A401 3 A401 1 A402 2 A402 1 A403 2 A403 D56 D56 D56 D56 D52 D52 D52 D52 D57 D55D94 B5 D55 D89 D96 B1 D52 D52 D52 D52 D52 B1 D58 D62 D63 D62 D63 D62 D63 D62 D63D61 D48 G3 G4 12' - 0" 11' - 0" 10' - 0" 11' - 0" 17' - 0"9' - 8 3/4"6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 3' - 6" 5' - 3" 17' - 2 1/8" PRECAST CONCRETE WALL CAP MASONRY VENEER WOOD BELLY BAND LAP SIDING PARAPET WALL PRE-FINISHED METAL COPING COVER WOOD VENEER CLAD COLUMNS TWO-PART FASCIA, TYP. STANDING SEAM METAL ROOF ALUMINUM CLAD WOOD WINDOWS EXPOSED HEAVY TIMBER STRUCTURE STUCCO WALL ASSEMBLY SNOW FENCE 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" 4" 12" EXPOSED STEEL ROOF SUPPORTS COILING OVERHEAD DOOR TO GARAGE METAL CLOSURE WALL ASSEMBLY METAL GUARDRAIL @ BALCONY EXPOSED STEEL ROOF SUPPORTS A15 A7D17 G4 A25 A25 2 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" C E F H J B G A EXPOSED TIMBER STRUCTURE HEAVY TIMBER PORTE COCHERE METAL CLOSURE WALL ASSEMBLY STONE VENEER WALL ASSEMBLY 2 A302 C .1 METAL RAILINGS AT DECKS 1 A406 3 A407 D91 D92 D82 D81 D80 D79 D6 D6 A18 C3 D83 D85 21' - 5 7/8" 3' - 2 7/8" 6' - 0" 2' - 0" 19' - 9" 19' - 0" 9' - 0" 14' - 9" 25' - 9 1/2" 121' - 0 1/8" B.3 D65 3 A406 WOOD BELLY BAND LAP SIDING PARAPET WALL TWO-PART FASCIA, TYP. STANDING SEAM METAL ROOF ALUMINUM CLAD WOOD WINDOWS CAST-IN-PLACE SITE STAIR; RE: LANDSCAPE METAL GUARD RAIL MECHANICAL LOUVER; RE: MECH SUNSHADE DECORATIVE STEEL W-SHAPE SUPPORTS SNOW FENCE 4" 12" 3" 12" 4" 12" LAP SIDING PARAPET WALL INTERLOCKING PAVERS WITH SNOWMELT SYSTEM ON PRECAST HOLLOW CORE PLANK D STONE VENEER EXTERIOR MATERIALS STUCCO TIMBERS PARAPET WALLS WOOD BAY WALLS RAILINGS WOOD BELLY BAND ROOF FASCIA AND FLASHING 6" MOUNTAIN ASH GRANITE WITH ASHLAR COURSING WHITE STUCCO WITH LIGHT DASH TEXTURE FINISH ROUGH SAWN DOUGLAS FIR WITH DARK BROWN SEMI-TRANSPARENT STAIN ROUGH SAWN DOUGLAS FIR WITH DARK BROWN SEMI-TRANSPARENT STAIN FINISH SMOOTH SAWN CLEAR RED CEDAR LAP SIDING WITH WEATHERED GRAY/BROWN STAIN FINISH SMOOTH SAWN CLEAR RED CEDAR LAP SIDING WITH WEATHERED GRAY/ BROWN CLEAR STAIN FINISH BLACK POWDER COATED STEEL DARK BROWN STANDING SEAM METAL ROOF, NON-REFLECTIVE FINISH DARK BROWN METAL FLAT ROOF 4-6" GRAY ROCK BALLAST ON EPDM Scale Date Drawn By Project Number As indicated 9/15/2017 4:59:45 PMA201 NORTH AND WEST ELEVATIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 NORTH ELEVATION 1/8" = 1'-0" 2 WEST ELEVATION 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" C E F H J B G A HEAVY TIMBER FRAMED PORTE COCHERE 2 A302 C .1 TOP OF ROOF DECKING AT RIDGE - 8260'-0" 3 A403 1 A404 2 A404 D64 D64 D64 D52 B.3 PRECAST CONCRETE WALL CAP MASONRY VENEER WALL ASSEMBLY WOOD BELLY BAND LAP SIDING PARAPET WALL PRE-FINISHED METAL COPING COVER TWO-PART FASCIA, TYP. STANDING SEAM METAL ROOF ALUMINUM CLAD WOOD WINDOWS EXPOSED STEEL ROOF SUPPORTS METAL CLOSURE WALL ASSEMBLY TRASH ENCLOSURE SNOW FENCE DECORATIVE STEEL W-SHAPE SUPPORTS SUNSHADE SITE STAIRS; RE: CIVIL & LANDSCAPE RETAINING WALL; RE: CIVIL & LANDSCAPE LAP SIDING WALL ASSEMBLY METAL RAIL @ DECK MASONRY VENEER CONC. ELEVATOR AND MECHANICAL SHAFT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM ON PRECAST HOLLOW CORE PLANK17' - 0"11' - 0" 10' - 0" 11' - 0" 12' - 0" 25' - 9 1/2" 14' - 9" 9' - 0" 19' - 0" 19' - 9" 2' - 0" 6' - 0" 3' - 2 7/8" 21' - 5 7/8" 121' - 0 1/8" D67 D100 A24 D93 C7 C6 C5 A25 D101 D37 D36 D102 G9 D STONE VENEER EXTERIOR MATERIALS STUCCO TIMBERS PARAPET WALLS WOOD BAY WALLS RAILINGS WOOD BELLY BAND ROOF FASCIA AND FLASHING 6" MOUNTAIN ASH GRANITE WITH ASHLAR COURSING WHITE STUCCO WITH LIGHT DASH TEXTURE FINISH ROUGH SAWN DOUGLAS FIR WITH DARK BROWN SEMI-TRANSPARENT STAIN ROUGH SAWN DOUGLAS FIR WITH DARK BROWN SEMI-TRANSPARENT STAIN FINISH SMOOTH SAWN CLEAR RED CEDAR LAP SIDING WITH WEATHERED GRAY/BROWN STAIN FINISH SMOOTH SAWN CLEAR RED CEDAR LAP SIDING WITH WEATHERED GRAY/ BROWN CLEAR STAIN FINISH BLACK POWDER COATED STEEL DARK BROWN STANDING SEAM METAL ROOF, NON-REFLECTIVE FINISH DARK BROWN METAL FLAT ROOF 4-6" GRAY ROCK BALLAST ON EPDM LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" 3 A301 1 4 5 63 4.1 1.1 1.2 0.1 T.O. CHIMNEY 149' - 0" 1 A301 SLIDING DOORS AT SOUTH PATIOS 2 A301 ENTRANCE TO BREEZE WAY STAIR 3 A404 1 A405 2 A405 1 A408 D9 D69 D69 D9 D75 D10 D10 D69 D9 D69 D66D66 D66 D66 D24 D44 2 A408 D73 D72 4 A408 170' - 5 1/4" 9' - 8 3/4" 6' - 8 3/8" 8' - 7" 71' - 3 3/8" 48' - 2 5/8" 3' - 6" 5' - 3" 17' - 2 1/8"17' - 0"11' - 0" 10' - 0" 11' - 0" 12' - 0" MASONRY VENEER WALL ASSEMBLY WOOD BELLY BAND LAP SIDING PARAPET WALL PRE-FINISHED METAL COPING COVER TWO-PART FASCIA, TYP. STANDING SEAM METAL ROOF ALUMINUM CLAD WOOD WINDOWS DECORATIVE STEEL W-SHAPE SUPPORTS ON STEEL PLATE METAL CLOSURE WALL ASSEMBLY SNOW FENCE SUNSHADE SUNSHADE MECH. ACCESS GATE D77 D78 B4 B3 G10 2 Scale Date Drawn By Project Number As indicated 9/15/2017 5:00:09 PMA202 SOUTH AND EAST ELEVATIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 2 EAST ELEVATION PERMIT 1/8" = 1'-0" 1 SOUTH ELEVATION 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" E C .1 D52 D5211' - 0" F3 F4 A505 16 OPP4' - 6"3' - 0" 8' - 6 1/4"HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM PRECAST INVERTED TEE BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK 2" RIGID INSULATION 2-1/2" CONCRETE TOPPING SLAB DOUBLE TEE; RE: STRUCT 4" CONCRETE TOPPING SLAB ON DRAINAGE MAT, RE: STRUCT STUCCO SOFFIT 19' - 9" SPRAY FIREPROOFING S1 D LEVEL 2 111' - 0" LEVEL 3 121' - 0" CB D53 10' - 0" 9' - 2 7/8" LEVEL 2 111' - 0" LEVEL 3 121' - 0" C B D53 10' - 0"LEVEL 3 121' - 0" LEVEL 4 132' - 0" C D34 B.3 11' - 0"6' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" B.3 D34 STONE VENEER EXTERIOR MATERIALS STUCCO TIMBERS PARAPET WALLS WOOD BAY WALLS RAILINGS WOOD BELLY BAND ROOF FASCIA AND FLASHING 6" MOUNTAIN ASH GRANITE WITH ASHLAR COURSING WHITE STUCCO WITH LIGHT DASH TEXTURE FINISH ROUGH SAWN DOUGLAS FIR WITH DARK BROWN SEMI-TRANSPARENT STAIN ROUGH SAWN DOUGLAS FIR WITH DARK BROWN SEMI-TRANSPARENT STAIN FINISH SMOOTH SAWN CLEAR RED CEDAR LAP SIDING WITH WEATHERED GRAY/BROWN STAIN FINISH SMOOTH SAWN CLEAR RED CEDAR LAP SIDING WITH WEATHERED GRAY/ BROWN CLEAR STAIN FINISH BLACK POWDER COATED STEEL DARK BROWN STANDING SEAM METAL ROOF, NON-REFLECTIVE FINISH DARK BROWN METAL FLAT ROOF 4-6" GRAY ROCK BALLAST ON EPDM Scale Date Drawn By Project Number 3/16" = 1'-0"9/15/2017 5:00:27 PMA203 MISC. EXTERIOR ELEVATIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/16" = 1'-0" 1 BREEZEWAY ELEVATION LOOKING WEST 3/16" = 1'-0" 2 ELEVATION 3/16" = 1'-0" 3 ELEVATION 3/16" = 1'-0" 4 ELEVATION 3/16" = 1'-0" 5 ELEVATION 3/16" = 1'-0" EXTERIOR MATERIALS 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" E H JB G A C .1 B.3 17' - 0"11' - 0" 10' - 0" 11' - 0" 12' - 0" 121' - 0 1/8" GARAGE G01 RR 135 RR 136 RR 128 OFFICE G07 LOCKERS G06 MECH / JANITOR G05 CENTRAL STAIR CS1 CONDOMINIUM 3B 245 CONDOMINIUM 3B 245 BOARD ROOM 202 STORAGE 134 RECEPTION HALL 201 CONF. 226 A903 6 21' - 5 7/8" 3' - 2 7/8" 8' - 0" 19' - 9" 28' - 0" 14' - 9" 25' - 9 1/2" D LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" C E H J B G A C .1 B.3 17' - 0"11' - 0" 10' - 0" 11' - 0" 12' - 0" 121' - 0 1/8" 25' - 9 1/2" 14' - 9" 28' - 0" 19' - 9" 2' - 0" 6' - 0" 3' - 2 7/8" 21' - 5 7/8" CONDOMINIUM 3B 245 RECEPTION HALL 201 BOARD ROOM 202 BREEZEWAY 101 ALPINE TUNING 126 TECH SHOP G04 GARAGE G01 4" 12" 3" 12" D LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" C E F H JB G A C .1 B.3 7' - 8 1/4"D Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 5:00:39 PMA301 BUILDING SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 TRANSVERSE SECTION 01 1/8" = 1'-0" 2 TRANSVERSE SECTION 02 1/8" = 1'-0" 3 TRANSVERSE SECTION 03 - CENTRAL BREEZEWAY 01 PERMIT 07.01.15 No. Description Date 06 9-15-17 BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" Level 5 139' - 0" 1 4 5 63 1.1 1.2 0.1 T.O. CHIMNEY 149' - 0" COACH LOUNGE 223 CONDOMINIUM 3B 245 CONDOMINIUM 3A 167 CLUB ROOM 207 RECEPTION HALL 201 MECH 209 WEST BREEZEWAY 116 EL. VEST 237 GARAGE G01 MECH G02 BREEZEWAY 101 CENTRAL STAIR CS1 EAST STAIR ES0 RR 212 RR 213 ADMIN AND WORKSPACES 214 RECEPTION HALL 201 ALPINE COACHES WORK STATIONS 102 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" Level 5 139' - 0" 1 4 5 6 4.1 0.1 CLUB ROOM 207 M COACHES 110 WMNS COACHES 115 BREEZEWAY 101 RECEPTION HALL 201 CONDOMINIUM 3B 245 CONDOMINIUM 3A 167 COACH LOUNGE 223 EAST ELEV VEST 235 ELEV. VEST. 152 WOMENS COACHES 149 MENS COACHES 144 GARAGE G01 BOILER ROOM G09 ELEV VEST G10 WMNS COACHES 153 Scale Date Drawn By Project Number 1/8" = 1'-0"9/15/2017 5:00:49 PMA302 BUILDING SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1/8" = 1'-0" 1 LONGITUDINAL BUILDING SECTION 01 1/8" = 1'-0" 2 LONGITUDINAL BUILDING SECTION 02 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 04 PERMIT 07.01.15 2 A302 1 A302 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" C C .1 A501 1A501 6 GYM 203 CONF 104 GARAGE G01 CONDOMINIUM 3A 167 A502 1 X27 80 X73 SLOPE F6 A603 6 A603 7 2 A851 1 A851 4 A851 A603 4 A501 14 A501 152 B.3 A502 8 LAP SIDING ALUMINUM CLAD WOOD WINDOWS REINF. CONCRETE FOUNDATION WALL; RE: STRUCT HOT, FLUID-APPLIED, FABRIC REINFORCED RUBBERIZED ASPHALT WATERPROOFING MEMBRANE; RE: SPEC 2" RIGID EXTRUDED POLYSTYRENE (XPS) FOAM INSULATION DRAINAGE MAT; RE: SPEC AND GEOTECH REPORT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT PERIMETER DRAIN; RE: CIVIL UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT CAST STONE MASONRY WALL CAP ANCHORED STONE VENEER METAL STUD FRAMING CONCRETE CURB; RE: CIVIL STRUCTURAL STEEL COLUMN; RE: STRUCT X37 D62 PRECAST DOUBLE-T; RE: STRUCT 3.5" TOPPING SLAB ON 1/2" DRAIN BOARD PER STRUCTURAL F2 F3 ANCHORED STONE VENEER STUCCO SOFFIT S1 STEEL BEAM; RE: STRUCT BELLY BAND 4" 12" R2 F5 3-RAIL SNOW FENCE WITH SCREEN BETWEEN RAILS; RE: SPEC STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) F4 2' - 5 3/4"STEEL BEAM; RE: STRUCT BELLY BAND 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK WOOD JOISTS; RE: STRUCT PLYWOOD SHEATHING; RE: STRUCT 1-1/2" TOPPING SLAB; RE: STRUCT A501 31 D 132'-8" PLATE HT.4" TOTAL BUILD UP FOR FURRED FLOORING AT INTERIOR SPACES LEVEL 1 100' - 0" LEVEL 2 111' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" CB A501 6 A501 2 A501 1 GARAGE G01 GYM 203 CONDOMINIUM 3A 167 CONF. 105 EHU G16 F6 X33 33 808' - 0 3/4"A603 6 A502 9 3 A501 4 A501 A502 2 A603 1 A603 5 A603 6 A603 7 A501 10 A501 14 B.3 43 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM F2 PRECAST DOUBLE-T; RE: STRUCT 3.5"CONCRETE TOPPING; RE: STRUCT ON TOP OF 1/2" DRAIN BOARD STEEL BEAM; RE: STRUCT BELLY BAND ALUMINUM CLAD WOOD WINDOWS D61 X37 S1 D34 X27 D89 R2 4" 12" F4 DUCTWORK; RE: MECH STEEL BEAM; RE: STRUCT BELLY BAND 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2"CONCRETE SLAB ON 2"METAL DECK 1/4" / 12" D52 5 A501 3' - 2 7/8" 6' - 0"1' - 6"0' - 6" D 4" FOR FIN. FLOOR BUILD UP LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" C C C .1 A501 1 TREATMENT 204 OFFICE 106 GARAGE G01 EHU G16 CONDOMINIUM 3A 167 A501 6 F6 8' - 0"A603 11 A603 12 A502 9 A501 14 A603 11 A603 12 A502 2 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM 80 43 4" 12" R2 S1 X27 ALUMINUM CLAD WOOD WINDOWS STEEL BEAM; RE: STRUCT BELLY BAND ALUMINUM CLAD WOOD WINDOWS STEEL BEAM; RE: STRUCT BELLY BAND X17 X13 3-RAIL SNOW FENCE WITH SCREEN BETWEEN RAILS; RE: SPEC STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) D55 D58 F4 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK 2' - 0" 6' - 7 3/8" A501 2 8' - 6 1/4"A501 31 D 132'-8" PLATE HT.LINE OF FIN. FLOORING Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:00:59 PMA401 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 WALL SECTION 3/8" = 1'-0" 2 WALL SECTION 3/8" = 1'-0" 3 WALL SECTION 1 A401 2 A401 3 A401 0' 1' 4' 8' 16'2' 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" C EB A C .1 A501 6 BOARD ROOM 202 RECEPTION HALL 201 GARAGE G01 A501 21 A603 6 A505 16 X37 9' - 7 1/2" A851 16 17 A851 A501 13245 A501 10 A501 10 5.00% CONDOMINIUM 3B 245 B.3 HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM PRECAST INVERTED TEE BEAM; RE: STRUCT F6 F2 X33 X33 F4 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK OVERHEAD COILING DOOR DOUBLE TEE; RE: STRUCT 3.5" CONCRETE TOPPING SLAB ON 1/2" DRAIN BOARD, RE: STRUCT S1 STUCCO SOFFIT PLYWOOD SHEATHING; RE: STRUCT 1-1/2" CONCRETE TOPPING SLAB FLOOR JOISTS; RE: STRUCT F5 9' - 0 1/2"VARIES7' - 9 5/8"VARIES; GABLE ROOF/CEILING144' - 1 1/4" 3' - 2 7/8" 6' - 0" 2' - 0" 19' - 9" ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) R2 R2 88 S1 19 A504 2 5 .60° 25.40°9' - 0 7/8"8' - 11 3/8"8' - 0"1 A409 D 5' - 11"137'-10-3/4" T.O. BEAM4" FOR FIN. FLOOR BUILD UP 1 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" C C .1 ELEV. EQUIP G14 EHU STUDIO - TYPE A UNIT G15 KITCH. 216 6 A603 8 A603 7 A603 A502 2 A501 1 A502 9 D34 8 A501 A501 12 6 A501 A501 10 80 73 43 CLUB ELEV CE1 CONDOMINIUM 3B 245 B.3 A502 3 F1 F6 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT EXHAUST FAN; RE: MECH EXHAUST GRILLE; RE: MECH HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM 43 13 88 A501 14 SIM X23 X27 R2 ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) LAP SIDING ALUMINUM CLAD WOOD WINDOWS BELLY BAND 2 A501 7 A501 6' - 0" 2' - 0" S1 D 133'-3-7/8" PLATE HT.Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:01:09 PMA402 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 WALL SECTION 04 - 3/8" = 1'-0" 2 WALL SECTION 05 - 1 A402 2 A402 0' 2' 8' 16' 32'4' 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" C B B C .1 A501 6 A501 1 GARAGE G01 CONF. 139 ADMIN AND WORKSPACES 214 ADMIS. OFFICE 217 A603 5 A603 7 A501 10 A603 6 A603 6 A603 7 3 A501 4 A501 A603 1 A603 2 EHU STUDIO - TYPE A UNIT G15 A501 14 33 33 80 43 A502 2 B.3 B.3 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT PRECAST DOUBLE-T; RE: STRUCT 3.5"CONCRETE TOPPING; RE: STRUCT HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM F2 STEEL BEAM; RE: STRUCT BELLY BAND ALUMINUM CLAD WOOD WINDOWS R2 F4 STEEL BEAM; RE: STRUCT BELLY BAND 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK D F6 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" C .1 CONF. 218 ADMIN AND WORKSPACES 214 F.ST./F.SK. OFFICE 141 GARAGE G01 A501 6 A501 1 4 A501 A603 6 A501 14 A502 1 A603 7 X37 X27 B.3 A502 8 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 80 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL DOUBLE TEE; RE: STRUCT 3.5" CONCRETE TOPPING SLAB ON 1/2" DRAIN MAT, RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK SIM 3-RAIL SNOW FENCE WITH SCREEN BETWEEN RAILS; RE: SPEC STANDING SEAM METAL ROOF RAFTERS; RE: STRUCT W-SHAPE STEEL COLUMN; RE: STRUCT TIMBER BEAM; RE: STRUCT METAL RAIL10 A504 A504 9 D56 ALUMINUM CLAD WOOD WINDOWS METAL DECK; RE: STRUCT TAPERED INSULATION STONE BALLAST HOT, FLUID-APPLIE, FABRIC- REINFORCED RUBBERIZED ASPHALT WATERPOOFING MEMBRANE ON 5/8" DENSDECK PRIME. FILTER FABRIC AND DRAINAGE MAT ON ASPHALTIC HARDBOARD PROTECTION BOARD A504 5 A501 31 D 133'-0-7/8" T.O. BEAM4" FINISH TOPPING LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" 6 A501 6 X37 A501 20 80 80 A501 17 DOUBLE TEE; RE: STRUCT 3.5" CONCRETE TOPPING SLAB ON 1/2" DRAIN BOARD, RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT S1 BOOK KEEPER OFFICE 221 TRASH/RECYLCING 154 4-1/2" CONCRETE SLAB ON 2" METAL DECK A502 14 A504 5 4" FINISH TOPPING Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:01:19 PMA403 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 WALL SECTION 3/8" = 1'-0" 2 WALL SECTION 3/8" = 1'-0" 3 WALL SECTION 1 A403 3 A403 2 A403 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" 6 6 A902 A502 4 A501 18 A501 19 A502 1 A502 212' - 0" 11' - 0" 10' - 0" 3' - 10 3/4"GARAGE G01 EAST STAIR ES1 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL PRE-FINISHED METAL COPING COVER BELLY BAND PREFAB METAL STAIRS NATURAL STONE WALL ASSEMBLY; RE: A571 LAP SIDING PRECAST DOUBLE-T; RE: STRUCT METAL FRAMED GYP. BD CEILING INVERTED ROOF MEMBRANE ASSEMBLY 4-1/2" CONCRETE SLAB ON 2" METAL DECK METAL FRAMED GYP. BD CEILING METAL GUARDRAIL LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" 6 ELECTRICAL 151 BOILER ROOM G09 MECH. 150 ADMIN AND WORKSPACES 214 MECH 232 EVENT STOR 234 CONDOMINIUM 3B 245 A603 5 A603 9 A501 30 A603 14 A502 1 D73 A502 10 80 X27 23 23 F4 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL PRECAST DOUBLE-T; RE: STRUCT 3.5" CONCRETE TOPPING ON 1/2" DRAIN BOARD; RE: STRUCT 4" HIGH (NOMINAL) HOUSEKEEPING PAD; RE: MECH PRE-FINISHED METAL COPING COVER NATURAL STONE WALL ASSEMBLY; RE: A571 BELLY BAND LAP SIDING WALL ASSEMBLY; RE: A571 DRYWALL CEILING; RE: RCP INVERTED ROOF MEMBRANE ASSEMBLY ALUMINUM CLAD WOOD WINDOWS METAL CLOSURE WALL ASSEMBLY; RE: A571 T&G SOFFIT STEEL BEAM; RE: STRUCT ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF FASCIA 4 " FIN. CONCRETE TOPPING F2 F1 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" HJ G A603 11 A603 11 A501 211 X13 A501 23 A603 1 A501 25 A502 1 A502 2 80 43 36 36 80 CLUB STORAGE G08 GARAGE G01 WMNS ACRO LOCKERS 148 SNOWBOARD / BOOT STORAGE 131 ADMIN AND WORKSPACES 214 OPERATIONS MANAGER 229 CONDOMINIUM 3B 245 25' - 9 1/2" 14' - 9" A504 32 A504 5 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING ON 1/2" DRAIN BOARD; RE: STRUCT SUNSHADE A501 30 FINISH GRADE WATERPROOF MEMBRANE ON 4-1/2" CONC. SLAB ON 2" METAL DECK SUNSHADE BELLY BAND LAP SIDING WALL ASSEMBLY; RE: A571 INVERTED ROOF MEMBRANE ASSEMBLY ALUMINUM CLAD WOOD WINDOWS ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) A501 33 PLYWOOD SHEATHING; RE: STRUCT 1-1/2" CONCRETE TOPPING SLAB FLOOR JOISTS; RE: STRUCT BELLY BAND ALUMINUM CLAD WOOD WINDOWS ALUMINUM CLAD WOOD WINDOWS D9 D69 D66 STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK PRECAST INVERTED TEE BEAM; RE: STRUCT139'-5-1/4" PLATE HT.4 " FIN. CONCRETE TOPPING Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:01:29 PMA404 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 WALL SECTION 3/8" = 1'-0" 2 WALL SECTION 3/8" = 1'-0" 3 WALL SECTION 1 A403 2 A403 3 A403 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" G A505 8 A505 18 ADMIN AND WORKSPACES 214 WMNS COACHES 147 GARAGE G01 A505 23 A505 28 8' - 3"A501 10 7' - 6"CONDOMINIUM 3B 245 PRECAST INVERTED TEE BEAM; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT VAPOR RETARDER PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING ON TOP OF 1/2" DRAINAGE BOARD; RE: STRUCT 33 4-1/2" CONCRETE SLAB ON 2" METAL DECK STEEL BEAM; RE: STRUCT ACT CEILING SLIDING DOOR; RE: DOOR SCHEDULE 1-1/2" CONCRETE TOPPING SLAB 3/4" FLOOR SHEATHING; RE: STRUCT FLOOR JOISTS; RE: STRUCT 5/8" GYPSUM BOARD SLIDING DOOR; RE: DOOR SCHEDULE STUCCO SOFFIT; RE: A571 4-1/2" CONCRETE SLAB ON 2" METAL DECK 9' - 8"10' - 8"11' - 0"10' - 0" 11' - 0" 12' - 0" STONE FLOOR TILE ON DRAINBOARD ON WATERPROOF MEMBRANE 4-1/2" CONCRETE SLAB ON 2" METAL DECK METAL GUARDRAIL ON KNEE WALL STONE FLOOR TILE ON DRAINBOARD ON WATERPROOF MEMBRANE PLYWOOD SHEATHING ON TAPERED FLOOR JOIST; RE: STRUCT STUCCO ON PLYWOOD SHEATHING LVL RIM JOISTS; RE: STRUCT 4" FINISHED TOPPING LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" H J G A603 12 A603 11 A502 2 355 A501 A505 8 A505 13 A851 5 A501 10 A501 10 X17 36 GARAGE G01 TECH SHOP G04 ALPINE TUNING 126 RECEPTION HALL 201 A502 12 A502 1 25' - 9 1/2" 14' - 9"8' - 3"5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL DUCTWORK; RE: MECH PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING ON 1/2" DRAIN BOARD; RE: STRUCT STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM BREEZEWAY 101 PRECAST INVERTED TEE BEAM; RE: STRUCT 34 A504 355 A501 34 A504 35 A501 CONCRETE COLUMN; RE: STRUCT S1 STUCCO SOFFIT; RE: A571 4-1/2" CONCRETE SLAB ON 2" METAL DECK F4 F2 F3 4-1/2" CONCRETE SLAB ON 2" METAL DECK STEEL BEAM; RE: STRUCT 8' - 6" 7' - 6" 0' - 6" 33 80 80 ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF X28 2 A409 3" SPRAY FOAM INSULATION (R-19) BELLY BAND W-SHAPE STEEL ROOF SUPPORTS 1-1/2" CONCRETE TOPPING SLAB 3/4" FLOOR SHEATHING; RE: STRUCT FLOOR JOISTS; RE: STRUCT 5/8" GYPSUM BOARD SLIDING DOOR; RE: DOOR SCHEDULE STONE FLOOR TILE ON DRAINBOARD ON WATERPROOF MEMBRANE PLYWOOD SHEATHING ON TAPERED FLOOR JOIST; RE: STRUCT LAP SIDING WALL ASSEMBLY; RE: A571 ALUMINUM CLAD WOOD WINDOWS ALUMINUM CLAD WOOD WINDOW HEAVY TIMBER ROOF SUPPORT; RE: STRUCT MECHANICAL DUCT; RE: MECH MECHANICAL EXHAUST GRILL; RE: MECH ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19)140'-2-1/2" T.O. BEAM4" FIN. CONCRETE TOPPING F6 Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:01:37 PMA405 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 WALL SECTION 3/8" = 1'-0" 2 WALL SECTION 2 A403 1 A403 01 PERMIT 07.01.15 No. Description Date 06 9-15-17 F2 BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" 1 0.1 T.O. CHIMNEY 149' - 0" A502 1 X40 X28 A603 1 8' - 0 5/8"368228.174 A904 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING ON TOP OF 1/2" DRAINAGE BOARD; RE: STRUCT MECHANICAL DUCT; RE: MECH SLAB ON GRADE METAL GUARD RAIL NATURAL STONE WALL ASSEMBLY; RE: A102 & A571 PRECAST CONCRETE CAP ALUMINUM CLAD WOOD WINDOWS 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK STEEL BEAM; RE: STRUCT S1 F4 F6 A504 12 ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) D79 D82 ALUMINUM CLAD WOOD WINDOWS METAL CLOSURE BELLY BAND STUCCO SOFFIT 4" FIN. TOPPING LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" 1 1.1 0.1 A502 1 A505 17 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL PRECAST DOUBLE-T; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE (XPS) FOAM INSULATION 3-1/2"CONCRETE TOPPING ON TOP OF 1/2" DRAINANGE BOARD; RE: STRUCT F2 80 34 F2 X17 18 A501 19 A501 F5 F3 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK NATURAL STONE WALL ASSEMBLY; RE: A571 PRE-FINISHED METAL COPING COVER BELLY BAND LAP SIDING WALL ASSEMBLY; RE: A571 S1 STUCCO WALL ASSEMBLY; RE: A102 & A571 ALUMINUM CLAD WOOD WINDOWS METAL CLOSURE 34 7311' - 0"10' - 0" 11' - 0" 12' - 0" ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) D83 C3 1-1/2" CONCRETE TOPPING SLAB 3/4" FLOOR SHEATHING; RE: STRUCT FLOOR JOISTS; RE: STRUCT 5/8" GYPSUM BOARD CONDOMINIUM 3A 167 CLUB ROOM 207 ELEV VEST 118 STORAGE 117 WEST BREEZEWAY 116 GARAGE G01 EL. MA. 238 WEST ELEV VEST PSE3 CONDO 4 169 METAL GUARD RAIL; RE: LANDSCAPE SIDEWALK; RE: LANDSCAPE & CIVIL 4" FIN. CONCRETE TOPPING F6 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" 10.1 A504 12 A504 8 A504 7 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE WATERPROOF MEMBRANE DRAINAGE BOARD VAPOR RETARDER PEREMETER DRAIN; RE: CIVIL PRECAST DOUBLE-T; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE (XPS) FOAM INSULATION 3-1/2"CONCRETE TOPPING UNDER 1/2" DRAINAGE BOARD; RE: STRUCT MECHANICAL DUCT; RE: MECH 30 A501 15 A501 9' - 8 3/4" METAL GUARD RAIL CONC. SIDEWALK; RE: CIVIL STONE VENEER ON 1" MORTAR PRECAST CONCRETE CAP MECHANICAL LOUVER; RE: MECH PRECAST CONCRETE CAP BELLY BAND LAP SIDING PARAPET STONE VENEER WALL ASSEMBLY; RE: A202 & A271 PRE-FINISHED METAL COPING COVER INTERLOCKING PAVERS WITH SNOWMELT SYSTEM ON 4-1/2" CONCRETE SLAB ON 2" METAL DECK; PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING; RE: STRUCT 73 1' - 6" Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:01:47 PMA406 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 2 WALL SECTION 3/8" = 1'-0" 1 WALL SECTION 3 A403 2 A403 1 A403 3/8" = 1'-0" 3 WALL SECTION 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" GARAGE 88' - 0" 3 A408 3 A408 A15 A7 0' - 8" 6' - 6"17 A603 16 A603 15 A603 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT SUBBASE; RE: SOILS REPORT SUBGRADE PERMETER DRAIN; RE: CIVIL WATERPROOF MEMBRANE EXHAUST LOUVER; RE: MECHALUMINUM CLAD WOOD WINDOWS NATURAL STONE WALL ASSEMBLY; RE: A571 INTERLOCKING PAVERS WITH SNOWMELT SYSTEM HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT A502 11 A502 1 LEVEL 1 100' - 0" GARAGE 88' - 0" 3 3 A408 3 A408 SIM D17 80 A502 1 16 A60317 A603 15 A603 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT SUBBASE; RE: SOILS REPORT SUBGRADE PERMETER DRAIN; RE: CIVIL WATERPROOF MEMBRANE EXHAUST LOUVER; RE: MECH ALUMINUM CLAD WOOD WINDOWS NATURAL STONE WALL ASSEMBLY; RE: A571 INTERLOCKING PAVERS WITH SNOWMELT SYSTEM A502 11 OPP SLOPE HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT G4 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" 1 1.10.1 A504 20 8 A502 SIM 4 A501 SIM A501 5 SIM S1 F4 X40 X47 A502 2 F2 A502 1 88 80 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT PERMETER DRAIN; RE: CIVIL WATERPROOF MEMBRANE VAPOR RETARDER NATURAL STONE WALL ASSEMBLY; RE: A571 WEST STAIR WS0 GARAGE G01 GYM 203 WEST STAIR WS2 WEST STAIR WS1 73 10' - 7 1/2"RUBBER FLOOR8' - 6"ACOUSTIC CEILING TILE SUSPENDED CEILING TEE A501 19 A501 1811' - 0"10' - 0" 11' - 0" 12' - 0" A504 11 A504 11 PRECAST DOUBLE-T; RE: STRUCT PRECAST CONCRETE CAP STUCCO SOFFIT 8' - 6 1/4"STANDING SEAM METAL ROOF ROOF JOISTS; RE: STRUCT 12"x24" HEAVY TIMBER BEAM W-SHAPE; RE: STRUCT PRE-FINISHED METAL COPING COVER 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECKA505 7 BELLY BAND LAP SIDING WALL ASSEMBLY; RE: A571 STUCCO BOARD 3' - 10 3/4"CAST-IN-PLACE STAIR; RE: LANDSCAPE RECESSED WALL MOUNT LIGHT FIXTURE; RE: ELECT TOUNGE AND GROOVE SOFFIT 2" RIGID EXTRUDED POLYSTYRENE133'-10-1/8" T.O. BEAMScale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:01:56 PMA407 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 WALL SECTION - WEST EHU PATIO 3/8" = 1'-0" 2 WALL SECTION - EAST EHU PATIO 3/8" = 1'-0" 3 WALL SECTION 1 A403 1 A407 2 A407 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" GARAGE 88' - 0" A 1 A407 1 A407 A603 16 SLOPE A502 7 A501 22 A502 6 HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM PRECAST CONCRETE WALL CAP ANCHORED STONE VENEER WALL ASSEMBLY CAST-IN-PLACE CONCRETE STAIRS ANCHORED STONE VENEER WALL ASSEMBLY REINF. CONCRETE FOOTING; RE: STRUCT 43 A7 METAL FRAMED DRYWALL CEILING BATT INSULATION LEVEL 1 100' - 0" LEVEL 2 111' - 0" LEVEL 3 121' - 0" H 4-1/2" CONCRETE SLAB ON 2" METAL DECK 2" RIGID INSULATION 2-1/2" CONCRETE TOPPING SLAB PRECAST DOUBLE-T; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE (XPS) FOAM INSULATION 2-1/2"CONCRETE TOPPING; RE: STRUCT 80 73 3610' - 0"11' - 0" PRE-FINISHED METAL COPING COVER BELLY BAND LAP SIDING WALL ASSEMBLY; RE: A571 SUNSHADE INVERTED ROOF MEMBRANE ASSEMBLYSTEEL BEAM; RE: STRUCT SOIL ON 4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT & CIVIL PRECAST CONCRETE WALL CAP ALUMINUM CLAD WOOD WINDOWS D24 ANCHORED STONE VENEER WALL ASSEMBLY; RE: A571 A504 32 A501 30 A504 5 A603 1 LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" E 17' - 0"PLYWOOD SHEATHING; RE: STRUCT 1-1/2" CONCRETE TOPPING SLAB FLOOR JOISTS; RE: STRUCT ROOF HATCH ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) 26 STANDING SEAM METAL ROOF 26 8' - 0"3' - 3 1/8"7' - 6 3/8"LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" H G A851 16 A502 2 A504 32 15 15 X24 A851 8 14' - 9" WMNS ALPINE LOCKERS 114 CLUB ROOM 207 GARAGE G01 TECH SHOP G04 CONDOMINIUM 3A 167 A504 5 A504 29 PRE-FINISHED METAL COPING COVER BELLY BAND LAP SIDING WALL ASSEMBLY; RE: A571 SUNSHADE INVERTED ROOF MEMBRANE ASSEMBLY A501 30 FULL LITE SWING DOOR; RE: A850 PLYWOOD SHEATHING; RE: STRUCT 1-1/2" CONCRETE TOPPING SLAB FLOOR JOISTS; RE: STRUCT ALUMINUM CLAD WOOD WINDOWS STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK METAL FRAMED DRYWALL CEILING STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM 36 HALL 127 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT VAPOR RETARDER PRECAST DOUBLE-T; RE: STRUCT 2" RIGID EXTRUDED POLYSTYRENE (XPS) FOAM INSULATION 2-1/2"CONCRETE TOPPING; RE: STRUCT PRECAST INVERTED TEE BEAM; RE: STRUCT COILING OVERHEAD DOOR; RE: A850 MECHANICAL DUCT; RE: MECH METAL FRAMED DRYWALL CEILING REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 80 SUNSHADE BELLY BAND DECORATIVE STEEL W-SHAPE SUPPORTS ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19)8' - 7"9' - 7 1/2"10' - 7 1/2"139'-4-1/8" PLATE HT.Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:02:06 PMA408 WALL SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 3 WALL SECTION 20 - 3/8" = 1'-0" 2 WALL SECTION 21 3/8" = 1'-0" 4 MECHANICAL CHIMNEYS 3/8" = 1'-0" 1 WALL SECTION 1 A408 3 A408 2 A408 4 A408 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" 3 8' - 0"EHU G16 EHU STUDIO - TYPE A UNIT G15 4" 12" G4 REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT SUBBASE; RE: SOILS REPORT SUBGRADE ALUMINUM CLAD WOOD WINDOWS VAPOR BARRIER INTERLOCKING PAVERS WITH SNOWMELT SYSTEM HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT HSS-SHAPE STEEL SUPPORTS; RE: STRUCT HSS OPEN TRELLIS AT ENTRY PORT COCHERE/ CANTILEVER PRECAST CONCRETE CAP METAL FRAME, ACHORED STONE VENEER WALL SNOW FENCE HEAVY TIMBER BEAM; RE: STRUCT ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF FASCIA LAP SIDING WALL ASSEMBLY METAL FRAME DRYWALL CEILING CONC. CURB AND GUTTER; RE: CIVIL ANCHORED STONE VENEER INSULATED FURRING WALL; RE: A570 43 43 1 27' - 3 1/8" 2 LEVEL 2 111' - 0" LEVEL 3 121' - 0"10' - 0"HEAVY TIMBER BEAM; RE: STRUCT ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF W-SHAPE STEEL SUPPORTS; RE: STRUCT STEEL PLATE; RE: STRUCT ANCHORED STONE VENEER WALL ASSEMBLY; RE: A571 30 A501 5 A504 G10 SLOPED STEEL BEAM; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT PRE-FINISHED METAL COPING COVER LAP SIDING ALUMINUM CLAD WOOD WINDOWS 34 A504 1 G202 Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:02:15 PMA409 LOW GABLE SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 PORTE COCHERE GABLE 3/8" = 1'-0" 2 SOUTH TERRACE 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 WEATHERED WOOD LAP SIDING 2" R-9 CONTINUOUS RIGID INSULATION STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT FLUID-APPLIED AIR/WATER BARRIER ON 5/8" GYP. SHEATHING BACKER ROD AND SEALANT 2X14 WEATHERED WOOD BELLY BAND 0' - 0 1/2" 2-1/2" METAL STUD FRAMING AT 16" O.C.1' - 11" 3-COAT STUCCO SOFFIT 2X4 WEATHERED WOOD TRIM 2X14 BELLY BAND J-MOLD BACKER ROD AND SEALANT CASING BEAD BACKER ROD AND SEALANT STEEL BEAM; RE: STRUCT STUCCO WALL ASSEMBLY; RE: FLOOR PLANS & BUIDLING ASSEMBLIES F4 2" R-9 CONTINUOUS RIGID INSULATION 6" METAL STUD FRAMING AT 16" O.C. WITH R-19 BATT INSULATION STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT FLUID-APPLIED AIR/WATER BARRIER ON 5/8" GYP. SHEATHING 2-1/2" METAL STUD FRAMING AT 16" O.C. 3-COAT STUCCO SOFFIT METAL LATH SCRATCH COAT MORTAR SETTING BED STONE VENEER STONE MASONRY VENEER 1" MORTAR CONCRETE WALL STONE CAP 0' - 2" 0' - 2" METAL THROUGH WALL FLASHING WITH DRIP EDGE 3/8" RAKED COPING JOINTS ANCHORING SYSTEM 10" HOLLOW CORE PLANK; RE: STRUCT WATERPROOFING MEMBRANE DRAINBOARD HYDRONIC SNOWMELT SYSTEM 4" PAVERS ON 1" SAND PROTECTION BOARD 1-1/2"Ø GUARDRAIL; SET WITH EPOXY SPPED GROUT AND SEAL 0' - 6"1' - 6"0' - 6" STONE RUBBLE CAP WITH 1" OVERHANG ON EACH SIDE CURB & GUTTER; RE: CIVIL STONE VENEER STRUCTURAL RETAINING WALL; RE: STRUCT BRICK LEDGE ANGLE 8X12 TIMBER ABOVE; RE: STRUCT 2-1/2" METAL STUD FRAMING 5/8" DENSGLAS SHEATHING WOOD CLADING 1' - 4 1/2" 1' - 4 1/2" A570 13 A570 13 PRECAST CAP WALL BELOW 0' - 1"2' - 2 1/4"0' - 1" 0' - 1" 4' - 1 1/2" 0' - 1"2' - 4 1/4" CAP4' - 3 1/2" CAP PRECAST WALL CAP ABOVE 3-5/8" METAL STUD FRAMING STONE VENEER ON 1" MORTAR A570 13 A570 13 0' - 8 1/2"0' - 0 1/2"F2 DRAINBOARD 3 3/4" 4"3.5" CONCRETE TOPPING SLAB PER STRUCTURAL WATERPROOFING MEMBRANE 4" FIN. CONCRETE TOPPING W/ HYDRONIC SNOWMELT SYSTEM 2" R-9 CONTINUOUS RIGID INSULATION 6" METAL STUD FRAMING AT 16" O.C. WITH R-19 BATT INSULATION STEEL BEAM; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT FLUID-APPLIED AIR/WATER BARRIER ON 5/8" GYP. SHEATHING 2-1/2" METAL STUD FRAMING AT 16" O.C. 3-COAT STUCCO SOFFIT METAL LATH SCRATCH COAT MORTAR SETTING BED STONE VENEER THROUGH-WALL FLASHING 2X WOOD BACKING 2X10 WEATHERED WOOD BELLY BAND REINF. CONCRETE FOUNDATION WALL; RE: STRUCT ANCHORED STONE VENEER ON 1" MORTAR FLUID-APPLIED AIR/WATER BARRIER LAP SIDING ON 1" Z- FURRING CHANNEL CONCRETE WALL; RE: STRUCT WOOD FURRING ON THE FLAT STUCCO BOARD PRE-FINISHED METAL COPING COVER FLUID-APPLIED AIR/WATER BARRIER LAP SIDING BLOCKING F4 THROUGH-WALL FLASHING 2X WOOD BACKING 2X10 WEATHERED WOOD BELLY BAND X23 X33 F4 X25 (2) LAYERS 1/2" GYPSUM BOARD ON METAL FRAMING STEEL BEAM; RE: STRUCT SPRAY FIREPROOFING AT THE UNDERSIDE OF METAL DECK; TYP. DRAIN BOARD ON PROTECTION BOARD ON WATERPROOF MEMBRANE 8X12 TIMBER BEAM; RE: STRUCT BATT INSULATION STUCCO SOFFIT ASSEMBLY S1 F4 WOOD CLAD COLUMN; RE: 4/A501 CASING BEAD SEALANT, BOTH SIDES 0' - 1" 5' - 10" 0' - 1" 2' - 3 1/4" CAP6' - 0" CAP PRECAST WALL CAP ABOVE 3-5/8" METAL STUD FRAMING STONE VENEER ON 1" MORTAR A570 13 7/8" HAT CHANNEL 1' - 1 5/8"0' - 1"0' - 4 5/8"1' - 4" 0' - 4 5/8"0' - 1"0' - 1" 1' - 4" 0' - 1"2X14 BELLY BAND BACKER ROD AND SEALANT BACKER ROD AND SEALANT STEEL BEAM; RE: STRUCT LAP SIDING WALL ASSEMBLY; RE: FLOOR PLANS & BUIDLING ASSEMBLIES F4 STONE MASONRY VENEER 1" MORTAR CONCRETE WALL STONE CAP 0' - 2" METAL THROUGH WALL FLASHING WITH DRIP EDGE 3/8" RAKED COPING JOINTS ANCHORING SYSTEM 10" HOLLOW CORE PLANK; RE: STRUCT WATERPROOFING MEMBRANE DRAINBOARD HYDRONIC SNOWMELT SYSTEM 4" PAVERS ON 1" SAND PROTECTION BOARD CURB & GUTTER; RE: CIVIL METAL GUARDRAIL STEEL PLATE; RE: STRUCT RE: CIVIL0' - 0 3/4"PRE-FINISHED METAL COPING COVER BLOCKING STUCCO BOARD 5/8" GLASS-MAT GYPSUM, WATER- RESISTANT WALL SHEATHING METAL STUD FRAMING LAP SIDING ON 1" Z- FURRING CHANNEL 2" R-9 CONTINUOUS RIGID INSULATION FLUID-APPLIED AIR/WATER BARRIER F4 THROUGH-WALL FLASHING 2X WOOD BACKING 2X10 WEATHERED WOOD BELLY BAND X23 X23 STANDING SEAM METAL ROOF ROOF SHEATHING; RE: STRUCT VAPOR PERMIABLE UNDERLAYMENT; RE: SPEC 3" NAIL BASE (LTTR = 15) OVER 3" POLYISO (LTTR = 17.4). JOINTS TO BE STAGGERED AND OFFSET PER MANUF. SPEC. ROOF SHEATHING; RE: STRUCT WATERPROOFING UNDERLAYMENT FIRE-RESISTANT ROOFING UNDERLAYMENT 3" SPRAY FOAM INSULATION (R-19) 1-1/2" SPRAY FOAM INSULATION BLOCKING BATT INULATION 5/8" GYPSUM BOARD 1X3 1' - 2 1/8" 6" DIA CORNICE DRAIN (2) ROWS HEAT TRACE; EXTEND (1) ROW MIN. INTO DOWNSPOUT TO POINT WHERE WATER WILL REMAIN LIQUID HEAT TRACE. HOLD WITH METAL CLIPS SARNAFIL DARK-BROWN COLRED FLEECE-BACK MEMBRANE FULLY ADHERED TO GUTTER & UP ROOF SLOPE 24" MIN. WELD MEMBRANE @ LAP 1' - 3 1/4"2' - 1 3/4"0' - 1 5/8"SNOW FENCE DOWNSPOUT; LOOSE-FIT CONNECTION TO PIPE DOWNSPOUT NOTE: SLOPE GUTTER 1/8"/FT; MAX RUN BETWEEN DRAINS 24'.MIN.0' - 6"MAX0' - 3"LINE OF MAX GUTTER HEIGHT BEYOND RAFTERS; RE: STRUCT CONTINUOUS CLEAT FASCIA BOARD 1' - 8"14" LVL EAVE OUTRIGGER BEAMS, RE: STRUCT 1/4" CEMENTIOUS SOFFIT BOARD 3/4" FT T&G BOARD 2X DOUBLE TOP PLATE W/ SEAT CUT BCI/LVL RAFTER STANDING SEAM METAL ROOF ROOF SHEATHING; RE: STRUCT VAPOR PERMIABLE UNDERLAYMENT; RE: SPEC 3" NAIL BASE (LTTR = 15) OVER 3" POLYISO (LTTR = 17.4). JOINTS TO BE STAGGERED AND OFFSET PER MANUF. SPEC. ROOF SHEATHING; RE: STRUCT WATERPROOFING UNDERLAYMENT FIRE-RESISTANT ROOFING UNDERLAYMENT 3" SPRAY FOAM INSULATION (R-19) 1-1/2" SPRAY FOAM INSULATION BLOCKING BATT INULATION 5/8" GYPSUM BOARD 1X3 1' - 2 1/8" 6" DIA CORNICE DRAIN (2) ROWS HEAT TRACE; EXTEND (1) ROW MIN. INTO DOWNSPOUT TO POINT WHERE WATER WILL REMAIN LIQUID HEAT TRACE. HOLD WITH METAL CLIPS SARNAFIL DARK-BROWN COLRED FLEECE-BACK MEMBRANE FULLY ADHERED TO GUTTER & UP ROOF SLOPE 24" MIN. WELD MEMBRANE @ LAP 1' - 3 1/4"2' - 1 3/4"0' - 1 5/8"SNOW FENCE DOWNSPOUT; LOOSE-FIT CONNECTION TO PIPE DOWNSPOUT NOTE: SLOPE GUTTER 1/8"/FT; MAX RUN BETWEEN DRAINS 24'.MIN.0' - 6"MAX0' - 3"LINE OF MAX GUTTER HEIGHT BEYOND RAFTERS; RE: STRUCT CONTINUOUS CLEAT FASCIA BOARD 1' - 2"14" LVL EAVE OUTRIGGER BEAMS, RE: STRUCT 1/4" CEMENTIOUS SOFFIT BOARD 3/4" FT T&G BOARD 2X DOUBLE TOP PLATE W/ SEAT CUT BCI/LVL RAFTER Scale Date Drawn By Project Number As indicated 9/15/2017 5:02:39 PMA501 EXTERIOR DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1 1/2" = 1'-0" 6 CANTILEVERED SOFFIT 1 1/2" = 1'-0" 2 BELLY BAND DETAIL 1 1/2" = 1'-0" 1 SOFFIT AT STONE WALL 1 1/2" = 1'-0" 11 STONE VENEER CONC WALL CAP 1" = 1'-0" 21 STONE WALL @ HOLLOW PLANK SLAB 3/4" = 1'-0" 4 COLUMN @ PORTE COCHERE 3/4" = 1'-0" 3 COLUMN BASE PLAN 1 1/2" = 1'-0" 10 ROOF GABLE FASCIA DETAIL 1 1/2" = 1'-0" 14 STONE WALL @ SLAB 1 1/2" = 1'-0" 9 SOFFIT AT STONE WALL W/ BEAM 1 1/2" = 1'-0" 12 STONE COLUMN TO WALL TRANSITION 1 1/2" = 1'-0" 18 STONE TO LAP SIDING @ CONC 1 1/2" = 1'-0" 19 CONC PARAPET DETAIL 1 1/2" = 1'-0" 30 STONE TO LAP SIDING @ MTL STUD 1 1/2" = 1'-0" 23 LANDSCAPE ROOF @ WALL 3/4" = 1'-0"5 BEAM @ PORTE COCHERE SECTION 3/4" =1'-0" 8 STONE VENEER FALSE WALL PLAN 1 1/2" = 1'-0" 7 BELLY BAND DETAIL 1 1/2" = 1'-0" 20 TRASH ENCLOSURE CAP 1" = 1'-0" 22 GUARDRAIL AT HOLLOW PLANK SLAB 1 1/2" = 1'-0" 15 LAP SIDING PARAPET DETAIL 1 1/2" = 1'-0" 35 STONE TO STONE BELLY BAND 1 1/2" = 1'-0" 31 ROOF EAVE DETAIL W 20" BCI 1 1/2" = 1'-0" 33 ROOF EAVE DETAIL W 14" BCI 01 PERMIT 07.01.15 No. Description Date 06 9-15-17 BLDG.PERMIT CORR. 10/24/17 WATERPOOF MEMBRANE UNDERSLAB VAPOR RETARDER 2" RIGID EXTRUDED POLYSTYRENE DRAINAGE MAT REINF. CONCRETE FOOTING; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT PEREMETER DRAIN; RE: CIVIL UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT SUBBASE; RE: SOILS REPORT PRECAST WALL PANEL WATERSOP BEDDED IN ADHESIVE CLOSED-CELL BACKER ROD AND POLYURETHANE SEALANT WATERPOOF MEMBRANE WATERSTOP VAPOR RETARDER ELASTOMERIC FLASHING SHEET UNDERSLAB VAPOR RETARDER REINF. CONCRETE FOOTING; RE: STRUCT 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT SUBBASE; RE: SOILS REPORT WATERPOOF MEMBRANE STEEL ANGLE; RE: STRUCT STONE VENEER CONC. WALL; RE: STRUCT LEVEL 1 RE: CIVILVARIES0' - 1" 0' - 4"0' - 1" 0' - 3 5/8" 1' - 5 5/8" 0' - 3 5/8" METAL STUD FRAMING 5/8" GLASS-MAT GYPSUM, WATER-RESISTANT WALL SHEATHING ANCHORED STONE MASONRY VENEER ON 1" MORTAR PRECAST CONCRETE WALL CAP F3 CONCRETE CURB AND GUTTER; RE: CIVIL F3 HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT INTERLOCKING PAVERS WITH SNOWMELT SYSTEM DRAIN BOARD ON PROTECTION BOARD ON WATERPROOF MEMBRANE 4" CONCRETE FIN. TOPPING 3.5" CONC. TOPPING PER STRUCTURAL GRID WEEPS FOUNDATION WALL WATERPROOF MEMBRANE SHEET-APPLIED WATERPROOF MEMBRANE WEATHER- RESISTIVE BARRIER THROUGH WALL FLEXIBLE FLASHING MEMBRANE LAP0' - 8"24" TYP.LEDGER ANGLE EXTEND 12" INTERLOCKING PAVERS WITH SNOWMELT SYSTEM DRAIN BOARD ON PROTECTION BOARD ON WATERPROOF MEMBRANE HOLLOW-CORE PRECAST CONRETE PLANK; RE: STRUCT DRAIN BOARD 2" RIGID INSULATION WATERPROOF MEMBRANE REINF. CONCRETE FOUNDATION WALL; RE: STRUCT E XTEND 12" COLORED CONCRETE BAND WITH SNOWMELT. RE: LANDSCAPE INTERLOCKING PAVERS WITH SNOWMELT SYSTEM DRAIN BOARD ON PROTECTION BOARD ON WATERPROOF MEMBRANE 2" RIGID INSULATION WATERPROOF MEMBRANE DRAIN BOARD REINF. CONCRETE FOUNDATION WALL; RE: STRUCT ANCHORED STONE VENEER CONCRETE CURB AND GUTTER; RE: CIVIL REINF. CONCRETE FOUNDATION WALL; RE: STRUCT EXPANSION JOINT WATERPOOF MEMBRANE STEEL ANGLE; RE: STRUCT STONE VENEER CONC. WALL; RE: STRUCT Scale Date Drawn By Project Number As indicated 9/15/2017 5:02:51 PMA502 FOUNDATION DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/4" = 1'-0" 1 FOUNDATION AT PERIMETER DRAIN 3/4" = 1'-0" 2 FOUNDATION DETAIL 1 1/2" = 1'-0"4 VERTICAL JOINT @ PRECAST WALL PANELS 3/4" = 1'-0" 3 FOUNDATION @ ELEVATOR 3/4" = 1'-0" 6 FOUNDATION DETAIL @ EHU PATIO 3/4" = 1'-0" 7 FOUNDATION AT STONE WALL 3/4" = 1'-0" 8 FND @ STONE WALL 1" = 1'-0"9 HOLLOW CORE PLANK @ WALL 1" = 1'-0" 10 FND @ EXTERIOR STONE WALL 1" = 1'-0" 11 HOLLOW CORE PLANK @ FND WALL 1" = 1'-0" 12 FOUNDATION WALL @ SOUTH PATIO 1 1/2" = 1'-0" 13 STONE WALL @ NORTH DRIVE 3/4" = 1'-0" 14 FND @ TRASH ENCLOSURE 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 COLUMN GRID 0' - 3 5/8"TS 4X4X1/4 0' - 2 1/8"BEAM BELOW COLUMN GRID 0' - 5 1/8"TS 5X5X3/8 BEAM BELOW 0' - 8"0' - 5 3/4"GRID 0' - 8"0' - 6"0' - 0 1/2"0' - 2 3/4" BEAM WALL/COLUMN 0' - 5 3/4" 0' - 3 3/4" BEAM WALL/COLUMN 0' - 6 3/4" W18X35 W12X45 1' - 2 7/8"1' - 8 1/2"0' - 3" BEAM WALL/COLUMN 0' - 6" W12X26 1' - 3"0' - 5 1/4" BEAM WALL/COLUMN 0' - 8 1/4" W18X97 1' - 9 3/8"1' - 5 7/8" 1' - 0"1' - 1 1/2" 0' - 11 1/2" 0' - 1 3/4" BEAM WALL/COLUMN 0' - 4 3/4" W12X22 1' - 3"0' - 9 1/2" 0' - 1 3/4" BEAM WALL/COLUMN 0' - 4 3/4" W12X14 1' - 2 5/8"0' - 9 1/2" 0' - 5 3/8" BEAM WALL/COLUMN 0' - 8 3/8" W18X119 1' - 9 3/4"1' - 4 3/4" 0' - 3 1/2" BEAM WALL/COLUMN 0' - 6 1/2" W18X50 1' - 8 3/4"1' - 1" COLUMN GRID 0' - 5 5/8" TS 4X4X1/4 BEAM BELOW0' - 0 1/8"0' - 8"Scale Date Drawn By Project Number 1 1/2" = 1'-0"9/15/2017 5:03:00 PMA503 EXTERIOR DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1 1/2" = 1'-0" 1 1HR COLUMN IN WALL DETAIL 1 1/2" = 1'-0" 3 1HR COLUMN IN WALL DETAIL 1 1/2" = 1'-0" 4 1HR COLUMN IN WALL DETAIL 1 1/2" = 1'-0" 5 TYPICAL BEAM @ EXTERIOR 1 1/2" = 1'-0" 2 1HR COLUMN IN WALL DETAIL 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 STUCCO ASSEMBLY CORNER BEAD TYPICAL 3 COAT STUCCO ASSEMBLY WITH FRAMING, RE: STRUCT FLASHING AT OUTSIDE CORNER STUCCO ASSEMLBY INTERIOR CONTROL JOINT TYPICAL 3 COAT STUCCO ASSEMBLY WITH FRAMING, RE: STRUCT FLASHING AT INSIDE CORNER TYPICAL 3 COAT STUCCO ASSEMLBY STUCCO CONTROL JOINT 3'-0" ABOVE TOP OF WALL0' - 6 1/2" 0' - 6 1/2"COVER PLATE 1 1/2" DIA. POSTS EMBEDDED IN CONCRETE WALL 3/4" CHAMFER EACH SIDE 1" VERTICAL POSTS 1" HORIZONTAL POSTS 1" HORIZONTAL POSTS 0' - 2"SEALANT /BACKER ROD 5/8" GYPSUM WALLBOARD OVER 6" EXTERIOR STUDS SCHEDULED BASE & FLOORING 2 COAT STUCCO SYSTEM OVER MTL LATH & 15# FELT 2 COAT STUCCO SYSTEM WRAPS BENEATH OVERHANG GYP SHEATHING OVER RESILIENT CHANNEL - PROVIDE WHERE 1-HR RATING REQUIRED STUCCO WEEP SCREED WITH DRIP 5/8" GYPSUM SHEATHING FLOOR JOIST , RE STRUCT. - PROVIDE WHERE 1-HR RATING REQUIRED EXTEND DRAINAGE BD TO DRIP 0' - 11"VARIESPRECAST CONCRETE STAIR WITH SNOWMELT 5' - 6" 6X10 HEAVY TIMBER 4" ANODIZED ALUMINUM AIRFOIL BLADES WELDED TO OUTRIGGERS ALUMINUM OUTRIGGER KNIFE PLATE; RE: STRUCT BOLTED CONNECTION X25 4' - 0" 1x4 TUBE STEEL 4' - 0" 0' - 2 1/2"3' - 0" X25 KNIFE PLATE; RE: STRUCT 6X10 HEAVY TIMBER0' - 9 1/4"4" ANODIZED ALUMINUM AIRFOIL BLADES WELDED TO OUTRIGGERS 1"x4" TUBE STEEL ALUMINUM OUTRIGGER WOOD BLOCKING BOLTED CONNECTION 2' - 0" MIN.FULLY ADHERED EPDM ROOFING MEMBRANE CANT STRIP PRE-FINISHED METAL COPING COVER BLOCKING F4 METAL STUD FRAMING (2) LAYERS 5/8" EXTERIOR GYPSUM WALL BOARD STUCCO BOARD STEEL BEAM; RE: STRUCT LANDSCAPE 1' - 6" RE: METAL STUD FRAMING 5/8" GLASS-MAT GYPSUM, WATER-RESISTANT WALL SHEATHING ANCHORED STONE MASONRY VENEER 1" MORTAR FLUID-APPLIED AIR/WATER BARRIER INTERLOCKING PAVERS WITH SNOWMELT SYSTEM COLORED CONC. BAND WITH SNOWMELT AND REBAR; RE: LANDSCAPE METAL STUD FRAMING MECHANICAL LOUVER; RE: MECH 5/8" GLASS-MAT GYPSUM, WATER-RESISTANT WALL SHEATHING ANCHORED STONE MASONRY VENEER 1" MORTAR FLUID-APPLIED AIR/WATER BARRIER W-SHAPE COLUMN; RE: STRUCT HEAVY TIMBER BEAM; RE: STRUCT BOLTED CONNECTION; RE: STRUCT WOOD BLOCKING 0' - 6"W-SHAPE COLUMN; RE: STRUCT HEAVY TIMBER BEAM; RE: STRUCT R2 T&G SOFFIT SOLID SOLDERED END CAP BY MANUF. SOLID SOLDERED COPING CORNER, BY MANUF. CAP JOINT RE: DETAIL 17/A9.20 HATCHED LINE - PREFINISHED MTL FLASHING OVER ROOFING MEMBRANE & EXTERIOR WALL ASSEMBLY. FLASHING TO MATCH FINISH OF PARAPET CAP. FLASHING TO WRAP PARAPET CORNER AND TO LAP UNDER COPING ON LOWER PARAPET PREFINISHED PARAPET CAP SHEET MTL SPLICE HAIRLINE JOINT TYP ROOFING MEMBRANE LAPS PARAPET BELOW SHEET MEL SPICE & CAP 14A 14A 14A SPLICE TO FIT IN PARAPET HEM, TYP METAL COPING- PAINT TO MATCH ADJACENT FINISH SLOPE TOP CONTINUOUS BLOCKING 4" MIN.CONTINUOUS CLEAT- BETWEEN BATTENS ATTACH 12" O.C. ROOF AREA EXTERIOR EQ EQ 1' - 6"EQ EQSTEEL COLUMN; RE: STRUCT (2) LAYERS 1/2" GYP. BOARD METAL CLOSURE; PAINT TO MATCH ADJACENT W-SHAPE SUPPORTS W-SHAPE COLUMN; RE: STRUCT WELDED CONNECTION; RE: STRUCT TIMBER BEAM ABOVE; RE: STRUCT 1' - 0"0' - 6"25 .00°RE: STRUCT10' - 10 1/2"10 A504 W-SHAPE SUPPORT; RE: STRUCT BOLTED CONNECTION; RE: STRUCT HEAVTY TIMBER BEAM; RE: STRUCT WELDED CONNECTION; RE: STRUCT BASE PLATE; RE: STRUCT 30.00° 28 A504 A501 33 X23 2X14 WEATHERED WOOD BELLY BAND F5 WOOD BLOCKING DECORATIVE STEEL W-SHAPE SUPPORTS; RE: STRUCT STEEL PLATE BOLTED CONNECTION; RE: STRUCT WOOD BLOCKING WOOD BLOCKING BOLTED CONNECTION; RE: STRUCT SNOW FENCE STEEL PLATE WOOD BLOCKING BOLTED CONNECTION; RE: STRUCT W-SHAPE; RE: STRUCT 9-1/2" X ??" STEEL PLATE (4) 1/2"Ø STEEL BOLTS 2X TREATED BLOCKING CAULK AROUND STEEL PLATE 25 .0 0°0' - 6"0' - 4"X23 F5 DECORATIVE STEEL W-SHAPE SUPPORTS; RE: STRUCT STEEL PLATE BOLTED CONNECTION; RE: STRUCT WOOD BLOCKING BOLTED CONNECTION; RE: STRUCT HEAVY TIMBER BEAM; RE: STRUCT 2' - 3"CAULKING LOOSE LINTEL; RE: STRUCT STONE VENEER ON 1" MORTAR CONCRETE WALL; RE: STRUCT 5/8" GYPSUM BOARD ON 7/8" HAT CHANNEL Scale Date Drawn By Project Number As indicated 9/15/2017 5:03:11 PMA504 EXTERIOR DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3" = 1'-0" 1 STUCCO EXTERIOR CORNER 3" = 1'-0" 3 STUCCO INT. CORNER 3" = 1'-0" 2 TYP. STUCCO CONTROL JOINT 3" = 1'-0" 16 RAILING @ RAMP WALL 1 1/2" = 1'-0" 4 STUCCO OVERHANG 1 1/2" = 1'-0" 6 PRECAST CONCRETE STAIR W/ SNOWMELT 3/4" = 1'-0" 31 SUNSHADE PLAN DETAIL 1 1/2" = 1'-0" 32 SUNSHADE SECTION DETAIL @ STONE 1 1/2" = 1'-0" 12 SOUTH WEST PLANTER DTL 1 1/2" = 1'-0" 7 BASE @ GRILL 1 1/2" = 1'-0" 8 EXHAUST GRILL @ PLANTER 1 1/2" = 1'-0" 10 ROOF SUPPORT PLAN DETAIL 1 1/2" = 1'-0" 9 ROOF SUPPORT SECTION DETAIL 1" = 1'-0" 15 TYP PARAPET TRANSITION 1" = 1'-0" 14 TYPICAL PARAPET CAP JOINT 1 1/2" = 1'-0" 5 METAL COPING AT LAP SIDING 1 1/2" = 1'-0" 19 PORTE COCHERE ROOF SUPPORT 3/8" = 1'-0" 20 BALCONY ROOF SUPPORT ELEVATION 1" = 1'-0" 29 VERT. W-BEAM @ ROOF ELEV 1 1/2" = 1'-0" 28 VERT. W-BEAM @ ROOF 1" = 1'-0" 34 VERT. W-BEAM @ ROOF ELEV Copy 1 1 1/2" = 1'-0" 11 STONE HEADER @ CONC WALL 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 SUBGRADE SUBBASE; RE: SOILS REPORT WATERPROOF MEMBRANE 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOUNDATION WALL; RE: STRUCT SUBGRADE SUBBASE; RE: SOILS REPORT WATERPROOF MEMBRANE 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT CERAMIC TILE ON 3/8" SETTING BED SCHLUTER TRANSITION STRIP DOOR THRESHOLD SUBGRADE SUBBASE; RE: SOILS REPORT WATERPROOF MEMBRANE 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT DOOR THRESHOLD STONE TILE ON 1/2" SETTING BED 0' - 1 1/2" 3" TOPPING SLAB PER STRUCTURAL 10" HOLLOW CORE PLANK; RE: STRUCT WATERPROOFING MEMBRANE DRAINBOARD HYDRONIC SNOWMELT SYSTEM 4" PAVERS ON 1" SAND PROTECTION BOARD 2" RIGID INSULATION 4" FIN. CONCRETE TOPPING W/ HYDRONIC SNOWMELT SYSTEM 0' - 4"1/2" CLOSED-CELL EXPANSION JOINT WATERPROOFING MEMBRANE TO WRAP UP EDGE OF SLAB AND TERMINATE JUST BELOW TOP OF SLAB DUAL LEVEL DRAIN BAR GRATE TOPPING SLAB DRAINAGE MAT3 1/2" F2 DOOR THRESHOLD CONCRETE TOPPING SCHLUTER TRANSITION STRIP BUILD UP AT RUBBERIZED FLOOR AND CP TILES DRAINAGE MAT4"3 1/2" SCHLUTER TRANSITION STRIP RUBBERIZED FLOORING F4 FINISHED CONCRETE 4 1/2" 1"F4 3/8" CAULK JOINT RUBBER FLOORING CONCRETE TOPPING DOOR THRESHOLD F4 SCHLUTER TRANSITION STRIP FINISHED FLOOR- CARPET FINISHED CONCRETE 4 1/2" 1"RAISED BAR GRATE SCHLUTER TRANSITION STRIP FLOORING FLOOR DRAIN; RE: PLUMB F4 GRID 0' - 4"2" MIN.STONE TILE ON HEAT TRACE ACOUSTICAL UNDERLAYMENT 1-1/2" CONCRETE TOPPING SLAB F1 VFY FINISH FLOORING CLUB LEVEL 2 (2) LAYERS 6 MIL POLYFILM PLYWD SHEATHING TAPERED INSULATION DENSDECK PRIME HOT, FLUID-APPLIED, FABRIC- REINFORCED RUBBERIZED ASPHALT WATERPROOFING MEMBRANE ASPHALTIC HARDBOARD PROTECTION BOARD DRAINAGE MAT FILTER FABRIC STONE BALLAST 2"GRID 0' - 2 1/4" MAX F5 STUCCO BOARD RIM JOISTS; RE: STRUCT STAINLESS STEEL PAN FLASHING WITH END DAMS FULLY SOLDERED TIGHT STONE TILE ON HEAT TRACE GRID 0' - 0 3/4" MAX0' - 2 3/4" F5 STAINLESS STEEL PAN FLASHING WITH END DAMS FULLY SOLDERED TIGHT STONE TILE ON HEAT TRACE F4 MIN.0' - 3"DRAINAGE MAT DUAL LEVEL DRAIN HYDRONIC SNOW MELT SYSTEM AMERICAN HYDROTECH 6125FR WATERPROOFING MEMBRANE 3 1/2" 1/2" CLOSED-CELL EXPANSION JOINT WATERPROOFING MEMBRANE TO WRAP UP EDGE OF SLAB AND TERMINATE JUST BELOW TOP OF SLAB BUILD UP AT RUBBERIZED FLOOR AND CP TILES DRAINAGE MAT4"3 1/2" GRID STAINLESS STEEL PAN FLASHING WITH END DAMS FULLY SOLDERED TIGHT F4 STONE TILE ON HEAT TRACE LEVEL 1 CLUB: BREEZEWAY, TUNING, BATHROOMS, MECH., CENTRAL STAIR CORE GARAGE LEVEL FIN FLOOR/ STAINED CONCRETE FLOOR WATERPROOFING MEMBRANE 3.5" MIN. CON. TOPPING PER STRUCTURAL PRECAST NOTES PRECAST TEES PER STRUCTURAL TOP OF FINISH TOP OF STRUCT. SLAB4"LEVEL 1 CLUB: COACHES WORK STATIONS, ACROBATICS, OFFICE, LOCKERS GARAGE LEVEL RUBBERIZED FLOORING, CP TILES, HARDWOOD 3/4" PLYWD 2X SLEEPER PRECAST TEES PER STRUCTURAL TOP OF FINISH TOP OF STRUCT. SLAB 3.5" MIN.TOPPING SLAB PER STRUCTURAL 4"3 1/2" LEVEL 2 CLUB: UNHEATED AREAS AT WEST CLUB LEVEL 1 RANDOM CUT STONE PAVERS, SAND SET CONCRETE TOPPING MORTAR SET AND HEAT DRAINAGE MAT TOP OF FINISH TOP OF STRUCT. SLAB11 1/2"4 1/2" 7"RIGID XPS INSULATION CONCRETE SLAB PER STRUCTURAL W/ 2" METAL DECK STEEL BEAM PER STRUCTURAL LEVEL 2 CLUB: RECEPTION HALL, BATHROOMS, KITCHEN, EAST HALL, EVENT OFFICE, MECH. CLUB LEVEL 1 MARINE GRADE PAINT CONCRETE TOPPING OVER 2" METAL DECK STEEL BEAMS PER STRUCTURAL TOP OF FINISH TOP OF STRUCT. SLAB4 1/2"5 1/2"LEVEL 2 CLUB: COACHES LOUNGE, OFFICE, CLUB ROOM, GYM, BOARD ROOM CLUB LEVEL 1 CP OR HARDWOOD FLOORING CONCRETE TOPPING OVER 2" METAL DECK STEEL BEAMS PER STRUCTURAL TOP OF FINISH TOP OF STRUCT. SLAB 5 1/2" 4 1/2" 1"LEVEL 3 CONDO CLUB LEVEL 2 FINISH FLOORING-VFY CONCRETE TOPPING MORTAR SET AND HEAT (2) LAYERS 6 MIL POLYFILM TOP OF FINISH TOP OF STRUCT. PLYWD SHEATHING 24" X 24" SPACERS FOR RIM SYSTEM 2" INSULATION/ KINETICS RIM SYSTEM PLYWD PER STRUCTURAL JOISTS PER STRUCTURAL 2"1 1/4"1/2"1 1/2"1"6 1/4"Scale Date Drawn By Project Number As indicated 9/15/2017 5:03:22 PMA505 FLOOR TRANSITION DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1 1/2" = 1'-0" 1 HM THRESHOLD AT STAINED CONC 1 1/2" = 1'-0"6 THRESHOLD @ STAINED CONC & TILE 1 1/2" = 1'-0"11 THRESHOLD @ CONC & STONE TILE 1" = 1'-0"16 HOLLOW CORE PLANK @ RAMP 1 1/2" = 1'-0"21 BAR GRATE THRESHOLD 1 1/2" = 1'-0"26 CONC. TOPPING TO RUBBER/CP THRESHOLD 1 1/2" = 1'-0" 2 RUBBERIZED FLOORING TO TILE TRANSITION 1 1/2" = 1'-0" 7 CONC TO RUBBER THRESHOLD 1 1/2" = 1'-0" 22 LVT TO CARPET TRANSITION 1 1/2" = 1'-0" 27 LVT @ RAISED BAR GRATE 1 1/2" = 1'-0" 3 CONC MTL DECK TO ROOF 1 1/2" = 1'-0" 8 LEVEL 3 BALC OVER LIVING SPACE 1 1/2" = 1'-0" 18 LEVEL 3 BALC WALL 1 1/2" = 1'-0" 23 DECK AT LEVEL 4 1 1/2" = 1'-0" 24 DECK AT LEVEL 4 OVER OCC. SPACE 1 1/2" = 1'-0" 29 DECK AT LEVEL 4 OVER OCC. SPACE 1 1/2" = 1'-0" 28 DECK AT LEVEL 4 OVER UN-OCC. SPACE 1 1/2" = 1'-0" 13 LEVEL 3 BALC OVER LIVING SPACE END 1 1/2" = 1'-0" 17 TRANSITION NEAR WEST ELEV 1 1/2" =1'-0" 9 DRAIN @ BREEZEWAY 1 1/2" = 1'-0" 14 TRANSITION AT INT. WALL 1 1/2" = 1'-0" 32 PATIO @ CLUB LEVEL 2 01 PERMIT 07.01.15 No. Description Date 1 1/2" = 1'-0" 4 GARAGE TO LEVEL 1- DETAIL AT CONCRETE FLOOR 1 1/2" = 1'-0" 5 GARAGE TO LEVEL 1- DETAIL AT RUBBERIZED FLOOR, CP TILES, HARDWOOD 1 1/2" = 1'-0" 10 CLUB LEVEL 1 TO CLUB LEVEL 2 DETAIL AT STONE PAVERS 1 1/2" = 1'-0" 12 CLUB LEVEL 1 TO CLUB LEVEL 2 DETAL AT CONCRETE FLOOR 1 1/2" = 1'-0" 19 CLUB LEVEL 1 TO CLUB LEVEL 2 DETAL AT CP TILE AND HARDWOOD FLOOR 1 1/2" = 1'-0" 20 CLUB LEVEL 2 TO CONDO LEVEL 3 FLOOR DETAIL 06 9-15-17BLDG.PERMIT CORR. 10/24/17 5' - 0"MOP HOLDER 2' - 8"3' - 2" 4' - 0"3' - 7"5' - 5"5' - 10"3' - 4" MAX.3' - 6" 2' - 8" MAX.3' - 2" MIN. 2' - 6" 0' - 6" MAX. 4' - 0" MIN. 0' - 6" MAX.0' - 6" MAX. 3' - 2" MIN.0' - 2" MAX. 3' - 10" MIN. 3' - 2" MIN.2' - 8" MAX. 0' - 8" MAX. 4' - 10" MIN. 2' - 0" MIN.TO TOP2' - 9" TO 3' - 0"0' - 9"1' - 0" MAX. 5' - 0" 2' - 0" MAX. 2' - 0" MIN.TO TOP2' - 9" TO 3' - 0"1' - 0" MIN. HEAD END CONTROL END GRAB BARS AT TUB (WITHOUT PERMANENT SEATS) GRAB BAR REINFORCEMENT AT TOILET (ADAPTABLE UNITS) GRAB BAR REINFORCEMENT AT TUB (ADAPTABLE UNITS) GRAB BAR REINF. AT SHOWER (ADAPTABLE UNITS) TOWEL BAR MEDICINE CABINET SHELF & ROD SHELF & ROD ALL WALLS, TYPICAL CONTROL END: (HEAD END SIM) CONTROL VALVE AREA HAND-HELD SHOWER SPRAY UNIT W/ 60" HOSE CONTROL VALVE AREA SEAT GRAB BARS SEATREFLECTIVE SURFACE3' - 4" MAX. BOTT. OFT.O. TOWEL SLOT4' - 0" MAX.T.O. COIN SLOT 4' - 0" MAX1' - 7" MIN.2' - 6" MAX.T. O. SLOT4' - 0" MAX.MIRROR PAPER TOWEL DISPENSER NAPKIN/TAMPON VENDOR NAPKIN DISPOSAL TOILET SEAT COVER DISPENSER SHELF SOAP DISPENSER ROBE HOOKS 4' - 0" MAX.PUSH BUTTON4' - 0" MAX. TO4' - 0"1' - 0"0' - 9" MIN.0' - 6" MAX. 0' - 8" MIN.2' - 5" MIN.2' - 10" MAX.1' - 5" MIN. LAVATORY 1' - 3" MIN.T.O. RIM1'- 5" MAXT.O. RIM1' - 8"T. O. HANDLE3' - 8" MAX.15" - 19" T.O. SEAT - TYPE A & B UNITS17" - 19" T.O. SEAT PUBLIC ACCESS1' - 3" MIN. 7"-9"1 1/2" MIN.1' - 0" 3' - 6"TO TOP2' - 9" TO 3' - 0"39" - 41"1' - 6"39" - 41" GRAB BARS AND TOILET TISSUE DISPENSER 17" - 19" AMBULATORY 16" - 18" ACCESSIBLE 2' - 0" 1' - 0" REAR GRAB BAR @ WHEELCHAIR ACCESSIBLE CONFIGURATIONS SIDEWALL GRAB BARS. PROVIDE ON EACH SIDE OF AMBULATORY STALL INSULATE ALL EXPOSED PIPING URINAL SHOWER BACK WALL SHOWER CONTROL WALL FOLDING SHOWER SEAT PLAN DRINKING FOUNTAINS 1' - 7"1' - 5" TO3" TO 6"4' - 0" MAX.5' - 0"1' - 3" MAX. 1' - 3" CONTINUOUS GRAB BAR FOLDING SHOWER SEAT CONTROL VALVE AREA HAND-HELD SHOWER SPRAY UNIT W/ 60" HOSE 14" - 15"3' - 0"15" - 16" 22" - 23" 17" - 19"2' - 3" MIN.MIN.0' - 9"6" MAX MIN. 0' - 8"T.O. SPOUT3' - 4"0' - 6" 3' - 6"3' - 2"LIGHT SWITCH DOOR LEVER 6'- 8" 4' - 0"DOOR & DEVICES WALL OUTLET THERMOSTAT, PHONE, FIRE ALARM PULL STATION, HC DOOR BUTTON OR CARD READER, IF NOT OBSTRUCTED FIRE ALARM SPEAKER/STROBE 6' - 8" TO 8' - 0"1' - 6"ELEVATOR CONTROLS ELEVATOR CAR CONTROLS ROOM SIGN OUTLET AT COUNTER FIRE EXTINGUISHER CABINET MAIL DROP MAIL BOX IN FIRE EMERGENCY DO NOT USE ELEVATOR USE STAIRS 6' - 0" MIN.5' - 0"3' - 6"RAISED & BRAILLE CHARACTERS ON HOISTWAY JAMB CALL BUTTON HALL LANTERN CONTROL INDICATORS RAISED & BRAILLE CHARACTERS (5/8" MIN)FLOOR BUTTONS4' - 6" MAX.CONTROL BUTTONS2' - 11" MAX.COMPLY W/ 703.2.9 & TABLE 703.2.45' - 0"0' - 9"3' - 4" - CAB. DEPTH 20" - 25"3' - 8" - CAB. DEPTH < 20"T.O. HANDLE4' - 0" MAX.