HomeMy WebLinkAbout1990-08-14 Support Documentation Town Council Work Session \_/i,~
VAIL TOWN COUNCIL
WORK SESSION
TUESDAY, AUGUST 14, 1990
1:00 P.M.
in the VAIL PUBLIC LIBRARY COMMUNITY ROOM
AGENDA
1. Planning and Environmental Commission Report
2. Second Quarter Financial Report
3. Discussion of Proposed Amended Town-wide Leash Law Ordinance
4. Request to Construct a Canopy on Town of Vail Property in the
Lionshead Mall (Applicant: Vail Resort Association)
5. Information Update
6. Other
Please be sure to wear appropriate clothing and footwear for the tours.
7. Tour of the Vail Village Transportation Parking Structure
8. Tour of Forest Management Activities on Forest Service Roads
VAIL TOWN COUNCIL
WORK SESSION
TUESDAY, AUGUST 14, 1990
1:00 P.M.
in the VAIL PUBLIC LIBRARY COMMUNITY ROOM
EXPANDED AGENDA
1:00 1. Planning and Environmental Commission Report
Kristan Pritz
1:15 2. Second Quarter Financial Report
Steve Barwick
Action Requested of Council: Ask questions and make
comments as desired.
Background Rationale: Staff estimates of 1990 revenues and
expenditures will be presented.
1:20 3. Discussion of Proposed Amended Town-wide Leash Law Ordinance
Larry Eskwith
Action Requested of Council: Give staff direction on
whether to proceed with town-wide leash law ordinance.
Background Rationale: Council directed staff to draft an
ordinance for discussion purposes.
1:35 4. Request to Construct a Canopy on Town of Vail Property in
Betsy Rosolack the Lionshead Mall (Applicant: Vail Resort Association)
Action Requested of Council: Allow/deny request to proceed
to DRB.
Background Rationale: The Vail Resort Association is
proposing a canvas canopy (roof only) as a temporary
structure to be placed at the fountain area in the Lionshead
Mall. The canopy would only be in place during special
events.
Staff Recommendation: Allow applicant to proceed to DRB.
1:45 5. Information Update
Ron Phillips
1:50 6. Other
Please be sure to wear appropriate clothing and footwear for the tours.
2:00 7. Tour of the Vail Village Transportation Parking Structure
Stan Berryman
3:00 8. Tour of Forest Management Activities on Forest Service Roads
Bill Ott
PLANNING AND ENVIRONMENTAL COMMISSION
August 13, 1990
SITE VISITS
- 11:30 A work session on Air Quality--Susan
Scanlan
- l:oo Site Visits
- 2:00 Public Hearing
1. Approval of minutes from the July 23, 1990
meeting.
- 2. A request for a setback variance in order to
enlarge.,a second story housekeeping service
room at Montaneros Condominiums located at
641 W. Lionshead Circle, Lot 8, Block 1,
Vail-Lionshead 3rd Filing.
Applicant: Montaneros Condominium
Association
2 3. A request for a conditional use permit, a
landscape variance, and a setback variance
for a remediation system equipment building
at the Alpine Standard Station, part of Lot
A, Vail Village 2nd Filing, 285 S. Frontage
Road West.
Applicant: Amoco Corp.
4 4. A request for a wall height variance and an
amendment to the approved access plan for
both lots at 146 and 126 Forest Road, Lots 5
and 6, Block 7, Vail Village 1st Filing.
Applicant: Ron Byrne
1 5. A request for a height variance at 2855
Snowberry Drive, Lot 6, Block 9, Vail
Intermountain.
Applicant: Doug and Michelle Cahill
3 6. A request for a conditional use to expand
hospital space at the Vail Valley Medical
Cuter on Lots E and F, Vail Village 2nd
Filing (181 West Meadow Drive).
Applicant: Vail Valley Medical Center
TABLED UNTIL 7. A request for an exterior alteratin on Lot C
AUGUST 27TH and Lot D, and the southwesterly 4 feet of
Lot B, all in Block 5-B, Vail Village 1st
Filing, 227 Bridge Street (Covered Bridge
Building).
Applicant: Hillis of Snowznass, Inc. and
Bruce Amm & Associates.
TABLED UNTIL 8. A request fora major amendment to SDD No.
AUGUST 27TH 16, part of parcel A, Lior.~sridge Subdivision,
Filing 2. (The Valley Pha~:e III)
Applicant: Brad & Susan 4'jossem
TABLED UNTIL 9. A request for a major subdivision, to approve
AUGUST 27TH the preliminary plan, a rE:quest for a
variance to the maximum height for retaining
walls, and a request for zi variance to the
maximum percent grade for a road, on a parcel
commonly referred to as S~~raddle Creek, an
approximate 40 acre parce]L located north and
east of the Main Vail I-70 interchange and
east of the Spraddle Creels livery.
Applicant: George Gillett:, Jr.
TABLED 10. A request for a major amendment to~SDD No. 4,
INDEFINITELY Coldstream Condominiums i~z order to amend
Sections 18.46.090 (B} density, 18.46.100 (B}
floor area, 18.46.220 employee housing and
18.46.230 time requiremenits to convert an
existing racquetball facility into an
employee housing unit, management office,
laundry and owner storage area atLot 53 Glen
Lyon Subdivision, 1476 We,sthaven Drive.
Applicant: Coldstream Co:ndominiuml'
Association.
WITHDRAWN 11. A request for a side setback varince at Lot
3, Block 5 Vail Village 1st Filing, Unit 3B--
Vail Rowhouses, 303 Gore Creek Drive.
Applicant: Stewart Colton ~I
WITHDRAWN 12. A request for a variance to Section 18.58.020
(C) in order to construct a 5' high wood
screen fence in the 20' front setback at 9
Vail Road--Holiday House, Lot B, Vail Village
2nd Filing.
Applicant: Holiday House/Pinnacle Resorts
I
4
`~cE
)t
j
-
r
town o~ uail
75 south frontage road
veil, Colorado 81657
(303) 479-2116
MEMORANDUM
TO: Ron Phillips ~
FROM: Steve Barwick .r~~l~-.~
DATE: August 6, 1990
RE: 1990 Second Quarter Financial Report
Please find attached the 1990 Second Quarter Financial Report.
The report differs very little from the report generated three
months ago.
The Town's General Fund balance is still expected to drop
dramatically due to the cash purchase of the Berry Creek 5th
filing parcel. As stated previously, I would strongly recommend
the Town pursue methods to restore the General Fund balance to a
much higher level within the next few months.
The projected fund balance of the Town's Capital Projects Fund is
looking somewhat stronger than previously estimated. Due to
strong sales tax revenues and higher than expected interest
earnings, this fund should have a fund balance of over $400,000
at year end.
In general, the Town's financial condition remains sound. Our
primary revenue sources are growing at a good, if unspectacular,
rate and the Town`s expenditures remain on budget.
SHB/ds
R~
TOWN OF VAIL
SECOND QUARTER FINANCIAL REPORT
~i
August 6, 1990
89FNDBAL Revised: 8`/'10/190
TOWN OF VAIL
STATEMENT OF PROJECTED CHANGES IN FUND BALANCE
1/1/90 - 12/31/90
SPECIAL
CAPITAL REAL ESTATE PARKING HEAVY VAIL ;
GENERAL PROJECTS TRANSFER ASSESSMENT EQUIPMENT MARKETING DEBT SERVICE ;
FUND FUND * TAX FUND FUND FUND FUND FUND ; TOTAL ;
Fund Balance 1/1/90 2,392,356 8,996,729 2,061,419 167,110 345,914 5,386 2,355,465 ; 16,324,379 ;
1 ~
Projected 1990 Revenue 11,613,300 8,312,966 1,728,400 270,000 1,329,000 660,605 3,984,904 ; 27,899,175 ;
Pro3ected 1990 Expenditures 13,772,822 16,866,746 2,440,288 437,110 1,314,000 658,189 2,907,520 ! 38,396,675 !
~ Gain/(Loss) (2,159,522) (8,553,780) ( 711,888) ( 167,110) 15,000 2,416 1,077,384 ~ (10,497,500)
Pro3ected Fund Balance 12/31/90 232,834 442,949 1,349,531 0 360,914 7,802 3,432,849 5,826,879 ;
* Includes Parking Structure Construction Fund.
sALgsset
Revised: 8i 8/90
10NN OF VAIL
SALBS tAI BSIINATION WOflbSflBBi
X Change X Change
1990 1990 frog frog
NON?B 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 ; BODGE? ACiOAL Variance 1989 Budget
-
January 626,448 514,102 675,186 696,752 742,262 881,304 890,585 1,063,196 1,128,496 1,436,328 1,508,000 1,574,399 66,399 9.6X 4.4X
February 624,040 594,292 687,792 751,856 824,650 918,154 946,552 1,135,786 1,205,101 1,532,394 1,535,000 1,668,882 133,882 8.9X 8.7X
March 683,000 697,464 853,648 977,828 1,084,814 1,187,520 1,316,652 1,378,182 1,591,705 1,992,245 1,990,000 1,944,501 ( 45,499) ( 2.4X) ( 2.3X)
April 246,820 308,436 355,300 319,546 481,204 531,668 430,877 425,961 550,205 549,660 5?5,000 822,392 47,392 13.2X B.ZX
Nay 89,180 135,774 147,378 156,588 166,200 162,912 244,987 245,518 170,567 201,615 ; 210,000 223,284 13,284 10.7X 6.3X
tv Jnne 176,044 245,204 241,326 257,744 262,696 280,828 361,627 331,581 329,039 407,623 ; 410,000 442,541 32,541 8.6X 7.9X
-
Subtotal 2,445,532 2,495,272 2,966,630 3,160,314 3,561,826 3,962,386 4,191,280 4,580,824 4,973,113 6,119,865 6,228,000 6,475,999 24T,999 5.8X 4.OX
July 281,846 339,418 349,116 407,474 406,462 447,815 479,507 479,201 559,683 656,127 ; 675,000
Augnat 268,052 332,724 348,756 384,338 402,792 386,985 512,513 536,904 575,887 653,560 675,000
Septe~ber 176,090. 285,918 268,598 324,670 384,864 340,102 374,060 442,402 422,502 513,920 517,000
October 137,316 225,024 223,830 198,614 206,248 209,282 237,504 273,951 291,204 294,369 300,000
Noveiber 140,630 210,254 245,894 281,104 310,588 229,083 376,651 386,270 376,235 423,096 ; 430,000
rnw nrw .nn nnn nrn nnr nrr . ono non 1 n~[ ern 1 n1o t C[0 rtCll 1 1 C7[ nnn
Dece~ber 590,241 8i0,76i 737,auo oaa,luu ~uo,lao aua,aaa t,tul,cou l,LtJ,U1L 1,7JJ,81V 1,VJY,JVV 1 L,VVY,YVV
TOTAL 4,039,768 4,109,372 5,140,330 5,610,214 6,179,538 6,481,608 7,338,801 7,945,164 8,654,572 10,319,906 ; 10,460,000 6,475,999 247,999
L
flBTT `
flevised: 2/ 3/1990
TOBH OF PAIL
ABAL BSTATB TflAHSFBfl TAI
History and Budget
1990
1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1990 BODGBT
flOHTfl ACT06L ACTOAL ecTDAL ACiOAL 6CTOAL ACTOAL ACiOAL AcTDAL ACT06L 6CTOAL BODGBt ACtOAL veeIAHCB
January 63,999 98,089 106,981 119,992 18,053 80,733 101,374 131,916 96,119 309,233 ; 98,966 162,954 63,988
February 40,595 69,018 105,024 132,220 86,289 170,052 64,906 44,040 109,873 140,192 ; 91,460 133,085 41,625
flarcb 69,886 126,935 109,533 139,820 62,693 63,831 92,557 38,791 68,104 145,957 ; 89,002 77,995 ( 11,007)
April 76,855 94,653 65,900 103,526 173,321 90,396 182,743 95,554 179,691 151,069 ; 117,440 152,027 34,589
flay 42,738 84,324 54,663 90,599 96,006 228,873 98,651 120,984 99,736 220,299; 105,291 169,796 62,499
w June 62,239 125,433 54,488- 140,638 76,467 49,513 79,915 73,509 101,364 122,466 ; 84,684 135,418 50,794
July 49,367 188,110 104,262 68,539 151,598 88,528 70,441 47,949 126,537 125,675 ; 96,253 75,139 ( 21,114) .
Subtotal 405,619 784,562 600,851 793,314 730,427 711,726 690,587 552,743 781,404 1,214,891 ; 683,103 904,474 221,391
Angnst 79,859 115,499 71,282 97,806 58,937 32,860 100,182 61,131 109,315 88,347 ; 80,910
Septeibr 59,800 113,992 49,332 96,746 64,671 48,516 108,187 78,819 116,557 143,306 ; 83,736
October 108,510 154,000 42,498 122,546 88,732 109,633 93,860 124,291 177,360 241,393 ; 119,130
flove~ber 102,623 107,768 81,898 91,385 105,109 74,909 89,047 114,839. 241,888 165,964 ; 104,468
Deceiber 142,662 133,869 110,911 58,533 81,890 333,139 106,695 95,495 192,947 192,737 ; 128,655
TOTAL 899,133 1, 409, 688 956, 572 1, 258, 330 1,129, 966 1, 370, 783 1,188, 538 1, 027, 324 1, 619, 471 2, 044, 638 ; 1, 200, 000 904, 474 221, 371
10-Aug-90 Financial Report
:::.P
~td:::::::::.:::.::.::.::.:::.:.:::.::.:<.::.:::.::::.:::.::.:~::.::.::.:::.;:::;:.
1990 1990 VARIANCE
G~NEpAL BUND REVENUE BUDGET; ESTiMAI E OVER/(UNDER)
Taxes
Property & Ownership Taxes 1,874,600 1,883,600 9,000.
Retail Sales Tax 5,322,000 5,511,~D00 189,000
Ski Lift Tax 788,000 830,~D00 42,000
>
Franchise Fees 426,000 425,!D00 _ ! (1,000)
, .
Penalty 8~ Interest 35,000 36,000 _ .
T;000
Subtotal Taxes 8,445,600 8,685,600
24 0.0 0 0.::
Construction Fees 170,000 285,000 s;;:;;?. _;::;115;000,
Licenses 8 Permits 28,900 44,'700 ; :75;800
Charges for Services 262,236 204,000 (58,236);
Transportation Centers 1,201,960 1,111,000 (90,960)
Intergovernmental Revenue 757,900 797,000: ' 39,1'00'`
Fines 8~ Forteitures 189,200 210,000 _ 20,800.:::
Other 389,435 276,000 (113,435)
TOTAL GF REVENUE
17`;445;231 11;,613;300::. ,~f~$,069>
1990 1990 ! VARIANCE
GENERAL FUND :EXPENDITURES BUDGET ESTIMA7 E OVER/(UNDER)
Town Officials 2,493,977 2,483,;500 ?;;;;;;:::;:::::(10;477):
Administrative Services 1,073,765 1,094,1)00 20;235
Community Development 671,642 658,1)00 ::...........,.::..113,642):
Police 2,227,759 2,203,000 ; {14;759)
Fire 879,696 879,696 ; . ':::0
Public Works 1,759,293 1,796,000 3ti70Z°;
Transit 1,540,714 1,510,1)00 ;;;<;<{30;714);
Transportation Centers 829,862 844,000 ; ;;:::::;:;:;:;';::?:::::14';138
Library 512,733 512,733 ' ;I:';<' 0'
Contributions & Events 760,867 755,000 ' ' 5;86..
Employee Benefits 115,750 115,000 ;,,.;;:<;;<«>' >';;<`;(750)
Insurance 390,300 380,000 >:;110'300)
Contingency 100 O s::::::::':;:.<{00)'
VMRD Recreation Contract 541,893 516,!393 <'''(25000)
Eagle Valley Child Care Study 25,000 25,000 ;:;0
TOTAL'GF EXPENDITURES ;1:3;823,351 .;.......13;772,1322' : .15Q,5~1~~
..............~~1 ~.h)~?t~aa~ ~ ~t.~0 ~ X59 ,~22:.;::::>::>::»::::>::::;:>::211:~~~~~::
4
10-Aug-90 Financial Report
's
' 1990 1990 VARIANCE :
CAPITAL PROJECTS FUND REVENUE BUDGET E..STIMATE .....OVER/jUNDER)
Retail Sales Tax 5,183,000 5,359,000 >;,;'176040'
County Sales Tax 173,000 188,000 <;,15000.
Ski Lift Tax 788,000 830,000 42,000;;
Recreation Amenities Fees 20,000 125,000 >10b,~000
Earnings on Investments 90,000 200,000 ;:;;:;:::::';;:.`.;;1;10;000'`:
Other Income 75,200 184,600 ;;::::<::;<:;1:09,400':.
RETT Loan Repayment 509,156 509,156 : 0::;
AT&T Lawsuit Funds 0 128,100 ......,...,128,100::.
WI Lease Revenue 0 20,000 <;;>; ::::;':;20;000..
W. Gore Cr. Dr. Bridge Grant 160,000 160,000 `'>!'?''0;:
Parking Construction Fund Int. 0 442,000 ?:,<42~00:'
Transfer from SPAF 0 167,110 . ;,;:;1:67;1.10
TOTAL REVENUE:..:....... 6;998;356. 8,312,966 ~.x3'l~,F~f~::;
1990 ; 199Q VARIANCE .
CAPITAL.. PROJECTS FUND EXP: BUDGET >s E. STIMATE ; QVER/(UNDER)
Project Rollforwards from 1989 621,000 621,000 ' 0
Handicap Access Van 36,600 37,000: 400
W. Gore Creek Dr. Bridge 182,500 182,500 ' > 0
Post Office Remodel/VRA Move 35,000 35,000 0.:
Fire Truck Purchase 350,000 350,000 _ <:0
Bus Replacement 481,000 481,000 0
Forest Serv Joint Visitor Center 15,000 15,000 '0
Street Maintenance ~ Improvements 1,345,000 1,345,000 : < D
New Snow Dump Site 25,000 32,000 ...........:.:...7;000:
Street Light Improvement 30,000 30,000 ';>;>>':"0
Esc. Bldg. Maintenance 70,000 70,000 :0;
.
Recreational Paths Maintenance 52,000 52,000 _,;;0.
Parking Structures Projects 30,000 30,000 ' 0 ;
TOV Shop Maint. & Improvements 110,000 110,000 0
Library Children's Area Remodel 29,000 29,000 0:`
Bus Interior Refurbishment 26,000 26,000: _ '0
Municipal Bldg Remodel/Study 49,000 49,000 '0
Fire Dept Furniture ~ Carpet 25,000 25,000 . ` 0
Bus Shelter Improvements 30,000 30,000. 0.
W. Meadow Dr. Conceptual Design 27,000 27,000
;0.,
People Mover Study/Grant Applic. 13,000 13,000 _ : _ 0
Dobson Arena Flooring 15,000 15,000 , :>;!;:>;>!';p;
Willow Bridge Replacement 50,000 50,000 ?0;'
Holy Cross Purchase 10 000 10 000 <:>`>`<`><>'<`<'`'
, 0:
Parking Structure Construction 9 787 842 9 787 842
, 0.
Transfer to Debt Service 3,414,404 3,414,404 `'p
::::.`:::TOTAL EXPENDITURES.. ; 16859;346 y6,1366746... 7,~4.
.............................................l... H~3RTF1~i.~.#.._::::::::.::::::.,:::.~;:;::.;~9,66a,99~~«:::<:::::::::><~8,~5~,'r8. ;;::::::~<::~.:,3Q~,.~`~..t:#}::~
5
10-Aug-90 Financial Report
1990::. 1990 VARIANCE
LOTTERY FUND ....:..:.BUDGET:;..: ;ESTIMATE,.:.4VER7(UNDER)
REVENUE 7,000 8,;100 `><<!<<" 500;
EXPENDITURES 7,000 8,:100 .1._,500,.'
1990 r 1990 1ARIANCE
_
REAL ESTATE TRANS TAX FUND: BUDGET:; ;;ESTIMATE OVER/(UNDER)
REVENUE
Rt i i Taxes 1,200,000 1,500,000 ' 300,000.`
Golf Course LeaseNMRD 73,400 73,~>•00 . 0
Earnings on Investments 100,000 155,000 ' . . 55;000::':
TOTAL Rr ~ REVENUE y;;373;400 1,728,~Z,00 355,000
EXPENDITURES
Purchase of O en S ace 340,932 340 932 _>;<<'<>>' :':0:;
P P
.
Transfer to Debt Service Fund 200,000 200,000 '<0'
Loan Repayment 509,656 509,fi56 < ` 0
Open Space Projects 1,358,700 1,389,700 31.,000.::
31,p
TOTAL:Rt ~ i.EXPEN.DITUR.ES ; . .......::2,409,288.::. 2,440,:88 _ 00
::>':>~:::~UF4PLf~Sf 3C-1.~FfTiF . ;:::>::::>::::>::::::>_:::::<:::::>:::>:::<:>::>
...........................~.1~35 888:«::>:<:::<::: >#:Il:>I388 :<:::>:>:>:><::::3 :
1.990 . ' 1990
VARIANCE
HEAVY;EQUIP,MENT:FUND,; ,BUDGET . .::;ESTIMATE _ OVER7(UNDER)
REVENUE 1,419,600 1,329,A00 ;;;{50~Q0)
EXPENDITURES 1,452,529 1,314,000 ; {1 38;529):
::::»~:S~f~PLISI~~HL3~TFAi~~~~>`:>><':<<<>«>s`32'9~'9:'>»>~><>~<>1~'~ t)00>'>~>~>~>~>''<~'~~~929
I
6
10-Aug-90 Financial Report
a
1.;990 > ..;;::1:990.;::.:::::::>:;::: VARIANCE
::.SPEC PARKING ASSESSMENTFUND BUDGET:;...,.... E$TI.MATE.:.. O,V. ERI(UNDER)
REVENUE
35 000 >><'>,;;`''''``'``<>
P rki
a n Assessm n
e is
35 000
9 ~ . 0..
