HomeMy WebLinkAbout1990-08-21 Support Documentation Town Council Work Session
V VAIL TOWN COUNCIL
WORK SESSION
TUESDAY, AUGUST 21, 1990
12:00 P.M.
AGENDA
1. Tour of the Vail Village Transportation Parking Structure
2. Site Visits to Potential Cemetery Sites
3. Discussion of Berry Creek 5th Filing
4. Investment Report Presentation
5. Discussion of Project Engineer Request
6. Request for Additional Funds of $4,936.36 for the Affordable
Housing Study
7. Design Review Board Report
8. Information Update
9. Other
10. Executive Session - Legal Matters
VAIL TOWN COUNCIL
WORK SESSION
TUESDAY, AUGUST 21, 1990 -
12:00 P.M.
EXPANDED AGENDA
12:00 1. Tour of Village Transportation Center
1:00 2. Potential Cemetery Site Visits
Kristan Pritz
Action Requested of Council: Review the sites.
Background Rationale: See enclosed memo. These site visits
are necessary in order for the Council to make a decision on
the appropriate site for a cemetery.
2:30 3. Discussion of Berry Creek 5th Filing
Ron Phillips
Action Requested of Council: Discuss Council's position in
relation to other upper Eagle Valley entities which may want
to assist in keeping the land public.
Background Rationale: The next meeting of the Upper Eagle
Valley entities is August 23 and the Council needs to
establish its position before that meeting.
3:00 4. Investment Report Presentation
Steve Thompson
Action Requested of Council: Ask questions and make
comments as desired.
Background Rationale: The investment policy requires that
staff present the investment report to Council twice a year.
3:20 5. Discussion of Project Engineer Request
Stan Berryman
Action Requested of Council: Approve/deny the request to
add an Engineer position.
Background Rationale: Current and projected projects number
more than can be effectively managed by existing staff (see
enclosure). We are requesting approval to hire the position
at this time, so that the engineer will be able to be
involved in the design process this fall-winter for projects
to be constructed next summer. We have included the
position in our 1991 budget. The difficulty of hiring staff
in January also necessitates the request at this time. The
majority of funds for this position will be charged to
projects.
Staff Recommendation: Approve request to add the position.
3:35 6. Request for additional funds of $4,936.36 for the Affordable
Kristan Pritz Housing Study
Action Requested of Council: Approve/deny an increase of
the budget to $12,500 by $4,936.36.
Background Rationale: See enclosed letter from Nolan Rosall
and also staff memo.
Staff Recommendation: Approve the request.
3:50 7. Design Review Board Report
Mike Mollica
Shelly Mello
4:50 8. Information Update
Ron Phillips
4:55 9. Other
5:05 10. Executive Session - Legal Matters
Larry Eskwith
r.
- -
~y,~
town of nail
75 south frontage road
vail, Colorado 81657
(303) 479.2116
MEMORANDUM
T0: Vail Town Councilc~~~
FROM: Steve Barwick
DATE: August 17, 1990
RE: Berry Creek 5th Filing
Please find attached one proposal for distribution of annual
costs for the Berry Creek 5th Filing intergovernmental agreement.
This proposal allocates the costs based upon assessed valuation
of the participating entities.
At this time no other method for cost sharing has been proposed
to the group working on this issue. If you would like to see a
different allocation of costs, please contact either Ron or me.
SHB/ds
:SSF'AGE
r
PROPOSED INTERGOVERNMENTAL PURCHASE OF
PERRY CREEP; FIFTH FILING
ALLOCATION OF ANNUAL COSTS
PASED UPON ASSESSED VALUATION
ASSESSED PERCENT ANNUAL
VALUATION OF TOTAL PAYMENTS
Vai 1 28._++, ~~+5, ~+2c:~ 6~ . ~+1 % 171.98C>
. Deaver GreeE, Metro 72, 87G 15.91% 43, 916
Avon 35 , ~+44, 45C> 7.78% 21, 461
Eagle-Vail Metro ~+G,~G.:+,65G 6.64% 18,E+4G
Perry CreeEc Metro 12, 413+,1:'+G ~ . 73~% 7, 537
Arrowhead Metro 1Cj,948,6GG 2.41% 6,648
Edwards Metro 7,54._+,`7G l.bb% 4,58E
LaFce CreeF~ Meadows Water 2,532,42C> G.56% 1,538
TOTAL 4°~4,547,GiC> iC~G.C>C>% 276,GGC>
Pried upon ~1,89C~,UC~G total costs. Financing calculated at
8.GC> percent for 1C> years.
s
TOWN OF VAIL MEMORANDUM
TO: Ron Phillips
Council Members
FROM: Steve Thompson
DATE: August 8, 1990
RE: Investment Report
Enclosed is the investment report with balances as of July 31,
1990.
The balance of the portfolio that can be used for operations is
still running at about $1.3 million less than at the same time last
year.
During the month of July the operating portion of the portfolio
increased by $334,000. No additional securities were added to the
portfolio in July due to expected cash flows. However, in August
we did get $640,000 in police confiscation proceeds to add to our
portfolio.
Our average yield to maturity on the portfolio at July 31, 1990 was
8.326$ versus a national average of 7.94$ for money market funds.
Interest income projected for 1990 compared to the amount budgeted
is as follows:
Estimate
Budget Estimate (Under)
(Thousands) For 1990 Budctet
General Fund 240 117 (123)
Capital Projects Fund 90 201 111
Parking Structure Const. Fund 379 442 63
Real Estate Transfer Tax Fund 140 156 16
Special Parking Assess. Fund 5 10 5
Debt Service Fund 110 123 13
Other Funds 44 57
1.008 1,106 98
The reason for the large drop in interest income in the general
fund is due to the Berry Creek Land Acquisition.
I will be presenting the July 31, 1990 Investment Report to Council
at the August 14, 1990 work session.
