Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2002-09-17 Support Documentation Town Council Evening Session
AMENDED AGENDA TOWN COUNCIL EVENING MEETING TUESDAY, SEPTEMBER 17, 2002 7:00 P.M. TOV COUNCIL CHAMBERS NOTE: Times of items are approximate, subject to change, and cannot be relied upon to determine at what time Council will consider an item. 1. ITEMITOPIC: Citizen Participation. (5 min.) 2. CONSENT AGENDA: Approval of August 6th and 20, 2002 meeting minutes. . (5 min.) 3. DELETE 4. ITEM/TOPIC: Council Contributions. (30 min.) 5. ITEM/TOPIC: Pedestrian Bridge Update. (10 min.) Leslie Pickling ACTION REQUESTED OF COUNCIL: Review artwork and direct AIPP to proceed through the development review process. BACKGROUND RATIONALE: The Town of Vail Public Works department intends to replace the pedestrian bridge at Gore Creek Promenade in Spring, 2003. The Art in Public Places Program identified the project as an ideal location for integrated art. A jury composed of Vail residents and business owners chose artist Lisa Fedon to design railings for the new bridge. The artist developed her original idea and the final design has been approved by the AIPP board. - The proposed artwork attempts to capture the essence of Vail by depicting activities such as kayaking, dog walking, snowboarding and cross country skiing. The ten foot long railing sections will be fabricated from perforated steel which is overlapped to form a figure. Perforations are large enough so that views of the -creek are not significantly obstructed. The Art in Public Places board believes that AIPP guidelines have been followed in selecting the artwork and that the design meets the criteria listed on page 29 of the guidelines. STAFF RECOMMENDATION: Approve the project. 6. ITEM/TOPIC: Ordinance #26, Series of 2002, first reading, sale of the Old Town Shops. (10 min.) Matt Mire ACTION REQUESTED OF COUNCIL: Approve BACKGROUND RATIONALE: Section 4.8 of the Town Charter requires an Ordinance to authorize the sale of real property owned by the Town. STAFF RECOMMENDATION: Approve 7. Russ Forrest ITEM/TOPIC 2"d reading of three ordinances to rezone property on and adjacent to the Vail Mountain School more specifically described below. (30 min.) ACTION REQUESTED OF COUNCIL: Approve, Deny, or Table Request The specific resolutions and ordinances being considered include: 1) Ordinance 21, Series of 2002: A request to rezone Lot 12, Block 2, Vail Village 12th F'''"9 to General Use, The northern portion of this lot is zoned Agriculture Open Space; 2) Ordinance 22, Series of 2002: A request to rezone 3010 Booth Falls Road/Lot 11, Block 2, Vail Village 12th Filing from Two- Family Residential to General Use; 3) Ordinance 23, Series of 2002: A request to rezone Tract C, Block 1, Vail Village 12th Filing from Two-Family Residential to General Use; BACKGROUND RATIONALE: On August 12, 2002, the Planning and Environmental Commission unanimously recommended to the Town Council that they approve the above mentioned requests. The PEC also approved of three conditional use permits (conditions are in attachment B) and a preliminary plat for a major subdivision request. On August 20tH the Vail Town Council unanimously approved 1St reading of the above mentioned ordinances. No changes were requested in the 2"d reading of these ordinances. The 2"d reading of a rezoning ordinance is the official public hearing for a rezoning request. STAFF RECOMMENDATION: Staff recommends approval of the applicants requests based on the criteria, findings, and conditions outlined in the Planning and Environmental Commission memorandum dated August 12, 2002. 8. Town Manager's Report. (5 min.) 9. Adjournment. (8:45 P.M.) NOTE UPCOMING MEETING START TIMES BELOW: (ALL TIMES ARE APPROXIMATE AND SUBJECT TO CHANGE) THE NEXT VAIL TOWN COUNCIL REGULAR WORK SESSION WILL BE ON TUESDAY, OCTOBER 1, 2002, BEGINNING AT 2:00 P.M. IN THE TOV COUNCIL CHAMBERS. THE NEXT VAIL TOWN COUNCIL REGULAR EVENING MEETING WILL BE ON TUESDAY, OCTOBER 1, 2002, BEGINNING AT 7:00 P.M. IN TOV COUNCIL CHAMBERS Sign language interpretation available upon request with 24-hour notification. Please call 479-2332 voice or 479-2356 TDD for information. ~. ;~ DRl~FT TOWN COUNCIL EVENING MEETING TUESDAY, August 6, 2002 7:00 P.M. TOV COUNCIL CHAMBERS Members present: Members Absent: Staff Members Present Ludwig Kurz, Mayor Dick Cleveland Diana Donovan Bill Jewitt Greg Moffet Rod Slifer, Mayor Pro-Tem Chuck Ogilby Pam Brandmeyer, Asst. Town Mgr. Matt Mire, Town Attorney The first item on the agenda was Citizen Participation. Teak Simonton, addressed the Council, stating she was running for Clerk and Recorder of Eagle County, to fill the vacancy being left by Sarah Fisher. Steve Kaufman, owner of the Tap Room and the Sanctuary located at the top of Bridge Street, addressed the Council, expressing concern about the Friday block parties. Kaufman presented a petition signed by businesses on Bridge Street requesting elimination or modifications to the Friday night parties, stating the events were hurting their businesses and conflicted with the guidelines established by the Vail Chamber and Business Association (VCBA). Mayor Kurz stated the Council had a copy of the petition and a letter that had just been received and was in hopes the issue had been resolved. Greg Moffet questioned whether the VCBA treated all business impacts uniformly, referring to the organization's. previous involvement in its protest of booths selling sunglasses and giving away hot chocolate. Kaye Ferry, Vail Chamber and Business Association, addressed the Council, reminding them this was not the normal procedure under Citizen Participation. Ferry stated there were approximately 600 people at the top of Bridge Street last Friday night and felt the promotion helped all village merchants. Phil Long, owner of the Red Lion, expressed his concern with being labeled as a trouble maker because he asked questions as to how things were being handled by the chamber. Bob Fritch, owner of the Sitzmark Lodge, addressed the Council, stating the VCBA did not represent the interests of the business community. Fritch encouraged the Council to audit the organization and to allow business license holders to choose the organizations they wished to join. The second item on the agenda was the Consent Agenda. The first item for consideration was the approval of the July 2"d and 16th, 2002 meeting minutes. Bill Jewitt had F:mcaster//Tcmeet/2002/080602 1 i a correction to the July 16th minutes. Dick Cleveland then moved to approve the July 2 and 16, 2002, minutes as amended. Diana Donovan seconded the motion. A vote was taken and the motion passed unanimously, passed 5-0, with Moffet voting on the approval of the July 2"d minutes only. The next item under the consent agenda was the appointment of Robert Matsuda to Art In Public Places Board. Greg Moffet moved to approve Matsuda to the board. Bill Jewitt seconded the motion. A vote was taken and the motion passed unanimously, 5-0. The next item under the consent agenda was the approval of Resolutions #6, 7, 8, 9, 10, Series of 2002, regarding change of signatures on Town of Vail bank accounts, removing Steve Thompson and adding Judy Camp as an authorized check signer. Greg Moffet moved to approve Resolutions 6, 7, 8, 9 and 10. Dick Cleveland seconded the motion. A vote was taken and the motion passed unanimously, 5-0. The third item on the agenda was presentation of the Betty Ford Alpine Garden Awards. Helen Fritch of the Betty Ford Alpine Gardens announced the winners of the Town of Vail Festival of Flowers award. Fritch stated the award was being given to commercial flower gardens this year. Fritch also thanked Rick Scalpello and Bob McLaurin for supporting this program. Awards were given to Billie's Island Grill, Bridge Street Lodge, Gastof Gramshammer, Plaza Lodge., Gorsuch's, Lancelot, Lionshead Minature Golf, Manor Vail, Ore House, and Sweet Basil. The Grand Prize was awarded to the Sonnenalp Resort. A special award was presented to the Town of Vail for its plantings around town. A plaque was presented to the town with this year's award winner's name engraved on it. This plaque will be presented each year. The fourth item on the agenda was a Conference Center Update. Stan Cope, chairman of the Lodging Advisory Council, gave an update on the proposed site and status for the conference center. Cope stated August 20th was the drop dead date for the ballot issues to appear on the November ballot. Cope reviewed the history of the Vail Center and stated Vail Resorts, Inc. had come up with a propose) of donating the Vail Resorts maintenance lot, also known as the Holy Cross site, stating the new proposed 6 acre site would accommodate two 20,000 square foot ballrooms and 250 parking spaces. Cope stated the lodging community unanimously supported the conference center. Cope stated the group was prepared to talk about the new proposal at work session next Tuesday with a site and financing plan. The Council requested an update of the redevelopment proposed for the five properties owned by Vail Resorts, including the North Day lot, as well as examples of successful conference centers that have been constructed without an anchor hotel and/or distanced from the activity hub. Support was received from several hotel representatives. Rick Scalpello of Vail Today questioned how the town could afford to take on another project, given its current long-term capital needs. The fifth item on the agenda was the Parking Plan Introduction. Mayor Kurz stated a task force was established and he thanked the group for the hard work done to this point. Greg Hall, Public Works Director, reviewed recommendations of the committee. Bill F:mcaster//Tcmeet/2002/080602 2 R Y z Jensen, COO of Vail Mountain and a member of the task force, stated the new parking plan would reduce the number of overflow parking days on the frontage road from a high of 50 days in 200-01 to 15 or fewer this season. The recommendations were reviewed by the Council. Diana Donovan complimented the task force for its creativity. Suggestions were made to the proposed plan, both from the Council and the audience. Validation for Dobson Arena users as well as the public library was discussed. Council concerns were mixed regarding the change of an hour and a half free parking. to 30 minutes and the change of Free After 3 to Arrive After 5. The Task force has identified 9 goals for the overall parking plan: • Use parking management strategies to reduce the frequency of overflow parking on the frontage road. The target is fewer than 15 overflow days, down from 42 days last season and 50 days the. year before. • Maximize parking structure utilization through supply and demand strategies to address weekday/weekend and daytime/nighttime needs. • Create an inventory of convenient, short-term parking opportunities for shoppers, diners and late arrivals to be accessible throughout the day. • Introduce a pilot incentive program to motivate employees to use satellite parking areas Friday through Sunday to increase close-in parking capacity for shoppers and skiers. • Augment employee satellite parking program with frequent and reliable shuttle service. • Introduce new park `n ride incentives to promote ECO ridership from down valley. • Recognize opportunities for increased parking revenues to help offset operational, maintenance and capital equipment costs. •' Create an effective enforcement program to deter short-term parking abuses. • Actively communicate the program to the various user groups. Jensen also stated discounted. merchant passes would be tied to the employee parking options. The next discussion of the proposed parking fees vvill be held on Tuesday, August 20th. The sixth item on the agenda was the Town Shop Addition Bid Review. Diana Donovan moved to accept the lowest bid. Bill Jewitt questioned the closeness of the top 3 bids. The motion was seconded. by Dick Cleveland. The motion was voted on and passed unanimously, 5-0. The seventh item on the agenda was the approval of a slurry seal contract for town services. Greg Moffet moved to accept the low bid of $90,699.62 to Quality Resurfacing for the Slurry seal program. Dick Cleveland seconded the motion. A vote was taken and the motion passed unanimously, 5-0. The eighth item on the agenda was Ordinance #20, Series of 2002, an emergency ordinance making changes to Ordinances 2, 2002, regarding General Obligation bond. F:mcaster//Tcmeet/2002/080602 3 Town Attorney Mire informed the Council this housekeeping ordinance eliminated the provision for insurance, which was not required due to the town's favorable bond rating. Greg Moffet moved to approve Ordinance #20. There was some question as to whether the ordinance also applied to Ordinance #3, Series of 2002, relating to sales tax. Attorney Mire stated he would check on the matter. Dick Cleveland seconded the motion. A vote was taken and the motion passed unanimously, 5-0. The ninth item on the agenda was Ordinance No. 19, Series 2002, an ordinance Establishing Guidelines fora 14-hour "dawn to dusk" period for curbside trash pick up. Attorney Mire stated this issue was discussed at Council work session on July 2, 2002. At that time, the Council's direction was to come back with an appropriate ordinance. Mayor Kurz stated this ordinance had been discussed during the afternoon work session. Attorney Mire read changes to ordinance from the afternoon discussion. Bill Jewitt moved to approve Ordinance #19 on first reading, as amended. Greg Moffet seconded the motion. Diana Donovan stated she was opposed to the ordinance, stating the solution should be education, not large fines. Dick Cleveland suggested having Dwight Henninger and Suzanne Silverthorn come back to the Council with an education program to give to the public. A vote was taken on the motion and the motion passed 4-1, Donovan opposing. The tenth item on the agenda was Ordinance #14, Series of 2002, 2"d reading, an ordinance amending Special Development District No. 6, Vail Village Inn, Phase IV, to allow for the conversion of accommodation units into Type III employee housing unit The applicant, Daymer Corporation, is again requesting a major amendment to Special Development District No. 6, to allow for the conversion of accommodation units into employee housing units, and a conditional use permit to allow Type III employee housing units at the Vail Village Inn. Russ Forrest, Director of Community Development, stated this was a temporary request to allow the applicant to utilize the property for employee housing until construction can begin on the redevelopment of the property which was approved in 2000. The property is currently zoned Special Development District No. 6, with an underlying zoning of Public Accommodation. Any proposal to change use and eliminate accommodation units within a special development district is considered a major amendment. The conditional use permit for the 56 Type III employee housing units was approved by the Planning and Environmental Commission on June 10, 2002, subject to approval of the major amendment by the Town Council. The Planning and Environmental Commission also voted to forward a recommendation of approval for the major amendment to Special Development District No. 6. The findings and conditions of the Planning and Environmental Commission decisions are in the staff memorandum, dated June10, 2002. Ordinance No. 14, Series of 2002, amends the approved uses in Special Development District No. 6, Phase IV, to allow for the conversion of accommodation units into Type III employee housing units. Building numbers 4 and 5 have been used over the last year for Type III employee housing units. A total of 56 EHUs have been used on the site in both buildings 4 and 5. The Fire Department has ordered that building number 5 (over Craig's market) no longer F:mcaster//Tcmeet/2002/080602 4 ~~ r be used for any type of occupancy due to significant life safety issues. With that order only 26 employee housing units would be available to the owner unless significant repairs are made to building # 5. Since the PEC hearing on June 6th, Club Chelsea has submitted a building application to move into the bar area of the Vail Village Inn. This is allowed by zoning. However it does utilize the available parking on the site. Greg Moffet moved to approve Ordinance #14. Dick Cleveland seconded the motion. There was no public input: A vote was taken on the motion and the motion passed unanimously, 5-0. The eleventh item on the agenda was second reading of Ordinance No. 15, Series Of 2002, an Ordinance amending the official zoning map so that that Tracts I & J, Block 1, Vail Lionshead 1St Filing be rezoned from Agriculture Open Space (AOS) to Lionshead Mixed Use -1 (LMU-1) and that Lot 7, Block 1, Vail Lionshead 1St Filing and Lot 6, Block 1, Vail Lionshead 2"d Filing from High Density Multiple Family (HDMF) and Medium Density Multiple~Family (MDMF) to Lionshead Mixed Use -1 (LMU-1) Community Director Forrest stated if approved, Ordinance 15 would rezone the Lodge at Lionshead to _Lionshead Mixed Use 1. This area is in the Lionshead Mater Plan area. However, based on a request from the property owners both the Lodge at Lionshead and Vail International were excluded from a multiple property rezoning that occurred in 1999. This was the first step in implementing the Lionshead Master Plan. The property owners of the Lodge at Lionshead are now requesting to be rezoned to Lionshead Mixed Use-1 Zoning. The applicant is not proposing any physical changes at this time. On June 10, 2002, the Planning and Environmental Commission unanimously recommended to the Town Council that they approve of this rezoning request. Greg Moffet moved to approve Ordinance #15 on second reading. Diana Donovan seconded the motion. A vote was taken and the motion passed unanimously, 5-0. Town Attorney Mire stated for the record this was a public hearing on the ordinance and there was no input from the public. The twelfth item on the agenda was Ordinance #16, Series of 2002, second reading, an ordinance adding two view corridors in Lionshead. Town planner Allison Ochs stated on May 20, 1997, recognizing the importance of visual connections, the Town Council approved the use of the existing Town of Vail view corridor ordinance to designate the first protected public view corridors in Lionshead. In order to qualify for protection under the Town's ordinance, a view corridor must meet the following criteria: a. The proposed view corridor protects and perpetuates a view from public pedestrian areas, public ways, or public spaces within the Town which fosters civic pride and is in the public interest for the Town. b. The proposed view corridor protects and enhances the Town's attraction to residents, guests, and property owners. c. The proposed view corridor protects a view which is commonly recognized and has inherent qualities which make it more valuable to the Town than other more common views. F:mcaster//TCmeet/2002/080602 rj t',° d The Lionshead Redevelopment Master Plan identifies five view corridors. However, it recommends that only two legally protected view corridors be established. The remaining three views are to be established as critical design parameters, not as benchmarked and surveyed corridors. Greg Moffet made a motion to approve Ordinance #16 on second reading. Bill Jewitt seconded the motion, A vote was taken and the motion passed unanimously, 5-0. As there was no further business, Greg Moffet made a motion to adjourn the meeting. BiII Jewitt seconded the motion. A vote was taken and the motion passed unanimously and the meeting was adjourned at 9:35 P.M. Respectfully submitted, Ludwig Kurz, Mayor ATTEST: Lorelei Donaldson, Town Clerk Minutes taken by Mary A. Caster F:mcaster//TCmeet/2002/080602 6 DRAFT VAIL TOWN COUNCIL EVENING MEETING TUESDAY, August 20, 2002 6:00 P.M. TOV COUNCIL CHAMBERS The regular meeting of the Vail Town Council was called to order at 6:00 P.M. in the Town of Vail Municipal Building by Mayor Ludwig Kurz. MEMBERS PRESENT: Ludwig Kurz, Mayor Rod Slifer, Mayor Pro-Tem Dick Cleveland Diana Donovan Bill Jewitt Greg Moffet Chuck Ogilby Staff Members, Present: Bob McLaurin, Town Manager Matt Mire, Town Attorney The first item on the agenda was Citizen Participation. Mayor Kurz informed the audience it appeared there were several people prepared to speak on behalf of the Middle Creek housing project that was not an agenda item for the evening's meeting. Kurz stated the Council would hear from several citizens, but the time to speak would be at the Planning and Environmental Commission meeting next Monday, August 26th, when the item would be scheduled on their agenda. Several citizens spoke in favor of the housing project. Ron Riley, local businessman, expressed his support of the project and asked for a show of hands from the audience that were in attendance in favor of the Middle Creek project. The majority of the audience raised their hands. Kimberly Ruotolo, Vail resident, addressed the Council, requesting the free parking in the structure be extended longer than 30 minutes. Paul Rondeau, Vail resident, addressed the Council and distributed a memo outlining an on-going improvement program. Rondeau stated he would have more input during the discussion on Resolution.#11 regarding a proposed increase in property taxes. The second item on the agenda was a request to Proceed Thru the Process for Christmas Tree Lighting on Public Right-of--Way. Rick Scalpello, Vail resident and owner of the request, addressed the Council, asking for questions in response to his request. After some discussion a motion was made by Greg Moffet to grant permission to proceed thru the process. Dick Cleveland seconded the motion. Rod Slifer asked if a tree been selected for the lighting. Scalpello stated there were 4 trees there. Diana Donovan stated F:mcaster//TCMin/2002/082002 1 X she was not in favor of the removal of mature trees and had he.considered thinning them. A vote was taken on the motion and the motion passed unanimously, 7-0. Arn Menconi ,Eagle County Commissioner, arrived late for Citizen Participation, but spoke in favor of Mountain Bell site. Town Manager McLaurin thanked Menconi for his participation in the private activity bonds. The third item on the agenda was a discussion of a memorial park. Diana Donovan reported their committee, consisting of Chuck Ogilby, Merv Lapin, and herself had researched sites, and were asking for authorization to proceed to work out details. The sites included the Spraddle Creek trailhead, the east end of the Katsos u property near the East Vail Interchange and the streamwalk between the covered Bridge and Ford Park. Chuck Ogilby stated would be nice to have Council concurrence before proceeding. Mayor Kurz stated the Council took site visit earlier in afternoon to two of the sites. Kurz felt the Spraddle Creek was more suited for the site. Bill Jewitt stated the riverwalk would be more accessible to people. Rod Slifer stated he was in favor of setting up a committee and moving forward and made a motion to that effect. Bill Jewitt seconded the motion. A vote was taken and the motion passed unanimously, 7-0. The fourth item on the agenda was a Formal Motion to Approve Design & Prepare Construction Contract of the Donovan Park Pavilion. Diana Donovan stated the committee needed authorization to move forward with the design contract. Greg Moffet moved to approve the contract. Chuck Ogilby seconded the motion. Rod Slifer stated he had missed several of the meetings, but complimented the rest of the committee on the excellent job they had done selecting an architect and builder and should be thanked for all the time spent coming. up with a great product. Bill Jewitt expressed his opposition to spending public funds for the pavilion, but stated he would be voting in favor of the approval of contract. A vote was taken and the motion passed unanimously, 7-0. The fifth item on the agenda was a discussion on the Cortina Lane Street Improvements Project. Tom Kassmel, project engineer, requested approval to award the contract to B&B Construction. Kassmel stated the project had a scheduled start date with Eagle River Water District of 8/26, with the town starting two weeks weeks later (Sept. 9T"~ Completion of the project is scheduled for October 31, 2002. Council asked why B&B Excavating's bid was so much lowerthan others. Kassmel reported that most oftheirwork is done locally, not requiring subcontractors. Town Attorney Mire suggested the Council word their motion to award the contract to the lowest responsible bidder, avoiding any potential problems with contractors. requesting changes after the bid award. Greg Moffet moved to award the Cortina Lane Street Improvement Project to the lowest bidder. Bill Jewitt seconded the motion. A vote was taken and the motion passed unanimously, 7-0. As a result of the meeting moving faster than had been anticipated and the parties representing the parking discussion were not in attendance, the Council heard.from Bob F:mcaster//TCMin/2002/082002 2 McLaurin regarding the Town Manager's Report. Chuck Ogilby moved to authorize the town manager to go forward with the design of a new pedestrian at the Gore Creek promenade, as well as improvements to the whitewater park beneath the bridge. McLaurin stated the project would begin in spring of 2003. Greg Moffet seconded the motion. Diana Donovan expressed her hopes of value engineering to cut cost of project. A vote was taken on the motion and the motion passed 5-2, Bill Jewitt and Dick Cleveland opposed. The Council then moved to the twelfth item on the agenda was Ordinance No. 19, Series of 2002, second reading, an ordinance establishing standards and regulations regarding the protection of wildlife. Town Attorney Mire presented the ordinance to the Council, noting strikeouts where the ordinance had been changed from first reading, the main points being the ordinance makes it unlawful to place trash containers out on days other than the scheduled pick- up days, and may only be placed after 6:00 a.m. and returned to