Daily Parking Revenue 235,000 225,000 ;('IO;000j
Earnings on Investments 5,000 10,000 ! ;'!:x::;:::;;:;::;::;;:;:;5;000
TOTAL:SPAF REVEN
_ . ..:<::::<<<:::;'::::;;;;::>;::;;:<;::<;<::':::::::275 000..:.:::::;::,::,:,:.:.:270 000.:::;>.;:.>:.>: 5 0
EXPENDITURES
Transfer to Debt Service 275,000 270 000 <<:<< 5'000
Trans to Capital Projects Fund 167,110 167,110 <<>> __<>'><:'0
T:OTAL;SPAFEXPENDITtJRES ; , , 442,1:10 437;110..; ;:(5;000).
..........................................l..:t~~3R~~A).,)..1:,,::....~:.~:::.:::::::......::::::::{1:~'~lr~.:(.~~:.;:.>:.;:.;:.::.::.,~..{'I.fTx~.~.~D~,;;::::.~:::.;:.;:.;;:.;:<.:;.:~;:;;:.;;:.;D:::;
1990
::;1.990:::::;`>>:. VARIANCE.::
MARKETING FUND ESTIMATE ;OVER!(tJNDERj
BUDGET.::
REVENUE
Business Licenses
325,000 325,000 ?<<'>:'::0 .
.
TOV Marketing Contribution 160,500 160,500 <>>>>`>0:
Other Marketing Contributions 116,000 140,000 24;000:`
Miscellaneous 1,000 17,105::;;;;:; ; .;<:;;;16,105 .
Earnings on Investments 12,000 18,000 ,>:;;:;;.;,;6,000
TOTAL MARKETING REVENUE 614,500 660.,605 ' 46,105`;
EXPENDITURES ':'651;1759 658,189:.: 7,130'
}..:.:::::::::::.:::::::::::::.>:<:.;:.;:I3E...~;~a~):<:.;:.;:;.;:<:<.;::::<:::: ;:.21..4.. ~.~~;:;:.;:.;;:.;:.;:.::;:.;:.;:.::;;~6:9fiS;::
7
MNTHRPT Re~~ised: 8/ 5/90
TOWN OF VAIL
FISCAL YEAR-TO-DATE REVENUE SUt4MARY
As of June 30, 1990 ;
(Operating.Funds Only)
1989 '1990
1989 JUN YTD % 1:90 JUN YTD % OVER
FUND JUN YTD OF TOTAL JUt1 YTD OF BUDGET (UNDER)
GENERAL FUND
Sales Tax 3,347,697 58.7% 3,306,191 62.1% 3.5%
Property Taxes 1,329,476 73.1% 1,3;16,780 72.4% ( .8%)
Ski Lift Tax 580,451 76.0% 6~E2,671 ~ 81.6% 5.5°6
Trans. Centers 813,652 67.9% 7~l0,356 61.6% ( 6.3%)
Charges for Services 101,684 40.7% 1'6,155 29.0% ( 11.7%)
Other 882,779 37.0% 1,1:3,254 55.6% 18.6%
GENERAL FUND TOTAL 7,055,739 58.2% 7,24E5,40? 63.2% 5.0%
i
CAPITAL PROJECTS FUND
Sales Tax 2,797,941 59.2°6 3,2(18,901 61.9% 2.7%
Ski Lift Tax 580,451 76.0% 662,671 j 81.6% 5.5%
Other 167,617 12.1% 2f?4,576 ' 58.6% 46.4%
Trans from C)ther Funds 0 .0% 0 ~ .0% .0%
CAPITAL PROJECTS TOTAL 3,546,009 39.3% 4,1:6,148 64.0% 24.7%
I
i
LOTTERY TOTAL 0 .0% 4,625 166.1% 66.1%
GRAND TOTAL 10,601,748 50.1% 11,3~~6,180 63.5% 13.4%
i
8
MNTHRPT Revised: 8/ 5/90
TOWN OF VAIL
FISCAL YEAR-TO-DATE EXPENDITURE SUMMARY
As of June 30, 1990
(Operating Funds Only)
1989 1990
1989 JUN YTD % 1990 JUN YTD % OVER
FUND JUN YTD OF TOTAL JUN YTD OF BUDGET (UNDER}
GENERAL FUND
Town Officials 260,543 48.0% 2,183,446 86.7% 38.6%
Administrative Serv. 447,597 48.2% 563,844 52.5% 4.3%
Community Development 243,470 47.8% 281,694 42.6% ( 5.2%)
Police - 938,673 50.1% 1,010,653 45.4% ( 4.8%)
Fire 405,411 47.9% 438,529 49.9% 2.0%
Public Works 773,121 48.0% 925,105 52.6% 4.6%
Transit 715,034 52.3% 743,905 48.3% ( 4.0%)
Transportation Centers 392,539 49.3% 388,948 46.9% ( 2.4%)
Library 204,915 45.5% 236,681 46.2% .7%
Contrib. & Events 469,980 75.3% .612,706 80.5% 5.2%
Employee Benefits 21,631 48.1% 47,744 41.2% ( 6.8%)
Insurance 141,457 36.5% 437,595 112.1% 75.6%
Contingency 0 .0% 0 .0% .0%
Trans. to Other Funds 200,000 11.0% 0 .0% ( 11.0%)
VMRD Contract 204,395 37.4% 268,615 49.6% 12.1%
GENERAL FUND TOTAL 5,418,766 43.9% 8,139,465 58.9% 15.0%
CAPITAL PROJECTS
Capital Projects 1,090,897 31.4% 477,175 3.5% ( 27.9%)
Transfers 872,028 31.2% U .0% ( 31.2%)
CAPITAL PROJECTS TC)TAL 1,962,925 31.3% 477,175 2.8% ( 28.5%)
LOTTERY TOTAL 0 .0% 0 .0% .0%
GRAND TOTAL 7,381,691 39.6% 8,616,640 28.1% ( 11.6%)
9
ORDINANCE N0.
Series of 1990
AN ORDINANCE AMENDING SECTION 6.04.190 OF THE
MUNICIPAL CODE OF THE TOWN OF VAIL TO PROVIDE THAT DOGS,
WHEN OFF THE PROPERTY OF THEIR OWNERS OR KEEPER, THEY
MUST BE ON A LEASH; AND SETTING FORTH DETAILS IN
REGARD THERETO.
WHEREAS, dogs running at large have become an increasingly serious problem
within the Town of Vail; and
WHEREAS, the Town Council believes that it will protect the safety and property
of the inhabitants of the Town to require that dogs off the property of their owners
throughout the Town of Vail must be on a leash.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF VAIL,
COLORADO:
1. Section 6.04.190 Running at Large of the Vail Municipal Code is hereby
amended as follows:
A. It is unlawful for the owner or keeper of a dog to permit his dog to
run at large on any bikepath or public park located within the Town or on any area
located within the Town.
B. A dog shall be deemed running at large when it is off or away from the
property or premises of its owner or keeper and is not on a leash of not more than
seven (7) feet in length that is held by a responsible person.
Z. Section 6.04.200 Running at Large - Elsewhere of the Vail Municipal Code is
hereby deleted in its entirety.
3. If any part, section, subsection, sentence, clause or phrase of this
Ordinance is for any reason held to be invalid, such decision shall not affect the
validity of the remaining portions of this Ordinance; and the Town Council hereby
declares it would have passed this Ordinance, and each part, section, subsection,
sentence, clause or phrase thereof, regardless of the fact that any one or more
parts, sections, subsections, sentences, clauses or phrases be declared invalid.
4. The Town Council hereby finds, determines and declares that this Ordinance
is necessary and proper for the health, safety and welfare of the Town of Vail and
the inhabitants thereof.
5. The repeal or the repeal and reenactment of any provision of the Municipal
Code of the Town of Vail as provided in this Ordinance shall not affect any right
which has accrued, any duty imposed, any violation that occurred prior to the
effective date hereof, any prosecution commenced, nor any other action or
proceedings as commenced under or by virtue of the provision repealed or repealed
and reenacted. The repeal of any provision hereby shall not revive any provision or
any ordinance previously repealed or superseded unless expressly stated herein.
6. All bylaws, orders, resolutions, and ordinances, or parts thereof,
inconsistent herewith are repealed to the extent only of such inconsistency. This
repealer shall not be construed to revise any bylaw, order, resolution, or
ordinance, or part thereof, heretofore repealed.
INTRODUCED, READ AND APPROVED ON FIRST READING this day of ,
1990, and a public hearing shall be held on this Ordinance on the day of
1990, at 7:30 p.m. in the Council Chambers of the Vail
Municipal Building, Vail, Colorado.
Ordered published in full this day of 1990.
Kent R. Rose, Mayor
ATTEST:
Pamela A. Brandmeyer, Town Clerk
INTRODUCED, READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED
this day of 1990.
Kent R. Rose, Mayor
ATTEST:
Pamela A. Brandmeyer, Town Clerk
-2-
WORK SESSION FOLLOW-UP
8/10/90
TOPIC QUESTIONS FOLLOW-UP SOLUTIONS Page 1 of 2
8/8/89 WEST INTERMOUNTAIN ANNEXATION ARRY: Proceeding w/legal requirements for A new advocate for petition circulation is being sought,
(request: Lapin) annexation. Cindy Callicrate to be contacted.
2/27 SATELLITE POST OFFICE (request: ON: Pursue station "in town" and/or increase Meeting to be set up with Ernie Chavez. Summer bus service
Osterfoss) summer bus service? increased.
5/1 AMEND CODE, 12.04.240, STREET CUT TAN/LARRY/KRISTAN: Per Council direction, proceed. Pam has given original ordinances to Stan. Recommended
PERMITS changes to be presented to Council in September.
6/12 VAIL GLO SIGN (request: Levine) ON/KRISTAN: Through DRB, or some other process, Kristan will handle.
can the lettering color and lighting be modified?
6/19 STOLPORT ON: Contact Jet-Link, Inc., Neal Meehan, on the Kent and Ron are scheduling meeting w/Bill James and Allan
Allen Expressway, Houston, TX, to further pursue Nottingham.
possible subsidy and resurfacing proposal.
6/26 ABANDONED VEHICLES EN: Contact County to see if a county-wide P.D. is analyzing along with County. Will report to
(request: Steinberg) crushing of same could be organized, resulting Council in August.
in lesser costs of demolition and ridding our-
selves of the problem.
6/26 AIR QUALITY USAN: Issue of passive smoke and smoking in Susan has been given assignment.
restaurants needs to be revisited by this fall.
6/26 TED KINDEL MEMORIAL ODD 0.: Track. down ownership of land to the south Land is all owned by VA. VA says a plaque can be placed
(request: Rose) of the Christiania. If this belongs to the TOV, there. A letter from VA is forthcoming. Stan will
begin to formulate memorial plan, i.e., park contact Gordon Britton, who will have a plaque made up.
bench, plaque, etc.?
7/17 BIKES/ROLLER BLADES AND SKATES/ EN/LARRY: Should bicycles, roller blades, etc. be Researching appropriate ordinances.
SKATEBOARDS prohibited from highly pedestrianized areas in
the Village and Lionshead?
1/17 BUSINESS LICENSE SURVEY RESULTS ALLY LORTON/LARRY: Council is interested in seeing Will be presented to Council in August.
survey results as related to the proposed short-
term rental amendment to the business license
ordinance.
7/24 AG/OPEN SPACE AMENDING ORDINANCE ARRY/KRISTAN: Unanimous consensus of Council to Ordinance being developed.
proceed to make AG/Open Space 35 acre minimum
per unit.
WORK SESSION FOLLOW-UP
8/10/90
Page 2 of 2
TOPIC QUESTIONS FOLLOW-UP SOLUTIONS _
8/7 VESTED RIGHTS (request: LARRY/KRISTAN: When does a person vest rights for Larry will develop.
Fritzlen) development purposes?
7/27 UNDERGROUNDING UTILITIES IN LARRY/STAN: Work with Holy Cross Electric to Scheduled to begin this fall.
EAS-T- VAd-L ~stabli-sh-specialimpr-ovement-distr-i-ct(s) far
undergrounding utilities in East Vail.
7/27 HOTEL/CONDOMINIUM CONVERSIONS KRISTAN/LARRY: Develop list of hotels with Will provide by August 28.
condominium approvals.
8/7 COUNTY-WIDE BUS MEMORANDUM STEVE B.: Send memo to County Commissioners prior Ron had memo and cover letter sent out August 9.
to 8/14 meeting at Public Works.
8/7 JOHNSON/GATES DEBATE RON: Schedule discussion w/Bud Gates and Linda Will do.
Johnson prior to November general election.
~
.
II
ZONING
existing,grade or finished grade (whichever is more restrictive),
at any given point to the top of a flat roof, or mansard roof
or to the highest ridge line of a sloping roof. (Ord. 37(1980)
§ 1 (part).)
18.04.180 Home occupation.
"Home occupation" means a use conducted entirely within
a dwelling which is incidental and secondary to the use of the
dwelling for dwelling purposes and which does not change the
residential character thereof. (Ord. 8(1973) § 1.600 (part).)
18.04.190 Kitchen facilities.
"Kitchen facilities" means fixtures and equipment for food
storage and preparation of meals, including a sink, stove, and
refrigeration and food storage facilities. (Ord. 8(1973) § 1.600
(P~)•)
18.04.200 Landscapin `
l;
"Landscaping" means planted areas and plant materials,
including trees, shrubs, lawns, flower beds and ground
cover, together with the core development such as walks,
decks, patios, terraces, water features, and like features not
occupying more than twenty percent of the landscaped area.
For the purposes of this title, natural or significant rock
outcroppings, trees or native vegetation shall be deemed
landscaping in a single family, two-family residential,
residential cluster, low density multi-family, Hillside
Residential, and primary/secondary residential zone districts.
(Ord. 36(] 987) § 1: Ord. 19(1976) § 2 (part): Ord. 8(1973)
1.600 (part).)
18.04.210 Lodge.
"Lodge" means a building or group of associated buildings
designed for occupancy primarily as the temporary lodging
place of individuals or families either in accommodation units
308
cvd~i iz-i-s>>
y w
C ~ DESIGN REVIEW .
Chapter 18.54
DESIGN REVIEW
Sections:
18.54.010 Intent.
18.54.015 Definitions and rules of construction.
18.54.020 Board organization.
18.54.030 Design approval.
18.54.040 Material to be submitted/procedures.
. 18.54.050 Design guidelines.
_ ~ 18.54.051 Park design guidelines.
18.54.060 Design review fee.
18.54.070 Performance bond.
18.54.080 Administrative policies.
18.54.090 Appeal to town council.
18.54.100 Enforcement.
18.54.110 Lapse of design review approval.
18.54.010 Intent.
Vail is a town with a unique natural setting, internationally
known for its natural beauty, alpine environment, and the
compatibility of man-made structures with the environment.
These characteristics have caused a significant number of visitors
to come to Vail with many visitors eventually becoming perma-
nent residents participating in community life.
These factors constitute an important economic base for the
town, both for those who earn their living here and for those who
view the town as a precious physical possession. The town council
finds that new development and redevelopment can have a
substantial impact on the character of an area in which it is
located. Some harmful effects of one land use upon another can
be prevented through zoning, subdivision controls, and building
codes. Other aspects of development are more subtle and less
amenable to exact rules put into operation without regard to
specific development proposals. Among these are the general
form of the land before and after development, the spatial
445 (Vail 12-23-86)
a
ZONING
relationships of structures and open spaces to land uses within the
vicin''"fty
and the town, and the appearance of buildings and open
spaces as they contribute to the area as it is being developed and
redeveloped. In order to provide for the timely exercise of
judgment in the public interest in the evaluation of the design of
new development and redevelopment, the town council has
created a design review board (DRB) and design criteria.
Therefore, in order to preserve the natural beauty of the town
and its setting, to protect the welfare of the community, to
maintain the values created in the community, to protect and
enhance land and property, for the promotion of health, safety,
and general welfare in the community, and to attain the objectives
set out in this section; the improvement or alteration of open
space, exterior design of all new development, and all modifi-
cations to existing development shall be subject to design review
as specified in this chapter.
It is the intent of these guidelines to leave as much design
freedom as possible to the individual designer while at the same
time maintaining the remarkable natural beauty of the area by
creating structures which are designed to complement both their
individual sites and surroundings.
The objectives of design review shall be as follows:
A. To recognize the interdependence of the public welfare and
aesthetics, and to provide a method by which this inter-
dependence may continue to benefit its citizens and visitors;
B. To allow for the development of public and private property
which is in harmony with the desired character of the town as
defined by the guidelines herein provided;
C. To prevent the unnecessary destruction or blighting of the
natural landscape;
D. To ensure that the architectural design, location, configura-
tion materials, colors, and overall treatment of built-up and
open spaces have been designed so that they relate harmo-
niously to the natural landforms and native vegetation, the
town's overall appearance, with surrounding development
and with officially approved plans or guidelines, if any, for
the areas in which the structures are proposed to be located.
E. To protect neighboring property owners and users by making
sure that reasonable provision has been made for such
~v;,u iz-z3_a~,> 446
DESIGN REVIEW
"matters as pedestrian and vehicular traffic, surface water
drainage, sound and sight buffers, the preservation of light
and air, and those aspects of design not adequately covered by
other regulations which may have substantial effects on
neighboring land uses.
(Ord. 39 (1983) § 1.)
. ~ \
DESIGN REVIEW
e. The applicant or his authorized representative shall
+s be present at the design review board meeting.
3. Staff approval. The zoning administrator may approve
any of the following applications:
a. Any application to an existing building that does not
significantly change the existing planes of the building
and is generally consistent with the architectural
design, materials and colors of the building, including,
but not limited to windows, skylights, siding, and
other similar modifications;
b. An application for an addition to an existing building
that is consistent with the architectural design, mate-
rials and colors of the building, and approval has been
received by an authorized member of a condominium
association, if applicable.
c. An application to remove or modify the existing
vegetation or landscaping upon a site.
In the above-specified cases, the zoning admin-
istrator may review and approve the application,
approve the application with certain modifications,
or may refer any application to the design review
,board for decision. All other applications shall be
referred to the design review board.
(Ord. 12(1988) § 1: Ord. 39(1983) § 1.)
18.54.050 Design guidelines.
Actions of the design review board shall be guided by the
objectives prescribed in Section 18.54.010, the Vail Village and
Vail Lionshead Urban Design Considerations and Guide Plans,
by all of the applicable ordinances of the Town of Vail, and by the
following design guidelines:
A. General.
1. Structures shall be compatible with existing structures,
their surroundings, and with Vail's environment. It is not
to be inferred that buildings must look alike to be
compatible. Compatibility can be achieved through the
proper consideration of scale, proportions, site planning,
landscaping, materials and colors, and compliance with
the guidelines herein contained.
454c
(Vail 8-2-88)
J
.
ZONING ~ .
2. ~A~y building site in Vail is likely to have its own unique
land forms and features. Whenever possible, these exist-
ing features should be preserved and reinforced by new
construction. The objective is to fit the buildings to their
sites in a way that leaves the natural land forms and
features intact, treating the buildings as an integral part of
the site, rather than as isolated objects at odds with their
surroundings.
B. Site planning.
1. The location and configuration of structures and access
ways shall be responsive to the existing topography of the
site upon which they are to be located. Grading require-
ments resulting from development shall be designed to
blend into the existing or natural landscape. Any cuts or
fills shall be sculptural in form and contoured to blend
with the existing natural undisturbed terrain within the
property boundary.
2. Building siting and access thereto shall be responsive to
existing features of terrain rock outcroppings, drainage
patterns, and vegetation.
3. Removal of trees, shrubs, and other native vegetation
shall be limited to removal of those essential for develop-
ment of the site or those identified as diseased.
4. All areas disturbed during construction shall be re-
vegetated. Ifnecessary, the DRB may designate allowable
limits of construction activity and require physical bar-
riers in order to preserve significant natural features and
vegetation upon a site and adjacent sites during con-
struction.
S. All projects shall be designed so as to provide adequate
snow storage areas for snow cleared from the parking
areas and roadways within the project. .
C. Building materials and design.
1. Building materials shall be predominantly natural such
as wood siding, wood shakes, and native stone. Brick is
acceptable. Where stucco is utilized, gross textures and
surface features that appear to imitate other materials
shall be avoided. Concrete surfaces shall be treated with
texture and color if used, however exposed aggregate is
more acceptable than raw concrete. Neither aluminum
454d
(Vail 8-2-88)
_ , /
i
DESIG\ RE~'IE~b'
~ -
steel, or plastic siding, nor simulated stone or brie: shall
be permitted. Plywood sidine shall not be oermitt~~.
2. The same orsimilar building materials and colors ~::atl'he
used on main structures and any accesson• strutsnres
upon the site.
3. Exterior wall colors should be compatible «~ith the site
and surrounding buiidin~s. \aturai colors rearth tones
found ~~•ithin the Vail areal should be utiiiz~d. Pry^arv
colors or other brunt colors shoutd be usea ~nty as
accents and then soacin~iy such as upon trim ur ra;un~s.
All exterior wall matertais must be cuntinuea do«•n to
finished Rrade thereby eiiminatin~= unfinisred tounaation
~ wails. ill exposed metal tlasiiin" trim, flues. and roof too
= mechanical equipment shah oe unnuuized, paint.a or
capable of weathenna so as to b~ non-r:aiecti~ e.
4. The majority of root forms «•i[i~in 'Fail are ;able roofs
with a pitch of at !east tour feet in t~reh~e feet. rio~.~eyer,
other root forms are allo~ced. Consideration ut en~;ron-
mentaland climatic determinants such as sno~y shedding,
drainage, and solar exposure should be integral to the
roof design.
5. Roof lines should be desiened so as nut to deposit snow
on parkin.: areas, trash storage areas. stain~~ays, dcclts
and baronies, or entry~~•ays. Secondary roof;, snu« ~ lips,
and snow guards should be utilized to protect these areas
from root snow sheddine_ if necessary.