& TOP OF DROP LIP4' - 0" MAX T.O. HANDLETO PATRON LOCK5' - 7" MAX.2' - 4" MIN.1 1/2" MAX.GENERAL NOTES 1. DIMENSIONS GIVEN ARE COMPLIANT WITH ANSI A117.1-2009. 2. NOT ALL FIXTURES AND DEVICES INDICATED MAY BE USED IN THE PROJECT. 3. INSTALL GRAB BARS TO WITHSTAND A DOWNWARD LOAD OF 250 LBF WHEN TESTED ACCORDING TO METHODS IN ASTM F-446. 4. ACCESSORIES IN BATHING AREAS THAT PROJECT MORE THAN 1" BEYOND FINISHED SURFACES SHALL BE INSTALLED TO WITHSTAND A DOWNWARD LOAD OF 250 LBF WHEN TESTED ACCORDING TO METHODS IN ASTM F-446. 5. MOUNTING HEIGHTS INDICATED MAY BE SUPERCEDED BY MORE SPECIFIC INFORMATION ELSEWHERE IN THE DOCUMENTS. 6. ALL APPLIANCES AND PLUMBING FIXTURES MUST COMPLY WITH APPLICABLE ANSI AND ADA REQUIREMENTS. 7. DOOR THRESHOLDS MUST HAVE A MAXIMUM HEIGHT OF 1/2" WITH A 1:2 BEVEL. 8. ALL ACCESSIBLE SINKS SHALL HAVE A MAXIMUM HEIGHT OF 34" TO THE RIM OR COUNTER (WHICHEVER IS HIGHER) AND PROVIDE A 27" MINIMUM HIGH KNEE SPACE. 9. PROVIDE AND INSTALL BLOCKING / REINFORCEMENT FOR ALL ACCESSORIES PER MANUFACTURER'S INSTRUCTIONS. 10. PROVIDE AND INSTALL BLOCKING IN ALL ADAPTIVE USE SPACES. 1' - 6" 0' - 4" MAX.3" TO 6"1' - 6" MIN.3' - 0" TO FINISHES 3' - 0" MIN.TO TOP2' - 9" TO 3' - 0"0' - 4" MAX.1' - 6" MIN.MAX. 1' - 3"3' - 2" MIN.2 1/2" MAX.3" MAX. 0' - 2" MAX. 3' - 10" MIN.3' - 2" MAX.2' - 8" MIN.GRAB BAR REINFORCEMENT AT TOILET 3' - 6"2' - 8"3' - 2"GRAB BAR REINF. @ SHOWER TOWEL BAR ALL WALLS TYPICAL LEGEND ACCESSIBLE 0' - 4" MAX. PROTRUSION 2' - 10"4' - 0" MIN.5' - 0" MAX.TACTILE AREA OF REFUGE SIGNAGE 2' - 0"2' - 0"TO TOP2' - 9" TO 3' - 0"0' - 6" VERT. REINFORCEMENT @ CONTROL END ONLY 0' - 6" VERTICAL REINFORCEMENT @ CONTROL END ONLY ACCESSIBLE LAV.2' - 10"0' - 6"2' - 0"PARCEL BOX 36" - 48" MAX.INTERIOR1' - 3" MIN. B.O.3' - 1" 0' - 6"2' - 0"0' - 8" MAX. 4' - 10" MIN. 3' - 1" 0' - 6"2' - 0"0' - 2" MAX. 3' - 4" MIN.3' - 8" MIN.2' - 8" MAX.0' - 8" MAX. 4' - 2" MIN. FOLDING GRAB BAR REINFORCEMENT AT TOILET (ADAPTABLE UNITS)2' - 8" 0' - 6" MIN.1' - 0"VERIFY WITH MANUFACTURER SPECIFIC REINFORCING REQUIREMENTS 2' - 8" MAX.3' - 2" MIN.MIN. 2' - 0" MIN. 2' - 0" TOILET AT CENTER 2' - 0" MIN.TO TOP2' - 9" TO 3' - 0"0' - 9" 1' - 0" MAX. RECESSED WIDTH 1' - 3" MAX. HEAD END CONTROL END GRAB BARS AT TUB (WITH PERMANENT SEATS) HAND-HELD SHOWER SPRAY UNIT W/ 60" HOSE SEAT GRAB BARS 0' - 4" MAX.3" TO 6" 1' - 6" MIN.TO TOP2' - 9" TO 3' - 0" BACK WALL 2' - 8" MAX.3' - 2" MIN.MIN. 2' - 0" MIN. 2' - 0" TOILET AT CENTER EXTERIOR DOOR THRESHOLD DETAILS MAX. ALLOWABLE HEIGHT DIFFERENCE BETWEEN INT. FLOOR LEVEL AND EXT. FLOOR LEVEL LEVEL DIFFERENCE AT PRIMARY ENTRY DOOR: 0" PERVIOUS CONSTRUCTION (WOOD DECKING) 1/2" IMPERVIOUS CONSTRUCTION (CONCRETE) LEVEL DIFFERENCE AT SECONDARY ENTRY DOOR: 1/2" PERVIOUS CONSTRUCTION (WOOD DECKING) 4" IMPERVIOUS CONSTRUCTION (CONCRETE) 3/4" MAX 1 1/2" MIN 1/2" MAX 1 1/2" MIN 1/4" MAX 2 1/2" MIN AT 1:2 3/4" MAX3/4" MAX 1/2" MAX 1 1/4" MAX 01 PERMIT 07.01.15 Scale Date Drawn By Project Number 1/2" = 1'-0"9/15/2017 5:03:30 PMA506 STANDARD MOUNTING HEIGHTSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEDW 07.01.15 000000 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 #PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 11 13 15 2x2 2x4 2x6 2-5/8" 4-5/8" 6-5/8" NR NR NR NA NA NA NA NA NA 0' - 0 1/2" UON 0' - 0 3/8"SCHEDULED BASE SEALANT 5/8" GYPSUM WALLBOARD 2X WOOD STUD CONCRETE STRUCTURE ACOUSTICAL BATT WHERE INDICATED 2X PLATE 0' - 0 1/2"#PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 23 24 25 26 2x4 2x4 2x6 2x6 4-3/4" 4-3/4" 6-3/4" 6-3/4" NR 1HR NR 1HR NA UL #U333 NA NA UL #U333 NA NA NA0' - 0 3/8"0' - 0 1/2"SCHEDULED BASE SEALANT BOTH SIDES 5/8" GYPSUM WALLBOARD BOTH SIDES 2X WOOD STUD 2X WOOD STUD 2X PLATE ACOUSTICAL BATT WHERE INDICATED #PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 31 33 34 35 36 37 1-1/2" 3-5/8" 3-5/8" 6" 6" 3-5/8" 2-7/8" 4-7/8" 4-7/8" 7-1/4" 7-1/4" 6-1/8" NR NR 1HR NR 1HR 2HR NA NA NA GA FILE NO. WP 1072 NA GA FILE NO. WP 1072 GA FILE NO. WP 1505 SIM. NA NA NA NA NA0' - 0 3/8"0' - 0 1/2"SCHEDULED BASE SEALANT BOTH SIDES 5/8" GYPSUM WALLBOARD BOTH SIDES STEEL STUD STEEL TRACK ACOUSTICAL BATT WHERE INDICATED #PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 54 56 58 2x4 2x6 2x8 5-7/8" 7-7/8" 9-5/8" 1HR 1HR 1HR GA FILE NO. WP 3245 GA FILE NO. WP 3245 50-54 GA FILE NO. WP 3245 50-54 50-54 NOTE: WHERE OSB SHEATHING REQUIRED BY STRUCT, IT SHALL BE IN ADDITION TO SPECIFIED ASSEMBLY AND SHALL BE PLACED ON SIDE OPPOSITE THE RC.0' - 0 3/8"UNIT CORRIDOR SCHEDULED BASE SEALANT BOTH SIDES 5/8" TYPE "X" GYPSUM WALLBOARD 2 LAYERS SHEATHING AT SHEAR WALL LOCATIONS; RE: STRUCT 2X WOOD STUD 2X PLATE 5/8" TYPE "X" GYPSUM WALLBOARD 1/2" RESILIENT CHANNEL 0' - 0 1/2"FURNISH FIBERGLASS OR MINERAL WOOL FIREBLOCKING IN ACCORDANCE WITH IBC 717.2; ELECT PENETRATIONS SHALL BE IN INDIVIDUAL STUD SPACES BETWEEN OPPOSING UNITS AND FITTED WITH PUTTY PACKS NOTE: ACOUSTICAL BATT 3-1/2" CONTINUOUS #PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 63 65 69 2x4 2x6 2x10 6" 8" 11-3/4" 2HR 2HR 2HR GA FILE NO. WP 8415 GA FILE NO. WP 8415 NA GA FILE NO. WP 8415 NA NA SEALANT SCHEDULED BASE AIR INFILTRATION BARRIER WO 5/8" TYPE "X" GYPSUM WALLBOARD 2 LAYERS BOTH SIDES ACOUSTICAL BATT 3-1/2" AT 2X4. 5-1/2" AT 2X6 0' - 0 3/8"VAPOR BARRIER 2X PLATE 0' - 0 1/2"#PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 71 72 73 74 2-1/2" 2-1/2" 2-1/2" 2-1/2" 3-5/8" 4" 3-1/8" 3-1/2" 1HR 2HR 1HR 2HR GA FILE NO. WP 6800 OR APPR. EQUAL ADDITIONAL GB TO ACHIEVE STC 50 50 GA FILE NO. WP 7051 OR APPR. EQUAL GA FILE NO. WP 6800 OR APPR. EQUAL GA FILE NO. WP 7051 OR APPR. EQUAL 50 NA NA0' - 0 3/8"SCHEDULED BASE SEALANT C-H CHANNEL 1/2" RESILIENT CHANNEL OMIT WHERE ACOUSTICAL PARTITION NOT SPECIFIED 1" GYPSUM LINER PANEL 5/8" TYPE "X" GYPSUM WALLBOARD 2 LAYERS @ 2HR; 1 LAYER @ 1HR J-RUNNER ACOUSTICAL BATT 1-1/2"SHAFT SIDE0' - 0 1/2"#PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 80 88 CONC. CONC. 10" 8" 4HR 4HR IBC TABLE 720.1(2)4 IBC TABLE 720.1(2)4 NA NA UNFINISHED CONCRETE WALL RE: STRUCT 0' - 0 1/2" UON STRUCTURE ACOUSTICAL BATT WHERE INDICATED 5/8" GYPSUM WALLBOARD CEILING ASSEMBLY VARIES 2X PLATE CONCRETE STRUCTURE STRUCTURE 1" GYPSUM LINER PANEL C-H CHANNEL 2-1/2" 1/2" RESILIENT CHANNEL WHERE OCCURS CEILING ASSEMBLY VARIES 5/8" TYPE "X" GYPSUM WALLBOARD 2 LAYERS @ 2HR. 1 LAYER @ 1HR ACOUSTICAL BATT 1-1/2" STRUCTURE ACOUSTICAL BATT WHERE INDICATED 5/8" GYPSUM WALLBOARD CEILING ASSEMBLY VARIES 2X PLATE 2X WOOD STUD STRUCTURE ACOUSTICAL BATT WHERE INDICATED 5/8" GYPSUM WALLBOARD BOTH SIDES MINERAL WOOL INSULATION & FIRESTOPING SPRAY ACOUSTICAL SEALANT @ NON-RATED PARTION STEEL TRACK 3" DEEP LEG STEEL STUD 0' - 0 1/2" STRUCTURE MINERAL WOOL INSULATION & FIRESTOPING SPRAY ACOUSTICAL SEALANT @ NON-RATED PARTION STEEL TRACK 3" DEEP LEG 5/8" GYPSUM WALLBOARD STEEL STUD UNITCOORIDORSHEATHING AT SHEAR WALL LOCATIONS; RE: STRUCT 5/8" TYPE "X" GYPSUM WALLBOARD 2 LAYERS ACOUSTICAL BATT 3-1/2" CONTINUOUS 2X WOOD STUD 1/2" RESILIENT CHANNEL 5/8" TYPE "X" GYPSUM WALLBOARD CEILING ASSEMBLY VARIES 2X PLATE STRUCTURE ACOUSTICAL BATT WHERE INDICATED 5/8" TYPE "X" GYPSUM WALLBOARD BOTH SIDES CEILING ASSEMBLY VARIES 2X PLATE 2X WOOD STUD STRUCTURE #PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 40 41 42 43 46 7/8" 1-5/8" 2-1/2" 3-5/8" 6" 2" 2-3/4" 3-5/8" 4-3/4" 7-1/8" NR NR NR NR NR NA NA NA NA NA NA NA NA NA NA0' - 0 3/8"SCHEDULED BASE SEALANT 5/8" GYPSUM WALLBOARD BOTH SIDES STEEL STUD STEEL TRACK ACOUSTICAL BATT WHERE INDICATED WRAP TS COLUMN IN ACCORDANCE WITH IBC 720.1(1)1-7.1 FOR 1 HOUR RATING (2) LAYERS 1/2" GYPSUM WALL BOARD APPLIED WITHOUT HORIZONTAL JOINTS. CORNER EDGES OF EACH LAYER STAGGERED. WALL BOARD LAYER BELOW OUTER LAYER SECURED TO COLUMN WITH DOUBLED 0.049" (NO. 18 B.W. GAGE) STEEL WIRE TIES SPACED 15" O.C. EXPOSED CORNERS TAPED & TREATED. 1/2" TYPE X GB (DENS GALSS AT COLUMNS IN EXTERIOR WALLS CARBONITE, LIGHTWEIGHT AND SAND-LIGHTWEIGHT AGGREGATE CONCRETE; MEMBERS 12" OR LARGER, SQUARE OR ROUND; SILICEOUS AGGREGATE CONCRETE, MEMBERS 12" OR LARGER, SQUARE OR ROUND. 1" MIN. COVER TYP. METAL STUDS GYP BD. (LAYERS PER PARTITION TYPE) METAL CONTROL JOINT BATT INSULATION AND SEALANT METAL STUDS GYP BD. (LAYERS PER PARTITION TYPE) METAL CONTROL JOINT WRAP GYP BD AT CONTROL JOINT METAL CONTROL JOINT GYP BD CEILING METAL SUSPENSION SYSTEM STEEL COLUMN, RE STRUCT. REFER TO TITLE SHEET(S) AND PROJECT MANUAL FOR GENERAL PROJECT NOTES, SYMBOLS, AND ABBREVIATIONS. 1. NOT ALL PARTITION TYPES DELINEATED MAY BE USED.2. REFER TO PLANS FOR DESIGNATION OF PARTITION TYPES AND RATINGS.3. ALL METAL STUD AND C.M.U. PARTITIONS ARE TO EXTEND TO UNDERSIDE OF STRUCTURE UNLESS NOTED OTHERWISE. 4. WHERE TWO DIFFERING PARTITION TYPES ABUT IN A LINE AND ALONG A CONTINUOUS LENGTH OF PARTITIONS, THE CONTINUOUS FINISHED SURFACES OF THESE PARTITIONS SHALL ALIGN UNLESS NOTED OTHERWISE. 5. ALL METAL STUDS TO BE SPACED @ 16" O.C. UNLESS NOTED OTHERWISE. 6. INCREASED STUD GAGE OR SPACING MAY BE REQUIRED DUE TO HEIGHT OR PARTITION. MAXIMUM ALLOWABLE DEFLECTION SHALL BE L/240. 7. PROVIDE FOR 1" DEFLECTION AT ALL PARTITION HEADS UNLESS NOTED OTHERWISE. PROVIDE MINIMUM 3" DEEP-LEG TRACKS. 8. PROVIDE MINIMUM DOUBLE STUD AT EACH DOOR JAMB. RE: STRUCT9. DO NOT PLACE GYPSUM BOARD JOINT AT CORNER OF DOOR FRAME.10. USE 5/8" TYPE "X" GYPSUM BOARD AT RATED PARTITIONS. USE 5/8" GYPSUM BOARD AT ALL OTHER LOCATIONS UNLESS NOTED OTHERWISE. 11. USE WATER-RESISTANT GYPSUM BOARD FOR WALLS IN ALL TOILET ROOMS, JANITOR'S CLOSETS, AND AS NOTED OTHERWISE. 12. USE WATER-RESISTANT GYPSUM BOARD FOR CEILINGS IN SHOWER ROOMS. MINIMUM FRAMING TO BE IN ACCORDANCE WITH IBC 2509.3. 13. USE CEMENTITIUOS BACKER UNITS AND SPACE STUDS AT 16" O.C. AT SHOWER ROOMS & PARTITIONS TO RECEIVE CERAMIC TILE OR STONE. 14. PARTITIONS WHICH DO NOT GO TO STRUCTURE ABOVE SHALL HAVE INTERSECTING PARTITION OR BE BRACED TO STRUCTURE @ 12' O.C.. 15. PROVIDE CONTROL JOINTS IN CEILINGS EXCEEDING 2500 S.F. AND IN PARTITIONS, WALLS, AND FURRING RUNS EXCEEDING 30 LINEAL FT. VERIFY EXACT LOCATIONS WITH ARCHITECT. SEE DETAILS THIS SHEET. 16. ALL FIRE-RESISTIVE PARTITIONS SHALL BE CONSTRUCTED IN FULL COMPLIANCE WITH TESTING REQUIREMENTS AND MANUFACTURER'S RECOMMENDATIONS FOR CONDITIONS AS REQUIRED. CONSTRUCTION OF ALL SYSTEMS SHALL EQUAL THAT OF THE TESTED ASSEMBLY. CONTRACTOR MAY NOT SUBSTITUTE ANOTHER LISTED ASSEMBLY FOR THAT INDICATED WITHOUT PRIOR APPROVAL OF THE ARCHITECT AND THE BUILDING DEPARTMENT. TESTING FACILITIES ARE ABBREVIATED AS FOLLOWS: 17. UL - UNDERWRITERS LABORATORIES INC. (www.ul.com/database/index.htm) GA - GYPSUM ASSOCIATION NER - NATIONAL EVALUATION REPORT WHI - WARNOCK HERSEY INTERNATIONAL IBC - INTERNATIONAL BUILDING CODE THROUGH-PENETRATIONS IN RATED PARTITIONS SHALL BE FIRESTOPPED IN ACCORDANCE WITH IBC. 713. 18. MEMBRANE-PENETRATIONS IN RATED PARTITIONS SHALL BE IN ACCORDANCE WITH 713.3.2, IBC & 713.4.1.2, IBC. 19. 713.3.2, IBC. MEMBRANE PENETRATIONS. MEMBRANE PENETRATIONS SHALL COMPLY WITH SECTION 713.3.1. WHERE WALLS OR PARTITIONS ARE REQUIRED TO HAVE A FIRE-RESISTANCE RATING, RECESSED FIXTURES SHALL BE INSTALLED SUCH THAT THE REQUIRED FIRE-RESISTANCE WILL NOT BE REDUCED. EXCEPTIONS: 1. MEMBRANE PENETRATIONS OF MAXIMUM 2-HOUR FIRE-RESISTANCE-RATED WALLS AND PARTITIONS BY STEEL ELECTRICAL BOXES THAT DO NOT EXCEED 16 SQUARE INCHES (0.0103 M2) IN AREA, PROVIDED THE AGGREGATE AREA OF THE OPENINGS THROUGH THE MEMBRANE DOES NOT EXCEED 100 SQUARE INCHES (0.0645 M2) IN ANY 100 SQUARE FEET (9.29M2) OF WALL AREA. THE ANNULAR SPACE BETWEEN THE WALL MEMBRANE AND THE BOX SHALL NOT EXCEED 1/8 INCH (3.1 MM). SUCH BOXES ON OPPOSITE SIDES OF THE WALL OR PARTITION SHALL BE SEPARATED BY ONE OF THE FOLLOWING: 1.1. BY A HORIZONTAL DISTANCE OF NOT LESS THAN 24 INCHES (610 MM) WHERE THE WALL OR PARTITION IS CONSTRUCTED WITH INDIVIDUAL NON COMMUNICATING STUD CAVITIES; 1.2. BY A HORIZONTAL DISTANCE OF NOT LESS THAN THE DEPTH OF THE WALL CAVITY WHERE THE WALL CAVITY IS FILLED WITH CELLULOSE LOOSE-FILL, ROCKWOOL OR SLAG MINERAL WOOL INSULATION; 1.3. BY SOLID FIREBLOCKING IN ACCORDANCE WITH SECTION 717.2.1; 1.4. BY PROTECTING BOTH OUTLET BOXES WITH LISTED PUTTY PADS; OR 1.5. BY OTHER LISTED MATERIALS AND METHODS. 2. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL BOXES OF ANY MATERIAL, PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE- RESISTANCE-RATED ASSEMBLIES AND ARE INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED IN THE LISTING. THE ANNULAR SPACE BETWEEN THE WALL MEMBRANE AND THE BOX SHALL NOT EXCEED 1/8 INCH (3.1 MM) UNLESS LISTED OTHERWISE. SUCH BOXES ON OPPOSITE SIDES OF THE WALL OR PARTITION SHALL BE SEPARATED BY ONE OF THE FOLLOWING: 2.1. BY THE HORIZONTAL DISTANCE SPECIFIED IN THE LISTING OF THE ELECTRICAL BOXES; 2.2. BY SOLID FIREBLOCKING IN ACCORDANCE WITH SECTION 717.2.1; 2.3. BY PROTECTING BOTH BOXES WITH LISTED PUTTY PADS; OR 2.4. BY OTHER LISTED MATERIALS AND METHODS. 3. MEMBRANE PENETRATIONS BY ELECTRICAL BOXES OF ANY SIZE OR TYPE, WHICH HAVE BEEN LISTED AS PART OF A WALL OPENING PROTECTIVE MATERIAL SYSTEM FOR USE IN FIRE- RESISTANCE-RATED ASSEMBLIES AND ARE INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED IN THE LISTING. 4. MEMBRANE PENETRATIONS BY BOXES OTHER THAN ELECTRICAL BOXES, PROVIDED SUCH PENETRATING ITEMS AND THE ANNULAR SPACE BETWEEN THE WALL MEMBRANE AND THE BOX, ARE PROTECTED BY AN APPROVED MEMBRANE PENETRATION FIRESTOP SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, WITH A MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF WATER, AND SHALL HAVE AN F AND T RATING OF NOT LESS THAN THE REQUIRED FIRE-RESISTANCE RATING OF THE WALL PENETRATED AND BE INSTALLED IN ACCORDANCE WITH THEIR LISTING. 5. THE ANNULAR SPACE CREATED BY THE PENETRATION OF AN AUTOMATIC SPRINKLER, PROVIDED IT IS COVERED BY A METAL ESCUTCHEON PLATE. 713.4.1.2, IBC. MEMBRANE PENETRATIONS. PENETRATIONS OF MEMBRANES THAT ARE PART OF A HORIZONTAL ASSEMBLY SHALL COMPLY WITH SECTION 713.4.1.1.1 OR 713.4.1.1.2. WHERE FLOOR/CEILING ASSEMBLIES ARE REQUIRED TO HAVE A FIRE-RESISTANCE RATING, RECESSED FIXTURES SHALL BE INSTALLED SUCH THAT THE REQUIRED FIRE RESISTANCE WILL NOT BE REDUCED. EXCEPTIONS: 1. MEMBRANE PENETRATIONS BY STEEL, FERROUS OR COPPER CONDUITS, PIPES, TUBES OR VENTS, OR CONCRETE OR MASONRY ITEMS WHERE THE ANNULAR SPACE IS PROTECTED EITHER IN ACCORDANCE WITH SECTION 713.4.1.1 OR TO PREVENT THE FREE PASSAGE OF FLAME AND THE PRODUCTS OF COMBUSTION. THE AGGREGATE AREA OF THE OPENINGS THROUGH THE MEMBRANE SHALL NOT EXCEED 100 SQUARE INCHES (64 500 MM2) IN ANY 100 SQUARE FEET (9.3 M2) OF CEILING AREA IN ASSEMBLIES TESTED WITHOUT PENETRATIONS. 2. CEILING MEMBRANE PENETRATIONS OF MAXIMUM 2-HOUR HORIZONTAL ASSEMBLIES BY STEEL ELECTRICAL BOXES THAT DO NOT EXCEED 16 SQUARE INCHES (10 323 MM2) IN AREA, PROVIDED THE AGGREGATE AREA OF SUCH PENETRATIONS DOES NOT EXCEED 100 SQUARE INCHES (44 500 MM2) IN ANY 100 SQUARE FEET (9.29 M2) OF CEILING AREA, AND THE ANNULAR SPACE BETWEEN THE CEILING MEMBRANE AND THE BOX DOES NOT EXCEED 1/8 INCH (3.2 MM). 3. MEMBRANE PENETRATIONS BY ELECTRICAL BOXES OF ANY SIZE OR TYPE, WHICH HAVE BEEN LISTED AS PART OF AN OPENING PROTECTIVE MATERIAL SYSTEM FOR USE IN HORIZONTAL ASSEMBLIES AND ARE INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED IN THE LISTING. 4. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL BOXES OF ANY MATERIAL, PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED ASSEMBLIES AND ARE INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED IN THE LISTING. THE ANNULAR SPACE BETWEEN THE CEILING MEMBRANE AND THE BOX SHALL NOT EXCEED 1/8 INCH (3.2 MM) UNLESS LISTED OTHERWISE. 5. THE ANNULAR SPACE CREATED BY THE PENETRATION OF A FIRE SPRINKLER, PROVIDED IT IS COVERED BY A METAL ESCHUTCHEON PLATE. PROVIDE ACOUSTICAL SEALANT AT ALL PENETRATIONS IN ACOUSTICAL PARTITIONS 20. ACOUSTICAL BATT INSULATION TO TERMINATE AT THE STRUCTURE UNLESSNOTED OTHERWISE. 21. WHERE WALLS OR PARTITIONS ARE REQUIRED TO HAVE A FIRE- RESISTANCE RATING, RECESSED FIXTURES SHALL BE INSTALLED SUCH THAT THE REQUIRED WILL NOT BE REDUCED. 22. FIRE PARTITIONS SHALL EXTEND FROM THE TOP OF THE FOUNDATION OR FLOOR/ CEILING ASSEMBLY BELOW TO THE UNDERSIDE OF THE FLOOR OR ROOF SHEATHING, SLAB OR DECK ABOVE OR TO THE FIRE-RESISTANCE RATED FLOOR/ CEILING OR ROOF CEILING ASSEMBLY. WHERE PARTITIONS ARE NOT CONTINUOUS THEY SHALL BE FIREBLOCKED OR DRAFTSTOPPED PER IBC 717.2 AND 717.3 AT THE PARTITION LINE. 23. PARTITION TYPES - GENERAL NOTES PARTITION TYPE - FIRST POSITION INDICATES GENERAL PARTITION TYPE, SECOND POSITION INDICATES RELATIVE WIDTH OF PARTITION. PARTITION TYPES - LEGEND 1. REFERENCE LEGEND, RE: FLOOR PLANS PARTITION - PARTITION REFERENCE SYMBOL IS ORIENTED TO DENOTED PARTITION ON SAME SIDE AS DELINEATED IN PARTITION DETAIL. DOUBLE DIAMOND INDICATES ACOUSTICAL PARTITION - IDENTICAL TO DESIGNATED PARTITION TYPE EXCEPT WITH ACOUSTICAL BATT INSULATION AND ACOUSTICAL SEALANT AT PERIMETER AND PENETRATIONS. LETTER INDICATES CONDITION AT HEAD OF PARTITION 23C 23C #PRIMARY FRAMING NOM WIDTH RATING DESIGN STC 73 76 3-5/8" 6" 3-5/8" 6" 2HR 2HR GA FILE NO. WP 1522 UL U412 55-59 50 SEALANT SCHEDULED BASE 5/8" TYPE "X" GYPSUM WALLBOARD 2 LAYERS BOTH SIDES ACOUSTICAL BATT 0' - 0 3/8"VAPOR BARRIER STEEL TRACK 0' - 0 1/2" 3" = 1'-0" WOOD FURRING PARTITION 1-- 3" = 1'-0" STANDARD 2X PARTITION2-- 3" = 1'-0" STANDARD STEEL PARTITION3-- 3" = 1'-0" 1HR ACOUSTICAL 2X PARTITION5-- 3" = 1'-0" 2HR 2X PARTITION6-- 3" = 1'-0" SHAFT WALL9-- 3" = 1'-0" CONCRETE WALL8-- 3" = 1'-0" WOOD FURRED PARTITION HEAD--A 3" = 1'-0" SHAFT WALL HEAD--G 3" = 1'-0" STANDARD WOOD PARTITION HEAD--B 3" = 1'-0" STANDARD STEEL PARTITION HEAD--C 3" = 1'-0" STEEL FURRING PARTITION HEAD--D 3" = 1'-0" 1HR ACOUSTICAL 2X PARTITION HEAD--E 3" = 1'-0" 2HR 2X PARTITION HEAD--F 3" = 1'-0" CONCRETE WALL HEAD--J 3" = 1'-0" STEEL FURRING PARTITION4-- 1 1/2" = 1'-0" 13 1HR COLUMN PLAN DETAIL 3/4" = 1'-0" 14 3HR COLUMN PLAN DETAIL 3" = 1'-0" 15 CONTROL JOINT @ NON-RATED PARTITION 3" = 1'-0" 16 CONTROL JOINT @ RATED PARTITION 3" = 1'-0" 17 CONTROL JOINT @ SUSPENDED CEILING 3" = 1'-0" 18 1 HR RATED BEAM Scale Date Drawn By Project Number As indicated 9/15/2017 5:03:41 PMA570 PARTITION TYPESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEDW 07.01.15 000000 3" = 1'-0"7 2HR NON-COMBUSTABLE PARTITION 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 VAPOR BARRIER GRID R-21 BATT INSULATION 2" R-9 CONTINUOUS RIGID INSULATION FLUID-APPLIED AIR/WATER BARRIER 5/8" GLASS-MAT GYPSUM, WATER- RESISTANT WALL SHEATHING 5/8" INTERIOR GYPSUM BOARD, TYPE X WOOD OR METAL FRAMING 3-COAT STUCCO SYSTEM VAPOR BARRIER GRID R-21 BATT INSULATION ANCHORED STONE MASONRY VENEER 1" MORTAR ADJUSTABLE MASONRY-VENEER ANCHOR WITH INSULATION CLIPS 3/16" CAVITY DRAINAGE SHEET, FULL HEIGHT 2" R-9 CONTINUOUS RIGID INSULATION FLUID-APPLIED AIR/WATER BARRIER 5/8" GLASS-MAT GYPSUM, WATER- RESISTANT WALL SHEATHING 5/8" INTERIOR GYPSUM BOARD, TYPE X WOOD OR METAL FRAMING 0' - 3 5/8" 0' - 1" 0' - 0 3/16" 0' - 2" 0' - 0 5/8" 0' - 7 7/16" VAPOR BARRIER GRID R-21 BATT INSULATION LAP SIDING 2" R-9 CONTINUOUS RIGID INSULATION FLUID-APPLIED AIR/WATER BARRIER 5/8" GLASS-MAT GYPSUM, WATER- RESISTANT WALL SHEATHING 5/8" INTERIOR GYPSUM BOARD, TYPE X WOOD OR METAL FRAMING 1" Z-FURRING CHANNEL 5/8" GLASS-MAT GYPSUM, WATER- RESISTANT WALL SHEATHING 3-COAT STUCCO SYSTEM NON-COMBUSTABLE FRAMING STONE MASONRY VENEER 1" MORTAR CONCRETE WALL STONE MASONRY VENEER & MORTAR ON OPPOSITE SIDE WHERE INDICATED. WALL TIE 5-1/2" FIN. CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT 0' - 5 1/2"SPRAY APPLIED FIREPROOFING LINE OF CONC. TOPPING STRUCTURAL SLAB PRECAST DOUBLE-T; RE: STRUCT 3.5" STRUCTURAL CONCRETE TOPPING SLAB, SLOPE TO DRAIN. 3" MIN. FINISH FLOORING-VFY CONCRETE TOPPING MORTAR SET AND HEAT (2) LAYERS 6 MIL POLYFILM PLYWD SHEATHING 24" X 24" SPACERS FOR RIM SYSTEM 2" INSULATION/ KINETICS RIM SYSTEM 2"1 1/4"1/2"1 1/2"1"6 1/4"1-1/2" METAL DECK; RE: STRUCT RIGID INSULATION R-20 (MIN) 25 PSI (MIN) SINGLE PLY ROOF MEMBRANE 1/2" COVER BOARD ON TOP OF INSULATION, MECHANICALLY FASTENED TO PLYWOOD SHEATHING SINGLE PLY ROOF MEMBRANE FLOOR JOIST; RE: STRUCT. FLOOR SHEATHING; RE: STRUCT 1-1/2" CONCRETE TOPPING SLAB 5/8" GYPSUM BOARD TYPE X. BATT INSULATION SCHEDULED FLOOR FINISH 1' - 4 1/4"4-1/2" CONCRETE SLAB ON 2" METAL DECK; RE: STRUCT 1" FLOOR FINISH- CP/HW/ RUBBERIZED FLOORING 0' - 5 1/2"0' - 4 1/2"SPRAY APPLIED FIREPROOFING DOUBLE TEE; RE: STRUCT 3-1/2" CONCRETE TOPPING SLAB PER STRUCTURAL 1' - 0" RUBBERIZED FLOORING, CP TILES, HARDWOOD 3/4" PLYWD 2X SLEEPER ANCHORED STONE MASONRY VENEER 1" MORTAR ADJUSTABLE MASONRY-VENEER ANCHOR WITH INSULATION CLIPS 3/16" CAVITY DRAINAGE SHEET, FULL HEIGHT 2" R-9 CONTINUOUS RIGID INSULATION FLUID-APPLIED AIR/WATER BARRIER REINF. CONCRETE FOUNDATION WALL; RE: STRUCT 0' - 3 5/8" 0' - 1" 0' - 0 3/16" 0' - 2" 0' - 6 13/16" VARIES; RE: STRUCT VAPOR BARRIER GRID R-21 BATT INSULATION METAL CLOSURE PANEL 2" R-9 CONTINUOUS RIGID INSULATION FLUID-APPLIED AIR/WATER BARRIER 5/8" GLASS-MAT GYPSUM, WATER- RESISTANT WALL SHEATHING 5/8" INTERIOR GYPSUM BOARD, TYPE X WOOD OR METAL FRAMING 1" Z-FURRING CHANNEL PRECAST DOUBLE-T; RE: STRUCT HOT FLUID-APPLIED FABRIC- REINFORCED ASPHALT WATERPROOFING MEMBRANE 4" CONCRETE TOPPING SLAB, SLOPE TO DRAIN. 3" MIN. DRAINAGE MAT 3.5" STRUCTURAL CONCRETE TOPPING SLAB, SLOPE TO DRAIN. 3" MIN. Scale Date Drawn By Project Number As indicated 9/15/2017 5:03:54 PMA571 BUILDING ASSEMBLIESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3" = 1'-0" STUCCO WALL ASSEMBLYX1-- 3" = 1'-0" STONE MASONRY VENEER WALL ASSEMBLYX2 3" = 1'-0" LAP SIDING WALL ASSEMBLYX3-- 3" = 1'-0" STUCCO SOFFIT ASSEMBLYS1-- 3" = 1'-0" STONE MASONRY VENEER CONC WALL ASSEMBLYX4-- 1 1/2" = 1'-0" CONC SLAB ON METAL DECKF1-- 1 1/2" = 1'-0" ACOUSTICAL BUILD UP AT CONDO LEVEL 3 F6-- 1 1/2" = 1'-0" CONC SLAB ON METAL DECK W/ TOPPINGR1-- 1 1/2" = 1'-0" COMBUSTABLE FLOOR/CEILING ASSEMBLYF5-- X21 - WOOD STUD, 3-1/2" X22 - WOOD STUD, 3-1/2"; NO INTERIOR GYPSUM BOARD X23 - WOOD STUD, 5-1/2" X24 - WOOD STUD, 5-1/2"; NO INTERIOR GYPSUM BOARD X25 - METAL STUD, 3-5/8" X26 - METAL STUD, 3-5/8"; NO INTERIOR GYPSUM BOARD X27 - METAL STUD, 6" X28 - METAL STUD, 6"; NO INTERIOR GYPSUM BOARD X11 - WOOD STUD, 3-1/2" X12 - WOOD STUD, 3-1/2"; NO INTERIOR GYPSUM BOARD X13 - WOOD STUD, 5-1/2" X14 - WOOD STUD, 5-1/2"; NO INTERIOR GYPSUM BOARD X15 - METAL STUD, 3-5/8" X16 - METAL STUD, 3-5/8"; NO INTERIOR GYPSUM BOARD X17 - METAL STUD, 6" X18 - METAL STUD, 6"; NO INTERIOR GYPSUM BOARD X31 - WOOD STUD, 3-1/2" X32 - WOOD STUD, 3-1/2"; NO INTERIOR GYPSUM BOARD X33 - WOOD STUD, 5-1/2" X34 - WOOD STUD, 5-1/2"; NO INTERIOR GYPSUM BOARD X35 - METAL STUD, 3-5/8" X36 - METAL STUD, 3-5/8"; NO INTERIOR GYPSUM BOARD X37 - METAL STUD, 6" X38 - METAL STUD, 6"; NO INTERIOR GYPSUM BOARD X40 - 10" CONCRETE, VENEER SINGLE SIDE X41 - 10" CONCRETE, VENEER BOTH SIDES X42 - 12" CONCRETE, VENEER SINGLE SIDE X43 - 12" CONCRETE, VENEER BOTH SIDES X47 - 8" CONCRETE, VENEER SINGLE SIDE X48 - 8" CONCRETE, VENEER BOTH SIDES 1 1/2" = 1'-0" ROOF ASSEMBLY 1R2-- 1 1/2" = 1'-0" CONC SLAB ON METAL DECK W/ TOPPINGF4-- 1 1/2" = 1'-0" CONC SLAB ON DOUBLE TEEF3-- 01 PERMIT 07.01.15 3" = 1'-0" STONE MASONRY VENEER WALL ASSEMBLY Copy 1X6-- X60 - 10" CONC. WALL X62 - 12" CONC. WALL X66 - 6" CONC. WALL X68 - 8" CONC. WALL 3" = 1'-0" METAL CLOSURE WALL ASSEMBLYX7-- X71 - WOOD STUD, 3-1/2" X72 - WOOD STUD, 3-1/2"; NO INTERIOR GYPSUM BOARD X73 - WOOD STUD, 5-1/2" X74 - WOOD STUD, 5-1/2"; NO INTERIOR GYPSUM BOARD X75 - METAL STUD, 3-5/8" X76 - METAL STUD, 3-5/8"; NO INTERIOR GYPSUM BOARD X77 - METAL STUD, 6" X78 - METAL STUD, 6"; NO INTERIOR GYPSUM BOARD No. Description Date 06 9-15-17 1 1/2" = 1'-0" CONC SLAB ON DOUBLE TEEF2-- BLDG.PERMIT CORR. 10/24/17 12' - 0" 3' - 3 1/4" EQ EQ 3' - 3 1/4"7' - 0"1' - 10"5' - 2" 2' - 2 1/4"14' - 0" EQ EQ EQ EQ5' - 4" 3' - 6"1' - 10"9' - 0" 3' - 2 1/4" 2' - 7 1/2" 3' - 2 1/4" 6' - 2" 2' - 1" 4' - 1"4' - 2 7/8" 2' - 3 1/4"6' - 6 1/8"2' - 9 1/2" 3' - 8 5/8"5' - 0"3' - 0" 2' - 0"9' - 6" EQ EQ EQ EQ 5' - 0"1' - 10"3' - 2" 4' - 9" EQ EQ 5' - 10"3' - 0"2' - 10" 2' - 11" 2' - 11" 5' - 10"1' - 6"3' - 6" 5' - 0"4' - 9" EQ EQ 7' - 0"5' - 2" 1' - 10"3' - 4"4' - 6" 0' - 3"3' - 8"18' - 6" EQ EQ EQ EQ EQ EQ 8' - 5"OPERABLE 2' - 10 3/4"3' - 2"EQ EQ EQ EQ 11' - 6"3' - 8"0' - 4"7' -6"2' - 8 1/4" 2' - 1 1/2" 2' - 8 1/4"4' - 0"7' - 0"1' - 9 7/8" 5' - 2 1/8"7' - 4 1/4"2' - 0" 5' - 4 1/4"3' - 2 1/4" 2' - 9 3/4" 2' - 9 3/4" 3' - 2 1/4" 12' - 0"2' - 0"7' - 6"5' - 0"2' - 0"3' - 0" 2' - 8 1/4" 2' - 1 1/2" 2' - 8 1/4" 9' - 0" 3' - 2 1/4" 2' - 7 1/2" 3' - 2 1/4" 4' - 6"1' - 6"3' - 0" 4' - 6"3' - 0" 1' - 6"3' - 0"4' - 6"1' - 6"3' - 0" 6' - 4" EQ EQ 1' - 10"4' - 3 1/2" 3' - 2 1/2" 7' - 6"9' - 10 3/4" 8' - 2 1/2"1' - 8 1/4"1' - 4" 3' - 3"6' - 6" 6' - 9" 3' - 4 1/2" 1' - 8 1/2" 1' - 8"4' - 10" 1' - 8" 8' - 0 7/8"1' - 7 1/2"6' - 5 3/8"1' - 4"7' - 10 1/2" 1' - 2"6' - 8 1/2"1' - 7 3/4" 4' - 1 1/4"2' - 1"4' - 2 1/2"1' - 5 1/2" 5' - 8"2' - 8" 6' - 0" EQ EQ 4' - 7 1/8"2' - 3 7/8"2' - 3 1/4"0' - 4 5/8"6' - 0" EQ EQ 7' - 6 3/4"4' - 6 1/2"1' - 2" 2' - 4" 4' - 0 3/4"7' - 6" 3' - 2 1/2" 4' - 3 1/2" C1C2 C3 C4 C5 C6 C7 C8 C9 C10 EQ EQ EQ EQ EQ EQ EQ EQEQ EQ EQ EQ 12' - 0"2' - 4"3' - 2"3' - 0"14' - 0"1' - 10" 12' - 0" EQ EQ EQ EQ A15' - 0"6' - 8" EQ EQ EQ 9' - 10 3/4"2' - 6" 5' - 0"2' - 4 3/4"EQ EQ 6' - 9" 5' - 0 1/4" 1' - 8 3/4"9' - 10 3/4"2' - 4 3/4"5' - 0"2' - 4" 6' - 9" EQ EQ EQ EQ 9' - 10 3/4" 1' - 11 3/4"3' - 5"4' - 6" 4' - 9" 1' - 3"1' - 11"1' - 7"6' - 6"9' - 10 3/4" 4' - 9"3' - 6"9' - 10 3/4"6' - 6"7' - 4"6' - 0"4' - 10"1' - 3"1' - 11"1' - 7"1' - 6"3' - 0" 2' - 0" 2' - 9 1/4"5' - 2 3/4" 1' - 10 3/4" 2' - 0 1/2" 1' - 5 1/2"1' - 10 3/4"2' - 4"5' - 8" 7' - 4" 3' - 0" 3' - 0" 1' - 4"1' - 6" 5' - 0"3' - 0" 3' - 0" 1' - 4"9' - 10 3/4"8' - 2"4' - 10"8' - 2 1/2" 7' - 