appropriate storage areas by 7:00 P.M. the same day. After discussion, Dick Cleveland moved to adopt ordinance No. 19 on second reading. Greg Moffet seconded the motion. Diana Donovan suggested the public look at the display of bear proof containers in the parking lot. Rick Scalpello agreed with the intent of the ordinance, and suggested rewriting the ordinance to eliminate opportunities for selective enforcement. Guy Ayrault, local resident, thanked the Council for approving the measure, calling it a "great leap forward". A vote was taken on the motion and the motion passed unanimously, 7-0. The next item heard was a discussion on proposed parking fees. Mayor Kurz thanked members of the parking task force for coming up with the new parking fees. Kurz also stated he had received 58 voicemails regarding the new guidelines. Public Works Director Hall presented the new proposal to the Council, which included a simplified hourly rate structure capped at $13 per day; free parking for the first 30 minutes with a $1 rate for up to 90 minutes; new metered short-term parking for $3; free parking after 5:00 p.m.; free validated parking for Vail library users; new low-cost outlying parking options for employees; a new park 'n ride option from Edwards to Vail; merchant ski pass discounts for employees who purchase outlying parking passes or park `n ride passes, and continuation of the Debit Card, Blue Card and Gold Card parking passes. Much discussion followed, including comments from Kaye Ferry, Vail Chamber and Business Association, expressed concerns regarding proposed price increases in the parking passes and the removal of the Free after 3 parking. Ferry also stated her group had planned to do a parking survey of the business community. Dobson user groups expressed their desire to have parking validations similar to the public library users. Bill Jensen spoke in favor of the parking recommendation. Jensen stated Vail Resorts was willing to make a $300,000 contribution in merchant pass discoun#s to create incentives for low-cost outlying parking opportunities for employees. Jensen also stated 375 parking spaces would be freed up on Friday, Saturday and Sunday with the use of the parking discounts being offered. Greg Moffet stated he favored 1 hour free parking as F:mcaster//TCMin/2002/082002 3 opposed to 30 minutes. Rod Slifer expressed his support of Free after 3 and the hour and one half free. Michael Cacioppo, Speakout, expressed his belief the local merchants would be hurt by eliminating the 1 1/2 hour free parking. Robert Akins, manager of Verbatim bookstore, spoke if favor of keeping the 90 minute free parking. Mayor Kurz thanked the staff for doing a very thorough job of informing the task force, stating most of the questions brought up tonight were brought up in other meetings and the business community had been included in discussions. Ogilby stated he hated to lose free after three and 1.5 free parking, reminding the Council and the public of his .election platform that included free parking in Vail, and acknowledged the fact that Vail Resorts had bent over backwards to seek parking alternatives. Dick Cleveland stated he felt the incentives work better than dissentives. Diana Donovan stated she was impressed with the Task Force work, calling the recommendations "creative" and "balanced", and felt the program should be adopted as is. Donovan also stated the need to look at validating Dobson users. Dick Cleveland moved to adopt the proposed parking fees for 2002-2003 season as submitted. Bill Jewitt seconded the motion. Diana Donovan suggested amending the motion to look further into validation for Dobson users. Dick Cleveland amended his motion accordingly. Bill Jewitt stated he would not amend his second, and the motion died for lack of a second. Diana Donovan seconded the motion. Rod Slifer stated he felt strongly about the hour and a half free parking and Free after 3. Bill Jewitt stated. he felt if the town opened up validation at Dobson, it would start special interest groups putting pressure on the Council for each their groups. A vote was taken on the motion and the motion passed 4-3, Slifer, Moffet, and Ogilby opposed. The seventh item on the agenda was Resolution No. 11, Series of 2002, a resolution calling for a special election in the Town of Vail, Colorado, concerning an increase in the town's property tax. Attorney Mire stated this was aCounty-wide mail in election. Chuck Ogilby suggested a recitial be added that identified the intent of the resolution, to address improvements to Lionshead Village; improvements to Vail Village; improvements to loading and delivery infrastructure; the hiring of additional firefighters; and improvements throughout the community. Chuck Ogilby made a motion to adopt Resolution 11 with the recommended changes. Rod Slifer seconded the motion. Attorney Mire proposed putting a time limit on it. Dick Cleveland stated he thought capital improvements should be included. Paul Rondeau suggested the need to accompany the property tax issue with an ongoing improvement program that would focus on effectiveness and efficiencies within the organization. Jim Lamont, Vail Village Homeowners Association, suggested the need to get the word out as to the how money is to be spent, i.e., public safety and a new fire department as well as other improvements. Diana Donovan stated she hoped for discussion from the public. Paul Rondeau, Vail resident, referred to a public meeting held in December, and questioned what had happen since then. John Cogswell, business owner, inquired how commercial property would be taxed. A vote was taken on the motion and the motion passed 6-1, Moffet opposing. Moffet stated he was uncomfortable with the ballot measure because it did not address tax relief provisions for full-time residents and business owners. F:mcaster//TCMin/2002/082002 4 The eighth item on the agenda was Resolution No. 14, Series of 2002, a resolution calling a special election in the Town of Vail, Colorado, concerning the issuance of bonds and increase in taxes to finance a conference center. Attorney Mire presented the resolution to the Council. A presentation was made by Stan Cope, of the Lodging Community, as well as a presentation from aMinneapolis-based company regarding feasibility studies done on public assembly spaces followed. The report identified corporate groups and- national associations as a target market for a Vail conference center. Tom Wierdsma of Hans Phelps, aGreeley-based construction/program management company, presented plans to provide a comprehensive development management agreement that would deliver a turn- key facility to the community, risk-free. The total development cost is estimated at $46.2 million. The donation of Vail Resorts land is valued at $9 million. Porter Wharton, III, of Vail Resorts, addressed the Council, stating the current maintenance and warehouse would be moved to the Mountain Center in Avon, snowcat facilities would move across the street with the water treatment plant, and lift maintenance would be located on the mountain. Discussion was held regarding who would run the conference center. Town Manager McLaurin expressed his confidence in the bond attorneys of George K. Baum & Company, stating the town had a long working relationship with and had complete trust in them. Although Bill Jewitf and Dick Cleveland expressed reservations, about possible competing ballot issues, both expressed support for moving forward with the project. Greg Moffet, Rod Slifer and Mayor Kurz expressed their support in moving forward with the project. A motion was then made by Greg Moffet to adopt Resolution #14 with a change on page 3 that sunsets the sales tax amended to include the lodging tax. Rod Slifer seconded the motion. Diana Donovan stated she would be voting against the resolution and read a list of objections and observations she had regarding the conference center. Chuck Ogilby gave an optimistic observation as to why the town should proceed with the conference center and how it would relate to the renaissance of Vail. Ogilby recalled a presentation last winter by Ford Frick stating the need for great diversity. Greg Moffet stated with a $9 million kickstart by the land owner and the hotels and business owners in support of the convention center, he felt the time was right to proceed. Rod Slifer stated he agreed with Ogilby's and Moffet's comments and felt Vail was suffering today because of the lack of such a facility. Slifer congratulated the committee who had worked on putting this proposal together. Mayor Kurz was in agreement with comments by Rod Slifer. Paul Rondeau, Vail resident, suggested drafting pro and con statements now for the issue. Jeff Wright of Destination Resorts, reported an increase in areas with conference businesses. Rick Scalpello, Vail Today, presented a list of concerns and questions, including the potential risk to the town and what he described as a need for additional private sector contributions. Scalpello urged the Council to postpone its vote, citing the need for additional analysis of the information presented at the meeting. Michael Cacioppo, Speakout, offered general support for the center, although he expressed concern about the proposed location. A vote was taken on the motion and the motion passed, 6-1, Donovan opposing. The next item on the agenda was Resolutions #12 ,Series of 2002, regarding F:mcaster//TCMin/2002/082002r~ Vail Mountain School. Resolution #12 amended the Town of Vail official rockfall hazard map to change the designation for a portion of Lot 12, block 2, Vail Village 12th Filing and a portion of Tract C, Block 1, Vail Village 12th Filing from high severity rockfall to rockfall hazard with approved mitigation.Russ Forrest presented the proposal to the Council. Greg Moffet moved to approve Resolution 12 with approved findings subject to criteria to page 21 on memo. Bill Jewitt seconded the motion. A vote was taken and the motion passed unanimously, 7-0. The next item on the agenda was Resolution #13, Series of 2002, a resolution amending the Town of Vail Land Use Plan, changing the land use designation for Tract C, Block 1, Vail Village 12th Filing from low density residential (LDR) to Public/Semi-Public (PSP). Greg Moffet then moved to approve Resolution #13, land use designation subject to findings on page 12 of the pec memo . Bill Jewitt seconded the motion. A vote was taken and the motion assed unanimously, 7-0. The next item on the agenda was Ordinance #21, Series of 2002, first reading an ordinance amending the zone district boundaries of the Official Zoning Map forthe Town of Vail in accordance with Title 12, Zoning Regulations, Chapter 5, Zoning Map, Section 3, Changes, Vail Town Code; rezoning Lot 12, Block 2, Vail Village 12th Filing from the Agricultural and Open Space (A) District to the General Use (GU) District. Russ Forrest addressed the Council, stating these resolutions and ordinances had been review at the work session held earlier in the day. Greg Moffet moved to approve Ordinance #21 on first reading, with changes to the criteria on page _ of staff memorandum to the Planning and Environmental Commission and findings on page _ of the staff memo. The motion was seconded by Bill Jewitt. A vote was taken and the motion passed unanimously, 7-0. The next item on the agenda was the first reading of Ordinance #22, Series of 2002, an ordinance amending the zone d istrict boundaries of the Official Zoning Map for the Town of Vail in accordance with. Title 12, Zoning Regulations, Chapter 5, Zoning Map, Section 3, Changes, Vail Town Code; rezoningLot 11, Block 2, Vail Village 12th Filing from the Two-Family Residential ®District to the General Use (GU) District. Greg Moffet made a motion to approve Ordinance #23 on first reading, subject to page _ staff memo to the Planning and Environmental Commission and findings on page 16 of the memo. Bill Jewitt seconded the memo. A vote was taken and the motion passed unanimously, 7-0. The next item on the agenda was the first reading of Ordinance #23, Series of 2002, an ordinance amending the zone district boundaries of the Official Zoning Map for the Town of Vail in accordance with Title 12, Zoning Regulations, Chapter 5, Zoning Map, Section 3, Changes, Vail Town-Code; rezoning Tract C, Block 1, Vail Village 12th Filing from the Two-Family Residential (R) District to the General Use (GU) District. Greg Moffet made a motion to approve Ordinance 22, on first reading, with criteria included in staff memo to the Planning and Environmental Commission and findings in the staff memo on page .Bill Jewitt seconded the motion. A vote was taken and the F:mcaster//TCMin/2002/082002 6 motion passed unanimously, 7-0. Forrest stated a public hearing would be held on September 17th for the second reading on all three ordinances. As there was no further business, Greg Moffet made a motion to adjourn the meeting. Rod Slifer seconded the motion. A vote was taken and the meeting was adjourned at 10:55 P.M. Respectfully submitted, Ludwig Kurz, Mayor ATTEST: Lorelei Donaldson, Town Clerk Minutes taken by Mary A. Caster F:mcaster//TCMin/2002/082002 7 ORDINANCE NO. 26 SERIES 2002 AN ORDINANCE AUTHORIZING THE CONVEYANCE OF FEE TITLE TO REAL PROPERTY IN THE TOWN OF VAIL COMMONLY KNOWN AS THE OLD TOWN SHOPS AND LEGALLY DESCRIBED AS PART OF TRACT C, VAIL VILLAGE, SECOND FILING; AND SETTING FORTH DETAILS IN REGARD THERETO. WHEREAS, the Town of Vail is the owner of certain property located at 890 S. Frontage Road, Vail, Colorado 81657, commonly known as "The Old Town Shops," legally described as Part of Tract C, Vail Village, Second Filing and more specifically described on attached Exhibit "A" (the "Property"); WHEREAS, it is the Town Council's opinion that the health, safety and welfare of the citizens of the Town of Vail would be enhanced and promoted by the sale of the Property to the Eagle River Water and Sanitation District (the "Purchaser"). NOW, THEREFORE, be it ordained by the Town Council of the Town of Vail, Colorado, that: The Town Council hereby approves this sale of the Property. 2. The Town Manager is hereby~authorized and directed to execute such instruments of conveyance as are appropriate to convey fee title from the Town of Vail to the Purchaser. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid, such decision shall not affect the validity of the remaining portions of this ordinance; and the Town Council hereby declares it would have passed this ordinance, and each part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or more parts, sections, subsections, sentences, clauses or phrases be declared invalid. The Town Council hereby finds, determines, and declares that this ordinance is necessary and proper for the health, safety, and welfare of the Town of Vail and the inhabitants thereof. The repeal or the repeal and reenactment of any provision of the Municipal Code of the Town of Vail as provided in this ordinance shall not affect any right which has accrued, any duty imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced, nor any other action or proceedings as commenced under or by virtue of the provision repealed or repealed and reenacted. The repeal of any provision hereby shall not revive any provision or any ordinance previously repealed or superseded unless expressly stated herein. All bylaws, orders, resolutions, and ordinances, or parts thereof, inconsistent herewith are repealed to the extent only of such inconsistency. This repealer shall not be construed to revise any bylaw, order, resolution, or ordinance, or part thereof, theretofore repealed. Ordinance 26, Series of 2002 INTRODUCED, READ, APPROVED, AND ORDERED PUBLISHED ONCE IN FULL ON FIRST READING this 17th day of September, 2002 and a public hearing shall be held on this Ordinance on the 1st day of October, 2002, at 7:30 p.m. in the Council Chambers of the Vail Municipal Building, Vail, Colorado. Ludwig Kurz, Mayor ATTEST: Lorelei Donaldson, Town Clerk READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED IN FULL this 1S' day of October, 2002. Ludwig Kurz, Mayor ATTEST: Lorelei Donaldson, Town Clerk Ordinance 26, Series of 2002 Exhibit A Legal Description A part of Tract C, Vail Village, Second Filing, more particularly described as follows: Beginning at the northwest corner of said Tract C; thence north 73 degrees 42 minutes 37 seconds east and along the northerly line of said Tract C a distance of 145.00 feet; thence south 14 degrees 46 minutes 10 seconds east a distance of 146.36 feet to a point of intersection with the southerly line of said Tract C; thence south 79 degrees 03 minutes 56 seconds west and along the southerly line of said Tract C a distance of 180.00 feet to the southwest corner of said Tract C; thence north 0 degrees 06 minutes 06 seconds east and along the westerly line of said Tract C a distance of 135.00 feet to the true point of beginning, County of Eagle, State of Colorado. Except that portion of said property deeded to the Vail Water and Sanitation District in deed recorded September 30, 1982 in Book 346 at Page 615. Ordinance 26, Series of 2002 MEMORANDUM TO: Vail Town Council FROM: Department of Community Development DATE: August 20, 2002 SUBJECT: A request to amend: the Land Use Plan designation from Low Density Residential to Public/Semi Public for Tract C, Block 1, Vail Village 12tH Filing; amend the rockfall hazard map to show approved mitigation on Tract C, Block 1 and Lot 12, Block 2 of Vail Village 12tH Filing; and to rezone Lots 11 and 12, Block 2, Vail Village 12tH Filing and Tract C, Block 1, Vail Village 12tH Filing to the General Use Zone District Applicant: Vail Mountain School represented by Braun and Associates Planner: Russell Forrest DESCRIPTION OF REQUEST The applicant is requesting the following: 1) Resolution 12, Series of 2002: A request to modify the official Town of Vail Rockfall Hazard Map to indicate approved mitigation for 3160 N. Frontage Road/Lot 12, Block 2, and Tract C, Block 1, Vail Village 12tH Filling; 2) Resolution 13, Series of 2002: A request to amend the official Town of Vail Land Use Map for Tract C, Block 1, Vail Village 12tH Filing from Low Density Residential to Public/Semi-Public; 3) Ordinance 21, Series of 2002: A request to rezone Lot 12, Block 2, Vail Village 12tH Filing to General Use, The northern portion of this lot is zoned Agriculture Open Space; 4) Ordinance 22, Series of 2002: A request to rezone 3010 Booth Falls Road/Lot 11, Block 2, Vail Village 12tH Filing from Two-Family Residential to General Use; 5) Ordinance 23, Series of 2002: A request to rezone Tract C, Block 1, Vail Village 12tH Filing from Two-Family Residential to General Use; The applicant will also be asking for the Town Council to approve of the final plat and the dedication of land involved with moving Katsos Ranch Road at the time a final plat is submitted.. RECOMMENDATION BY THE PLANNING AND ENVIRONMENTAL COMMISSION (PECK On August 12, 2002, the Planning and Environmental Commission unanimously recommended to the Town Council that they approve the above mentioned requests. The PEC also approved of three conditional use permits (conditions are in attachment B) and a preliminary plat for a major subdivision request. The DRB has reviewed the application and was generally very supportive of the building design. CRITERIA AND FINDINGS FOR DECISION MAKING Staff would like to remind the Town Council that new criteria and findings were approved in 2002 for rezoning and text amendments. These criteria and findings should be referenced as outlined beginning on page 13 of the PEC memo in any motion on this proposed ordinance. The criteria for amending the Land Use Plan are on pages 11-13. The criteria and findings for amending the hazard maps are on pages 21 - 22 of the staff memo. SIGNIFICANT ISSUES Applications: The applicant has had 4 meetings with the PEC and one meeting with the DRB regarding the development plan for the school. Prior to submitting an application, the Vail Mountain School met with adjacent property owners to discuss the project and strategies for addressing adjacent property owner concerns. The application did change significantly as the project was reviewed by both the neighborhood and the Town's boards. Most significantly, the site disturbance on Tract C was significantly reduced and the applicant is now proposing one zoning (General Use) for the entire development site. The Land Use Designation for Lot 11 and Lot 12 is Public/Semi Public. The applicant is requesting a Land Use Amendment for Tract C from Low Density Residential to Public Semi Public. 2000 Approval: The applicant did receive approval for a development plan in 2000. The applicant did not act on that development plan but choose to continue to work on it's planning for the school and expand its land area for the school by acquiring Lot 11, Tennis Court area on Lot 12, and Tract C. The applicant is asking for the same approximate number of teachers, students, and class rooms as was approved in 2000. Overall Mass and Height: The maximum height is 41 feet. The proposed structures are larger than the 2000 development plan with approximately 87,300 square feet of gross floor area versus approximately 55,390 square feet of floor area approved in the 2000 master plan, which is nearly 58% increase in floor area. It is important to note that the Vail Mountain School has increased its land area from 6.1 acres to 9.18 acres. That is an approximately 50% increase in total lot area. Overall site coverage for development plan is 15% versus the 2000 approved site coverage of 14.1 %. Employee Housing: With the additional class rooms that were proposed in the 2000 master plan 2 employee housing units were required (30% of new employees). The applicant is proposing 8 employee housing units on Tract C. Circulation and Parking: Currently there are traffic congestion problems on Katsos Ranch Road when school is over at the end of the day. The School is proposing a new circulation plan that would eliminate school traffic on Katsos Ranch Road except for the 8 employee housing units on Tract C. Anew exit lane would be created of the new parking lot directly onto the Frontage Road. Therefore traffic circulation on Katsos Ranch should be significantly improved and the Traffic Impact Analysis concludes that there should be no significant impact on Booth Creek Road. Parking stays the same at 116 parking spaces as was approved in 2000. The applicant is proposing 20 additional valet parking spaces for events. Environmental Impacts: Staff required an Environmental Impact Report for the project. Please contact staff for a copy if you would like to review it. There are existing trees that would be removed as the result of the project. Approximately 330 aspens and 40 evergreens would be removed. However, the landscape plan helps mitigate that impact. The applicant is proposing to add 445 deciduous trees and 250 evergreen trees to the site as part of the landscaping plan. AttarhmPnts• 1. Ordinances and Resolutions • Resolution 12: Rock Fall Plan Amendment • Resolution 13: Land Use Plan Amendment • Ordinance 21 Rezoning of Lot 12 ,Block 2, Vail Village 12th Filing • Ordinance 22 Rezoning of Lot 11, Block 2 Vail Village 12th Filing • Ordinance 23 Rezoning of Tract C, Block 1, Vail Village 12"' Filing 2. Conditions from PEC on Conditional Use Permits 3. Memo to Planning and Environmental Commission (includes plans) ORDINANCE NO 21 Series of 2002 AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP FOR THE TOWN OF VAIL IN ACCORDANCE WITH TITLE 12, ZONING REGULATIONS, CHAPTER 5, ZONING MAP; REZONING LOTS 12, BLOCK 2, VAIL VILLAGE 12T" FILING FROM THE AGRICULTURE OPEN SPACE DISTRICT TO THE GENERAL USE DISTRICT WHEREAS, the Town Council finds the amendment is consistent with the Zoning Regulations, and that the amendment is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and WHERAS, the Town Council finds the amendment supports a coherent and harmonious development plan for the Vail Mountain School and is consistent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the development objectives of the Town . WHEREAS, the Town Council considers it in the interest of the public health, safety, and welfare to amend the official Town of Vail Zoning Map. WHEREAS, the Planning and Environmental Commission of the Town of Vail has recommended approval of these zoning map amendments in accordance with the approved criteria grid findings for a rezoning as per Ordinance # 4, Series of 2002 at its August 11th, 2002 meeting; and WHEREAS, the Town Council finds that this amendment is in accordance with the approved criteria and findings for a rezoning as per Ordinance # 4, Series of 2002. NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF Ordinance No. 11 ,Series of 1998 VAIL, COLORADO, THAT: follows: Section 1. The Official Zoning Map of the Town of Vail is hereby amended as That Lot 12, Block 2, Vail Village 12th Filing from Agriculture Open Space to General Use; as shown in attached map Exhibit A.. Section 2. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid, such decision shall not effect the validity of the remaining portions of this ordinance; and the Town Council hereby declares it would have passed this ordinance, and each part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or more parts, sections, subsections, sentences, clauses or phrases be declared invalid. Section 3. The Town Council hereby finds, determines and declares that this ordinance is necessary and proper for the health, safety and welfare of the Town of Vail and the inhabitants thereof. Section 4. The amendment of any provision of the Town Code as provided in this ordinance shall not affect any right which has accrued, any duty imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced, nor any other action or proceeding as commenced under or by virtue of the provision amended. The amendment of any provision hereby shall not revive any provision or any ordinance previously repealed or superseded unless expressly stated herein. Section 5. All bylaws, orders, resolutions and ordinances, or parts thereof, inconsistent herewith are repealed to the extent only of such inconsistency. This repealer shall Ordinance No. 11 ,Series of 1998. 