T
Town of Vail, Colorado
Investment Report
Summary of Accounts and Investments
For the Month Ending July 31, 1990
Funds For Reserve Balances Percentage Percentage
Operating Finds 1/31/90 of Total Allowed
Money Market Accounts (see page 1)
Commercial Banks $760,080 $245,144 $1,005,224 5.26% 50%
Meney Market Funds $3,264,293 $3,264,293 11.01% 100%
Colorado Investment Pools $1,235,411 $1,235,411 6.46% 100%
Total $1,995,491 $3,509,437 $5,504,928 28.19%
Commercial Savings &
Banks Loans
Certificates of Deposit (see page 2)
Eagle County Institutions 0.00%
Other Colorado Institutions 0.00%
National Institutions $1,281,000 $t,089,000 $1,683,000 $693,000 $2,316,000 12.43%
Total $1,281,000 $1,089,000 $1,683,000 $693,000 $2,316,000 12.43% 100%
Percentage of Portfolio in Savings & Loans 5.10% 25%
U.S. Government Securities (see page 3)
Repurchase Agreements $189,108 $189,108 0.99% 15%
Treasury Notes 8 Bills $230,000 $1,810,810 $2,040,810 10.68% 100%
GNMA's $165,210 $165,210 0.86% 100%
U.S. Savings Bonds $19,818 $19,818 0.10% 100%
Federal Agency Discount Notes 8 Bonds $5,124,381 $3,696,946 $8,821,333 46.15% 100%
Total $5,539,535 $5,696,924 $11,236,459 58.18%
Total Portfolio $9,218,026 $9,899,36t $19,111,381 100.00%
Maturing Within 12 Months $8,103,818 $9,013,253 $11,111,131 92.68%
Maturing Within 24 Months $99,000 $691,000 $196,000 4.16%
Maturing After 24 Months $415,148 $189,108 $604,256 3.16%
$9,218,026 $9,899,361 $19,111,381 100.00%
Breakdown of Reserve Funds
G.O. Band Reserve $2,513,051
Parking Structure Bond Proceeds $6,946,445
Booth Creek Mitigation Proceeds $191,914
Chuck Anderson Memorial $10,991
Health Insurance Funds $116,960
$9,899,361
8/8/90 sjt
invsmC01
Money Market Accounts
as of July 31, 1990
--For the Manth of June--
Institution Balances
Type of Accounts High low Average 1/31/90
COMMERCIAL BANK ACCOUNTS
First Bank of Vail - Operating
Interest 7.610% 6.880% 1.240%
Balance b1,263,852 b241,113 b590,566 bI39,486
First Bank of Vail - Insurance
Interest 7.610% 6.880% 1.240%
Balance b116,960
Central Bank of Denver Reserve Accounts
Interest 5.000%
Balance b4,961
Central Bank of Denver
Interest 1.345%
General Operating Account
Balance $31,585
Parking Structure Clearing Account
Balance b52,232
Total Commercial Bank Accounts b1,005,224
IOCAI GOVERNMENT INVESTMENT POOL
Colorado Trust (Investment Pcol)
Interest 1.120%
Balance b1,235,411
MONEY MARKET MUTUAL FUNDS
Federated Securities Corp. U. S. Treasury Trust Reserve Account
Interest 1.610%
Balance b122,100
Fidelity Investment Government Money Market Accounts
Interest 1.820%
Bond Issue Reserve Account tx
Balance b963,882
Booth Creek Imp Funds
Balance b191,914
Parking Structure Const Fund Account
Balance b1,986,391
Total Money Market Mutual Fund b3,264,293
Total all accounts b5,504,928
x~Account Subject to Arbitrage Rebate
8/08/90SJT
invmm001 Page 1
Certificates of Deposit
as of July 31, 1990
Bank Name, Location Days to
Rates Purchase Maturity Maturity Maturity
Ins Coupon Yield Date Date at Purchase Value
First American Bank, Boston, MA
FDIC 10.290% 10.290% 12-Nov-Bl 12-Nov-90 1096 $99,000
Standard Pacific Savings and loan, Newport, CA Reserved Funds
FSLIC 9.815% 9.610% 26-May-89 28-May-91 732 $99,000
Century Bank and Trust, Somerville, MA Reserved Funds
FDIC 9.450% 9.450% 26-May-89 26-Nov-90 549 $99,000
Century Bank of Suffolk, Suffolk, MA Reserved Funds
FDIC 9.450% 9.450% 30-May-89 29-Nov-90 548 $99,000
Security Savings and Loan, Chicago, IL
FSLIC 8.250% 8.250% 18-Apr-90 19-Oct-90 184 $99,000
Midstate Savings and Loan Associaton, Baltimore, MD
FSLIC 10.350% 10.100% 21-Apr-89 18-Oct-90 545 $99,000
First Savings and loan, Beverly Hills, CA
FSLIC 10.315% 10,125% 10-Apr-89 03-Jun-91 T84 $99,000
Sterling Savings and loan, Irvine, CA
FSLIC 10.500% 10.250% 10-Apr-89 02-Dec-91 966 $99,000
Bay Loan 6 Investment Bank, East Greenwich, RI, Reserved Funds
FDIC 9.300% 9.050% 11-Jul-89 02-Dec-91 814 $99,000
Homestead Savings Association, Middletown, PA, Reserved Funds
FSLIC 9.100% 8.900% 21-Jul-89 02-Dec-91 864 $99,000
East Bank, New York, NY
FGIC 9.000% 8.900% 11-Ju1-89 11-Jul-91 i30 $99,000
Brentwood Square Savings and Loan, Los Angeles, CA
FSLIC 10.150% 9.900% 09-May-89 08-May-91 729 $99,000
St. Edmcnd's Savings and Loan Association, Philadelphia, PA
FSLIC 10.250% 10.000% 05-May-89 05-Nov-90 549 $99,000
American General Financial Center, Midvale, UT
FDIC 8.45% 8.25% 23-May-90 23-Nov-90 184 $99,000