6. hoof surfacing materials shall he compatible «•ith the Site
and surrounding buildings. The predominant roof mate-
rials utilized are wood shakes and their use is strrn~~ly
encouraged. The use of metal roofs is acceptable, hm~~eyer
in no instance will metal m~l:~ «•hich reflect direct
sunli~sht ~~nto an ad}accnt property hr permitted. It metal
roofs are used they shall he surfaced with :t loin-,-loss
finish or capahlc: of «eatherinf; to a dull finish. ~1eta!
rcm(s shall ~_encrtlly hays a st:utdine seam in order to
hru~,~ide surge relict to the roof surface anti he of a heavy
~au:.~e. :~~hhalt and fihcr~~Ltss shin~~lcs .mall nrt he
' ~~•rntitted, ht~~~~cver, thrv sh;rll he ~~t sufficient ~zauLe,
drsien, and cule~r to hr rumnatihle t~ith these ~ui~i,lincs.
I.uIlrCic:nt ~~au~_c shall he ~4f(1 hds su it ut ruuhnt!
ntatcrial). 1j.~,:
s•.:..
ZO~I\G
"f. -Rooftop heating and air conditioning equipment. large
vent stacks, elevator penthouses and simiiar features
should be avoided, however, if necessary, shall be de-
signed to be compatible with the overall design of the
structure or screened from view. Rooftop antennae shall
not be permitted unless as allowed under a conditional
use review as specifed within the zoning code.
Solar collectors shall lie flat on pitched roofs, ho~ve~~~r.
when retrofitting an existing buiiaing with active sour the
collectors should be designed and placed in a manner
compatible with the o~~erall design of the building.
9. Deep eaves, overhangs, canopies, and other buiidut~~
features that provide shelter from the elements are
encouraged.
10. Fenestration should be suitable for the climate and for the
orientation of the particular building elevation in ~ti~htch
the fenestration occurs. The use of both passive and acr,~: e
solar energy systems is strongly encouraged.
11. Exterior lighting shall be designed and located in a
manner to minimize impact of li~Pubine upon li~~ing ar~:ts
within a proposed project and upon adjacent structures
and properties.
12. In no instance shalt a duplex structurz be so ~~~rtstruct:d
as to result in each half of the structure appearing
substantially similar or mirror image in design.
l3`,. Duplex and primary; secondar~~ residential d«~ellin` units
-
~liall be designed in a manner thaty.~~ns t'te two
d«~elling units and gara~~es within-tine single ~tructt:re.
\
However, in the event that the fi~esence of sign;iicant site
~ ~ characteristics necessitat~.i
sSite design which utrlud.s :t
• ~ ph}•sical separatiun gl~'thc two dweilin~~ unit: and or.
/ ~ ~_araccs into sepac~rte stru~[ures, the Ultl3 mas :tppr~~~~e
ppp'~,,,;i the design. Sut;.lr desi.fn may b~ appru~ ed onl~• ~~•hen the
~ separate styrtctures are ~~i~uall~• attached h~• mr:tns nl the
use of si~rtiiar and rumpatrhle ;zrrhitecnrral desi~_n, rolurs,
and~trrials and, or ph~~sicall~~ cculn~cted ~~uh tcnc~,,
gill;, decks ur other simiiar arrhitecni`r:tl. C~atuc~..
• IJ. I.andsrapine draina~:c; rroawn control.
I. ~•anuus natural vel;et:ttion zones ext~t ~~~ithin cite e~,~rc
V:tliry as a result of the: term and aypcrts ~~t tiir ~.u;d itxi?.
s -
.
DESIG~+ REVIE`V
~r
The north facing slopes within the valley are typically
heavily wooded with spruce. pine and aspen and generally
receive less direct sunii~Tht than the drier south facing
slopes which typically consist of sage. aspen and other
vegetation tolerant of drier conditions. The valley floor
which is adjacent to Gore Creek consists of wide variety of
trees and shrubs adapted to the reiative'ty_ fertile soi? and
natural availability of \\~ater.
The goal of any landscape plan should be to preserve
and enhance the naturai lanciscane character of the area in
--\v.hich it is to be located. The lanascape scale and overall
landscape-design 5iiali be developed so that new yegeta-
lion is integral with the naturai landscape and the
inherent form line, color and texture of the local plant
communities. Since the ma;or obiectiye of the iand-
scaping is to help reduce the scale of new structures and to
assist in the screening of structures, the piantirg of large
sized plant materials is encouraged. Special care should
be taken in selecting the types of plants to use when
desiening a landscape plan. Final selection should be
based upon the soils and climate, ease of establishment,
suitability for the specific use desired, and the level of
maintenance that can be proyidcd. \'ew planting shall use
plants that are indigenous to the Rocky Mountain alpine
and sub-alpine zones ur as capable uC being introduced
into these zones.
• A list of plant materials indigenous to the Vail area is
nn file with the department cIf comrnunity development.
also indicated on the list :Ire ornamentals which are
suitable for planting within the ~',Iif area. The minimum
sizes of landscape materials acceptable are as follows:
Requirc~cl trees.
Occiduous -two inch caliper
Conifers -six foot
Rc~c/rrirect sl?nth.r - 'i ~~allun runtainer
F~nurclatinn shrubs >hall II:IVC :I nunumun hci~,ht ~rl
ciLhtcen inches at time of plantinL.
• landscape design shall he Iicvriuprd to locate new
r,. - pl:uitini; in order to cxt::net exititin~z canui~~' edees ur
-1 ~-l ti
~:=n i .
I •
a
ZONING
planted in natural looking groups. Geometric plantings,
evenly spaced rows of trees, and other formal landscape
patterns shall be avoided.
3. Particular attention shall be given the landscape design of
off-street parking lots to reduce adverse impacts upon
living areas within the proposed development, upon
adjacent properties, and upon public spaces with regard
to noise, li~,hts, and visual impact. Parking lots of fifteen
or more spaces si~all comply with the landscape reauire-
menu found in Section 1~.~2.030(F.) of the Vail viunici-
pal Code.
~ 4. All landscaping shall be pru~: ided ith a method of
irrigation suitable to ensure the continued maintenance of f
1
planted materials. ~
5. 1~Vhenever possible natural drainage patterns upon the
site shall not be modified. `~e~_ative drainage impacts
upon adjacent sites shall not b~ allo«~d.
6. Runoff from impervious surfaces tiuc'tt as roofs and
pavement areas shall be directed to natural or improved
drainage channels or dispersed into shallow sloping
vegetated areas.
7. Slope of cut and fill banks snail be det:rmined by ~uii
characteristics fur the specific site to avoid erasion. and
promote reve,etation opportunities. but in am' case sizall
be limited to a maximum of 2:l slope.
8. Measures shall be taken to retain all eroded s~~i! material
on site during construction, control bath .:round water
and surface water runoff. and to permanently aabilire all
disturbed slopes and dr;tina`c fcanlres anon cumpktiun
of construction.
9. All plants shall be planted in a ~~oud auaiity tai~,ail mis of
a type and amount recumnnn(led by the :\merican
Landscape Contractor .\s,ucl:uu)n and the C~)1(~rado
Nurseryman's AtiSUCI1[l~~[l.
l0. ~'\Il plantin!,s must he nnil(:h.d.
! 1. Paving near a tree to br ~:ncd n)u.t ~antain :r Dian fur :t
"tree ~auit" in order to";n,urr t!l~ ahil;ty ul the nuts to
_ rcreive air.
L-. Fencing. walls.
1. The placement ai ~.v,tli.:ln~i trn~•:, •.n.lil cr•t,rrt r~i>unL
land forms and lit int(~ 1:1n(1 n);l„ut+~ r:ultcr than arhi-
rva~t ti-is-xt) .t;.lh
. y
I" R. 3l I"1RS. SYRON RCSE ~cQ'
2895 Booth Creek Crive RECD AUG - ? 1990
Vail, Cclarsda 81857
r;ugust 1 ~ 98
M „ ~ ~wr 1/wv.i Plwnw
i ICyul I1CIil I~u~a
TG`rYii of IJ 3i 1
75 S. rl cn tCgB !Gaud
`Jail, Colorado 81557
11nnr I/wY,i
bitcui 1\C114,
`t~2 ar a Y~riti ng this tG 2:;prass C,'sir.~QnC2r ~ about the proposed Caulking residence
at mat ~"r, 1 1th ~liilig to be built betYYeen the ~ramptans and I:apl3ns un vvaath Cr 28k
~ri'va. ~E'~a u nuar ~t3i u t+ia Dasiyn ~evlei~l °uDard has appr wuVed the praposad "ame
'r1~ i th ni! yCr age l~i?d a proof i cal l y noii"er;i S to nt i onda4l~pe pi 3n. ir'~e f i ilu th i 3 trui y
+~w? I ai n ~In linM? nO ~a M ? ~a~ 4an~lr= h , ~w nw 1•Mrn I h n I In •n I+Ililrl r
v361~1,~~'i~iini~. Ilf 1i1~114 4i Y~ill~i. rYe iIUYV flad ~U ~u I.Ifi uL.Igll t0 yet appra~alJ I. l! IJU11N 4~ui
hw~~ww ww Ow!~5~I~ 1"rwwl~ I'1 r~}}_ A 4h, .}h rwnwr~.. rf+ /fOf1C Qr.}~ ih r`rwnl~ r1r+}}
i ltJ {AJG UII f.iUV lil C..1 GGt~ i?1 i Ya. Ml 1111FU1J. it our pl U~IGI I.y Ul itl ~,J LaVlJ tll a GGi\ i!1 1 Ye
Cunti~inad eight very large pine trees, Y•Ee Cgr eed tv Cdd tell ii~r c. Tii1S pi3i1 'rYu3
Sublili tt2d to ti'ic ~ics i yl
i i:c''i a~r~E °u ~i3r d u'v cr u your 'ugv tC gat Elar liii sj i an to start
1~} ~i 1 d, ng ~ ~r hn~ Iww beg~l i tl IC l UI i.1.w',r4.rU~1111~' U 1 UUi^ i iUTA.aG !.1
if C~rG 'Y'r G4`(~J Ut~U Ul
ld
ulAl i 111 61,11 IIIJIAJG.
1~.1LIrIVLrd tG IIIavG t'YYo t"e ten na~Y trees f r ant the YYest side tG Cil exposed earner.
r rlAA i d n rr~ngnwi{~ in w~ iMwwr~ ~rwww l !w wi Ilw fillr~
Inl,ral.11 Li 1' , 'YY Lam. fl Sri 8 YGn1~U 'Je) IIIIJJIan Vu IIIaY4 LI Iii J4~r ~1 IibJ. T~G nu'N hsYG i 1 YG
.~.nr!} w ~ www "n rw~wn~' n° ?hw wy ~,i w i w..r r nw l.~w .~~wrw ~wrwwrl
tiNl uCsi ~IrCC;~ ~r.NI u lGt, ~1 ny li iG 'YY e3+. J 1 dG Y f e Yr C I UUi gal ayG. 'ri G Yy GIG 1 Ui ,.GU to
span d th~,~IsandJ of do]lars for trees that 'rra can't even see. Indeed, the trees are
so thi cl; thst onl y ani rnal s cannnnrppal on that s i d2 of o1,ur ~h+ous~e. Concur i ant ''r~~ i th
f.hat d~cii3141i by tii~G 3t~f 1, the UI~LOi d2cidGU to p4~~73 the Caulkln3 hou3e'rYith nII
garage and "natural" landscaping. ya'~~r can these decisions possibly be reconciled?
tiE{~ bGl IGYe t"at a "i atilr al" IOGi: is nothing iiiGre t~ian 3n er~cuse t0 12t the Nrcperty
ga to SEed. In addition, we can not believe that the Town can require us to impend
msny thoussnds to landscspe our hawse and then sllo~r a duplex dol~rn the street
with outdoor parlci ng. A dupl e;; without garages i s an invitation to turn Booth
Creek Crive into an e~stended parking lot. ate urge you to require this house to have
adEquatElndaor par'1<inr~ and sn appropriate landscaNing plsn .
Sincerely,
~
~yrcn ~ Sally Rase
`f~Q1
fCQ° G~2~'c
RECD q~~ _ ~ i990
July 26, 1990
Dear Neighbor:
There is presently a house about to go under construction between the
Kaplans' and the Framptons' that we believe is totally inappropriate for the .
neighborhood. Everyone in the neighborhood has spent significant dollars
upgrading their homes, both on,~he interior and exterior, and we do not want to
see this house built. We have attached a copy of the letter that both of us have
sent to the town expressing our strong concerns. The Design Review Board has
approved the house, but we have appealed the decision to the Town Council. Also
attached is a picture of a house on Mill Creek Circte that is similar to what the
builder is considering.
If you agree that this is an inappropriate desi n, there"are two things you can ' ~
do: ,/~!Gt-emu ; ~ ~~e
a~ ~ . a ' - ' ~ •3cSa .E~~<
~ ~
1. Please write to Kent Rose in care of the Town of Vail expressing your
strong concern as a resident of Booth Creek. Kent's address is as
follows: Mayor Kent Rose
Town of Vail
75 S. Frontage Road
Vail, Colorado 81657
2. The Town Council is scheduled to hear the appeal on Tuesday Night,
August 7, 1990. We would urge you to attend the Town Council
Meeting to express your concern.
If you have any questions or ideas, please feel free to contact either of us.
Thank you far your support. _
Sincerer,
~ ~
. %
G~~ ~~jl
arty F ampton
Werner Kaplan
enclosures
/mkl
cc: Mayor Kent Rose
v
ORDINANCE NO. 25
Series of 1990
AN ORDINANCE AMENDING SPECIAL DEVELOPMENT DISTRICT NO. 23,
THE VAIL NATIONAL BANK BUILDING, AND SETTING
FORTH THE DETAILS IN REGARD THERETO.
WHEREAS, Chapter 18.40 of the Vail Municipal Code authorizes
Special Development Districts within the Town in order to
encourage flexibility in the development of land; and
WHEREAS, an application has been made to amend Special
Development District No. 23, commonly referred to as The Vail
National Bank Building; and
WHEREAS, in accordance with section 18.66.140 the Planning
and Environmental Commission held a public hearing on the
proposed amendments and has submitted a recommendation to approve
said amendments to the Town Council; and
WHEREAS, the Town Council finds that the Vail National
Banks request to provide limited (6 spaces) off-site parking in
the adjacent Vail valley Medical Centers parking structure is a
unique and practical solutian, which is consistent with the
public interest; and
WHEREAS, this solution is a direct result of the
comprehensive master planning process for the following, adjacent
properties:
-Vail National Bank Building property
-Vail Valley Medical Center property
-Doubletree Hotel property
Through a joint effort to master plan access, parking, and other
site development, a consolidated parking structure and vehicular
access off of South Frontage Road has been created, thereby
reducing vehicular traffic on West Meadow Drive.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE
TOWN OF VAIL, COLORADO, THAT:
Section 1.
The Town Council finds that the procedures for a zoning amendment
as set forth in Chapter 18.66 of the Municipal Code of the Town
of Vail have been fully satisfied, and all other requirements of
the Municipal Code of the Town relating to zoning amendments have
been fully satisfied.
Section 2.
The Town Council finds that the procedures set forth for
amendments to Special Development Districts in Chapter 18.40 of
the Municipal Code of the Town of Vail have been fully satisfied.
Section 3.
Section 4 of Ordinance No. 9, Series of 1989 is hereby amended
with the addition of subparagraph 3 to read as follows:
The development plan is comprised of those plans submitted
by Sidney Schultz-Architect AIA, and consists of the
following documents:
3. Architectural Plans designated as Sheets Al ind A2,
dated December 26, 1989.
Section 4.
Section 5, Paragraph E. of Ordinance No. 9, Series of 1989 is
hereby amended to read as follows:
E. Parking
Parking demands of this development shall be met in
accordance with the off-street parking requirements for
specified uses as stated in Section 18.52 of the Vail
Municipal Code. Six parking spaces required by this
development shall be provided in the: adjacent Vail
Valley Medical Center parking structure.
Shall any additional parking be required for future
expansions or redevelopment, said pa,rkinq shall be
provided on-site at the Vail National Bank building
property.
Section 5.
Section 6 of Ordinance No. 9, Series of 1989 i.s hereby amended by
the addition of subparagraphs 5-6 to read as follows:
5. The Vail National Bank Building shall not occupy the
expanded premises as shown on architectural plans A-1
and A-2 unless Vail Valley Medical Center has received
a Temporary Certificate of Occupanc~~ for the parking
structure.
6. The Vail National Bank Building agrees that if for some
unforseen reason the Vail Valley Medical Center's
parking structure is not completed, the newly
constructed deck enclosure shall only be allowed to be
used for common storage.
i
Section 6.
If any part, section, subsection, sentence, c]_ause or phrase of
this Ordinance is for any reason held to be invalid,.sich
decision shall not affect the validity of the remaining portions
of this Ordinance; and the Town Council hereb]i declares it would
have passed this Ordinance, and each part, section, subsection,
sentence, clause or phrase thereof, regardles:a of the fact that
any one or more parts, sections, subsections, sentences, clauses
or phrases be declared invalid.
2
I
Section 7.
The Town Council hereby finds, determines and declares that this
Ordinance is necessary and proper for the health, safety and
welfare of the Town of Vail and inhabitants thereof.
Section 8.
The repeal or the repeal and reenactment of any provisions of the
Vail Municipal Code as provided in this Ordinance shall not
affect any right which has accrued, any duty imposed, any
violation that occurred prior to the effective date hereof, any
prosecution commenced, nor any other action or proceeding as
commenced under or by virtue of the provision repealed or
repealed and reenacted. The repeal of any provision hereby shall
not revive any provision or any ordinance previously repealed or
superseded unless expressly stated herein.
Section 9.
All bylaws, orders, resolutions and ordinances, or parts thereof,,
inconsistent herewith are hereby repealed to the extent only of
such inconsistency. This repealer shall not be construed to
revise any bylaw, order, resolution or ordinance, or part
thereof, heretofore repealed.
INTRODUCED, READ AND PASSED ON FIRST READING THIS 3rd day Of
July , 1990, and a public hearing shall be held on this
Ordinance on the 3rd day of July , 1990 at 7:30 p.m.
in the Council Chambers of the Vail Municipal Building, Vail,
Colorado.
Ordered published in full this 3rd day of July , 1990.
Kent R. Rose, Mayor
ATTEST:
Pamela A. Brandmeyer, Town Clerk
INTRODUCED, READ AND APPROVED ON SECOND READING AND ORDERED
PUBLISHED this day of , 1990.
Kent R. Rose, Mayor
ATTEST:
Pamela A. Brandmeyer, Town Clerk
3
~~ti
town of nail
75 south frontage road
vail, Colorado 81657
(303) 479-2105
office of town manager
MEMORANDUM
TO: Kristan Pritz, Director
Community Development Dep ent
FROM: Ron Phillips, Town Manage
DATE: August 7, 1990
SUBJECT: The Byrne Residence, Lot 6, Block 7, Vail Village 1st Filing
The Town Council has asked me to appeal the staff approval of the Byrne
residence noted above to the Design Review Board. The Council's concern
is that the additional rock walls add to the bulk and mass of the
residence to result in an impact that is neither compatible with the
neighborhood nor sensitive to the site.
RUP/bsc
cc: Vail Town Council
7Ga.~ L~iv~c~ebca~
MR. AND MRS. ROY JOHN~~1viQ
2925 A BOO'T'H CREEK DRIVE
VAIL, COLORADO 81657
nu;~AUG-fi1990
August 6, 1990
The Honorable Kent Rose
Mayor of the Town of Vail
The Town of Vail
75 South Frontage Road
. Vail, Colorado 81657
Dear Mayor Rose:
My wife and I are strongly ~~.~sed to the design of the new residence-proposed
for Lot 4, 11th Filing in the Town of Vail. We feel that the design of the
home does not fit in to the theme of our neighborhood and that the above home
would dramatically decrease the value of our home and property, as well as, our
neighbors properties.
Ve truly yours,
Mr. and Mrs. Johnston
ALLAN D . VANDEFORD REC'~ AUG - 6190
2905 Booth Creek Drive
Vail, Colorado 81657
303-476-0820
6 August, 1990
Mayor Kent Rose & Town Council
Town of Vail '
75 S. Frontage Road
Vail, Colorado 81657
Dear Kent:
As you are aware, I am the property owner of Lot 1, Block 2 of the
Vail Eleventh Filing. This property lies in close proximity to a
proposed new dwelling on Lot 4 of this same filing. I have just
returned from a protracted visit outside the States to find that
the construction proposal has been reviewed and approved by the
Design Review Board.
Kent, I have reviewed the plan for this residence and have visited
the site of the previously constructed Caulkins' residence on Mill
Creek Circle, the design of which is to be reproduced on Booth
Creek Drive. This concept, in my opinion, would be a disruption of
the continuity in design reflected within the neighborhood and
could thereby have a considerable negative influence on the
financial stability of the area considered.
I would like to request that the Design Review Board be directed to
re-evaluate the proposal with an eye to the overall effect, both
visual and financial, that might be expected from such an
incompatible plan.
Thank you for your consideration and cooperation in this matter.
Sincerely,
lan & Ma an ord
D
~ ~ REG'D AUG - 61990
v
D
D
TOWl~i OF FRASER
'Icebox of the Nation"
Box 20 1 153 Fraser Avenue 6a~ c90
Fraser, Colorado 80442 ~6o Ope
726-5491
August 2, 1990
Town of Vail
75 S. Frontage Road West
Vail, Co. 81657
Dear Ron,
Enclosed is a resolution passed by the Board of
Trustees of the Town of Fraser concerning Federal land
exchanges.
Although the resolution is more generic than the sample
you sent us, I believe that the message that Forest Service
procedures and local government planning policies should not
be circumvented by congressional action is clear.
I hope that this will assist you in your efforts.
Sincerely yours,
Clay on G. Brown
Town Manager
y
.