2 not be construed to revise any bylaw, order, resolution or ordinance, or part thereof, theretofore repealed. INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED PUBLISHED ONCE IN FULL ON FIRST READING this 20th day of August, 2002 and a public hearing for second reading of this Ordiriance set for the 17'h Day of September, 2002, in the Council Chambers of the Vail Municipal Building, Vail, Colorado. Ludwig Kurz, Mayor Attest: Lorelei Donaldson, Town Clerk READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED this 17th day of September, 2002. Ludwig Kurz, Mayor Attest: Lorelei Donaldson, Town Clerk Ordinance No. 11 ,Series of 1998 3 1 Attachment A Agriculture ~~ ~ ,'` Open Space to r~ ~~, ~e General use ~~ ,,,., ,;~~ ~~ - ~-~`~ s~ - ~ ~ ~ ~ ,.~s ~ .? _ , i ~ rc an Lot 11: Two ~ t ; ,4~~wr-~~ ~~ ~~a * 1 _~ ___-,- Family ' ~ Residential to Tract C: Two General use E --- Family Residential to General use Ordinance No. 11 ,Series of 1998 ,4 ORDINANCE NO 22 Series of 2002 AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP FOR THE TOWN OF VAIL IN ACCORDANCE WITH TITLE 12, ZONING REGULATIONS, CHAPTER 5, ZONING MAP; REZONING LOTS 11, BLOCK 2, VAIL VILLAGE 12T" FILING FROM THE TWO FAMILY RESIDENTIAL DISTRICT TO THE GENERAL USE DISTRICT WHEREAS, the Town Council finds the amendment is consistent with the Zoning Regulations, and that the amendment is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and WHERAS, the Town Council finds the amendment supports a coherent and harmonious development plan for the Vail Mountain School and is consistent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the development objectives of the Town . WHEREAS, the Town Council considers it in the interest of the public health, safety, and welfare to amend the official Town of Vail Zoning Map. WHEREAS, the Planning and Environmental Commission of the Town of Vail has recommended approval of these zoning map amendments in accordance with the approved criteria and findings for a rezoning as per Ordinance # 4, Series of 2002 at its August 11th, 2002 meeting; and WHEREAS, the Town Council finds that this amendment is in accordance with the approved criteria and findings for a rezoning as per Ordinance # 4, Series of 2002. NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF Ordinance No. 11 ,Series of 1998 VAIL, COLORADO, THAT: follows: Section 1. The Official Zoning Map of the Town of Vail is hereby amended as That Lot 11, Block 2, Vail Village 12th Filing from Two-Family Residential to General Use; as shown in attached map Exhibit A.. Section 2. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid, such decision shall not effect the validity of the remaining portions of this ordinance; and the Town Council hereby declares it would have passed this ordinance, and each part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or more parts, sections, subsections, sentences, clauses or phrases be declared invalid. Section 3. The Town Council hereby finds, determines and declares that this ordinance is necessary and proper for the health, safety and welfare of the Town of Vail and the inhabitants thereof. Section 4. The amendment of any provision of the Town Code as provided in this ordinance shall not affect any right which has accrued, any duty imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced, nor any other action or proceeding as commenced under or by virtue of the provision amended. The amendment of any provision hereby shall not revive any provision or any ordinance previously repealed or superseded unless expressly stated herein. Section 5. All bylaws, orders, resolutions and ordinances, or parts thereof, inconsistent herewith are repealed to the extent only of such inconsistency. This repealer shall Ordinance No. 11 ,Series of 1998 2 s not be construed to revise any bylaw, order, resolution or ordinance, or part thereof, theretofore repealed. INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED PUBLISHED ONCE IN FULL ON FIRST READING this 20th day of August, 2002 and a public hearing for.second reading of this Ordinance set for the 17'h Day of September, 2002, in the Council Chambers of the Vail Municipal Building, Vail, Colorado. Ludwig Kurz, Mayor Attest: Lorelei Donaldson, Town Clerk READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED this 17th day of September, 2002. Ludwig Kurz, Mayor Attest: Lorelei Donaldson, Town Clerk Ordinance No. 11 ,Series of 1998 3 r Attachment A Lot 12: - ~ ~~ ~~ ~~ ' Agriculture ~- ' - ~ ~ ' Open Space to ~ '~ ~ ~-'~ ~ ~ '~ General use -- _ %~ ~ „~, ,,~;~" E ~, y ~~~_`~ 1 ~ ~.;) - ,,~ afro _ __ t ~. ~. "~ ~"~ .~ 1 ~~ i 1 ~ ~~ ~ ~ ~ ~ ~ '' r v ~~ ~.~`~f Lot 11: Two ~ t~ ~~ swr_ ~ °~ Family „~ ~,~ ~ s ~ ~ ~ .a; ~T~ Residential to ~~' ~ `~~ _ _ Tract C: Two General use E Family Residential to General use Ordinance No. 11 ,Series of 1998 4 ORDINANCE NO 23 Series of 2002 AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP FOR THE TOWN OF VAIL IN ACCORDANCE WITH TITLE 12, ZONING REGULATIONS, CHAPTER 5, ZONING MAP; REZONING TRACT C, BLOCK 1, VAIL VILLAGE 12T" FILING FROM THE TWO FAMILY RESIDENTIAL DISTRICT TO THE GENERAL USE DISTRICT WHEREAS, the Town Council finds the amendment is consistent with the Zoning Regulations, and that the amendment is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and WHERAS, the Town Council finds the amendment supports a coherent and harmonious development plan for the Vail Mountain School and is consistent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the development objectives of the Town . WHEREAS, the Town Council considers it in the interest of the public health, safety, and welfare to amend the official Town of Vail Zoning Map. WHEREAS, the Planning and Environmental Commission of the Town of Vail has recommended approval of these zoning map amendments in accordance with the approved criteria and findings for a rezoning as per Ordinance # 4, Series of 2002 at its August 11th, 2002 meeting; and WHEREAS, the Town Council finds that this amendment is in accordance with the approved criteria and findings for a rezoning as per Ordinance # 4, Series of 2002. NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF Ordinance No. 11 ,Series of 1998 VAIL, COLORADO, THAT: follows: Section 1. The Official Zoning Map of the Town of Vail is hereby amended as That Tract C, Block 1, Vail Village 12th Filing from Two-Family Residential to General Use; as shown in attached map Exhibit A.. Section 2. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid, such decision shall not effect the validity of the remaining portions of this ordinance; and the Town Council hereby declares it would have passed this ordinance, and each part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or more parts, sections, subsections, sentences, clauses or phrases be declared invalid. Section 3. The Town Council hereby finds, determines and declares that this ordinance is necessary and proper for the health, safety and welfare of the Town of Vail and the inhabitants thereof. Section 4. The amendment of any provision of the Town Code as provided in this ordinance shall not affect any right which has accrued, any duty imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced, nor any other action or proceeding as commenced under or by virtue of the provision amended. The amendment of any provision hereby shall not revive any provision or any ordinance previously repealed or superseded unless expressly stated herein. Section 5. All bylaws, orders, resolutions and ordinances, or parts thereof, inconsistent herewith are repealed to the extent only of such inconsistency. This repealer shall Ordinance No. 11 ,Series of 1998 2 not be construed to revise any bylaw, order, resolution or ordinance, or part thereof, theretofore repealed. INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED PUBLISHED ONCE IN FULL ON FIRST READING this 20th day of August, 2002 and a public hearing for second reading of this Ordinance set for the 17th Day of September, 2002, in the Council Chambers of the Vail Municipal Building, Vail, Colorado. Ludwig Kurz, Mayor Attest: Lorelei Donaldson, Town Clerk READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED this 17th day of September, 2002. Ludwig Kurz, Mayor Attest: Lorelei Donaldson, Town Clerk Ordinance No. 11 ,Series of 1998 3 r Attachment A ,~ , ~ - ~„ Lot 12: 1 .\` i x, ~. f Agriculture '~ ,' Open Space to ~~' General use '~ ~ ~~ ~ ~" ~~ ~- rl;~ '~__ ,. __ ~ ~, Y. ~^ -j _ x- tl ~ I ~~ A1" a ~ ...5 r _~J Lot 11: Two ~ Family `' Residential to General use ,~ - -- v- __ r i ~ =~cr _ Tract C: Two Family Residential to General use Ordinance No. 11 ,Series of 1998 4 Ordinance No. 11 ,Series of 1998 Attachment 3 MEMORANDUM TO: Planning and Environmental Commission ~~FROM: Community Development Department DATE: August 12, 2002 SUBJECT: Amendment to the Vail Mountain School Development Plan and associated rezoning, conditional use permit, and hazard area amendment requests located at Lots 11 and 12, Block 2, Vail Village 12tH and Tract C, Block 1, Vail Village 12tH Applicant: Vail Mountain School, represented by Braun and Associates Planner: Russ Forrest SUMMARY The applicant is requesting final decisions and recommendations on the various applications that have been submitted to redevelop the Vail Mountain School. It is critical that the Planning and Environmental Commission utilize the criteria and findings referenced in section VI of this memorandum in considering a decision. There are a total of nine applications involved with this proposal. The Planning and Environmental Commission should reference section II for a summary of those applications that the Planning and Environmental Commission makes a recommendation to the Town Council on those applications where they are making a final decision. Since the last Planning and Environmental Commission meeting on July 22nd meeting the applicant has: • Created a pedestrian trail from the north parking area to the school. • Further moved the soccer field away from the street. • Completed a lighting plan • Created a pedestrian connection to the bus stop. II. DESCRIPTION OF THE REQUEST This project involves the following properties: Parcel Current Proposed Lot Size Property Zoning and Zoning and Owner Use Use 1) Lot 12 S ,Block 2, Vail General Use General Use 6.1 acres Vail Mountain Village 12th (Current (GU) Zoning/ School School Site) school, soccer field & 88 parking spaces 2) Lot 12 (applicant has Agriculture General Use. 1.28 Vail Mountain referred to property as Open Space Zoning/ acres School 12N), Block 2 Vail Village (AOS) 12 parking (Previously 12th (Tennis Court Site) spaces, owned by the This site was not properly relocated Booth Falls subdivided and is actually cabin Homeowners. part of Lot 12. Associations) 3) Lot 11, Block 2, Vail Two Family General Use/ .408' Vail Mountain Village 12th (lot directly Residential Soccer Field acres School west of current soccer field) 4) Tract C, Block 1, Vail Two Family General Use/ 1.19 Vail Resorts Village 12th Residential 8 EHUs & 16 acres parking spaces required for EHUs The following is a summary of the applications for this project: Applications that the Planning and Environmental Commission will make a recommendation on: 1) A request for a recommendation to the Vail Town Council to rezone 3010 Booth Falls Road/Lot 11, Block 2, Vail Village 12th Filing from Two-Family Residential to General Use; 2) A request for a recommendation to the Vail Town Council to rezone Lot 12, Block 2, Vail Village 12th Filing to General Use, The northern portion of this lot is zoned Agriculture Open Space; 3) A request for a recommendation to the Vail Town Council to rezone Tract C, Block 1, Vail Village 12th Filing from Two-Family Residential to General Use; 4) A request for a recommendation to the Vail Town Council to modify the official Town of Vail Rockfall Hazard Map to indicate approved mitigation for 3160 N. Frontage Road/Lot 12, Block 2, and Tract C, Block 1, Vail Village 12th Filling; 5) A request for a recommendation to amend the official Town of Vail Land Use Map for Tract C, Block 1, Vail Village 12th Filing from Low Density Residential to Public/Semi-Public; 3 Applications that the Planning and Environmental Commission will make a decision on: 6) A request for an amendment to the previously approved development plan and a new conditional use permit for a private educational institution. and an active outdoor recreation area on 3010 Booth Falls Road/Lot 11, Block 2, Vail Village 12tH Filing grid 3160 N. Frontage Road East/ Lot 12, Block 2, Vail Village 12tH Filing; 7) A request for a conditional use permit to allow for the construction of eight Type III EHUs located on Tract C, Block 1, Vail Village 12tH Filing; 8) A request for a for a conditional use permit to continue to allow for the existing temporary modular classroom structures located at 3160 N. Frontage Road East/ a part of Lot 12, Block 2, Vail Village 12tH Filing; 9) A request for a major subdivision and preliminary plat approval for the Vail Mountain School Subdivision, A resubdivision of Lots 11, 12, Tract C, and Katsos Ranch Road, Vail Village 12tH Filing in accordance with Title 13, Chapter 3, Vail Town Code, and setting forth details in regards thereto. The Town Council will also need to accept the dedication of land and approve of the subdivision. BACKGROUND A. 2000 Vail Mountain School Master Plan On June Stn, 1999, the Vail Town Council discussed Planning and Environmental Commission's decision to approve a conditional use permit (CONDITIONAL USE PERMIT) to allow for the addition of a temporary classroom structure at the Vail Mountain School. The Council agreed the CONDITIONAL USE PERMIT could be extended for an additional year if the applicant presented a master plan to the Council within one year. On April 24tH, 2000 the Vail Mountain School received approval for a development plan (master plan) and a conditional use permit for the expansion of the school facilities, including eight Type III employee housing units. Attachment A summarizes the development parameters that were approved for the master plan. The Vait Mountain School Master Plan involves significant improvements constructed in two separate phases. Phase I (June 2000-July 2001) improvements include: ^ Demolition of the rockfall mitigation berm • Removal of the existing temporary classroom structure • .Construction of an eight-classroom wing to the north of the existing building ^ An elevator connection to all floors ^ Reconfiguration of the existing access and parking area to allow for the addition of a "drop off' lane and additional parking. Phase II (long-term) improvements include: ^ Addition of a 300-seat auditorium • Faculty housing ^ Additional classrooms south of the gymnasium ^ Additional parking It is important to note that the proposed 2002 development plan and the approved 2000 master plan propose the same number of students (330 students) and 28 class rooms. The 2002 proposal does include a larger auditorium (400 seats versus 300). The total floor area is approximately 31,993 square feet larger than the 2000 master plan. Parking (116 spaces) and employee housing is proposed to be the same for the 2002 application and the 2000 master plan given that the number of students and faculty will remain the same. B. History of the Property The following is a brief synopsis of Vail Mountain School development over the last 20 years: 1972 -Vail Village 12th Filing was annexed into the Town of Vail and platted. This subdivision plat shows Lot 12 at 8.66 acres in size. 1972-At the-time of annexation Agriculture Open Space zoning was applied to Lot 12. The total area of the parcel was 8.66 acres. The minimum lot size of the Agriculture Open Space zone district is 35 acres. 1979 -Vail Resorts conveyed the Tennis Court site to the Booth Falls Homeowners through a quick claim deed. 1979-the first two story building was constructed on the site. 1980-Vail Resorts conveyed the land the school is on today to the Vail Mountain School. 1979 -Original 2-story building constructed 1984 -North classrooms and rockfall berm constructed (berm is no longer necessary) 1989 -Gymnasium and stage addition constructed 1992 -Additional story added to existing building 1995 =Library expansion 1999 -Temporary classroom structure constructed IV. ROLES OF REVIEWING BOARDS Order of Review: Generally, applications will be reviewed first by the Planning and Environmental Commission for acceptability of use and then by the Design Review Board for compliance of proposed buildings and site planning. A. Major Subdivision Planning and Environmental Commission: Action: The Planning and Environmental Commission is responsible for final approval/approval with conditions/denial of a major subdivision. Specifically the the code states: The burden of proof shall rest with the applicant to show that the application is in compliance with the intent and purposes of this Chapter, the Zoning Ordinance and other pertinent regulations that the Planning and Environmental Commission deems applicable. Due consideration shall be given to the recommendations made by public agencies, utility companies and other agencies consulted under subsection 13-3-3C above. The Planning and Environmental Commission shall review the application and consider its appropriateness in regard to Town policies relating to subdivision control, densities proposed, regulations, ordinances and resolutions and other applicable documents, environmental integrity and compatibility with the surrounding land uses and other applicable documents, effects on the aesthetics of the Town. (1997 Code: Ord. 2(1983) § 1 B. Conditional Use Permit Plannina and Environmental Commission: Action: The Planning and Environmental Commission is responsible for final approval/approval with conditions/denial of a conditional use permit. The Planning and Environmental Commission will make recommendations to the Town Council on rezoning land, text amendments, and modification of hazard designations. The Planning and Environmental Commission is responsible for evaluating a proposal for: Relationship and impact of the use on development objectives of the Town. 2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. 3. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking areas. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. 5. Such other factors and criteria as the Commission deems applicable to the •proposed use. 6. The environmental impact report concerning the proposed use, if an environmental impact report is required by Chapter 12 of this Title. The Planning and Environmental Commission is also responsible for prescribing the development parameters on General Use zoned land and ensuring the development parameters conform to approved zoning in other zone districts. The development parameters that must be considered include: • Lot area • Setbacks • Building Height • Density • GRFA • Site coverage • Landscape area • Parking and loading • Mitigation of development impacts C. Design Review Board Application Design Review Board: The Design Review Board has no review authority on a conditional use permit, but must review any accompanying Design Review Board application. The Design Review Board is responsible for evaluating the Design Review Board proposal for: • Architectural compatibility with other structures, the land and surroundings • Fitting buildings into landscape • Configuration of building and grading of a site which respects the topography • Removal/Preservation of trees and native vegetation • Adequate provision for snow storage on-site • Acceptability of building materials and colors • Acceptability of roof elements, eaves, overhangs, and other building forms • Provision of landscape and drainage • Provision of fencing, walls, and accessory structures • Circulation and access to a site including parking, and site distances • Location and design of satellite dishes • Provision of outdoor lighting • .The design of parks D. Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a 7 recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. E. Rezoning, Major Subdivision Town Council: The Town Council is the final decision making authority for a rezoning or a text amendment. Final actions of Design Review Board or Planning and Environmental Commission maybe appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the Planning and Environmental Commission or Design Review Board erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. The Town Council is also responsible for accepting land for public right of way in a Major Subdivision. V. SUMMARY OF PLANNING AND ENVIRONMENTAL COMMISSION ~ DESIGN REVIEW BOARD INPUT June 10th 2002 Planning and Environmental Commission Meeting • The Planning and Environmental Commission asked that a sensitive lighting plan be developed. • Make the parking on Tract C more consolidated. • There was some interest in moving the Headmasters House onto Tract C. • The Planning and Environmental Commission wanted to see a management plan for the EHUs to show how the units would be used by employees of the school. • There was a comment to move Katsos Road further to the East to create more space for the school. • There was a comment to subdivide the headmaster's house from the rest of the school and recreational field. • There was a need for additional information on retaining walls and grade changes. • Create enclosed parking for EHUs on Tract C • There was concern expressed about the van parking on Tract C. • There was agreement with Design Review Board that the height of the gymnasium could be reduced. • There was general support that EHUs on Tract C were appropriate. • There was some concern about the overall mass of the school. • Some members did not support an amendment to add the 425 credit to the Agriculture Open Space Zone District. July 8th 2002 Planning and Environmental Commission Meeting • The Planning and Environmental Commission asked the applicant to rezone the tennis court area to either General Use or Single Family Residential. There was agreement that a more appropriate zoning should be used for the headmaster's house and the soccer field. • The majority of Planning and Environmental Commission indicated that they would not support a text amendment for the Agriculture Open Space zone district to accommodate a 425 GRFA credit. • The Planning and Environmental Commission did not approve of parking on the Frontage Rd for overflow parking. • There was some interest from the Planning and Environmental Commission in pursuing event parking at the Booth Falls trailhead. • The Planning and Environmental Commission wanted to see a sensitive lighting plan for the project. • The Planning and Environmental Commission stated that the fence beside the soccer field must be moved at least 10 feet from the edge of asphalt of Booth Falls Road. • Several members. of the Planning and Environmental Commission commented that the school was addressing their concerns and moving in the right direction. Also the new plan was similar to the plan approved in 2000 in that the school would be accommodating the same number of students and would have the same number of staff. Planning and Environmental Commission heard testimony from adjacent neighbors that the school was still too big and that the height should be further reduced to minimize the visual impact of the school. There was testimony regarding the need to remove parking from Tract C. Also lighting was a critical issue neighbors were concerned about. There were also comments that the school needed to improve trash removal and clean-up of the grounds. A letter from Winston Associates was provided to the Planning and Environmental Commission by several Katsos Ranch neighbors that outlined their position on the project and recommendations for Tract C. _ July 22"d 2002 Planning and Environmental Commission Meeting • The Planning and Environmental Commission asked that a pedestrian trail be created between the north parking lot and the school. • The Planning and Environmental Commission asked that a MOU be created to facilitate parking on the Booth- Creek Trail Head for special events in the winter. • Planning and Environmental Commission asked that the bus stop be moved to the south side of the bus turn in. • Planning and Environmental Commission asked that the Soccer Field be moved further from the road. June 5T" 2002 Design Review Board Meeting The Design Review Board was very supportive of the architectural form of the building. Specifically they liked the horizontal and vertical variation in the design. The Design Review Board liked the contrast in the use of materials and that several roof materials would be considered. The Design Review Board requested that the applicant look at sinking the gymnasium to reduce the height of this element to address concerns from adjacent property owners. • The Design Review Board expressed concern regarding any impact to the aspen stand on Tract C. • The Design Review Board asked to see a very sensitive lighting plan. The Board asked that low level Ballard lighting be used. • The Design Review Board asked the applicant to consider structured parking underneath the soccer field which could enable the parking to be reduced on Tract C. , • The Design Review Board wanted to make sure that the applicant would have adequate landscaping. They were concerned that much of the landscaping was on Colorado Department of Transportation right-of-way and wanted to make sure that they could plant that material. • Design Review Board asked that a gate be considered for Tract C to prevent non school related traffic from parking in that lot. • Design Review Board asked whether a porte-cochere was needed for the entrance to the school. • The Board inquired whether there was adequate space for loading and delivery. 