Palmer National Bank, Washington, DC
FDIC 8.25% 8.25% 22-May-90 30-Nov-90 192 $99,000
Modesto Bank Company, Modesto, CA
FDIC 8.35% 8.35% 23-May-90 20-Nov-90 181 $99,000
Seacoast Savings Bank, Dover, NH
FDIC 8.25% 8.25% 22-May-90 30-Nov-90 192 $99,000
Westside Savings and loan Association, CA
FSLIC 8.450% 8.450% 13-Mar-90 30-Nov-90 262 $99,000
Page 2 Continued
a
Certificates of Deposit
as of July 31, 1990
Bank Name, Location Days to
Rates Purchase Maturity Maturity Maturity
Ins Coupon Yield Date Date at Purchase Value
Republic National Bank, Phoenix, AT Reserved Funds
FDIC 9.150% 9.500% 30-May-89 29-Nov-90 548 $99,000
Republic Bank of California, Torrance, CA
FDIC 8.500% 8.500% 22-May-90 14-Dec-90 206 $99,000
Colonial National Bank USA, Wilmington, DE
FDIC 8.500% 8.250% 14-May-90 13-Nov-90 183 $99,000
Western Federal Savings 8 loan, San Mateo, CA
FSLIC 8.750% 8.500% 14-May-90 13-Nov-90 183 $99,000
Western Financial Savings Bank, Irvine, CA
FSLIC 8.150% 8.500% 14-May-90 13-Nov-90 183 $99,000
Lyndonville Savings Bank & Trust, lyndonville, VT, Reserved Funds
FDIC 9.250% 9.050% 26-Jul-89 01-Jun-92 1041 $99,000
Avg Yield 9.091% $2,316,000
Days to Maturity 198
invcd001
8/1/90 sjt Page 2
Government Securities
as of July 31, 1990
~x~Treasury Notes 8 Bills~~#
Years to
Interest Rate Purchase Maturity Maturity Years to Book Par
Type Fund Coupon Yield Date Date at Purchase Maturity Value Value
Bend Pooled Cash 8.815% 1.410% 11-Mar-86 15-Feb-96 9.94 5.55 $230,000 b230,000
Bond Parking 8.815% 9.067% 02-Dec-88 30-Nov-90 1.99 0.33 $250,000 $250,000
Band Debt Service 9.315% 9.630% 28-Feb-89 28-Feb-91 2.00 0.58 $200,000 $200,000
Bond Debt Service 8.250% 8.259% 31-Aug-89 31-Aug-91 2.00 1.08 $400,000 b400,00G
Bill Parking 8.161% 08-Feb-90 09-Aug-90 0.50 0.02 $960,810 E1,OOO,OOG
Average Maturity Years 1.51 $2,040,810 $2,080,000
Average Yield 8.36%
#x~Repurchase Agreementsx~~
Purchase Maturity Book
Institution Yield Date Date Value
Morgan Stanley x 1.850% 01-Jun-90 O1-Dec-95 $189,108
~ Sinking Fund Investment to Retire G.O. Bonds
~x~GNMA'Sx~#
Years to Estimated
Interest Rate Purchase Maturity Maturity Years to Principal
Pool Coupon Yield Date Date at Purchase Maturity Outstanding
58C3 8.000% 8.480% 14-Nov-86 15-Oct-05 19.10 16.00 $42,102
13003 8.000% 9.50C% 24-Oct-86 15-Oct-O6 2C.20 17.00 $54,308
14659 8.000% 9.2C0% 24-Oct-86 15-Jan-01 21.20 18.00 $68,860
Avg Yield 9.115% $165,210
~~xU.S. Savings Bondsx~~
Years to
Issue Maturity Maturity Years to Book Maturity
Series Yield Date Date at Purchase Maturity Value Value
EE 7.110% 01-Oct-86 O1-Oct-96 10.C0 6.43 E19,818 $30,000
~~~Federal Agency Discount Notes 8 Bonds~~~
Days to
Interest Rate Purchase Maturity Maturity Days to Book Maturity
Agency Fund Coupen Yield Date Date at Purchase Maturity Value Value
FHLB Pooled Cash 8.305% 15-May-90 16-Nov-90 185.00 108.00 b998,313 $1,040,OG0
FHLB Parking 8.000% 8.000% 25-Jan-90 25-Jan-91 365.00 118.00 $250,000 E250,OC^
FHLB Parking 8.205% 09-Feb-90 O1-Aug-90 113.00 ?,00 $962,565 $1,000,000
FHLB Parking 8.300% 8.060% 14-Feb-90 25-Sep-90 223.00 56.00 $1,000,000 $1,000,000
FHLB Parking 8.125% 8.130% 15-Feb-90 25-Oct-90 252.00 86.C0 $1,000,000 51,000,000
FNMA Pooled Cash 8.265% 23-Feb-90 26-0ct-90 245.00 81.00 $110,188 $150,000
FHLB Pooled Cash 8.400% 8.110% 15-Feb-90 26-Nov-90 284.00 118.00 $500,000 E500,000
FFC Pooled Cash 8.300% 8.300% 01-Mar-90 04-Sep-90 181.00 35.00 $1,000,000 E1,000,000
FNMA Parking 8.500% 8.500% 26-Mar-90 26-Sep-90 184.00 51.00 $250,000 $250,000
FNMA Pooled Cash 8.342% 2T-Mar-90 21-Aug-90 153.00 21.00 5483,106 $500,000
FNMA Pooled Cash 8.443% 21-Mar-90 28-Sep-90 186.00 59.00 $419,631 $500,000
FNMA Pooled Cash 8.500% 8.500% 26-Mar-90 26-Sep-90 184.00 51.C0 $250,000 $250,000
FHMC Pooled Cash 8.110% 30-Jan-90 20-Nov-90 294.C0 112.00 $103,143 $150,000
FHMC Parking 8,170% 30-Jan-90 20-Nov-90 294.00 112.00 $234,381 $25C,000
$8,821,333 $9,040,000
Average Yield 8.23%
Average Days to Maturity 18 Total $11,236,459
8/1/9C sjt
invtr007 Page 3
r
TM y
Y
.
town ofi nail ~
75 south frontage road
vail, Colorado 81857 VAIL 1989
(303) 47g-2158
department of public works/transportation
MEMORANDUM
TO: Ron Phillips
FROM: Stan Berryman
Greg Hall
DATE: August 14, 1990
RE: Project Engineer Request
This memo is to request a supplemental appropriation to create and
fill a Project Engineer position (see attached position
description). This position would report to the Town Engineer.