6"4' - 2"6' - 0"4' - 4"6' - 3 1/2"9' - 10 3/4"9' - 10 3/4"1' - 10"3' - 0" EQEQ 1' - 0" 1' - 6" 2' - 9" 0' - 9" 2' - 6" 5' - 0"7' - 10 3/4"2' - 0" 0' - 11 1/2" 3' - 2 1/2"6' - 2"2' - 0" 1' - 10"3' - 0"1' - 6" 4' - 6"2' - 0" 6' - 2 1/2"EQ EQ6' - 2"4' - 3 1/2"2' - 0" 1' - 10 3/4"2' - 4"5' - 8" 4' - 3" 1' - 3" 3' - 0"1' - 10 3/4"8' - 0"4' - 3" 9' - 10 3/4"2' - 1 3/4"7' - 9"6' - 2" EQ EQ 6' - 6"2' - 10"3' - 8" 7' - 0" EQ EQ 6' - 6"2' - 10"3' - 8" 6' - 3" EQ EQ 9' - 10 3/4"2' - 1 3/4"7' - 9"5' - 8" EQ EQ 6' - 6"9' - 0"2' - 10"3' - 8" 3' - 0" 3' - 0" 3' - 0"7' - 4 1/4"5' - 4 1/4"2' - 0" 3' - 0" 1' - 2" 5' - 0" A2 A3 A4 A5 A6 A7 A8 A10 A11 A12 A13 A14A15 A17 A18 A19 A20 A21 A22 A16 A23 A24 B1 B2 B3 B4B5 1' - 8"0' - 4"12' - 0"0' - 4"0' - 6"A25 A269' - 11 3/4"7' - 6 3/4" 2' - 5"1' - 2"2' - 4"7' - 6" 5' - 0" 2' - 6"7' - 6 3/4"6' - 6"1' - 0 3/4"5' - 0"4' - 3" 1' - 3" 3' - 0"7' - 6 3/4"8' - 7 1/2"4' - 3" 3' - 6" 2' - 0 1/2" 1' - 5 1/2" C11 3' - 0" D1D2 D4 D5 D6 D7 D8 D9 D10 D11 E1E2 E3 E4 9' - 10 3/4"D3 6' - 0"6' - 0"EQEQ EQ EQ A9 F1 Scale Date Drawn By Project Number 3/16" = 1'-0"9/15/2017 5:04:03 PMA601 WINDOW TYPESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/16" = 1'-0" WINDOW TYPES 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 7' - 6" EQ EQ EQ19' - 11 3/8" EQEQ EQ EQ 7' - 6" 7' - 8 3/4" 1 G202 6' - 6"12' - 0" EQ EQ EQ EQ 3' - 8" 2' - 10"6' - 0"4' - 2" 1' - 10"5' - 4" 3' - 0" 2' - 4"6' - 0"11' - 0 1/2" EQ EQ EQ EQ 1' - 10"4' - 2"9' - 6"6' - 1"3' - 5" 4' - 5 1/4" 5' - 0 3/4"16' - 10" 6' - 8 3/8" 10' - 1 5/8" 3' - 3 1/4" 3' - 5 1/8"5' - 6"1' - 10"3' - 8" 6' - 5" 2' - 1" 4' - 4"4' - 6"4' - 9 1/8" EQ EQ 7' - 6"21' - 5 1/4" EQ EQ 7' - 0 1/2" 1' - 10" 9' - 0 3/4" 3' - 6" 1 G202 Scale Date Drawn By Project Number 3/16" = 1'-0"9/15/2017 5:04:23 PMA602 WINDOW TYPES AND SCHEDULESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 WINDOW SCHEDULE TYPE COUNT D96 1 D97 1 D98 1 D100 1 D101 1 D102 1 F1 1 WINDOW SCHEDULE TYPE COUNT D91 1 D92 1 D93 1 D94 1 WINDOW SCHEDULE TYPE COUNT D76 1 D77 1 D78 1 D79 1 D80 1 D81 1 D82 1 D83 1 D85 1 D87 1 D89 1 WINDOW SCHEDULE TYPE COUNT D61 1 D62 4 D63 4 D64 3 D65 1 D66 4 D67 1 D69 4 D72 1 D73 1 D75 1 WINDOW SCHEDULE TYPE COUNT D53 2 D55 2 D56 4 D57 1 D58 1 WINDOW SCHEDULE TYPE COUNT A7 1 A8 1 A15 1 A24 1 A25 2 B1 2 B3 1 B4 1 B5 1 C3 1 C5 1 C6 1 C7 1 D6 2 D9 3 D10 2 D17 1 D24 1 D27 1 D34 2 D36 1 D37 1 D44 4 D47 2 D48 1 D52 12 G1G2 G3 G4 G4 G5 G6 G7G8 G9 G10 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 STEP 1 MAKE MODIFIED "I-CUT" IN THE MOISTURE BARRIER. FOLD SIDE FLAPS INTO ROUGH OPENING AND SECURE. STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 APPLY FLASHING PRIMER PRIOR TO APPLY FLASHING APPLY CONTINUOUS BEAD OF CAULK TO WALL OR BACK SIDE OF WINDOW MOUNTING FLANGE ACROSS JAMBS AND HEAD, BUT LEAVE BOTTOM SILL FLANGE UNCAULKED. CUT HEAD FLASHING TO EXTEND BEYOND OUTER EDGES OF JAMB FLASHINGS. STEP 2B: FOR AREAS WITH BUILDING PAPER OVER OVER MOISTURE BARRIER ADHERE SILL FLASHING INTO ROUGH OPENING ACROSS SILL AND UP JAMBS. SECURE FANNED EDGES WITH MECHANICAL FASTENERS. APPLY JAMB FLASHING ALONG OUTER EDGES OF WINDOW FLASHINGS AFTER WINDOW HAS BEEN INSTALLED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. AT INTERIOR APPLY A CONTINUOUS BEAD OF CAULK TO THE BACK SIDE OF THE WINDOW FRAME ACROSS JAMBS, HEAD AND SILL APPLY FLASHING PRIMER OVER BUILDING PAPER PRIOR TO APPLYING FLASHING APPLY SECOND LAYER OF HEAD FLASHING TO EXTEND BEYOND OUTER EDGES OF CUT MOISTURE BARRIER TAPE ALONG ALL CUTS IN MOISTURE BARRIER AT AREAS WITH BUILDING PAPER OVER MOISUTRE BARRIER: LAP BUILDING PAPER OVER HEAD FLASHING FLIP HEAD FLAP UP AND TEMPORARILY SECURE WITH TAPE EXPOSING SHEATHING OR FRAMING MEMBERS. FLIP DOWN UPPER FLAP OF MOISTURE BARRIER SO IT LAYS FLAT ACROSS HEAD FLASHING. M OI STUR E BARR IER M OI STUR E BARR IER MOISTURE B A RRIE R M OI STUR E B ARRI E R M OI STUR E BARR IER MOISTURE B ARRI ER M OI STUR E B ARRI ER MOISTURE B ARRI ER MOISTURE B ARRI ER SHEA T HING M OI STUR E B ARRI E R MOISTURE BARRI E R M OI STUR E BARRI E R M OI STUR E BARR IER M OI STUR E B ARRI ER MOISTURE BARRIER SH EAT HING B UI LDI NG PAPER OVER MOI STUR E B ARRI E R MOISTURE BARRIERBUI LDING P APER OV ER MOI ST URE BARRI E R BUI L DING PAPER OVER MOI STUR E BARRI E R MOISTURE BARRIERM OISTU R E BARR IER MOI STUR E B ARRIER MOISTURE B ARRI E R Scale Date Drawn By Project Number As indicated 9/15/2017 5:04:34 PMA603 WINDOW DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1 1/2" = 1'-0" 1 WINDOW SILL @ STONE 1 1/2" = 1'-0" 2 WINDOW HEAD @ STONE 1 1/2" = 1'-0" 3 WINDOW JAMB @ STONE 1 1/2" = 1'-0" 6 WINDOW SILL @ LAP SIDING 1 1/2" = 1'-0" 7 WINDOW HEAD @ LAP SIDING 1 1/2" = 1'-0" 8 WINDOW JAMB @ LAP SIDING 1 1/2" = 1'-0" 11 WINDOW SILL @ STUCCO 1 1/2" = 1'-0" 12 WINDOW HEAD @ STUCCO 1 1/2" = 1'-0" 13 WINDOW JAMB @ STUCCO 1/2" = 1'-0" 20 MOISTURE BARRIER @ WINDOW DETAIL 1 1/2" = 1'-0" 16 WINDOW HEAD @ CONC STONE 1 1/2" = 1'-0" 15 WINDOW SILL @ CONC STONE 1 1/2" = 1'-0" 17 WINDOW JAMB @ CONC STONE 1 1/2" = 1'-0" 4 WINDOW SILL @ PATIO SLAB 1 1/2" = 1'-0" 5 WINDOW BEAM DETAIL 1 1/2" = 1'-0" 9 WINDOW SILL @ ROOF 1 1/2" = 1'-0" 14 WINDOW HEAD @ MTL CLOSURE 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 DN REF.DN REF. C B A C .1 2 A401 3 A401 1 A407 3 A408 80 33 33 33 33 33 43 80 43 80 80 43 80 33 A15 A7 33 43 EHU G16 1 A505 G15 6 A505 B.3 1 A409 2 3 C B A C .1 2 A402 1 A403 2 A407 43 43 80 33 33 33 33 43 80 73 D17 80 80 G14A EHU STUDIO - TYPE A UNIT G15 1 A505 6 A505 B.3 1 A409 33 33 Scale Date Drawn By Project Number 3/8" = 1'-0"9/15/2017 5:04:45 PMA701 ENLARGED EHU PLANSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 3/8" = 1'-0" 1 EHU FLOOR PLAN 3/8" = 1'-0" 2 EHU STUDIO 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 UP 4 53 4.1 1.2 E E F H J G 1 A405 3 A904 ALPINE DIRECTOR OFFICE 103 CONF 104 CONF. 105 OFFICE 106 OFFICE 107 ALPINE COACHES WORK STATIONS 102 CONF. 108 ATHLETIC DIR.OFFICE 109 WMNS COACHES 115 WMNS COACHES 113 M COACHES 112 M COACHES 110 TEAM HUDDLE FILES FILES WEEKEND ATHLETE CUBBIES TR L/FTV/BOARDS L/F TR T R L/FF.D. F.D. F.D. MENS ALPINE LOCKERS 111 WMNS ALPINE LOCKERS 114 X27 36 33 33 3333 33 36 33 33 33 36 36 33 33 X25 X27 X27 33 33 33 33 33 43 33 33 33 36 36 36 33 3333 102B 102A 33 33 36 36 D52 D52 D52 D52 D52 D52 D52 36 A903 1 A951 2 TEAM HUDDLE FILES FILES FILES TV/BOARDS L/FL/FTR T R SNOWBOARD OFFICE 138 CONF. 139 F.ST./F.SK. OFFICE 140 F.ST./F.SK. OFFICE 141 FREE SKI/STYLE DIR. OFFICE 142 CONF. 143 ACROBATICS WORK 137 MENS COACHES 146 WMNS COACHES 147 WMNS ACRO LOCKERS 148 MENS ACRO LOCKERS 145 MECH. 150 ? ? 138 139 140 141 142 143 137 CENTRAL STAIR CS1 STORAGE 134 RR 135 RR 136 MENS COACHES 144 X27 33 33 33 33 X27 33 33 43 34 33 33 33 73 73 33 33 136 135 134 101B 109 106 107 108 105 103 88 88 88 88 3333 3333 33 3333 33 13 43 43 33 R @ 0' - 6 3/4"19 33 33 33 43 33 34 33 33 43 73 73 73 36 36 43 21 A505 7' - 8 5/8" 9' - 5" 9' - 5" 9' - 5" 9' - 5" 6' - 8 3/8" 52' - 1"6' - 9 3/8" 4' - 10" 6' - 6" 5' - 6"31' - 1 1/4" 16' - 10" 7' - 11 3/8"24' - 9 3/8"6' - 7 3/8" 7' - 3 3/4" 17' - 2 1/8" 4' - 5" 10' - 1 1/2" 5' - 0 1/4" 6' - 1" 6' - 3 3/8" 5' - 0 1/4" 14' - 4 3/4" 3' - 11 1/2" 4' - 9" CLEAR 3' - 0" 6' - 0" CLEAR 3' - 0" 3' - 0 3/8" 3' - 0 3/8" CLEAR 3' - 0" 6' - 0" 4' - 4 1/4" 7' - 6 3/4" 4' - 0"2' - 8 1/8"21' - 4 1/8" 9' - 11" 9' - 11" 7' - 7 1/8" 2' - 9 3/4"CLEAR0' - 0 1/2" 7' - 9 1/4"0' - 6 3/4"9' - 11"8' - 3 1/4"8' - 0 3/4" CLEAR 3' - 1 3/8" 5' - 6"CLEAR 1' - 11 3/8" 20' - 10 3/4" CLEAR 4' - 8 3/8" 0' - 7 1/4" CLEAR 4' - 8 3/8" 20' - 5 1/4" 5' - 9" 12' - 10 3/4" 9' - 2 1/4" 20' - 0" CLEAR 4' - 9 5/8" 0' - 4 7/8" CLEAR 4' - 9 5/8" 7' - 4 7/8" 12' - 5 3/8"9' - 2 3/4"14' - 6 3/8"ALIGN ALIGN ALIGN ALIGN 7' - 1 7/8"17' - 2" 1' - 9 1/4"ALIGN 2 D J 33 33 33 33 33 33 33 33 33 33 43 4336 43 80 43 43 36 128 129 36 9' - 2"CLEAR3' - 6"19' - 11 1/2"2' - 8 7/8" 0' - 9 3/4"5' - 7 1/2"18' - 8 5/8" 10' - 5" 18' - 8 3/8" 13' - 3 1/4" 5' - 5 3/8" 5' - 1 5/8" 5' - 3 3/8" 5' - 8 1/2" 12' - 11 7/8"2' - 10 3/4"2' - 10 3/4"4' - 8"2' - 1 3/8"2' - 1 3/8"4' - 5 1/4" 19' - 4 7/8" 19' - 6 1/2" 4' - 5 1/4" RR 129 RR 128 9' - 2"3' - 6" 2' - 8 7/8" 0' - 9 3/4" 5' - 7 1/2"Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:04:58 PMA702 ENLARGED CLUB LEVEL 1 PLANSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 ENLARGED ALPINE PLAN 1/4" = 1'-0" 3 ENLARGED CLUB LEVEL RESTROOM PLANS 01 PERMIT 07.01.15 No. Description Date 06 9-15-17BLDG.PERMIT CORR. 10/24/17 DN DN DN UP REF. REF.REF. REF. 3 A301 4 4 5 5 6 6 3 4.1 C C E E F H H B G G 2 A301 C .1 C .1 1 A402 2 A402 1 A403 2 A403 3 A403 1 A404 2 A404 3 A4042 A405 3 A904 2 A408 CLUB ELEVATOR CONF. 218 CONF. 226 DEV. MNGR. OFFICE 227 FINANCE OFFICE 219 G.M. OFFICE 220 BOOK KEEPER OFFICE 221 TRAVEL OFFICE 222 COLLABORATION WORK SPACES ELEV VESTIBULE KITCH. 216 DISPLAY RR 212 RR 213 MEETING 215 ADMIS. OFFICE 217 EXEC. OFFICE 225 EXEC. ASSIST. OFFICE 228 OPERATIONS MANAGER 229 COACH LOUNGE 223 ADMIN AND WORKSPACES 214 EVENT STOR 234 STORAGE 211 KITCHENETTE RR 224 EVENTS 230 COMPETITION OFFICE 231 RACE INFO DESK 233KITCHKITCH TVTVTV PRINTER / COPIER AV COC TO RACE SEC. A951 3 A902 3A952 3 MECH 232 X27 X17 X17 X37 X37 33 33 33 X37 33 33 33 26 28 23 28 73 23 23 73 73 33 23 23 23 23 23 23 35 2323 23 219 220218 217 215A 215B 216 224 12327 235 232 234 233A 230 229 227 225211 12350 221 222 D56 D56 D56 D56 D64 D64 D64 D57 D66 D66 D66 D66 233B B.3 2 D E E 219 SF KITCHEN 205 2 Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:05:10 PMA703 ENLARGED CLUB LEVEL 2 PLANSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 ENLARGED CLUB LEVEL 2 OFFICES AND RESTROOMS 1/4" = 1'-0" 2 ENLARGED KITCHEN PLAN 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 6 C .1 3 A403 7 A704 A704 3 A7044 A704 6 A704 5 154 1/4" / 12" 1/4" / 12"1/2" / 12" 1/2" / 12"D - --- LEVEL 1 100' - 0" 6 7 A704 11 A851 20 A501 LEVEL 1 100' - 0" C .1 3 A403 D LEVEL 1 100' - 0" 6 LEVEL 1 100' - 0" C .1 3 A403 D LEVEL 1 100' - 0" C .1 3 A403 1/4" / 12"1/4" / 12"8210.748210.798210.798210.660' - 4 1/2" 14' - 5"8220.003' - 2 1/2" 5' - 8"0' - 4"A851 11 A501 20 TRASH/RECYLCING 154 GARAGE G01 D 6 C .1 3 A403 7 A704 A704 3 A7044 A704 6 A704 5 SLOPESLOPE SCUPPER TO DOWNSPOUT TO GRADE D - --- Scale Date Drawn By Project Number As indicated 9/15/2017 5:05:28 PMA704 TRASH ENCLOSURESKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 TRASH ENCLOSURE FLOOR PLAN 1/4" = 1'-0" 3 TRASH ENCLOSURE NORTH ELEVATION 1/4" = 1'-0" 4 TRASH ENCLOSURE EAST ELEVATION 1/4" = 1'-0" 5 TRASH ENCLOSURE SOUTH ELEVATION 1/4" = 1'-0" 6 TRASH ENCLOSURE WEST ELEVATION 1/2" = 1'-0" 7 TRASH ENCLOSURE SECTION 1/4" = 1'-0" 2 TRASH ENCLOSURE ROOF PLAN 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 DN G G 8 A505 18 A505 - --- - --- G G 1 A405 G G 23 A505 - --- - --- G G 1 A405 G G 2 A405 1 1 1.1 1.2 C C E E C .1 C .1 1 A401 3 A407 6 A950 6 A901 B.3 27' - 9"6' - 0"2' - 0" 19' - 9" 6' - 8 3/8" 8' - 7" D 4 C C C .1 C .1 - - 2 A403 B.3 A504 20 - - Elevation 18 - a D - --- - --- Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:05:38 PMA750 BALCONY PLANS AND DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 BALCONY 3A PLAN 1/4" = 1'-0" 2 BALCONY 3B PLAN 1/4" = 1'-0" 3 BALCONY 4A PLAN 1/4" = 1'-0" 4 BALCONY 4B PLAN 1/4" = 1'-0" 5 BALCONY 4C PLAN 1/4" = 1'-0" 6 BALCONY 3D PLAN 1/4" = 1'-0" 8 BALCONY 3E PLAN 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 FM1FG1 FW2 FG2 P C BF FW1 S1 7' - 0 1/2"12' - 0"8' - 0"12' - 0" S2 7' - 6"14' - 0" S3 Scale Date Drawn By Project Number 3/16" = 1'-0"9/15/2017 5:05:48 PMA850 DOOR TYPES AND SCHEDULESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 DOOR SCHEDULE DOOR NUMBER LEAF FIRE RATING (MIN) FRAME COMMENTSTYPE WIDTH HEIGHT QUANTITY THICKNESS MATERIAL FINISH MATERIAL FINISH G59 FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD 60 HM TBD G62 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL <By Category> MTL G63 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL <By Category> MTL PSE1 FW2 2' - 10" 7' - 0" 2 0' - 1 3/8" WD TBD 60 HM TBD LEVEL 2 131 0' - 0" 192 0' - 0" 201 7' - 6" 0' - 1 3/8" WD TBD TBD 202A FG2 3' - 0" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 202B FG2 3' - 0" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 203 FG2 3' - 0" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 205 P 2' - 10" 7' - 0" 1 0' - 1 3/4" WD TBD WD TBD 206 7' - 0" 0' - 1 3/8" WD TBD 90 TBD 207 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 208 FW2 2' - 0" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 209 FW2 2' - 0" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 210 FW2 2' - 10" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 211 FW2 2' - 10" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 215A B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 215B B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 216 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 217 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 218 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 219 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 220 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 221 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 222 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 224 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 225 FG3 3' - 0" 7' - 0" 1 0' - 2" GLASS TBD MTL TBD 227 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 229 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 230 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 232 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 233A FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 233B 7' - 6" 0' - 1 3/8" WD TBD TBD 234 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 235 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 298 0' - 0" 12327 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 12350 FG2 3' - 0" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 12567 7' - 6" 0' - 1 3/8" Storefront Frame CS2 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G23 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD G45 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G46 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G53 6' - 0" 0' - 1" TBD TBD G54 6' - 0" 0' - 1" TBD TBD G55 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G56 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G57 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G58 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G64 7' - 6" 0' - 1 3/8" Storefront Frame WS2 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD LEVEL 3 108AA FG1 3' - 0" 8' - 0" 1 0' - 1 3/8" WD TBD HM TBD 108X 8' - 0" 0' - 1 3/8" WD TBD TBD 108Y S2 12' - 0" 8' - 0" 1 GLASS VINYL PREFINISHED 108Z S2 12' - 0" 8' - 0" 1 GLASS VINYL PREFINISHED 258 0' - 0" 299 0' - 0" 12395 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 12396 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 12485 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD WD TBD 12528 FG1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD WD TBD 12570 8' - 0" 0' - 1 3/8" WD TBD TBD 12571 S2 12' - 0" 8' - 0" 1 GLASS VINYL PREFINISHED 12575 8' - 0" PREFINISHED LEVEL 4 259 0' - 0" 12397 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 12398 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 12491 0' - 0" 12572 S1 12' - 0" 7' - 0" 1 GLASS VINYL PREFINISHED 12573 7' - 6" PREFINISHED 12574 S1 12' - 0" 7' - 0" 1 GLASS VINYL PREFINISHED MECH. G36 3' - 10" 0' - 1 3/8" WD TBD G37 3' - 10" 0' - 1 3/8" WD TBD DOOR SCHEDULE DOOR NUMBER LEAF FIRE RATING (MIN) FRAME COMMENTSTYPE WIDTH HEIGHT QUANTITY THICKNESS MATERIAL FINISH MATERIAL FINISH GARAGE 108GG FW1 2' - 6" 7' - 0" 1 0' - 1 3/4" WD TBD WD TBD 108HH FW1 2' - 6" 7' - 0" 1 0' - 1 3/4" WD TBD WD TBD 108I FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 108II FW1 3' - 0" 7' - 0" 1 0' - 1 3/4" WD TBD WD TBD 108JJ FW2 2' - 0" 7' - 0" 2 0' - 1 3/4" WD TBD WD TBD 108K FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 108KK FW1 2' - 6" 7' - 0" 1 0' - 1 3/4" WD TBD WD TBD 108LL FW1 3' - 0" 7' - 0" 1 0' - 1 3/4" WD TBD WD TBD 108N FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 108P FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 108Q 0' - 0" 108T FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD 296 0' - 0" 12562 0' - 0" ES-G FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G01A C 18' - 6" 8' - 0" 1 0' - 2" MTL TBD MTL TBD G01B FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G02 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G03 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G04 C 8' - 0" 6' - 6" 1 0' - 2" MTL TBD MTL TBD G05 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G07 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G08 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G08 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G09 FW2 3' - 6" 7' - 0" 2 0' - 1 3/8" WD TBD 90 HM TBD G10 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G11 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G13 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G14 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM G14A FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G14B FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G15 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD G16 7' - 0" 0' - 1 1/2" WS-G FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD LEVEL 1 101A B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 101B B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 102A FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD 60 HM TBD 102B FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD 60 HM TBD 103 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 105 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 106 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 107 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 108 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 109 FG3 3' - 0" 7' - 0" 1 0' - 2" GLASS TBD MTL TBD 117 FW2 2' - 10" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 118 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 120 FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD 60 HM TBD 121 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 122 FW2 2' - 10" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 123 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 124 FW2 2' - 10" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 128 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 129 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 130 0' - 0" 132 FW2 2' - 10" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 134 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 60 HM TBD 135 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 60 HM TBD 136 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 60 HM TBD 137 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 60 HM TBD 138 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 139 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 140 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 141 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 142 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 143 B 3' - 0" 6' - 8" 1 0' - 2" WD TBD WD TBD 151A FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 151B FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 151C FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 152 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 60 HM TBD 153 FW2 2' - 10" 7' - 0" 1 0' - 1 3/8" WD TBD HM TBD 154 FW2 3' - 6" 7' - 0" 2 0' - 1 3/8" WD TBD HM TBD 257 0' - 0" 297 0' - 0" CS1A FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD CS1B FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD 90 HM TBD CS1C FW2 2' - 8" 7' - 0" 2 0' - 1 3/8" WD TBD 90 HM TBD ES1 FW1 3' - 0" 7' - 0" 1 0' - 1 3/8" WD TBD 90 HM TBD G24 6' - 0" 0' - 1" TBD G25 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G28 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G29 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G30 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G33 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G34 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL G35 FM3 2' - 8" 6' - 0" 1 0' - 1" MTL TBD MTL 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 5/8" GYP. 2X6 FRAMING INSULATION EXT GRADE OSB VAPOR BARRIER RIGID FOAM INSULATION LAP SIDING METAL FLASHING HEADER BLOCKING DOOR JAMB STOP DOOR EXT TRIM SEALANT AND BACKER ROD 5/8" INTERIOR GYP. 2X6 FRAMING WALL INSULATION TRIM JAMB EXT. TRIM EXTERIOR GRADE OSB VAPOR BARRIER RIGID FOAM INSULATION HORIZONTAL LAP SIDING SWING DOOR SWING DOOR THRESHOLD FINISH FLOOR SUBFLOOR INSULATION SOUND INSULATION FLOOR LEVELING CONCRETE PAVERS SAND SUBSTRATE WATERPROOFING MAT 6" CONCRETE DECK 5/8" INTERIOR GYP. 2X4 FRAMING WALL INSULATION CONCRETE SUBSTRATE WALL VAPOR BARRIER RIGID FOAM INSULATION DRAINAGE MAT STEEL TAPCON W/METAL TIE STONE VANEER METAL FLASHING STEEL L-ANGLE HEADER BLOCKING FOR SLIDING DOOR SLIDER TRACK SLIDING DOORS TRIM JAMB 5/8" INTERIOR GYP. 2X4 FRAMING WALL INSULATION CONCRETE SUBSTRATE JAMB BLOCKING JAMB SWING DOOR STEEL L-ANGLE TRIM VAPOR BARRIER RIGID FOAM INSULATION DRAINAGE MAT TAPCON W/STEEL TIE STONE VANEER SLIDING DOORS CONCRETE PAVERS SAND SUBSTRATE WATERPROOFING MAT 6" CONCRETE DECK SLIDING DOOR THRESHOLD FINISH FLOOR SUBFLOOR BLOCKING INSULATION SOUND INSULATION FLOOR LEVELING 5/8" INTERIOR GYP. 2X4 FRAMING WALL INSULATION CONCRETE SUBSTRATE WALL HEADER BLOCKING FOR SLIDING DOOR JAMB HEADER BLOCKING TRIM STOP VAPOR BARRIER RIGID FOAM INSULATION DRAINAGE MAT STEEL TAPCON W/METAL TIE STONE VANEER METAL FLASHING STEEL L-ANGLE DOOR 5/8" INTERIOR GYP. 2X4 FRAMING WALL INSULATION CONCRETE SUBSTRATE JAMB BLOCKING JAMB STOP SWING DOOR VAPOR BARRIER RIGID FOAM INSULATION DRAINAGE MAT TAPCON W/STEEL TIESTONE VANEER STEEL L-ANGLE TRIM CONCRETE PAVERS SAND SUBSTRATE WATERPROOFING MAT 6" CONCRETE DECK SWING DOOR THRESHOLD FINISH FLOOR SUBFLOOR INSULATION SOUND INSULATION FLOOR LEVELING 1/2" OSB & 2X6 HEADER BLOCKING TRIM STOP SWING DOOR GLASS WINDOW JAMB RIGID INSULATION TRIM LAP SIDING BLOCKING 5/8" INTERIOR GYP 1/4" CASING WINDOW JAMB SWING DOOR STOP DOOR JAMB TRIM HORIZONTAL LAP SIDING RE: DOOR MANUF 18 3/4" (N.T.S.) 0' - 5 3/4" 5/8" INTERIOR GYP. 2X4 FRAMING WALL INSULATION BLOCKING JAMB STOP TRIM EXTERIOR GRADE OSB RIGID FOAM INSULATION DRAINAGE MAT SELF-FURRING METAL LATH STUCCO SWING DOOR 5/8" INTERIOR GYP. 2X4 FRAMING WALL INSULATION HEADER BLOCKING TRIM DOOR STOP JAMB EXTERIOR GRADE OSB RIGID FOAM INSULATION DRAINAGE MAT SELF-FURRING METAL LATH STUCCO METAL FLASHING 1/2" OSB & 2X6 HEADER BLOCKING TRIM TRACK SLIDING DOOR GLASS WINDOW JAMB Scale Date Drawn By Project Number As indicated 9/15/2017 5:05:58 PMA851 DOOR DETAILSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1 1/2" = 1'-0" 1 SWING DOOR HEAD @ LAP SIDING 1 1/2" = 1'-0" 2 SWING DOOR JAMB @ LAP SIDING 1 1/2" = 1'-0" 3 SWING DOOR THRESHOLD @ SOUTH PATIO 1 1/2" = 1'-0" 6 SLIDER HEAD @ STONE 1 1/2" = 1'-0" 7 SLIDER JAMB @ STONE 1 1/2" = 1'-0" 8 SLIDER THRESHOLD @ SOUTH PATIO 1 1/2" = 1'-0" 11 SWING DOOR HEAD @ STONE 1 1/2" = 1'-0" 12 SWING DOOR JAMB @ STONE 1 1/2" = 1'-0" 4 SWING DOOR THRESHOLD @ CONDO PATIO 3" = 1'-0" 13 SWING DOOR HEAD @ TRANSOM 3" = 1'-0" 14 SWING DOOR JAMB @ WINDOW 1" = 1'-0" 16 COILING OVRHD DOOR HEAD 3" = 1'-0" 17 COILING OVRHD DOOR JAMB 1 1/2" = 1'-0" 9 SWING DOOR HEAD @ STUCCO 1 1/2" = 1'-0" 10 SWING DOOR JAMB @ STUCCO 3" = 1'-0" 5 SLIDER HEAD @ TRANSOM 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 UP DN UP DN UP DN 10.1 E C .1 8 A901 9' - 8 3/4"19' - 9"WS-G CLEAR 3' - 10"5' - 5 1/2"9 TREADS @ 11"8' - 3"4' - 3 1/2" CLEAR 7' - 11 3/4"3' - 4"6 A9015/8" GYP. BOARD ON 7/8" HAT CHANNEL REINF. CONCRETE FOUNDATION WALL; RE: STRUCT DRAINAGE MAT ON 2" RIGID EXTRUDED POLYSTYRENE ON WATERPROOFING MEMBRANE PRECAST CONCRETE STAIRS 10.1 E E C .1 C .1 8 A901 10 TREADS @ 11"9' - 0 1/8" 4' - 6 1/2"6' - 2 5/8"8 TREADS @ 11"7' - 4"0' - 6 3/8"3' - 11 3/4"6 A901 X40 X47 X40 40 5/8" GYP. BOARD ON 7/8" HAT CHANNEL REINF. CONCRETE FOUNDATION WALL; RE: STRUCT DRAINAGE MAT ON 2" RIGID EXTRUDED POLYSTYRENE ON WATERPROOFING MEMBRANE PRECAST CONCRETE STAIRS D 10.1 E C .1 6 A950 8 A901 6' - 2 5/8"8 TREADS @ 11"7' - 4"4' - 5 3/8" 9 TREADS @ 11"8' - 3"WS2 19' - 9"6 A901 D 10.1 E E C .1 C .1 8 A901 0' - 11 1/2"6' - 2 5/8"8 TREADS @ 11"7' - 4"4' - 5 3/8" 8 TREADS @ 11"7' - 4" 7' - 2 1/8"6 A901 D LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" EC .1 9 RISERS5' - 0"9 RISERS5' - 0"11' - 0" 12' - 0" A504 6 124' - 10 3/4" D LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" E C .1 D Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:06:11 PMA901 WEST STAIR PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 WEST STAIR - GARAGE PLAN 1/4" = 1'-0" 2 WEST STAIR - LEVEL 1 PLAN 1/4" = 1'-0" 3 WEST STAIR - LEVEL 2 PLAN 1/4" = 1'-0" 4 WEST STAIR - LEVEL 3 PLAN 1/4" = 1'-0" 8 WEST STAIR SECTION 1/4" = 1'-0" 6 WEST STAIR SECTION1 7 WEST STAIR ISOMETRIC5WEST STAIR ISOMETRIC 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 UP DN UP DN 6 E 5 A902 10 TREADS @ 11"9' - 2" 3' - 7 1/4"0' - 9 1/2"CLEAR 3' - 7" CLEAR 3' - 7" 0' - 9 1/2" 8' - 7" 0' - 8" 5' - 0" 3' - 4" 1' - 4"18' - 1 3/4"10' - 4" ES-G 6 A902 6 E 5 A902 1' - 0" CLEAR 3' - 7"6' - 2 3/4"8 TREADS @ 11"7' - 4"4' - 7" 18' - 1 3/4"9 TREADS @ 11"8' - 3"ES1 6 A902 6 E 5 A902 9 TREADS @ 11"8' - 3"8 TREADS @ 11"7' - 4"6 A902 6 E F 5 A902 6 A902 9 TREADS @ 11"8' - 3"8 TREADS @ 11"7' - 4"CLEAR 3' - 7" 1' - 0" CLEAR 3' - 7"19' - 0"LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" EF 1 A302 1 A404 0' - 10 1/4"18' - 1 3/4" 19' - 0"12' - 0"3' - 10 3/4"10' - 0" 11' - 0" 12' - 0"LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" E F 1 A302 1 A404 3' - 10 3/4"10' - 0"11' - 0"12' - 0"10' - 0"11' - 0"12' - 0"7590 SF GARAGE G01 503 SF BOILER ROOM G09 19' - 0" 0' - 8" 16' - 9 3/4" 0' - 8" 0' - 10 1/4" 124' - 10 3/4" Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:06:21 PMA902 EAST STAIR PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 EAST STAIR - GARAGE PLAN 1/4" = 1'-0" 2 EAST STAIR - LEVEL 1 PLAN 1/4" = 1'-0" 3 EAST STAIR - LEVEL 2 PLAN 1/4" = 1'-0" 4 EAST STAIR - LEVEL 3 PLAN 1/4" = 1'-0" 5 EAST STAIR SECTION 1 1/4" = 1'-0" 6 EAST STAIR SECTION 27EAST STAIR ISO SECTION 1 8 EAST STAIR ISO SECTION 2 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 UP DN UP DN UP DN LEVEL 1 100' - 0" LEVEL 2 111' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" E 3 E 8 A903 6 A903 CLEAR 3' - 