10 VI. APPLICATION CRITERIA, FINDINGS, STAFF RECOMMENDATIONS, AND CONDITIONS A. AMENDMENT TO THE LAND USE PLAN FOR TRACT C 1) General Overview of the Plan The Town of Vail Land Use Plan was initiated in 1985 and adopted in 1986 by the Vail Town Council. The main purposes of the Land Use Plan are two- fold: To articulate the land use goals of the Town. To serve as a guide for decision making by the Town. The Tovvn of Vail Land Use Plan is intended to serve as a basis from which future land use decisions may be made within the Town of Vail. The goals, as articulated within the Land Use Plan, are meant to be used as adopted policy guidelines in the review process for new development proposals. In conjunction with these goals, land use categories are defined to indicate general types of land uses which are then used to develop the Vail Land Use Map. The Land Use Plan is not intended to be regulatory in nature, but is intended to provide a general framework to guide decision making. Where the land use categories and zoning conflict, existing zoning controls development on a site. To be effective, the Land Use Plan must be updated to reflect current thinking and changing market conditions. The Town of Vail Land Use Plan can be amended in three ways: 1) The Community Development Department can update and revise the plan periodically. The Community Development Department then makes recommendations for the proposed changes to the Planning and Environmental Commission, where these changes would then be considered in a public hearing format. The Planning and Environmental Commission would then make a recommendation to the Town Council, where another public hearing would be held. The Council then adopts the changes by resolution. 2) The Planning and Environmental Commission or Town Council can also initiate amendments to the Land Use Plan. Again, both boards hold public hearings and the changes are adopted by the Town Council by resolution. 3) The private sector can also initiate amendments to the Vail Land Use Plan. Applications may be made by a registered voter, a property owner, or a property owner's authorized representative. The amendments are then heard by both the Planning and Environmental Commission and the Town Council. The Town Council then adopts the changes by resolution. 2) Land Use Plan Designation Description for Tract C Current Land Use Plan designation for Tract C: Low Density Residential: This category includes single-family detached homes and two family dwelling units. Density of development within this category would typically not exceed 3 structures per buildable acre; however, all of the adjacent residential uses exceed 3 dwelling units per acre. Also within this area would be private recreation facilities such as tennis courts, swimming pools and clubhouses for the use of residents of the area. Institutional /public uses permitted would include churches, fire stations, and parks and open space related facilities. Proposed Land Use designation: Public/Semi-Public (PSP): The Public and semi-public category includes schools, post office, water and sewer service and storage facilities, cemeteries, municipal facilities, and other public institutions, which are located throughout the community to serve the needs of residents. 3) Criteria for amending the Town of Vail Land Use Plan Any amendments to the Land Use Plan require a public process. Adjacent properties are notified, the Planning and Environmental Commission holds a public hearing and makes a recommendation to the Town Council on the proposal. The Town Council adopts the changes by resolution. Any changes to the Land Use Plan must address the following three criteria: 1. How conditions have changed since the plan was adopted? Physical conditions and the fundamental land use patterns of the neighborhood have not changed since the 1986 adoption of the plan. However, the Vail Mountain School is proposing to expand their program and physical space consistent with a development plan that was approved in 2000. Since the Land Use plan was adopted the need for employee housing has significantly increased with only a 1 % vacancy rate in the rental market in Vail. Employee housing is a critical need in the Town of Vail and any proposed use that generates new employees needs to provide a reasonable amount of housing for their employees. 2. How the plan is in error? The plan is not in error with respect to the land use designation. However, this land will be an integral component of the school's operation, and a Public/Semi Public land use designation will be more appropriate in the future and will facilitate a cohesive development plan for the community and the school. 12 3. How the addition, deletion or change to the plan is in concert with the plan in general? Adjacent lands are designated Public/Semi Public to the west and Low Density Residential to the north. This designation allows for the creation of associated housing for the school which is similar to how housing located at Buzzard Park which supports the Town of Vail Public Works operation also with aPublic/Semi Public designation. The Town of Vail Land Use Plan also states on page 8 of the plan that affordable employee housing should be made available through private efforts, assisted by limited incentives and additional employee housing needs should be accommodated at varied sites throughout the community." 4. Staff Recommendation The Community Development Department recommends that the Planning and Environmental Commission forward a recommendation of approval to the Vail Town Council for the land use amendment in that it allows for uses consistent with adjacent land uses and the creation of a harmonious relationship with the adjacent residential and institutional uses and that this application meets the criteria mentioned above. B. REZONING OF LOTS 12, 11, AND TRACT C Rezoning Criteria Before acting on an application for a zone district boundary amendment, the Planning & Environmental Commission and Town Council shall consider the following factors with respect to the requested zone district boundary amendment: 1) The extent to which the zone district amendment. is consistent with all the applicable elements of the adopted goals,. objectives and policies outlined in the Vail Comprehensive Plan and is compatible with the development objectives of the Town. Lots 11 and 12 have aPublic/Semi Public Land Use Plan Designation. Rezoning Lot 11 and the northern area of Lot 12 will increase the conformance to the Vail Land Use Plan. With an amendment to the Land Use Plan for Tract C, the rezoning of Tract C to General Use zone district would be consistent with the Comprehensive Plan. The affordable housing on Tract C is an integral part of the school on Lot 12. 2) The extent to which the zone district amendment is suitable with the existing and potential land uses on the site and existing and potential surrounding land uses as set out in the Town's adopted planning documents. A school in a residential neighborhood is suitable and can work well together. Schools are typically located in residential areas. ,The 1~ school has been located on Lot 12 since 1980. There has been a relatively harmonious relationship between the school and the adjacent neighborhood. The location of school employee housing on Tract C is also consistent with the adjacent neighborhood. Tract C currently has a zoning of Two Family Residential. With that zoning, the lot could be subdivided into three parcels and have approximately 15,000 square feet of gross residential floor area. The school is proposing 2 structures with 8 employee housing units for a grand total of 7,280 sq. ft. of gross residential floor area. 3) The extent to which the zone district amendment presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives. The proposed rezoning of the entire area of Lot 12 as General Use creates a more workable relationship among land uses and corrects an error that occurred in 1979 when that land was improperly subdivided and conveyed to another owner. Lot 11 which is now owned by the Vail Mountain School should be rezoned to General Use since the use of the property will be a school. This lot has been surrounded by school land and this rezoning creates a more harmonious workable relationship with the Vail Mountain Schools development plans. Tract C will continue to have a residential use that is interconnected with the school. The proposed housing on Tract C in relationship with the circulation plan for the school will reduce traffic on Katsos Ranch Road. These rezonings essentially consolidate the land on and around the school into the same zone district (General Use) and creates a more workable relationship for the school's development plans and allows the impacts of the school to be effectively mitigated to the extent possible. 4) The extent to which the zone district amendment provides for the growth of an orderly viable community and does not constitute spot zoning as the amendment serves the best interests of the community as a whole. By rezoning the northern area of Lots 12 and 11 to the General Use Zone District there is increased conformity to the Land Use Plan since the designation for this land is Public/Semi Public. With the amendment to the Land Use Plan for Tract C to Public/Semi Public and the development of housing on the site for the school that amendment will also serve the interests of the community as a whole by having an employer provide housing for a portion of the new employees that would be generated by the project. 5) The extent to which the zone district amendment results in adverse or beneficial impacts on the natural environment, including but not limited to water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features 14 An Environmental Impact Report was prepared for this proposal. No significant environmental impacts were identified in the report. There are existing trees that would be removed as the result of the project. Approximately 330 aspens and 40 evergreens. However, the landscape plan helps mitigate that impact. The applicant is proposing to add 445 deciduous trees and 250 evergreen trees to the site as part of the landscaping plan. 6) The extent to which the zone district amendment is consistent with the purpose statement of the proposed zone district. The purpose statement of the General Use Zone District is defined in Section 12-9C-1, Vail Town Code, and reads as follows: "The general use district is intended to provide sites for public and quasi-public uses which, because of their special characteristics, cannot be appropriately regulated by the development standards prescribed for other zoning districts, and for which development standards especially prescribed for each particular development proposal or project are necessary to achieve the purposes prescribed in section 12-1-2 of this title and to provide for the public welfare. The General Use District is intended to ensure that public buildings and grounds and certain types of quasi-public uses permitted in the district are appropriately located and designed to meet the needs of residents and visitors to Vail, to harmonize with surrounding uses, and, in the case of buildings and other structures, to ensure adequate light, air, open spaces, and other amenities appropriate to the permitted types of uses. (Ord. 21(1994) § 10)" A school is a public or quasi public use which does have special needs. The development plan process provided for in the General Use zone helps ensure that the proposed development is in harmony with the adjacent uses and that the potential impacts of the building are adequately mitigated. 7) The extent to which the zone district amendment demonstrates how conditions have changed since the zoning designation of the subject property was adopted and is no longer appropriate. With regard to Lots 12 and 11, the proposed rezoning addresses an error that was made in 1979 when the northern portion of Lot 12 was conveyed to another owner. In addition, the school has surrounded Lot 11 making a residential development on that site difficult at best. With regard to Tract C, an increased need for employee housing has resulted in the last 20 years. It is now a matter of policy that when an employer generates new employees that they need to accommodate housing for a percentage of those new employees. Also employers are finding it necessary to provide employee housing to recruit high 15 quality employees. Therefore, staff believes that the eight proposed EHUs are an integral and necessary component of the school. 8) Such other factors and criteria as the Commission and/or Council deem applicable to the proposed rezoning. 3. Necessary Findings: Before recommending and/or granting an approval of an application for a zone district boundary amendment the Planning & Environmental Commission and the Town Council shall make the following findings with respect to the requested amendment: 1) That the amendment is consistent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the development objectives of the Town. 2) That the amendment is compatible with and suitable to adjacent uses and appropriate for the surrounding areas. 3) That the amendment promotes the health, safety, morals, and general welfare of the Town and promotes the coordinated and harmonious development of the Town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. 4. Staff Recommendation The Community Development Department recommends that the Planning and Environmental Commission forward a recommendation of approval for the rezoning of Lots 11 and 12, Block 2, Vail Village 12th and Tract C, Block 1, Vail Village 12th and that the proposed amendments are consistent with the criteria and findings described above. C. CONDITIONAL USE PERMIT(S) FOR DEVELOPMENT PLAN, EIGHT EHUs ON TRACT C, AND MAINTAINING THE MODULAR STRUCTURES ON THE SITE. riteria for a Conditional Use Permit 1) Relationship and impact of the use on the development objectives of the Town. The Vail Land Use Plan applies a "Public/Semi-Public" land use designation on this property. This category includes uses such as schools, post office, water and sewer service and storage facilities, cemeteries, municipal facilities, and other institutions which are located throughout the community to serve the needs of residents. Staff believes this proposal is in compliance with all applicable objectives of the Vail Land Use Plan. Staff believes the proposal furthers the following specific goals: 16 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.3 The quality of development should be maintained and upgraded whenever possible. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. 5.3 Affordable employee housing should be made available through private efforts, assisted by limited incentives, provided by the Town of Vail with appropriate restrictions. 5.4 Residential growth should keep pace with the marketplace demands for a full range of housing types. 5.5 The existing employee housing base should be preserved and upgraded. Additional employee housing needs should be accommodated at varied sites throughout the community. 6.1 "Services should keep pace with increased growth. With relationship to the conditional use permit for the temporary structures, Section 12-9C-3, Vail Town Code allows for temporary structures subject to the issuance of a conditional use permit. The Vail Town Code requires the. issuance of a conditional use permit for temporary structures, in part, to insure that adequate steps are taken to insure that the structure complies with the development objectives of the Town. The intent of allowing temporary structures is to accommodate those situations when a permanent structure is not appropriate or circumstances, such as duration of use, warrants a temporary structure. In the case of the Vail Mountain School, staff believes a temporary structure is warranted for a limited period of time to accommodate the immediate needs of the school while the school completes construction of the new facility. Staff believes the two-year request is appropriate. However, a request for an extension to the two-year timeframe should not be permitted. 2) The effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities needs. Transportation -please refer to item 3 below. Schools -Planned improvements for the school would increase capacity to approximately 300 students and provide affordable housing for teachers and 17 staff. Staff believes the proposal would have a significant positive impact on educational opportunities in the Vail Valley. Parks and Recreation -Staff. believes the proposed auditorium facility could be a valuable amenity to Vail residents if managed via apublic/private partnership. The applicant has expressed a desire to provide opportunities for public events at the auditorium when school-related functions are not planned. The redevelopment of the soccer field will also provide recreational opportunities for the community. The requested conditional use permit for the temporary structures will have positive effects on the immediate needs of the school to meet growing demands. The temporary classrooms will allow the school to provide educational opportunities for up to 18 additional students. . 3.Effect upon traffic with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the street and parking areas. The applicant has completed a traffic impact assessment. This study concludes that traffic on Katsos Ranch Road will be reduced. Traffic on Booth Creek Road will not be increased significantly and the traffic consultant has concluded that additional turning lanes are not required. Adjacent fields and open space will provide more than the 30% of the parking area for snow storage. However, the applicant needs to identify snow storage for the EHU parking and the north parking lot. With the change in circulation of the parking area and with the eight EHUs on Tract C a net decrease in traffic will occur on Katsos Ranch Road. 4.Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. The proposed structures are larger than the 2000 development plan with approximately 87,300 square feet of gross floor area versus approximately 55,390 square feet of floor area approved in the 2000 master plan, which is nearly 58% increase in floor area. It is important to note that the Vail Mountain School has increase its land area from 6.1 acres to 9.18 acres. That is an approximately 50% increase in total lot area. The applicant is attempting to articulate the building to reduce the perceived bulk and mass of the building. However, this is still a large structure for this area of Vail. The proposed EHUs are compatible in scale with other adjacent uses. The total floor area of the EHUs is less than if the lot was fully developed for duplex development under the Two Family Residential Zone District. With regard to the conditional use permit for the temporary structures, staff believes that due to the exterior improvements of the structures, the location 18 of the structure on the school site, and the temporary nature of the building, the temporary classroom will have minimal, if any negative impacts on the character of the area. 2. Findings for Conditional Use Permits The Planning & Environmental Commission shall make the following findings before granting a conditional use permit: That the proposed location of the use is in accordance with the purposes of the conditional use permit section of the zoning code and the purposes of the district in which the site is located. 2. That the proposed location of the use and the conditions under which it would be operated or maintained would not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 3. That the proposed use would comply with each of the applicable , provisions of the conditional use permit section of the zoning code. 3. Staff Recommendations and Conditions The Department of Community Development recommends that the Planning and Environmental Commission approve of the proposed conditional use permits, based upon the above mentioned criteria and findings referenced above, for: • The Development Plan • 8 EHUs on Tract C • Continued use of modular trailers If the Planning and Environmental Commission chooses to approve of these conditional use permits, staff would recommend the following conditions: The applicant shall provide the Town of Vail with an easement for the existing public bus stop at the southwest corner of the property prior to building permit submittal. 2. The applicant shall provide the Town of Vail with drainage easements in accordance with the proposed grading and drainage plans. These easements shall be recorded prior to the issuance of a temporary certificate of occupancy or certificate of occupancy for any proposed development on the site. 3. Prior to the issuance of a Temporary Certificate of Occupancy or a Certificate of Occupancy for any phase of the school, the applicant shall complete and receive a Certificate of Occupancy for the eight employee housing units constructed on Tract C except for the occupancy of the cabin. 19 4. All housing units on Tract C shall be deed-restricted as Type III employee housing units. These units must be constructed in conjunction with the approved development plan. Required Type III deed-restrictions shall be recorded by the applicant with the Eagle County Clerk Recorder prior to the issuance of any temporary certificate of occupancy or certificate of occupancy for development of the school. The employee housing units shall comply with the minimum requirements for Type III employee housing regulations, as defined in Chapter 12, of the Vail Town Code. 5. The bicycle/pedestrian path shall be constructed by the applicant as per the approved development plan. Construction shall be completed prior to receiving a Temporary Certificate of Occupancy for the School. An easement shall be provided to the Town of Vail by the applicant for the bike/pedestrian path prior to the issuance of a building permit. 6. A cash deposit shall be submitted to the Town of Vail by the applicant prior to the issuance of any building permits for 100% of the value of creating a bike path/pedestrian trail for the entire length of Tract C, Block 1, Vail Village 12 Filling of the same quality and width as the path specified in condition number 5 above and more specifically described in the Development Plan. 7. Approval of the conditional use permit for the development plan is conditioned upon the rezoning of Lots 12 and 11, Block 2, Vail Village 12th Filing to the General Use District and approval of a final plat. 8. The conditional use permit for the modular structures shall be null and void two years from the approval of the conditional use permit for the two modular structures. This conditional use permit is valid only for the current number and location of the existing modular structures as of the date of this approval. 9. The Vail Mountain School shall not use any public right of way for parking. 10. A debris flow berm should be designed and constructed prior the location of the cabin on the northern portion of lot 12. A qualified engineer or geologist shall conclude in a written letter to the Community Development Department that the berm will adequately protect the cabin from a debris flow with out adversely impacting private or public property. 11. The applicant shall verify with a qualified lighting expert that luminance for all types of exterior lighting do not exceed 125. The applicant shall submit a report to the Town that the lighting complies with the Town's development standards, prior to the issuance of a Temporary Certificate of Occupancy. Zo 12. The applicant shall submit revised development plans to the Town identifying adequate snow storage for the north parking area and the parking area for Tract C prior to the issuance of final Design Review Board approval. D. Hazard Plan Amendment: 1. Criteria for Hazard Amendment Specific criteria for amending the Master Hazard Plans are not provided in the code. However, the purpose statement of Chapter 12-21 and provisions for providing mitigation for development specified in Section 12-21-15-C.1 of the Vail Town Code do provide criteria for a decision to amend the hazard master plan. The following are the recommended criteria for making an amendment to the hazard plans: 1) That the mitigation supports the purpose statement of section 12-21 which states in part "The purpose of this Chapter is to help protect the inhabitants of the Town from dangers relating to development of flood plains, avalanche paths, steep slopes and geologically sensitive areas...." Based on the review of the mitigation by qualified professionals the mitigation will help protect the inhabitants of the Town from dangers relating to geologically sensitive areas. 2) That the corrective engineering or engineered construction or other mitigation or alternations can be accomplished to reduce the danger to the public health and safety to property to a reasonable level. Based on the engineering design of the rockfall berm and the review of the construction by qualified engineers, staff believes that the rockfall hazard is reasonably mitigated. Dr Bruce Collins a qualified geologist has concluded that the mitigation will be effective in protecting the northeastern portion of Lot 12 and Tract C. 3) Such mitigation does not increase the hazard to other property or structures or to public buildings, roads, streets, rights of way, easements, utilities or facilities. Based on reliable engineering input the mitigation will not impact other property or structures, or public buildings, roads, streets, rights of way, easements, utilities or facilities. 4) The applicant must establish by clear and convincing evidence that the information contained in the site specific geological investigation is reliable. 