Currently, the Town Engineer and Public Works Director are acting
as project managers for too many projects. We are unable to
provide effective day-to-day management of the projects we are
trying to complete. Adequate documentation, coordination, quality
control and assurances, management of resources, effective and
timely decision making are in some instances not meeting an
acceptable level of service to carry out the projects in a smooth
manner. Projects not being managed in a smooth manner will create
additional time and expenses to the Town over the life of the
project .
We have tried to cover project management shortages as much as
possible through the use of consultants. This is not effectively
meeting our needs, as consultant management is time consuming in
itself and inefficient during construction, where time is money to
the contractor, the consultant and the Town.
The addition of a project engineer will allow the Town to complete
budgeted projects and enhance management of them as well.
Furthermore, we anticipate our project load to remain at a level
over what we can handle for the next several years.
MEMO REGARDING ENGINEERING POSITION
PAGE - 2
The following table outlines post, current, and. future pirojects and
the status of each one. Also included is a li;~t of current plans,
maintenance programs, and surveys which require staff input.
* COMPLETED
UNDERWAY
NOT STARTED TO DATE
1989 Desian Proiects
Streets 1989
Streets 1990
Pitkin Creek ..Bridge
East Vail Bike Path
W. Gore Creek Drive Bridge
Booth Falls Rock Fall Berm
Pulis Bridge
Village Parking Structure
1989 Construction Projects
Bus Wash
Street Project
East Vail Bike Path
East Vail Bridge Replacement (Pitkin Creek)
Booth Falls Rock Fall Berm
1990 Desian Projects
Streets 1990
Streets 1991
W. Gore Creek Bridge
Pulis Bridge
Village Parking Structure
Bridge Replacement (Bighorn Creek)
Ford Park Entryway
East Vail Bike Path/Phase II
Dowd Junction Bike Path
Vail Valley Drive Sidewalk
Snow Dump
Willow Bridge Replacement
Lionshead Mall Improvements
Maintenance Facilities Expansion & Road Relocation
1990 Construction Projects
Street Project
W. Gore Creek Bridge Replacement
Bighorn Creek Bridge Replacement
Ford Park Entryway
Booth Falls Rock Berm
Village Parking Structure
East Vail Bike Path/Phase II
Bus Wash
n
i
MEMO REGARDING ENGINEERING POSITION
PAGE - 3
1991 Desian Proiects -
Street Projects 1991-92
Ford Park Parking Lot
Dowd Junction Bike Path
Vail Valley Drive Sidewalk
Snow Dump
Public Works Maintenance Facilities Expansion & Road Relocation
Municipal Building Road Improvements
Willow Bridge
Vail Das Shone Recreation Path
1991 Construction Proiects -
Street Project
Willow Bridge Replacement
Snow Dump
PW Maintenance Facilities Improvements
VTRC Community Improvements
1992 Desian Proiects -
Streets 1992-93
Chapel Bridge
Dowd Junction Bike Path/Phase II
Vail Valley Drive Improvement/Phase II
Vail Das Shone Rec Path
Municipal Building Road Improvements
1992 Construction Proiects -
Streets
Vail Das Shone Rec Path
Municipal Building Road Improvements
Current Plans Reauirina Public Works Staff Input:
Master Transportation & Parking Plan
Village Streetscape Plan
Eagle County Bus System Analysis
West Meadow Drive Plan
Main Vail Off-Street Rec Trails Master Plan/Feasibility Study
GIS/AM/FM Project
Signage Improvement Project
On Going PW Maintenance Programs Reauirina Professional Input:
Street Maintenance
Parking Structure Maintenance (Capital Projects)
Drainage Improvements
Concrete Improvements
Recreation Trails Maintenance
Bridge Maintenance
PW Facilities Maintenance (Capital Projects)
Sidewalk Improvements
Miscellaneous Building Projects (Capital Projects)
MEMO REGARDING ENGINEERING POSITION
t
PAGE - 4
Survevs Required:
All design and construction staking for projects listed in addition
to all Parks projects.
Holy Cross Parcel
Performing Arts Center
Municipal Building
Miscellaneous Surveys
We request approval of a supplemental appropriation in the amount
of $10,917 for the remainder of 1990. We would like to recruit for
this position as soon as possible. The majority of funds for this
position will be charged to projects and not tYie general fund. We
should see almost a net effect on costs, as currently we have
$25,000 budgeted during construction for con:~ultants to provide
some construction management to the street projects. This amount
does not seem adequate due to the complexity of the design and
nature of the work. In addition, $10,000 of 'the Town Engineer's
salary is allocated to the street project.' ~Che majority of the
$10,000 can be allocated to those projects currently not being
completed, but costs are budgeted into for project management.
We would request immediate. approval of this position so that a
person can be hired to be involved in the design process of
projects to be constructed next year.
i
PROJECT ENGINEER
SALARY RANGE - $28,932 - $36,732
GENERAL STATEMENT OF DUTIES
This is engineering work involving complexity, professional
development requirements, or problem solving sophistication at a
level beyond that of an entry level engineer.
Employees in this class exercise engineering knowledge, skills and
abilities in the design and construction of more complex streets,
and other public work projects, or are involved in other
engineering activities requiring professional development beyond
an entry Engineer level and/or of an advanced problem solving
nature. Complexity as an allocation factor would be indicated by
significant time involvement in design and construction
responsibility for large projects such as a major street project.
Problem solving as an allocation factor focuses on the requirement
to conceptually analyze major, non-routine engineering or
engineering service delivery problems in terms of alternative
goals, to perform the necessary research as a data base, to develop
alternative courses of action relative to goals in cost-benefit
terms, and to develop a coherent project proposal or analysis.