6"4' - 5" 9 TREADS @ 11"8' - 3"0' - 7 3/4" CLEAR 3' - 6" CS1CCS1B G5 G6 3 E 8 A903 6 A903 8 TREADS @ 11"7' - 4"9' - 2 7/8" 8 TREADS @ 11"7' - 4"CLEAR 3' - 6" G7 3 E 8 A903 6 A903 3 E 6 A903 LEVEL 1 100' - 0" LEVEL 2 111' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" E 1 A302 Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:06:34 PMA903 CENTRAL STAIR PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 8 CENTRAL STAIR SECTION 1/4" = 1'-0" 1 CENTRAL STAIR - LEVEL 1 1/4" = 1'-0" 2 CENTRAL STAIR - LEVEL 2 1/4" = 1'-0" 3 CENTRAL STAIR - LEVEL 3 1/4" = 1'-0" 4 CENTRAL STAIR - LEVEL 4 1/4" = 1'-0" 6 CENTRAL STAIR SECTION 7 CENTRAL STAIR ISOMETRIC SECTION 15CENTRAL STAIR ISOMETRIC SECTION 2 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 LEVEL 1 100' - 0" LEVEL 2 111' - 0" HG D6 D6 VFY LOCATION OF FLOOR DRAINS AND SNOWMELT UNDERNEATH BAR GRATE STAIRS 10.1 H G 4 A904 80 36 36 33 43 88 8 TREADS @ 15"8' - 0"4' - 0" VFY LOCATION OF FLOOR DRAINS AND SNOWMELT UNDERNEATH BAR GRATE STAIRS. VFY ACCESS FOR CLEAN OUT 10.1 H G 4 A904 X28 X40 X406 TREADS @ 15"8' - 0"4' - 0" 6 TREADS @ 15"8' - 0"4' - 0" 6 TREADS @ 15"8' - 0"4' - 6" D6 D6 CLUB ROOM 207 MECH 209 G 3 A904 H G 3 A904 G1 G2 LEVEL 1 100' - 0" LEVEL 2 111' - 0" LEVEL 3 121' - 0" H G 6' - 8"6' - 11 1/2"8' - 3 1/4"7' - 0 5/8"Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:06:44 PMA904 STAIR PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 4 PATIO STAIR SECTION 1/4" = 1'-0" 5 PATIO STAIR LEVEL 1 PLAN 1/4" = 1'-0" 6 PATIO STAIR LEVEL 2 PLAN 1/4" = 1'-0" 1 MISC STAIR 01 - LEVEL 1 PLAN 1/4" = 1'-0" 2 MISC STAIR 01 - LEVEL 2 PLAN 1/4" = 1'-0"3 MISC STAIR 01 SECTION 01 PERMIT 07.01.15 No. Description Date 06 09.15.17 BLDG.PERMIT CORR. 10/24/17 DN REF. REF.REF. REF. 4'-0" 4'-0" 4'-0"7'-0"7'-0"8'-1"CONCEALED GUTTERS TO CONCEALED DRAIN LEADERS CONCEALED GUTTERS TO CONCEALED DRAIN LEADERS SCONCE SCONCE SPOT SPOT SCONCE SCONCE SCONCE SCONCESCONCESCONCE SCONCESCONCESCONCESCONCESPOTSPOTSCONCESCONCESCONCECAN CAN CANCANCAN STEPCAN CAN CANCAN CAN CAN CAN CAN CAN CAN CAN CANCAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CANCAN SCONCE SCONCE SCONCE SCONCE SCONCE STEPSTEPSTEPSTEPSTEPSTEPSTEPSTEPSTEPSTEPSTEPSTEP STEP STEPSTEPSTEP STEP STEP STEP STEP STEP STEP STEP STEP SPOTSPOTSPOTSPOTSTEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEP STEPSPOTCANCAN STEP STEPSTEP STEP STEPSTEPSTEPA D D R E S S SI GNAGE SCONCE STEP STEPSTEPSTEPSTEPSTEP STEP STEPSTEPSTEPSTEP-LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1-LVL 3 -LVL 3 SCONCESTEP -LVL 1 -LVL 1-LVL 1- L VL 1 -LVL 1-LVL G-LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 -LVL 1 STEP -LVL G -LVL G-LVL G -LVL G -LVL G-LVL G -LVL G -LVL G -LVL G -LVL 3 -LVL 3-LVL 3 -LVL 2-LVL 2-LVL 2 -LVL 3-LVL 3-LVL 1 -LVL 1 -LVL 1 -LVL 1-LVL 1 -LVL 3-LVL 3 -LVL 3 -LVL 3 -LVL 3-LVL 1 -LVL 2 -LVL 2-LVL 2-LVL 2 -LVL 2 -LVL 1-LVL 1 -LVL 1-LVL 2-LVL 2-LVL 2-LVL 1-LVL 1 -LVL 1-LVL 2-LVL 2-LVL 2-LVL 2 -LVL 2 -LVL 2 -LVL 2 -LVL 2 -LVL 2 -LVL 1-2 -LVL 2-LVL 2-LVL 2-LVL 2 -LVL 2 -LVL 2 -LVL 2 -LVL 4-LVL 4-LVL 4-LVL 4-LVL 4 -LVL 4-LVL 4-LVL 3-LVL 3-4-LVL 3-4-LVL 3-4DOOR-LVL 2 DOOR -LVL 2DOOR-LVL 2DOOR -LVL 2 B.3 2 D STEP LIGHT, +18", U.O.N. EXTERIOR SCONCE, +7'-6", U.O.N. LIGHTING LEGEND RECESSED CAN LIGHT, CEILINGS DOWN LIGHT OVER ENTRANCES LANDSCAPE SPOT LIGHT, STRUCTURE UP - LIGHT SCONCE STEP CAN DOOR SPO T SYMBOL DESCRIPTION MANUFACTURER COUNT HINKLEY, ATLANTIS HINKLEY, 40W G9 BRICK HINKLEY, TYP. HINKLEY, ATLANTIS HINKLEY, 35W SPOT 25 60 36 4 9 Scale Date Drawn By Project Number As indicated 9/15/2017 5:21:49 PMAS906 SITE LIGHTING PLANSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/8" = 1'-0"1 SITE LIGHTING PLAN 3/16" = 1'-0" LIGHTING LEGEND No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 1 1 0.1 0.1 E E 6 A950 118 117 80 34 46 46 88 88 88 34 34 34 5' - 0 5/8"8' - 11 5/8" 6' - 2 7/8" 3' - 5 7/8" 6' - 2 1/8" WEST BREEZEWAY 116 ELEV VEST 118 STORAGE 117 WEST STAIR WS1 88 2' - 2" 9' - 8" 46 5' - 3" 0' - 8" R 11' - 1 0 1/2" 2' - 10 1/8"5' - 2 5/8"0' - 3 5/8"6' - 1" 10.1 E 6 A950 80 73 73 5' - 2 5/8"14' - 0 1/4" 5' - 0 5/8"8' - 11 5/8" 6' - 2 7/8" 9' - 8" 9' - 8 3/4" 6' - 2 1/8" G02 108T 108P 88 MECH G02 EL. MA. 238 GARAGE G01 WEST STAIR WS0 EL. VEST 237 TECH ENTRANCE G03 8' - 4" - - 1 1 0.1 0.1 E E 6 A950 4' - 1 7/8" 2' - 1" 3' - 5 7/8" 6' - 2 1/8" 43 X17 X17 73 33 X47 80 X40 88 88 88 88 207 WEST STAIR WS2 WEST ELEV VEST PSE3 MECH 209 CLUB ROOM 207 STOR/MECH 206 5' - 3 1/4"8' - 0 1/2" 13' - 3 3/4"5' - 0 5/8"8' - 11 5/8" 33 10.1 E 6 A950 CONDOMINIUM 3A 167 9' - 8 3/4" 4' - 1 7/8" 2' - 1" 9' - 8" 5' - 3"0' - 8" 1' - 7" 8' - 6 1/2" D83 88 88 88 88 13 13 13 7.83° 8.00°5' - 3 1/4"8' - 0 1/2" 13' - 3 3/4"0' - 7 5/8"5' - 0 1/2"8' - 11 3/4" 10.1 E 6 A950 88 88 88 88 D815' - 3 1/4"8' - 0 1/2" 13' - 3 3/4"4' - 1 7/8" 2' - 1" 5' - 3"0' - 8" C3 13 13 13 9' - 8 3/4"2' - 11 1/4"1' - 7" 7.83° 8.00°0' - 7 5/8"5' - 0 1/2"8' - 11 3/4" X73 A8 LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" E 17' - 0"11' - 0" 10' - 0" 11' - 0" 12' - 0" 5' - 0" 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT VAPOR RETARDER PRECAST DOUBLE-T; RE: STRUCT 3.5"CONCRETE TOPPING; RE: STRUCT w/ 1/2" DRAINAGE BOARD ABOVE 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) 1-1/2" CONCRETE TOPPING SLAB 3/4" FLOOR SHEATHING; RE: STRUCT FLOOR JOISTS; RE: STRUCT 5/8" GYPSUM BOARD SPRAY APPLIED FIREPROOFING CONDOMINIUM 3A 167 WEST ELEV VEST PSE3 MECH 209 WEST BREEZEWAY 116 ELEV VEST 118 GARAGE G01 EL. VEST 237 5' - 0 5/8" 8' - 5 3/4" SPRAY APPLIED FIREPROOFING 4" 12" ACOUSTICAL FLOOR BUILD UP Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:07:52 PMA950 ELEVATOR 01 PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 2 ELEV 01 - LEVEL 1 PLAN 1/4" = 1'-0" 1 ELEV 01 - GARAGE PLAN 1/4" = 1'-0" 3 ELEV 01 - LEVEL 2 PLAN 1/4" = 1'-0" 4 ELEV 01 - LEVEL 3 PLAN 1/4" = 1'-0" 5 ELEV 01 - LEVEL 4 PLAN 1/4" = 1'-0" 6 ELEVATOR 01 SECTION 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 3 C C .1 5 A951 G13 73 80 43 0' - 8 5/8" 9' - 3 7/8"1' - 2"3' - 4" 2' - 3" 0' - 8" 5' - 3"2' - 9" 6' - 9"8' - 8"80 7' - 1" ELEV. EQUIP G14 EHU STUDIO - TYPE A UNIT G15 GARAGE G01 3 5 A951 CLUB ELEV CE1 CENTRAL STAIR CS1 BREEZEWAY 101 0' - 8"5' - 3" 2' - 9" 8' - 8"88 88 43 13 73 2' - 0 1/8" 7' - 7 1/2" D 3 5 A951 RECEPTION HALL 201 RR 212 MEETING 215 KITCH. 216 BOARD ROOM 202 CLUB ELEV CE1 D 3 5 A951 9' - 7 1/2"8' - 7 3/4"D LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" 3 11' - 0"10' - 0" 11' - 0" 12' - 0" 23' - 0" TRAVEL DISTANCE PIT DEPTH4' - 0"CONDOMINIUM 3B 245 MEETING 215 BREEZEWAY 101 GARAGE G01 CLUB ELEV CE1 RECEPTION HALL 201 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT VAPOR RETARDER PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK 4-1/2" CONCRETE SLAB ON 2" METAL DECK 1" FIN. CONCRETE TOPPING SLAB SPRAY APPLIED FIREPROOFING SPRAY APPLIED FIREPROOFING12' - 8" OVERHEAD CLEARACOUSTICAL FLOOR BUILD UP 4" FINISH FLOORING Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:08:15 PMA951 ELEVATOR 02 PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 1 ELEVATOR 02 - GARAGE PLAN 1/4" = 1'-0" 2 ELEVATOR 02 - LEVEL 1 PLAN 1/4" = 1'-0" 3 ELEVATOR 02 - LEVEL 2 PLAN 1/4" = 1'-0" 4 ELEVATOR 02 - LEVEL 3 PLAN 1/4" = 1'-0" 5 ELEVATOR 02 SECTION 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 DN LEVEL 1 100' - 0" LEVEL 2 111' - 0" GARAGE 88' - 0" LEVEL 3 121' - 0" LEVEL 4 132' - 0" T.O. CHIMNEY 149' - 0" F 17' - 0"11' - 0" 10' - 0" 11' - 0" 12' - 0" CONDOMINIUM 3B 245 EAST ELEV VEST 235 ELEV. VEST. 152 ELEV VEST G10 GARAGE G01 RR 224 CONDOMINIUM 3B 245 5" REINF. CONCRETE SLAB ON GRADE; RE: STRUCT REINF. CONCRETE FOOTING; RE: STRUCT VAPOR RETARDER PRECAST DOUBLE-T; RE: STRUCT 3-1/2"CONCRETE TOPPING; RE: STRUCT 4-1/2" CONCRETE SLAB ON 2" METAL DECK ACOUSTICAL FLOOR BUILD UP 4-1/2" CONCRETE SLAB ON 2" METAL DECK 1" FIN. CONCRETE TOPPING SLAB ROOF JOISTS; RE: STRUCT STANDING SEAM METAL ROOF 3" SPRAY FOAM INSULATION (R-19) 1-1/2" CONCRETE TOPPING SLAB 3/4" FLOOR SHEATHING; RE: STRUCT FLOOR JOISTS; RE: STRUCT 5/8" GYPSUM BOARD SPRAY APPLIED FIREPROOFING SPRAY APPLIED FIREPROOFING 44' - 0" TRAVEL HEIGHTD101 D100 4" 12"6 1/4"4 1/2" 4 5 F 7 A952 36 36 34 88 88 88 88 73 73 73 G10 G11 8' - 9" 0' - 1 1/8" 2' - 4 1/8" 4' - 4 7/8" 1' - 3 1/2" 7' - 0 1/2" 0' - 5" ELEV VEST G10 BOILER ROOM G09 EAST STAIR ES0 GARAGE G01 0' - 2 3/4"5' - 5"3' - 9 3/8"0' - 10 3/8"4' - 7 3/4"5' - 3" 0' - 8" 4 5 F 7 A952 137 152 151A 73 33 73 43 43 88 88 88 33 46 46 88 34 8' - 6 5/8" 7' - 0 1/2" 7' - 9 5/8"0' - 2 3/4"6' - 3 1/4" 8' - 10 1/8" 2' - 3 1/2" 4' - 5 1/2"5' - 4 3/8"3' - 3 3/8" 4 4 5 5 F 7 A952 13 13 88 13 88 46 46 46 88 8' - 10 1/8" 2' - 3 1/2"8' - 11"0' - 2 3/4"9' - 1 3/4"2' - 11 1/8" 5' - 3" 0' - 8" 4 5 F 7 A952 0' - 2 3/4"8' - 10 1/8" 2' - 3 1/2" 10 5 . 0 0 °75.00°0' - 1 7/8" 5' - 1 1/8" 4 5 F 7 A952 0' - 2 3/4" 8' - 11"9' - 1 3/4"0' - 1 7/8" 5' - 1 1/8"75.00°8' - 10 1/8" 2' - 3 1/2" 0' - 1 1/8" 10 5 . 00 ° D101 D102 13 8813 88 88 13 Scale Date Drawn By Project Number 1/4" = 1'-0"9/15/2017 5:08:28 PMA952 ELEVATOR 03 PLANS AND SECTIONSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 1/4" = 1'-0" 7 ELEV 03 SECTION 1/4" = 1'-0" 1 ELEV 03 - GARAGE PLAN 1/4" = 1'-0" 2 ELEV 03 - LEVEL 1 PLAN 1/4" = 1'-0" 3 ELEV 03 - LEVEL 2 PLAN 1/4" = 1'-0" 4 ELEV 03 - LEVEL 3 PLAN 1/4" = 1'-0" 6 ELEV 03 - LEVEL 4 PLAN 01 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 Scale Date Drawn By Project Number 9/15/2017 5:10:39 PMAS901 PERSPECTIVESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1 NORTHWEST PERSPECTIVE 2 SOUTHWEST PERSPECTIVE 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 04 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 Scale Date Drawn By Project Number 9/15/2017 5:13:36 PMAS902 PERSPECTIVESSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEMEW 07.01.15 000000 1 NORTHEAST PERSPECTIVE 2 SOUTHEAST PERSPECTIVE 02 P.E.C. RESUBMITTAL 8-25-14 01 P.E.C. SUBMITTAL 7-14-14 03 P.E.C. RESUBMITTAL 9-26-14 04 PERMIT 07.01.15 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 Scale Date Drawn By Project Number 9/15/2017 5:14:00 PMAS903 HISTORIC AND PROPOSED CONTOURSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 Scale Date Drawn By Project Number 9/15/2017 5:14:41 PMAS904 CONTOURS AND BUILDING HEIGHTSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 PROPOSED GRADE HISTORIC GRADE EXISTING GRADE No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 Scale Date Drawn By Project Number 9/15/2017 5:15:26 PMAS905 CONTOURS AND BUILDING HEIGHTSSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEAuthor 07.01.15 000000 PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE No. Description Date 06 09.15.17BLDG.PERMIT CORR. 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 GENERAL NOTES & LEGEND C-01 “ ” · · · · · · · · # 09-08-17 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-10 811 OVERALL SITE PLAN 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-11 811 EXISTING COND'NS & DEMO PLAN 09-08-17 10/24/17 C-12 EXISTING COND'NS & DEMO PLAN Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-21 811 EROSION CONTROL PLAN (INITIAL) “ ” 09-08-17 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-22 811 EROSION CONTROL PLAN (FINAL) 09-08-17 10/24/17 UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-31 811 DETAILED GRADING PLAN 09-08-17 10/24/17 UP CLUB ELEVATOR C-32 DETAILED GRADING PLAN Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 TYPICAL CURB RAMP AT DRIVE CUT N.T.S. TIERED BOULDER WALL DETAIL N.T.S. BOULDER WALL DETAIL N.T.S. 09-08-17 10/24/17 UP CLUB ELEVATOR DRIVE CENTERLINE DRIVE SECTION Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-33 811 DRIVE PLAN AND PROFILE C33 09-08-17 10/24/17 UP UP CLUB ELEVATOR WATER SERVICE SANITARY SERVICE Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-50 811 “ ” “ ” OVERALL UTILITY PLAN 09-08-17 10/24/17 UP STORM A Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-61 811 STORM SEWER PLAN & PROFILE ORIFICE PLATE DETAIL 09-08-17 10/24/17 STORM B UPC-62 STORM SEWER PLAN & PROFILE Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-63 811 PERIMETER DRAIN PLAN 09-08-17 10/24/17 UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-81 811 HORIZONTAL CONTROL PLAN 09-08-17 10/24/17 UP CLUB ELEVATOR C-82 HORIZONTAL CONTROL PLAN Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 C-83 LINE AND CURVE TABLES Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 UP UP CLUB ELEVATOR DD UP BB A A CC Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-91 811 SIGNAGE, STRIPING & PAVING PLAN PAVER SECTION DETAIL SECTION A-A (TYP.) SECTION B-B (TYP.) SECTION C-C (TYP.) PAVING SECTIONS SCALE: 1:10 SECTION D-D (TYP.) 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 SITE DETAILS C-101 09-08-17 10/24/17 C-102 EROSION CONTROL DETAILS Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-1709-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 GENERAL NOTES & LEGEND C-01 “ ” · · · · · · · · # 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-10 811 OVERALL SITE PLAN 09-08-17 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 C-10 811 OVERALL SITE PLAN 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 SITE DETAILS C-101 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 SITE DETAILS C-101 10/24/17 C-102 EROSION CONTROL DETAILS Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-1709-08-17 10/24/17 C-102 EROSION CONTROL DETAILS Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No . Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-11 811 EXISTING COND'NS & DEMO PLAN 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 C-11 811 EXISTING COND'NS & DEMO PLAN 10/24/17 C-12 EXISTING COND'NS & DEMO PLAN Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 C-12 EXISTING COND'NS & DEMO PLAN Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No . Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 811 10/24/17 Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-21 811 EROSION CONTROL PLAN (INITIAL) “ ” 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 C-21 811 EROSION CONTROL PLAN (INITIAL) ³ ´ 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-22 811 EROSION CONTROL PLAN (FINAL) 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 C-22 811 EROSION CONTROL PLAN (FINAL) 10/24/17 UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-31 811 DETAILED GRADING PLAN 09-08-17 10/24/17 UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 C-31 811 DETAILED GRADING PLAN 10/24/17 B-BA-A C-C D-D D-D UP CLUB ELEVATOR C-32 DETAILED GRADING PLAN Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-08-17 811 TYPICAL CURB RAMP AT DRIVE CUT N.T.S. TIERED BOULDER WALL DETAIL N.T.S. BOULDER WALL DETAIL N.T.S. 10/24/17 SOUTH WALL SECTION C-CSOUTH WALL SECTION A-A SOUTH WALL SECTION B-B SOUTH WALL SECTION D-D SOUTH WALL SECTION E-E -- -- 811 10/24/17 UP CLUB ELEVATOR C-32 DETAILED GRADING PLAN Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 811 TYPICAL CURB RAMP AT DRIVE CUT N.T.S. 10/24/17 UP CLUB ELEVATOR DRIVE CENTERLINE DRIVE SECTION Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-33 811 DRIVE PLAN AND PROFILE C33 09-08-17 10/24/17 DRIVE CENTERLINE Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No . Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 C-33 811 DRIVE PLAN AND PROFILE 10/24/17 UP UP CLUB ELEVATOR WATER SERVICE SANITARY SERVICE Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-50 811 “ ” “ ” OVERALL UTILITY PLAN 09-08-17 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 C-50 811 “ ” “ ” OVERALL UTILITY PLAN 10/24/17 UP STORM A Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARDCLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-61 811 STORM SEWER PLAN & PROFILE ORIFICE PLATE DETAIL 09-08-17 10/24/17 UP STORM A Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 C-61 811 STORM SEWER PLAN & PROFILE ORIFICE PLATE DETAIL 10/24/17 STORM B UPC-62 STORM SEWER PLAN & PROFILE Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 STORM B STORM C C-62 STORM SEWER PLAN & PROFILE Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No . Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 811 10/24/17 UP UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-63 811 PERIMETER DRAIN PLAN 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No . Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 C-63 811 PERIMETER DRAIN PLAN 10/24/17 UP CLUB ELEVATOR Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-81 811 HORIZONTAL CONTROL PLAN 09-08-17 10/24/17 Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 C-81 811 HORIZONTAL CONTROL PLAN 10/24/17 UP CLUB ELEVATOR C-82 HORIZONTAL CONTROL PLAN Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 C-82 HORIZONTAL CONTROL PLAN Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 811 10/24/17 C-83 LINE AND CURVE TABLES Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 811 09-08-17 10/24/17 C-83 LINE AND CURVE TABLES Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARDCLUB VAIL .REJ JUNE 1 2015 14 .0498 No . Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 811 10/24/17 UP UP CLUB ELEVATOR DD UP BB A A CC Scale as shown Date Drawn By Project Number --SKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 3 UPDATED SET 09-07-17 C-91 811 SIGNAGE, STRIPING & PAVING PLAN PAVER SECTION DETAIL SECTION A-A (TYP.) SECTION B-B (TYP.) SECTION C-C (TYP.) PAVING SECTIONS SCALE: 1:10 SECTION D-D (TYP.) 09-08-17 10/24/17 UP UP CLUB ELEVATOR DD UP BB A A CC Scale as shown Date Drawn By Project Number --6/26/2014 5:34:31 PMSKI ANDSNOWBOARD CLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 2 BUILDING PERMIT REVISIONS 08-15-16 C-91 811 SIGNAGE, STRIPING & PAVING PLAN PAVER SECTION DETAIL SECTION A-A (TYP.) SECTION B-B (TYP.) SECTION C-C (TYP.) PAVING SECTIONS SCALE: 1:10 SECTION D-D (TYP.) 10/24/17 SCALE: MOUNTING HEIGHTS DETAIL1 E0.0 N.T.S. SCALE: TELE/DATA/CATV RISER DIAGRAM2 E0.0 NONE Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 NONE E0.0 ELECTRICAL COVER SHEET 10/24/17 AWARDS PODIU M LARGE B O U L D E R BLOCK S SNOW S T O R A G E - 1,050 S.F. TOTAL (10% OF E X P O S E D P A V E D AREA) SNOW STORA G E SNOW S T O R A G E - S.F. T O T A L (10% OF EXPOS E D PAVED A R E A ) UP UP CLUB ELEVATOR IRRI GATIO N CONTR O L L E R AND S T U B -O U T LOCATI ON SCALE: ELECTRICAL SITE PLAN1 E0.1 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E0.1 ELECTRICAL SITE PLAN 10/24/17 UP UP UP DNDN 1 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A A GARAGE G01 ELEV. EQUIP G14 BOILER ROOM G09 EAST STAIR ES0 C .1 C .1 MECH G02 CLUB STORAGE G13 TECH ENTRANCE G03 EHU G16 EHU STUDIO - TYPE A UNIT G15 OFFICE G07 CLUB STORAGE G08 MECH / JANITOR G05 LOCKERS G06 WEST STAIR WS0 ELEV VEST G10 ELEV. EQ. G11 WATER ENTRY G12 EL. VEST 237 EL. MA. 238 TECH SHOP G04 B.3 2 SCALE: ELECTRICAL POWER PLAN - GARAGE1 E1.0 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E1.0 ELECTRICAL POWER PLAN - GARAGE 10/24/17 UP UP UP DN UP DN UP UP DN DN 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A C .1 C .1 CENTRAL STAIR CS1 WEST STAIR WS1 BREEZEWAY 101 EAST STAIR ES1 ALPINE COACHES WORK STATIONS 102 RR 128 MECH. 150 ELEV. VEST. 152 STORAGE 134 ELECTRICAL 151 ACROBATICS WORK 137 TRASH/RECYLCING 154 VENUE EQUIP. 132 SNOWBOARD / BOOT STORAGE 131 TUNING 130 RR 129 GATE SERVICE 119 TECH FITTING AND DROP-OFF 121 ALPINE STORAGE 124 TECH SERVICE CARTS 120 BOOT / SKI STORAGE 125 ALPINE TUNING 126 HALL 127 RR 135 RR 136 WMNS ACRO LOCKERS 148 MENS ACRO LOCKERS 145 MECH. 122 JAN. 123 B.3 MENS ALPINE LOCKERS 111 WMNS ALPINE LOCKERS 114 BREEZEWAY 101 2 D D ALPINE DIRECTOR OFFICE 103 CONF 104 CONF. 105 OFFICE 106 OFFICE 107 CONF. 108 ATHLETIC DIR.OFFICE 109 SNOWBOARD OFFICE 138 CONF. 139 F.ST./F.SK. OFFICE 140 FREE SKI/STYLE DIR. OFFICE 142 F.ST./F.SK. OFFICE 141 SCALE: ELECTRICAL POWER PLAN - 1ST FLOOR1 E1.1 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E1.1 ELECTRICAL POWER PLAN - 1ST FLOOR 10/24/17 DN DN REF. REF.REF. REF. DN UP DN DN UP 1 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A CLUB ROOM 207 BOARD ROOM 202 WEST STAIR WS2 C .1 C .1 CONF. 218 TREATMENT 204 MECH 209 CONF. 226 DEV. MNGR. OFFICE 227 FINANCE OFFICE 219 G.M. OFFICE 220 BOOK KEEPER OFFICE 221 TRAVEL OFFICE 222 STOR/MECH 206 GYM 203 KITCHEN 205 KITCH. 216 RECEPTION HALL 201 RR 212 RR 213 MEETING 215 ADMIS. OFFICE 217 EXEC. OFFICE 225 EXEC. ASSIST. OFFICE 228 OPERATIONS MANAGER 229 COACH LOUNGE 223 ADMIN AND WORKSPACES 214 EVENT STOR 234 STORAGE 211 RR 224 EVENTS 230 COMPETITION OFFICE 231 RACE INFO DESK 233 STORAGE 208 MECH 232 JAN 210 B.3 PATIO STAIR EAST 236 CLUB TERRACE 239 2 D SCALE: ELECTRICAL POWER PLAN - 2ND FLOOR1 E1.2 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E1.2 ELECTRICAL POWER PLAN - 2ND FLOOR 10/24/17 1 1 4 4 5 5 6 62 3 4.1 1.1 1.2 0.1 0.1 C C E E F H H D J J B G G A C .1 C .1 SCALE: ELECTRICAL ROOF PLAN1 E1.3 1/8" = 1'-0" Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E1.3 ELECTRICAL POWER PLAN - ROOF 10/24/17 UP UP UP DNDN 1 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A A GARAGE G01 ELEV. EQUIP G14 BOILER ROOM G09 EAST STAIR ES0 C .1 C .1 MECH G02 CLUB STORAGE G13 TECH ENTRANCE G03 EHU G16 EHU STUDIO - TYPE A UNIT G15 OFFICE G07 CLUB STORAGE G08 MECH / JANITOR G05 LOCKERS G06 WEST STAIR WS0 ELEV VEST G10 ELEV. EQ. G11 WATER ENTRY G12 EL. VEST 237 EL. MA. 238 TECH SHOP G04 B.3 2 SCALE: ELECTRICAL LIGHTING PLAN - GARAGE 1 E2.0 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E2.0 ELECTRICAL LIGHTING PLAN GARAGE 10/24/17 UP UPUP DN UP DN UP UP DN DN 1 1 4 4 5 5 6 63 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A C .1 C .1 CENTRAL STAIR CS1 WEST STAIR WS1 BREEZEWAY 101 EAST STAIR ES1 ALPINE COACHES WORK STATIONS 102 RR 128 MECH. 150 ELEV. VEST. 152 STORAGE 134 ELECTRICAL 151 ACROBATICS WORK 137 TRASH/RECYLCING 154 VENUE EQUIP. 132 SNOWBOARD / BOOT STORAGE 131 TUNING 130 RR 129 GATE SERVICE 119 TECH FITTING AND DROP-OFF 121 ALPINE STORAGE 124 TECH SERVICE CARTS 120 BOOT / SKI STORAGE 125 ALPINE TUNING 126 HALL 127 RR 135 RR 136 WMNS ACRO LOCKERS 148 MENS ACRO LOCKERS 145 MECH. 122 JAN. 123 B.3 MENS ALPINE LOCKERS 111 WMNS ALPINE LOCKERS 114 BREEZEWAY 101 2 D D ALPINE DIRECTOR OFFICE 103 CONF 104 CONF. 105 OFFICE 106 OFFICE 107 CONF. 108 ATHLETIC DIR.OFFICE 109 SNOWBOARD OFFICE 138 CONF. 139 F.ST./F.SK. OFFICE 140 FREE SKI/STYLE DIR. OFFICE 142 F.ST./F.SK. OFFICE 141 SCALE: ELECTRICAL LIGHTING PLAN - 1ST FLOOR1 E2.1 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E2.1 ELECTRICAL LIGHTING PLAN 1ST FLOOR 10/24/17 REF. REF.REF. REF. 1 1 4 4 5 5 6 6 3 4.1 1.1 1.2 0.1 0.1 C C E E F H H J J B G G A CLUB ROOM 207 BOARD ROOM 202 WEST STAIR WS2 C .1 C .1 CONF. 218 TREATMENT 204 MECH 209 CONF. 226 DEV. MNGR. OFFICE 227 FINANCE OFFICE 219 G.M. OFFICE 220 BOOK KEEPER OFFICE 221 TRAVEL OFFICE 222 STOR/MECH 206 GYM 203 KITCHEN 205 KITCH. 216 RECEPTION HALL 201 RR 212 RR 213 MEETING 215 ADMIS. OFFICE 217 EXEC. OFFICE 225 EXEC. ASSIST. OFFICE 228 OPERATIONS MANAGER 229 COACH LOUNGE 223 ADMIN AND WORKSPACES 214 EVENT STOR 234 STORAGE 211 RR 224 EVENTS 230 COMPETITION OFFICE 231 RACE INFO DESK 233 STORAGE 208 MECH 232 JAN 210 B.3 PATIO STAIR EAST 236 CLUB TERRACE 239 2 D SCALE: ELECTRICAL LIGHTING PLAN - 2ND FLOOR1 E2.1 1/8" = 1'-0" NORTH Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 1/8" = 1'-0" E2.2 ELECTRICAL LIGHTING PLAN - 2ND FLOOR 10/24/17 SCALE: ELECTRICAL ONE-LINE DIAGRAM1 E4.0 NTS SCALE: ELECTRICAL ELEVATOR RISER DIAGRAM2 E4.0 NTSSCALE: LIFT STATION GENERATOR DIAGRAM 3 E4.0 NTS Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 NONE E4.0 ELECTRICAL ONE-LINE DIAGRAM 10/24/17 Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 NONE E5.0 ELECTRICAL SCHEDULES 10/24/17 CUBICLES NORTH SCALE: DIGITAL SWITCH DETAIL 3 E400 N/A CHELSEA TYPE DIGITAL SWITCH SCALE: LIGHTING CONTROL SCHEMATIC 1 E400 N/A SCALE: WALL STATION BUTTON LABELS 2 E400 N/A ALL ON/OFF ACRO OFFICE DOWN LIGHTS ALL ON/OFF LINEARS DAYLIGHT LINEARS RECEPT PENDANT SPARE RECEPTHALLWAY ALPINE OFFICE PENDANTS DAYLIGHT PENDANTS DAYLIGHT DOWNS GYM DAYLIGHT GYM ALL ON/OFF SPARE SPARE SOUTH HALL HALL WALLWASH ADMIN/ WORK SPARE SPARE Scale Date Drawn By Project Number 3/23/2015 4:16:37 PMSKI ANDSNOWBOARDCLUB VAIL598 VAIL VALLEY DRIVEREVISED BLDG PERMIT 09-15-17 Description Date 01 No. AEDESIGN SEPT. 15, 2017 2847.00 AE DESIGN Integrated Lighting and Electrical Solutions 1900 Wazee Street #205 Denver, CO 80202 303.296.3034 aedesign-inc.com Project #:2847.00 NONE E6.0 ELECTRICAL SCHEDULES 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 NON-COMMERCIAL LIGHT DUTY KITCHEN NOTES PER SKI AND SNOWBOARD CLUB VAIL OWNERSHIP, THE KITCHEN WILL BE USED INFREQUENTLY FOR PRIVATE NON-COMMERCIAL, LIGHT DUTY USE. TYPICAL FOODS TO BE SERVED TO THE SKIERS WILL BE PASTA AND SOUPS. FOR THE INFREQUENT LARGER GATHERING, FOOD WILL BE COOKED OFF SITE (CATERED) AND ONLY REHEATED IN THE KITCHEN AS NEEDED. THE OWNERSHIP HAS INDICATED THE KITCHEN WILL NOT BE USED TO COOK FOODS THAT PRODUCE GREASE AND/OR SMOKE. THE TYPE II HOOD WILL BE SUFFICIENT TO CAPTURE HEAT AND MOISTURE. THE ONLY COOKING APPLIANCE IN THE KITCHEN WILL BE A 30" WIDE ELECTRIC INDUCTION RANGE. FOR THE SAME REASONS STATED ABOVE, A GREASE INTERCEPTOR IS ALSO NOT REQUIRED AS THE OWNERSHIP HAS INDICATED THAT THE USE OF THE KITCHEN WILL NOT PRODUCE GREASE-LADEN WASTE. 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 System No. C-AJ-1184 SECTION A-A 1. Floor or Wall Assembly -- Min 4-1/2 in. thick reinforced lightweight or normal weight (100-150 pcf) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Floor may also be constructed of any min 7-1/2 in. thick UL Classified hollow core Precast Concrete Units*. Max diam of opening is 14 in. when concrete floor or wall is used and max 7 in. when precast concrete units are used. See Concrete Blocks (CAZT) and Precast Concrete Units (CFTV) categories in the Fire Resistance Directory for names of manufacturers. 