~
j
.r
" RECD AUG - 61990
RESOLUTION 8-1-90
A RESOLUTION COPICEF;PIING CURREPIT PRACTICES BY TFiE FEDEP.AL
GOVERNMENT IN THE 1~CQUISITION AND TP.ADIPIG OF PUBLIC LANDS
WHEREAS, much of Gr°and County and land surrounding the
municipalities of said county are under th.e ownership and
control of the federal Government; and,
WHEREAS, the town of Fraser, and other municipalities have the
right and responsibility of regulating land use within and
adjacent to the mu~zicipal boundaries; and,
WHEREAS, Federal a~~encies are petitioned from time to time by
private iradividual;s wishing to acquire certain Federal lands
found to be desirable; and,
WHEREAS, upon occasion, individuals seeking to acquire federal
parcels have sought to bypass the administrative process by
seeking direct Congressional action; and,
WHEREAS, such federal land trades or acquisitions may be
contrary to the municipality's master land use plan; and,
WHEREAS, the Town of Fraser strongly believes in the principle
that local land use decisions are best made at the local level,
PJOW THEREFORE BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FFtASER COLORADO:
THAT, the Town calls upon Federal agencies to work with local
governments adjoining federal lands whenever said lands are
proposed for e~cche.nge or trade ; and,
THAT, the Federal government honor and respect the
municipality's adopted master land use plan for the public and
private property c~?ithin and adjoining the municipality; and,
THAT, members of t:he Congressional delegation are respectfully
requested to refr~rin from introducing private bill legislation
authorizing trades or e~tchanges of Federal property which are
contrary to the local government's land use plan; and,
THAT, the Federal government should allow and permit only those
lands trades within and adjoining municipalities specifically
endorsed and approved by the municipality.
~ UVED THIS DAY O 1990.
DULY MOVED AND AP1.R
~ ~
i ~ )~J
BY l ;11~)~.~-^-
C . B . y~Jensen , Mayor
ATT$ST:
Virg'n a Winter, Town Clerk
(Seal)
EchoRanch, Inc.
P.O. Box 1567
Avon, Colorado 81620
July 30, 1990
Town of Vail
75 South Frontage Road West
Vail, Colorado 81657
On behalf of the Board of Directors and the children
at Echo Ranch, I wish to extend our many thanks to the
Town of Vail far your continued support in the tremendous
donation of $2,000.00 for 1990.
Your gift to Echo Ranch is greatly appreciated and
will be used to meet the continuing needs of the child-
ren.
Thank you for supporting Echo Ranch, "The home for
kids who can't go home."
Sincerely,
C
Kevin Lindahl, President
for the Board of Directors
KL/mpw
A Colorado not for profit corporation. Managed by Volunteers of Amenca
i
TO: Vail Town Council
FROM: Community Development Department
DATE: August 7, 1990
RE: Town Board Compensation
Town Council asked the staff to investigate how other Town Boards
are compensated in similar communities to Vail. Attached to this
memo is a chart which lists compensation for the Mayor, Council
Members and Planning Board, and Board of Adjustment for 11 towns
and 2 counties. Given this information, the staff makes the
following recommendations.
.
PRESENT _ _ _ " PROPOSED
COUNCII.
Mayor: $500 per month ' > $1000 per month
Council: x200 per month ' $ 400 per month
PEC & DRB' BIue;Parkmg Pass; and ! Blue Parking Pass, and
, ;Tennis`Pass; and " Golf;Pass; and
Ice .Skating Pass Tennis Pass; and
Ice Skating; and
' or: : ; `.Ski Pass.*;
Golf Pass
LIQUOR BOARD Blue'Parkin `Pass' and' Tennis Pass• and
9
::::::::::::::Tennis Pass~?ard; Skatin Pass; and
9
.
tce Skating Pass. " "
Blue Parking Pass
or............ or
Golf Pass
Golf Pass
ART IN PUBLIC None _ ..::Same as
PEACES 'BOARD .liquor ,Board
• On same basis as Council passes.
Staff feels it is appropriate to increase the compensation in the
form of various passes for these boards due to the significant
amount of time and effort they give to community service.
i
C
A ON:::>>:::>::<><:::::::::::
:.::.:::.:.:::::::::.::.:...:::::::::.:..;;TOWN::::::0:::: S.:C:O ~
> CO ARI O .
U4N N 1 ~ G/BOA/:<<>~<
I
L
UNC
CO
Z~ NI G M~ ERS>~~~~.
>~~~~Iu1AY0~~`~`~~~' MEMBERS O.
VAIL: ;:><::>:>::>:>::::::$50000:. $200.00
a
V I tee
600.00.'' :`<>:><:`:<:: 400.00;:::>::>:<:>.::::..:.:. o U i
STEAM BOAT:::::>::::;>;:><>:<::;::::>:>:~:::::: $ .
Valu tee
DURANGO: ><><><~<<$30000;; $200.00
' ` r G I ass
V ~~~~I~~~~n e o
:::::::::;;:::>:::;;:<:::<::> 300.00»><::>:::::::::... o u to
B,~LCF~EN,RIDG:E~ :::>:>::::»:>::::>:::::::::::::$5000b.::..::.; $ p
n
meet
00
.0
50 0 $
CRESTED BUTTE <»><>>> <$:1:00 0.. $ ..:...9
V tee
BOULD~R..;:..:;:::.;::.:;.:: ;:.:<::;::.:<.;:.;:.;::.::;.:$1.00.00;; ::::>::»:::;::>:<:>::>:::::~:100,0 .:::>::<;:<::<>::..:.;:.<...:o. u.:...:.:.~
ASPEN: <><_~<><~$8bb~00 $550.00 1/oluntee F .
500.00.:..;:.;:;:.::.;;;;:;:.;:.;:«.:$200,00:;.;;:<.;;:.;::;.:.>:.;:..$1,00..00/ ~ ..::::::.:.:::;;g::;<.:.;:<.;:<.::.;:.;:.;:.::.
AVON;<:>:::<:;::»::::::>::»::>::;:>:<:::::::>:>:>:>;::>:::<.::::~
:.::.;:;.:;n.:: ,
::::::>:<:>:::><:::>:<:>:<:::>::>:<:::>:>:>:<:>>»:<::<:>::>:::>:: <:::>::::>::<>:::>:~:»<::~::>:<:>::`<~< 200:00/
>::«::::I~ ~ n e
.
::<:::>::>::<:>:>:»::>::>.$~0000.> $400.00 o.:u::. e... ~ .
TELLURIDE: ~ ~
`I".COLLINS::;:<::»:>::::<:>:<:>:::::>:>::<:::»:$35b00.>>::<:::»:«:>::>::<>::>>::>::$X50,00:<.:>:.;:.;:.;:.;;:;:::..:o u G:::.::. .
::>::>:;{n e
GREELEY: >~>><<:$75000 $500.00 Volu.... te
i
COUN i ir,S
COUNTYCOMMISS.LONERS~'~<<~''~~ COUNTY PLANNING BOARD
>
r
e
I me
V u
0
ASPEN: :><<;:$23;000
EAG.LE.::::>::::»::>;::><::>::>::>>::>:.>::>::>::>:~:;:::$32,000.00:;:.;:.::.;:<.;:~:.;:.;:.;;
I
I
town of nail
75 south frontage road
veil, Colorado 81657
(303) 479-2116
MEMORANDUM
TO : Vail Town Counc
FROM: Steve Barwick
DATE: August 6, 1990
RE: Proposed 1991 Capital Projects
Please find attached the proposed 1991 Capital Projects for the
Town of Vail. The projects are listed in proposed priority order
and an explanation sheet has been included for each 1991 project.
Please bring this packet to tomorrow's work session as this item
is scheduled for discussion.
SHB/ds
CAPSCHDI Revised: 8/ 5/1990 ~
1991 - 1995 CAPITAL IMPROVEMENT PROJECTS
REQUIRED PROJECTS 1991 1992 1993 1994 1995 CONDITIONS/COMMENTS
1. VTC Community Improvements 563,000
2. Willow Bridge Replacement 320,000 $280,000 in State revenue
3. Bus Replacement 241,500 241,500 241,500 Assumes 3 yr lease/purchase
4. Finish Interior of New Ski Museum 160,000
5. Pave Ford Park Parking Lot 230,000
SUBTOTAL REQUIRED PROJECTS 1,284,500 471,500 241,500 0 0
ESSENTIAL PROJECTS 1991 1992 1993 1994 1995
1. Replace Fire Dept Breathing Apparatus 34,960
2. New Town Snow Dump 210,000
3. Street Maint. & Improvements 1,464,576 1,844,400 1,629,120 1,879,500 1,647,840 Per street maintenance plan
4. Snow Dump Road/Overlay Shops Complex 200,000
5. Holy Cross Parcel Purchase 56,500 63,539 63,539 63,539 63,539 14 yr debt service
6. Berry Creek 5th Filing Debt Service 173,000 173,000 173,000 173,000 173,000 10 yr debt service
7. Bus Replacement Program 513,000 897,000 1,125,000 989,000 Bus Fleet Replacement by 1996
8. Parking Structures Maintenance 35,000 440,000 330,000 220,000 200,000 Per asset maintenance Plan
9. Town Shops Maintenance & Improvements 300,000 375,000 400,000 370,000 Per shops plan
10. Communications System Maint. & Replcmnt 20,000 20,000 15,000 15,000 15,000 Ongoing radio replacement
11. Recreation Paths Maintenance 81,000 85,000 89,000 93,000 98,000 Per paths maintenance plan
12. Miscellaneous Building Maintenance 50,000 50,000 25,000 25,000 25,000 Per RAM Committee plan
13. Municipal Complex 457,000 460,000 460,000 460,000 460,000 New Fire & Police Building
14. Space Needs Fixes ?
15. Fire Truck Replacement 250,000 375,000 Per Fire Truck Replacement Plan
16. Additional Buses 171,000 187,000 Additions to bus fleet
17. Street Lights 30,000 3(1,000 30,000 30,000 30,000 Per street light plan
18. Dobson Arena Flooring 15,000
19. Bus Shelter Improvements 40,000 40,000 40,000 40,000
20. Chapel Bridge Replacement 35,000 365,000 $320,000 in State revenue
21. Pedestrian Overpass 50,000 50,000 50,000 50,000
22. Fire Extrication Equipment 16,000
SUBTOTAL ESSENTIAL PROJECTS 2,827,036 4,524,939 4,557,659 4,761,039 4,536,379
DESIRABLE PROJECTS 1991 1992 1993 1994 1995
1. Ford Park Sidewalk Improvements 115,000
2. Replace Pulis Bridge 275,000
3. Implement Master Transportation Plan 575,000 575,000 575,000 575,000 575,000
4. Street Furniture 20,000 20,000 20,000 20,000 20,000
SUBTOTAL DESIRABLE PROJECTS 985,000 595,000 595,000 595,000 595,000
ti
CAPSCHDO Revised: 8/ 5/1990
TOWN OF VAIL
REAL ESTATE TRANSFER TAX
1991 - 1995 CAPITAL IMPROVEMENT PROJECTS
PROPOSED PROJECTS 1991 1992 1993 1994 1995 CONDITIONS/COMMENTS
1. West Vail Park Purchase Debt Service 72,086 67,436 62,784
2. Golf Maintenance Parcel 94,000 94,000
3. Landscape Improvement Pro3ect 172,000 147,000 128,000 124,000 124,000 Per Landscape Plan
4. Gore Creek Promenade 74,000
5. Ski Museum Demolition, Park Construction 27,000
6. Stevens Park Construction 151,000 145,000
7. Parks, Open Space, & Mountain Recreation
Trails Master Plan/Feasibility Study 60,000
8. Donovan Park Revegetation 7,000
9. Sidewalk Improvements 50,000 50,000 50,000 50,000 50,000
10. Dowd Junction Recreation Path 275,000
11. Village Trans Ctr to Athletic Field Path 350,000
12. Donovan Park 84,000 410,000 410,000 410,000
13. Vail Das Schone Recreation Trail 85,500
14. Ford Park Lower Bench Improvements
15. Athletic Field Restrooms 150,000
16. Buffehr Creek Park Tot Play Area 6,000
17. Mill Creek Landscaping 15,000
18. Ford Park_ Skating/Fishing Pond 84,000
TOTAL 982,086 1,028,936 815,784 584,000 668,000
* Source of funding undecided.
ULI~ARIMENT DIYISIUN
• PUBLIC MORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: VILLAGE TRANSPORTATION CENTER - LANDSCAPE AND IRRIGATION INSTALLATION
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION ANO LOCATION
VILLAGE TRANSPORTATION CENTER
FUND A AND TITLE: 10
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
SITE. LANDSCAPING b STREET 563000 563000
DEVELOPMENTS R IMPROVEMENTS
BUILDING. STRUCTURE 4 PLANT
DEVLEOPMENTS 6 IMPROVEMENTS
TOTAL - 10 563000 563000
PROJECT FUNDING
TOTAL - 10 563000 563000
FUTURE OPERATING COSTS
1791 TOTAL PRIORITY
NEM PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
i
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOMN PROJECTS
COMMENTS AND JUSTIFICATION
LANDSCAPING b IRRIGATION 195000 ~~d u ~ ~c.~
RETAINING MALLS. LIGHTING. SIDEMALKS.
PLANTERS, PEDESTRIAN AREAS 293000 (PCL BID) f
15Ti DISCOUNT. PREPARATION 8 CONTINGENCY 75000
TOTAL 563000
SUBMITTED BY: T000 OPPENNEiMER DATE:
TOWN OF VAIL - PROPUSEO CAPITAL IMPROVEMENT DROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DAZE:
PRQTECT TITLE: WILLOW BRIDGE REPLACEMENT PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
REPLACE SUBSTANDARD WILLOW BRIDGE
FUND ~ ANO TITLE: 10 AND CDOH
PROJECT COSTS 1991 1992 TOTAL
PLANNING/DESIGN 20000 20000
LANG AC.GUISITION
SITE. LANOSCAPINO 6 STREET 300000 300000
DEVELOPMENTS 6 IMPROVEMENTS
BUILDING. STRUCTURE b PLANT
DEVELOPMENTS 6 IMPROVEMENTS
TOTAL 10 b CDOH 320000 320000
PROJECT FUNDING
CDOH FUNDS 280000 280000
TOWN OF VAIL CAPITAL 40000 40000
TOTAL 10 6 COON 320000 320000
FUTURE OPERATING COSTS 1991 1992 TOTAL
PRIORITY
NEW PERSONNEL NEEDED IFTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
. OPERATING SERVICES 4 SUPPLIES
CAPITAL OUTLAYS
TOTAL 10 6 CDOH
FUTURE REVENUE FROM PROJECT AMONG ALL /
TOWN PROJECTS /Qe ; ~~c
COMMENTS AND JUSTIFICATION
BRIDGE FUNDS HAVE BEEN SECURED FROM COON. DESIGN WAS BEr,UN tN 1990 ~ '
AND WILL BE FINISHED IN 1991. PROJECT INCLUDES REPLACEMENT OF
WILLOW BRIDGE 6 PEDESTRIAN BRIDGE. IMPROVEMENTS WILL ENHANCE SEPARATION
OF VEHICLES AHD PEDESTRIANS, AND POSSIBLY ADD ADDITIONAL TRUCK LOADING AREA.
SUBMIT?ED BY: GREG HALL DATE:
TOWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: BUS REPLACEMENT PROGRAM
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
REPLACE WORN OUT TRANSIT BUSES
FUNO M ANO TITLE: 10
PROJECT COSTS ~ 1991 1992 1993 1994 1995 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
SITE, LANDSCAPING 11 STREET
OEVEIOPMENTS b IMPROVEMENTS
BUILDING, STRUCTURE 6 PLANT 241500 754500 1138500 1125000 989000 4248500
DEVELOPMENTS & IMPROVEMENTS
TOTAL - 10 241500 754500 1138500 1125000 989000 4248500
PROJECT FUNDING
TOTAL - 10 241500 754500 1138500 1125000 989000 4248500
FUTURE OPERATING COSTS
1991 1992 1993 1991 1995 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES b SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS AND JUSTIFICATION ~nP v '
CONTINUE REPLACEMENT Of .3
MORN-OUT BUSES
HANDICAPPED ACCESSIBILITY LEr,ISLATION (MANDATING
WHEELCHAIR LIFTS) MAY IMPROVE COSTS BEGINNING 1992 225,000/BUS
SUBMiTTE0 8Y: STAN BERRYMAN DATE-
~ ~
TOMN OF VAIL
Bus Replacement Schedule
ITEM 1991 1992 1993 1994 1995
REPLACE 4 1979 BUSES 241500 241500 241500
REPLACE 3 - 1979 BUSES 513000
REPLACE S - 1981 BUSES 897000
REPLACE 5 1981 BUSES 938000
REPLACE 1 1982 BUS 187000
REPLACE S - 191 BUSES 989000
TOTAL BUS COSTS 241500 754500 1138500 1125000 989000
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPARTMENI'~ ~DI VISION I
Administrative Services
ROJECT TITLE: ROJECC STARTING DATE:
Finish Interior of New Ski Museum ~R07ECI'COMPLETIONDATE:
ROJECTDESCRIPTIONANDLOCATION I The Town has agreed to do the basic finish work on
the 4,000 sq. ft. of space to be leased to the Colorado Ski Museum.
UND N AND TITLE:
KVJLI.I I.VJ 1 J 1991 1992 1993 1994 1995 P(>ST t 995 1 U 1 AL
LANNING/DESIGN
ACQUISITION
ITE, LANDSCAPING &
TREET DEVELOPMENT
MPROVEMENTS
Construction
t'.ncra $160.000
OTAL
X160.000
ROJECT FUNDING
OTAL
UTURE OPERATING 1993 1994 ~ ~ 1995 1 U 1 AL PRIORI"I'Y
OSTS RATING AMONG
DEPARTMENT
W PERSONNEL PR0IECTS ONLY
DED (FI'E)
PERSONNEL COSTS
PERATING SERVICES
SUPPLIES
APITAL OUTLAYS I I
I
I ~ I I I
~ I I 1...
AMUNC, ALL
UTURE REVENUE TOWN PRO
^
OMMENTS AND 7USTIFICATiON~
SUBMITTED BY: DATE:
TOMN OF VAII - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC MORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: FORD PARK PARKING LOT ,
PAVING ANO IMPROVEMENTS
PROJECT COMPIEiION DATE:
PROJECT DESCRIPTION ANO LOCATION
FORMULIZE FORD PARK PARKING lOT
MILL REWIRE COON ACCESS PERMIT
FUND N AND TITLE: 10 - SPECIAL PARKING ASSESSMENT
PROJECT COSTS 1992 TOTAL
PLANNING/DESIGN 29610 29E10
LAND ACWISITION
31TE. LANOSCAPTNO b STREET 197G00 197600
DEVELOPMENTS 6 IMPROVEMENTS
TOTAL - 10 227210 227210
PROJECT FUND(NO
10TA1 - 10 227210 227210
FUTURE OPERATING COSTS
1992 TOTAL PRIORITY ,
NEM PERSONNEL NEEOEO (FTE1 RATINGS AMONG
DEPARTMENT
AlL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOMN PROJECTS ~
COMMENTS AND JUSTIFICATION POSTPONED FOR 1991
PAVING Of THE LOT MAS REWIRED AS A CONDITION OF APPROVAL @Y THE PLANNING
ANO ENVIRONMENTAL COMMISSION.
FORMILIZATION OF THE PARKTNG LOT MTLL REWIRE AN ACCESS PERMIT FROM
THE CDOH. THIS Mill REWIRE ADDITIONAL LANEAGE ON THE FRONTAGE ROAD
SUBMITTED BY: STAN BERRYMAN DATE:
'DOWN OF .~L -PROPOSED CAPITAL IMP. 'VEMENT PROJECT
. ' u~nR-I7+~1~NI~ PIVISIGN~
Fire Department
~Raurx-r lrn~: ROJECf STARTING DATE: 1 / 91
Breathing Apparatus Replacement ~ROTFrC'I'OOIvlp1E1TONDATE: 6/91
RorECr DESC.~urLTON wrm LACAnoN ~ '
See attached sheet
ND «AND TCIlE:
,.wz.., vw,o ,vv~ IYSI~! ly~K~ lyya ~srsrs ~r,~os, I IuAAL
LANNING/DESIGN
AOQL~,,,ON
LA1 v.,.t.,APIIdG ~
DEV'Vl;3~DPIrffNI
MPROVFJ,¢IdTS
oTnt' 34.960.00
ROJL•C? FUNDING
OTAL
•UTURL-OPERATING 1993 1994 ~IUTAL' PRIORITY
~ i ~ RATWG AMON
DEPARTMENT
EW PERSONNEL, PROJF.C1'S ONLY
ED (FfE)
PERSONNEL l..w, ~
PERATING SERVICES
SUPPLIES
ITAL OUIiJ1YS
OTAL
iw,u,vu rul,
UTURE REVENUE TOWN PR
~SS~-:~:..~
I
sL>BL,,.,~sY: Dick Duran n~.TF: June 29, 1990
~ \ i
BREATHING APPARATUS REPLACEMENT
Our current Self Contained Breathing Apparatus is old and
maintenance cost is on the increase, not to mention down time. We
also have units that are no longer recognized by OSHA, N. F. P.A. , or
NIOSH, which can be a liability issue.
Normally we should have two spare cylinders for each S.C.B.A.
The following is our request:
16 XL 30 Survivair S.C.B.A. @$1,535.00 ea.......$24,560.00
20 Spare aluminum cylinders @ 335.00 ea.........6,700.00
1 Survivair test bench* @ 3,700.00 ea........ 3.700.00
TOTAL......$34,960.00
* This year three of us attended a repair class and passed our
certification to repair survivair equipment. This will save us
money, but a test bench in needed to insure adjustments are
correct.
TOWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
OEPARTMENI DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: NEW TOWN OF VAIL SNOW DUMP
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION ANO LOCATION
FUNO • AND TITLE: !0
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN 30000 30000
LAND ACQUISITION
SITE, LANDSCAPING ~ STREET 180000 180000
DEVELOPMENTS ~ IMPROVEMENTS
BUILDING. STRUCTURE 4 PLANT
DEVEEOPMENTS d. IMPROVEMENTS
TOTAL - 10 210000 210000
PROJECT FUNDING
TOTAL - 10 210000 210000
FUTURE OPERATING COSTS
1991 TO1AL PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES ~ SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS AND JUSTIFICATION „
PROJECT COSTS ARE ONLY ESTIMATED AT THIS TIME
SUBMITTED BY: STAN BERRYMAN DATE:
r.