21 The rockfall berm has been reviewed by a qualified geologist and Bruce E Collins has concluded that the mitigation will effectively protect Lot 12 and Tract C. 2. Staff Recommendation: The Community Development Department recommends that the Planning and Environmental Commission forward a recommendation of approval to the Town Council of an amendment to the Rockfall Hazard Map to show approved mitigation on Lot 12, Block 2, Vail Village 12th Filling and Tract C, Block 1, Vail Village 12th Filing. E. MAJOR SUBDIVISION 1. General Overview of a Major Subdivision Title 13, Subdivision Regulations, of the Vail Town Code establishes the review process and criteria for a major subdivision proposed in the Town of Vail. Pursuant to Chapter 13-3 (Major Subdivision) of the Town Code, the first step in the review process is for the applicant to meet with a Town Planner to discuss the preliminary plan. Staff has met with the applicant on several occasions to discuss the proposal and address submittal requirements. Staff feels the applicant has successfully complied with the initial step in the review process. The Town of Vail is required to notify the following agencies that a major subdivision is proposed and that preliminary plans are available for review: a. Department of Public Works. b. Town Fire Department. c. Town Police Department. d. Public Service Company of Colorado. e. Holy Cross Electric Association. f. U.S. West g. Cablevision company serving the area. h. National Forest Service. i. Eagle River Water and Sanitation District. j. Vail Recreation District. k. Eagle County Ambulance District. I. Other interested agencies when applicable. The next step in the review process shall be a formal consideration of the preliminary plan by the Town of Vail Planning and- Environmental Commission. The applicant shall make a presentation to the Planning and Environmental Commission at a regularly scheduled meeting. The presentation and public hearing shall be in accordance with Section 12-3-6 of the Vail Town Code. The applicant's appearance before the Planning and Environmental Commission today shall serve to meet the public hearing and presentation requirement. 22 The burden of proof that the application is in compliance with the intent and purposes of the Zoning Code and other pertinent regulations shall lie upon the applicant. In reviewing the preliminary plan, the Planning and Environmental Commission shall review the application and consider its appropriateness in regard to Town policies relating to: 1. Subdivision Control; 2. Densities proposed; 3. Regulations; 4. Ordinances, resolutions and other applicable documents; 5. Environmentallntegrity; 6. Compatibility with surrounding land uses; and 7. Effects upon the aesthetics of the Town and surrounding land uses. The Planning and Environmental Commission shall have twenty-one days from the date of the review of the preliminary plan to approve, disapprove or approve with conditions or modifications, the major subdivision request. Within ten days of making a decision on the request, the staff shall forward the Planning and Environmental Commission's decision to the Vail Town Council. The Council may appeal the Planning and Environmental Commission's action. The appeal must be placed within seventeen days of Planning and Environmental Commission's action. If the Council appeals the Planning and Environmental Commission's action, the Council shall hear substantially the same presentation by the applicant as was heard at the Planning and Environmental Commission public hearing. The Council shall have thirty days to affirm, reverse, or affirm with modifications the Planning and Environmental Commission decision. The appeal hearing shall be held during a regularly scheduled council meeting. The final step in the review process of a major subdivision request, after Planning and Environmental Commission preliminary plan review, is the review of the final plat. At any time within one year after the Planning and Environmental Commission has taken action on the preliminary plan, a final plat shall be submitted to the Town of Vail Community Development Department. The staff shall schedule a final review of the final plat. The final review shall occur at a regularly scheduled Planning and Environmental Commission public hearing. The review criteria for a final plat are the same as those used in reviewing the preliminary plan as contained in Section 13-3- 4 of the Subdivision Regulations. The Town of Vail has the ability to require certain improvements when approving a major subdivision. The following improvements shall be required by the applicant unless. otherwise waived by the zoning administrator, Planning and Environmental Commission, or Council: 1. Paved streets and parking lots; 2. Bicycle and pedestrian path linked with the town system and within the subdivision itself; 3. Traffic control signs, signals or devices; 23 4. Street lights; 5. Landscaping; 6. Water lines and fire hydrants; 7. Sanitary sewer lines; 8. Storm drainage improvements and storm sewers; 9. Bridges and culverts; 10. Electric lines; 11. Telephone lines; 12. Natural gas lines; 13. Other improvements not specifically mentioned above but found necessary by the Town Engineer due to the nature of the subdivision. 2. Criteria for Review Section 13-3 of the Town of Vail Code provides the criteria by which a proposed major subdivision is to be reviewed. Section 13-3-4: Commission Review of Application; Criteria states: The burden of proof shall rest with the applicant to show that the application is in compliance with the intent and purposes of this Chapter, the Zoning Ordinance and other pertinent regulations that the Planning and Environmental Commission deems applicable. Due consideration shall be given to the recommendations made by public agencies, utility companies and other agencies consulted under subsection 13-3-3C above. The Planning and Environmental Commission shall review the application and consider its appropriateness in regard to Town policies relating to subdivision control, densities proposed, regulations, ordinances and resolutions and other applicable documents, environmental integrity and compatibility with the surrounding land uses and other applicable documents, effects on the aesthetics of the Town. 1) Subdivision Control There are two lots being platted as part of this major subdivision request: Lot Zoning Lot Size Frontage Lot 12 General 347,826 sq ft. 950 ft on Use the Frontage Rd./680 ft on Booth Creek Rd. Tract C General 52,010 sq ft 360 ft on Use Frontage Rd Za 2) Densities Proposed Density does not apply to EHUs or a school 3) Regulations Both lots 11, 12, and Tract C are proposed to be zoned General Use. The General Use District requires an approved development plan in conjunction with development on the site. The rezoning is contingent on the Planning and Environmental Commission's approval of the development plan. 4) Ordinances, resolutions and other applicable documents In reviewing this proposal, staff relied upon the Town Code and the Vail Land Use Plan. The issues relating to the Town Code have been addressed previously. 5) Environmental Integrity The Vail Mountain School does have a rock fall hazard and a medium severity debris flow on the northwest corner of the site. The rockfall hazard has been mitigated by the existing rockfall berm. A qualified geologist has concluded that the berm does mitigate the rockfall hazard on all areas of Tract C and Lot 12. The geologist, Dr. Collins, also recommends the construction of a debris flow berm on the northwest corner of the site. A condition of approval is recommended above to ensure this occurs if the cabin is located in the northwest corner of the site. 6) Compatibility with other adjacent Land Uses Compatibility with adjacent land uses is described above. The Vail Mountain School has been located on the site since 1979 and has operated harmoniously with the neighborhood. The eight EHUs are consistent in bulk and mass with other adjacent residential uses. In fact their total floor area is less than would be allowed under the current Two Family Residential zoning. 7) Effects Upon the Aesthetics of the Town and Surrounding Land Uses The Vail Mountain School and the eight EHUs will need to comply with all applicable Design Review Board guidelines. There are existing trees that would be removed as the result~of the project. Approximately 330 aspens and 40 evergreens. However, the landscape plan helps mitigate that impact. The applicant is proposing to add 445 deciduous trees and 250 evergreen trees to the site as part of the landscaping plan. 25 3. Findings. The following findings are used for a Major Subdivision: That the application is in compliance with the intent and -purposes of the Major Subdivision Chapter, the Zoning Ordinance and other pertinent regulations that the Planning and Environmental Commission deems applicable. 2. That the application is appropriate in regard to Town policies relating to subdivision control, densities proposed, regulations, ordinances and resolutions and other applicable documents, environmental integrity and compatibility with the surrounding land uses and other applicable documents, and effects on the aesthetics of the Town. 4. Staff Recommendation The Community Development Department recommends that the Planning and Environmental Commission approve the preliminary plat for Vail Mountain School Subdivision, a resubdivision of Lots 11, 12, Tract C, and Katsos Ranch Road, Vail Village 12th Filing based upon the criteria evaluated in mentioned above in this memorandum. The recommendation of approval includes the findings mentioned above. In addition to the findings above, staff recommends the following conditions: 1) Within one year of the Planning and Environmental Commission's approval, the applicant shall submit a final plat to the Department of Community Development for review by the Planning and Environmental Commission. 2) Prior to submitting a final plat the applicant shall address all comments of the reviewing agencies to the satisfaction of the said agencies. -Any comments shall be incorporated into the final plat. VI. ZONING ANALYSIS Vail Mountain School is located in the General Use Zone District. Pursuant to the Town of Vail Zoning Regulations, the purpose of the General Use Zone District is to: provide sites for public and quasi-public uses which, because of their special characteristics, cannot be appropriately regulated by the development standards prescribed for other zoning districts, and for which development standards especially prescribed for each particular development proposal or project are necessary to achieve the purposes prescribed in Section 12-1-2 of this Title and to provide for the public welfare. The General Use District is intended to ensure that public buildings and grounds and certain types of quasi-public uses permitted in the District are appropriately located and designed to meet the needs of residents and visitors to Vail, to harmonize with surrounding uses, and, in the case of buildings and other structures, to ensure adequate light, air, open spaces, and other amenities appropriate to the permitted types of uses. (Ord. 21(1994) § 10). 26 Sections 12-9C-2 and 12-9C-3 of the Vail Town Code outline the permitted and conditional uses allowed in the General Use Zone District. Public and private schools and educational institutions are a conditional use in the General Use Zone District subject to the issuance of a conditional use permit. The Agriculture Open Space zone District is outlined in 12-8A of the Town .Code and the Two Family Residential District is in section 12-6C. ?~ Zoning Analysis Lot 12 and Lot 11 Zoning: General Use *All development standards in the GU zone district are prescribed by the Planning and Environmental Commission Lot Size: 7.98 acres (Lot 12 S) or 347,826 sq. ft. Lot12S&Lot11 Existing 2000 2002 Proposed Density: n/a n/a n/a Setbacks: Cabin Side/Booth Ck Rd n/a -Side/East n/a Front/north n/a School Side/Katsos: 90' Frontage Rd: 76' -Side: Booth Creek 358' Rear: 23' t Height: 27' Parking: 85 Site Coverage: 22,027 sf (8.26%) Landscape Cover Snow Storage Floor Area: Students Faculty 20,488 sf 261 43 n/a 25' n/a 162' n/a 135' 24' 20' 76' ~ 25" 358' 370' 20' 20' 36' 41 ' 116 100 14.1 % 16%/55,804 sq. ft. 71 %/246296 sq ft 31 % for main parking No defined storage for other parking 55,390 87,383 330 320 48 48 28 Tract C Zoning: Two Family Residential /Proposed zoning is General Use Lot Size: ,1.194 acres or 52,010 square feet Existing (allowed TFR) 2002 Proposed Density: 2/site Not counted towards density (poteritial for 3 lots) 6.7 units/acre (Total = 8 EHUs) Setbacks Side: East 15' 138' Side: West 15' 30' Rear: North 20' 25' Front: South 20' 65' Height: 33' 33' Parking: 2.5/unit 16 Site Coverage: 20% Landscape Area 9% /4,859 sq ft. 76%139,692 Floor Area: 7385/1 lot 11,250/ 3 lots of 15,000 total sq ft. 8,478 (EHUs excluded from GRFA) 29 Summary of Entire Project Total Area: 9.18 Acres or 399,837 sq ft. Existing 2000 Approval Proposed Plan Density: n/a 8 EHU's = 4 d.u.'s 8 EHU's = 4 d.u.'s Setbacks: Main School BuildingSetbacks: Cabin Side/Booth Ck Rd n/a n/a 25' Side/East n/a n/a 162' Front/north n/a n/a 135' School Side/Katsos: 90' 24' 20' Frontage Rd: 76' 76' 25" Side: Booth Creek 358' 358' 370' Rear: 23' 20' 20' Faculty Housing Side: East 138' Side: West 30' Rear: North 25' Front: South 65' Height: 27' 36' 36' - 42' Parking: 85 spaces 116 spaces 116 + 20 for events Site Coverage: 22,027 sf (8.26%) 37,469 sf (14.1%) 60,663 sf (15%)* GRFA: n/a 4,800 square feet n/a Total school 31,990 sf 55,390 sf 95,861 sf Floor Area: 30 Attachment A 2002 Master Plan 31 ;; i .,.,. as „~ .____.._.~._ I ...,., e.._ ~._...r l ~~--= ` - `= f,ONTACTS tlAlIEA 1 wa A0. 1.v pA~ SISd eev Pe+Y Lc 'uz), faMab EIQ) T01)L11b 910 r;~1'ro tAt (a^.:. a-:YE~d 9inn+ Awry WAD PLVm4R$ Lan ua,,bli5 k ro &+l4S6 [hsY. C0 A161! 9852E )553 f IC.9t ~v16IN LatiM (uavx9¢ M' ARpnrEn :i,p GG-, kart LlLn N<nA,a, a. c I.fld Lam. St,nl. LSn ina I o-,K, rc rout wtr!.ld?d xaes!:2a, m G G~mn N+ 4 A r~. Lrvge I crF~1 E1rIUEEe .. j m cmasMd rnMrM il19 kvue itnl Eak~r, (clack Mk: k:n Irce. [GU'w Nana N.IIarY, Pejai ~r ~IOSGWE IALwIECi :m> ama u,~1 •~ a L ND WLE~G~~ TOWN OF VAIL PLANNING SUBMITTAL KLIPP ~,OLUSSY ETENKS DUBOIS ARCHITECTS, P.C. ARCHITECT'S JOB N0. 2001-028.00 August 12, 2002 !curl aa; xLe;tax ru !w w:~ ?m:e n,w. Nae s`P:i PM.Y W tP NISPoRIF7IC,'! CN1510.11Vt ..yA I~ann~„, uao va. en u;m P).T~].}L'9 FAQ non. Hpas $IR11'.NR}L ENGdRER M Gr~x:ry Slmefual u 1119 ~ e tivel Eevk., feaaa, pexA xAala:Ail ~ Ra+r. t. 5..1, vL I NEa~v±,cu~, ii['cikrx L ~ RNaEeaC EM;I ~'CER ~ Gw+n tax: [mfJlp [•rjnmy a. 1' ~k.+.e NN Ry ~ ' ... IY1 wln, ro m~.+: (v U. lar .N I fl (L tPiMLd[f:OW(Tln Cldi t4 ~etd MMw; nun f:.01 b%i~ d [RCXL qAl I.Id LINT aAV 10 •ni AHp1 P.U SEfft?l L+~ a.lro Y[NAY u ci rmvl mi aria acid I~Aif.(nT~ um a Inn nox un ~' ~F info EEHA nrx Fw: k@ I~Y,A ICH'. R~ TJ% m AnFI nas nF] ~ aaa usfF Inn ros nw +} 10 Faf;.y ucr I(w, GLA\ I y,ll AA5LY 441 ICS: nAI ~ !! W Iuv LLH_ TAY ~ u u vulx IATA etl n~N •unx unA lea A a} If FAVlL UAFR L'KA qNl LLID BttaA: fILUV/+ ux tgl1Y d Y: YL1K~i t] m[ gcros u v e:.l ~ n.AU j +t-0 nUA FNT]lG V A P.YONC NuSG 4d [Yfii/ FiJ'.'F.R Ra V~.tv!Fl.d>]A3 [!CJ CnGIGU[I3: NCI J~ PhRAll GRADING FND DRNtU~GE PIAN nm v+e r.m / \~ ~___ / Z a w Q J 0 U Z_ Q z O Q y ~. ~-~, ~, mama e~r~~m ,~,~.~ -- ~~~-_ -- »~~ - ~,,~~ ,.~ d va nP,~y s~c„~nm w, u~w Mpd 11 MIP! ~~`•. 01.00 ~ ~ ~ % I~ ~\ i ~\ J 0 U c/1 Z Q ~ ~ ~ z J_ Q Z a ii w g ~`~' `°y. aX >> .,. tL . ~,~ 1111rr1 LJL''Jllll ~oms~m.~ 2001.020 ~_~ _ ~~i: ±~ ~ _. .____ yu_m___ VF4 SWM4Ai 9FQ a~ d Vd ~M.onq S~lltl Yal, Cobmb ~1~~m va XryA I; MR /~~ \ n \\ \ Ct02 ^ i '~.:~.-L'~ .R,,,~; ~ NA7SO$ RFNCN ROPD - 1YPICk SECTION NATSOS wucx Noes - atu+ aeH CiA AHL i'•A' - --`------ -- ----------- ---- -l .... ..~„ ::. -- _- ~~ ~~~~~ . ., V J - `' Z z s w ~ ~ - I z ~ ~:~~ ~, .._ ~~~~wrp ~ - .I ~... .. . n+ + ~ ..~ ~-- i... :' j t''llltlll a ~~. ~~ - ~~8356 ~2001028E~s ,ate -~ . 1 - ~ _. ~um is ,`I r_ ~ has, ~- y m uxMAm YxSa im b v¢1 P.mir~g `~-~n~if Vft LdwMo KA1S05 (LWCN RO7D PROIIlE i ~.2~ ~ ~~ -- ~~ ---- ~~, sWt M1m'-J O O z U g `~ a. z ~L w F- <~ ~ z a ~ ~ a J_ d `' z ~ ~"'+s j ~~ ., CIVITAS 2001.028 -_ ~-_ Yu mmrm umn. Iwn d Yd .tr^nq Supnab' va rddw i~ w A1.00 ~~ ~~ ~' ~~ /i ---i j ...,. ~.., , .. ~,.........., j ~-- i J C] (] S Z L7 g ~ a z W ~- U N ~ J cQ G cO G J_ Q } z „ .~ ;~~. CIVITAS ~` _' \ \ 3 ~ ~ `\ i - - - `j'~ >~ ~ . ~ -. `, -~ , ~~_ ,~ ~ ~r ~.~ ._--_- _____.__-__--______ --- ~ --~. KEY PLAN _. ....~°' sic r.nc 4i i . i . .......................... _... ._ J I NTS i } ~~ ~z jai i _...., (~ A1.01 ,~ ~~. E--~ ,.... . a ... J y- I ....... .. - - r 1 1 ~,~~ , ....,... .....,. a ~: ~ r r -~~--- _ I 1 ~ A<~.r j~ 4,n~~ ~~ t ~, / tuws~ r a y1a 1,A ~ ! -,.! r„ i rLr P,RAIL ROUND L'lOODEN FENCE ~_ -__ NTS 5. r-= ~ -1_ [ nw t-- -+ i ~~ I ~I ^P 1~ I ; ~_ s a ~ I I ~ RETAINING WALL SEAT WALL = l TYPICAL RETAINING AND SEAT WALIE ~ Z v,, NTS ~ Z o V i J P T ~ _ Q 01KE A H _ N15 i .. ..~ FN . ,IIGE~YE ttEE1 ~~ws IfMrR'r „vekrl+ ui~i~~A se EcRr.UV0.itI BddK1 rnvas r[rrnr.r.u nr>»~'«~i to•.l0.rn[m ........ Mm011FA1IF: J4 Na6 aw_~,senl 1!IQ'ISRaM1K£ vis rz~i ~ i ^ oN '.y'~, rev aas Y. '~ r~~ wK9E:Emrs cPUliA~ixb ~ -- P.AY LAGI4 r'. ~ ., h..rtr,. urnYasrs Mri - CAJSweu11 L.J NmEwAESrsnmR.axm s[o _ s uu.rm _SUUn~~a~uzwq<u~Eiaun Nx~ws r .~rv~.r ~ ~,+r.~..,wa ~, rco.~n.usv.w.~ecdR1 c ERx~ws ~~&- aASsalTVS1 s..r. .ax ..w. <r ~'~J ~,~AAC aiauE:xma~~ewa 7 , ~i A T ,g, ~.+" CIVITAS 2001.0?.8r I _- ~~ A1.02 KEY PLAN NTS _ _ ~~ x ` ' LE%ISTING A$PEN ~GR EB1 ~~i" ~- - ~- .. ti4~~'. ~ },,, ` ASPENS 7 4 CAIIPEP. 1d6 ~ ~ ~~ ' f15REN9'jd CI,LI ER- ~ ,~ - "m' ,~+`, t ~i wj e c I` ~ ~.. ~( / 1 ~ i~ T - - oz ~ I ,~ m ( ~_ .. ,, ~ L ->~ ~ L m ,~ _ _ -- -- F' ~- --. '`,' ' ~' ~ s. Y~ - - -- ,' ._ ., _._ ,Y~ . .. / _._. _.._ - ~Y F C pry' ~{ Li, Y _ }~ . :_.._. '~ w, ~.--"'`i`. `°i ~~ s+o~,a-.,..„es~-i3i "Y Fns. sb ^''-~."'~~ _ ~~I' (,r~~.~ l ~-~:'i~.'?% f ~ ti \ \, t _- _ ~. '- - -' T--r-- tt _ __ _.. _ - ~___ - ~ I ~ ~ .:. _ _.._. .._.. .._ n~._~~.-_.____ ~ r '~ l 1. . ~, ~ 1 ........... .. _ _- -- - ___ _ _ s NS 2 770 ,...:. \ ~~.:_..____ ___ .. /: ~~. ""~ /ASPENS I Zd SCALIPER V~90 ,,, :~ - .. ..., ,... - ESISTING SPRUCE TREES Rd I -- n +>`.,~' ~ '~'"HEIGHT971': 5'~~'~-~~~.: -.. NORTX FRONTAGE ROAD ~ ~'S•ir" 3 I .. ' HEIGHT 1i 70`.5 " "" ~ " ' ~ '--~- ~ ~ ~- . .--. I ~ ~' °$.,~~. '- ~ j ~ ~ ~E%ISTING ASPEN GROVE R2 . .. .. s. s. ... .. .. .. ..... .. - ASPENS 74 CALI EAR: s7'S _ #i,. >a ~~ _ - .. ~ "' ""'- ~ ~ ~ . .... _ ... ~ E%ISTING SPRUCE TREES tl4 ~ " - '"k.E~ ~ ~ ~ ... . . ... .. .. .. ;: n - '' ~~ - HEIGHT B-17':9 ~ "~ - .._ .. .. HEIGMT'72.70" 9 .. , ... .... .. ,.'r~ .:~ f .. .. ... . .. p. .. ., . ... .. .. _ i - ~. ~I... ... ..kk,~ a .... .... .. , . ~`~~ x,. ~. w-S li .: ~ 'ry ,. :.r\, i .. ..... .~.~Td.4~.. 4 .. ... ... .... _ Y i ;' .,. U ~ ~ I ~ o Z U g VJ F- U I 1.1.1 ~ ~ ~ ~ ~C G I z Q ~ ,, ~~~ CIVIYAS zooi(oz`e~~ h+~- _ ~___ Ali '/K tlR.N Y Hh'TY. ~a' ftr*M S.a-dia~ I M1l GkOb +rnnt i:. ]Wi /~~~ '~ A1.10 ;' SRF COVFRAf,FS !Hl 91tl0. UEV M4 LII I£L lOf4 9R Nh,U[S '~ (Lf,PA[F- CRlti! 1155 a0 2tW r!1 ~ ILO 50 YR,]U ;'1 1612 91[[01pM~0WJ 2' Slb qO 1+115 ~0 106 SIR [CVK?- 101 I1 ~ 8!10 r{I I)511 +A 11:019 MI 1)6 FLOOR AREAS ~•.-_••_a_ NW TINA LLRR RLQV ILFW M[Y 1014'~OM AVA Y.MCx f10CA AiG (1SN4 ~ x100. swvzx xn umwxHl 55,96 x91 na:o q0 1160 eml 9,1W 101 lAN.rc w sc N nmv uu zwo a~ :sm xpl sxo ~m fKN.n 199Sk; 9~ RIXR A91. 1S`A x!1 E.557 xql j 5.101 » fIA: llIXa. MC1 ~/ SSn91 A90iP'Q 11`A x91 iTH qM1 auo o~ ~ quo a ~ - ~~ ~ `~ ~ ~ r "'""~ ~ , l •-s- ~b a= _ _ P ~n l _ .. ce~ a~ I -~5'~ II• W2 II ~ . R~mMr, } ~ ~ G cax . I'1~..: '~ . 1 RMp I ~-1.0.~y 7T E~ 1~ n1 ~1 / ~~ (~. I ~ I ,~ VIPFRWM. ~j~,,_ ' ~~ Mw MIA ~ ~ Y¢nAlm ~ ! . ,: ~~ 0,~ ... .5t04 ~ ~ ~ POOY J n. 1 f I ..M~. 5~ ` CA11Ldl .. _ .1 n ,i .. ~: _ I _ _ _ 1 ~ +s, ¢eF.. ~ m [ ~ qua `. I ~ ~ ~j "`5 a+ V~' /~__.~.~, ire -t_ s ar -F slcvnul Y"L..~, 614oAG ' rtroa aun - uw~ tEfft _~ l;lr.,-0- .... -~ i Fair. ......r_i..- ..eis ~..~_~~ I ~..,...~......~.,.. I __._. ____ I/i `\ ~. \`_ ~: ^~~ ~ I ~ ~r ~~ AAE1 2 IpCp l ~ ~~ J 0 Q U cn 3 z ~ ~ O 4 . ~'"~ '} A 1 2001.028 v~ Agart 12 ~2 ~--~, A2.oo \I 1~ ~_J l(~5 ~I 9I }Itl Cup 'J9. 1 1 - I ~ W '~ VS o p ._~r~ Sri ~ O Lf~ ~~ ' y J 1y 9I -~µ~ I ! 'Ni -Fi ~ L.I ~ } -{ /~ LLB ~.~ W US ~ -- + I ~ ~~~ E SRi i SM _ +.. udv I}~-'~1 ~j,,,,,y ~y~ 'uuu' C:aCF ' ;rA ~~ _ AC ~.1 9. ENA90P'T ^N -- WIA PYJN PoOV ~~~...99„ _ I ~ mvJ 11~ US I y ' ~ ` ~~~ ~ I ' Y ~+ 9A' ry . rum J / _ ' .. ~~ \ up v mau , (',~ ~ L~ 9Jr r0. it ~~~` SITE COVERAGES tMV. 59M G0r Nfti sR I.3A iPH 5R MSbLF r mr.9xc-avw s,ro>cn 5uro w'r r.r»M ~i3r An re~x [ CRtiAT- ~'C s,lw nll nJ95 qn r0A 91E NRP.LZ- LO< 11 YprO Gt r]`A ~ 3130x9 yl ri}x FLOOR AREAS ww nam WiEP nace m9~.s ncm tmu nmv ua.1 sma noox.w.s lsssr ~I r,~atrt noxuc um mxA~ecu~ ssIm ~ ssIm qn 9as, gas e9,F1 ~ ruutt Inrsw'n' nox uPJ i.KO,cn a.wo wn sIm ~n 1A7Ytt NO.IfiIG Z nIXM Md1 1,530 Nh 1.YA ~1 StW yfl CYM 1100e /FU N/ e%ep1900egN) 1730 wll 1730 rel 1 __,r ~~ I '~ i ~ ~ Woos Plug - uv~rx If4EL /~ um ~ swc Vln•Ya ci,rr . I~. r~9a~+ C / •`~ J U Fes- ~ ~z~ ¢~ ~o C ~v „~. i ~y 2001 028 ~~ fix- __ ~ 9 - h?-_ rem q WI Pom~~q 5ibilb ~~ ~~ r~. ---~ i~ A2.rn .' l ~,~] BOOR PUN -LONER Iflf1 __ f~1 a~.~ S1a0.w3 ua I Sf6tl4 l1 WN nap'(u F100R %,W -LONER Lftfl ~~ SITE COVERAGES [xu. war rizn xnr. srt ~ nx s¢ mwvt 41[ MrttJ(2- 0.SPIL 5,1"J >N SS6A qA I,aY All NS:61 qi 16+R SiR [0.RJLt- bACi'C SIA 5a +1,115 ri, tOQ 4R (0.T!3- W I] S1dA ryll - I.YA Bbl N8019 spl 1In FLOOR AREAS «.~ xm num wrx nua laxta rtow rmx nxa Aw n+ex nma axn Os.'n an rlrul s-awx aA xrcruniU ssam wn tSZA rc~l +,t6o wu u,+6o „n -_ rewn wl~r, x nma wu >ero pn xw~ ern 619 ua resin xoayc'¢ nem+.wG ass6 yn ssw wa s,~m,y6 as. nax 9eu R] nwt.arrsul I.tA ql u`o qa ._+-i _r r-j r--~Z__ -111 1 I r__ i 1 1 l 1 ~~b. ~~ CA14IXY ~1 901Ex RCM r. M~6~A. "~ TAV'£ sa:c ~bZ4A oxsea a~a+ . s~w.cf nca an ,....FLOOR RJJI - LOWfR IFVEL Taal wig !/16'~I'-o' ~~ } n~i.r ~. l..s• n.aoi• -.-..~ i~ 1 ~, ~ ,~ ;, J U C!~ S Z $ ~ ~ ~ Z ~ ~ O J_ Q a`~~ }' s 2001.028 ~~ _ ws= - ---- '-"s =-- _ -.__ _M-?.?~_-_ i6 ~vt~ni~.p sm~e rd ceM9m ux~ N,nal 11, ?99t ~ ~-.~. ~-.~ i , SITE COVFRA(;FS cxu. mim cwx :mu Sm Aara ~o:u. sm mzort 'YIE xccn- Otf.4LLl 5.~» +ql 546A ~}~ 17!0 w!i NSlb qY _ 16 r. [ rmuu- sm r, m s.im a~ ,~ ru a*. --_ ~ ina 1 ~ l~ uafn¢- m a 1 seyrv at tno qn ~ 1u.o~s ~r. __ n7a_ FI OOR ARFAS wei naoa ulcs nas iowv nex rw woa wu ~ar xva u.i. fn.>u at .hw rwxt 1w Ka •ux; ss,w w! nm ai i7w a~ ¢~ro uo _ lbAtt Ig41C'~ xVP A9~ _ 1.~0 47 _ LdW ~ SZd KA itlAft !IX4& B nlC IfG 11Y0 M 1XA M0~_ 5,101 MI ua~ nem uv h/ ~ ~1 '~° ^ ! m n^ 1 1 ~_ ~•" J U Z_ Q ~ ~a Z O J_ Q Z S n- w 55` K ^J t >/t,~ . zooi:oze '-"~ ~ - -- »~=-- oa w~ ...!. xwa ~ w,m FLOOR FUN - F4UN 1f4F1 o ~~ ,, r.,•-a. uuA I l L~Jt ~ ARFA 3 ~, -~,,,, A2.03 ,,~ ,; SITE COVERAGES Ulu. SbI00. G&i ION 91I WG IOUL ffe m2N{ r mhna- om u vw wl k.sro qn Itw ~! rosau w+_ lu: mE mrtar[- ntti_C s,lw yl n,ns an I>A 9f: mRF.ItF- N! IZ k$N qA I,}w Kr lkAla qY I].tF FLOOR AREAS uul nax ~rvu rwn :cm time »w time ua SCbx time WG QS9m ~ r(ml 4.:llf 4W Y[CVKAU S,95f NI ran qn ~,]w +m qlm +iY f1'Ihn minis 'F {Im1 !MA >.w141 l.tm +rl Um x-0I 11lAitt IOA4 9 IImG lR1 >}w~ S.Im vpl 0.-x nma ~ h/ mapn .~a'1 11w MI IY.A qn ^ ~`\ t\% \ / •~~/ z 5 J S U z o F-- z O _J Q x~ z ~ r iy A4'1 . /2001.028 ~-it*~ v1is+-_ . !ka!~d___. w uar.*.a soaa tem d vd Ihcy'vfie Yy trbeb kgs! 11. 1mi /--...~ ~ A2.O4 ~_l SITE COVERAGES 1xu. senasera rasx mx ~rt Aw lciu Ar rv(aut sa arnwx- aaau s,l.w yn xsm ~1 tm pn s41~ rn Is.1s Si[ Rrtfaa- i4+Cl '[' S,1A v!1 11.15 i'I 10.¢[ 91L NNFAa- L01 11 SB,6N aJl I,}50 a-0I )MA19 i I12S FLOOR AREAS uxm naa ~cxa now ~a« nra 1mu nace xsv w+n. nox wa rysmc wn x/nn` smmxc ~w IxauwW s,~l xpl izra ,~I r,sso wn nz,rso al FNLiM gb14'~ hOCA .N4 i,Ef9 MI }.&0 NA S.1~s4A !MAlt Ip150C'C'rtOCA 44A ts`r1 +d1 1550 ryfl ism WA Ulml h[OA A%A ('X/ }acaA AAPIIP/f 1150 apl 1250 ;fl ~i.~ r Ir. .,no~~ -- ~_~ -- ~~ / ~'~ j i z 4 J U U~ z Q - E-- ~ z c0 C J_ Q /~'.~~ ~i i / ~~I,,~~ /~!~~~~ ~ PRFA 2 OAEA ~ ~~ 2001.028 !~v'~-_ hs m_ ~ -_ - tea. nx xaamal soca f:n M'M Rvfy S~Ee`4 Y; UJon4 krrl :2 11K[ j~ \ A2.10 .,~; SITE COVERAGES cxu. saga ri~x ]mu m[ Ir rmu m[ mt~cc SR NN'JR- RSPNI 5,1}~ ~I S9,fiA qll I.]SO aTl N5.161 >pl Ifi.R [PSFMS-1R4':I'G' 1.i`A >Vfi 11,]R A]M1 106 91C (IM.Rft[- lm lE N,6)O l~yl I.TA Iglus AliAli sIA 11.R FI tlOR ARFAS ucx rlma I.fca nmv mea nam lolK nan +Ra S]Stl- RmR ARA IiS,]m wM1 M/UA SlRu1R A'9 ~TLW.VH) R95) MI ]Sli0 >al __ Alm KM1 E].Am rytt fNLLIY N}5W 'A' nma Hl ]bm all :m0 ~C!! S,AO qX f+OAtt mla~c'¢ nmP IRA ]Sm url ],Yd >ml S,im Im C1BM f4'[R AiJ (w( mbpll klYM10.~ I]it Idl 1,]:A rAl /~ _~~\ I j 1 ~__. / /` z a J 0 U Z ~ ~ `4 Z O J_ Q "•+. ij ,._ ,y xA.l .,,,N'Ff I FEOOR PLAN - 4A4 LEVEL AREA 2 u.n AWL irt'.f-0' Y ~_' L '~' ~,, ~ ~ "' 1 ~ ~,. ,,, AREA ~ ~ KEY 2007.028 w _ ~ m_ _--- ~iR?a-_ Irn tl~V3 Raq SY'..~ Ari cRAee ~ Iz tm] ~~ ~~.~ ~ ~.~i ~_~, ,.., ,~ ~' J U t/~ z -~ ~ ~ z O J_ Q s <~ N 2001.028 -. r -. _ 99-- qt vAMAN YNJA tom q Yd Prnvq SWm1W Yty WMeM hysl 12 tJCi / ~~'. V \~~ A2.12 ~ ,\~ .: SITE COVERAGES [xu vint oav='wt4 srt .mr )mx ~ mrcx.¢ flC W.CXt- RUUf S,Ib dl b,EN M I.YA M ffi)69 ql !61t p{ryq- rvJLr C' 11b ya I?).5 q! lads AE [TfR!Q- fW i} Y$N .AI tab M SNj99 df 1)ri FLOOR AREAS ww nms ~rrfa naa wau nas mru naa avt9 b1alIX f10aA ~Ii5,9CJ p~ 9~ SNUGf NAI bL}NNGIj fgAlY IbJSNr'i nRR 111A ff.9b MI ).hb e9a 1..1A !qa t,WO r21 11W !(! Bt,IW qX __ __ S1W !q0 r)eun waec'a' nix wa Lsb ,9n zbo #I s.I01 apl uacl naa ure fV .gym 9Q~1 lab .p~ _ Ira wn `% ~ \ ~ \ ,/ a w z J Q Q U Cr) z -O~ ~- ~ z 0 J_ Q ~i %~ ~~ ~~~ ~~ r~~~ ~ /.'/i/,%%fyj~'' /. /'%•',/ . KEY %PN 2001.028 ~r.= gum _ ~~- - .yn pn ap Vl V}N!aT f~IGOf im V VIDl Rnvq 9~+Ma1 14t 4beS wqm a, mci ~__\`~~ A2.13 ) \ ~~ ~FEOOR PIPN -UPPER lFhl FAEA 1 an sue Ifa'a-a' SITE COVERAGES uw w+ci ru -iau r[ xa Imx srt mmrz mtux- avxs Uro m sl,ro an IsSO ~ x'i~u M Isa srz m.~ a- ron'r s.lv +p~ n.~o a+ laa 9rz oamxt- lar a `e.sm ar lin ~ ),Sala M ila FLOOR AREAS wa nmA wiw nnz Ivata rmv row naa wm ¢ron rwoa eaF1 (saro A w/nn max: xm u[aiwxl 'svm aM nnc ww VXw aw a.lm ,~ _ fgD,tt MZ-F'~ MA NSI 1,600 aA iaa ~ S,EO] a0 rN1itt 110.®!C x Rmc IHA i;SO aA 2530 q9 x100 aX may RWp IFG ~~ ypaq x~on0~7 I,:A a0 I,lSO aX ~I ~~- i O O Z U cn Z_ Q ~ i--- Z d J Q Z a w "'",,, PRUt~ f ~r~~~ ~~~~~' rea, s ~~ NEY PLW.__.._ ~zoo%oza m ._. nt ~wRw'NI StlUGL Im d W Vasvq SdnLd w,t CaNeb ~~ ,z. ~~a ~ -- .. / \I ~ A2.14 SITE COVERAGES CNO. YNOOI Cum mrx 9R 4tG IOIx 9R f0.ffJR 91F (PfRxI- OM1AxI 5,130 plt k610 w9 1.