SUPERVISION RECEIVED
Employee operates under the general supervision of the Town
Engineer. Since most work is of a project nature, it is assessed
in terms of completion within a time frame and quality of work
product. Consultation with the supervisor by conference is
sometimes required for special problems.
SUPERVISION EXERCISED
Employees are normally assigned for working supervision on a
project basis and may include a variety of engineering support and
clerical personnel.
EXAMPLE OF PRINCIPLE DUTIES
Designs simple to complex engineering structures to include
streets, storm drain systems and drainage channels. Performs
design work necessary for replacement, repair and updating of
existing structures.
Supervises the preparation of plans specifications and contract
documents and related work necessary to bring the project to a
point where it is under contract and ready to proceed with
construction.
i
i
~ ~
Administers the construction of projects to include supervising the
construction inspection process utilizing e~zgineering support
personnel such as Construction Inspectors anti Material Testing
Technicians. Activities which the engineer must perform,, monitor,
or supervise include: project staking by surve~?ors; determination
of traffic flows during construction; contractors operat'i'ons; field
and laboratory testing of materials to be used. and those already
incorporated in the work; contacts with adjacent property owners;
computation of pay quantities, preparation of progress reports;
calculation of partial payments due contractorsa, final payment to
contractor, determination of assessments and financing as required,
and consultant management. ,
Performs advanced engineering planning assignmE~nts. ~
Performs a variety of related duties as required.
I
KNOWLEDGE, SKILLS AND ABILITIES
Knowledge of engineering methods and procedure: as applied to the
design and construction of roads and sewers to include knowledge
required for the design of more complex structures such s streets.
Knowledge of civil engineering or other disciplines as required by
the position, for example, knowledge of the principles of land use
planning.
Knowledge of special legal and financing princi~~les and procedures
related to position.
Ability to assign and supervise engineering sup~~ort personnel such
as survey crews in duties related to the pz-oject or function
supervised. ~
Ability to perform on-site inspections and make such engineering
judgments as to whether actual construction. meets plans and
specifications.
Ability to communicate effectively both orally ~~nd in writing with
the general public s well as contractors and other agencies. In
certain positions this includes the ability to effectively conduct
public meetings.
Ability to write clear, logical reports when required.
Ability to conceptually analyze major, non-routine engineering or
engineering service delivery problems in teYnns of alternative
goals, to perform the necessary research as a data base, to develop
a coherent project proposal or analysis.
MINIMUM QUALIFICATIONS
Graduation from an accredited college or univ~arsity with a B.S.
degree in Civil Engineering or closely related area.
One year of experience in the field of civil Engineering.
Possession of Engineering-in-Training Certificate.
- J L.. ~ ~,J
ROSALL REMMEN CARES - ~~=-~.~r.~E':"':~~as;ES.INC
_~g FE-qL c*::EET fv14LL
PLANNING. URBAN DESIGN AND RESEARCH q~JLDE= ~Oi.~?RADO 40302
"s0?~~a9-..53
August 9,1990
Ms. Kristin Pritz -
Town of Vail
75 South Frontage Road
Vail, CO 81657
Dear Kristin:
The purpose of this letter is to update you on where we stand relative to the budget for the
Affordable Housing Study and to estimate the amount it will take to complete the study. As
you know, the initial estimate of cost for the study was $12,500, which was authorized by the
Town Council.
The principal intent of the work program which was defined at that time was to provide a
set of recommendations that the Town might consider adopting in an effort to increase the
supply of affordable housing within the community. At the time we initiated the study, the
Town was desirous of getting the information as quickly as possible - by May 1990. The
work program, in addition to the analysis to be undertaken by RRC staff, was to incorporate
two focus groups, two work sessions with the Housing Task Force, and one or two public
meetings. Our objective was to produce a set of recommendations to get the Town started in
a positive direction and to provide a framework for the Town to review future requests for
affordable housing development approvals.
Recommendations contained within the study would be somewhat general in nature, yet
specific enough for the staff and Town Attorney in the next phase to convert the information
into ordinance form or to develop a set of development regulations which could be written
into the code. These latter steps were considered as follow-up to the primary thrust of our
contract and work program.
As we began our study, it became clear that more than two focus groups were necessary. At
the staff
s and Task Force's request, we actually held five focus group sessions, two with
developers/architects, two with local employers, and one with local employees. In addition,
we held a sixth focus group, which represented a composite of employers and
developers/planners as a result of a few key invited participants being unable to attend the
initial two focus group sessions.
In addition to the extra focus group sessions, we have had arr,~ximately five Task Force
meetings, as well as two joint Town Council/PEC public meetings and work sessions.
These additional meetings and focus groups have been valuable to the process and have
permitted a more refined and detailed set of recommendations to be developed as part of this
effort. As a result, however, the Task Force has also dealt with more specific issues and
i
i
ROSALL REMMEN CARES ~
PLANNING. URBAN DESIGN AND RESEARCH
I
Ms. Kristin Pritz
August 9, 1990 j
Page Two
conditions which would govern each of the particular areas of interest, such as the caretaker
unit provision, than was originally proposed. This more detailed. Level of concern needed to
be fully addressed in order for the Task Force to feel more comfartable with the overall
recommendations. In order to meet this need, it required additional research and report
d.^.fdng and r_~*afting beyond the scope of the original proposal
i
One of the impacts of the shift in emphasis and level of detail, along with the need to
schedule. additional meetings, has been to increase the overall co.;t involved in completing the
study. To-date, through July 31st, RRC has expended $13,936.39, which exceeds the original
authorization by $1,436.39.
i
In addition, as part of the final report which is to be submitted to the Town Council, the
Introduction, the Summary of Focus Group Sessions, the Sumn~uuy of Other Affordable
Housing Programs from certain selected communities, as well as refinement of the Final
Recommendations need to be completed. We also anticipate that: one additional Task Force
meeting will be required for final review of the material, and one additional joint meeting of
the Town Council and PEC will be required to complete this housing study for the Town of
Vail
i
We estimate the additional time and expenses required to complete the remaining
responsibilities at $3,500. This, in addition to the $1,43b.39 already expended in excess of the
original estimate, would suggest an amendment to the contract of $4,936.36.