TOWN OF VAIL - Pn,.~~~oED CAPITAL IMPROVEMENT PRQTECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PRQTECT STARTING DATE:
PROJECT TITLE: STREET IMPROVEMENT AND
MAINTENANCE PROGRAM
PROJECT COMPLETION DATE:
PROJECT pESCRIPTTON AND LOCATION
SEE ATTACHMENT
FUND • AND TITLE: 10
PROJECT COSTS 1991 1992 1993 1994 1995 1996 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
SITE, LANDSCAPING & STREET 1444576 1844100 1629120 1879500 1647840 1622840 10088276
DEVELOPMENTS 3 IMPROVEMENTS
BUILDING, STRUCTURE 6 PLANT
DEVEEOPMENTS 6 IMPROVEMENTS
TOTAL - !0 1464576 1844400 1629120 1879500 1647840 1622840 10088276
PROJECT FUNDING
TOTAL - 10 1464576 1844400 1629120 1879500 1647840 1622840 10088276
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 1996 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FIE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL ~
TOWN PROJECTS
COMMENTS ANO JUSTIFICATION
CONTINUES CURRENT ON-GOING PROGRAM
SUBMITTED BY: STAN BERRYMAN GATE: 3
- ti
f
!STREET IMPROV~:MENTS - 199
ROAD COST
Booth Falls Road $ 137,500
Booth Falls Court $ 87,500
Bald Mountain Road $ 375,000
Mann's Ranch Road $ 112,500
Katsos Ranch Road $ 187,500
Aspen Lane $ 56,800
Aspen Court $ 17,600
Booth Falls Drive S 104000
Subtotal $1,078,400
Test Seal (West Vail) $ 30,000
Maintenance Patching S 100,000
Engineering, Surveying, $ 181,176
Construction Management and
Testing 1991
Engineering 1992 S 75.000
Total $1,464,576
STREET IMPROVEMENTS - 1992 '
T
ESTIMATED
ROAD LENGTH COST
Vail Valley Drive 7800 $ 624,000
Eagle's Nest Circle 200 $ 16,000
Homestake Circle 400 $ 32,000
Fairway Drive 800 $ 64,000
Fairway Court 200 $ 16,000
Hornsilver Circle 550 $ 44,000
Cabin Circle 250 $ 20,000
Ptarmigan Road 1800 S 144,000
Spring Hill Lane 450 $ 36,000
Sunburst Drive 2850 $ 228,000
Mill Creek Circle 1200 S 96.000
Subtotal $1,:.20, 000
Maintenance Paving and Seal $ 225,000
Coating (West Vail)
Engineering, Surveying, Construction $ 224,400
Management and Testing 1992
Engineering 1993 S 75.000
Total $1,844,400
1 `
STREET IMPROVEMENTS - 199
ESTIMATED
jtOAD ~ENGTI~ COST
Bridge Road 550 $ 44,000
Nugget Lane 800 $ 64,000
Columbine Drive 2250 $ 180,000
Spruce Way 2250 $ 180,000
Spruce Drive 150 $ 12,000
Streamside Circle 2300 $ 184,000
Meadow Drive 4400 $ 352,000
Juniper Lane 1500 S ~Q.000
Subtotal $1,136,000
Maintenance Paving and Seal $ 225,000
Coating (Main Vail)
Engineering, Surveying, Construction $ 193,120
Management and Testing 1993
Engineering 1994 S 75.000
Total $1,629,120
~ !STREET IMPROVEMENTS - 1994
ESTIMATED
ROAD LENGTH COST
Lionsridge Loop 5300 $ 530,000
Buffehr Creek Road 6800 $ 680,000
Circle Drive 500 $ 50,000
Meadow Ridge Road 900 S 90.000,
Subtotal $1,350,000
Maintenance Paving and Seal ~ $ 225,000
Coating (Sandstone)
Engineering, Surveying, Construction $ 229,500
Management and Testing 1994
Engineering 1995 S 75.000
Total $1,879,500
STREET IMPROVEMENTS - 1995
ESTIMATED
~20AD j,ENGTH COS'~_
Meadow Lane 1000 $ 80,000
Gore Circle 1300 $ 104,000
Main Gore Drive 5100 $ 408,000
Kel-Gar Lane 550 $ 44,000
Black Gore Drive 2200 $ 176,000
Grouse Lane 550 $ 44,000
Ute Lane 250 $ 20,000
Snowshoe Lane 500 $ 40,000
Lupine Drive 2600 $ 208,000
Willow Way 350 S 28,000
Subtotal $1,152,000
Maintenance Paving and Seal $ 225,000
Coating (Intermountain)
Engineering, Surveying, Construction $ 195,840
Management and Testing 1995
Engineering 1996 S 75,000
Total $1,647,840
A
!STREET IMPROVEMENTS - 1996
ESTIMATED
#20AD ~.ENGTH COST
Greenhill Court 1450 $ 145,000
Westhaven Circle 3100 $ 310,000
Westhaven Drive 350 $ 35,000
Westhaven Lane 1000 $ 100,000
Alta Circle 200 $ 2,000
West Gore Creek Drive 2500 $ 200,000
Matterhorn Circle 3570 $ 357,000
Shasta Place 300 S 3.000
Subtotal $1,152,000
Maintenance Paving and Seal $ 225 000
.Coating (Bald Mountain) ~
Engineering, Surveying, Construction $ 195,840
Management and Testing 1996
Engineering 1997 S 50.000
Total $1,622,840
sIAEEI IW1ECi sYllllr
un 1IN ~ lln nl m m al tf5 1»/ m m trlf :111 :Nl :N2 2N3 eN
1ECONllllltl 1. ?Ul f0AE11 SIN1101E 11EY0111111 U F IT IYIE IOp1I11E NILE IlE1 LrN ltlllf 1 111011
1011 1111A E . rill ffFlr . i/il Y11EMN1 (OISIEY
1,I11,IM 11,SN,N1 1,15i,N1 p,1S1,N1 I1,1S2,N1 rl EWr
11,331,111 WI 11M,N1
(3 IIlEl)
~ IS11.111
EIGIIEEIIN I I 12SI,1N 1211,N1 1211,111 IIN,SN 1211,IN 1211,111 gN,NI l1M,N1 11N,N1 IIN,NI 11N,N1 fiN,NO 11N,N1 I1N,N1
I
I I
I
IAl11ElAltE 1131,N1 ittS,lll 122S,N1 I22S,N1 g2S,N1 I21S,111 122S,M1 l2JS,N1 1225,101 i22S,101 f22S,N1 1225,N1 122S,N1 1225,N0
?A1t11116 (1JI,N1 1. llll WAEII NNIIQN I1tEY011pi1 YU IOIF 111 IY3E 1101311NE 2N IYSE ilEl rllUiE IIC101M SAM03101E
AM/ SEAIIMi 1E31 3EIl IOY ~ IONllll WIIItE E. I/IL U01 E. 1111 lIN 1. rill YII
1. lul? rul
OrEWr 1500.11( ISN,NI 1150,N1 3351,111 3ISO,N1 f31S,N1 II15,N1 g1S,N1
1. /lll FOAE31 f1111fOME I11EIl01MI1A11 YU
NN 10YI111M
f01A1 I I 1 fl /1S 1N it NI 110 l 121 121 1 111 SN 111 I
, 13 , f , 131, ,NI ~ it Hl W/~ 11 325 NI Il 125 IN ills NI I /1S NI J lS NI 1N NI IN 1
I 3 H 3 NI N NI
. J ~ ~1 11 ,
.
TOMN OF VAiI - P.rur..~EO CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC MORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: SNOM DUMP ROAD
OVERLAY SFIOPS COMPLEX
1 PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
~ PROVIDE ADEQUATE SURFACE TO SUPPORT INCREASED HAUL
TRAFFIC REQUIRED BY NEM SNON DUMP
FUND f ANO TTTIE: 10
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN
LANG ACQUISITION
SITE. LANDSCAPING b STREET 200000 200000
DEVELOPMENTS i IMPROVEMENTS
TOTAL - 10 200000 200000
PROJECT FUNDING
TO1Al - 10 200000 200000
FUTURE OPERATING COSTS
1991 TOTAL PRIORITY
NEN PERSONNEL NEEDED (FTEI RATINGS AMONG
DEPARTMENT
Alt PERSONNEL COSTS PROTECTS ONLY
OPERATING SERVICES b SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REYENUE FROM PROJECT AMONG ALL
TONN PROJECTS
COMMENTS AND JUSTIFICATION ~
SUBMITTED BY: STAN BERRYMAN DAZE:
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPAR7'MEN"I'~ DIVISION
Administrative Services
RUJr.~.l iiTLE: ~ROJECT STARTING DATE:
Holy Cross Parcel Purchase ROJECTCOMPL.ETTONDATE:
ROJECT DESCRIPTION AND LACATION
UND q AND TIT1E:
xw r.~, t wa i a ] 991 1992 1493 1994 l 995 Pf7$T 1995 1 U 1 A L
LANNING/DESIGN
ACQUISITION
5Fi.5~(l F,~.5~4 ~~.5'14 F,4.5~q 63.539 635.390 946.046
ITE, LANDSCAPING 8c
TREET DEVELOPMENT
MPROVEMENT'S
oTAL 56,500 63,539 63,539 63,539 63,539 635,390 946,046
ROJECT FUNDING
OTAL
UTURE OPERATING 1993 1994 PRIORI7~Y
OSTS RATING AMONG
DEPART'MENT'
EW PERSONNEL PROJECT'S ONLY
ED (FTE)
PERSONNEL COSTS
PERATING SER VICES
SUPPLIES
APITAL OUTLAYS
OTAL I I
AMVIVU HLL
UTURE REVENUE TOWN PRQI
he _ /)1
GSS~~~1
OMMENTS AND JCISTIFICATION~
The current proposal for the purchase of this site is based upon a price of $565,500.
Debt payments continue for 14 years at 8.5~. Staff will attempt to get abetter
SUBMITTED BY: DATE:
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPARTMENT~ 'DIVISION I
Administrative Services
ROJECT TITLE: ~ROJECT STARTING DATE:
Berry Creek 5th Filing Debt Service ROJECTOOMPLETIONDATE:
ROJECTDESCRIPTIONANDLOCATION I This debt service schedule assumed that the Town of
Vail enters into an intergovernmental agreement which repays the entire purchase
price~~to the Town, the $173,000/year would be Vail's cost based upon an assessed
UND~"ANIl''Ci;,..c: ~a.~~.,..~.tieY:
~xvrn~, i ~w t ~ 1991 1992 1993 1994 1995 P[7ST t 995 1 U 1 AL
LAAINING/DESIGN
ACQUISITION $173,000 $173,000 $173,000 $173,000 $173,000
ITE, LANDSCAPING 8r.
TREET DEVELOPMENT
MPROVEMENTS
OTAL
ROJECT FUNDING
OTAL
UTUREOPERATING 1993 ~ 1994 1995 IUTAL PRIORITY
OSTS RATING AMONG
DEPARTM ENI'
EW PERSONNEL PROJECTS ONLY
EDED (FI'E)
PERSONNEL COSTS
PERATING SERVICES
SUPPLIES
APITAL OUTLAYS
I
I ~ I I
OTAL I
UTURE TOWN PRO]E
RnM ~)JF.CT
Ess
6
OMMENfS AND JUSTIFICATION'
SUBMITTED BY: DATE:
' ~ f ' r
TOMN Of VAII - P.+~'r„~ED CAPITAL IMPROVEMENT PRATECi
DEPARTMENT DIYISION
PUBLIC MORKS/TRANSPORTATION PROJECT STARTTNG DATE:
PROJECT TITLE: PARKING STRUCTURES
CAPITAL ASSET MAINTENANCE PROGRAM
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AHO LOCATION
3EE ATTACHMENT
FUND ! AND TITLE: 10 '
PROJECT COSTS 1491 1992 1993 1991 1995 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
SITE. LANDSCAPING b STREET
OEVEIOPMENT3 b 1MPROVEMENT3
BUIl01NG, STRUCTURE 6 PLANT
DEVELOPMENTS b IMPROVEMENTS 35000 110000 330000 220000 100000 1225000
TOTAL - !0 35000 110000 330000 220000 200000 1225000
PROJECT FUNDING
TOTAL - 10 35000 140000 330000 220000 200000 1225000
FUTURE OPERATING COSTS
L??t l?92 1993 1994 1995 TOTAL PftIOR1TY
N[M PERSONNEL NEEDED (FTEI RATINGS AMONU
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES b SUPPl1ES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS ANO JUSTIFICATION Q
CONTINUES CURRENT PROGRAM ~ SS""'*
SUBMITTED BY: STAN BERRYMAN DATE: O
~i ~ , ~
~ t
`PARKING STRUCTURES -
CAPITA~ ASSET MAINTENANCE
1991 --1996
X991,
Crack repair walls (VTRC) $ 5,000
Replace control joints (LHTRC) $ 20,000
Engineering 5 year program development S 10,000
Total $ 35,000
1992
Complete bus terminal retrofit (PCL bidj $ 235,000
Computerize parking equipment (LHTRC) $ 100,000
Remodel 4th level terminal building (VTRC) $ 50,000
Install generator (LHTRC) $ 15,000
Seal, joint repair and deck maintenance S 40,000
(VTRC lower levels)
Total $ 440,000
1993
Seal decks (LHTRC - 5 year) $ 100,000
HSP joints (top deck - LHTRC) $ 150,000
Seal, joint and control cracks (VTRC - $ 40,000
old 2nd level)
Computerize West Day Lot S 40.000
Total $ 330,000
1994
VTRC Engineering Study Condition $ 20,000
Joint ~ crack control (LHTRC - 2nd north) $ 40,000
Light replacement (LHTRCj $ 100,000
VTRC lower level final phase (1st concrete) $ 40,000
Trash compactor (LHTRCj S 20.000
Total $ 220,000
1995
Implement 1994 Condition Study of $ 100,000
VTRC repairs (most likely top deck
seal and joints)
Joint and crack control (LHTRC - 2nd south) $ 40,000
LHTRC concrete replacement S 60.000
(1st north & south)
Total $ 200,000
.~r+ 1
TOWN OF PAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING GATE:
PROJECT TITLE: TOWN SHOPS AND BUS BARN
CAPITAL ASSET MAINTENANCE PROGRAM
PROJECT COMPLETION GATE:
PROJECT DESCRIPTION ANO LOCATION
SEE ATTACHMENT
FUND 1i AND TITLE: 10
PROJECT COSTS 1991 1992 1993 199? 1995 TOTAL
PLANNING/DESIGN
LANG ACCUISITION
SITE, LANDSCAPING 6 STREET
DEVELOPMENTS 3 IMPROVEMENTS
BUILDING. STRUCTURE 6 PLANT
DEVELOPMENTS K IMPROVEMENTS 0 300000 375000 400000 370000 1445000
TOTAL - 10 0 300000 375000 400000 370000 1445000
PRWECT FUNDING
TOTAL - 10 0 300000 375000 400000 370000 1445000
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FIE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS AND JUSTIFICATION 4 "
CONTINUES CURRENT FIVE-YEAR IMPROVEMENT PROGRAM ~ S S (~i
SUBMITTED BY: STAN BERRYMAN DATE:
TOWN SHOPS
CAPITAL ASSET MAINTENANCE PROGRAM
1991 - 1995
Old Town Shops Replacement $1,350,000
Butler Building Storage
(When shops go to UEVWSD)
1992
Enlarge Administration Building S 300.000
(1000 sq. ft. - storage., file room,
copy room)
(2000 sq. ft. - bus driver's lockers,
showers, storage and offices)
Total $ 300,000
1993
Install fire sprinkling system (shops) $ 95,000
Construct two additional operating $ 250,000
bays (1250 sq. ft. each)
Install retaining wall - shops tunnel S 30.000
Total $ 375,000
1994
Retrofit building exteriors, plumbing S 400.000
HVAC and electrical
Total $ 400,000
1995
Construct two additional operating $ 250,000
bays (1250 sq. ft. each)
Construct bus barn bay extensions S 120,000
to accommodate 35' buses
Total $ 370,000
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPARTMEN7~ r.~c v,.,,.V~N~
Police
ROJEC'I' TITLE: ROJECf STARTING DATE: 1 / 1 / 91
Communi cat ions ~RQTEC'I' OOMPLETION DATE: 12 / 31 / 91
ROJECI DESCRIPTION AND LOCATION
These are on-going costs associated with replacement of portable and mobile
radios, payers, and other town-wide communications needs.
urro a AND TITLE ~
• nw c~, i wa i a 1991 1992 1993 1994 1995 POCT 1995 1 V 1 AL
LANNING/DESIGN
ACQUISITION
ITE, LANDSCAPING do
TREEI' DEVETAPMENf
MPROVEMEN•IS
Communications
Eqpt. Program 20,000 20,000 15,000 15,000 15,000 85,000
ornL ~ 20,000 20,000 15,000 15,000 15,000 85,000
ROJECT FUNDING
OTAL
• UTURE OPERATING 1991 199E 1993 1994 1995 1 U 1 AL pRI V~ i
OS•IS RATING AMON
DEPARTMENT
EW PERSONNEL PROJECT'S ONLY
EDED (FI'E)
LL PERSONNEL wa i ~
PERATING S1~tVICIs
• SUPPLJIs
PITAL OUTIAYS
1 I
OTAL I I ~ I I
Anlunv wu.,
UTURE REVENUE TOWN PR
f:T v
EssG.a~-,~-1 ~ •
OMMENTS AND JUSTiF[CATION'
The 1991 and 1992 requests for $20,000 are due to the 1990 request of $15,000 being
deleted. The 1993 and beyond requests are standard on-going requests.
t
SUBM111cuBY: ~ ~ ~ DATE e.,~,..+ ~ loon
TOMN OF VAIL - , ~a~ED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC MORKS/TRANSPORTATION PROJECT 9TARTINO DATE:
PRQTECT TITLE: RECREATIONAL PATHS
MAINTENANCE PROGRAM
PRQTECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
SEE ATTACHMENT
FUND S AND TITLE: 10
PROJECT COSTS 1991 1992 1993 1994 1995 TOTAL
PLANNING/DESIGH-
lANO ACQUISITION
S1iE, LANDSCAPING 8 STREET 81000 85000 89000 93000 98000 446000
DEVELOPMENTS b IMPROVEMENTS
8UILOING. STRUCTURE 6 PLANT
DEVELOPMENTS 6 IMPROVEMENTS
i01AL - 10 81000 85000 89000 93000 98000 146000
PROJECT FUNDING
TOTAL - !0 81000 85000 89000 93000 98000 446000
FUTURE OPERATING COSTS
1991 1992 1993 1991 1995 TOTAL PRIORITY
NEM PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOMN PROJECTS
COMMENTS ANO JUSTIFICATION
J i.
CONTINUES CURRENT FIVE-YEAR IMPROVEMENT PROGRAM ,rS S
SUBMITTED BY: STAN BERRYMAN GATE:
.
~t ,
1991 - 1995
BIKE PATH MAINTENANCE PLAN
~TEP+~ ~99~ ~99~ X993, ~99~} X995
PATCHING 22,300 26,300 30,300 34,300 39,300
OVERLAY 15, 000 15, 000 15, 000 15, 000 15,000
SIGNAGE 5,000 5,000 5,000 5,000 5,000
ROCK REMOVAL 4,000 4,000 4,000 4,000 4,000
VEGETATION CONTROL 6,700 6,700 6,700 6,700 6,700
BRIDGE MAINTENANCE 2,000 2,000 2,000 2,000 2,000
CRACK SEALING 2,200 2,200 2,200 2,200 2,200
DRAINAGE IMPROVE. 4,000 4,000 4,000 4,000 4,000
SWEEPING 5,500 5,500 5,500 5,500 5,500
FILL AREAS 3, 000 3, 000 3, 000 3, 000 3,000
BARRICADES 1,900 1,900 1,900 1,900 1,900
REFLECTORS 1,400 1,400 1,400 1,400 1,400
ROCKFALL 1,000 1,000 1,000 1,000 1,000
STRUCTURAL IMPROVE. 7.000 7.000 x.000 x.000 7.000
TOTAL/YEAR 81, 000 85, 000 89, 000 93, 000 98,000
TOWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: TOWN FACILITIES
CAP1iAl ASSET MAINTENANCE pR00RAM LRAM)
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
FUND N ANO TITLE: 10
PROJECT COSTS 1991 1992 1993 1994 1995 TOTAL _
PLANNING/DESIGN
LAND ACQUISITION
SITE, LANDSCAPING d STREET
DEVELOPMENTS 6 IMPROVEMENTS
BUILDING. STRUCTURE R PLANT
DEVELOPMENTS 6 IMPROVEMENTS 50000 50000 25000 25000 25000 175000
TOTAL - 10 50000 50000 25000 25000 25000 175000
PROJECT FUNDING
TOTAL - 10 50000 50000 25000 25000 25000 175000
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES b SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALl
TOWN PROJECTS
COMMENTS AND JUSTIFICATION
~iL
PROJECTS TO BE DESIGNATED C SS-~-~'a..~ II
SUBMITTED BY BERRYMAN/ROSE DATE:
Z
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPAR'fMEN71 ~IVLSION~
Police
ROIECT TITLE: ROJECT STARTING DATE: L I 1 ~ 91
Municipal Complex Redevelopment ROJECTOOMPLETIONDATE 1996
ROJEC?Di:'SCRIPTiONANDLACATION ( This proposal is for a new police and fire building on the
current site of the old post office. The 1991 budget is for final design and
engineering costs. If a West Vail fire station is recommended and approved, a portion
of these funds could be used for that purpose.
•nwn~,i w~ia 1991 1Y91 1~J3 1994 lY9S PO,F!' 1995 IUTAL
LANMNG/DESIGN 457 , 000
ACOULSTTION
TTE, LANDSCAPING do
TREETDEVELAPMENT 460,000 460,000 460,000 460,000
MPROVEMENTS
ornL 457,000 460,000 460,000 460,000 460,000
ROJECT FUNDING
OTAL
•UTUREOPERATING lY`J1 1`lYL 1993 1994 1 1'J'l~ 1V1AL PRlvn„f
OSTS RATING AMOK
DEPARTMENT
EW PERSONNEL PROJECTS ONLY
ED (FTE)
PERSONNEL ~.va ~ ~
PERATING SERVICES
SUPPLIES
TEAL OUTLAYS
OTAL
AMVIVU ALL
~~g ~ TOWN PR
OM P~T ESSs~~''.-~ ~
OMMEN'~,AND.iUSTiFIC ON
~ -
SUBMITT'EDBY: '1"'~ DATE August 6. 1990
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPAR'IMENII ~IVLSION,
Police
nwu. i i i TIE: RQTECf STARTING DATE: 6-1- 9 0
Municipal Complex Redevelopment ~ROJEC.TOOMPLETIONDATE: 1993
ROIECT DESCRIPTION AND LACATION
Provide temporary housing for police department and other town offices
as needed.
