APPLICATION FOR RIGHT OF WAY USE-STREET CUT PERMIT PRJ#: Town of Vail PW#: Public Works Dept Parcel #: 1309 Elkhorn Dr Bldg Permit #: B - Vail, CO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use-Street Cut Permit and forfeiture of application fees. By signing this permit, the applicant declares he/she has read all contents of this document, Town of Vail Roadway Standards and chapters of Title 8 – Public Ways and Property, of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee: $100.00 Company Company Name: Phone: City/State/ Company Address: Zip:
Contractor
License Number: Email: Contact Contact Name: Phone: ROW Use Location: Requested ROW Requested Use Dates: to Work Times:
Purpose for Request: Street Cut Dimension (if applicable): C Underground Utility Installation C Landscaping Length:
C Temp Site Access C Construction Staging Width (min 4’): C Roadway Construction C Other (explain): Total Square Footage:
Requested ROW Use: C Single Lane Closure – lft of closure (including taper)
C Two Lane Closure – lft of closure (including taper) C Three Lane Closure – lft of closure (including taper)
C Sidewalk/Bike Path – lft of closure C Other (explain):
1. Applicant shall submit a traffic control plan, and work site/staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections, advanced warning signage, taper lengths, buffer space and work zone dimensions. No full street closures are allowed.
2. Applicant must contact Public Works Department at 479-2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process.
Xcel Enery (800-922-1987) Qwest (800-922-1987)
Comcast (800-922-1987) Holy Cross Electric (800-922-1987) Eagle River Water & Sanitation District (970-477-5453) Town of Vail Electric (970-479-2158) Town of Vail Irrigation (970-479-2158)
Print Applicant Name Applicant Signature Date
GE Johnson Construction Company
Mike Ingo
A-120
40800 HWY 6 #8
B18- 0053
970-445-7351
Avon, CO 81620
ingom@gejohnson.com
180 South Frontage Rd, Vail, CO 81657
1/14/19 7:00 AM - 7:00 PM
Mike Ingo 1/8/19
970-445-7351
1/17/19
X
X Shoulder of road in CDOT Right of Way per CDOT Lease, 100 feet +/-
Material Deliveries &
Concrete Placement w/Pump
4 days of use between
285 LFX 1/15/19 only for Concrete Placement
01/08/2019
REF.REF.FDFDDD12DD13PLAN GENERAL NOTESPLAN LEGENDKEY PLANPLAN KEYNOTES EXISTING TO REMAINEXISTING TO BE REMOVEDPROPERTY LINEOUTLINE OF EXISTING BUILDING ABOVENOT IN SCOPEEXISTING SYSTEMS, LIFE SAFETY FEATURES, ETC., ARE TO REMAIN OPERATIONAL DURING ALL HOURS OF THE DAY. REGULAR CONSTRUCTION WORK HOURS ARE FROM 7:00 AMAND 5:30 PM. ALL SHUT DOWNS OR MODIFICATIONS WILL BE AT NIGHT OR ON WEEKENDS. ADDITIONALLY, NO SYSTEM IS TO BE SHUT DOWN WITHOUT FIRST COORDINATING WITH VVMC AND OBTAINING AN APPROVED METHOD OF PROCEDURE.PATCH AND REFINISH AREAS INPACTED BY CONSTRUCTION. FINAL CONDITION TO BE LIKE-NEW. ALL LIFE SAFETY SYSTEMS AND FIRE RATED ASSEMBLIES TO BE MAINTAINED PER LIFE SAEFTY CODE REQUIREMENTS AT ALL TIMES. SEE LS SERIES FOR MORE INFORMATION.DOORS TO BE LOCATED 6" FROM ADJACENT WALL ON HINGE SIDE UNLESS NOTED OTHERWISESALVAGE ALL MEDICAL EQUIPMENT, CONFIRM NEW LOCATION WITH OWNERPROVIDE COORDINATION WALK WITH OWNER AND ARCHITECT TO CONFIRM ALL BACK BOXES AND WALL DEVICE LOCATION BEFORE DRYWALL INSTALLATION. WHEN ITEM NOTED TO BE DEMOLISHED, ENTIRETY OF ITEM TO BE DEMOLISHED. ABANDON IN PLACE IS NOT ACCEPTABLE.CONTRACTOR IS ULTIMATELY RESPONSIBILE FOR ALL DEMOLITION AND PREPARTIONS REQUIRED FOR FINAL CONSTRUCTION, INCLUDING BUT NOT LIMITED TO CORING, TRENCHING, AND FINISH MODIFICATIONSDEVICES TO BE LOCATED SUCH THAT THEY DO NOT SPAN BETWEEN SURFACES OF VARYING DEPTH. THEY SHALL BE SCRIBED INTO THE SURFACE MATERIAL WITH THE GREATEST DEPTH FROM THE SURFACE OF THE WALL. 1.2.3.4.5.6.7.8.9.2901 Blake Street, Suite 100Denver, CO 80205303.861.8555DenverDPA Project:Sheet Number:COPYRIGHT -DAVIS PARTNERSHIP, P.C.123456ABCDE123456ABCDESheet Title:ConsultantRevisionDateSheet InformationProject InformationOriginal Issuance9/28/2017 5:29:37 PM15924.00AD010.12017EAST WING ADDITION180 S. Frontage Road West, Vail, CO 81657OVERALL DEMOSITE PLAN09/28/17DP1VAIL HEALTH 1/32" = 1'-0"A1OVERALL SITE PLANDD12 DEMOLISH EXISTING STRUCTURES, LANDSCAPE AND HARDSCAPE.DEMOLISH, CAP OR REMOVE UTILITIES ONLY SERVING THE DEMOLISHEDBUILDING. ABANDON IN PLACE IS NOT ACCEPTABLE.DD13 DP1 DEMOLITION PHASE 1.90CBANORTHWest Meadow Dr.CDOT Right of WaySouth Frontage RoadFlagger as needed to assisttrucks entering and exitingshoulder of road at CDOT ROW.Truck Staging
VAIL HEALTH HOSPITALS. FRONTAGE ROAD SINGLE LANE SHIFT TRAFFIC CONTROL PLAN110918 Traffic Plan
Vail Health
Hospital
East Wing
Project
Existing EB Lane
Existing Center Lane
Existing WB Lane
Existing ROW Shoulder
Proposed concrete pump truck
Proposed concrete trucks
Proposed concrete washout
Proposed single lane shift of EB Lane
1/15/19 only for Concrete Placement
UPPER VALLEY ELITE TRAFFIC CONTROL
ATSSA TCS DATE
970-216-8683
CERT# 102791
ISSUE DATE: 03/20/2015
EXPIRATION DATE: 02/18/2019
GE JOHNSON
SHIFT TO THE NORTH
PUMPER TRUCK
ROADWORKAHEADNORTH FRONTAGE RDROADWORKAHEAD150'150'150'150'* SIGNS SHALL BE SET 150' APART
* TRAFFIC WILL BE SHIFTED TO THE NORTH
* FLAGGERS WILL PULL STOPS FOR TRUCKS IN AND OUT
www.invarion.com
1/15/19 only for Concrete Placement