HomeMy WebLinkAboutDRB18-0612_Approved Plans_1547577767.pdfAccess into lot must be from existing access, similiar to as shown here.
Access from any other point in the CDOT ROW would have to gain
approval from CDOT.
Applicant shall apply erosion control blankets on all slopes greater than 2:1 slope,
within 24 hours after completion of re-seeding the disturbed soils, and prior to
November 15, 2018.
Applicant shall complete all on-site work, including tree removal, soils testing, backfill,
and application of native seed mix on disturbed soils prior to November 15, 2018.
DRB
APPROVED
10/26/2018
12:00:00 AM
Access to property is only allowed
thru area shown on plan. Any other
access requires a Temp site access
permit from CDOT. Please make
your sub contractor aware of this. NO
access allowed from the Frontage
Road. 01/04/2019
DRB
APPROVED
1/9/2019 12:00:00
AM
East Vail Housing
Geotechnical Testing Access Plan
Prepared by MOC
michael@triumphdev.com 970.688.5057
See Revised Plan from 10/24/18
Must use existing
access point unless
CDOT approves
temporary access.
DRB
APPROVED
10/26/2018
12:00:00 AM
DRB
APPROVED
1/9/2019 12:00:00
AM
DRB
APPROVED
1/9/2019 12:00:00
AM