UND u AND TITLE:
•xwt~ i i ~ 1991 1992 1993 1994 1995 P()~995 l U l AL
LANNlNG/DESIGN
ACOUISTTION
TTE, LANDSCAPING Qt
TREET DEVELAPMENT 4, 000 4 , 000
MPROVEMEN'!S
ornL 4,000 4,000
RO.IECT FUNDING
OTAL
•UTUREOPERATING lY`J1 lvvt 1993 199d 19v~ iu~tw PRIORITY
OSTS RATING AMON
DEPARTMENT
EW PERSONNEL PRO.IF.CI'S ONLY
ED (FIE)
PERSOxNELt..,a,a 2,100 4,200 4,200 10,500
PERATING SERVICES
• SUPPLIES 600 1, 200 1, 200 ~ . 00~
ITALOUTLAYS 11,600 7,200 7,200 26,000
oTAL 14,300 12,600 12,600 ~ 39,500
Anavrv~ Au.
U•I•I~E ~ TOWN PR
nM RO.TEC'~' ~r
OMMENTS AND 7U5TIFICATIOIV~
The 1991 costs assume a six month use that includes one time set-up cost,
one time furnishing cost, and one time site improvement costs.
~ f r
SUBMI , , cu BY: ~ , ~ _ / ~ DATE S ~ ~~14 U
~V
TOMN Of VAII - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC MORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: STREET LIGHT
IMPROVEMENT PROGRAM
PROJECT COMPLETION GATE:
PRQTECT DESCRIPTION AND LOCATION
SEE ATTACHMENT
FUND • AND TITLE: 10
PROJECT COSTS ~ 1991 1992 1993 199+ 1995 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
SITE. LANDSCAPING b STREET 30000 30000 30000 30000 30000 150000
DEVELOPMENTS 6 IMPROVEMENTS
BUILDING. STRUCTURE b PLANT
DEVELOPMENTS 6 IMPROVEMENTS
TOTAL - 10 30000 30000 30000 30000 30000 150000 ~
PROJECT FUNDING
TOTAL - 10 30000 30000 30000 30000 30000 150000
FUTURE OPERATING COSTS
1991 1992 1993 199, 1995 TOTAL PRIORITY
NEM PERSONNEL NEEDED IFTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES b SUPPLIES r)
CAPITAL OUTLAYS J
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOMN PROJECTS
COMMENTS AND JUSTIFICATION »
mss
CONTINUES CURRENT FIVE-YEAR IMPROVEMENT PROGRAM
SUBMITTED BY: STAN BERRYMAN DATE: r
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
EPARTMEN7~ ~I VISION
Administrative Services
ROJECT ? i i LC: ROJEC'T STARTING DATE:
Dobson Arena Flooring ~ROJECTOOMPLETIONDATE:
ROJECTDESCRIPTIONANDLOCATION ~ per Vail Town Council agreement with the VNIlZD, the
Town will pay $15,000 in 1990 and 1991 for replacement of flooring material
to cover the ice surface.
UND N AND TITLE:
ttv.~tA- ~ w~ ~ a 1991 1992 1993 1994 1995 P(1~ST 1995 l U l AL
LANNING/DESIGN
AOQUISI770N
ITE, LANDSCAPING do
TREET DEVELOPMENT
MPROVEMENTS
Flooring
Surface $15,000
oTAL $15,000
ROJECT FUNDING
OTAL
UTUREOPERATING IY`J1 19y1 1993 1994 1995 IUTAL PRIORITY
OSTS RATING AMONG
DEPARTMENT
W pERSONNEI. PROJECTS ONLY
ED (Fl'E)
PERSONNEL wa i ~
PERATING SERVICES
SUPPLIES
APITAL OUTLAYS
OTAL
AMVIVI~ ALL
~E REVENL>E TOWN PROD
EsS~. f.~
/g
OMMENTS AND JUSTTFICATIONI
SUBMi i ~ nu BY: DATE:
TOWN OF VAII - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT PUBLIC WORKS/TRANSPORTATION DIVISION
PROJECT TITLE: BUS SHELTER REPLACEMENT PROJEt'T STARTING DATE:
AND IMPROVEMENT PROGRAM
PROJECT COMPLETION DATE:
PRQTECT DESCRIPTION AND LOCATION ,
REPLACE 3 EXISTING AND INSTALL 3 NEM BUS SHELTERS EACH YEAR (f10,000 EA. 1.
FUND N AND TITLE: 10
PROJECT COSTS 1991 1992 1993 1994 1995 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
SITE. LANDSCAPING d STREET
DEVELOPMENTS d IMPROVEMENTS
BUILDING, STRUCTURE d PLANT 0 40000 40000 40000 40000 160000
DEVEEOPMENTS d IMPROVEMENTS
TOTAL - 10 0 40000 40000 40000 40000 160000
PROJECT FUNDING
T01AL - 10 0 40000 40000 40000 40000 160000
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FTEI RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERV~CES d SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
i TOWN PROJECTS
COMMENTS AND JUSTIFICATION . ~
EXISTING SHELTERS WERE PURCHASED WITH A FEDERAL UMTA GRANT IN 1980. E S S
THEY ARE IN NEED OF REPLACEMENT AND WE RECEIVE NUMEROUS REQUESTS FOR
ADDITIONAL SHELTERS. REPLACEMENTS POSTPONED FOR 1991. ( 9
SUBMITTED BY: STAN BERRYMAN DATE:
TOMN OF VAIL - ..•.~r„oE0 CAPITAL IMPROVEMENT PRQ7ECT
DEPARTMENT DIVISION
PUBLIC MORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: FORD PARK SIOEMALK IMPROVEMENTS
PRQIECT COMPCETTION GATE:
PROJECT DESCRIPTION ANO LOCATION
IMPROVEMENT OF SIOEMALK FROM VTRC TO FORD PARK
ALONG FRONTAGE ROAD
FUND • ANO 1ITLE: !0 - SPECIAL PARKING ASSESSMENT - 30-RETT
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN 15000 15000
LANG ACQUISITION
S[TE. LANDSCAPING 6 STREET 100000 100000
DEVELOPMENTS 8 IMPROVEMENTS
TOTAL - 10 115000 115000
PROJECT FUNDING
TOTAL - 10 115000 115000
FUTURE OPERATING COSTS
1991 TOTAL PRIORITY
NEM PERSONNEL NEEDED (FTEI RATINGS AMONG ~
DEPARTMENT
All PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALl / ~i
TOMN PROJECTS D~S~ra~~ i
COMMENTS 6 JUSTIFICATION
AS AN ADDITIONAL PRQTECT TO THE FORD PARK FRONTAGE ROAD IMPROVEMENTS, I
A SIDEMALK FROM VTRC TO FORD PARK COULD BE PROVIDED FOR SAFETY CONCERNS.
SUBMIT7E0 BY: ~ STAN BERRYMAN DATE:
TOMN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
DUBLIC MORKS/TRANSPORTATION PROJECT 3TARTING DATE:
PROJECT TITLE: PULIS BRIDGE REPLACEMENT PROJECT COMPLETION GATE:
PROJECT DESCRIPTION AND LOCATION
REPLACE FULLS BRIDGE AT VAIL VALLEY DRIVE
FUND • AND TITLE: 10
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN 15000 15000
LAND ACQUISITION
SITE. LANDSCAPING d STREET 260000 260000
DEVELOPMENTS d IMPROVEMENTS
BUILDING. STRUCTURE d PLANT
DEVELOPMENTS d IMPROVEMENTS
TOTAL !0 275000 275000
PROJECT FUNDING 1
TOIIN OF YAIL CAPITAL 275000
CDOH FUNDS
TOTAL 10 275000
FUTURE OPERATING COSTS 1991 TOTAL
PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES d SUPPLIES
CAPITAL OUTLAYS
TOTAL - 10
FUTURE REVENUE FROM PROJECT AMONG ALL
TOMN PROJECTS //es ~
COMMENTS AND JU5TIFICATION
BRIDGE IS NOT ELIGIBLE FOR r,RANT ASSISTANCE 8UT REQUIRES
MIOENING AS A MAJOR COLLECTOR AND BUS ROUTE.
SUBMITTED 8Y: GREG HALL DATE:
TONN OF PAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC NORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: MASTER TRANSPORTATION PLAN IMPLEMENTATION PROJECTS
PROJECT DESCRIPTION AND LOCATION PROJECT COMPLETION GATE:
FUND fl AND TITLE: 10
PROJECT COSTS 1991 1992 1993 1994 1995 TOTAL
PLANNING/DESIGN 75000 75000 75000 75000 75000 375000
LAND ACQUISITION
SITE. LANDSCAPING 6 STREET 500000 500000 500000 500000 500000 2500000 1
DEVELOPMENTS b IMPROVEMENTS APPROX. APPROX. APPROX. APPROX. APPROX. APPROX.
BUILDING. STRUCTURE 6 PLANT
DEVLEOPMENTS 6 IMPROVEMENTS
TOTAL - 10 575000 575000 575000 575000 575000 2875000
PRQ7ECT FUNDING
TOTAL - 10 575000 575000 575000 575000 575000 2875000
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 TOTAL PRIORITY
NEN PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES '
CAPITAL OUTLAYS
TOTAL -10
FUTURE REVENUE FROM PROJECT AMONG ALL ~yy~~ /
TONN PROJECTS (/03 ir4b ~
COMMENTS ANO JUSTIFICATION
THE TONN'S MASTER TRANSPORTATION PLAN HILL GENERATE NUMEROUS PROJECTS TO BE IMPLEMENTED.
SOME OF THESE PROJECTS MAY INCLUDE A DELIVERY ALLEYNAY-PARK ON MILL CREEK. FRONTAGE
ROAD IMPROVEMENTS (SIOENALKS 6 MEDIANS) ANO INTERCHANGE IMPROVEMENTS. SOME OF THESE
PROJECTS MAY INVOLVE OFFSETTING FUNDING SUCH AS S.I.O.. COON OR LOCAL MATCHES FROM PRIVATE
BUSINESSES ASSOCIATED NITH PRIVATE REDEVELOPMENT. THE EXACT IMPROVEMENTS KITH ESTIMATED
COSTS NILL 8E DETERMINED AT THE CONCLUSION OF THE MASTER PLAN.
SUBMITTED BY: STAN BERRYMAN GATE:
~ . y.pe/w~M11yi11 ~ /a4
TOMN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC MORKS/TRANSPORTATION PROJECT 31ARTING GATE:
PROJECT TITLE: STREET FURNITURE IMPROVEMENTS
PROJECT COMPLETION DA7E:
PROJECT DESCRIPTION AND LOCATION
ADDITIONS AND REPLACEMENTS TO PARK BENCHES, BIKE RACKS AND BENCNES
FUND f AND TITLE: 10
PROJECT COSTS 1991 1992 1993 1994 1995 TOTAL
PLANNING/DESIGN
LAND ACCUISITION
SITE, LANDSCAPING 6 STREET 20000 20000 20000 20000 20000 100000
DEVELOPMENTS 3 l~~~n~+IEMENTS
BUILDING. STRUCTURE 6 PLANT
DEVLEOPMENTS 6 IMPROVEMENTS
TOTAL - 10 20000 20000 20000 20000 20000 100000
PROJECT FUNDING
TOTAL - 30 20000 20000 20000 20000 20000 100000
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 1OTAL PRIORITY
NEM PERSONNEL NEEDED (FTE) RATIN09 AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL -10
Y
FUTURE REVENUE FROM PROJECT AMONG ALL
TOMN PROJECTS ~'-°S'I" C
COMMENTS ANO JUSTIFICATION
ADO 6 REPLACE ANNUALLY: S BENCHES AT =1250 EA. S PICNIC BENCHES AT !1500 EA. 7 BIKE RACKS AT 1900 EA. '
SUBMITTED BY: STAN BERRYMAN DATE:
TOWN OF VAIL -PROPOSED CAPITAL IMPROVEMENT PROJECT
cr'Hn r MENT~ DIVISION
Administrative Services
ROJECT TITLE: ~ROJF.Cf STARTING DATE:
Golf Maintenance Parcel RQTECI'COMPLETTONDATE:
ROJECIDFSCRIPTIONANDL.OCATION ! Continued debt service on the purchase of the Forest Service
Parcel where the golf course maintenance facility is located. The process for purchas ng
this parcel was begun in 1990. The final price has not yet been determined.
-UND #i AND TITLE: ,
rcwc~,rw~.o 1991 1 1 199 PQST1945 IUTAL
LANNING/DISIGN
AaxnsinoN $94,000 $94,000
ITE, LANDSCAPING &
TREET DEVELAPMENT
MPROVEMF.N75
°T~- $94,000 $94,000
ROJECT FUNDING
OTAL 1 _L
IYYl 1993 1994 1 lam- PRIORI7~Y
IJ'TURE OPERATING RATING AMONG
STS DEPARTMENT
PROJECT'S ONLY
EW PERSONNEL
ru (F'I'E)
PERSONNEL wJ r,
PERATING SERVICES
SUPPLJE5
APITAL OUTIAYS
OTAL _
' ~ AMUN~ ALL
TOWN PRQI
LI'I'tJRE REVENUE
l~F T i
Z
OMMENI:SANDJUSTIFICATION, The estimated cost for this parcel is $250,000. We have
assumed a three year lease purchase of the property with annual payments of
$94,000.
SUBMITTED BY: DATE:
. .
TOWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING GATE:
PROJECT TITLE: LANDSCAPE IMPROVEMENT PROJECT IMPLEMENTATION
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
INSTALLATION OF LANDSCAPE PLANT MATERIALS. IRRIGATION. SEEDINti. GRADING AND
CONSTRUCTION OF SITE FEATURES AS SHOWN IN 1989 L.I.P. MASTER PLAN DOCUMENT
FUND f AND TITLE: 30-RETT
POST
PROJECT COSTS 1991 1992 1993 1994 1995 1995 TOTAL
PLANNING/DESIGN 15000 13000 34000 0 0 22000 84000
LAND ACQUISITION
SITE, LANDSCAPING ~ STREET 157000 130000 90000 124000 124000 206000 831000
DEVELOPMENTS IMPROVEMENTS PHASE II C1 C1 C1 C1 REMAINDER
A1.A2
SURVEY-BASE MAPS 0 4000 4000 0 0 13000 21000
TOTAL - 30 172000 147000 128000 124000 124000 241000 936000
PROJECT FUNDING
TOTAL - 30 172000 147000 128000 124000 124000 241000 936000
FUTURE OPERATING COSTS POST
1991 1992 1993 1994 1995 1995 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL OUTLAYS
TOTAL - 30
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS AND JUSTIFICATION
IMPLEMENTS 1989 LANDSCAPE IMPROVEMENT PLAN (INTERCHANGE IMPROVEMENTS PRIMARILY) T T
SUBMITTED BY: TODD OPPENHEIMER DATE:
„ a.,.:~,.M,p~1p
TONN OF VAII - PROPO''ED CAPITAL IMPROVEMENT PRO1ECi
DEPARTMENT DIVISION
PUBLIC MOKRS/TRANSPORTATION PROJECT STARTING DATE
PARKS
PROTECT TITLE: SKI MUSEUM POCKET PARK
PROTECT COMPLETION DATE
PROJECT DESCRIPTION AND IOCNTION
E. MEADOM DRIVE AND VAII ROAD
DEMOLITION OF EKISTING BUILDING AND CONSTRUCTION OF PARK
FUND N AND TITLE: 30 - RETT
PROTECT COSTS 1991 TOTAL
PLANNING/DESIGN 2000 2000
LAND ACQUISITION
SITE, LANDSCAPING 6 STREET 25000 25000
DEVELOPMENTS 6 IMPROVEMENTS
TOTAL - 30 RETT 27000 27000
PROTECT FUNDING
TOTAL - 30 RETT 27000 27000
FUTURE OPERATING COSTS
PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROTECTS ONLY
i
OPERATING SERVICES
CAPITAL OUTLAYS
TOTAL - 30 RETT
FUTURE REVENUE FROM PROJECT AMONG ALL S
TOMN PROJECTS ~ ~
COMMENTS R JUSTIFICATION
PROJECT INCLUDES DEMO OF EXISTING BUILDING, REGRADING, INSTALLATION OF IRRIr,ATtON
SYSTEM, SOO AND FIANT MATERIALS; RESTROOMS, SITE FURNISHINGS AND STREET IMPROVEMENTS ~
NOT INCLUDED.
SUBMITTED 8Y: TODD ODPENNEIMER GATE:
TOWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: GORE CREEK PROMENADE
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
SEE ATTACHMENT
FUND !f AND TITLE: 30-RETT
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN 4000 4000
LAND ACQUISITION
SITE. LANDSCAPING d, STREET 70000 70000
DEVELOPMENTS I4 IMPROVEMENTS
BUILDING, STRUCTURE & PLANT
DEVEEOPMENTS 6 IMPROVEMENTS
TOTAL - 30 74000 74000
PROJECT FUNDING
TOTAL - 30 74000 74000
FUTURE OPERATING COSTS
1991 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FIE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES S SUPPLIES
CAPITAL OUTLAYS
TOTAL - 30
FUTURE REVENUE FROM PROJECT AMONG ALL ~ E / /
TOWN PROJECTS
COMMENTS AND JUSTIFICATION
INCLUDES GRADING, NEW IRRIGATION, LANDSCAPING. LIGHTS, COMPLETE DRAINAGE IMPROVEMENTS
WITH. BRICK PAYER REPAIR
SUBMITTED BY: TODD OPPENHEIMER DATE:
_ GORE CREEK PROMENADE
1991
Planning/Design $ 4,000
Grading $ 12,000
Irrigated Turf $ 17,500
Trees $ 5,000
Park Lights $ 13,500
Drainage $ 6,000
Brick Repair $ 10,000
Contingency S 6.000
Total $ 74,000
TOWN OF PAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: STEVEN'S PARK IMPROVEMENTS
PROJECT COMPLETION GATE:
PROJECT DESCRIPTION AND LOCATION
WEST VAIL - KINNICKINNICK AND SWTH FRONTAGE ROAD - NEIGHBORHOOD PARK DEVELOPMENT PROJECT
SEE ATTACHMENT
FUND 7! AND TITLE: 30-RETT
PROJECT COSTS 1991 1992 TOTAL
PLANNING/DESIGN 26000 10000 36000
LAND ACQUISITION
SITE, LANDSCAPING b STREET 125000 135000 260000
DEVELOPMENTS 6 IMPROVEMENTS
BUILDING. STRUCTURE ~ PLANT
DEVLEOPMENTS i IMPROVEMENTS
TOTAL - 30 151000 145000 296000
PROJECT FUNDING
TOTAL - 30 151000 145000 296000
FUTURE OPERATING COSTS
1991 1992 TOTAL PRIORITY
NEW PERSONNEL NEEDED (,FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES 6 SUPPLIES
CAPITAL WTLAYS
TOTAL - 30 '
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS AND JUSTIFICATION
INCLUDES ALL IMPROVEMENTS REQUESTED BY NEIGHBORHOOD ~ E T T
CONSISTENT WITH OTHER TOWN PARK IMPROVEMENTS
2:
SUBMITTED BY:~ TODD OPPENHEIMER DATE: •
• F
T
V '
P ~
STEVEN~S PARK IMPROVEMENTS
X991
Planning/Design $ 26,000
Grading $ 11,000
Playground Equipment $ 40,000
Irrigated Turf $ 55,000
Contingency S ~.ooo
Total $ 151,000
X992
Footbridge $ 27,000
Cabin Renovation $ 20,000
Nature Trail $ 3,000
Park Lights $ 9,900
Trees $ 7,500
Volleyball Court $ 4,000
Furnishings $ 8,600
Parking $ 11,000
Construction of new restroom S 54.000
Total $ 145,000
TOWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PROJECT STARTING DATE:
PROJECT TITLE: PARKS, OPEN SPACE AND MOUNTAIN RECREATION TRAILS MASTER PLAN/FEASIBILITY STUDY
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
100K AT THE NEED AND POSSIBILITY OF PROVIDING OFF STREET TRAILS
BETWEEN THE VAIL GOLF COURSE ANO LIONSHEAD.
FUND # AND TITLE: 30-RETT
PROJECT COSTS 1991 TOTAL
PLANNING/DESIGN 60000 60000
lANO AC®UISITION
SITE, LANDSCAPING & STREET
DEVELOPMENTS & IMPROVEMENTS
BUILDING, STRUCTURE & PLANT
DEVELOPMENTS & IMPROVEMENTS
TOTAL - 30 60000 60000
PROJECT FUNDING
TOTAL - 30 60000 60000
FUTURE OPERATING COSTS 1991 TOTAL
PRIORITY
NEW PERSONNEL NEEDED (FTE) RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES & SUPPLIES
CAPITAL OUTLAYS
TOTAL - 30
FUTURE REVENUE FROM PROJECT AMONG ALL /~/C T T
TOWN PROJECTS /1
COMMENTS AND JUSTIFICATION
THIS STUDY WILL 100K AT THE NEED, JUSTIFICATION AND FEASIBILITY OF PROVIDING A SYSTEM OF OFF STREET RECREATION TRAILS TO BE PROVIDED
BETWEEN THE VAIL GOLF COURSE ANO LIONSHEAD WHICH WILL TIE THE OTHER TRAIL SYSTEMS TOGETHER. IT WILL LOOK AT THE NEEDS OF ALL
USERS AND DETERMINE THE BEST APPROACH AT MEETING THE MANY DIFFERENT NEED RE9UIREMENTS.
THE RESULTS OF THE TRANSPORATAION OUESTIONAIRE IN THE CITIZEN SURVEY STATED THIS AS BEING A VERY HIGH PRIORITY.