2. Through-Penetrants -- One metallic pipe, conduit or tubing to be installed either concentrically or eccentrically within the firestop system. The annular space between pipe, conduit or tubing and periphery of opening shall be min 0 in. (point contact) to max 3-1/4 in. Pipe, conduit or tubing to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of metallic pipes, conduits or tubing may be used: A. Steel Pipe -- Nom 10 in. diam (or smaller) Schedule 10 (or heavier) steel pipe. B. Iron Pipe -- Nom 10 in. diam (or smaller) cast or ductile iron pipe. C. Conduit -- Nom 4 in. diam (or smaller) steel electrical metallic tubing or steel conduit. D. Copper Tubing -- Nom 4 in. diam (or smaller) Type L (or heavier) copper tubing. E. Copper Pipe -- Nom 4 in. diam (or smaller) regular (or heavier) copper pipe. 3. Forms -- (Not Shown, Optional) -- Used as a form to prevent leakage of fill material during installation. Forms to be rigid sheet material, cut to fit the contour of the penetrating item and positioned as required to accommodate the required thickness of fill material. Forms to be removed after fill material has cured. Additional forming material may be used concrete block wall is penetrated. A min 1/2 in. thickness of min 4 pcf mineral wool batt insulation is firmly packed into the annulus as a permanent form and recessed from both surfaces of the wall as required to accommodate the required thickness of fill material. 4. Fill, Void or Cavity Material* -- Sealant -- Min 1 in. thickness of fill material applied within the annulus. At the point contact location between through penetrant and concrete, a min 1/2 in. diam bead of fill material shall be applied at the concrete through penetrant interface. When precast concrete units are used, the fill material shall be installed within annular space, flush with lower surface of floor. When concrete block wall is penetrated, a min 1 in. thickness of fill material shall be applied within the annulus flush with both surfaces of wall. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- FS605 or FS-ONE Sealant *Bearing the UL Classification Mark A Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc. March 12, 1999 F Rating -- 3 Hr T Rating -- 0 Hr A 4 2 1 C Classified by Underwriters Laboratories, Inc. to UL 1479 and CAN/ULC-S115 US System No. C-AJ-1421 SECTION A-A A A 4B 2 3 4B 1 4A C Classified by Underwriters Laboratories, Inc. to UL 1479 and CAN/ULC-S115 US ANSI/UL1479 (ASTM E814) CAN/ULC S115 ) 5DWLQJ ²  RU +U ) 5DWLQJ ²  RU  +U 7 5DWLQJV ²  +U )7 5DWLQJV ²  +U / 5DWLQJ $W $PELHQW ² /HVV 7KDQ  CFM/sq ft )+ 5DWLQJ ²  RU  +U / 5DWLQJ $W  ) ² /HVV 7KDQ  CFM/sq ft )7+ 5DWLQJV ²  +U 6HH ,WHP & / 5DWLQJ $W $PELHQW ² /HVV 7KDQ  CFM/sq ft / 5DWLQJ $W  ) ² /HVV 7KDQ  CFM/sq ft  )ORRU RU :DOO $VVHPEO\ ² 0LQ  LQ  PP WKLFN UHLQIRUFHG OLJKWZHLJKW RU QRUPDO ZHLJKW  SFI RU 1600-2400 kg/m3) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 6 in. (152 mm). See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers.  0HWDOOLF 6OHHYH ² 2SWLRQDO 1RP  LQ  PP GLDP RU VPDOOHU 6FKHGXOH  RU KHDYLHU VWHHO VOHHYH FDVW or grouted into floor or wall assembly, flush with floor or wall surfaces.  7KURXJK3HQHWUDQW ² 2QH PHWDOOLF SLSH RU FRQGXLW WR EH LQVWDOOHG HLWKHU FRQFHQWULFDOO\ RU HFFHQWULFDOO\ ZLWKLQ the firestop system. The annular space between pipe, tube or conduit and periphery of opening shall be min 0 in. (0 mm) (point contact) to max 5-3/8 in. (137 mm). Pipe or conduit to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of metallic pipes or conduits may be used: $ 6WHHO 3LSH ² 1RP  LQ  PP GLDP RU VPDOOHU 6FKHGXOH  RU KHDYLHU VWHHO SLSH % ,URQ 3LSH ² 1RP  LQ  PP GLDP RU VPDOOHU FDVW RU GXFWLOH LURQ SLSH & &RSSHU 3LSH ² 1RP  LQ  PP GLDP RU VPDOOHU 5HJXODU RU KHDYLHU FRSSHU SLSH ' &RSSHU 7XELQJ ² 1RP  LQ  PP GLDP RU VPDOOHU 7\SH / RU KHDYLHU FRSSHU WXELQJ ( &RQGXLW ² 1RP  LQ  PP GLDP RU VPDOOHU VWHHO FRQGXLW ) &RQGXLW ² 1RP  LQ  PP GLDP RU VPDOOHU VWHHO HOHFWULFDO PHWDOOLF WXELQJ (07  )LUHVWRS 6\VWHP ² 7KH ILUHVWRS V\VWHP VKDOO FRQVLVW RI WKH IROORZLQJ $ 3DFNLQJ 0DWHULDO ² 0LQ  LQ  PP WKLFNQHVV RI PLQ  SFI  NJP PLQHUDO ZRRO EDWW LQVXODWLRQ ILUPO\ packed into opening as a permanent form. Packing material to be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of fill material. % )LOO 9RLG RU &DYLW\ 0DWHULDO  6HDODQW ² 0LQ  LQ  PP WKLFNQHVV RI ILOO PDWHULDO DSSOLHG ZLWKLQ WKH annulus, flush with top surface of floor or with both surfaces of wall. For 3 Hr rated assemblies, a min 1/4 in. (6 mm) diam bead of fill material shall be applied at the concrete/pipe interface at the point contact location on the top surface of floor and on both surfaces of wall. +,/7, &216758&7,21 &+(0,&$/6 ',9 2) +,/7, ,1& ² )621( 6HDODQW RU &3 6HOI/HYHOLQJ Firestop Sealant. CP604 shall be used in floor applications only. When CP604 is used, F Rating is 2 Hr. *Bearing the UL Classification Mark Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc. November 21, 2012 System No. C-AJ-7051 SECTION A-A 1. Floor or Wall Assembly - Min 4-1/2 in. thick reinforced lightweight or normal weight (100-150 pcf) concrete. Wall may also be constructed of any Underwriters Laboratories Inc. Classified Concrete Blocks*. Max area of opening is 1024 in. sq. with a max dimension of 32 in. See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers. 2. Steel Duct - Nom 30 by 30 in. (or smaller) No. 24 gauge (or heavier) galv steel duct. One steel duct to be positioned within the firestop system. The annular space shall be min 1/4 in. to a max 1-3/4 in. Duct to be rigidly supported on both sides of floor or wall assembly. 3. Firestop System - The firestop system shall consist of the following: A. Packing Materials - Min 3-1/2 in. thickness of min 4 pcf mineral wool batt insulation firmly packed into opening as a permanent form between the bare steel duct and the periphery of the opening . Packing material to be recessed from top surface of floor or both surfaces of wall as required to accommodate the required thickness of fill material. B. Fill, Void or Cavity Material* - Sealant - Min 1 in. thickness of fill material applied within annulus, flush with top surface of floor or both surfaces of wall. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI, INC. - CP606 Flexible Firestop Sealant or FS-ONE Sealant 4. Steel Retaining Angle - Nom 2 in. by 2 in. by No. 16 gauge (or heavier) steel angles attached to all four sides of the steel duct on the top surface or both surfaces of the wall. The angles shall be attached with No. 8 (or larger) steel sheet metal screws spaced max of 1 in. from each end and a max of 3 in. OC. *Bearing the UL Classification Marking A Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc. October 20, 2000 F Rating - 3 Hr T Rating = 1 Hr A 2 3B 4 3A 1 System No. W-L-7040 SECTION A-A  :DOO $VVHPEO\ ² 7KH ILUHUDWHG J\SVXP ZDOOERDUGVWXG ZDOO DVVHPEO\ VKDOO EH FRQVWUXFWHG RI WKH PDWHULDOV and in the manner specified in the individual U300 or U400 Series Wall and Partition Designs in the Fire Resistance Directory and shall include the following construction features: $ 6WXGV ² :DOO IUDPLQJ PD\ FRQVLVW RI HLWKHU ZRRG VWXGV RU VWHHO FKDQQHO VWXGV :RRG VWXGV WR FRQVLVW RI nom 2 by 4 in. lumber spaced 16 in. OC. Steel studs to be min 2-1/2 in. wide and spaced max 24 in. Additional framing members shall be used to completely frame around opening. % *\SVXP %RDUG ² 1RP  LQ WKLFN ZLWK VTXDUH RU WDSHUHG HGJHV 7KH J\SVXP ZDOOERDUG W\SH QXPEHU RI layers and sheet orientation shall be as specified in the individual Wall and Partition Design Number. Max area of opening is 1300 in. with the dimension of 50 in. The hourly F rating of the firestop system is equal to the hourly fire rating of the wall assembly in which it is installed.  6WHHO 'XFW ² 1RP  LQ E\  LQ RU VPDOOHU 1R  JDXJH RU KHDYLHU JDOY VWHHO GXFW WR EH LQVWDOOHG ZLWKLQ the firestop system. The annular space shall be min 0 (point contact) in. to a max 2 in. Duct to be rigidly supported on both sides of the wall assembly.  )LUHVWRS 6\VWHP ² 7KH ILUHVWRS V\VWHP VKDOO FRQVLVW RI WKH IROORZLQJ $ )LOO 9RLG RU &DYLW\ 0DWHULDO²6HDODQW ² 0LQ  LQ WKLFNQHVV RI ILOO PDWHULDO DSSOLHG ZLWKLQ DQQXOXV IOXVK with both surfaces of wall. At point contact location, a min 1/2 in. diam bead of fill material shall be applied to the wall/duct interface on both surfaces of wall. +,/7, &216758&7,21 &+(0,&$/6 ',9 2) +,/7, ,1& ² )621( 6HDODQW &36 (ODVWRPHULF Firestop Sealant or CP606 Flexible Sealant. % 6WHHO 5HWDLQLQJ $QJOH ² 1R  06*  LQ JDOY VWHHO DQJOHV FXW WR ILW FRQWRXU RI GXFW ZLWK D  LQ overlap on the duct and a min 1 in. overlap on the gypsum board assembly on both sufaces of wall. 2 in. leg of angle secured to duct with min No. 8 by 3/4 in. long sheet metal screws, spaced a max of 6 in. OC. When bead of fill material is used at joint contact locations, angles shall be installed prior to full material curing. *Bearing the UL Classification Mark Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc. August 27, 2010 ) 5DWLQJV ³  DQG  +UV 6HH ,WHPV  DQG  7 5DWLQJ ³  +U / 5DWLQJ DW $PELHQW ³ /HVV 7KDQ  &)0VT IW / 5DWLQJ DW  ) ³ /HVV 7KDQ  &)0VT IW 1A 3B 3A 1B 3B 3A C Classified by Underwriters Laboratories, Inc. to UL 1479 and CAN/ULC-S115 US 2 C Classified by Underwriters Laboratories, Inc. to UL 1479 and CAN/ULC-S115 US System No. W-L-1249 SECTION A-A 1. Wall Assembly The 1 or 2 hr fire-rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner described in the individual U400 Series Wall or Partition Design in the UL Fire Resistance Directory and shall include the following construction features. A. Studs Steel studs 3-1/2 in. deep, fabricated from 25 MSG galv steel, spaced max 24 in. OC. B. Gypsum Boards* The gypsum board type, number of layers, fastener type and sheet orientation shall be as specified in the individual Wall and Partition Design. Max area of opening is 360 sq in. with max dimension of 30 in. The hourly F Rating of the firestop system is equal to the hourly fire rating of the wall assembly in which it is installed. 2. Through Penetrants One or more nom 2 in. diam (or smaller) rigid steel conduit or electrical metallic tubing (EMT) to be installed within the opening. The annular space between conduits or tubing shall be min 0 in. (point contact) to max 3-3/8 in. The annular space between conduits or tubing and periphery of opening shall be min 0 in. (point contact) to max 3 in. Conduit or tubing to be rigidly supported on both sides of wall assembly. 3. Fill Void or Cavity Material - Foam* Fill material applied within annulus flush with both surfaces of the wall. Min fill material thickness for 1 Hr F Rating is 4-3/4 in. Min fill material thickness for 2 Hr F Rating is 6 in. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- CP 620 Fire Foam *Bearing the UL Classification Mark A Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc. December 7, 2001 F Ratings - 1 and 2 Hr (See Items 1 and 3) T Rating - 1/2 Hr A 3 2 1 C Classified by Underwriters Laboratories, Inc. to UL 1479 and CAN/ULC-S115 US 10/24/17 10/24/17 10/24/17 General 1. Immediately notify the Engineer of any discrepancies. 2. It shall be assumed that all subcontractors are experienced and thoroughly knowledgeable in their respective areas of the construction industry and shall perform in a responsible manner in an appropriate construction sequence. 3. Do not scale drawings. Verify dimensions in field prior to commencement of work. 4. It is the intent of these drawings and specifications to establish a standard of quality. The Engineer reserves the right to take exceptions to approve methods and materials not reflected herein. 5. Failure to order, or release order, for materials and/or equipment will not be accepted as a reason to substitute alternate materials, equipment, or installation methods. 6. Work shall be performed in a workmanlike manner to the satisfaction of the Architect & the Engineer. 7. Labor, materials, and equipment shall conform to the latest applicable editions of local, State of Colorado, and National Codes and ordinances. If conflict between those publications exists, the most stringent requirement shall apply. 8. Provide record drawings to architect. Drawings shall include all addendum items, change orders, alterations, re-routings, etc. 9. The drawings show the intent of the mechanical systems but do not show all details required. It is the responsibility of the Contractors to install complete & operable systems, which conform to the manufacturers' installations instructions & industry standards. 10. Systems shall be tested for proper operation. If tests show work is defective, Contractor shall make corrections necessary at no cost to Owner. 11. It is the Contractors' and manufacturers' responsibility to assure themselves that the code authorities will approve any product to be installed on the project. 12. Provide necessary trenching, backfill, excavation, supports, piping, insulation, saw cutting and patching, concrete/paving, etc., as UHTXLUHG %DFNILOO WUHQFKHV LQ ´ OD\HUV DQG WR  FRPSDFWLRQ DQG SDWFK WR PDWFK H[LVWLQJ JUDGH 13. Systems shall be professionally labeled. Piping shall be labeled with color coded commercial grade labels indicating piping service and flow direction. Equipment, fans, pumps, valves, switches and controls shall be labeled with engraved plastic or metal tags and an equipment/valve schedule shall be provided and mounted on the mechanical room wall. Equipment labels shall follow the same nomenclature as the mechanical drawings. 14. 3URYLGH ´ KLJK OHYHO FRQFUHWH HTXLSPHQW SDGV EHQHDWK JDV ILUHG IORRU PRXQWHG PHFKDQLFDO HTXLSPHQW LQ PHFKDQLFDO URRP 15. See architectural reflected ceiling plan for all ceiling penetrations. 16. Coordinate architectural, structural, electrical, landscaping, fire protection, and interior design drawings with mechanical drawings prior to installation. 17. Offset piping, ductwork, etc. as necessary to accommodate structure, beams, columns, and existing equipment. 18. Verify exact locations of existing and new underground utilities, piping, and raceway systems prior to trenching. Contractor shall obtain and verify exact utility company drawings and requirements. Electrical 19. Contractor must carefully verify electrical service voltage and phase available before ordering any equipment. 20. The following are to be furnished by MC and wired by EC: equipment motors, magnetic starters, line voltage thermostats, factory disconnect switches (if specified as part of factory wired equipment) resistance heaters, fire and smoke detectors. 21. The following are to be furnished and wired by EC: disconnect switches, thermal overload switches, manual operating switches and contactors. 22. The following are to be furnished and wired by MC: low voltage thermostats, control transformers, control relays, control panels, motorized valves, motorized dampers, pilot lights, multi-speed switches and interlocks. Shop Drawings 23. Submit entire HVAC and plumbing shop drawing submittal data at one time. Submittal to be bound in three-ring binders, indexed in a neat and orderly manner. Partial submittals will not be accepted. Submittals shall include, but not be limited to: equipment, fixtures, insulation, diffusers, pumps, fans, piping, valves, and boilers. 24. Provide with shop drawing submittal, 1/4" scale layout drawings of rooms with mechanical equipment, piping and ductwork. Layouts shall show locations of mechanical systems and shall be coordinated with plumbing, fire protection, and electrical systems. Equipment shall be drawn to scale. Insulation 25. Piping Insulation Schedule: Service Thickness (in.) +:65 ´ SLSH DQG VPDOOHU 1.5 +:65 ´ SLSH DQG JUHDWHU 2.0 Domestic Hot Water 1.0 Domestic Cold Water 0.5 Domestic Cold Water in Parking Garage 1.0 Domestic Hot Water Recirculation 1.0 Above Ground Piping - U.L. approved, white, all service, glass fiber, snap-on, pipe insulation. Insulate fittings with glass fiber blanket insulation and premolded PVC covers. Provide submittal. 26. Insulation shall be installed under all exterior snowmelt areas. Insulation shall be Dow Styrofoam Highload 100 extruded polystyrene foam board insulation that has an R-5 per inch insulation value, 100 psi compressive strength rating, and 2" thick (or approved equal). Insulation installed under traffic areas must be traffic rated. 27. Insulation for all types of piping shall be carried full size through pipe hangers or pipes shall be supported with vibration clamps. 28. 6QRZPHOW SLSLQJ H[SRVHG RXWGRRUV VKDOO EH LQVXODWHG ZLWK 8/ DSSURYHG ZKLWH DOO VHUYLFH JODVV ILEHU VQDSRQ ´ WKLFN SLSH insulation. Insulate fittings with glass fiber blanket insulation. Cover outdoor piping and insulation with aluminum jacket. The jacket shall be held in place by a continuous friction type joint, providing a positive weather seal over the entire length of jacket. The circumferential joints shall be secured with preformed aluminum jackets, two-piece elbows, and flange covers, secured with steel bands. 29. Internally line all new ductwork inside the thermal envelope (unless noted otherwise) with 1/2" thick, 2.0 PCF, U.L. rated, glass fiber insulation with a continuous vapor barrier. 30. ([WHUQDOO\ ZUDS DOO XQOLQHG GXFWZRUN ZLWK ´ WKLFN LQVXODWLRQ ZLWK D FRQWLQXRXV YDSRU EDUULHU 0LQLPXP 59DOXH RI  31. ,QVXODWH WUDQVIHU GXFWV ZLWK ´ WKLFN  3&) JODVV ILEHU GXFW OLQHU  2ZHQV &RUQLQJ $HURIOH[ RU HTXLYDOHQW Piping 32. Domestic Hot, Cold & Recirculation piping inside building may be type 'L' copper water tube, wrought copper fittings and no lead solder. 33. Waste, Vent, Storm, and Overflow lines above ground - Standard weight, C.I. soil pipe, and fittings, or hubless, C.I. soil pipe and fittings. Up through 2-1/2" may be standard weight, galvanized steel pipe with black, C.I. drainage fittings. 34. Waste, Vent, Storm, and Overflow lines below grade - Schedule 40 ABS-DWV plastic pipe and fittings (ASTM D2661) or Schedule 40 PVC-DWV plastic pipe and fittings (ASTM D2665). All pipe and fittings shall bear NFS-DWV mark and shall be joined with solvent weld joints as recommended by the manufacturer. 35. Pressurized waste piping shall be Schedule 40 PVC-DWV plastic pipe and fittings (ASTM D2665). 36. Heating Water and Snowmelt piping above ground - All piping, 2-1/2" or smaller, shall be type 'L' copper, wrought copper fittings, and no lead solder. All piping, 3" or greater, shall be schedule 40 black steel pipe with EITHER grooved mechanical joint coupling and fittings and grooved mechanical joints (Victaulic or equal) OR wrought-steel fittings and wrought-cast or forged-steel flanges and flange fittings, and welded and flanged joints. Contractor may provide alternate pricing for PEX, pipe sizes must be reviewed and increased as required to equal inside diameter +/-10% of basis of design, which is sized for Type L Copper. PEX must be supported as per the manufacturer's installation instructions, and supports shall include cradles. Exposed piping shall be installed neatly, and as straight as possible. 37. Snowmelt piping below grade - All buried snowmelt piping shall be pre-insulated PEX piping, Urecon or equivalent. Bury minimum 4' deep. 38. Condensing Boiler Condensate shall be neutralized via a neutralization basin before discharge into building drainage system. Condensate piping shall be PVC or other approved material suitable for pH levels of 3. 39. Gas Piping - Schedule 40 black steel pipe, 150 lb. malleable iron screwed fittings on above ground pipe, welded fittings with all piping coated and wrapped on buried pipe. Welded gas piping shall be pressure tested at a minimum of 60 psi per Town of Vail amendment to the 2015 IFGC, section 406.4.1. CSST pipe is prohibited entirely. 40. Gas Valves - Lubricated plug valve 175 lb. W.O.G. iron screwed or flanged. 41. Copper pipe Valves and Specialties: Gate Valves: Bronze, Class 125, 200 lb. W.O.G. Ball Valves: Bronze, Class 125, 200 lb. W.O.G. Check Valves: Bronze, Class 125, 200 lb. W.O.G. Balancing Valves: 125 psig w.p. for 250F service tight shut-off, Illinois dual-purpose, balancing/shut-off valve, Hoffman, Sarco, or equivalent. 42. Refer to Fixture Connection Schedule for pipe sizes to individual fixtures. 43. Support pipe with rod and clevis or clamps. No pipe tape allowed. 44. Provide expansion joints or loops on all heating water piping runs in excess of 50'. 45. Dielectric Unions - Furnish and install a dielectric union at all connections where non-ferrous material is in contact with ferrous material and fluid is not protected with corrosion inhibitors. 46. *UDGH DQG YDOYH DOO KHDWLQJ ZDWHU SLSLQJ ZLWK ô´ KRVH HQG YDOYHV WR SHUPLW GUDLQDJH RI WKH V\VWHP 9HQW DOO KLJK SRLQWV LQ HTXLSPHQW rooms as necessary with automatic air vents piped to convenient drain. All high points in system outside of equipment rooms with manual air vents as required to relieve air in the system. 47. Provide plastic grommets on all heating water piping passing through wood joists and studs. 48. Install plumbing clean-outs as required by applicable codes. Boiler Flue Piping 49. Boiler flues must be double wall stainless steel Category IV positive pressure boiler flue, Z-flex model Z-vent or approved equal. 14" ID/ 16" OD for B-1 & B-2 common vent & 8" ID/ 10" OD for B-3 & B-4 common vent. Inner liner is AL29-4C stainless steel, outer jacket is 304 stainless steel. Maintain minimum 3" clearance to combustibles. Terminate each common vent above chimney roof w/ double wall exit cone. Exit cone shall penetrate chimney roof/cap per M300/C & discharge unobstructed to the atmosphere. Include double wall boot tee with tee cap and drain at base of each stack. Provide submittal for entire venting system. Antifreeze Solutions 50. DILUTION WATER QUALITY: Contractor shall be responsible for testing the water and submitting a report to the Owner & Engineer, prior to system fill. "Hard" water shall not be used. The water used to dilute the concentrated inhibited glycol-based heat transfer fluid must be either distilled, deionized, or contain less than 25 ppm of chloride, 25 ppm of sulfate, 50 ppm of calcium, and 50 ppm of magnesium, with a total hardness not to exceed 100 ppm. If good quality water is unavailable, the manufacturer of the glycol product will provide the heat transfer fluid and water to meet the specifications of the system. 51. Fill B-1 and B-2 KHDWLQJ ZDWHU V\VWHP ZLWK  SURS\OHQH JO\FRO   ZDWHU VROXWLRQ E\ YROXPH IRU IUHH]H SURWHFWLRQ WR ƒ) DQG EXUVW SURWHFWLRQ WR ƒ) ,QFOXGH FRUURVLRQ LQKLELWRUV 52. Fill B-3 and B-4 KHDWLQJ ZDWHU V\VWHP ZLWK  SURS\OHQH JO\FRO   ZDWHU VROXWLRQ E\ YROXPH IRU IUHH]H SURWHFWLRQ WR ƒ) DQG EXUVW SURWHFWLRQ WR ƒ) ,QFOXGH FRUURVLRQ LQKLELWRUV Ductwork 53. Duct sizes shown on drawings are outside (sheet metal) duct dimensions. 54. All ductwork shall be sealed airtight with duct mastic. Duct tape is prohibited. 55. All returns shall be ducted. Panning of stud cavities, joist bays, etc. is not allowed. 56. Provide 1/4" galvanized mesh screen on all combustion air ducts or openings. 57. Seal all ductwork joints and vapor barrier penetrations at all exterior walls. 58. Ducts and piping penetrating through roof shall have roof flashing with caulk type counter flashing sleeve or by method acceptable by roofing manufacturer. Installation shall be watertight. 59. Provide backdraft dampers at any and all ductwork penetrations through exterior wall (except outside air and combustion air ductwork). 60. Provide turning vanes in all mitered rectangular elbows. 61. Provide volume dampers at all accessible round duct take-offs. 62. Make all final connections to supply GRD's with acoustic flexible duct. Minimum length shall be 4 feet. Maximum length shall be 8 feet. 63. All ductwork or surfaces which are visible behind a grille, register, diffuser or louver shall be painted flat black by the MC. 64. Sheet metal and fittings to be pursuant to SMACNA and ASHRAE standards. 65. All ducts shall be 26 gauge minimum. Duct gauge and construction shall conform to SMACNA HVAC Duct Construction Standards. 66. Contractor to coordinate exact location of grilles, registers and diffusers before installation. 67. Seal off all ducts during construction. Exposed Spiral Ductwork 68. $OO H[SRVHG VSLUDO GXFWZRUN ORFDWLRQV LQGLFDWHG RQ SODQV VKDOO EH VSLUDO ZRXQG ³SDLQWORFN´ VWHHO IRUPHG IURP FRQWLQXRXV FRLOV RI sheet metal. Contractor shall wipe down minimal excess lubricant with dry rags twice before painting. In addition, wipe down with no rinse pre-paint cleaner #13158 (Sherman Williams) before applying two coats of metal primer. All primer and paint shall be labeled "to adhere very well for metal painting applications". 69. Ducts shall be 26 gauge for 3-14" diameter, 24 gauge for 16-26" diameter, and 22 gauge for 28-36" diameter. 70. Fittings shall be 22 gauge for 3-26" diameter and 20 gauge for 28-36" diameter. 71. 45 & 90 degree elbows shall be 1.5x centerline elbows. 3"-10" shall be die stamped with continuous stitch welding. 12" and larger shall be gore-lock. 72. Hangers shall be Ductmate "Clutcher" system consisting of Ductmate steel cable and Ductmate Clutcher mechanism or equivalent or threaded rod and hangers. Install per manufacturer's installation instructions. 73. Ductwork shall be cleaned before acceptance of building by Owner. 74. Trim duct sealants flush with metal. Create a smooth and uniform exposed bead. 75. Protect ducts exposed in finished spaces from being dented, scratched, painted or damaged. 76. Maintain consistency, symmetry, and uniformity in the arrangement and fabrication of fittings, hangers and supports, duct accessories and air outlets. Vibration Isolation 77. Where specified, duct-to-fan connections shall be made with flexible canvas duct connector material. Provide duct alignment within 1/2" at the fan collar and duct collar. 78. Where specified, spring vibration isolators for support of equipment shall be properly aligned so that support rod does not contact spring housing. Type II Exhaust Ductwork 79. Ductwork serving Type II exhaust hoods shall be constructed of stainless steel or aluminum. All joints and seams shall be sealed water tight and air tight with mastic. Ductwork system shall slope not less than one-fourth unit vertical in 12 units horizontal toward the hood. Controls 80. Mount all thermostats and humidistats 4'-0" above finished floor. 81. Thermostats & remote temperature sensors shall not be installed above heat emitting equipment, including wall mounted touch screen controls. Do not mount on exterior walls or above/below forced air supply registers. 82. All thermostats shall have a temperature range suitable for the application and have adjustable set points. The thermostats shall be able to display temperature setpoint and room temperature. All thermostats shall be approved by the Owner. 83. Freeze Detection Thermostats. Each supply system with water coils taking outside air shall have a freeze detection thermostat located on the downstream side of the coil. Thermostats shall be of adjustable electric contact type, silver plated, manual reset with 20' flexible sensing bulb of increment type with any section capable of actuating mechanism on temperature drop below set point, thermostat shall stop fan(s) and close outside air damper. They shall have an isolated set of contacts for alarm system. 84. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 CFM, in the return duct or plenum upstream of any filters, exhaust air connections or outdoor air connections. Installation shall comply with NFPA 72 and Section 606 of the 2015 IMC. Upon detection of smoke, fan shall automatically shut down. 85. Install emergency power off (EPO) gas shutoff switch inside mechanical rooms containing boilers. Switch plate shall be red in color DQG ODEHOHG ³*$6 %851(5 (0(5*(1&< 6:,7&+´ 6ZLWFK VKDOO EH FRPSOLDQW ZLWK 6HFWLRQ  RI WKH  ,0& 5HIHU WR electrical drawings for additional information. 86. See Sequence of Operation for additional control information. Testing, Adjusting & Balancing (TAB) 87. Air and water flows must be balanced, and fan belts, pumps, and drive systems adjusted as required. Balance Contractor shall furnish subsequent air balances after acceptance of the building. 88. Submit a written balance report. Balancing procedures shall be in accordance with NEBB or AABC guidelines for proportional balance. Submit report on standard NEBB forms. 89. Airside measurements shall include all motor amperage, voltage readings, motor RPM, fan RPM, fan CFM, fan inlet static pressure, fan outlet static pressure, and CFM at all grilles, registers, & diffusers. 90. Hydronic measurements shall include circuit setters/ balancing valves, all motor amperage, voltage readings, motor RPM, pump RPM, pump GPM as calculated from the pump curve, inlet and outlet pressures at pumps, and temperature and pressure drop at all coils. 91. Adjust flows to within 10% of required quantity. If actual quantity is less than 90% of design, investigate cause, attempt to rectify and notify Engineer. Submittal of balance report with less than required flows without explanation is cause for rejection of report. 92. Submit three copies of all submittals in addition to any required by the Contractor. These copies shall be retained by the Owner, Contractor and Engineer. Snowmelt 93. Snowmelt tubing shall be 5/8" nominal diameter, except for the Driveway which shall be 3/4" tubing. Tubing shall be PEX-a crosslinked polyethylene with an oxygen diffusion barrier, manufactured by the Engle method in accordance with ASTM F 876. 94. Piping shall be installed in continuous loops, no splices allowed. Tube centers and the maximum loop lengths are specified in the Snowmelt Zone Schedule on the plans. 95. Tubing loops off each manifold shall be installed in equivalent lengths (+/- 5%). 96. The Contractor shall install manifolds as provided by the tubing manufacturer. The manifolds shall consist of a return header (including: balancing valve for each loop, compression fitting to receive tubes and air vent) and supply header (including: manual shut-off valve for each loop and compression fitting to receive tubes). 97. Secure piping in snowmelt areas by attaching tubing to wire mesh using plastic tie straps, every 3' on straight runs and at apex of turn for any change of direction. No metal wiring shall be used. 98. Snowmelt system shall be pressure tested in accordance with tubing manufacturer's instructions as required for warranty protection. In the absence of manufacturer's instruction, pressurize the entire snowmelt system with compressed air. Charge system to a pressure of not less than 80 psig or more than 100 psig. Pressure test shall last for 24 hours with not less than a 2 psig drop. With system air charged, soap test all joint on and within the manifolds. After hydrostatic test pressure has been applied, examine piping, joints and connections for leakage. Eliminate any leaks as necessary & re-test. Any portion of tubing layout that rises as a result of being pressurized shall be re-secured to be at the proper level within the slab structure when poured. 99. Entire snowmelt system shall be left pressurized with monitoring pressure gauge throughout installation of concrete or sand/pavers. Continually monitor pressure on system to make certain tubing system remains intact with no leaks or punctures. 100. Manifolds shall be tagged to identify area served. Each connection on supply & return manifolds shall be permanently labeled with loop number. 101. Prior to final system fill and commissioning, the PEX tubing system and manifolds shall be chemically cleaned as prescribed by the tubing manufacturer. Supply all tools, connections, labor, and accessories necessary to properly remove all foreign material, chemical, and residue within the tubing system before permanently charging system and placing into operation. 102. After entire system has been properly cleaned and flushed, fill system with clean water to proper cold fill pressure. Add propylene glycol to the snowmelt system to the concentration specified using a positive displacement pump. Antifreeze fluid shall include corrosion inhibitors. Purge each individual loop to eliminate air pockets in the system. After purging remove fill connection to any potable water lines to prevent any possibility of contamination. Mechanical System Commissioning 103. Commissioning of the mechanical systems is required for this project per the 2015 IECC. 104. Commissioning Authority (CxA) shall provide a commissioning plan, a preliminary commissioning report and a final commissioning report. 105. A representative of the Mechanical Contractor (MC), Temperature Controls Contractor (TCC) and General Contractor (GC) shall be required to assist in the commissioning process and attend the onsite system commissioning. 106. Mechanical Contractor shall be required to perform Equipment Functional Perfomance Testing in the presence of the CxA. Equipment functional performance testing shall demonstrate the installation and operation of components, systems and system-to-system interfacing relationships in accordance with approved plans and specifications such that operation, function and maintenance serviceability for each of the commissioned systems is confirmed. Testing shall include all modes and Sequence of Operation, including under full-load, part-load and the following emergency conditions: - All modes as described in the Sequence of Operation - Redundant or automatic back-up mode. - Performance of alarms - Mode of operation upon a loss of power and restoration of power Project Close-out 107. Provide new clean air filters in all air handling equipment prior to system acceptance. 108. Clean all equipment, ducting, piping, etc. of dust and debris from construction. 109. Clean all water-side strainers and filtration equipment prior to system acceptance. 110. Furnish HVAC as-built / record drawings within 90 days of system acceptance. 111. Furnish O&M manuals for mechanical systems within 90 days of system acceptance. 112. Provide Owner training of equipment operation & maintenance, including a detailed project walk through of the mechanical systems. END OF SPECIFICATIONS. Mechanical Specifications 10/24/17 1. Common Heating Boiler Plant (B-1 & B-2) a. Boilers shall be controlled by integral boiler controls. b. Boilers shall be enabled whenever there is a call for snowmelting or Garage heating. c. Boilers shall be rotated for equal run times. d. Boilers shall be staged and modulated to maintain the SMS setpoint at TS-1 temperature sensor. e. 606 VHWSRLQW VKDOO EH ƒ) DGM f. P-1 and P-2 boiler pumps shall run whenever associated boiler is firing. 2. Snowmelting a. Provide (2) Tekmar 091/094 snow/ice sensors and sockets, one for each snowmelt zone. Refer to sheet M001 for sensor locations. b. Provide (2) Tekmar 654 snowmelt controls, one for each snowmelt zone. c. Upon a call for snowmelting from snow/ice sensor, associated snowmelt zone pump (P-3 or P-4) shall start and B-1/B-2 boilers shall be enabled. d. 7HNPDU FRQWURO VKDOO EH VHWXS IRU ::6' ZDUP ZHDWKHU VKXW GRZQ DW DSSUR[LPDWHO\ ƒ) DGM 6\VWHP VKDOO QRW RSHUDWH LI RXWGRRU temperature is above this setting. e. 7HNPDU FRQWURO VKDOO EH VHWXS IRU &:&2 FROG ZHDWKHU FXW RII DW DSSUR[LPDWHO\ ƒ) DGM 6\VWHP VKDOO QRW RSHUDWH LI RXWGRRU temperature is below this setting. 3. Garage Heating (GUH-X) a. Upon a call for garage heating from garage thermostat, P-5 pump shall start, GUH-1 Garage Unit Heaters shall start, and B-1/B-2 boilers shall be enabled. 4. Club Heating Boiler Plant (B-3 & B-4) a. Boilers shall be controlled by integral boiler controls. b. %RLOHUV VKDOO EH HQDEOHG ZKHQHYHU 26$ WHPSHUDWXUH LV OHVV WKDQ ƒ) DGM RU ZKHQHYHU WKHUH LV D FDOO IRU KHDW IURP :+  RU  Water Heaters. c. Boilers shall be rotated for equal run times. d. Boilers shall be staged and modulated to maintain the HWS setpoint at TS-2 temperature sensor. e. +:6 VHWSRLQW VKDOO EH DXWRPDWLFDOO\ UHVHW OLQHDUO\ E\ LQWHJUDO ERLOHU FRQWUROV EDVHV RQ RXWGRRU DLU WHPSHUDWXUH ƒ) # ƒ) WR ƒ) # ƒ) DGM f. P-6 and P-7 boiler pumps shall run whenever associated boiler is firing. 5. Club Water Heating a. P-8 pre-heat tank pump shall be controlled by a time clock located in the mechanical room. Pump shall run during occupied periods and shall be off during unoccupied periods. Coordinate time schedule with Owner. Also, provide a high limit control at PHT-1 pre-heat tank. If tank temperature at temperature sensor TS-3 DW 3+7 H[FHHGV ƒ) WKHQ SXPS VKDOO EH WHPSRUDULO\ GLVDEOHG b. Upon a call for heating from temperature sensor TS-4 DW :+ VHW DW ƒ) DGM 3 ZDWHU KHDWHU SXPS VKDOO VWDUW DQG %% boilers shall be enabled. c. Upon a call for heating from temperature sensor TS-5 DW :+ VHW DW ƒ) DGM 3 ZDWHU KHDWHU SXPS VKDOO VWDUW DQG %% boilers shall be enabled. d. Upon a call for heating from temperature sensor TS-6 DW :+ VHW DW ƒ) DGM 3 ZDWHU KHDWHU SXPS VKDOO VWDUW DQG %% boilers shall be enabled. e. P-13 domestic hot water recirculation pump shall be controlled by timer and aquastat. Coordinate time schedule with Owner. 6. FC-1 Fan Coil (Club Room) a. FAN: Single speed fan shall run continuously during occupied periods to provide code required ventilation. During unoccupied periods, fan shall be off unless there is a call for setback heating in which case fan shall cycle on to satisfy call. b. VENTILATION: During unoccupied periods, outside air damper MOD-5a shall be fully closed and return air damper MOD-5b shall be fully open. During occupied periods, outside air damper MOD-5a shall be set to "Occupied Ventilation" position (225 CFM). c. DEMAND CONTROLLED VENTILATION: During occupied periods, if CO2 levels rise above CO2 setpoint, then outside air damper MOD-5a shall be set to "DCV Ventilation" position (450 CFM). Initial CO2 setpoint shall be 1000 PPM. Initial differential setpoint shall be 200 PPM. d. ',6&+$5*( $,5 7(03(5,1* ([FHSW ZKHQ WKHUH LV D FDOO IRU KHDWLQJ RU FRROLQJ LI RXWVLGH DLU WHPSHUDWXUH LV OHVV WKDQ ƒ) DGM then 2-way modulating control valve shall modulate to maintain Discharge Air Temperature (DAT) setpoint as measured by WHPSHUDWXUH VHQVRU PRXQWHG LQ IDQ FRLO VXSSO\ DLU GXFW '$7 VHWSRLQW VKDOO EH ƒ) DGM +HDWLQJ ZDWHU SXPS 3DE ZLOO DOUHDG\ EH running (see"Pumps" sequence for additional information on P-12a/b). e. HEATING: Upon a call for heating, fan shall start and 2-way modulating control valve shall fully open. Heating water pump P-12a/b will already be running (see"Pumps" sequence for additional information on P-12a/b). f. (&2120,=(5 &22/,1* ,I 26$ WHPSHUDWXUH LV ƒ) DGM RU OHVV DQG WKHUH LV D FDOO IRU FRROLQJ WKHQ IDQ VKDOO VWDUW DQG RXWVLGH DLU GDPSHU 02'D DQG UHWXUQ DLU GDPSHU 02'E VKDOO IXOO\ PRGXODWH WR PDLQWDLQ GLVFKDUJH DLU WHPSHUDWXUH RI ƒ) DGM g. KITCHEN MAKE-UP AIR: FC-1 blower shall be interlocked with KEF-1. Whenever KEF-1 is running, FC-1 blower shall start and outside air damper MOD-5a shall be set to "DCV Ventilation" position (450 CFM). Discharge Air Tempering shall be enabled. 7. FC-2 Fan Coil (Gym) a. FAN: Single speed fan shall run continuously during occupied periods to provide code required ventilation. During unoccupied periods, fan shall be off unless there is a call for setback heating in which case fan shall cycle on to satisfy call. b. VENTILATION: During unoccupied periods, outside air damper MOD-6a shall be fully closed and return air damper MOD-6b shall be fully open. During occupied periods, outside air damper MOD-6a shall be set to "Occupied Ventilation" position (150 CFM). c. DEMAND CONTROLLED VENTILATION: During occupied periods, if CO2 levels rise above CO2 setpoint, then outside air damper MOD-6a shall be set to "DCV Ventilation" position (450 CFM). Initial CO2 setpoint shall be 1000 PPM. Initial differential setpoint shall be 200 PPM. d. ',6&+$5*( $,5 7(03(5,1* ([FHSW ZKHQ WKHUH LV D FDOO IRU KHDWLQJ RU FRROLQJ LI RXWVLGH DLU WHPSHUDWXUH LV OHVV WKDQ ƒ) DGM then 2-way modulating control valve shall modulate to maintain Discharge Air Temperature (DAT) setpoint as measured by WHPSHUDWXUH VHQVRU PRXQWHG LQ IDQ FRLO VXSSO\ DLU GXFW '$7 VHWSRLQW VKDOO EH ƒ) DGM +HDWLQJ ZDWHU SXPS 3DE ZLOO DOUHDG\ EH running (see"Pumps" sequence for additional information on P-12a/b). e. HEATING: Upon a call for heating, fan shall start and 2-way modulating control valve shall fully open. Heating water pump P-12a/b will already be running (see"Pumps" sequence for additional information on P-12a/b). f. (&2120,=(5 &22/,1* ,I 26$ WHPSHUDWXUH LV ƒ) DGM RU OHVV DQG WKHUH LV D FDOO IRU FRROLQJ WKHQ IDQ VKDOO VWDUW DQG RXWVLGH DLU GDPSHU 02'D DQG UHWXUQ DLU GDPSHU 02'E VKDOO IXOO\ PRGXODWH WR PDLQWDLQ GLVFKDUJH DLU WHPSHUDWXUH RI ƒ) DGM 8. FC-3 Fan Coil (Board Room) a. FAN: Single speed fan shall run continuously during occupied periods to provide code required ventilation. During unoccupied periods, fan shall be off unless there is a call for setback heating in which case fan shall cycle on to satisfy call. b. VENTILATION: During unoccupied periods, outside air damper MOD-7a shall be fully closed and return air damper MOD-7b shall be fully open. During occupied periods, outside air damper MOD-7a shall be set to "Occupied Ventilation" position (115 CFM). c. ',6&+$5*( $,5 7(03(5,1* ([FHSW ZKHQ WKHUH LV D FDOO IRU KHDWLQJ RU FRROLQJ LI RXWVLGH DLU WHPSHUDWXUH LV OHVV WKDQ ƒ) DGM then 2-way modulating control valve shall modulate to maintain Discharge Air Temperature (DAT) setpoint as measured by WHPSHUDWXUH VHQVRU PRXQWHG LQ IDQ FRLO VXSSO\ DLU GXFW '$7 VHWSRLQW VKDOO EH ƒ) DGM +HDWLQJ ZDWHU SXPS 3DE ZLOO DOUHDG\ EH running (see"Pumps" sequence for additional information on P-12a/b). d. HEATING: Upon a call for heating, fan shall start and 2-way modulating control valve shall fully open. Heating water pump P-12a/b will already be running (see"Pumps" sequence for additional information on P-12a/b). e. (&2120,=(5 &22/,1* ,I 26$ WHPSHUDWXUH LV ƒ) DGM RU OHVV DQG WKHUH LV D FDOO IRU FRROLQJ WKHQ IDQ VKDOO VWDUW DQG RXWVLGH DLU GDPSHU 02'D DQG UHWXUQ DLU GDPSHU 02'E VKDOO IXOO\ PRGXODWH WR PDLQWDLQ GLVFKDUJH DLU WHPSHUDWXUH RI ƒ) DGM 9. MAU-1 Make-up Air Unit (Ski Tuning) a. SKI TUNING MAKE-UP AIR: MAU-1 blower shall be interlocked with EF-1. Whenever EF-1 is running, MAU-1 blower shall start and normally closed outside air damper MOD-4 shall open fully (2,200 CFM). Discharge Air Tempering shall be enabled. b. ',6&+$5*( $,5 7(03(5,1* ,I RXWVLGH DLU WHPSHUDWXUH LV OHVV WKDQ ƒ) DGM WKHQ ZD\ PRGXODWLQJ FRQWURO YDOYH VKDOO modulate to maintain Discharge Air Temperature (DAT) setpoint as measured by temperature sensor mounted in make-up air unit VXSSO\ DLU GXFW '$7 VHWSRLQW VKDOO EH ƒ) DGM +HDWLQJ ZDWHU SXPS 3DE ZLOO DOUHDG\ EH UXQQLQJ VHH3XPSV VHTXHQFH IRU additional information on P-12a/b). 10. Panel Radiators (PR-X-X) a. PR-1-X panel radiators shall each be controlled by a decorative thermostatic mixing valve located at the panel radiator. No control wiring required. b. PR-2-X panel radiators shall each be controlled by a decorative thermostatic mixing valve located at the panel radiator. No control wiring required. 11. Unit Heaters (UH-X) a. Upon a call for heat from associated thermostat, associated 2-way on/off control valve shall open. Heating water pump P-12a/b will already be running (see"Pumps" sequence for additional information on P-12a/b). b. UH-3 Unit Heater in mechanical room shall be controlled by the Boiler Room thermostat (which shall also control SF-1 supply fan for cooling, refer to "Fans" sequence for additional information). 12. Cabinet Unit Heaters (CUH-X) a. Upon a call for heat from associated thermostat, associated 2-way on/off control valve shall open. Heating water pump P-12a/b will already be running (see"Pumps" sequence for additional information on P-12a/b). 13. Heating Coils (HC-1, HC-2, HC-3) a. Upon a call for heat from temperature sensor mounted in ERV fresh air supply duct, associated 2-way modulating control valve shall PRGXODWH WR PDLQWDLQ 'LVFKDUJH $LU 7HPSHUDWXUH '$7 VHWSRLQW '$7 VHWSRLQW VKDOO EH ƒ) DGM +HDWLQJ ZDWHU SXPS 3DE ZLOO already be running (see "Pumps" sequence for additional information on P-12a/b). b. See "Energy Recovery Ventilators" sequence for additional information. 14. Pumps a. P-1 shall run whenever B-1 boiler is called to fire. Pump shall be controlled by integral boiler controls. b. P-2 shall run whenever B-2 boiler is called to fire. Pump shall be controlled by integral boiler controls. c. P-3 shall run whenever there is a call for snowmelting from snow/ice sensor located in SZ-1. d. P-4 shall run whenever there is a call for snowmelting from snow/ice sensor located in SZ-2. e. P-5 shall run whenever there is a call for garage heating. f. P-6 shall run whenever B-3 boiler is called to fire. Pump shall be controlled by integral boiler controls. g. P-7 shall run whenever B-4 boiler is called to fire. Pump shall be controlled by integral boiler controls. h. P-8 shall be controlled by a time clock and a tank high limit (TS-3 temperature sensor). i. P-9 shall run whenever there is a call for heat from TS-4 temperature sensor. j. P-10 shall run whenever there is a call for heat from TS-5 temperature sensor. k. P-11 shall run whenever there is a call for heat from TS-6 temperature sensor. l. 3DE VKDOO UXQ ZKHQHYHU RXWVLGH DLU WHPSHUDWXUH LV OHVV WKDQ ƒ) DGM 2QO\ RQH SXPS LV UHTXLUHG WR UXQ DW D WLPH 7KH VHFRQG pump is for standby operation for the case that the other pump fails. Pumps shall be rotated for equal run times. Grundfos Magna pump is equipped with an integrated variable frequency converter to automatically vary pump speed based on flow demand. Set pump to ³3URSRUWLRQDO 3UHVVXUH´ PRGH 3XPS ZLOO UXQ HYHQ ZKHQ WKHUH DUH QR ]RQH YDOYHV FDOOLQJ 7KLV LV 2. EHFDXVH WKH SXPS ZLOO VORZ down to a very slow speed and very little electrical energy will be used. Pump alarm contacts shall be wired to an external alarm. m. P-13 shall be controlled by timer and aquastat. Provide an on/off line voltage wall switch to turn pump off during extended unoccupied times. 15. Energy Recovery Ventilators a. Energy recovery ventilators shall each be controlled by a Renewaire TC7D-W digital time clock (see plans for locations) to run continuously during occupied periods and shall be off during unoccupied periods. Coordinate time schedule with Owner. b. Manual override operation shall be provided by "On/Auto/Off" switch integral to time clock. c. Discharge air shall be tempered by heating coils (see "Heating Coils" sequence for additional information). 16. Fans a. EF-1 ski tuning exhaust fan shall be controlled by an on/off wall switch wired in series with variable fan speed control (mounted at fan for balancing purposes). MAU-1 is interlocked with this fan to provide tempered make-up air. b. EF-2 elevator equipment room exhaust fan shall be controlled by a line voltage cooling thermostat located in the elevator equipment room. c. GEF-1 garage exhaust fan shall be controlled by VCP-1 ventilation control panel. Fan shall run when 35 ppm of CO is detected or 2.5 ppm of NO2 is detected from sensors ((2) CO sensors, (2) NO2 sensors). MOD-1 garage ventilation damper shall be interlocked to open whenever GEF-1 is called to run. Damper shall be closed whenever GEF-1 is off. Audible alarm (90 dB @ 1') shall sound if the CO or NO2 level reaches 200 ppm or 5 ppm respectively. d. GEF-2 garage exhaust fan shall run continuously. There are no interlocks between GEF-2 and MOD-1 or VCP-1. e. KEF-1 kitchen exhaust fan shall be controlled by a line voltage on/off switch integral to KEH-1 kitchen exhaust hood. Refer to "FC-1 Fan Coil" sequence for make-up air information. f. RF-1 radon fan shall be controlled by an on/off wall switch located in the same room as the fan. Fan shall run continuously 24/7. g. SF-1 mechanical room supply fan shall be controlled by the Boiler Room low voltage thermostat to provide room cooling. This thermostat shall also control UH-3 for room heating. h. TEF-1 toilet exhaust fan shall each be controlled by a separate on/off wall switch. 17. Electric Wall Heaters a. Electric wall heaters shall each be controlled by an integral thermostat. 18. Air Purifiers a. Air purifiers shall run 24/7 continuously regardless of airflow. No fan interlocks required. 19. Glycol Feeders a. Units shall each be controlled by integral controls. b. Set pressure setting so that glycol feeders automatically maintain closed loop system pressure at approximately 15 psi (adj). 20. Hoistway Venting a. DELETED FROM PROJECT, NOT REQUIRED BY 2015 CODES. 21. Sump Pumps (SP-1, SP-2, SP-3) a. Sump pumps shall each be controlled by simplex control panel. b. Sump pumps shall be equipped with an oil guard system to automatically shut the pump down if oil is sensed. A light will illuminate if oil is sensed. c. When the "stop" and "start" floats are closed the pump will start and the pump run light will illuminate. The pump will remain operational until the "stop" float opens. d. In the event the liquid level continues to rise, the "alarm" float will be closed. When the "alarm" float is closed the following will also occur: - The external high water light will illuminate. - The audible high water alarm will sound. - The auxiliary dry contacts will close. A signal shall be sent to the owner. 22. LS-1 Lift Station a. Lift station shall be tied into dedicated emergency backup generator. Refer to electrical drawings. b. Lift station shall be controlled by duplex control panel. c. When the "stop" and "lead" floats are closed pump 1 will start and the pump 1 run light will illuminate. Pump 1 will remain operational until the "stop" float opens. d. The next time the "stop" and "lead" floats are closed the alternating circuit will energize pump 2 and the pump 2 run light will illuminate. Pump 2 will remain operational until the "stop" float opens. This cycle will repeat each time the fluid level rises and falls. e. If the fluid level continues to rise after the first pump has been energized the "lag" float will close. When the "lag" float has closed the second pump will energize. Both pumps will remain operational until the "stop" float opens. f. In a three float system when the "lag" float is closed the following will also occur: - The external high water light will illuminate. - The audible high water alarm will sound. - The auxiliary dry contacts will close. A signal shall be sent to the owner. END OF SEQUENCE OF OPERATION. Sequence of Operation 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 FINAL DRAINAGE REPORT FOR SKI AND SNOWBOARD CLUB VAIL VAIL, COLORADO JUNE 2015 PROJECT NO. 14.0498 PREPARED FOR: K. H. WEBB ARCHITECTS 710 WEST LIONSHEAD CIRCLE, SUITE A VAIL, COLORADO 81657 PHONE: (970) 477-2990 ATTN: MR. KYLE WEBB PREPARED BY: MARTIN/MARTIN, INC. 0101 FAWCET ROAD, SUITE 260 P.O. BOX 8896 AVON, CO 81620 (970) 926-6007 PRINCIPAL IN CHARGE: John C. Moore, III, PE PROJECT MANAGER: L. Mark Luna, PE PROJECT ENGINEER: Ryan Johnson, EIT 10/24/17 ii TABLE OF CONTENTS 1. GENERAL LOCATION AND DESCRIPTION ........................................... 1 A. LOCATION ........................................................................................................ 1 B. DESCRIPTION OF PROPERTY ....................................................................... 1 2. MAJOR DRAINAGE BASINS AND SUB-BASINS ..................................... 2 A. MAJOR BASIN DESCRIPTION ....................................................................... 2 B. SUB-BASIN DESCRIPTION ............................................................................ 3 3. DRAINAGE DESIGN CRITERIA ................................................................. 3 A. REGULATIONS................................................................................................. 3 B. DEVELOPMENT CRITERIA REFERENCES AND CONSTRAINTS ........... 3 C. HYDROLOGIC CRITERIA ............................................................................... 3 D. HYDRAULIC CRITERIA.................................................................................. 4 E. WATER QUALITY REQUIREMENTS UNDER DENVER’S MUNICIPAL CDPS STORMWATER PERMIT ..................................................................... 4 F. WAIVERS FROM CRITERIA........................................................................... 4 4. DRAINAGE FACILITY DESIGN ................................................................. 4 A. GENERAL CONCEPT ....................................................................................... 4 B. SPECIFIC DETAILS.......................................................................................... 5 5. CONCLUSIONS ............................................................................................... 7 A. COMPLIANCE WITH STANDARDS .............................................................. 7 B. DRAINAGE CONCEPT .................................................................................... 7 C. WATER QUALITY............................................................................................ 8 6. REFERENCES ................................................................................................. 9 7. APPENDICES ................................................................................................ 