}50 ;M w5,)W ryX 16.1. M CORiM- RXI Y' zlw 19'I 11,113 fpM1 10.51 wywu- 10l t9 A,610 >AI t,Y.A qx. W.019 qll I]ri FLOOR AREAS wa noaa usm nua9 umre r;xa Imx rwx xu SIUOI nCUe A3A (ISWU a/1 N/CN noun am urnanriil 55,9w ICO 151N X11 1]w a{I 51,1w .nn F90ntt iWSeC'A flwA MU }bw qn i,w0 qn 3dn wrt rKUtt Muac a nwa uu ?.sw ao Lsso ?n zlw ~9n uar nnx uv. h/ 3w + rrnwx) t.m yl 1159 ~ MEA 1 ~ ~ ,:;: ~ ~~ ~: -'~:~.-. KEY %/J7 Carr . lexr. n~n~r.• -/'-_ \\ C/ J U C/~ _Z Q ~ F~ U Z cO G J_ Q F- .,~. '~ fi ~ ~~ 2001.0288 w.~....w _ n it r~ :~. -- ±yaim wn m nmrn ~ rem a v,9 rosy send ru new (/~ A2.15 ~ ,,\_ , i zne *om mn ur5 w.nwr ~.tirF .. - nm uxe _ ~ ~ _i. ~~;. u~,s~mrt~a El'4 ' aRT STliI110S COURTYARD ACAGEMIC CLUSTER LIRMRY ~[ ~ P~ F f - ~ ` ,~ ~~ i~ ' f, r ~ II 6.Cm.M x~~t'drc~Y _.¢-._-_ --___ ~- _ - - GYMNASIUM - _._- ~~ NORM ElEVAiION ~_~ ~ u~ xue Vls'n=o' ~WESi EIfVAIION _ _ -~ w scve V:e'•r ~~ i -/ ... ~ j ~\ I / I e........ ~... : SOURi F1fVA71QN ILS SGtF: ~I/IS•1'-0-0 ~t . e~w' ',tie' ~' ~~ ~ ~P ~_ I i -stm4lx $IW.U y1I ~ I I-M~'.IFD: SRUL I _.._- II ,.I It I~ I - ~ ~~~w ~-4~~F, _~--~ ') ~3J~~ I~_Lt~'t~ ~ ~~ -~_~ r ~- = __ ~ ~-- --tuvm t4xFrx ray-"Ir ~ ~~l I IJ I Il I I--- wax FALll_L7Y HOUSING- SIDE EIFV. 'B' ____ ~ FACUttt HOUSING- FROM F1EY. 'B' _ ~ !-~- 1. ~t J ' ~ ~~ -~-d ~ ~~=-'- ~\ ~ w ~ _ a!sr =~~~F - -.s~~ L - I ~ -mmnuc mao .. a.! -I j ~~~ ~ , err ~1 FACUItt l~I15B1G- SRS EIfV. 'A' ~. . N~ sc~ t/e'•t'a a~ i.ri_ L Ili-- I ~_ ~ ~ ~ .5 ~. '! _mm~Frc snamusr t ~~ .k .F .~ at f 14i ,F Y 4. ~; ~_ ~ wrm~.sua s FACULTY HOIISIhG- FROM EIfY. 'A' ub rxe. Iry~=I'4 aar esa' 4r~ '. f r ~k. „ I ~.. ~I 1~ ~) I ..^~~- n~~n~ I • ,'il ~ I~ ~ I , r ~l .~ rll ~~, _V t ~, ~ r. I FALUl1Y HOUSING- 56JE ELfV. 'A' . ~f •' ~ i r - . 7 w _._ t " I .-... -II _. I r 1 --. - __.______ _-__ ^ _ ~ •-____- ~~ FACULY HOU9AIG- ldp1N IFAI BOOR PIPE! -- ,F~~F e.~ , r it A ~ - ~ ~ tT - SLR - - I ~ ~~ P4ro - 46V1¢ / i SlgUt£ SiCRn'E i I 1__ --' ~~ '~J ' ~ `~----- ~~ ~ Y I _ _ -_ '~~ _ _ _ ~-. _.\ (\ 1 ~~ U 5 Z s ~ ~ ~ w z 0 Q ~~~~. 2'` ~ ~, iooT:oze ~_ N9m- tx Idmxv mw lem d Vvl Vlvrrnq SubdW YoA Rbob rts~y t; eft i ~~ ( A2.30 1 ~..~I ~1 FACUI_tt HWSING- SIDE E1fY. 'B' ~i l FM.11L1Y HOUSNG- UPPER l1~£L FLOOR PLAN ~. tin-/ w¢: t/r.r-o~ ~~A.-. A59O:~-:~ ~ ., ~,:, __ d11O ~ Y ~ / \ ~~.~ ., ---- ~gD '~4 I 'ill ve _ :: ~ ~~ 8370. .. .. ~ _ .. . , 3::~ ~I SNE SECTION ®I-T 4- SCOTT RESIDENCE iz~a ~ ~:ips.i-o' A570 . . ~; ~~ - - ~,~~ - -~-. ~~ i SRE SECTION ®lOlb- IAMB/GUERRf RESIDEACE &S A~~ CSYi nom as L•S eiui` 8J:' ' JN ~n `" -- _.___.. ~ - .~,~ z -- } k ~~ SNE SECTION ®L0T9- 'FUASI RESIDENCE / ~\ FlINRE HEAD aF SCHOOL RESIDENCE ~~, uw w~c +pi=r-0~ ~ A51 SSY', ~a; ~1, . -„ I ~ F ~ I ' - _- -.~___ e,,., „~. ~.o~. .`~ J 0 U z z ~ o `' z > O J Q ~~`• 3, $ Y '(j 2001 028 - a~ __-: -- ~ m. vu uxmwn sacx lom el Nd Pwirq SA'.lld V3. [ddko ~~N i:, ron /"_'-,. \/ A2.40 ~ . i '~~- ~.- . / Z J U cn Z ~ s ~ ~ Z O _J Q y ?,~ f zooioza yam -. ~~_,~"- - -... ya-~._- ,~ ~~ri ~. km d ki Pumq SMMd Vd Waob n ~ it. tP1t /. ` A2.50 ,y~ t~_. ~~, ~••, .A ,~ i~r ~~" ~4~~~ ..ifl5~,ti„ ~ `yi,'l;i': ~~~ , F', ~rC~ _.,~~ 'c`5 t". ,'f1~;~m. `~ ~ ~- ~'^ "F~'t~et ~;~,'`£~ ,`~ v' :~ .area _ ~ q~ ~~ ``~~}~~ ~'S ~, ~~ ~5 - 1", ~ ~ _ ,,.~, -il ~'~." ?LS s ~.$ d...~~~ " ~~ e' - ~e~ 1~ ~"~ :~.'~ +C'kMa4~ , ~~..~yH, ~. ,t 2. /i y 1e'h~ ~ F ~ Q:~~~~R„e ,~.! t^'. ''`~ + •~, ~~,C: A,`~`\ 'r(Y ,~T;; ~` ~. r~ '7.~ ~, ~y~, r t ' trl[[~" lR5 'a`ir t~ oa,. aa" ~, c~ ~,~ _ ~ ". ~ ~ ~` ':~ r ~ ~~~A '.~.~® ~. ~;~ ~9,}#9; 1{1S ~~p' .ct --~"'~' - '~~'`T~+h,:;^S°.; t~ ~'~ °.'~.~.\j y; - it :~$ ~ t~t~ ~E:, _:64~~1','.°L,.;~~m~_ -i-•. +hc'~aR. ~ 'hr ~ '~"~ .. R~^,.e4 ~b ~4:,:.~•~~. `+~~ a~\~5 :: 3~;~ ~.„~.` '~~ 1~ ~ u .y~s,,'sla~ t `1 :r;+3 ':1 11 - ~~',", ~`~y-~:;ha`~~,~. 4,ra..~.o "~ ~ ~1~. ":~`+ t k v~5 '~_'? !`v~.•;~~y' Fj .. tE' a .-~.+t~~,,? ~} Z L~i~' i ;b ~ ~PT-~- e'F~:-,a,~ W`.~,' ,o. "*-'~. '`vo,. ?vL.~< . a\'~w~° ~. ~' `~: (: / / '. ~ ~`'r \~' t c ,~ t~ ~w r ~'. ~N -: @.~ ~{ \~p.-'nLN".cg4'~v1~ :- ±~A~.y, ..'nCa v'' ~ 4a.~c, Cp. i:~~ - - - / ,~ . ~~~ '..~ ~+~~ ,e ~. ; wr IC. ,. r~~yyeepp,, ~^~ ' \ ;t b .ger `~P ;lf+`~~g S aa^. yMV \.}~ 'h .~„~~i ~'~a'~~•.\ 5yt ~ ~-' ~, 4` 5°r ~~-i ? .4i..~,, •.~ A , ,~. ~`S 1 ~ ...i~c~•.€~,.. i ~'~~:. 4.~~ ,~y~4:4;~a.'-.. ~.~i;~}vlE ~: ~' ,~, G': W . ~nr ~' ~ F~y.~ ^~ ~" .~ I r,~:,~'~~, ;, ~, i. ~; ~ -2~ •",~6-~~'~v':~ 8?"~'"L~rs -% '~.~±.~. a .: i"''i -~v ,.r.:L ~' I t d 3 b ,~,~y"~ u~.~ 'i~ ~~~~~'.~~: 1S ~s ~ r `:x ,..,9~' - x ,}~x, _xx~~i?t'~.`,>• ~+s .ve °~~t'7~' ^' rc~~.w~:::Q~-, _:u~: \:'. x` ~ s~' ~ ,TT ; :~~ ~aA ' ~ 'La F .~ .9 .o'~ v ~ ~ .~~~ _ ~')t,a~ ,z'~.E ''s' ~~ j~~ ~~.~. a gib ='S~. `~.- i~"~"~:~ra:+. G},, `, .5, ~ rt 7 ~ ' ~/ _ :1 r.(-!r~^,i. K4e ~S - : ~. S ~ 1 ~~ _~Ff-: -~..a p -9`'3 ~~ M.. :,~afa ~!,~d'`~~ r ::;a r , ..1~ v '~`rg~,.,;,,~~ ~ t9 . -w~v~L~~ .'.•`~>'%.•S ~~~ * a 3 ~~"~ \ 'YCxr,b : ~~ 'v~~ . r.,, -~~~pq*a.~~~-~...d~., /1 ,tr •~t ,r1^m:, ~-~;A ~r'. 'N. '~` <x~ r. '~ '- ; ~, ~ {. ~ ''+c. q,,:,x: " ..ak. 'S.! . ~ "~i..r~%q .,-./ ~ ~~ ~, ~~ - itl ~:.4~.,p ~~... lrA ,~~ ri ~~4. ~ ;" `l~`t'.1 ~^~ ~! f <:x'`~'s ,. `r`i'~'°'',. ~~•` ~.~,,, ®,-•a ''~b ~ ,/~,~ , j: M h t~vn;'~~ <~ , `~~'1~~. ~~~s`1*,.~'-- -5~„a~~ :~ ;Q ;- .: ~~~ 't. ,.,~r -` Cr~3,:M~z i - :irk ii 1+c ~ it ;~ .:~~n~ _ "~ ~~. .~ ~~.ti~ ' 'i., ,~t,' t'h x. 9' 3~ .k. x{ '-~..'°.Y-.m Y' ^`~ F ~ ~ ~_ .~a~~~ ~~~ - ~ ' ~ _ ~'Si Pw{c~j~~~ =4 ~'V;~, ,ti~9'a';,,ty. R '~qA~;~~ ~p1~ w' ~.'v ~~~c M~"~ '4~ -+cc-::m+'ec~ t . ~ ~ _ ti ~>y. ~ '^';~ 9 :~ '.ems ~~ :.~: y NS f,~-: t" ~,:~y~ :,' I' ^'.'~,.~. .i P ~ S~ b~r~+~ 4r _ ... 1, s ; -/ , f s'ir' , ~ ~ S ~/J~.:. ~ C )~~~~~5 ~yv ~ t _ ~ / d>'~ ..~"GytL~ ta>~. ~ "ii,, ~,`i~#~~,'Mt:.; 1 ~A; \C~ ,,3) of %~ ~.A •A,9~11~i ~~.;L ~d~~~7 /~. ~ ~-sa+r'~~~, ~~ '~ Try d' ,"~ ~~ a 4~, I6 -'~ ~3 `t `~ 4rt,~ld s~ e ~'~ aw'"'-. .: 1`_ ~~~ z~ r~ ~ jr; ~ :, ~~ z,~ :..~.?YC.n.". Banc J F ,. ,'~}>r @~,~ }~.ilr Fali~~~l®.l'~. _.~~M„ r. x ',_1~~ .. ,r 4 ~ ~% ~ v;' ~n ~.'}~. ~ _~r `I A~Y~ _~ ~.~C~a~1a~y ~m~ a~ '4~ ~+6: a ~ - a.. x (` I _ \ ~ :, : y i 4r ~e~L*>,e r~a.~ocs 3'mp._ ~,~r: '~~ 7 a4.~~, i - ~ r `4.`.~.i C :~~ ~~_~ ~ ` .y j /~ ` .5. '~ Y '~-°~~-t'rrF' ,.r.,r:. ~, 1 A~, !~.i 1:4 ~ $~ s~ _ ,/•. Y ~ ,: - j s ,, i arwc ou sct - ~L' ~;~' ~i ~~~,:{~~ ~3 •~i ~ °4~^-r Y L - { ` ~~ ~ ~ j ~ ~ j 7 ~r~ Ir l r i ~'l°,r~! r ~a ~~~sY,oJ' ~'.~ _ -~ ri f -I ~~ - - / ~ ti~eg. .~ C~,C ~/ c ` r<"C=~+~~ ^A ~~' ;.~ ~ u~-~~ /.;' r' ~ 7'~ r r ,r~~~; x~ 'I .F,pa~~ 1 ~ r ~ ./.~ {t ~ ;~ x Ire ~"~3?,~,~~ r .". ! r ~ .1 i i ~ v G 1~ .!~- ~~'I ~ f ai i. ,~ct`t r '~ ~y; s. .~.t _ c~~~ r~/ r 1 1 1 ` 1 n' \ f,. nu ~i~b$' , ~ ~ -~/~ ~~_ F _.~ t T~ / ',!i~,4j _ ~,. ~.~~.}~_'~ ~ I f rl ~, r 1 ~iF`a(,' /~ h..,h r r: ~i z , ~ y '"~'" t _ ^. ~ ~ _ ~ ~ ~ t. ~"~ r ~ 1 F 'S.~'~.'."_.': ~:..,,_ \ -~ ~ `".n .L ,~~ ~5 sn 9~~}'/ '...J Pe. 7'r.A: ~ y~v f .- r '~~~ p.+ ,„. ~` ~:r3' ti -° ~ ~- .a'_-a.-. - -~ ~~ ~~ ~ y, W .w,sm I ~,k i ~ ! t1`~~ ';g'~`"^r =~ ~'~,r t a ~.;~.~ ^~ -2 -a~ 'tis-.;, - - i a { ~~ '.r~3cc:~mmr°tt,7~ -;,.. ,~-c~ra"';~~ ~...~. lie.~.~ . .. .5.. G a+Om'p,~~ p~ -^n^ e., 'F't- ^r ~. sam K t~ 9~'r: • '~ ... >".~. -. `.M-° ~ .'mss sa'~'as.~ ~ ..;..x~".~'"'.5-~"st,~r..c'~ ti„~ -- - - : .....~e.~n ~` '."~. ' "`!.1; ~ M `^•'_^'wm11:uCL-~,~,j;~ S ~~~ .[~..~tLKG'iix. -U'.h.141~ .;.F,TV3rrc~~ 4~ ~ r~~.- '-~..-i-..^.~+~..s.3v.,r~:^~',=~a,,..~.;~~,... .,,a..__-___ ... _ ' ~e~3-n°~.rz-""~a~.~~~ ~... ?~ r E4FNi PPRIUNG PVJI ~ J FN4SE I td EDtY.A110'.~Ut SPZCfi EMIINS IAGpJA45iG BE USE D FGR SUPPGfi NNCICNS~ PfV51NG PUN- PHASE I ~~ PE61S@!G PVN- PEtSSE A .~.-0. i _ \ \% - =' + \ - "fix 84 ~ \ \ ~ \ J ~ \ \~ ~ ~ . ~ ~ ~ \ \ ~ ~ \ \ \ ~ ~ ~ '~ \ J „Z , \ \ ~\ 1 \ ~ it ~ \ -- ~_ -- -\ - y _~ ,I ~ II \\ \\ f ~ \\ \ \ ~~~~~~ ~~~~\\ ~\~ ~ \~ ~~ \_ I -. ,\. .. -. •~ ~ \ r- ~r .tom _ .. 1 ~~" \ \\ ~\ r /'1:. I 11_,. ~_~ ~ \ \ \\\\\ .\ \\~~)\~ ~~ - _ , / - \ `\. v ~> ;\ ~ _ - ;. ~, ` \ ~.. 8 4 ,. I ~ i,~ ~ ~l~ ~ r ;. - < ~ ~ a _ ' c - -~ ~ ~~~~~ ~ ~. c. ~ ,.__ \,, __ j .. -- ,: _ ~ _ ,, , .. ,. -- - - - ~ -{E~ -- ~ --- ---_.-_ ~~~ . 1' -_-______ ,, ~-,~ o _. __ .. r ' ~, _ . s ,- ~ _ ~~ ..: .;:. _ , - - - --s------------------ .~ ' I-~o ------------- ----_---- ~' ----- - -- - E T_- ------ -_ ----------- ------ ------------ - ~ ~ - -- -- -` ------- E%ISIING GRADING PNO PRGPOSED GRADING PLW u.® swc r'~a ,~ eE~a 0 ii ~ ~~ v ~: C4a: Cpl rns: M1bJ'fN; f ~~-~ _.. I SPCCTF~A" Saturn 4 ~,~-~~ Saturn 4 c~~~i a ~, ~ ~ P.ol.ccww.~-u~. MoununQ 'n1?vt ~;; a•Ai1T', Dll7''~ -V~lr~~~ .~ - ~- ~. -~~r -, r.. ~ ~ ~~ ..v n+av,ti ismuyWw O fl 5~ s'.7 Jl~t 'Kmal mn I~ ~ "~\~ r ). ~ NFdb bo -._ i. b~'. 15- ' iI ~~_ I ~ ^^ « _ ~... i;''w ~'t7Pi~G:t I. t~su vP.~ %' ~ r°~rr ill ~;=a ., _ ~__.J ,,;I ~. ~c`, "-?'~!} I '~~ ~ I :, ``<` • / / ~ i-i •,~` ai ~f :~ ~ / _ % f .. .... ^ , . / 1 -, ~ . ~ ,../1/ '., l,.` .i ,, A ` 4 .~~I f y- _. ~ r 5 I 3• ~ f u , ~ e°F y~ ' J ll, yf~w _ f I II ili I I t~ a' ~ l' ~.. ' i . ~~, ~F ~ 7~. ~ V _ ~ /~- ~'.~ .~~ • - .:~= '].l 1:' _L'_if L_.1L1 ~: _tl ~ .. .. l - , ~ ..~ I 1 7 ! . ~' _ . . Y ~ i l I I 4'-e/~4: ~4/"~ - L i - i J _ ' _.._ ... _. ._.. 1 ~ .. 7- / ~ tom' i u~ ~ ~ N _ - ,,. \ - I. ~ _,. .. ~ r,l,. -L1.7,- '].L '1-.~ .. ' _:.1 'ri_1 r1~ 1- -T rl.l r'; ~ - - - -- _,_ T ill I.. .. ~.. _-- _---. _.__ . __ - -----"-- ~ t ~. SITE ILLUMINANCE PLAN /~` ` LIGHTING FD(TURE SCHEDULE . ..._.. ~ ....... ..... .._. _.:._ .. I..._....-...:.__.._._-__... _. - . ~ ...F ..-.., a ILLUMINANCE STATISTICS ILLUMINANCE STATISTICS WEST PARKING LOT EAST PARKING LOT ~....,. -~ e.e.oo~r...n __ .~ a' reorz.wn ..,.. ~ ~~ o .,-..M -1_ ~. W ~ ~ _.-._ _~.} ~ 1 I _.. .. \ I~' y ~i.. ~-°., .. ~d. B~ ai >~a~ S a w 0 0 U cn z ~ ~ z O J_ Q /T~ d~ 2001.028 ~~ D~ ~~ r~ a mn E1.0 Attachment B .Information From Applicant 32 i~~~i~i~~i~ ~ssociia~r~~. ii~c. PLANNING and COMMUNITY DEVELOPMENT August 6, 2002 Planning and Environmental Commission And Russell Forrest, AICP Director of Community Development Town of Vail 75 S. Frontage Road Vail, CO 81657 Re: August 22 hearing for Vail Mountain School Project, Vail, Colorado Dear Planning Commission Members: Thank you again for your insightful comments on the Vail Mountain School project. We appreciated the opportunity to review with you our progress on the project at your last meeting. We are requesting a final review of the project at the August 12 hearing and believe that we have addressed all of the issues raised by the PEC and the neighbors. The revised plans that have been submitted address the specific comments raised at the July 22 hearing. Below is a list of the comments and how we have addressed them: • Rotate or pivot the soccer field to provide increased separation of the northwest corner of the field to Boo"thfalls Road. o The plans were revised to provide this separation and provide a landscape berm between the soccer field and Boothfalls Road. Move the bus stop to the west side of the bus stop loop. o The bus stop has been relocated to the west side of the bus stop loop. Provide a direct pedestrian connection from the bus stop to the school and provide a raised crosswalk within the parking area. o A direct pedestrian connection and raised crosswalk have been provided. Edwards Village Center, Suite C-209 Ph. - 970.926.7575 0105 Edwards Village Boulevard Fax - 970.926.7576 Post Office Box 2658 www.braunassociates.com Edwards, Colorado 81632 Provide a painted crosswalk at the entrance on Boothfalls Road to allow pedestrians the ability to cross. o A crosswalk has been provided in addition to sidewalk connections to the bus stop area. Provide a paved path from the cabin area to the school. o A paved path has been provided. Add a statement in the parking management plan that the school will pursue an agreement with the Town of Vail to utilize the Boothfalls trailhead parking area for overflow parking during special events. o This language has been added to the Special Event Parking Management Plan (attached). We believe that we have addressed your final comments on the project and hope that you will approve/recommend approval of all of our applications. Thank you again for your help on this project. in rel , Domim F. Mauriello, AICP 2 Vaol Mountain School Special Event Parking Management Plan /~~N-ral~v S~y~ 0 August 8, 2002 Vail Mountain School Special Event Parking Management Plan August 12, 2002 I. Purpose The purpose of this Special Event Parking Management Plan (here after, "Plan") is to regulate how parking is controlled during special events at the Vail Mountain School (VMS) campus. The school will ut~l~ze this Plan when planning special events or when working with community groups desiring to use the school's facilities. This Plan is intended to be a guide. Additional parking solutions may be developed by the school working in concert with the Town of Vail. II. Special Events The proposed school facilities have been designed to address the typical programmatic needs of the Vail Mountain School. The parking provided on the site will meet the day-to-day needs of the school. Additionally, the 116 parking spaces provided on-site exceed the Town's parking requirement for a 400-seat auditorium. The Town's parking requirement of I parking per 120 sq. ft. of seating floor area generates a need for 30 parking spaces (3,500 sq. ft. seating area). however, VMS understands that certain rare events may exceed the Town's parking calculation and the number of standard spaces provided on-site. VMS will from time-to-time have events in the auditorium or within the athletic facilities that may generate parking demand beyond the normal capacity of the designated parking areas. In these rare circumstances alternative parking scenarios and modes of transportation will need to be utilized. VMS, on a case-by-case basis, may allow other community groups to utilize its facilities. These community events may require special prov~s~ons for parking depending on the number of participants and the type of event planned. III. Parking Alternatives During special events VMS may employ (or require of others ut~liz~ng the school facilities) the following parking management techniques in order to reduce parking impacts to the neighborhood and the Town's street network. One or a combination of the following techniques may be utilized. A parking plan is attached to this plan. 2 • Encourage users to utilize the Town of Vail bus system. The Town's bus stop is located on the property and is proximate to the school's facilities. VMS will use notices, letters, or flyers to indicate that the Town's bus system is available and encourage participants to take the bus to and from the campus. • Require/encourage the use of private shuttles to delver users to the property from other remote public parking areas. These public parking areas may include the CDOT parking area located at the east Vail interchange, Booth Falls Trailhead parking area, Ford Park parking areas, the Vail Village parking structure, and the Lionshead Parking structure. Any use of the Town's parking facilities will require coordination with the Town of Vail. • Employ the services of a parking valet to use the on-site parking areas as efficiently as possible. With valet service approximately 20 additional cars that can be accommodated within the designated parking areas. • Encourage carpooling by users and participants. The school will notify guest and users that parking is limited on the property for special events and will encourage them to ride together. • The Vail Mountain School will pursue an agreement with the Town to allow overflow parking during speaal events on the Boothfalis Trail Head parking area in exchange for the use of VMS parking for the Town's overflow in the summer months. IV. Parking Restrictions Parking on Booth Falls Road, Katsos Ranch Road, and the North Frontage Road will not be endorsed or encouraged by VMS. VMS, through notices to parents, participants, and users, shall indicate that parking is prohibited on Booth Falls Road, Katsos Ranch Road, and the North Frontage Road. VMS will work with the Town of Vail and code enforcement to ensure that users of the school facilities do not park on these neighborhood streets. 3 P. 01 MEMORANDUM Date: August 1, 2002 x01046 ParkingMemo.wpd To: Dominic Mauriello Braun Associates, ln~. (via FAX: 970.926.7576) From: Jo Ann Higgin ,,, . Subject: Vail Mountain School Project -Parking and Access Since completion of the traffic impact study (TIS) dated May 9, 2002 for the Vail Mountain School Project, the proposed school parking configuration has been revised. The TIS vas based on a total of 115 parking spaces on the site with 80 parking spaces in the main school lot access from Booth Falls Road and 35 spaces in the faculty housing lot access from Katsos Ranch Road. The current plan identifies a total of 120 parking spaces with 92 spaces in the main school lot (Booth Falls Road access), 12 spaces in the northern lot (Booth Falls Road north access), and 16 spaces in the faculty housing lot (Katsos Ranch Road access). The parking supply on the school campus will sufficiently serve the average day to day school operations. These operations currently include school plays, performances, meetings, and athletic events. The revised parking configuration will result in slight diversions in traffic (15- 20 vehicles) from the Katsos Ranch Road to the Booth Falls Road intersection along the Frontage Road. This traffic diversion does not warrant the need for auxiliary }apes along the Frontage Road since the percent increase in traffic over existing volumes will remain at less than 20°/0. As noted in the TIS, alternatives to reduce parking derrrands should be considered if an event occurs on the site or at the auditorium that creates a parking demand in excess of the proposed i 20 spaces. A parking management plan has been established by the school that addresses parking demands and methods for containing these vehicles on site for large events. Tlie parking alternatives include shuttle service during large events, valet parking assistance where vehicles are stacked on the site, or identifying overflow parking areas such as remote parking areas. Because less than 10 events per year are planned at the auditorium, on-site parking should be adequate in most cases. There are adequate areas (remote and valet parking, etc) t}iat allow for opportunities to contain excess parking demands within the site boundaries. This concludes our supplemental review of the current parking and access plan for the Vail Mountain School site. P.4. BOX 1 9768, BDULDER, CDLDf2ADD R03O8-2768 PHONE: 303-652-3571 ^ FAX: 303-652-3574 08/07/2002 05:05 970-926-7576 BRAUN ASSOCIATES PAGE 01 BAI/~~~11N ASSC~~QA~ES. ANC. Pl,}1NNING and COMMUNITY DEVELOPMENT TO: ~) S S ~~`~~ FAX #: L,~~ ~~ Z ~ ~ Z - FR®M: ~CJ/~ . DATE: ~'~` ~ ~ Rl;s ~ ~,~ PAGESs (includes this cover sheet) COMAAENTS: !~/e ~~r ~ ~h-~ . (~M~..~ R~~~~d C. ~,,~5~~v ~ ~ ~e~c s ~ a,3o Please call if you have not received aR pages or have any problems with this transmission. EdwardsYllage t,.rnter, Suite C-209 ffi.- 470,926.7575 0105 Edwards Village Boulevard Fax -970,926,7576 Post OKce Box 2658 www,braunassociates.corn Edwards. ~PIP~'dCld H ~ tip 08/07/2002 05:05 970-926-7576 BRAUN ASSOCIATES PAGE 02 08/07/2902 17:02 303893224 AUG. 7,2002 4~1zPM CIVITpS Pl~kN'T S~L~~~JOf~ {~T1', SIZE p~CipUOUS TR~~S KGJA PAGE 84 N0.935 P.2/2 ALNUS TEN~II yWIA ' ~ ~N1N-LEAF ALDER 25 ~~5~' ~~3 FRAKINUS PENNSYLUANICA LANCEOLATA GREEN ASH 10 3" CAI„ POPULUS RNQUSTIFOLIA NARROWLEAF C01'1'ONWOOB 2F~ 7" CAI., POPULUS TREMULQ1QEa _ QUAKING ASPEN 3~ ~~5 2" 'GAL. ooN1~~ROUS ~~~s ARIES I,ASIOCARPA SURAI.PINE FIR 50 fi-10' PICEA PUNGENS COI.ORA00 SPRUCE 125 B-10' PlNus ARiSTATA BRISTLECON~ PINE 25 b-1Q' PlNUS PONDEROSA PaNQERpSA PINE 56~ 6.10' D~GIpIlDUS SHRUBS ~ ARTEMISIA FILIFOLIA SAND SAGEBRUS[~ 150 5Q AMEIANCHIER ALNIFOLfA SI=RVICEBERRY i6Q s' B&S CARAQANA ABO~4ESCENS SIBERIAN PEASHRUB 160 ;;G CORNuS STOI.ONIFERA RED 4SfER pOQWDOIO 50 5G COTONEASTER AGUTfFOLIA PEKING COTONEASTER 50 bGa JAMPSIA AMERICANA MOUNTAIN MOCitORAN4E 100 5G L'ONICERA fNV01.UCRATA REARI3ERRY HONEYSUCKLE 60 5G MAhfONIA REPENS ~ CREEPING GRAPE ~iOLY ~ 100 5G RISES ALPINUM ALPINE CURRANT 160 5G RISES AUREUM YE~,LOW FLOWERING CURRANT 160 fiG SYRiNGA VUI~RRiS COMMON LILAC 50 5G VIBURNUM OPULUS EURbPEAN CRAN~~RRY~USH a0 6G GONI~~ROUS•SHRU~S c~RCOCARPUS ~t`p(FO~ius CURL-LEAF' MOUNTAIN MAHOGANY 50 5G JUNIPERUS HQRIzoNTaLl9 'BLUE CHIP' SEUE GRIP JUNIPER 100 5G JUNIPERUS SABINA 'BUFFALO' BUFFALO JIINIP~R i0o 5Q JUNIPERUS SABINA TAMARISCIFOLIA TAMARIx JUNiP~R ~ 100 6G GRQUNDCOVERSIPERINAIIACS AQUIIEGIA co~uMaINE 4oU 1G ASTER ALPINUS PURPLE ASTER X475 1G GHRYSANTHEUM MAXIMUM 9f~AS~"A gA15Y 450 iG COREaPSIS GRADIFLORA COREOpSIS 47S 1G ECHINACEA PURPUREA • ' PURPLE CQNEFLOWER ~ 400 iG GAILI.ARDIA X GRANRIFLORA 6LANKET FLOWER ~ S00 1c LA1rANRuLA ,~NcusT(Fa~1A ENGLISH (.AVFNDFR 200 1G uMoNIuM ~ATIFODUM SEA LAVENp~R 400 1G SEDUM AUTUMN JOY +400 1G 08/07/2002 05:05 970-926-7576 BRAUN ASSOCIATES 0®/97/2002 ].7:02 3038992204 KCJD B.T S TTAL DATE: August 7, 2002 NUMBER OF FA,GES: 1 (YNC1f.UI3~lVG COVER) TO: Kyle Schroeder CO1V~'ANY: K1xpp Colussy Jenks Dubois b',~,X 1\t[TMBER 303-893-2204 FROlV~: Tia Nord SUBJECT: Lighting Stazzdaxds ~~OJEC~ 1YULt~BER: 7511.01 MESS,A,GE: PAGE 03 PAGE 02 B~unIIv ~A.NZE COft601+TII'iG ll7CII~sr A'(C. oaleea OfRcs 14142 rtansaP WB111 Pkl [a,ite 11B Oelden, CO ~WOf (:~ tie-iM2D prm ~~~12te.ssa The exterior lighting dosign foz the Vail Mountain School meets Che Town of Vail Development Standards as follows. 1. Height limits -Type S I Fixture is mountcd to a 8' pole wb,ich is the maximu~aa height allm~red for a residential, zone. 2. Light Sources A,ffixad To Structures -Type Sz is a wall sconce mounted to the wall at a Height of 10' above fiu~ished ground, thus meeting the regturomcnt that nv taxtuze is xnouttted on the xnof. 3. Cutof£ Shields - Type S 1 fixture meets the cut-off requirement by a louver that shields the lamp and does not emit light above 60 degrees from vertical. ~4. Lumimau,ee -For type S3 the ratio o£source lumens, 9,000 lumens, to lurxxiztous area, 100 sq. izt., is 90 which is less than the maximum I25. Calculatxozz SuAarti.axy The illwo:ivaanee level the parking lots are designed to are those recommended by the Illumination Engi~,eering Society. The average illutxiinance level far the West and East parking lot are 0.4 footcazicUes and 0.2 footcandles: respectively. PLRA9~ VP~k'X ttECk~~' Q>? ALL PA,GF.9. ~k' ANX A.~ D~SSTNG, PLEASE CALF (3Q3) 278-3820 FUA~'t•~S1VII5SZON. CC: C:~Daumca~ and scclM~UpddLo~J 9CMna.~tb~+penoY IMwnct F1c+10L1C217s11016F03TT` r~lx smidads compiiaue,dvt 08/07/2002 05:05 970-926-7576 BRAUN ASSOCIATES 08/07/2002 17:02 3038932204 1<C.TD AUG. ?. X82 ~}: ~1PM CXVITAS ~~3C To: kyle 5chraec~er F~]c Noi 303.a93,220~ KN Olussy~enks DuOais Fmm: a aesJardfns Dade; Aug, 7, qz Proje Yell Moun~11r1 achao! Cllr Na: CC; I]~X N00 Subject: Dominfc's rsgyest Pag~.s a !hd! 1YaAMdtt2t Kyle, Pl~aee fled enclosa~ ~ table of veget~Upn that pominic requested, PAGE 04 PAGE 03 (`10.909 P.l/Z ~~~~ >orbaa Aaalraara > P]saaez~ aLandsaevo Arebitaa a 08/09/2002 02:49 970-926-7576 BRAUN ASSOCIATES PAGE 01 BAS/1BlRA~.11N ASSC~~aATES, ~N~. PLANNING ar,d CQMMUNfTY DEVI:LaPMENT FAx r>:de~alwlaslOld To: u~ S ~- ,.,~ FAQ #: C~~ ~ ~~5~- FROM: ~.. DATE: ~~~ !8~ PAGES: .~ {includes tlsiis cover sheet) COMAAENI[a: ^( .y Q...ovt.C' ~`~ll~~' . Please call 1# you have not received all pages or hake arty problelms with this transmission. Edwards Village Center, Suite C-~09 Ph. - 470.926.7575 0 { OS Edwards V1lage Boulevard ~2" Fax - 470,926,7576 Past Qfl'ice Bax 2658 vvwwbraunassodates_corn Edwards. Colorado 8! 632 ~~ ~/ -~ ~''~ V 08/09/2002 02:49 970-926-7576 08/07/2002 17;02 3038932204 AUG. 7.2002 4~~,2PM CSVITRS ~- BRAUN ASSOCIATES KCJA PAGE 02 PAGE 04 N0, 935 P.?~ Pt~hlT SE~EC~ION CITY, SIZE D~CIpUOUS TREE . RLNUS T~NUIFOLIA ~ ~ THIN-LEAI` ALDi=R ~ 25 6-6' SIB FRAXlNUS PENNSYLUaNiCA LANCEOLAYA GREEN ASH 10 3" CAt„ PDPU~US ANQuSTIF4LlA NAR.RoW~EAF coTToNw~op 26 P" CAL, I~DPU~US TREMULOIpES QUAKING ASPEN 3135 2" 'GAS CQNl~~RDUS TREES ABMs >~ASIOCARPA suaALPINF I^IR 5a s-~o' PICEA PUNGENS CQLORADO SPRUCE 125 s•10' PINUS ARISTATR SRIST~ECONE PIS 25 6-~0' PINUS PONDER08A PONDEROSA PINE 50 610' pECIpU0U5 SHRUBS ARTEMISIA FiL.IFOLIA SAND SAGEBRUS(~ 160 5q AMELANCH(ER ALNIFOLIA sERViC1=BERRY 16a 6' a&B CRRAGANA ABORcSCENS SISERiAN PEAS~iRUB 160 5G CORNuS STOLoNIFERA RED OSIER pOQWDDD 50 ~ 5G COTp~VEASTER ACUT(FOLIR PEKING COTONEAS~'ER 50 bG JAMESIA AMFR(CANA MOUNTAIN MOCKORANc~E 1~0 5G LONICERA (NUOLUGRRTA BEARBERRY HONSYSUCKLE 50 5G MANON(A RE'PENS • CRFI;PING CRAPE HaLY ~ 100 5G R(BES ALPINUM A~PINP CURRANT 1~0 5Q R(8ES AURFUM YFf-IOW F~DWPRING CURRANT X60 6G SYRINGA UULOaARIS ~ COMMON LJLAC . 5a 5G VfBURNt1M OPULUS EUROPEAN CRANSERRYRUSH 50 6Ca C~ON~~RO~lS~SHRUBS GERCOCARPUS LERiF4L1US CURL-LEAF MOUNTAIN MAHOGANY 50 5G JUNIPERUS HORIZONTALl9 'S1,UE CHIP' SLUE GRIP JUNIPER 1pp gC, JUNIP~RUS SABINA 'BUFFALO' BUFFALO JUNIPER 100 5q JUNIPERUS SABINA TAMARISCIFO~IA TAMARiX JUN(P~A 1p0 OG CR4UNDCQ~RStPERINNI~~S , AQUILEGIR Co~uM~INF ~o0 1C ASTER ALPINU5 PURPLE ASTER 475 9G CHRYSANT~`iEUM MAXIMUM SHASTA DAISY 4sa iG COREOPSiS GRApIFLORA CoREOpSIS 475 1G ECN(NRCEA PURPUREA ~ ' PURPLE CONEFLQUUER ~40Q iG GAILLARDIA X GRANpIFLORA SLANKE7 FLOWER ~ 300 1G LAUANpULA RNGUSTIFOLI~I ENQLISH LAVENDER ~ z00 1G LIMOlVIUM (.ATIFOLIuM SFA LAVENDER 400 ,. sFaUM AUTUMN ~oY aao ,' 08/09/2002 02:49 970-926-7576 BRAUN ASSOCIATES 08/07/2092 17:02 3638432294 KC.7A FACSIN~);,E TRAN9iV;l~'X'AL DATE: August 7, 2002 NUMBER dF PA,GES: (~NCLUDZIVG COVER TO: Kyle Schraeder COMPANY: K1ipp Colussy Jenks Dubozs FAX N[T1V~ER: 303-893-2204 FROM: Tia Nord SUBJECT: Lightung Standards 1P)~OJ~CT N[J11~BER: 7511.01 N~SS.A.GJE: PAGE 03 PAGE 02 BEAUAIN ~'ANZE cotvavuxuac nvaa~s. ~c oma~ arrt~ 1~16f Dmwer Wert Pkl suCe 1fS GbidMt, W X0001 (373) 2i6~7a2D rye f~l maau The exterior lighting design for the Vail Mountajzt School meets the Town of Vail Development Standards as follows. 1. Height Limits ~ Type SI fixture is mounted to a 8' pole which is tkxe maximum height allowed for a xesidezztial zone. 2. Li~.t Sources A.