I hope this letter explains the situation adequately. Please let me~ know if there is any
additional information which you need. This is obviously a very important piojert for the
Town. We look forward to working ~~t,'; you to assist in complE~ting this stage of the work,
and permitting the Town to move forward in implementing the recommendations.
sincerely, j
ROSALL REMMEN CARES, INC.
I
~ i
Nolan L. Rosall, AICP
President
i
NLR/dlb
i
i
TO: Vail Town Council
FROM: Community Development Department
DATE: August 21, 1990
RE: Additional funding for the Affordable Housing Study
The staff and consultant are requesting that the Council increase
the budget for the Affordable Housing Study by $4,936.36. The
original budget for the project was $12,500. Nolan Rosall has
prepared a letter explaining the reasons for the need for the
additional funding (Please see attached letter).
The staff agrees that the project has much more of an in depth
analysis than originally planned when the project started in
January. Through the research, the task force and staff have
realized that a comprehensive approach to the issue is
appropriate. In addition, because the housing needs assessment
was not completed when the task force began working on the
project, additional focus groups and public input sessions were
scheduled. Below is a comparison between the original meeting
schedule and the meetings that have actually occurred to date.
Atinroved Work Program Actual Work Program
2 Focus Groups 6 Focus Groups
2 Housing Task Force meetings 5 Housing Task Force Meetings
2 Town Council/PEC Work Sessions 2 Town Council/PEC Work Sessions
6 Total 13 Total
This results in an additional 7 meetings that have been held.
At this time, a rough draft of the Housing Study Report has been
written. Several sections of the report need to be added such as
an introduction, summary of focus group sessions, summary of
other affordable housing programs from certain selected
communities, as well as refinement of. the final recommendations.
An additional task force meeting as well as one joint meeting
with the Town Council and Planning Commission are also necessary.
The staff believes that it is appropriate to add this money to
the budget. The money may be taken out of the Community
Development budget as there is. funding available due to salary
savings. We also believe that this project.. is extremely
important to the community and needs to be finished up so that
developers interested in building affordable housing will have
clear direction from the Council and staff. The consultant has
also performed very well for the Task Force and has gone above
and beyond the work program outlined in the original contract.
For these reasons, the staff asks the Council to approve the
additional $4,936.36.
The Town of Vail and Town of Avon have also submitted a joint
funding request to the Colorado Housing Finance Authority for
$7,000. Each community will receive $3,500 if the grant is
received. Please see attached letter and work program.
'y'1
town of nail
75 south frontage road office of community development
vast, Colorado 81657
(303)479-2138
(303)479-2139
August 15, 1990
Ms. Sandy Blaha
Associate Executive Director
Northwest Council of Governments
P.O. Box 739
Frisco, CO 80443
RE: CHFA Housing Technical Assistance Request
Dear Sandy:
The Town of Vail is pleased to have the opportunity to request
funds from the Colorado Housing and Finance Authority for housing
technical assistance. Governmental entities and community
businesses within Eagle County have been working in a cooperative
manner to address affordable housing. As you know, a housing
needs assessment was recently completed. The research was
jointly funded by Avon, Vail, Eagle County, Vail Associates,
Vail Valley lodges and hotels. The document provides valuable
information to all of the communities as well as the county for
affordable housing.
The Town of Avon and Town of Vail would like to continue to
cooperate on the affordable housing issue by making a combined
funding request of $7,000 for housing technical assistance. Each
town would receive $3500. We believe a joint effort on such an
important issue is the most effective way to address this basic
need.
The Town of Vail has completed a rough draft of our housing
policies. Attached to this letter is an outline of the work
program. Rosall, Remmers and Cares have been hired to assist the
Town in developing these housing policies. However, additional
funds are needed to complete the work. The Town of Vail would
use the $3500 to complete the work program.
i
I
SANDY BLAHA ~
LETTER, PAGE 2
i
The Town of Vail appreciates your consideration of ourlrequest.
Please contact Kristan Pritz, Director of Community Development,
at 479-2138 if you have any further questions.
Sinc re ,
Rondall V. Phillips
Town Manager
I
cc: Vail Town Council
Kristan Pritz, Community Development Director
Rick Pylman, Community Development Director, Town of Avon
Keith Montag, Community Development Director, Eagle County
I
I
~I
I
i
I
I
i
I
i
TOWN OF VAIL AFFORDABLE HOUSING STUDY WORK PROGRAM
A. Town of Vail solutions:
1. Complete the housing needs assessment for Eagle County
and use this data to develop affordable housing
policies. (Completed)
2. Develop policies for incorporating affordable units
into projects including Special Development Districts.
Policies must be coordinated with the Zoning Code, Land
Use Plan, and other planning documents. (In Process)
3. Analyze potential for a caretaker unit to be
incorporated into a single-family, primary/secondary or
duplex zoned property. (In Process)
4. Study definition of family in respect to affordable
housing. Should bedrooms be counted as opposed to
units to gain a more realistic understanding of density
impacts? (In process)
5. After inventorying and determining potential for
affordable housing on publicly and privately owned
sites, decide if further steps should be taken to
encourage affordable housing. (In Process)
6. Analyze funding possibilities for affordable housing?
Housing Authority, Housing Trust Fund, Tax incentives,
etc.. (In Process)
7. Determine potential for Town of Vail employee housing
within Vail. (In Process)
8. Determine ways to encourage better utilization of
second homes by increasing long-term rentals. (In
Process)
B. Reaional Solutions:(In Process)
1. Take a leadership role in coordinating Town and County
efforts to provide affordable housing.
2. Actively participate in the Planning for the Berry
Creek site.
3. a) Discuss the possibility of utilizing the Eagle
County Housing Authority with other governmental
entities and the Eagle County Commissioners.
b) Discuss the possibility of a 0.5$ sales tax going
to public transportation and other alternatives
for providing coordinated Upper Eagle Valley
public transit.
c) Discuss Housing Trust Fund option with Avon, Eagle
County, and other governmental entities.
i
_ ~I .