10 APPENDIX A – MAPS APPENDIX B – HYDROLOGIC COMPUTATIONS APPENDIX C – HYDRAULIC COMPUTATIONS APPENDIX F – DRAINAGE PLANS 10/24/17 1 1. GENERAL LOCATION AND DESCRIPTION A. LOCATION i. The proposed Ski and Snowboard Club facility is located within the Town of Vail, Eagle County, Colorado. Access to the site is provided by Vail Valley Drive along the north side of the site. No other roads are within or immediately adjacent to the project limits. The Vail Ski Resort located is south of the property. ii. The parcel to be redeveloped encompasses a portion of Vail Village Filing 7 Tract Bwith an existing approximate area of 0.27 acres plus or minus. The proposed parcel has an approximate area of 0.52 acres plus or minus. iii. The parcel is bordered by multi-family housing to the east and north, the Vail Ski resort Lies to the South and West. B. DESCRIPTION OF PROPERTY i. In its existing condition, the parcel is developed with the existing Vail Ski and Snowboard Club facility consisting of one building with associated landscaping, asphalt parking, and concrete walks. Redevelopment of the parcel will require the demolition of the entire existing facility and construction of a single structure with associated landscaping, asphalt parking, concrete walks, and assorted utilities. ii. The lot and distrubed area encompass a footprint area of approximately 1.18 acres plus or minus. iii. Based on ground survey completed by Eagle Valley Surveying, the existing site is approximately 35% impervious and consists of native grasses, landscaping, asphalt parking, concrete walks/plaza, and building structures. 10/24/17 2 iv. There are no known major drainage ways directly adjacent to the site. Gore Creek is located directly north of the multifamlily residences north of Vail Valley Drive. v. There are no major irrigation facilities, such as ditches and canals, located on-site. vi. There is no documented history of flooding on the parcel. vii. There is one existing utility easement within the limits of the site. Refer to the Civil Engineering Plans for locations. 2. MAJOR DRAINAGE BASINS AND SUB-BASINS A. MAJOR BASIN DESCRIPTION i. Flood Insurance Rate Map (FIRM) Number 08037C0488D is applicable to this parcel. The site location is identified on the FIRM in the Appendix. The site is within Zone X meaning it is an area of 0.2% annual chance flood; 1% annual chance flood with average depths less than 1 foot or with drainage areas less than 1 square mile. There are no major drainageway planning studies such as flood hazard area delineation (FHAD) reports or major drainageway master planning reports that are applicable to this parcel. There are no known existing drainage reports applicable to this parcel. ii. There are no irrigation facilities within 100 feet of the property, which will influence or be influenced by the local drainage. 10/24/17 3 B. SUB-BASIN DESCRIPTION i. For the purpose of this study the overall drainage basin limits associated with the site are delineated by the Vail Valley Drive Right-Of-Way line to the north and the limits of disturbance to the south, east, and west. The limits of distrubance is used as the basin boundary to isolate the drainage areas that are affected by the site development. 3. DRAINAGE DESIGN CRITERIA A. REGULATIONS Drainage design is in compliance with the Town of Vail Development Standards (Vail Standards), Colorado Department of Transportation Drainage Design Manual (CDOT Manual), and the Urban Drainage and Flood Control District Drainage Criteria Manual (Urban Drainage Manual). See the appendices for calculations and design aids. B. DEVELOPMENT CRITERIA REFERENCES AND CONSTRAINTS i. There are no known drainage studies or master plan studies on this site ii. The Town of Vail has indicated that the storm sewer within Vail Valley Drive west of the site is at capacity, thus the release rate from the site must be less than or equal to the existing condition. C. HYDROLOGIC CRITERIA The proposed drainage system was designed in accordance with Vail Standards, the CDOT Manual, and the Urban Drainage Manual. The Rational Method was used to determine the 2-year, 5-year, 10-year, and 100-year existing and developed runoff. The proposed drainage facilities will accommodate up to the 100-year runoff without adversely affecting existing conditions. See the Appendices for detailed calculations and design aids. 10/24/17 4 D. HYDRAULIC CRITERIA Industry-standard software programs were utilized to analyze the hydraulic capacity of the various proposed storm drainage components. Programs include StormCAD®, Culvert Master®, Flow Master®, and Excel® spreadsheets developed and published by Urban Drainage Flood Control District. E. WATER QUALITY REQUIREMENTS i. No jurisdictional water quality requirements apply to this project. ii. A sand-oil separator is being provided within the below-grade parking structure to provide a level of water quality improvement for the development. No additional water quality measures are proposed for the development. iii. No specific landscaping requirements are applicable to the proposed water quality improvement measures. iv. The project owner will be responsible for regular maintenance and cleaning of the sand-oil separator. All on-site, private inlets will require regular removal of the sediment within the sumps of each inlet by the owner. F. WAIVERS FROM CRITERIA i. No waivers from jurisdictional criteria are requested for this project. 4. DRAINAGE FACILITY DESIGN A. GENERAL CONCEPT i. Drainage across the site generally trends from south to north. The overall site drainage basin is delineated by Vail Valley Drive Right-of-Way to the north and the disturbed area on the south, east, and west. Flows generated from the slope to the south are divereted around the building via swales and culverts. Flows developed from the roof area will be piped to onsite detention, and have a controled 10/24/17 5 release via storm sewer to the existing storm sewer in Vail Valley Drive. Runoff from the drive lane and parking area will be conveyed undetained to Vail Valley Drive via curb and gutter. ii. Due to the limited existing capacity of the storm sewer within Vail Valley Drive the release rate from the site is limted to the existing condition. The redevelpoment of the site increases the imperviousness and the total flow from the site. Detention is provided to reduce the overall release rate from the site to the existing condition. In addition to the detention a dry well is proposed on the east side of the site to mimimize flow directly to dischargeing onto Vail Valley Drive. iii. Proposed drainage patterns are anticipated to match existing in that captured drainage will be conveyed to Vail Valley Drive storm system and the culvert to the west of the site iv. Refer to the various Appendices for detailed calculations, exhibits, drawings, and tabulations for the drainage analysis completed for the development. B. SPECIFIC DETAILS i. In the existing condition the site drains to two conveyance elements. One being the storm inlet west of the site in Vail Valley Drive and is know as Design Point One. The second being a culvert west of the site in a depressed area known as Design Point Two. Sub-basin EX1 drains to Design Point One via overland flow to curb and gutter at a flowrate of 0.3 cfs and 1.4 cfs for the 5-year and 100-year storm respectively. Runoff from Sub-basin EX2 travels overland to a wide swale which conveys flows to the culvert inlet at Design Point Two. The flowrates from this sub-basin are 0.9 cfs and 2.8 cfs for the 5-year and 100-year storm respectively. The total 100-year flow from the site is 4.3 cfs, and is considered the allowable release rate for the site. 10/24/17 6 The proposed site is divided into three drainage basins. Sub-basin PR1 is composed of the entry/exit drive lane and parking areas in conjuction with the eastern portion of the site. Runoff from drive lane area is collected and conveyed in curb and gutter where it is discharged to the curb and gutter in Vail Valley Drive. The flows follow the existing drainage pattern in Vail Valley Drive, flowing from east to west where it is ultimaltey intercepted by the storm inlet at Design Point One. Runoff from the eastern portion of the sub-basin travels overland to a culvert inlet passing flows under the recreation path. The culvert discharges the runoff into a swale flowing to the north. A dry well is located at the north end of the swale to intercept and infiltrate nuisance flows. When the dry well reaches capacity flows will then be conveyed over the sidewalk to the curb and gutter in Vail Valley Drive where it follows the exsiting drainage pattern flowing to the west. The flow from sub-basin PR1 is 0.7 cfs and 2.1 cfs for the 5-year and 100-year storm respectively. Sub-basin PR2 is the southwest corner of the site tribuary to Design Point Two. Runoff travels overland to a proposed swale, which continues into the broad swale to the west. The flow from sub-basin PR2 is 0.4 cfs and 1.6 cfs for the 5-year and 100-year storm respectively. Sub-basin PR3 is the roof area for the proposed building. The flow from sub-basin PR2 is 0.4 cfs and 1.0 cfs for the 5-year and 100-year storm respectively. The total flow from the proposed site is 4.7 cfs and requires detention to reduce the total proposed flow to the allowable release rate a difference of 0.4 cfs for the 100- year storm. Detention and flow reduction is achieved by routing all of the roof flows into the detention structure. The roof flows are greater than the difference in proposed to allowable flows, thus can be controlled to release such that the allowable release rate for the site is not exceeded. A summary of the allowable flows and detention release rate is located Appendix X. The required detention volume for the site is approximatly 300 cf based on the captured flows. 10/24/17 7 The FAA method was used to calculate the required detention volume. This method was used because it uses a "volume in" "volume out" calculation which is a more accurate representaion of how the detention facility will function during a storm event. This method also uses the area directly trubutary to the facility to estimate the volume captured per time increment. vi. The proposed storm system within Vail Valley Drive and the onsite storm culverts are private and maintanance is the responsibility of the property owner. vii. The proposed drainage design is in compliance with all applicable local, state and federal requirements. viii. Structural best management practices (BMPs) will be provided in accordance with CDOT and Town of Vail criteria. Refer to the Erosion and Sediment Control plans. 5. CONCLUSIONS A. COMPLIANCE WITH STANDARDS i. The proposed drainage design is in accordance with Town of Vail. ii. There are no known major drainageway planning studies applicable to this parcel with which the drainage design must conform. B. DRAINAGE CONCEPT i. Although the proposed drainage system is designed in accordance with applicable criteria, the limiting factor in operation of the system is the existing downstream drainage system. As a result, on-site detention is provided in order to limit post-development release rates to match those of the existing condition. 10/24/17 8 ii. There are no master drainage plan recommendations which apply to the development of this site. iii. There are no anticipated impacts to the drainage patterns on upstream and downstream properties as a result of the proposed development. C. WATER QUALITY i. No water quality improvement measures are required for this project. However, a sand-oil separator will be provided for the below-grade parking area to capture sediment before it is pumped into the public storm system. 10/24/17 9 6. REFERENCES 1. Storm Drainage Design and Technical Criteria, City and County of Denver, Department of Public Works, Wastewater Management Division, Revised January 2006. 2. Urban Drainage and Flood Control District Drainage Criteria Manual Vol. 1, 2, and 3, Wright-McLauglin Engineers, Latest Revision. 3. "Drainage Design Manual." Colorado Department of Transportation, 2004. 10/24/17 10 7. APPENDICES 10/24/17 APPENDIX A MAPS 1. VICINITY MAP 2. FLOOD INSURANCE RATE MAP (FIRM #08037C0468D) 10/24/17 SITE LOCATION 10/24/17 APPENDIX B HYDROLOGIC COMPUTATIONS 1. RUNOFF COEFFICIENTS 2. TABLE RO-3 RECOMMENDED PERCENTAGE IMPERVIOUSNESS VALUES 3. TABLE RO-5 - RUNOFF COEFFICIENTS, C 4. STANDARD FORM SF-1 - TIME OF CONCENTRATION 5. STANDARD FORM SF-2 - MINOR STORM 6. STANDARD FORM SF-2 - MAJOR STORM 10/24/17 PROJECT INFORMATION PROJECT NAME: PROJECT NO: DESIGN BY: REVIEWED BY: JURISDICTION: REPORT TYPE: DATE: C2 C5 C10 C100 % IMPERV 0.04 0.15 0.25 0.50 0% 0.73 0.75 0.77 0.83 90% 0.89 0.90 0.92 0.96 100% 0.73 0.75 0.77 0.83 90% 1.18 0.33 0.41 0.48 0.66 35.2% AREA (ACRES) C2 C5 C10 C100 0.34 0.04 0.15 0.25 0.50 0% 0.04 0.73 0.75 0.77 0.83 90% 0.06 0.89 0.90 0.92 0.96 100% 0.44 0.22 0.31 0.39 0.60 22.5% AREA (ACRES) C2 C5 C10 C100 0.42 0.04 0.15 0.25 0.50 0% 0.04 0.73 0.75 0.77 0.83 90% 0.28 0.89 0.90 0.92 0.96 100% 0.74 0.40 0.47 0.53 0.69 42.7% 1.18 0.33 0.41 0.48 0.66 35.2%TOTAL SITE COMPOSITE EX2 LANDSCAPE ROOF ASPHALT/CONCRETE SUB-BASIN COMPOSITE SUB-BASIN COMPOSITE ROOF ASPHALT/CONCRETE SUB-BASIN SURFACE CHARACTERISTICS COMPOSITE RUNOFF COEFFICIENTS PERCENT IMPERVIOUSNESS COMPOSITE RUNOFF COEFFICIENTS PERCENT IMPERVIOUSNESS ROOF LANDSCAPE TOWN OF VAIL FINAL DRAINAGE REPORT 01/05/15 JURISDICTIONAL STANDARD SSCV 14.0498 R. JOHNSON M. LUNA ASPHALT/CONCRETE EX1 LANDSCAPE DRIVES AND WALKS TOTAL SITE COMPOSITE SUB-BASIN SURFACE CHARACTERISTICS 4/6/2015 3:02 PM COMPOSITE_C-VALUES H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 CALCULATED BY:JOB NO: CHECKED BY:PROJECT: DATE: FINAL tc AREA LENGTH SLOPE ti LENGTH SLOPE VEL. tt COMP. TOT. LENGTH ac ft ft/ft min ft ft/ft fps Min tc ft min min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) EX1 1 0.31 0.44 75 0.5000 3.4 600 0.0500 20 4.47 2.2 5.6 675.0 13.8 5.6 EX2 2 0.47 0.74 75 0.5000 2.7 165 0.1000 15 4.74 0.6 3.3 240.0 11.3 5.0 *Velocity (V) = CvSw0.5 TABLE RO-2 *Table RO-2, UDFCD (V.1), Chapter 5, Page RO-6 in which: Cv = Conveyance Coefficient (See Table Above) Sw = Watercourse Slope (ft/ft) BASIN DESIGN POINT C5 tc=(L/180)+10 Cv DATA SUB-BASIN TIME (ti) Paved Areas and Shallow Paved Swales 20 Heavy Meadow 2.5 Tillage / Field Nearly Bare Ground 10 Grassed Waterway 15 5 Short Pasture and Lawns 7 Type of Land Surface Conveyance Coefficient, Cv (URBANIZED BASINS) tc CHECK REMARKS (tt) TRAVEL TIME 14.0498 SSCV STANDARD FORM SF-2 (RATIONAL METHOD PROCEDURE) R. JOHNSON M. LUNA 01/05/15 INITIAL/OVERLAND TIME OF CONCENTRATION SUMMARY TOC 4/6/2015 3:02 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 2-YEAR ONE-HR PRECIP: 0.582 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) EX1 1 0.44 0.22 5.6 0.10 1.91 0.19 EX2 2 0.74 0.40 5.0 0.30 1.97 0.59 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) 2-YEAR 4/6/2015 3:02 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 5-YEAR ONE-HR PRECIP: 0.751 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) EX1 1 0.44 0.31 5.6 0.14 2.47 0.34 EX2 2 0.74 0.47 5.0 0.35 2.55 0.89 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) 5-YEAR 4/6/2015 3:02 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 10-YEAR ONE-HR PRECIP: 0.913 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) EX1 1 0.44 0.39 5.6 0.17 3.00 0.52 EX2 2 0.74 0.53 5.0 0.39 3.10 1.22 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) 10-YEAR 4/6/2015 3:02 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 100-YEAR ONE-HR PRECIP: 1.64 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) EX1 1 0.44 0.60 5.6 0.27 5.38 1.43 EX2 2 0.74 0.69 5.0 0.51 5.56 2.85 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) 100-YEAR 4/6/2015 3:02 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 PROJECT: JOB NO: 01/14/00 DATE: 01/05/15 DESIGN AREA % Q5 Q100 POINT (ACRES) IMP. (CFS) (CFS) EX1 1 0.44 22.5% 0.31 0.60 0.34 1.43 EX2 2 0.74 42.7% 0.47 0.69 0.89 2.85 1.18 35.2% 0.41 0.66 1.23 4.28 SSCV SITE COMPOSITE BASIN RUNOFF SUMMARY C5 C100 RUNOFF_SUMMARY 4/6/2015 3:02 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Existing-FDR.xlsm 10/24/17 PROJECT INFORMATION PROJECT NAME: PROJECT NO: DESIGN BY: REVIEWED BY: JURISDICTION: REPORT TYPE: DATE: C2 C5 C10 C100 % IMPERV 0.04 0.15 0.25 0.50 0% 0.73 0.75 0.77 0.83 90% 0.89 0.90 0.92 0.96 100% 0.73 0.75 0.77 0.83 90% 1.18 0.45 0.51 0.57 0.72 50.3% AREA (ACRES) C2 C5 C10 C100 0.26 0.04 0.15 0.25 0.50 0% 0.25 0.89 0.90 0.92 0.96 100% 0.52 0.46 0.52 0.58 0.73 49.1% AREA (ACRES) C2 C5 C10 C100 0.30 0.04 0.15 0.25 0.50 0% 0.14 0.89 0.90 0.92 0.96 100% 0.44 0.30 0.38 0.46 0.64 30.8% AREA (ACRES) C2 C5 C10 C100 0.23 0.73 0.75 0.77 0.83 90% 0.23 0.73 0.75 0.77 0.83 90.0% 1.18 0.45 0.51 0.57 0.72 50.3% SUB-BASIN COMPOSITE TOTAL SITE COMPOSITE PERCENT IMPERVIOUSNESS PR3 ROOF SUB-BASIN COMPOSITE SUB-BASIN SURFACE CHARACTERISTICS COMPOSITE RUNOFF COEFFICIENTS PR2 LANDSCAPE ASPHALT/CONCRETE SUB-BASIN COMPOSITE ASPHALT/CONCRETE SUB-BASIN SURFACE CHARACTERISTICS COMPOSITE RUNOFF COEFFICIENTS PERCENT IMPERVIOUSNESS COMPOSITE RUNOFF COEFFICIENTS PERCENT IMPERVIOUSNESS ROOF LANDSCAPE TOWN OF VAIL FINAL DRAINAGE REPORT 01/05/15 JURISDICTIONAL STANDARD SSCV 14.0498 R. JOHNSON M. LUNA ASPHALT/CONCRETE PR1 LANDSCAPE DRIVES AND WALKS TOTAL SITE COMPOSITE SUB-BASIN SURFACE CHARACTERISTICS 4/6/2015 3:04 PM COMPOSITE_C-VALUES H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 CALCULATED BY:JOB NO: CHECKED BY:PROJECT: DATE: FINAL tc AREA LENGTH SLOPE ti LENGTH SLOPE VEL. tt COMP. TOT. LENGTH ac ft ft/ft min ft ft/ft fps Min tc ft min min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) PR1 1 0.52 0.52 50 0.5000 2.0 600 0.0500 20 4.47 2.2 4.3 650.0 13.6 5.0 PR2 2 0.38 0.44 50 0.5000 2.5 190 0.1000 15 4.74 0.7 3.2 240.0 11.3 5.0 PR3 DETAINED 0.75 0.23 0.0 0.00 0.0 0.0 0.0 10.0 5.0 *Velocity (V) = CvSw0.5 TABLE RO-2 *Table RO-2, UDFCD (V.1), Chapter 5, Page RO-6 in which: Cv = Conveyance Coefficient (See Table Above) Sw = Watercourse Slope (ft/ft) BASIN DESIGN POINT C5 tc=(L/180)+10 Cv DATA SUB-BASIN TIME (ti) Paved Areas and Shallow Paved Swales 20 Heavy Meadow 2.5 Tillage / Field Nearly Bare Ground 10 Grassed Waterway 15 5 Short Pasture and Lawns 7 Type of Land Surface Conveyance Coefficient, Cv (URBANIZED BASINS) tc CHECK REMARKS (tt) TRAVEL TIME 14.0498 SSCV STANDARD FORM SF-2 (RATIONAL METHOD PROCEDURE) R. JOHNSON M. LUNA 01/05/15 INITIAL/OVERLAND TIME OF CONCENTRATION SUMMARY TOC 4/6/2015 3:04 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 2-YEAR ONE-HR PRECIP: 0.582 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) PR1 1 0.52 0.46 5.0 0.24 1.97 0.47 PR2 2 0.44 0.30 5.0 0.13 1.97 0.26 PR3 DETAINED 0.23 0.73 5.0 0.17 1.97 0.33 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) 2-YEAR 4/6/2015 3:04 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 5-YEAR ONE-HR PRECIP: 0.751 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) PR1 1 0.52 0.52 5.0 0.27 2.55 0.68 PR2 2 0.44 0.38 5.0 0.17 2.55 0.42 PR3 DETAINED 0.23 0.75 5.0 0.17 2.55 0.44 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) 5-YEAR 4/6/2015 3:04 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 10-YEAR ONE-HR PRECIP: 0.913 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) PR1 1 0.52 0.58 5.0 0.30 3.10 0.93 PR2 2 0.44 0.46 5.0 0.20 3.10 0.63 PR3 DETAINED 0.23 0.77 5.0 0.18 3.10 0.55 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) 10-YEAR 4/6/2015 3:04 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 CALCULATED BY: R. JOHNSON JOB NO: 14.0498 CHECKED BY: M. LUNA PROJECT: SSCV DATE: 01/05/15 DESIGN STORM: 100-YEAR ONE-HR PRECIP: 1.64 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) PR1 1 0.52 0.73 5.0 0.38 5.56 2.09 PR2 2 0.44 0.64 5.0 0.28 5.56 1.56 PR3 DETAINED 0.23 0.83 5.0 0.19 5.56 1.07 I. One-Hr Precipitation Values for the City and County of Denver Return Period: 2-YEAR 5-YEAR 10-YEAR 100-YEAR Depth In Inches: 0.58 0.75 0.91 1.64 *Equation RA-3, UDFCD (V.1), Chapter 4, Page RA-6 *Rainfall Intensity: In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) REMARKSAREA (AC) RUNOFF COEFF tc (MIN) STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) CxA (AC) I (IN/HR) Q (CFS) BASIN DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF tc (MIN) S(CxA) (AC) I (IN/HR) Q (CFS) 100-YEAR 4/6/2015 3:04 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 PROJECT: JOB NO: 01/14/00 DATE: 01/05/15 DESIGN AREA % Q5 Q100 POINT (ACRES) IMP. (CFS) (CFS) PR1 1 0.52 49.1% 0.52 0.73 0.68 2.09 PR2 2 0.44 30.8% 0.38 0.64 0.42 1.56 PR3 DETAINED 0.23 90.0% 0.75 0.83 0.44 1.07 1.18 50.3% 0.51 0.72 1.55 4.72 SSCV SITE COMPOSITE BASIN RUNOFF SUMMARY C5 C100 RUNOFF_SUMMARY 4/6/2015 3:04 PM H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Rational - Proposed-FDR.xlsm 10/24/17 Q2 Q5 Q10 Q100 TOTAL EXISTING SITE FLOW (CFS) 0.77 1.23 1.73 4.28 TOTAL PROPOSED SITE FLOW (CFS) 1.06 1.55 2.10 4.72 FLOW INCREASE (CFS) 0.29 0.32 0.37 0.44 CAPTURED ROOF FLOW (CFS) 0.33 0.44 0.55 1.07 DETENTION RELEASE RATE (CFS) 0.04 0.12 0.18 0.62 DETENTION RELEASE RATE SUMMARY 10/24/17 PROJECT INFORMATION PROJECT NAME: PROJECT #: POND NAME: DATE: NRCS Hydrologic Soil Group: C & D Max 5-Year Release Rate = 0.1 (cfs) Max 10-Year Release Rate = 0.2 (cfs) Max 100-Year Release Rate = 0.6 (cfs) One-Hr Precipitation Values for the City and County of Denver Return Period: 2 5 10 100 Depth In Inches: 0.58 0.75 0.91 1.64 *Rainfall Intensity In Which: I = Rainfall Intensity (Inches Per Hour) P1 = 1-Hour Point Rainfall Depth (Inches) tc = Time Of Concentration (Minutes) Site Composite Surface Characteristics: Characteristic: Acres C2 C5 C10 C100 % Imp. tc Values: 0.23 0.73 0.75 0.77 0.83 90.0% 5.0 5-Year Storage Volume =(ft³) (ac-ft) 10-Year Storage Volume =(ft³) (ac-ft) 100-Year Storage Volume =(ft³) (ac-ft) 278 0.006 249 0.006 270 0.006 *Table SO-1, UDFCD (V.2) Chapter 10, Page SO-8 100 0.50 0.85 1.00 10 0.13 0.23 0.30 5 0.07 0.13 0.17 SSCV 14.0498 DETENTION STRUCTURE 04/06/15 Maximum Unit Flow Release Rates (cfs/acre) from On-Site Detention Facilities Design Return Period (Years) NRCS Hydrologic Soil Group A B C & D 4/6/2015 3:08 PM Detention Volume H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Copy of Det.Vol_FAA.xls REQUIRED DETENTION VOLUME 10/24/17 Storm Duration, T Intensity-Duration Volume Inflow, Vi Outflow Adj. Avg. Outflow Rate Volume Outflow Req'd Storage Vol. (Minutes) (Inches/Hour) (Cubic Feet) (Minutes/Minutes) (cfs) (Cubic Feet) (Cubic Feet) 0 7.65 0.00 0.00 0.00 0.00 0.00 1 7.10 81.66 1.00 0.62 37.20 44.46 2 6.63 152.52 1.00 0.62 74.40 78.12 3 6.22 214.83 1.00 0.62 111.60 103.23 4 5.87 270.23 1.00 0.62 148.80 121.43 5 5.56 319.96 1.00 0.62 186.00 133.96 6 5.29 364.96 0.92 0.57 204.60 160.36 7 5.04 405.97 0.86 0.53 223.20 182.77 8 4.82 443.58 0.81 0.50 241.80 201.78 9 4.62 478.27 0.78 0.48 260.40 217.87 10 4.44 510.41 0.75 0.47 279.00 231.41 11 4.27 540.33 0.73 0.45 297.60 242.73 12 4.12 568.29 0.71 0.44 316.20 252.09 13 3.98 594.50 0.69 0.43 334.80 259.70 14 3.84 619.17 0.68 0.42 353.40 265.77 15 3.72 642.45 0.67 0.41 372.00 270.45 16 3.61 664.48 0.66 0.41 390.60 273.88 17 3.50 685.37 0.65 0.40 409.20 276.17 18 3.41 705.24 0.64 0.40 427.80 277.44 19 3.31 724.17 0.63 0.39 446.40 277.77 20 3.23 742.24 0.63 0.39 465.00 277.24 21 3.14 759.52 0.62 0.38 483.60 275.92 22 3.07 776.08 0.61 0.38 502.20 273.88 23 2.99 791.96 0.61 0.38 520.80 271.16 24 2.92 807.23 0.60 0.37 539.40 267.83 25 2.86 821.93 0.60 0.37 558.00 263.93 26 2.80 836.08 0.60 0.37 576.60 259.48 27 2.74 849.74 0.59 0.37 595.20 254.54 28 2.68 862.94 0.59 0.37 613.80 249.14 29 2.62 875.69 0.59 0.36 632.40 243.29 30 2.57 888.04 0.58 0.36 651.00 237.04 31 2.52 900.00 0.58 0.36 669.60 230.40 32 2.48 911.60 0.58 0.36 688.20 223.40 33 2.43 922.86 0.58 0.36 706.80 216.06 34 2.39 933.80 0.57 0.36 725.40 208.40 35 2.35 944.44 0.57 0.35 744.00 200.44 36 2.31 954.78 0.57 0.35 762.60 192.18 Required 100-Yr Detention Volume - FAA Method 4/6/2015 3:08 PM Detention Volume H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\Copy of Det.Vol_FAA.xls 10/24/17 APPENDIX C HYDRAULIC COMPUTATIONS 1. STORMCAD CALCULATIONS - MINOR STORM (Not Included) 2. STORMCAD CALCULATIONS - MAJOR STORM (Not Included) 3. STREET CAPACITY CALCULATIONS 4. INLET CAPACITY CALCULATIONS 5. NORTH FRONTAGE ROAD OFF-SITE SUB-BASIN SUMMARY TABLE 6. NORTH FRONTAGE ROAD ON-SITE SUB-BASIN SUMMARY TABLE 7. CULVERT ANALYSIS 8. I-70 EXISTING AND PROPOSED DITCH CAPACITY ANALYSIS (100-YR) 10/24/17 100-YEAR RESTRICTOR PLATE PROJECT INFORMATION PROJECT NAME: PROJECT #: POND NAME: DATE: Max 100-Year Release Rate = 0.6 (cfs) Outlet Pipe Invert Elevation = 0.00 (ft) MINIMUM 3" BELOW LOWEST PERF. 5-Year WSEL = 0.00 (ft) Inlet Grate Elevation = 0.00 (ft) 100-Year WSEL = 5.96 (ft) Orifice Equation: *Equation SO-15, UDFCD (V.2), Chapter 10, Page SO-20 Q = Flow Rate Through Orifice (cfs) C = Discharge Coefficient (0.40-0.65) A = Area Of Orifice (ft²) H = Effective Head On Orifice Opening (ft) g = Gravitational Acceleration (32.2 ft/sec²) Minimum Opening Area = 0.05 (ft²) H = 5.87 (ft) g = 32.2 (ft/sec²) C = 0.60 (0.40-0.65) Outlet Pipe Diameter = 6 (in) 0.50 (ft) R = 0.25 (ft) θ = 1.19 (rad) "y" Invert To Plate = 0.16 (ft) = 1.9 (in) A = 0.05 (ft²) Centroid Elevation = 0.09 (ft) Velocity = 11.66 (ft/s) SSCV 14.0498 Detention 42100 4/6/2015 3:13 PM 100-Yr Restrictor Plate H:\14.0498-SKI & SNOWBOARD CLUB VAIL\ENG\DRAINAGE\REPORT\report assemble\Copy of 100-Year_Release.xlsm 10/24/17 Project Description Friction Method Manning Formula Solve For Full Flow Capacity Input Data Roughness Coefficient 0.010 Channel Slope 0.00800 ft/ft Normal Depth 0.50 ft Diameter 0.50 ft Discharge 0.65 ft³/s Results Discharge 0.65 ft³/s Normal Depth 0.50 ft Flow Area 0.20 ft² Wetted Perimeter 1.57 ft Hydraulic Radius 0.13 ft Top Width 0.00 ft Critical Depth 0.41 ft Percent Full 100.0 % Critical Slope 0.00801 ft/ft Velocity 3.32 ft/s Velocity Head 0.17 ft Specific Energy 0.67 ft Froude Number 0.00 Maximum Discharge 0.70 ft³/s Discharge Full 0.65 ft³/s Slope Full 0.00800 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Worksheet for DETENTION OUTFALL 4/6/2015 3:23:10 PM Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of 1 Page GREATER THAN ALLOWABLE RELEASE RATE=0.62 CFS 10/24/17 GVF Output Data Normal Depth Over Rise 100.00 % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.50 ft Critical Depth 0.41 ft Channel Slope 0.00800 ft/ft Critical Slope 0.00801 ft/ft Worksheet for DETENTION OUTFALL 4/6/2015 3:23:10 PM Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of 2 Page 10/24/17 APPENDIX F DRAINAGE PLANS 10/24/17 1 2 DRAINAGE PLAN - EXISTING Scale as shown Date Drawn By Project Number NOT FOR CONSTRUCTION SKI ANDSNOWBOARDCLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 D1 1 10/24/17 1 2 DRAINAGE PLAN - PROPOSED Scale as shown Date Drawn By Project Number NOT FOR CONSTRUCTION SKI ANDSNOWBOARDCLUB VAIL.REJ JUNE 1 2015 14.0498 No. Description Date 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM 1 BUILDING PERMIT 07-01-15 D2 1 10/24/17 clarify size water main for fire protection 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17 10/24/17