SUBMITTED BY: r,REG HALL DATE:
TOWN Of VAiI - Pn~~~~EO CAPITAL IMPROVEMENT PROJECT
DEPARTMENT DIVISION
PUBLIC WORKS/TRANSPORTATION PARKS
PROJECT 1ITLE: PROJECT STARTING GATE
OONOVAN PARK REVfOETATION PROJECT COMPLETION DATE
PROJECT DESCRIPTION ANO LOCATION
FUND • AND TITLE: - 30 RETT
PROJECT COSTS 1991 TOTAL
PLANNING/OESIr,N
LANG ACQUISITION
SITE, LANDSCAPING 1< STREET 7000 7000
DEVELOPMENTS b IMPROVEMENTS
TOTAL - 30 RETT 7000 7000
PROJECT FUNDING
TOTAL - 30 RETT 7000 .000
FUTURE OPERATING COSTS
PRIORITY
NEW PERSONNEL NEEDED (FTEI RATiNr;S AMONG
DEPARTMENT
ALl PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES
CAPITAL OUTLAYS
TOTAL - 30 RETT
FUTURE REVENUE FROM PROJECT AMONG ALl T
TOWN PROJECTS ~ E T
COMMENTS !4 JUSTIFICATION
PROJECT INCLUDES SCANIFICATION AND RESEEDING OF DISTURBED AREAS AT DONOVAN PARK.
SUBMITTED BY: TODD OPPENNEIMER DATE:
' •*OWN OF VAIL - PROPOSED CAPITAL IMPROVEMENT PROJECT
.i'
DEPARTMENT PUBLIC WORKS/TRANSPORTATION DIVISION y
PROJECT TITLE: SIDEWALK IMPROVEMENTS PROJECT STARTINti DATE:
PROJECT COMPLETION DATE:
PROJECT DESCRIPTION AND LOCATION
6'
CONSTRUCT APPROXIMATELY 1.000 LINEAR FEET OF SIDEWALK IN VARIOUS AREAS
WITHIN THE TOWN IN ACCORDANCE WITH THE REC TRAILS PLAN, VAIL VILLAGE
MASTER PLAN, URBAN DESIGN GUIDE PLAN AND SPECIAL COUNCIL REQUESTS.
FUND li AND TITLE: 30-RETT
PROJECT COSTS 1991 1992 1993 1994 1995 TOTAL
PLANNING/DESIGN
LAND ACQUISITION
51TE. LANDSCAPING 6 STREET 50000 50000 50000 50000 50000 250000
DEVELOPMENTS & IMPROVEMENTS
BUILDING, STRUCTURE R PLANT
DEVLEOPMENTS 6 IMPROVEMENTS
TOTAL - 30 50000 50000 50000 50000 50000 250000 i
PRQTECT FUNDING
TOTAL - 30 50000 50000 50000 50000 50000 250000
FUTURE OPERATING COSTS
1991 1992 1993 1994 1995 TOTAL PRIORITY
NEW PERSONNEL NEEDED (FTEI RATINGS AMONG
DEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
OPERATING SERVICES b SUPPLIES
CAPITAL OUTLAYS
TOTAL - 30
FUTURE REVENUE FROM PROJECT AMONG ALL
TOWN PROJECTS
COMMENTS AND JUSTIFICATION
rj' F_ T 7- 9
SUBMITTED BY: STAN BERRYMAN DATE:
TOMN OF VAiL - PROPOSED CAPITAL IMPROVEMENT PROJECT
DEPARTMENT OiVISION
PUBLIC MORKS/TRANSPORTATION PRQTECT STARTING GATE:
PROJECT TITLE: DOMO JUNCTION BIKE PATH
PROJECT COMPLETION DAZE:
PROJECT DESCRTPTION AND LOCATION
BIKE PATH FROM THE END OF THE S. FRONTAGE ROAD IN
INTERMOUNTAIN TO US. 21-6 ALONG GORE CREEK.
FUND • AND TITLE: 30-RETT POSSIBLE STATE RECREATION FUNDS
PROJECT COSTS 1991
PLANNING/DESIGN X7500
LANG ACQUISITION ? POSSIBLE
SITE, LANOSCADING d STREET 250000
DEVELOPMENTS 6 IMPROVEMENTS
BU[LDTNG, STRUCTURE 6 PLANT
DEVELOPMENTS 6 IMPROVEMENTS
TOTAL - 30 297500 '
PROJECT FUNDING
TOTAL - 30 275000
FUTURE OPERATING COSTS 1991
PRIORITY
NEM PERSONNEL NEEDED (FTE) RATINGS AMONG
OEPARTMENT
ALL PERSONNEL COSTS PROJECTS ONLY
i
OPERATING SERVICES d SUPPLIES
CAPITAL OUTLAYS
TOTAL - 30
FUTURE REVENUE FROM PROJECT AMONG ALL ~ r ~,T / O
TOMN PROJECTS C
COMMENTS ANO JUSTIFICATION
CONNECT A BIKE PATH FROM END OF SOUTH FRONTAGE ROAD TO US 21-6 THROUGH OOMD CANYOOES GRAOINO. PAVING
RETAINING STRUCTURES d MAJOR BRIDGE CROSSING. THE FIRST PHASE MOULD TRY TO GU TO GORE CREEK d T1E INTO THE INTERSTATE.
THE SECOND PHASE MOULD DEAL MITH THE CROSSING OF THE RAILROAD AND EAGLE RIVER. THE STAFF MILL APPRSTATE
OUTDOOR RECREATION FOR A GRANT AND ALSO APPROACH COON AND OTHER ENTITIES FOR POSSIBLE FUNOTN(1.
SUBMIiiED BY: GREG HALL
. ~.::~~i
• ~ t ,
l ~ JJ~~'~~
'•ti' I ' Vail's Greatest -
~ Netuspaper Since 1965
' I .
py,lip, 4 ~
~,s•"'~ 4
t
24, No. 4U Vail, Colorado -Week of August 3 - 9, 1990 Twenty-Five Cents
2 ~ ]au Traa -August 3.1990
- 1n1~ n • " •
_ .o r
.Parkin oli is a st ~~~~~•'~~~~~s~~{~~ ~ '
~:zn~~the.•~rz ht direction
We applaud the Town of Vail for its new parking policy. We expect to may take 10 or 15 minutes longer, but with the parkingryst a wee bit more
hear the policy criticized, loudly and persistently. It took a certain amount _ . ~••r=~sive at the Village Parking Structure, there is more incentive to use
of courage for town staffers to submit what is certain to be a very unpopulaz the buses. - • •
if modest increase in parking rates. Yes, the-bus shuttle gets a huge subsidy from the town -more than $2
Make no mistake, convenience of parking has been subsidized, and million per year. It won't get any better. The subsidy to the parking
heavily so. The expansion of the Village Parking Structure this year is ~ structures is currently running at about $2.2 million, but in nine more years
costing nearly $10 million. Not all of that money is going to parking, of_r.:•.the debts will be paid, and town officials say that the life expectancy of
course -there is a visitors' center, a refurbished transportation center, and . the parking garages is 30 to 40 more years. Viewed from that perspective, it
space for the Colorado Ski Museum. The parking cost, though, is calculated could be argued, that we.ahould.spend more on parking spaces and less for
at $1],500 per parking space. To allow people to park there all day for ~ -buses. ~ ' .y~.z;'' ' - _
$].33 -which is what the parking coupons allowed us to do last winter-:" ~ That could be argued, but ~ it's 'a lame argument. A~, bus shuttle is
makes absolutely no sense. Where else in Vail can you find rent so cheap? ~ -imperative in Vail.. Without an extensive bus shuttle, we would be
All manner of things in •this valley could warrant similarly: huge expanding the parking structures constantly. The four-way intersection
subsidies, making life in Vail even more fun, and stimulating the valley's ;;::would become more than a men: annoyance. Driving to Vail•V_ illage would .
economy at the same time. A convention center iomea ,to.mind ~ for $10 a' L •:..e . , :exasperating for everyone during peak seasons.
million, we could have a very good one. A performing arts center?,A gallery ~~`:".The Blue Pass r. „r.;.~ed by the town staff is still a good deal - $1.34 per
and museum?The list could goon and on. . day at L.ionsHead Mall. fiven if used ~ only every third day, that's still a
We cannot continue to fritter away our money, $10 million here and $10 •~'modest costa And it.,will still be possible to park at the Village Parking
million there, on building parking.stalls. There are better answersin mass:=},;' Structure after 3 p.m. at minimal cost. The policy merely reflects the high
transit, and we already have a very good alternative in the bus., system."e?;~demand for parking at. Vail Village during day hours::` ; ~ - .
Although heavily used in the Vail Village-LionsHead Mall loop,'outlying;*?•:.It's a'good policy, a~easonable policy, a policy that is overdue. It takes a
circuits often have oodles of vacant seats. The town's new parking•policy;,-. long sMde toward electing the mats of parking convenience. We support
should encourage people to use that already good bus system Using the bus it = AB~• _ ::~°ti ; .
~~i~`
I • Veil's Greatest _
,~i ~Y ~ Newspaper Since 1965
' I
y,~ •
~l. 24, No. 4U ,Vail, Colorado -Week of August 3 - 9, 1990 Twenty-Five Cents
' .M+..'~.. :i M'...
;~Parkirig~fees'are~'likelyao
take a BikeWW~_nezt° s.i~~y~gnter ~r
By TARA I?I.ANAGAN
If ail goes as planned by the fir' • ~ ° ".:'-s".~~.' '
Town of Vail, parking ie going'. ss,7~t:..~ ;,:-s~ira ,
to get more ,r .slue and lase ~ ~:,;-E='There is no free '
convenient for locals this wine' ' ,;~:•~r =~:~:'•v;:
ter. Out-of-townera who park` ~o.'.lUIIC~I. r~,.
their care,for more then five ,•.~:.>::r :•t= :''-Tom Steinber ~ "
hours at a stretch will feel the 7 n:; i:+a: ; ~ • g
change 'as well, and anyone. .~"r~T~••~• ~ ~ '
who buys a Gold Pass will cer•' . "
tainly notice the new prlcetag: ~ :period,' expect' to 'pay more
The Vail Town' Council on' than twice ae much as you did
Tuesday reviewed sparking- lest year. Fees Tor 18 to 24'
policy for the 1990-91' ski hours of parking will be $lb,
season, which will be ,..:.:,:..,tad whereas they were $71ast wa-
in s public hearing next:' eon. • • "
Tuesday evening. The three- Last year.it cost $b to park
- pronged proposal eliminates for six hours, $6 for seven to 12
the town s ott-abused parking hours. Next winter the price
coupon system and replaces it will be E6 for five to seven
with the eo-called Blue Pase,' hours; $7 for seven to nine; $8
which coats $200 for the aki~ for nine to 11 hours; $9 for 11
aeon. The pass moat likely ~ to 13; and $12 for 13 to 18.
be available for =70 per A Vail parking study shows
..gird season. ~ ~ ~ that out of 2,000 parked care,
Blue Paso holders will not be' 160 stayed. for more than five
able to park at the Village hours: Thirty percent of the
Parking Structure until 3 p.m:~ ; transactions were registered at
Last year, coupon users and -lees than 90 minutes. The pro-
Blue Paee "holders " Were poeal . ~ ......mends that the 90- '
allowed to use 'the Village minute period remain free, as '
Parking Shvcture". on' week: to allow locals to run errands,
days through moat of the ski and to lessen the tendency for
Beason. This year, however, the people to park illegally.
town wants to steef locale The -plan • received Iittle
away from the village strut= •resietance from the council,
tore, which :,,r,.:.:... to be the' with the exception of Rob
preferred parking spot among LsVine. Hs said LioneHead
visitors. ~ Mall business could sutler if
To help accommodate pave the village structure became
holders, Ford Park'B parking primarily a visitor lot and the
area may be converted into a L onaHead lot became mainly
lot for Blue Paso holders only. an employee and locale lot. •
People with passes would alw 'Mayor I{ent Rose, however,
have unlimited : parking'' at .celled the Blue Pass "a heck of
LioneHead. ~ ' " " " ' a deal," and challenged locale
There's more: The lesson to find a similar discount any-
Go]d Paso, which sold for $476 where ales in Vail. Rose added
" last year, will coat =760, and that' parking probably won't
will be limited to 1b0 buyers: get any cheaper as time goes
Gold Pase holders are guar:. by.
anteed parking at any time at "1'he only way it's going to
' the LioneHead and Village go from now is up," he said.
parking structures. ' ' ' ~ Councilman Tom Steinberg
And one more thing: If you mentioned the possibility of
don t have a .pass and plan on starting to charge patrons for
parting 'your 'car" at either the Bret 90 minutes of parking, "
structure for more than live but his cohorts declined to sup-'
hours, expect to pay a little port the notion. ~ ' "
more than you are aocuetomed: "There is no free lunch," he
For instance, if you leave your said. "Somebody's got to pay
ear for an entire ° 24-hour far it."" • " ~ • r • :
• .k~.•
!I~C~W
~i•, J~~~~i~a~~- ~ -ira.~~~ t W.i .i~.. i'R.1•',`JhS~I '.IF.fl~9 -
. a'~g., < et ~ yS~v.l9.: '•RCt;,t:; _t ~ ..9~ '`y-zA~~; K~?'!x.~^fi.? n%~
Serving Enyle County •
Tuesday through Sunday
' Volume X, Number 137
-
. ~ ti. e=... ice: ~ .f
K
~~~Vail.budget offic~r~de_fends
~~proposed~~•parking~Fprice~liike~
By Scott Taylor • . percent of the town's annual Structure and Ford Pazk. Ford Park -
mry s~rtwri~ ~ budget Combined with Vail's frce ' = free parking last'season -
`bus system -which costs the town would become 'blue-pass parking
Parking fees need to increase W about $2 million annually'- the' only. ~'::•1
kcep Vail's head above water, a town use`s about 20 percent of its Gold parking passes would in-
.town official said Friday. ~ annual. budget on parking and crease in price from $475 last
Vail Budget O[ficer Steve Bar- trahSportation matters, Barwick season to $750 this season. Gold-
wick said the drain on the town's ; laid. pass holders would be able park in " '
budget from Vail's parking swc= Most of that money is sales-tax any lot they chose and would be !
lures justifies increased parking revenues, Barwick said. ' ' ' guaranteed a space.
rates. 'There's only so much you can The plan also increases hotvly
Barwick said the town pays spend in the way of sales tax," parking rates in each swcture.
about $3.4 million each year to Barwick said. "Other solutions These increases will add another' '
own and operate both the Village need to be found. One is parking $150,000 in parking revenues, '
and Lionshcad parking structures revenues." Barwick said.
but receives only about S1 million The Town Council will decide ;
in revenue. Tuesday evening on a plan that 'The town's subsidy will stay at
"I think this makes a solid case would increase those revenues. about 52.4 million," Barwick said.
for the need for more parking The town would eliminate last "If we don't increase parking
revenue;' Barwick said. "People season's parking coupons. The revenues, that subsidy will have to
don't understand how expensive sown would sell blue passes - increase."
operating a parking system is. $200 for the entire season and $70 Barwick said the cost of the "
"If this were a private business, for onc•titIrd. The $70 blue passes swctures may go down as the town
parking prices would probably would replace the $40 coupons, ac- pays them o[f.
triple. Who in private business is cording to the plan. '
going to subsidize one-third of the Blue-pass holders would not be "Maybe in 10 years, that`ll drop
parking operation?" allowed in the Village Parking off," Barwick said. 'Then again,
The town pays about $2.4 mil- Swcture until 3 p.m. Instead, they the town may have more debt 10
lion annually, he said, about 10 would be directed to the Lionshead pay oCL"
Town of Vai! ready to redeem
its parking incentive coupons
By Scoll Taylor SU tickets can be exchanged fora :gold passes from $475 last season
rwysurtw~~ $50 discount and 75 tickets fora . to $750 this season. Gold-pass hot-
$100 discount. Only one, ticket per ~ tiers would be able to park in either
Vail's parking incentive ,,.,,b.~m day will be accepted by the town, parking Swcture .anytime and
will transfer to this winter's parking Thompson said. would be able to come and go es. ,
program, Vail officials said Friday. Those who collect 50 rickets will ~ many times as they wanted.
Vail Finance Controller Steve also be entered in a Nov. 6 drawing Blue passes would cost $200 for
Thompson said the Wwn will be for gill certificates from Eagle Val- the whole season or $70 for one-
rcady to accept the incentive Icy Music, Bart and,Yeti's and the third of Ule season arld would be
coupons Tuesday. - ~ Chcese Shop. Those .who collect 75 g~ in the Lionshead Swcture
The far-right ticket machine in tickets wiU have (heir names en- and Ford Park lot any lime and the
the Lionshcad Parking ~ Swcture :tend in 'a drawing dor a ;Vail As-~ ~Villagt::sn~tctttreafte{3.p.m._~.~.
kls been tamed on since July 1. sociatcs merchant ski pass. ' ~ ~
Locals can collect the tickets and The' discounts' will be-good Thompson said tite town will ice- '
rum them in W the Vail Finance toward all winter parking passes, sue S25 credit vouchers for the
Department in exchange for dis- according to Vail Public Informs- parking irtcenlive coupons. The
counts on winter parking. ` lion Officer Caroline Fisher.-g:r-~.~-;:town will also issue 530 credit
25 tickets will be good fore $25. •'A plan currcndy before the 7bWn ~?'~vouchers if a ttses a 5100
discount on winter parking passes. Council would ittctease the price, of credit to ptuchase a S70 blue pass. ' '
~~....M.....w.. . .
r• ~
;~E
i~H~~
~eA .1 •rr;M434~4^~'%. •'~a:~~ij :b:. :'r.l~',M'.Ll~~.th )Vy '
•
~ . .
.
. ~"¢.4, .Vile.. .fig a<~:...1:4. '4' P~RyQ.ii'l::t ~~,po (A+~,' _,~i:;`1er
Sensing Engle Count f,L"' 1~ _ ,
r
Tuesday through Sunday - ~
,f ~ Volume X, Number 137
i~
' ~ .7r. i
Pepe 3a -Yap Dally Saturday, August 4, tt190 '
~ n ~ o..n . ~ : .
Editors Note Beginning today, the Vail Daily will publish I
I .regular editorial opntlons.On issues impokant to readers. II
No parking
Locals aie being asked to buy the mansion, but to live in
the servants' quarters.
Vail's r..:.r;..+ed winter-parking plan will drive locals and'
workers away from the village this'ski season. The plan ezhibifs
a lack of political understanding of the community.
Locals could park in the Village Parking Structure if
they, wanted.to pop for a3750gold -parking pass, pay`newly ,
increased hourly ratesbr come to work after;3 p.m, daily. The
5200 blue passes will grant the bearer the privilege of trudging'' '
to work through the mud and slush'from Lionshead or Ford
Park.
The town begged our indulgence during Village
Structure renovation. Village businesses have taken a hit well
below the belt this summer square in the'pocketbook with'
the promise of increased parking capacity and the expectation '
that the parking chinch would be solved for at least a`couple
years. Now if seems we're being asked to be patient forget a
summer of ~ncorivenience-and file quietly into expensive slots
'out in the boonics. Plain and simple, that would be a huge
breach of the public trust.
Yes the town probably needs to increase prices. Vail's
latest,addruon fo the Village Structure-cost 510.4 million
5800.000 more than first estimated. That money has to come '
from'somewhett, and charging the user makes sense:
Parking is a scarce commodity in Vail. With the addition to the
Village Sttvcluic, the town has 2,700 spaces. Stack that
alongside an average of 10,000 skiers per day and several '
thou and outlying and down-valley employees. The problem is
obvious. .
Visitor parking is top priority. Guests tend to'ge[ cranky
if they,have to drive around trying to find a parking spot. Cranky:
guests may noCcotrie back next year. But locals also tend to Set
cranky if they have to drive around for hours frying to find a
spot; a cranky warier makes a deeper, morc'lasung impression
on a guest than the lack.tif a parking slot.
Most employees don't have the wherewithal to dmp
3200 Cora parking pass when they first pull into town. With
rent, a damage deposit and a ski pass, some may have trouble
scraping up 370 for a parking pass to get them through the first "
one-third of the §cason. , .
":The Town Council will almost surely come face to face
with a iooinful of angry`people Tuesday night when it fortnally
tevtews the parking plan. Without ignificant co~essions to the:'
pubhe.mood, we face a long, cold winter. Vail's status as the
number one ski area in America'dcpends oncustomcr service. '
Unless the town'can keep the servants happy, however, customer
servtce`wiLl goalie way of the dodo bird and the 3101ift ticket: ° '
r„fir - - .'_,r~ _ - -
~
:1~ c .:3~T $ ...iF.aJ -i~', ~ t~" ^'.~i'~.',lYSil',Ih, ~t9 3..1
-
f. r I + 'rI' t• wlt:,t;~. tat Z' n. ~ ht:: ~~5; ~FI.~ w~ 1` .
Serving Errt~?e County - . r: -j~ ~ ,
Tuesday through Sunday ,Y•"
t
Volume X, Number 137
Merchants: Parking plan~.won't cut the mustard
By Stott Taylor eliminate Bail - kin wu
ory swrw,t~ Y par g, pons.; ' Lionshcad and v111age aWCWres at • quc off at the guest." of Snug in Utc Village, said the plan
- Instead, locals would be en- any Ume. ' Friedman said he also opposes could hurt her efforts to bring in
Vail's new winter-parking plan couraged to purchase blue parkingg~ Both blue and pnld Doss holders ` the plan for the effect it could have winter employees.
will have a ripple effect on the vat- passes - goo~'ncrilhGr the entire~vould be allowed to pome ana qu on Lionshead business. Friedman "Most of the employees don't
ley economy -and probably mak ski season or one-third of the as many Gmes 85 they want, a said he and the merchants assoc:ia- want Io incur the expense of park-
employces surly, local merchant season, tsme passes wows cost. benefit last season's partung Gon are drafting a letter W the ing" Broy said. "lf they have to
said Thursday. .e~w ror the entve season or S70 coupons did not offer. ~ Town Cowcil opposing the plan. pay, they're not going to work
The Town Council is scheduled [or one-third of the season. Merchants in .the :.village and : . "If all the employees park _ here, here."
to make a final,Qecision on the plan Blue-pass holders would not be Lionshead said ~ they oppose llte . it'll drive the paying customers and Ghiqui Hoffman, manager of the
at a '1:30 p.m.:~pttblic meeting allowed W park in the Village Park- plan, ; , guests there," Friedman said. Rucksack, said guests will suffer.