~xed To Structuros -'type S2 is a wall sconce mounted m the wall at a height of IO' above finished ground, t$us meeting the requirement that no fixture is nrtnuz~ted on tl~e 7COp~. 3. Cutoff Shields - Type S 1 fixture meets the cut-off requitement by a louver that shields tb;e lamp and does not emit light above 60 degrees fronrt vertical. ~4. Luminance ~ For type S3 the ratio o£source lumens, 9,op0lumens, to ltuninous area, 100 sq. in., is 90 which is less khan the maximum 125. Calculation Suzarnary The illuminance level the parking lots are designed to are those recommended by the Illumination Ilngineering Society. The average illuminance level for the West and ]rest Parking lot are 0.~ footcandles and 0.2 £ootcandles, respectively. PLEA9~'V~RIFY R~CE~~' oP' A.L. t'AGES. ~F' ANY AAE i~98ING, ~P'LEA.SE CALL {303) z7$-3$20 FOA R~'~~ANS11'tllSSIOr. CC: C:wocummh ~,a 3~tdn¢~~y4~Coc~ sn~bra~Tanva.+~ mscmat rUc~OLr.2nsi ~o~efa9'fh fpu rcmds~ compia~,w.aoc T .... 08/09/2002 02:49 970-926-7576 BRAUN ASSOCIATES PAGE 04 08/0B/ZH92 15:22 393449691, WINSTON ASSOCIATES PAGE 02 DR AUGUST 7, 2ooz MR. PETER j`~. AbU151 - hEAOM/~TER `/AIL rJOUNTAIN ~CHOOL X160 ~ATS.'~9 RANGH }ZOAD vA1L CQ• 8~6~7 SCAR MR, ABUISI THANK YOU FOR YOUR LETTER OF AUGUST OF THE ~/AI~ j~OUNTAIN °,GWOOL TQ Hf:LP TF+E ~ATS09 jZANGH ROAD NEIGHBORHOOD. LETTCR AND APPRL`CIAT~ THE Rf1VISIONS THE: ' DtvEI.OPI"1ENT Or TRACT '` _ T ZOCZ AiVD THE GENERAL GOf'Y•i1T1•'ItNTS TIGATE THE IP1PPlCTS UP TWE EXPAN.5ION pN _ "HE NEIGHBORS HAVE REVIEWED YO~JR iGHOOL N~,S MADE TO THE PROPOJEp TI-{E NEIGHI:OR9 UNDERSTAND THt: DIFFICUL 9'TAGE OP THE PROJECT GNEN THE APDITIgI /'All, ~-•jOWEVL`R THE N)sIGNBORJ ARE CQN YC)UR LETTER CONCEFLVING THE LANDSGAPII` TO HELP RESOLVt; TNE~ SITUATION WE tv OPPORTUNITY 70 Rf~VIEW THE SPE'UPiC P! A9 THEY ARE DEVELOPED .ANA PRIOR TJ NE~IGHBURS CAN RE'_i"IAIN IN THE PROG:59 TOWN COMPLETING iT9 REVIEW OF THE F "1"HI; KEY 155UE9 FOR TNe NEIGHOORHOOD (, THE NEIGHBORg WANT TO BE'URE PERCENTAGP OF EVERGRttNS U9E C PERENNIAL PLANTINGS ARE CONJIS~ I,ANp~7CAPING'. EN I"EAKING SPECEFiC Go(7rirTE~1t;NT5 AT THIS _ REVIEW REQUIRCD pY TNt TOwN OP ~NtD ApOUT THE LACK OFJPEGIFiGITY IN AND i4RGHlTf`GTURl: OF PRQJEGT ~ RC-QUtwST THAT Tt1E NElGH00R5 HAV): AN FOR THE LAN05GAPf~ AND ARCI-I1TEG';"URE 'T'OWN'S rZCVIEW -j'HIS WAY THE ~ 4~SoLVE ANY 199UE5 PRIOR TO THE ? A5 >=OLLOWS: iAT THE ,I~ AND Nl1M3FR Or TReES, ~t:.4M7: LANDSCAPE BOULOER~ AND JT WITW THE CO,"u•11TMENT OF "SU»5 T ANTIAL 8/E3/c]2 303.40.9200 FAX 70S•'I°9.691, WWW.W~NSTONASSOCIAT(~S.COh1 2299 PEgFL STREET, SUITE X00 BDUEDER. CO 80302 08/09/2002 02:49 970-926-7576 BRAUN ASSOCIATES 88/@8/2662 15:22 3934496911 WINSTON ASSOCIATES `J I i ~ 2 TNT BUiLpWG ARCHITECTURE INGl.UDE.~ HIGH QUALITY Dl=3lGN AND h1ATERtAL~ WHIGFI I.NGI~UpE NATl1RAL ~T'C7N<: ~APP~}tgXIMATELY ~~ O)= T}~E EXTERIOR ELEVATICJN) INSTAL-LED TO APPEAR AS~ PART OF THE DUILOING STFlUGTURE= ,41vp THA- THE DETAIL. AND MATt`RIALS Carl EACH POUR PLCX ARt_ ~Ui`f ICIENTLY DI<=I=ERENT 30 THE BUILDINGS WILL NQ~'i APPEAR IDCNTIGAL• i Ti~E NEIGHDORS UNDERSTAND THE,SCHOOL 15~NOT IN A p051TION TO GOP1MIT TO THESE ITEh'LS UNTIL Tl-IE DI=YAlLf;D ~E5(GN IS ~'URTHE>~ ALOrlG RATHER T1-IAN WITIzHUL() TfI>? NElGHBORHOOD•S .7UPPORT U~' THE PROJECT D E TO LAGI< QF JP~Gl~lGS AT Tu19 TiP'IE THEY WOUL1? nAl'HER WORK GOUPERATIVELY 1vlITH THE SCHOOL AS T`iE OXTAILS OF THE PRQ~EC7 GAN 5E PROVIgEQ, { ~"HAN:c9 YOU FOR YOUR GON51t7ERATl(}N OF ~'H15 APPROAGN ANq WE LOOK FgRV/ARD TQ YOUR RESPON~e i I i { ,~ ~ING~ftt;LY ~JWSTON ~1,~0~1ATc_; INC, 1 ~ ~. ~, 1 i T,ZODERT L PERLETZ AS(_A i ~ENIG>R ,ggSUGiATt: i CC: FENNY LUBIN 1 ~OMINIG MAURIELLO BRAUN A390G~ATES j i i i t I 1 • i 1 i 2 J e/e/oz PAGE 05 PAGE 03 307~110.9zOC FAX 303.19.691 I WWW.WINSTONASSOCIATE ~.COn 129? PcARL STRCF ~. SUtTi Io0 BoULDE0., CO 40)G3 MEMORANDUM TO: Vail Town Council FROM: Bob McLaurin, Town Manager RE: Town Manager's Report DATE: September 17, 2002 OLD TOWN SHOP As indicated on the agenda, we have prepared an ordinance authorizing the sale of the Old Town Shop. In accordance with our previous discussions, I have been working with Rick Sackbauer and Piet Pieters to identify a temporary location for the gymnastics program until such time as a permanent site can be identified and a facility constructed. Thanks to the work of Rick Sackbauer, we have identified a location in Avon which will work on a temporary basis. This facility is owned by Vail Resorts and VRI is willing to lease the land for up to 2 years for $1 dollar per year. There are, however, CAM fees of approximately $13,000 annually. We have also prepared the necessary plans for the renovation and have solicited proposals from 3 contractors. The range in prices for completing the necessary renovation is between $22,000 - $78,000. The water district needs to begin the demolition of the old shop site next spring in order to be able to accommodate additional redevelopment in Lionshead. It is my suggestion the TOV/VRD subcommittee meet to work out the details of this issue. Please advise me on how you wish me to proceed. PARKING TASK FORCE At the last council meeting, several merchants requested that the town reconsider the recommendations of the parking policy for the upcoming ski season. Pursuant to Council's direction, we are in the process of setting up a meeting of the parking task force. We are attempting to schedule this meeting the week of September 23~d. We are unable to meet beforehand, as two of the Task Force members are out of town. As soon as we have scheduled this meeting, we will advise you and report back as soon as possible. UPCOMING ITEMS: Work Session, October 1, 2002 VRD Quarterly meeting Discussion of Ord. #25, major amendment to SDD #4 (Cascade Village) Evening Meeting, October 1, 2002 Ord. # 26 , 2"d reading, sale of Old Town Shops Ord. # 25, 1St reading, major amendment to SDD #4 (Cascade Village) SEP,12.2002 12:O1PM RESORT COMPANY 970 845 5945 N0, 5759 P, 1 To: Council Members, Staff From: Ludwig Kurz Re: Public input at Farmers Market, Sunday, September 8~'. Date: 9-12-02 Parking: Some concerns regarding the proposed changes in times and costs. Upon some probing, it became clear that most concerns and some opposition is based on misinformation, and a lack of understanding of the total proposed program. EDUCA,')(')<ON AND COMMUNIC,t~TYON!! Middle Creek: Comments were evenly split between proponents and opponents. Mill Levy increase: Crenerally supported with the caveat: "Give us specifics why the Town needs it and how it's proposed to be spent". "Help us help you to get it done". Public Bathrooms: Need for more, better appointed and maintained. (Comparison was made to on mountain facilities). ~c~~ ~.~ . ~e~ 241 S. Fronngr Rd. E., Sa. 2 • Vail, Colorado B1G57 phone 970-477-0075 n 6~c 970.477-0079 nr,ail: ~cbaevai,.ne[ Vail Chamber & <;~ Business A,ssociatio Pater Coors Coors Brewing Company .Box 4030 Golden, Colormmdo 80401 August 15, 2001. Dear Mr.'Coors: I am contacting you directly about an issue that 1 feel is significant as regards the Vail Chamber end Business Association. it is also important that you personally be awaraof. the problem that has been created as it reflects negatively on your organisation. Last year, Coors was the hoer sponsor.for tbe VCBA's Friday Block Parties, 'They are 10 in number and run from the last of June through. August. These parties are. funded by the Town of Vail and presented by the. Chamber.. Coors was also the sponsor of this event for the Srst 5 parties this year: After the 5°i event this year, we started hearing some grwnblings 5tim two of the restatuaNs that arc located near the event venue. Keep in mind that the event had essentially taken place in the same location, under a similar format in 1999, 2000, 200] with very little eonflict..1 might add that we were bringing in 600+ people for a floe been, trx feed, and a band From 530-7:30. As things escalated, these two bars went to Coors and requested that the sponsorship be pulled. At this point, I contacted your Customer Service Departmmt the woman(whose name I unfortunately misplaced was quite polite but at lthe end of the dsy, it was Brian Lee's decision and he in fact pulled sponsorship. We received a letter stating drat Coors would'provide us with the 53000 chock but would no longer provide product. A little history should be given here. Several years ago, we sponsored an Irish Fest and Coors was so helpful that I wanted to reciptvcate. Whoa the Block Parties first started, thry were co-sponsor~od with the Restaurant Association. At that time, I taed to get them to rase Coors fiat was rmsuocessful and Budweiser became the sponsor. When the Chattrber became the sole organiser, I contacted Coors and they were.soemirigly ihalled to snake' so in toad into Var7 which has pretty much been Bud territory. We had do signed couuact as I uever'felt that one was ~cessazy and, in fact, tbitigs had progressed without s problem until recently. T 'd E6ET-LLb-OL6 R~en~aueS/tuoo~ del ayl d9i =i~0 ZO T i daS i I think it is irnportaat for you to be personally awam of the situation and the ramifications. For starters, the Chamber will never use Coors for any event which we sponsor. Additionally, ss President of the Chamber, I will make sure that ottie~ organizeas are aware that Cools cannot be relied upon to honor its commitments, in fact, left us in. quite a bind nud way through the event with only 4 days to go before the next scheduled date: Just 'as a point of reference, in the midst of this, I called the Vail Valley Foundation who sponsors the Wednesday night Street Beat with Bud as a sponsor. For years they have faced even greater opposition to their event than we have to ours. I asked if Budweiser had ever threatened to pull out and they said absolutely never. On a very personal note, I also happen to own The Grind. which is a 14 year old business in the heart bf Vail Village. It is a locals' hang out with signi5cant tourist traffic. While it wi11 surely have no effect on your bottom line, as a matter of principle, l cancelled my Coors account last week. ~ _ CC: Board of Directors Mayor Kurz and Vail Town Council Bob 11~cLaurin, Town Manager Dick•Cleveland, Town Council Rep Bill Jensen, Vail Resorts Rep Contribution Request Spreadsheet W ,.~ 'TOWN OF VAIL'FUNDING REQUEST ~ GENERAL FUND Contributions: 2002 In-Kind Description 2002 Cash Request 2002 Contribution 2003 In-Kind Description 2003 In-Kind Request 2,003 Cash Request ECONOMIC: Bravo! ColoradoMew York Philharmonic Bravo! Colorado Parking Ford-13 30,000 22,500 Parking @ Ford-15 100,000 27,500 The Chamber of Commerce/Jen Brown 10,500 0 Vail Valley Chamber & Tourism Bureau (Mer red) 100,000 25,000 40,000 Vail .lazz Foundation/Howard Slone 15,000 7,000 1 Blue Pass 750 15,000 Vail C:harnber & Business Association 372,740 355,000 280K + 75K 346,700 Vail'I'oday/Rick Scal Ilo 325,000 0 41,625 Vail Valley Foundation American Ski Classic Village Parking 30, 000 20,000 Parking (American Ski Classic) 2,300 2,300 in parking Snowboard Vail Village Parking-2,000 30,000 0 Gerald R. Ford Amphitheater (Hot Summer Nights) 20,000 20,000 25,000 Vail International Dance Festival 15,000 12,500 20,000 Winter Concert Series/Street Beat PW & Police-6.000 25,000 20,000 PD & PW support 6,000 27,500 Subtotal - VVF 92,300 72,500 Vail Valley Tourism & Convention Bureau/Frank Johnson: Nothing submitted Events 8c Information StatT Parking 9 blue passes 9 blue passes Infiinnation Booths 191,352 191,352 Special Events 308,000 308,000 Vail 50 (parking passes for ski passes & com. Hosts) 25 blue passes 25 blue passes Special Events Commission 160,000 160,000 Total VVTCB - 659,352 659,352 TOTAL ECONOMIC - 1,604,89 1,Y41,352' ' 48;375 601,700 ENVIRONMENTAL: TO"1'AL F,NVIRONMENTAL (SEE RETT) - - ~,-~ ~ ~:. ; ., r - ~ ~. _ p EDUCATIONAL: Alexander Foundation Vail Music Faire 10,000 Youth Golf Clinic 9,000 Clore Range Natural Science School/Kim Langmaid 3,000 2,000 Learning Tree-ABC School/Moe Mulrooney (Casino Night table) Onl if no building starts 2,000 1,000 Meet [hc Wilderness/'T'homas McCalden 5,000 1,000 Museum of Contem orary Cultures/Sarah Stauch 3,000 0 I'he Vail Sym osium/Ebby Pinson 1,500 0 The Vail Symposium-Sawatch Summit/Ebby Pinson 2,500 0 Vail Valley Foundation-The Magic Bus 2,500 TO"I'AL EDUCATIONAL - ' 17,000 4,000 - - 21,500 11EA1.,Tll AND HUMAN SERVICES: CASA of the Continental Drive 3,000 Crime Sto pers of Eagle CO 2 blue ass 2 blue pass 2 Blue Pass 750 Eagle River Youth Coalition 3,200 Eagle Valley Humane Society/Char Newman 2,000 0 'T'he Buddies Program of Eagle Count 2,500 'fhe Resource Center of Eagle County 15,000 5,000 7,000 Vail-Eagle Rotary Club 5,000 Vail Mountain Rescue Group 2,000 2,000 2,000 TOTAL HEALTH AND HUMAN SERVICES - 19,000 7;000 - 750 22,700 RECREATION: First Descents 2,000 2,000 2,000 Skating Club of Vail Yes - R days of ice Granted 8 days of ice 10,570 Ski Club Vail Yes - 4 days of ice Granted 4 days of ice 5,285 Ski Club Vail/Linda Kildow I blue arking pass 0 Battle Mountain High School Ski Team Kathryn Benysh 2 debit cards n $384 each Granted Snowshoe Shuttle-Sarah Ladd 700 arking debits Granted VRD-Club vail 2002/Mare Thomas 1,500 0 VRD-F..agle CO Youth Activities/Diane Johnson 1,000 1,000 VRD-Vail Family Carnival/Diane Johnson 1,000 1,000 TOTAL RECREATION - 5,500 4,000 2,000 SUBTOTAL -CONTR(BUTiON„S--~' ~-' ~- - ... ~ '~ ~ - ~ 1,646,392: 1;156,352 ~- ~. - . -~ .• <~ 49,125 647,900 ARRANGEMENTS and AGREEMENTS: Vail Valle Comm. TV/Ch5 (40% of franchise tee) (Note I.) 60,000 60,000 Vail Valley Exchange 2,500 2,500 Youth Recognition Award 6,000 6,000 Vail Valley Athlete Commission 5,000 5,000 SU13 TOTAL -ARRANGEMENTS and AGREEMEN - 73,500 73,500 - - 0 GRAND TOTAL General Fund - 1,719,892. .' 1,229,852 49,125 647,900 Real Estate Transfer Tax Fund: Eagle River Watershed/Caroline Bradlord River & Community Pride Hwy Clean Up 50,000 1,000 Vail AI ine Garden Foundation/Ry Southard 56,460 Funds for o erations 56,460 Funds for new garden ca ital construction 100,000 11arkcting Fund Vail Local Marketing District 308,000 200,000 Capital Projects Fund L'agle C'. Down Payment Assistance Comm-Christie B (Note 2) NOTES: 1. Required based on franchise agreement 40% of Revenue 2. Up to $15,000 from down payment assistance program if Avon matches contribution home should be in Vail. Special Events submitted to the Council but referred back to the Commission on Special Events (CSE) include: Teva Mountain Games $100,000 cash + in-kind Big Wheel and Chili 30, 000 cash + in-kind VRD Family Carnival 1,500 cash Vail Valley Foundation - American Ski Classic $30,000 cash + $2,500 parking - Knockout Grant 20,000 cash + $2,500 parking - Birds of Prey Festival (12/3-8/02) 10,000 in-kind transit/ADA Applications submitted to Council under the "Qualifying Cultural Events" include: Vail Valley Foundation - Street Beat $27,500 cash + $6,000 in-kind - Vail International Dance 20,000 cash - Gerald R. Ford Amphitheater Grant _.__ ___ _ _ -._._ -____..---._.. _, ._ ._.______..___-___ _v.-._ _.._-_~.---_.__-- ---_____ __.---.-.--. Pam Brandmeyer -COUNCIL CONTRIBTUTIONS (for agenda backup) Page 1 From: Pam Brandmeyer To: Mary Caster Date: 9/10/02 6:17PM - -~~ ~,~~~?.~"~ ~tCnwlrYl~t~~t Subject: COUNCIL CONTRIBTUTIONS (for agenda backup) C= BACKGROUND RATIONALE: In an attempt to simplify Council's deliberations with respect to funding Council Contributions for'03, and because the following larger funding decisions must be made prior to proceeding with the rest of the contributions process, staff is requesting direction from Council on the following requests: 2002 Request 2002 Actual 2003 Request Manager's Recom. Vail Chamber and Business Association (VCBA) ~37d,n~6 $280,000 $346,700 $180,00 ~ ~. 75,000 SE OVail Today (Rick Scalpello) $325,000 '715a ~O6(~ CBA) $41,625 uCTB Vail Valley Chamber and Tourism Bureau (V~BPr) $100,000 25,000 $40,000 [5,000 (merged valleywide chamber) Vail Valley Chamber and Tourism Bureau (WCTB) Information Services $191,352 $191,352 $210,000 [FUNDED 9/3/02] less 5% _ ) L$T99;50Q Vail Valley Chamber and Tourism Bureau (WCTB) Special Events $468,000 $468,000 No Submitta [CSE Vail Local Marketing District $308,000 BLF $308,000 +- $200,000 C=_ 1 - - --- ~308,A00_to CSE Commission on Special Events $160,000 seed $160,000 $694,433 ($594,433_ New York Philharmonic/Bravo!Vail Valley 0 0 $100,000 -- -- L100,000 from (CSE '01%'02 rolh foruvard seed $' ~_... BOB/MARY/JUDY/STEVE: I am also preparing a second document that will be an attachment to the agenda, showing all the transfers from Council Contributions to the CSE + a summary of the "culturally qualifying events" and their'03 requests (to be considered by Council at their October 1st meeting -FYI). 11~.~i~Ut . ~ic,~ [-_ ~~ ~. ~ C- [- --- _) [_ ~..~ -~ VAIL CHAMBER & BUSINESS ASSOCIATION Application for Town Funding - 2003 Vail Chamber & Business Association 241 S. Frontage Road, Suite 2 Vail, CO 81657 970-477-0075 Kaye Ferry, President Steve Rosenthal, Vice President Nicole Hoffman Ewing, Treasurer/Secretary Robb G. Chiles, Executive Director 1) Name of Organization 2) Contact Person 3) Mailing Address 4) Telephone Vail Community Chamber dba Vail Chamber & Business Association Robb G. Chiles Executive Director 241 Frontage Road., Suite 2 Vail, CO 81658 970-477-0075 5) Members & Titles of your governing board Vail Chamber & Business Association Advisory Board Kaye Ferry, President Steve Rosenthal, Vice President Nicole Hoffman Ewing, Secretary/Treasurer Kenny Friedman Gary Boris Bill Jensen Ghiqui Hoffman Ron Weinstein Dan Berry John Gorsuch Dick Cleveland -Council Representative 6) Amount of Contribution Requested 7) Organization fiscal year-end 8) Are your books Audited? 9) How will the contribution be used? The Grind Colorado Footwear General Store/Rucksack Kenny's Double Diamond Montauk Vail Associates Laughing Monkey Roxy Eye Pieces Gorsuch, LTD $346,700.00 September 30, 2002 Yes, annually by C.R. Engel & Associates To increase the amount of new initiatives that help benefit the overall business health of the community and to provide visitors to Vail a better quality experience. These initiatives include Turn It Up!, a customer service training program, a Vail Reunion Week and Premier Impressions, a guest service reward program. 10) How does your request support item 1 C of the contribution policy? By providing visitors a better experience, our efforts are encouraging return visits and positive word of mouth advertising. This helps the long term financial health of the community. Involvement with Customer Service Programs has a direct result on the pursuit of the Town's mission statement, by providing the basic tools necessary to become a premier resort community 11) Who currently funds your organization? Town of Vail American Express Sponsorships 355,000/Business License Fee 10,000/The Vail Guide 6,000 12) Organizations Mission Statement To promote and support commerce and enterprise in the Town of Vail. It shall be a strong advocate and speak with a unified voice for the business interests of its members while remaining mindful of the interests of the community at large. It will work with the Town of Vail and Vail Associates to be the premier mountain resort community. Expenses Budget 2003 Fixtures and Equipment Com uter $ 4,000.00 Co ier & Fax $ 3,000.00 Office Equipment $ 2,000.00 Sub Total ' $ 9,000.00 Information Services Advertisin $ 8,000.00 I nternet/website $ 3, 000.00 Or anization Dues $ 100.00 Newsletter $ 5,000.00 The Vail Guide $ 35,000.00 Misc. $ 5,000.00 Sub Total `$ 56,100 40 Operating Expenses Rent $ 24,000.00 Remodel/Maintenance $ 10,000.00 Phone $ 13,000.00 Posta e $ 3,500.00 Office Su lies $ 4,000.00 Ski Museum (Rental) $ 500.00 Travel & Entertainment $ 2,500.00 Insurance $ 12,000.00 Accountin & Le al $ 8,000.00 Misc. $ 5,000.00 Sub Total $ 82,500.00 Personnel Salaries $ 85, 000.00 Part Time Staff $ 42,000.00 P/R Taxes $ 19,000.00 Health Insurance $ 3,600.00 Workman's Comp $ 2,000.00 Ski/Parking Pass $ 2,000.00 Sub Total $ 1:53, ,6,,00:00 Member Services Trainin Speakers $ 4,000.00 Monthl Meetin s $ 4,500.00 Communi Mixer $ 5,000.00 Communi Meetin s $ 2,000.00 TIU/Customer Service $ 19,000.00 Premier Impressions $ 10,000.00 Virtual Walkin Tour $ 20,000.00 Misc. $ 10,000.00 Sub Total $ 74,500:00 New Initiatives Vail Reunion Week $ 100,000.00 Santa & Cookies $ 7,000.00 Sub Tota! $ 1'07,000.00 TOTAL EXPENSES.. $ 482,700:00 Income Budget 2003 Town of Vail $ 346,700.00 American Express $ 10,000.00 TUI/Customer Service $ 19,000.00 Sponsorships $ 107,000.00 .:...Sub-Total $ 482,700.00 TOTAL EXPENSES $ 482,700.00 TOTAL INCOME $ 482,700.00 FROM' : LAURA FAX N0. 9496379 Jul. 31 2002 1~1:33PM P1 1:46 PM 07/31 J02 Accrual Basis VAIL CHAMBER ~ BUSINESS ASSOCIATION Balance Sheet As of December 39, 2001 [tec 31, 01 ASSETS Current Assets CheckinglSavings CHECKING WESTSTAR -5,596.46 SPECIAL EVENTS 855.80 I Total Chacking/Savings -4,740.66 Total Current Assets -A~,7d0.66 Oth®r Assets COMPUTER 3,281.54 LEASEHOLD IMPROVEMENTS 6,D63.75 OFFICE EQUIPMENT 3,001.88 Total Other Assets 12,367.17 TOTAL ASSETS 7,626.51 LIABILITIES 8 EQUITY r Liabilities Current Liabilities Other Current Liabilities Payroll Liabilities 1,763.37 . Total Other Current Liabilities 1,763.37 Total Current Llabflldas 1,763.37 Total Liabilities 1,763,37 Equity Opening Sal Equity -2,677.56 Retained Earnings 30,911,91 Net Income -22,371.21 Total Equity 5,863.14 TOTAL LIABILITIES & EQUITY 7,626.51 o....,. , f.~.: 1. • APPLICATION FOR.TOWN OF VAIL FUNDING GENERAL INSTRUCTIONS All applications must be submitted to the Town of Vail by Wed. July 31, 2002 by 5:00 P.M.. You must provide 12 copies of the application. Any application received after that date or any application packet with fewer than 11 copies will not be considered. Please send application to: Town of Vail Penny Harpe, Accounting Tech. 75 South Frontage Road West Vail, Colorado 81657 For questions on the financial statements, please contact Penny Harpe at 479-2104. PLEASE TYPE THIS APPLICATION OR .PRINT IN BLACK INK 1. Name of organization: ~ {~ ~ (.. % ~ d7 ~ ~` 2, Contact person: ~ I G K, SG q (,,, j~EL~ Q 3. Mailing address: "p U. 13 O x I g~ g U /~ I C- ~ C ~ ~~~ 5 g 4. Telephone: ~7D , ~7q- 17/` ~'~~.; -! 7~" ~f 7 g ~ 7,30 5. Members and Titles of your governing board: ~JJ F p ~,~~~L ~ ~ ~ ~N I ~ ~ 7°1 ~~ OF uA6C 6vSlJUGSS COI~I~UJJ~~T'y (-E~~E~S q ~ 1~~y uu ~c~~ ~~[9A11~S ~2DU -0~J 6. Amount of contribution re uested: ~ D ~-~ 6~TI"i ~~ 1 i o rod ~~B~I c 2 ks 7. Organization fiscal year-end: fJ `~ g. Are your books audited? IJ ~ }~ 9. How will the contribution be used? SEE D r(~E~ S ~ ~C 10. How does your request support item 1C of the contribution policy? SEE ~ ~~R, S~ ~~ 11. Who currently funds your organization (other governments, private donations, user fees, etc.)? pRiuATE r`7oJJ-9 s i bl)S. ~ZL t~~LUI~ J EE ~ 12. Organization's mission statement: 1D FIEC.p ~ ~ JL aECDI'l E Tf~~ U)~t71S ~ T~~ pR6~.cER, noU~r-9 i,~ RESo2r C0~11~~~U 1 T~ (If more room is needed to answer questions, please use the back of this pag 3 #9 "VILLAGE" LIGHT POSTS GORE CREEK DRIVE LIONSHEAD ENTRANCE FLAGS/BANNERS VILLAGE LIONSHEAD E. MEADOW DRIVE EVENT INFORMATION SIGNS LIONSHEAD BUNKER FIBER OPTIC LIGHTS TOTAL' 2003 BUDGET REQUEST FOR VAIL TODAY 2002 2003 Budget Request Status $8,000 $0 Finished. Greatly improved lighting and ambiance. $15,000 $21,000 Additional Lights to Complete Entrance. 2 year total is $36K. $4,375 $4,375 Installation Postponed to 2003. Request rollover of 2002 funds $3,250 $3,250 Installation Postponed to 2003. Request rollover of 2002 funds $0 $3,000 High foot-traffic area due to events like Farmers' Market, Guided Art Walks, Italian Festival, Christmas Festival $5,600 $0 Bids In Process. DESIGN ATTACHED. $6,000 $10,000 Design Cost Exceeds Budget. Additional Funds Needed. Request rollover of $6K plus $4K additional $27,775 $0 Delayed due to changes contemplated by new Streetscape Designs. Target is Christmas 2002 $70,000 $41,625 $28,000 of new funding plus $13,625 of rollover funds #10 These improvements will enhance the appearance of Vail's business districts by diverting our visitors' attention from our deteriorating infrastructure while design work continues on the new streetscapes. When combined with street entertainment and special events, these improvements contribute directly to the Town's economic health and premier resort community status. .t r. r Y ~., a F ~~,~ ~ ~. r„ ~, ~~._, ~'~~~ r ~. ~r i ~ f f. .'` ~ -_'~ ~ , .. pa` ~ ~: ~. ~~~, ~ '' ~.rv'~'i'i~'T^:..~.. e 4x7 ~.. ~ '~ ~' :! ~ : ~,,j ~~~' ,a . 4s e ~~~~ ~, A ,;~~:~~ ~, _ . ~ _ .. k1 .... n....., 4cdrin : ~i.F:~ .. t ,- a ,., -. ~ - ..., -..- F ~ ~r.~ ., ` ,,, ._ ~ i : . , d., .: .