1
Town of Avon P. O. Box 975, Avon, CO 81620 (303) 949-4280 ~
'
I
I
August 16, 1990
Ms. Sandy Blaha
Associate Executive Director
NORTHWEST COUNCIL OF GOVERNMENTS ~
P.O. Box 739
Frisco, CO 80443_ ~
Dear Sandy, ~
RE: CHFA Housing Technical Assistance Request
The Town of Avon is pleased to support the Northwest
Colorado Council of Governments request for funds from
the Colorado Housing and Finance Authority. The recently
completed county wide housing needs assessment has
provided valuable information and insight to all of the
participating communities. The Town of Avon believes
that it is crucial to utilize the conclusions of the
needs assessment to adopt a specific housing policy for
the Town. This policy will guide private developers
seeking to provide housing and assist in goal setting for
the Avon Housing Authority.
The Town of Avon and the Town of Vail would ;like to
continue our cooperative efforts on the affordable
housing issue by combining our request for $7,;000 for
hou$,ing technical assistance. Each town would 'receive
$3,9~b0. We believe a joint effort is the most effective
way to approach this issue. -
The Town of Avon has completed a conceptual work iprogram
to complete a Housing Policy document. That work
program, attached to this letter, was developed in
conjunction with Peter Jamar Associates, Inc. Peter
Jamar Associates Inc. was a consultant to the Town of
Avon during our recent comprehensive plan process, and
the Housing Policy will work in conjuction with our
comprehensive plan. i
The Town of Avon appreciates your consideration and
assistance with this request. Please contact me at
949-4280 if you have any further questions.
Sincerely,
Richard Pylman
Director of Community Development
i
I
i.
ti
TOWN OF AVON HOUSING POLICY
CONCEPTUAL WORK PROGRAM
men OAe - evaluate ~xistinQ Housing Sutinly
1.) Data Compilation
a.) Number of units by type
b.) Vacant land inventory
c.) Number of Units on Market by type
d.) Number of "affordable" units built &
projected
* Need definition of affordable
Step Two - Analyze Eaale County Housing Needs
Assessment
1.) Evaluate results and determine Avon's
appropriate role in responding.
a.) Determine unit type and number
needs for Avon area.
b.) Compare to existing and projected
development.
c.) Compare to vacant land inventory.
Step Three - Identi~v Annronriate Sites
1.) Using a set of site suitability criteria,
determine suitability of vacant sites within Avon
for affordable housing, including unit type and
densities.
,Stec Four - Implement
1.) Using above information establish policies
re ardin9 affordable housing development in Avon.
2.~ Possibly establish new zone districts to deal
mith various housing types and performance
standards.
l
PETER jAMAR ASSOCIATES, INC.
PLANNING, DEVELOPMENT ANALYSIS, RESEARCH
FIRM DESCRIPTION:
Peter Jamar Associates, Inc.. offers professional consulting
services in planning, development analysis, and development and
environmental research. The firm has abroad range of planning
and development experience and is committed to excellence
achieved by personal attention to each project. By offering a
comprehensive range of services tailored specifically to the
needs of each project, Peter Jamar Associates, Inc. provides
project solutions that respond to individual project parameters
often resulting in unique solutions.
Peter Jamar Associates, Inc. has experience with the planning of
- resorts, new communities, recreation areas, residential areas,
mixed-use developments, and commercial and office parks.
Services offered include all aspects of land planning, site
planning, .preparation of development guidelines and design
guidelines, environmental impact reports, comprehensive plans,
and regulatory issues.
Recent projects include preparation of the Town of Avon
Comprehensive Plan and revision of Avon's Zoning Regulations,
preparation of a revised Master Plan for Beaver Creek Resort, and
preparation of the Eagle County Regional Recreation Plan.
PETER JAMAR BACKGROUND:
Peter Jamar, AICP has a varied background in both public and
private sector planning and development analysis. He has been
responsible for providing and coordinating a full scope of
comprehensive services on a number of planning, design, and
development projects involving multi-disciplinary consultant
teams, often in a lead role.
Prior to forming Peter Jamar Associates, Inc. in 1987, Mr. Jamar
directed planning and land development consulting services for
the three offices of Berridge Associates, Inc. located in San
Francisco, Denver and Vail. In this position he was responsible
for the completion of a large number of master planning studies,
development and design guidelines, environmental analysis and
zoning documents. He served as Town Planner for the Town of
Vail, Colorado for three years from 1980-83.
Suite 308, Vail National Bank Building
108 South Frontage Road West . Vail, Colorado 81657 . (303) 476-7154
i
it
. 'i
FIRM DESCRIPTION
Page 2 I~~
Mr. Jamar attended the graduate school of Design andlPlanning at
the University of Colorado-Denver and also received a Bachelor of
Arts degree from Gustavus Adolphus College in 1979.
Mr. Jamar is a member of the Urban Land Institute, American
Planning Association, and American Institute of Certified
Planners.
i
i
I
it
I
f
DESIGN REVIEW BOARD AGENDA
AUGUST 15, 1990
2:00 P.M.
SITE VISITS
12:00 p.m.
7 1. Perot - 250 Addition MM
84 Beaver Dam Rd./Lot 31, Blk 7, Vail Village 1st
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Approved with conditions.
10 2. Covered Bridge Building - Exterior Alteration MM
and Redevelopment. Lot C & D, and the southwesterly
4 feet of Lot B, all in Block 5-B, Vail Village 1st.
227 Bridge Street. (Conceptual Review Only)
MOTION: SECOND: VOTE:
NO VOTE - Conceptual Only.
8 3. Byrne Residence - Revisions to retaining walls MM
and landscaping. 126 and 146 Forest Road
Lot's 5 & 6, Block 7, Vail Village 1st
MOTION: Pat H. SECOND: George L. VOTE: 4-0
Approved as presented.
1
4. Byrne Residence - Revisions to ext:erior wall MM
materials. Change from stucco to stone.