Tuesday. ll ing Structure until 3 p.m. Instead, Ken Friedman, manager at Char- : ~~ar Ltd. owner Steve ' ~ "'If .the Village is so important,
Cyrano's owner Dave Dowell they would be dviceted to the lie's Gondola Ski' • Shop in ; Stockmar agreed. who's going to provide the services
said business owners will have W ~Lionshead Parking Swcture and Lionshead and president of the ~ "(.don't see why •the village is here?" she said. "Wc have a lot o[
increase employce wages to help Ford Park. Parking al Ford would Lionshead Merchants Association, ~ any better than Lionshead;' Stock- guests. Who is going to cater to
them pay for parking passes. Those no longer be free; gates and com- • said the new plan could create rear said. "I don't have a problem them?"
costs, in tum, will be passed on W puters would be installed at the grumpy employees in the Village. ;with increasing parking revenues. I Hoffman said the Eagle County
customers, he said. entrance. Free narking would be "When you're' running late; you . do have a real problem with a and Vail bus systems are not the
"A sandwich will be a IitUe mo~available~ hoy°ver• at the Vail Golf park your car acid then wait fot the number of spaces in Lionshead answer. Employees who depend on
expensive;' Dowell said. "fhe ~otuse Clubhouse and the soccer bus," Friedman said..•'"Ihe~com- being chewed up. the bus system often make it tc
business ownetS won't pay it: field on Vail Valley Drive. bination of running and~•waiting ~ "1 like the locals, but you know work late, and that ~•means angry.
"Ultimately, the guy that suffers The proposal would also increase ,makes the stress.'load oni the ,the guests are the ones that are ,customers, -
is the one who makes $6 an hour." the price for gold parking passes employee huge. We're' under 'going to spend the money." r~~.~ ^MWe' have employees as .[ar out
The plan, presented to the Vail from $475 W $750. The gold pass enough stress in ski season anyway, ' 'The plan is just es unpopular in '
Town Council on Tuesday, would would be valid at both the and i Ihink the employee could tor- the village. Laurel Broy, manager t~le~u a« Pantin~prasr raa~ s
~ BULK RATE
. U.S. POSTAGE
. ~ - PAI D
va4 co erase
Serving E6gle County P„mn ~ n
Tuesday through Sunday
Volume X, Number 139
August 5, 1990
Vail• parking •could be: as~~expen~siue~~as~~in~~.NYC -
5',C'~ rie+....
Avera a Dail Parkin Rates . i~=~ R•eVam~ped-.plan would
9 Y. 9 _
bose~d
on 8-10 hours per doy~ r• , raise hourly rates
Va I I (proposed) p
Q Q Q
Q ~ Q
0~' Q
0~ By SCOIt Taylor Would cost 512. The rates would
' o~y s~ttw~~ top out at $15 for 24 hours of park-
New York~.~~~~~.~~ ing.
O O O O 0 .O 9 _Q O O O O 0 .O O :r ' Vail's hourly parking rates would 24 hours of parking cost $7 last
be at least as expensive as season.
D e n V e r ~ ~ ~ downtown New York Cit 's and Accorain to the New York City
O O O O :O O O .O O O y g
more ratpcnsive then Downtown Visitors and Convention Bureau,
Aspen ~ ~ ~ Iknvcr and other Colorado ski parking rates average 57.50 for 10
areas, if a rate. increase gets council hottrs of parking in the downtown
Breckenridge -FREE- approval. ' ' area loll. Rates vary. depending on
Vail town officials said Friday distance from Fifth Avenue. The
Copper Mountain -FREE- ~ Uteir hourly ra
~e high because closer w Fifth Avenue the higher
of a lack o[ c land and off- 'the rates - S8 to $9 for 10 hours.
Steamboat Springs -FREE- strcctparking. 'Rates drop Canner from Fifth
Vail wotdd entirely revamp its "Avenue to a low of about $6 [or 10
• parking rate structure if the plan is .hours.
approved. Hourly rates in both . - Denver Public Works Com-
$1 X00 t', sttvettrres next ski"season would..~.munity Director Amy Lingg said
remain the same as last season, $1 ~„parking rates in downtown private
(DOes not Include parking pt:155es Oroff-street porking) , , , per 'hour for five hours, 'Parking ~ lots average about $3 to $5 per
would cost $6 for seven hours grid , daily. Municipal lots cost about $1
vii apr o!•P!~ r ~ ~~a+ S7 [or nine. Eleven hotus of park• ~pcr day, Lingg said.
ing would cost S8 and 13 hours . , t?Iwe ae P~rk(n
would cost S9. 18 bolus of parking t P's° s
Parking • ~ • . .
' From page 1 ~ :~.V,:•..: ,
An abundaitcd of on-street park- move away from on-street pazk- Crews direct cars to empty spaces
ing makes those low rates possible, ing, according to • ;Steamboat. in a variety of loLS. Louis said those
Lingg said. Springs City Manager Harvey parked a long way from dte ski area
`It's simple supply and demand," Rose. The city is designing'a park- are bussed to the slopes.
Lingg said. "We have about 2,400 ing swaure for 1992, he said. The Vail Public Works Director Stan
on strcet spaces in the central busi- ~ reson was required to build Berryman said that is one- of the
ness district and lens of thousands enough parking areas' for futtue bigger difference between Vail and
on city side streets. There is a growth when it first opened. Il built other ski areas. Skiers and locals
surplus of parking." two parking structures about eight 'can park right at the base of the
Lingg said on-street parking ran- • years ago -about 2,500 spaces, :mountain - a convenience worth
gcs from free to $1 per hour. Most .Rose said. Both were tamed over w 'paying for. ~
parking meters cost about 25 cents the town, he saidr • ~ • - "It's one of the reason's we're
per hour, but Denver has special Parking is Gee in both structures, 'successful," Berryman said. "It's an
"red-head" meters that cost SI per but donations arc accepted, Rase • improvement over outlying gravel
hour to discourage long term park- .•said. ~ ~ parking lots. People have the ail-
ing. ~ "Steamboat originate in an vantage oC being able W drive into
Abundant off-street parking also agriculwral community and oC covered, paved parking right by the
drives parking prices down in course the tanners were looking for slopes "
Aspen: Public Works D'vector Bob abroad valley," Rose said. "Most
Gish said Aspen's new parking other resorts arc in a narrow valley. Berryman also cited a lack of off
structure costs about $1 per day. As a result, we have a bt of land to street parking (or higher rates.
Aspen is trying to discourage be developed." j "VVe certainly don't have ~ an
off-street parking, however. ' - Parking is-also ~frce in Brack- 'abundance of street available for
'Parking is a ~ huge concern," enridge and al Coppei Mtxrntain. parking," Berryman said. "We also
Gish said. "It's always' a problem. Both areas have several lots a dis- ~ have'a scarcity of land for outlying
Our strocts are small and we're lance from ~Utq ski area end parking lots. It's always been com- .
trying to do away with cars on the downWwn arcs;.•'a`„ ~ pleii, '
street. We're trying to become more .Kevin Louis, bast crew' super- •i 'The fact that Ihcre is rio free
like Vail.". visor at Copper Motinmin, said the ~ parking is a~stalcment of just how
Steamboat Springs is also trying ski area optxates,all of the parking.. canplex parking has gotten here."
• ~ ~ ~ ~ BLLK RATE
' ~ • ~ ~ y U.a. P09TAQE
PAiD
Serving Engle County varc,coeiese
Tuesday through Sunday ~ P.,~„a • n
" ;_s . ' Volume X, Number 139
. August 5, 1990
Public hearing on parking set for Tuesday • '
By Scott Taylor Gold ~arlung passes would also are puuing together a vansportauon ;
• nry, swrw.rv~ be more expensive - S750 this master plan for the town. .
season compared W 5475 last Ullcvig said Tuesday that the
A contmversiat winter p9rking acason, Cold pass holders would fie plan is meant W increase the town's
plan goes before the Vail Town allowed to park in either structure parking revenues and make
Council Tuesday night for a public anytime and would be guaranteed a management of the system easier.
hearin8• parking place. Town o[flcials said Friday That the
The plan was first ,,.,,v,,.,rd W Hourly parking rafe9 would in- expense of Vait's parking structures
ttre council last Iltesday. This crease, as well. Parking this winter requires increased rates.
Tuesday's meeting begins at 7:30 would cost Sl per, hour for flue Only council member Rob Le-
p.m, in the Vail Municipal Build- hours of parking =the same as last Vine objected to the plan Tuesday.
~8• season. Parking for a more eaten- Workers would be forced to park in '
The plan would eliminate last ded period of time would L-w,......: Lionshead, he said, fuming it into
season's discount parking cwpons by about 50 tints: per hour w, a ~ employee bt.
and free ,.~.1.:..g in Ford Park. ,maximum of SIS., for, 18. to 24
Locals would be able to purchase a :hours, ' Lionshead Merchants Associa-
blue parking pass good tat the en-::: The first lyS houra~of parking in lion otflcials said they were send-
tire season for 5200 or orwthird of :
; both the • Village ` iird ; Lionshead ing a letter to the town council ob-
' ' the season for 570. Blue pass hot- : ` ~cumes would be 6ee.`: , ' jetting to tht plan for the same
dens would be able to park in tha The plan was= assembled ~ by reason. Visitors -the bulk ~ win-
Lionshead Struture and Ford Park Van's Parking and Transportation ter business -would be forced to
anytime snd the Village Parking Task Force and consultant Amie the Village Structure u Lionshead
Structure after 3 p.m.; • ~ , ~ ; F ~ ; Ullevig: UUevig_ end the task force tills with employees.
~
REC'n AUG 1 4 1990
T0: Vail Town Council Members
FROM: Abe Shapiro
I wish to express my thoughts to you relative to the present and
future zoning under "Agriculture-Open Space" and my recent "Grand-
father" request.
I've been a land developer for over 40 years in many communities in
New Jersey, Florida and Colorado, so perhaps I know a little about
the subject.
I don't believe it makes any sense to prohibit or restrict property
owners of land of less than 35 acres with this zoning, to 2, 000
S.F. GRFA if they have several acres with 1 or more acres of
buildable land. A residence built on several acres under
Agriculture Open - Space zoning, that is properly planned and
designed with its permitted and accessory uses could be a
compliment to Vail by its rural and mountain ambiance and
appearance. Does everything in Vail have to be multi-story condos
or lodges, commercial office and store buildings, parking
structures, large duplexes, etc? If you don't keep some of the
rural-mountain-ranch atmosphere in Vail, you'll defeat the purpose
of why many people come to Vail. Vail will become like the cities
people want to leave.
The present restriction of 2,000 S.F. on less than 35 acres is
absurd. If someone has for example 5 acres with at least 1 acre
buildable, why restrict them to 2,000 S.F. GRFA, which is a home
not really large enough for 2 people? What's the point? Compare
this with your other codes? Control the size but not be ridiculous
about it? Let the property owner build a decent home that will be
a compliment to Vail. When this 2,000 S.F. GRFA zoning was passed
in 1978, 2,000 S.F. GRFA may have been a reasonable GRFA for a
single family home, however in 11 years just as Vail has changed,
so has the GRFA needs for a single family home, which today would
probably be a minimum of 3,000 S.F. GRFA.
Isn't the Town promoting "caretaker" units? Then why restrict a
caretaker unit on a parcel of land that may be over 5 acres with
over 1 acre of buildable land? A parcel like this would pretty
much require a caretaker to maintain the property and to restrict
this doesn't make any sense. Control the size of the caretaker
unit to 12 or 1,500 S.F. GRFA but don't restrict it. On parcels of
5 or more acres with over 1 acre of buildable land, what's wrong
with a single family residence not to exceed 3,000 or 3,500 S.F.
GRFA with a caretaker unit not to exceed 12 or 1,500 S.F. GRFA - is i
this gong to negatively affect Vail's density in any way??
I think these thoughts should be taken into consideration when you
work on your new zoning ordinances. Thank you. i
i
.i~' I
i
f _
I
On another subject, I feel I have been unfairly treated by
erroneous statements made by a Council member as it relates to my
interests. At your July 24th meeting when Mr. EskwitYi and staff
related to Council that my attorneys found that I had'~a right to
build on my West Vail lot. Mr. Lapin stated ghat he had 3 lots of
a similar situation to mine and that there wens many more in Vail.
Mr. Lapin went on to make a resolution that no residences should be
permitted on Agriculture - Open Space zoning o:f less than 35 acres
which unfortunately was passed. Mr. Lapin's in:formationwas wrong,
yet his erroneous statements possibly influences the; way other
Council members voted. None of Mr. Lapin's lots compared to mine
in any way. One of his referred to lots wasn't even in the Town of .
Vail. Mr. Lapin states that there are many lots in Vail'~like mine?
Wrong main. In researching the Vail zoning m:~.ps I could not find
a single lot that compares to mine which has the following
characteristics:
I
1) Are they zoned Agriculture - Open Space?
2) Do they have 6.844 acres or near it?
3) Do they have 1.39 acres buildable land oz' near it?
4) Are they contiguous on 2 sides with USFS or BI,M or
Colorado State Land? (Mine borders USFS land for
thousands of acres on 2 sides.)
5) Are they near other homes or homes that can be built?
(Mine is hundreds of feet from any home or home that can
built.)
I
Again at the August Council work session, the same type erroneous
statements were made by Mr. Lapin including comparing mY lot with
Condo - Upen Space lots. This is like comparing apples with
peanuts, yet 1 believe these erroneous statements! may have
influenced the thinking of other Council membE~rs as it ;related to
mry request for Grandfathering the zoning on my lot.
At the August 7th meeting, Mr. Lapin disqualified himself as a
Council member because he stated he had a conflict ofi interest.
Why then was he permitted to attend the executive session to give
his views if he had a conflict of interest? Is this proper
protocol? Is this fair to me who wasn't <~.ble to protect my
interests at the executive session? Mr. Rose disqualified himself
because of a conflict of interest .and properly did not ~iattend the
i
executive session.
i
I believe I have a fair and legitimate right to be Grandfathered on
~p lot in the event of a future zoning change for the reasons I
gave (see attached). If you were me, wouldn't you feel that way?
I should not be a victim of erroneous information that may have
affected some of the Council's thinking. '
I therefore request that the Council consider giving me the
Grandfather zoning on this lot that I requested. I believe this to
be a fair and reasonable request under the circumstances.
Abe Shapiro
I
I
I
~`.~d
REC'~ AUG 1 41990
Abe Shapiro's talk to Vail Town Council on 8-7-90:
Concerning my desire to build a single family residence on my W.
Vail land, I believe it's important that the Council understand how
we came to where we are so that my request can be considered in its
proper perspective.
After being a homeowner and developer-builder in Vail for 18 years,
my wife and I wanted to find a quiet, out of the way piece of land
that would enable us to build a modest 3,000 S.F. home with a
caretaker unit and a place where we could keep a few horses and, if
possible, still stay in Vail.
When this land became available to us, consisting of almost 7
acres, surrounded on 2 sides by thousands of acres of USFS land and
hundreds of feet from any existing built or to be built homes, we
thought we found exactly what we were looking for with the
Agriculture - Open Space zoning thereby enabling us to do all that
we wanted.
When I discussed my plans with Town Staff, I was told that I must
have at least 35 acres to build a residence under this zoning. I
discussed this with the Town Attorney and was advised that I could
apply for a variance, which I did, and was denied. I then
discussed this problem with my attorneys who suggested they
research the Town's Zoning Ordinances and as you know, I am
permitted to develop this land under the Agriculture - Open Space
zoning, but with the restriction of building up to 2,000 S.F. GRFA
for this single family residence.
It's unfortunate that with almost 7 acres of land and with 1.39
acres of buildable area on it and located as it is, that I cannot
have the home that I want!
In any event, I intend to pursue the building of the home within
the constraints and as permitted. By so doing, I am and will be
incurring expenses for survey, topographical studies, engineering,
environmental assessment reports, cultural reports, geographical
hazard reports, legal costs, architectural costs, etc. for both my
land and USFS access land which I estimate will come to over
$50,000. While I will be doing this work in a diligent and
consistent manner, I cannot be sure that I'll have everything done
in time to have Design and Review approval before the Town's new
zoning ordinances may become effective, possibly making it
mandatory to have at least 35 acres for Agriculture - Open Space
zoning!
I think it only fair that under these circumstances that the Town
give me the consideration of "Grandfathering" the present zoning on
this particular parcel of land, so that I will be protected for tie
present permitted zoning in the unlikely event that I do not have
everything done that the Town's Staff requires of me in order to
obtain the Town's Design and Review approval by the time this
particular ordinance modification may take place.
r
i.
r 'c.
I don't think it's the Town's intent or desire to have me lose this
substantial investment plus all my work and effort by~my running
out of time so long as I am deligently pursuir.~g this effort.
I would appreciate it very much of the Council would give me the
time it will take to design and build this home in a manner that
will allow it to be a compliment to Vail as ha:~ been the case with
everything else I've built in Vail over the last 18 years.
I respectfully ask that someone on the Council. make such a motion
and that it be favorable approved.
i
I'
i
REC'C AUG 131990
GON ~ ~NENTAL EXPRE55
August 7, 1990
Ron Phillips
Vail City Manager
Town of Vail '
75 South Frontage Road
Vail, Colorado 81657
Dear Ron:
Just a quick note to let you know that a early buy out
on the lease we had with Bill Nottingham has. been
concluded.
As you know the economics for the service were not
possible without community support. In that regard, I
would like to thank you for your personal interest and work
on trying to get community support.
As the primary Colorado/Wyoming air carrier we will
continue to concentrate our efforts on being the best
provider of regional airline service for the communities
that we serve or may serve in the future.
Sincerely,
enni R. Hea
Vice PreSi ent/
General Manager
DRHlslw
E
t
cc: Don Smith
HANGAR NO 6 • STAPLETON INTERNATIONAL AIRPORT • DENVER, COLORADO 80207 • (303) 388-8585
1 1 , r r r ~ ~.I~AY~AIFGHST'_~.~~
tl~ 1~ ~ ((?C '
Law: Court rules that Continental
Can violated ERISA in layo
f
f case Page 84.
' Who's News: J.P. Bolduc is named •
. ~ ~ ~ i ~ president o
f W.R. Grace Page B8:
Travel Industr ~ s Stalled. f
or Second umm r i ~
. . , y~ S e naRow
By JONATHAx DAHL 1 creases have slowed down this' sultlmer,
And PAULINE Y03HIHASHI ~T R A Y E L I but prices are still 50% higher on some
stafl&epo.tersoJT„Ew,.,.,.sTRFeraooxx~,. routes than a few years ago. Other travel
The U.S. travel and tourism industry is letter. "Everyone has come down a lines. The National Park Service, mean- specialists are worried that as the baby
having a slow summer for the second year notch," he says. Like most experts, Mr. while, says June traffic volume was flat. boom generation gets older, the percent-
In arow. Cammisa says the shaky national economy Although Walt Disney Co. doesn't re- age of people in their 20s, a large traveling
Nearly every sector of domestic leisure seems to be keeping travelers home. "In ~ lease attendance figures, analysts suspect group; is shrinking. They say baby. ,
travel-from the sprawling California bad times, discretionary travel is the first that Disneyland's business is at best flat boomers also may be a little burped out "
theme parks to the quaint inns of Nan- to go," he says. and that DisneyWorld in Orlando is ahead
tucket, Mass.-is reporting that business The news is good for travelers, since of last year. Universal Studios Hollywood from all their past trips.
is flat or down 5% to 10% from last year. the slowdown is keeping many travel concedes its total gate is off slightly, with Americans went on a travel binge rllt
Many airlines, hotels and car rental com- prices down. But it's troubling for airlines, stronger local attendance mitigating the the '80s," says John Savich, director of~ile
panies say domestic business is flat, too. because most of them are in the midst of lack of foreign and out-of-state visitors. Michigan Travel Bureau. "Novi, .th just
Fear of Prolonged Slump big fleet expansions. It's also worrisome "The tourists are not here" in Southern have less of a drive to travel; pari' ul
That's a big change from the for several huge new resorts, casinos and California, says Joan Bullard, a • spokes- on long trips." ~ ~
_ double-digit increases the industry reveled theme parks-ranging from the Excalibur woman for the MCA tour. Few analysts are optimistic that there
in durin most of the 1980s. More im r- Hotel in Las Vegas to MCA Inc.'s Univer- One of the hardest-hit areas is New will be a turnaround this fall: Often, air-
g ~ sal Studios Florida in Orlando-that have
• tantly, the slowdown comes only a few England, according to. travel experts. lines drop fares in this season, which gives
months after air travel began rebounding, opened in the past few months. Some Nantucket hotels, for example, say •the travel industry a boost_But fuel prices
which had raised some hopes that the in- Fewer Airline BOardings business is off 10% to 40% during the week. are expected to rise sharply soon, and that
dustry wouldn't be hurt badly by the na- To be sure, a few regions, such as parts "We're not a bunch of happy campers could discourage a lot of carriers- from
lion's weakening economy. Now, most ex- of Florida and Texas, are experiencing a right now," says Elizabeth Oldham, execu- dropping prices. "If you asked me a month
perts are worried that the 5320 billion-a- strong summer. But overall, U.S. airline live director of the Nantucket Island ago, I would have said there would be dis-
year travel industry may be headed fora hoardings fe110.7% in June from year-ear- Chamber of Commerce. counting in the fall," says Sky MagaFy,
prolonged slump. lier figures, and analysts say July dcesn't
"Just about nobody is doing very well," look much better. "The industry is just Along with the unstable economy, travel executive vice president of marketing for
says James Cammisa, publisher of Travel having a soft summer," says John Tague, experts say high airline fares may be con• Northwest Airlines, a unit of NWA Inc.
Industry Indicators, a Miami-based news- marketing vice president for Midway Air; tributing to the slowdown. The fare in- "Now, I'd say there would be less of it."