Loading...
HomeMy WebLinkAboutMountain View Phase 1 Demo Staging Plan 1.21.19 Rev2.pdfEXIT BUILDING AREA FRON T A G E ROAD APOLLO PARKMOUNTAIN VIEW40' ROLLING GATE TRUCK ENTRANCE 20' SWING GATE TRUCK EXIT LOA D I N G ZON E DEMO STAGING PLAN AUTHORIZED PERSONNEL ONLY GARAGE ENTRY GARAGE EXIT/ENTRY PHASE 1 RESIDENCE CONSTRUCTION ACTIVITIES • 4th QUARTER 2018 • EXPORT SOILS/CLEAR & GRUB • DEMO/REMOVE EXISTING STONE VENEER • ESTABLISH LEVEL DELIVERY/LOADING ZONE • UNDERGROUND UTILITIES • VERIFY EXISTING CONDITIONS TOV WORK REQUIREMENTS • WORK HOURS 7 AM TO 7 PM • NO FLAGGERS WHEN FRONTAGE ROAD IS SLICK • NO WORK OFF-SITE AFTER DARK • TRAFFIC CONTROLS TO BE REMOVED PRIOR TO DARK ON FRONTAGE ROAD • SNOW TO BE TRUCKED OFF-SITE N FI R E S T A G I N G 32'50'FDC FIRE HYDRANT SPRINKLER RISER ROOM ACCESS DOOR (ROOM LOCATED ON MIDDLE GARAGE LEVEL) FIRE ALARM ROOM KNOX BOX MIN 4' EXIT CONCRETE JERSEY BARRIERS W/ CHAINLINK FENCE ALONG SIDEWALK 6' - 0" CONSTRUCTION FENCE CHAINLINK W/ GREEN SCREEN PROPERTY LINE GATE FIRE STAGING ZONE 42" GUARDRAIL WITH SOLID PLYWOOD 42" GUARDRAIL NO PLYWOOD LOADING ZONE PROJECT / SAFETY SIGN COVERED WALKWAY PLYWOOD IN AREAS INDICATED ON PLAN GUARD RAIL DETAIL _45'_ _6'_ _18'_ VAIL 431 LADDER FEET WIDTH : 8.50 TRACK : 8.00 LOCK TO LOCK TIME : 6.00 STEERING ANGLE :28.70 0' 5' 20'10' #1) 1/22/19 to 1/24/19 and 1/28/19 to 1/29/19 Fence panels installed on sidewalk, keeping sidewalk open. Fence panels have additional sandbags and tied back to stakes in multiple locations during this portion of work and weekends. We will only focus on the snow and soil on the N side of the garage to prepare the loading zone. UVETC to provide traffic control to back trucks into East gate of the site during this time as shown on the attached plan. (Dates pending snow on frontage road that would prevent ability to haul). #2) 1/30/19 to 1/31/19 Jersey Barrier with fence on top to be installed on jobsite property and out of ROW with gates as shown on this drawing. We will try to set all jersey barriers from the jobsite side but a seperate ROW permit and Traffic Control plan will be submitted prior to the work taking place if the sidewalk area is needed to set them. #3) 1/30/19 Scaffold covered egress to be installed immediately following removal and leveling off soil in this area. Remainder of soil on top of parking garage to be hauled off using loading zone with no encroachment into ROW. UVETC to provide traffic control during this operation if needed when trucks are entering and exiting the frontage road. Pedestrian gate for access to path. All construction equipment to be stored inside of job fence. Fence panels only with no jersey barriers to allow for transformer access if needed. UPPER VALLEY ELITE TRAFFIC CONTROL ATSSA TCS DATE 970-216-8683 CERT# 102791 ISSUE DATE: 03/20/2015 EXPIRATION DATE: 02/18/2019 SHAW CONSTRUCTION 434 S FRONTAGED RD E #1 ROADWORKAHEADROADWORKAHEAD * SIGNS SHALL BE SET150' APART * TRUCK SHALL BE BACKING INTO THE EAST END TO START WITH THEN AFTER THE ROAD IS MADE THEY WILL PULL IN FRON THE WEST END AND WILL PULL OUT ON THE EAST END. * THE FLAGGERS SHALL PULL STOPS FOR TRUCKS IN AND OUT 150' 150'150'150'VIL VALLEY DR SOUTH FRONTGE RDwww.invarion.com