146 Forest Rd./Lot 6, Block 7, Va~ll Village 1st
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval.
i
i
5. Vail Gateway - Minor Modifications to windows, MM
siding and guardrails. 12 Vail Road
Lot N, Block 5-D, Vail Village 1st
MOTION: George L. SECOND: Dalton W. VOTE: 3-0-1
Consent approval. Ned Gwathmey abstained.
1
3 6. Montaneros - Exterior Alteration AK
641 Lionshead Place/Lot 8, Blk 1, Vail Lionshead 3rd
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
I
Consent approval. ~
f
7. Hutchinson - New Primary/Secondary ~ AK
2049 Sunburst Drive/Lot 1, Vail Valley 4th
MOTION: Dalton W. SECOND: Pat H. VOTE:. 4-0
I
Approved with conditions. ~
i
i
2
I
9 8. Up the Creek Bar & Grill - Type of sign and JK
location of sign variances. 223 Gore Creek Dr.
Gore Creek Condominium Building.
Lot 5-B, Vail Village 1st
MOTION: SECOND: VOTE:
TABLED TO SEPTEMBER 5TH MEETING.
1 9. The Talon - Club House Building JK
Part of Lot 1, Block 3, Lions Ridge 3rd Filing
MOTION: George L. SECOND: Pat H. VOTE: 4-0
Approved with conditions.
5 10. Alpine Standard Station - Temporary Bldg. JK
for Remediation System. 28 S. Frontage Road West
Part of Lot A, Vail Village 2nd Filing
MOTION: George L. SECOND: Pat H. VOTE: 4-0
Approved with conditions.
12 11. Oelbaum - Satellite Dish SM
3907 Lupine Drive/Lot 3, Block 1, Bighorn 1st
MOTION: SECOND: VOTE:
TABLED TO AUGUST 29TH MEETING.
3
{
13 12. Boettcher Residence - Addition SM
4394 Streamside Cir./Lot 9, Bighorn 4th~~Addition
MOTION: George L. SECOND: Pa.t H.0 VOTE: 4-0
Approved with conditions.
4 13. Lionshead Canopy I BR
Lionshead Mall Area
MOTION: George L. SECOND: Pat: H. VOTE: 4-0
Approved with conditions.
14. Cascade Crossing Retail Center - Sports Rent Sign
1031 South Frontage Road BR
MOTION: Pat H. SECOND: George L. VOTE: 4-0
Approved as submitted.
i
15. Vail Pointe - Entry Sign BR
1881 Lionsridge Loop/Lot 1, Block 3, Lionsridge #3
MOTION: George L. SECOND: Pat: H. VOTE: 4-0
Approved as submitted.
4
6 16. Blano's Pizza - Awning and Signage BR
100 East Meadow Dr./Nail Village Inn Plaza
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval with conditions.
17. Vail Gateway - Sign Program AK
28 Vail Road/Lot N, Block 5D, Vail Village 1st
MOTION: Dalton W. SECOND: George L. VOTE: 3-0
Approved with conditions. Ned Gwathmey abstained.
11 18. Crossroads Unit #A5 - Balcony Expansion AK
141 E. Meadow Dr./Lot P, Block 5D, Vail Village 1st
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval.
19. Colton - Remodel AK
303 Gore Creek Dr., Unit #313/Lot 3, Block 5
Vail Village 1st
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval.
5
2 ~ 20. Marriott Mark - Phase I Condo Units 583, 585, JK
683 & 685 Door Modifications. 715 West 'Lionsheads
Circle.
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval.
21. Cheney Residence - Replace existing deck with JK
new deck. 4424 Streamside Circle.
Lot 10, Bighorn Subdivision 4th Filing
MOTION: SECOND: VOTE:
Staff approval.
22. Moritz Residence - New Deck JK
788 Potato Patch/Lot 13, Vail F~otato Patch
MOTION: SECOND: iVOTE:
Staff approval.
14 23. Ridgeview Square Townhouses - Sign ~ JK
4506 Spruce Way I,
MOTION: Pat H. SECOND: George L. VOTEI; 4-0
Approved with conditions.
6
24. Spruce Park - Project Sign BR
4515 Bighorn Road/Lot's 6 & 7, Block 1, Bighorn 3rd
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval.
25. Stewart Residence - Exterior BR
3876 Lupine Drive/Lot 14A, Bighorn 2nd Addition
MOTION: George L. SECOND: Dalton W. VOTE: 4-0
Consent approval.
26. Rader Residence - 250 Addition JK
1107 East Vail Valley Dr./Lot 7, Blk 6, Vail
Village 7th
TABLED TO AUGUST 29TH MEETING.
MEMBERS PRESENT: MEMBERS ABSENT:
George Lamb
Dalton Williams (PEC)
Pat Herrington
Ned Gwathmey
7
i
STAFF APPROVALS:
i
Fritzlen/Pierce Residence - 3 new skylights on roof.
Lot 5, Block 2, Vail Intermountain
Marriott Mark Units 583/585 & 683/685 - Artinian Residence Remodel.
Replace existing balcony sliding glass doors, ~sdd rail pickets to
balcony railing.
770 Potato Patch Unit #2 - Remove vertical mulaion & replace with
single picture window. ~
Brown Residence Deck - Remove existing deck, install larger deck.
Lot 18, Block 6, Vail Intermountain
Blano's Pizza - New wooden hanging sign.
Vail Village Inn Plaza ~
Landmark Condo. Unit #702 - Replace slider ~~aith french doors,
enlarge windows.
Crossroads - "Vail Brewery", remodel exterio~^ of former Burger
King. Lot P, Block 5-D, Vail Village 1st i
GE Johnson Residence - Add an 18" x 24" flue to exterior of house,
revise interior floor plans. Lot 10, Block 3, Bighorn~5th
Ricci Residence - Deletion of 4 windows and the: addition of 3 roof
skylights in the kitchen. Lot 5, Block E, Vail Das ScYone #1
i
I
I
I
I
i
i
8
I