~ r M~. ~I ~ M~~ \ .., ~~ ~ r; ti ,. ~ k ~ ~ . ~ - ~~~ ~ . ~ ~ P ~ ~~ ~~ ~ ~~~ ~ l.t~ q- ~?. -~ ,9R.d6..:6sC_ y _ _ , a _ ~ f.;tiR 2003 FUNDING REQUEST INCREMENTAL SERVICES TO BE PROVIDED BY THE VAIL VALLEY CHAMBER AND TOURISM BUREAU Steve Pope, Chairman of the Board Brian Nolan, Vice-Chairman Stan Cope, Secretary/Treasurer Frank W. Johnson, President 100 East Meadow Drive, Suite 34 Vail, Colorado 81657 970.477.4008 2002 Vail Valley Chamber & Tourism Bureau Board of Directors Steve Pope- Chairman Publisher Vail Daily P.O. Box 81 Vail, CO 81658 949-0555 ext. 300 390-1349 ceil FAX: 949-7109 spope@vaildaily.com Cliff Eldredge Vail Valley Medical Center 181 W. Meadow Dr., Ste.100 Vail, CO 81658 479-7231 (Assistant: Lorie) FAX: 479-7192 eldredge@vvmc.com Bill Jewitt Vail Town Council Bart & Yeti's 553 E. Lionshead Circle Vail, Co, 81657 476-9336 bjewitt@colorado.net Brian Nolan- Vice Chairman The Blue Moose P.O. Box 5549 Avon, CO 81620 904-8666 FAX: 845-7357 Office: 845-0545 blumoose@rof.net Stan Cope- Secretary/ Treasurer Lodge Tower 200 Vail Road Vail, CO 8 L657 476-9530 FAX: 476-4093 spcope@gwest.net Bob Borg Avon Business Association P. O. Box 7626 Avon, CO 81620 949-9073 FAX: 949-9091 wbclodge a~attbi.com Mike Brown Avon Town Council Alpine Bank P.O. Box 7330 Avon, CO 81620 949-3333 FAX: 949-3283 michaelbrown @alp ineb ant:. com. Tim Cochrane Eagle Valley Chamber of Commerce P. O. Box 964 Eagle, CO 81631 328-5220 FAX: 328-1120 evcc@,eaglevalley.org Robert Dallain Park Hyatt Beaver Creek P. O. Box 1595 Avon, CO 81620 949-1234 (Assistant: Betsy) FAX: 949-4164 rdallain cr,beavepo.hyatt.com Jim Feldhaus Colorado Mountain Express P. O. Box ~ 80 Vail, CO 81658 949-4227 x 6920 FAX: 9495032 j imf@cmex. com John Garnsey Beaver Creek P. O, Box 7 Vail, CO 81657 845-5130 FAX: 845-5131 Cell: 3762503 jgarnsey@vailresorts. com Loren Gifford Vail Valley Ace Hardware 2111 N. Frontage Rd. Vail, CO 81657 476-8282 FAX: 476-9386 Loren@vailace.com Ghiqui Hoffman Vail Chamber Business Association P.O. Box 2657 Edwards, CO 81632 926-9494 x205 FAX: 926-9497 ghiqui@excite.com Alan Holub Minturn Business Assn. Shade Tree Auto Body P. O. Box 1198 Minhirn, CO. 81645 8275572 8275810 fat Bill Jensen Vail Resorts Inc. Sr. VP & COO of Vail P. O. Box 7 Vail, CO 81658 479-3020 (Assistant: Molty) FAX: 479-3017 billj-rl;vailresorts.com Arn Menconi Eagle County Commissioner P.O. Box 2020 Avon, CO 81620 SOS: 845-7040 SOS FAX: 845-7067 County: 328-8605 (Cherie) County Fax: 328-7207 arn;u!vail.net Tony O'Rourke Beaver Creek Resort Company P. O. Box 5930 Avon, CO 81620-5390 845-5857 FAX: 8455945 Cell: 3907441 TonyO@vaih-esorts. com Steve Shanley Edwards Business Association Northwestern Mutual- Owner P.O. Box 660 Edwards, CO 81632 926-6650 FAX: 926-0747 shanley(a~vail.net Beth Slifer Slifer Designs Owner 216 Main St., Suite C-100 Edwards, CO 81.632 926-8200 (Assistant: Amy/Patty) FAX: 926-8228 bcth(cJslifcrdcsigns.cnm amy@sliferdesigns. com VISION TO IMPROVE THE ECONOMIC WELL-BEING-OF THE VAIL VALLEY BY IMPROVING THE BUSINESS CLIMATE IN THE REGION AND IN EACH OF THE COMMUNITIES WITHIN THE REGION. MISSION TO ENHANCE THE ECONOMIC OPPORTUNITY AND THE BUSINESS ENVIRONMENT BY ATTRACTING VISITORS TO THE REGION; IMPLEMENTING REGIONAL PLANNING AND COOPERATION; AND IMPROVING THE BUSINESS EXPERIENCE. WE WILL COMPLETE OUR WORK THROUGH PROGRAMS THAT MAINTAIN OR ENHANCE THE REGION'S NATURAL ENVIRONMENT. VALUES AS AN ORGANIZATION, WE WILL IMPLEMENT PROGRAMS THAT ADVANCE THE WELL-BEING OF THE VAIL COMMUNITY AND THE ACHIEVEMENT OF OUR VISION AND MISSION...OUR GUIDING PRINCIPLES ARE: Teamwork--We will always endeavor to create a sense of partnership among ourselves and with other organizations, based on mutual respect and the belief that everyone's goals are best achieved through collaboration. Communication--We will always speak honestly in dealing among ourselves and with others. We will Develop the capacity to listen first, learn, then determine the best course of action. Integrity--All our business transactions, internally among ow•selves, or externally with other groups, will be conducted ethically and only on a win/win basis...we will do what is RIGHT, rather than what is simply politically expedient. F1SCa1 Responsibility--Our primary financial role is to leverage the resources of sponsors, partners, and investors to achieve maximum economic impact for them. We will respond honestly to questions and accept responsibility for our expenditures and productivity. Imagination--We will encourage each other to seek new ways to achieve our goals and nurture in each other the courage to take the prudent risks necessary to achieve our vision. Leadership--We recognize that a significant part of our "value" to each other and our stakeholde-•s is our knowledge, expertise, and leadership skills. We will expand upon that know- ledge and seek opportunities to share our expertise for the good of the community. Customer Focus-We will strive to be the Vail community's pace-setter in recognizing and respecting the needs and desires of our customers both within the conununity and externally. FUNDING REQUEST The Board of Directors of the Vail Valley Chamber and Tourism Bureau is truly gratified by your participation in funding the merged organization's first year of operation. There have been many successes, detailed on the following pages, and this request of all. the major funding partners will be discussed with you at a joint work session to be scheduled in August. The CTB has demonstrated that your investment, when leveraged with those of other funding partners, members, and other revenue sources, can produce dramatic results and progress toward the goals outlined in last years' discussions with you. An incremental funding requirement of $240,000 has been established, to be shared as follows: Fundin Partner 2002 investment 2003 re nested investment Town of Avon $25,000 $40,000 Town of Vail $25,000 $40,000 Eagle Coun Government $25,000 $40,000 Beaver Creek Resort Cotn an $25,000 $40,000 Beaver Creek Mountain O erations $25,000 $40,000 Vail Mountain O erations $25,000 $40,000 This funding will enable us to continue to grow the successful programs for which you helped lay the foundation in 2002. A complete analysis of achievements and proposed incremental benefits for 2003 is attached. The formation of the Chamber and Tourism Bureau would not have been possible without your support, and it is only with your continued backing that we can provide the Vail resort community with the tools and programs to improve their economic picture! SIGNIFICANT AC~IEVEA'IENTS...2002 SIMPLIFICATION & COORDINATION / Merged memberships into a body of 850+ businesses...merged benefit programs / Merged websites to provide one "point of entry" for visitor information, booking, and member information / Developed Lodging Advisory Council for "steering" on Lodging and visitor related issues / Developed "One Valley Leadership Coalition"...forum for regional. planning and problem solving BUSINESS SERVICES / Implemented improved communication of issues, programs through consolidated newsletter and online newsletter / Provided Concierge Information Website...accurate visitor information available to all front-line personnel / Paid out over $80,000 in dividends to members of Workernlan's Compensation Group / Hosted Community Employment Resources Forum...define agenda for improved workforce enhancement programs / Enlisted support of local medical service providers in Community Health Insurance Initiative...ftnalizing rates and programs / Implemented Volunteer Consultant trial program to assist businesses in need ECONOMIC ENHANCEMENT / Generated over 140 group meeting leads through June / Booked over $4.6 million in group meeting revenue / Coordinating Iogistics...ADP...largest group in Vail this year...1500 ppU7nights / Lodging Council...leadership in development of Conference Facility / One Valley Leadership Coalition...define our community's "agenda" for the future / Developed informational forums for election issues in the fall EXPANDED SERVICE QUALITY ASSURANCE / Support fall customer service training for all communities / Expand employee recognition/service quality "shopping" program for winter / Developed "Exploring Leadership" for middle managers...involve them in life of community / Expanded Lodging Quality Assurance program to over 3500 units throughout resort 2003 KEY INITIATIVES SUPPORTED BY FUNDING PARTNERS Your investment of $40,000, along with the same investment by all our founding funding partners will support the following expansions and enhancements of the programs begun in 2002. BUSINESS SERVICES ^ Expand Community Health Program to over 3000 lives ^ Development of additional cost saving programs available to businesses on a collaborative basis (ie other types of insurance, "back of house" services, other employee retention tools) ^ Advance child care options for employers ^ Development of international workforce "clearing house" ^ Development of community workforce "recruiting" ^ Development of advanced web-based communications network for employers/potential employees ^ Expand Volunteer Consultant program to assist businesses in need ^ Expand advocacy effort to state level to change insurance regulations EXPANDED SERVICE QUALITY ASSURANCE ^ Expand lodging rating program to include all units ^ Expand use of rating to include tour operators and wholesalers ^ Develop local and national communication program to highlight positive impacts of program ^ Create "Platinum Service" standards for visitor-based members ^ Continue expansion of managerial/leadership training for all levels ^ Begin establishing consistent visitor information program ECONOMIC ENHANCEMENT ^ Create "agenda" for Vail resort community through Leadership Coalition ^ Create effective regional Special Event marketing program ^ Establish product improvement "agenda" to support at the local. and county level 12:44 PM Vail Valley Chamber ~ Tourism Bureau °7/31/02 Balance Sheet Accrual Basis As of June 30, 2002 Jun 30, 02 ' ASSETS -----_- --._.._ Current Assets ~ Checking/Savings 1000 • Operating Cash 235,494.38 1050 • CD 126,991.87 1090 • Tour Cash 43,781.57 600 • Cash on Hand 200.00 Total Checking/Savings 406,467.82 Accounts Receivable 1100 • Accounts Receivable 377,681.32 Total Accounts Receivable - 377,681.32 Other Current Assets 1080 • American Express Receivable 2 916 08 1110 • Travel Advances , . 200.00 1150 • Allowance - Uncollectibles -9,061.79 • 1205 • Prepaid Postage 4,730.25 1300 • Suspense 42,463.85 1499 • Undeposited Funds 693.34 Total Other Current Assets -. 41,941.73 Total Current Assets 826,090.87 Fixed Assets 1900 • Leasehold Improvements 125,359.98 1910 • Furniture 8 Equipment 300,255.50 1920 • Software 82,522.02 1990 • Accumulated Depreciation -342,453.21 ~ Total Fixed Assets 165,679.29 TOTAL ASSETS 991,770.16 LIABILITIES 8 EQUITY --...._ _..__. __ ._. Liabilities Current Liabilities Accounts Payable 2000 • Accounts Payable 1,062.75 Total Accounts Payable ............................... 1,062.75 Other Current Liabilities 2011 • Due to Operating 0.80 ~ 2050 • Travel Agent's Payable 1,278,07 2090 • Advance Guest Deposits 72,712.24 2095 • Guest Refunds Payable 8,102.24 2110 • Federal W/H Payroll Tax 4,116.70 2111 • FICA W/H Payroll Taxes 4,384.47 2112 • Accrued FICA 8,949 92 2113 • FUTA 387.80 2114 • State W/H Payroll Taxes -2,952.81 2115 • SUTA 999.55 2118 •401K Deductions Payable 3,265.28 2119 • Cafeteria Plan Payable 3,579.27 2120 • Accrued Employee Benefits 24,932.39 2310 • Lodging Dues Deferred 27,618.00 2320 • Business Dues Deferred 54,270.36 Total Other Current Liabilities 206,644.28 Total Current Liabilities 207,707.03 Total Liabilities 207,707.03 Page 1 12:44 PM 0'7/31 /02 Accrual Basis Vail Valley Chamber & Tourism Bureau Balance Sheet As of June 30, 2002 • Equity 3900 • Retained Earnings Net Income Total Equity TOTAL LIABILITIES 8 EQUITY M Jun 30, 02 220,892.64 563,170.49 784,063.13 991,770.16 Page 2 •. 12:46 PM Vail Valley Chamber $c Tourism Bureau 07/31/02 Profit & Loss Accrual Basis January through June 2002 Jan -Jun 02 Income 4000 • Contributions 150,000.00 4110 • Inspection Fees 12,846.66 4200 • Group Commissions 89,754.82 4201 • Allowance for Adj Group -4,875.01 ~ 4205 • Group Co-op Revenue 6,328.30 4208 • Group Activity.Comm 7.92 4250 • BC Mktg Fund 85,767.01 4300 • TOV Contract -Events 468,500.00 4310 • Corporate Sponsors 78,025.00 4320 • Event Merchandise Sales 352.00 4400 • TOV Contract -Info 104,606.00 4405 • Lodging Commissions 22,145.10 4410 • Activity Commissions 1,370.14 4420 • Merchandise Sales 4421 • Map Sales 39.00 4423 • Sunscreen 406.00 4424 • Postcard Sales 1,554.88 4425 • Wildflower seeds 130.00 4426 • Puzzle Sales (Impact) 3,193.56 4428 • Ticket Sales Comm 705.15 4430 • Internet Access 598.00 4432 • Vending Comm 4,255.18 4433 • Book Sales 130.00 4435 • CD Sales 174.25 4436 • Vail Souvenirs 60.00 4437 • WTCB Merch 132.00 4420 • Merchandise Sales -Other 125.00 Total 4420 • Merchandise Sales 11,503.02 4440 • Misc Programs 8 Tours 300.00 4500 • Membership 4501 • Lodging Dues 139 829.90 ~ 4505 • Business Dues , 232,071.08 4507 • Bus Booked Leads BBL 400.00 4540 • Mailing Lists 1,750.00 • 4545 • Relocation Guide 405.00 . _ Total 4500 • Membership .. . _ ......._ ................... 374,455.98 4550 • Co-ops 4554 • Homeowner's Resource Guide Ads 19,649.05 4555 • E-Commerce Programs 31,950.00 4556 • Summer Vacation Guide 0.00 4564 • Winter Vacation Guide 131,364.69 4565 • TA Guide (DTP) 0.00 ~ 4568 • Front Range Co-ops 39,575.03 Total 4550 • Co-ops 222,538.77 4580 • Business Svc Income 4581 • ECO Bus Passes 1,563.50 4582 • Safety Pgm 8,255.00 4583 • Meeting space rental 4,625.00 4585 • Blue Jeans Lobsterfest Income 11,349.40 Total 4580 • Business Svc Income 25,792.90 A Page 1 12:4s PM: Vail Valley Chamber ~ Tourism Bureau oa/31ro2 Profit & LOSS Accnial Basis January through June 2002 Jan -Jun 02 4584 • Business 8 Consumer Show 2,600.00 4590 • Miscellaneous 7,698.96 4600 • Lodging Commission 155,149.34 ' ~ 4601 • Allow for Adj 1,274.22 4605 • Visitor's Center Transfer -22,145.10 4610 • Airline Comm 5,579.20 4615 • Hotline 2,980.84 4620 • Car Rental Comm 1,761.50 4630 • Shuttle Comm 3,094.55 4640 • Travel Insurance 1,569.68 4650 • Lift Ticket Comm 2,430.12 4660 • Service Fee Income 32,635.65 4665 • Cancellation Fees 882.01 4680 • Brochure Mailings 1,897.69 4685 • Interest Income 660.95 4800 • Research Rpt Sales 50.00 ' 4900 •LMD Funding 52,316.08 4999 • Uncategorized Income -384.18 Total Income 1,899,470.12 Expense Quality Assurance Exp 1005000 • Salary Expense 0.00 Total Quality Assurance Exp 0.00 5000 • Salary Expense 484,618.27 5001•Incentives 24,002.91 5002 • Payroll Taxes 38,813.39 5003 • Employee Benefits 67,577.28 5004 • Education 2,820.00 5005 • Group Salary Transfer 0.00 5006 •LMD Salary Expense 25,232.91 5007 •LMD Payroll Tax 1,930.35 5008 •LMD Benefits 2,677.05 5010 • Professional Fees 14,966.46 5025 • Hardware Maint 385.00 5030 • Long Distance Phone 6,969.62 5035 • Fax 1,276.85 5036 • 800 Number 4,933.41 5037 • Denver Line 0.00 5038 • Cell Phone _ 1,978.97 5060 • Postage 9,939.86 5065 • Priority Mail 239.05 5070 • Operating Supplies 5,606.61 5080 • Printing 375.22 5090 • Rent/Util -Avon 20,076.73 ~ 5095 • Web Maint -Avon 1,470.00 5096 • Prop tax -Avon 1,274.88 5097 • Leased Equip -Avon 4,590.05 • 5098 • Equip Repair/Maint -Avon 983.41 5100 • Web Development 14,185.00 5110 • Newsletter LCA 1,694.38 5210 • Group Referral Payments 111.45 5240 • BC Marketing Exp 11,579.42 5300 • Seed Money -6,433.00 5315 • UM Contract Fee 165,099.00 5320 • Advertising 2,854.34 5330 • Sponsor Recognition 89.73 ~ 5340 • Contract Labor 0.00 5350 • Corp Ptshp Exp 201.25 5360 • EquipmtlSupplies 1,200.00 5380 • Insurance/Town Fees 390.00 5390 • Event Merchandise 1,531.13 5392 • Sales Tax 620.51 5395 • Lodging 1,349.07 5400 • Event & Activity Advertising 9,260.09 Page 2 12:46 PM Vail Valley Chamber ~ Tourism Bureau 07!31/02 Profit & Loss Accrual Basis January through June 2002 Jan -Jun 02 5415 • Host Expense -50.00 5420 • Merchandise Exp 4,936.14 5430 • Cleaning 2,475.64 ~ 5440 • Leased Equip (Info) 224.61 5500 • Member Expense 5510 • Member Collateral 620.04 • 5580 • Research 5,504.01 Total 5500 • Member Expense 6,124.05 5550 • Co-op Program Expense 5558 • DMCVB Exp 9,847.00 5560 • CTTA Exp 2,114.06 5562 • Winter Vacation Guide Exp 43,174.86 5563 • Vail Guide Exp 13,178.38 5564 • Homeowner's Resource Guide 19,780.16 5568 • Front Range Co-op Exp 8,632.80 Total 5550 • Co-op Program Expense 96,727.26 ' 5600 • FIT Advertising 17,288.72 5620 • Housing Bureau Expense 161.27 5630 • Airline Equip 292.74 5635 • Active Rez Fees 9,005.41 5640 • Credit Card Fees 29,997.07 5641 • Bank Svc Charges 1,116.47 5660 • Chargebacks 714.08 5661 • Settlements 6,364.27 5730 • Finance & Svc Charges 5,942.18 5800 • General Photography 136.32 5820 • Local Programs (PR) 491.58 5830 • Newsletter 735.00 5840 • PR Transfer Out 0.00 ~ 5900 • Dues 8 Subscriptions 4,079.00 5910 • Travel 3,532.85 5920 • Entertainment 22,207.02 • 5925 • Recruiting Expense 24.01 5930 • Miscellaneous Exp 439.77 5950 • Blue Jeans Lobster Party 5951 • Entertainment 700.00 5952 • Advertising 729.40 5950 • Blue Jeans Lobster Party -Other 6,220.81 Total 5950 • Blue Jeans Lobster Party 7,650.21 5953 • Workforce Enhancement 1,319.83 5954 • Ambassador Pgm Expense 207.97 9000 • Allocated Expenses 9001 • Salaries 75,733.65 9002 • Payroll Taxes 6,404.99 9003 • Employee Benefits - Alloc 3,478.01 9015 • Website Mgmt 3,075.00 9030 • Operating Supplies - Alloc 8,015.16 9040 • Leased Equip 7,833.06 9045 • Equip Repair/Maint 1;211.35 9050 • Phone Svc/Equip 22,813.17 9055 • RenUUtilities 28,383.33 9057 • Bldg Repair/Maint 3,409.18 9090 • Insurance 4,332.00 9095 • Depreciation 21,974.80 9099 • Property Taxes 1,021.81 ~ Total 9000 • Allocated Expenses 187,685.51 9100 • PR Allocated Transfer 0.00 • Total Expense 1,336,299.63 Net Income 563,170.49 Page 3 °- (,~~~, ~ I .-,. ~' r .~ UAILVALLEY CHAMBER & TOURISM BUREAU July 31, 2002 To: Mayor Ludwig Kurz Vail Town Council Cc: Bob McLaurin From: Frank Johnson Re: Future Special ~~ ,~~@~ 3 ~ ~ C' ~ Co1~l 100 E. Meadow rive, Suite 34 Vail, Colorado 81657 www.visitvailvalley.com The Board of Directors has asked that I address the position of the Vail Valley Chamber and Tourism Bureau as it relates to future Special Events contracts with the Town of Vail. As you are aware, we were solicited in 1995, following the Vail Valley Exchange trip to St. Moritz, to produce several special events in the town of Vail, and coordinate the operations of the Special Events Commission to strategically address the role of events in Vail's summer marketing. Since that time, we have significantly increased the amount of revenue available for the production of these events through sponsorships, increased the budget for"seed mone~'from $40,000 to $160,000, and absorbed the cost of personnel and departmental operating costs within our organization...outside of the first year of the contract, when we were trying to establish a Special Events Department to manage this process on your behalf, the Town's contract fees have gone 100% toward the cost of producing the events and seeding other Town events. For the past two years, under Joel Heath's leadership, we have attempted to move the events that we undertook into conformance with the strategic marketing plan outlined by the Vail Marketing Advisory Committee. The White~~~ater Festival/Mountain Games and Big Wheel `n' Chili event were specifically targeted at the 21-35 age group in Colorado, the primary target for VMAC marketing in June, and the Oktoberfest was tailored for the market identified by the VMAC as being the most appropriate segment during the fall. Now, with the addition of Rick Chastain to our marketing group, we are prepared to work with the community to develop higher level events that fulfill the strategic objectives identified by the VMAC and Special Events Commission and dramatically improve the economy of Vail during the spring, summer, and fall months. The Board has chosen to respond to the strategic direction established by the VMAC and Special Events Commission for the future and, therefore, we will not be submitting a request for funding of any events at this time. When the Special Events Commission has Group Sales Reservations Visitor Services Business Office 1-800-775-8245 1-800-525-3875 (970) 479-1014 (970) 476-1000 FAX (970) 479-2364 FAX (970) 476-6008 FAX (970) 479-7162 FAX (970) 476-6008 determined its process of attracting and funding events for next year, and is interested in requesting companies/organizations come forward to submit proposals, we will respond to those specific needs at that time. We stand ready to be a partner in improving the conditions for doing business in Vail in the future through the use of special events as a marketing tool, and await your further direction as to how to be most effective. TOWN OF VAIL 7S South Frontage Road Yail, Colorado 81657 970-479-2100 Fax: 970-479-2157 www. ci. vail. co. us TO: Judy Camp, Finance Director FR: Bill Jewitt, Chairman Commission on Special Events DT: August 16, 2002 RE: PROPOSED 2003 BUDGET FOR COMMISSION ON SPECIAL EVENTS (CSE) The CSE is proposing a 2003 budget equal to that allocated for special events in 2002. That total was divided between the following categories. - $308,000 to WCTB for contracted special events - $160,000 to WCTB for seed fudning of new events - $ 43,500 to VCBA for block parties and LionsHead jazz - $ 75,000 to VCBA for Vail Today street entertainment - $107,933 Rollforward from Y2002 unexpended seed funding (WCTB) This is a total of $694,433. The CSE foresees continuing to provide ambient entertainment, community events such as Vail America Days (4th of July)., as well as events designed to bring large numbers of people to Vail from outside the valley. It is also envisioned that some events may be able to return funds to the CSE, thereby reducing the request for funds in the future years (or enabling the CSE to provide further benefits to our community). It is further believed that the CSE will be able to provide the professional management foreseen in Ordinance #18, Series of 2002, within this budget request. However, the single caveat remaining that at this time period is the CSE will not have had an extensive enough period of time to evaluate all requests before them, thus leaving the possibility of later funding requests. Bill Jewitt, Chairman Commission on Special Events August 15, 2002 xc: Bill Dewitt Pam Brandmeyer ~~ RECYCLEDPAPER MEMORANDUM TO: Planning and Environmental Commission FROM: Department of Community Development DATE: September 23, 2002 SUBJECT: A request for a final review of a final plat for a major subdivision; a request for a final review of a conditional use permit to allow for a private educational institution and development plan approval to construct employee housing; and setting forth details in regards thereto, located at the site known as "Mountain Bell"/an unplatted piece of property, located at 160 N. Frontage Rd./to be platted as Middle Creek Subdivision. Applicant: Vail Local Housing Authority, represented by Odell Architects Planner: Allison Ochs I. SUMMARY . The applicant, the Vail Local Housing Authority, represented by Odell Architects, is requesting a final review of a development plan to allow for the construction of 142 employee housing units; a conditional use. permit to allow for the relocation and expansion of the Early Learning Center; and a final review of a final plat for a major subdivision on the site known as Mountain_ Bell, located at 1.60 N. Frontage Rd. / to be platted as Middle Creek Subdivision. The Department of Community Development is recommending approval of the applications, in accordance with the findings and conditions as indicated in Section XIII of this memorandum. II. DESCRIPTION OF THE REQUESTS The applicant, the Vail Locai Housing Authority, represented by Odell Architects, is requesting approval of three applications: A. A final review of a final plat for a major subdivision to allow for the platting of Middle Creek Subdivision. The subdivision includes Lot 1 (the proposed housing and Early Learning Center); Lot 2 (the existing Mountain Bell tower site); and Tract A (remaining open space). B. A final review of a conditional use permit to allow for a private educational institution (referred to as the Early Learning Center). C. A final review of a development plan to allow for the construction of 142 employee housing units. III. BACKGROUND The Mountain Bell site was annexed into the Town of Vail by Ordinance No. 8, Series of 1969. In 1974, as part of an agreement with Vail Associates, Inc., regarding bus service, h~~ ~Y. TUWN OF PAIL the property was deeded to the Town of Vail. A portion of the site is owned by Qwest and is the site of thef ~~lountain Bell tower. In addition, ABC and Learning Tree schools are located on the site. The remainder of the site is currently open space. On September 24, 2001, the Planning and Environmental Commission reviewed the following requests: A major subdivision, to allow for the platting of the site known as Mountain Bell. The subdivision will be known as "Middle Creek Subdivision," and will consist of Lot 1 (the housing site, known as Middle Creek Village), Lot 2 (the Mountain Bell tower site), and Tract A (the open space parcel). 2. A Land .Use Plan amendment, to change the land use designation from "Open Space" to "High Density Residential" of Lot 1, Middle Creek Subdivision. 3. A rezoning, to rezone Lot 1, Middle Creek Subdivision, from "Natural Area Preservation District" to "Housing Zone District". Tlie Planning and Environmental Commission approved the major subdivision request, and forwarded recommendations of approval to the Town Council•for the Land Use Plan amendment and the rezoning request. With Ordinance No. 29, Series of 2001, Town Council approved the rezoning of the site, and with Resolution No. 6, Series of 2001, Town Council approved the Land Use Plan amendment. Both approvals are conditioned upon the filing of the final plat for Middle Creek Subdivision, and the approval of a development plan for the site. This application has been before the Planning and Environmental Commission on numerous occasions over the past few months to discuss the development plan for Middle Creek in a work session format. The applicant is requesting a final review of the proposed development plan for Middle Creek and the conditional use permit for the Early Learning Center. On March 11, 2002, the Planning and Environmental Commission voted 5-2 (Schofield and Golden against) to table the request for development plan review and the conditional use permit for the Early Learning Center at Lot 1, Middle Creek Subdivision. On April 8, 2002, the Planning and Environmental Commission and Design Review Board held a joint worksession to review the proposed Middle Creek Housing Development. At this worksession, the Planning and Environmental Commission and Design Review Board provided specific direction to the applicant regarding the proposed design of Middle Creek. The Planning and Environmental Commission and Design Review Board provided the following summary of their concerns: 1. As proposed, the bulk and mass does not relate to the site, nor is there a relationship or a hierarchy of buildings on the site. 2. As proposed, the surface parking and amount of asphalt is excessive. The resolution to this issue will not involve a reduction in the parking requirement, nor will screening the surface parking be acceptable. Based upon the Planning and Environmental Commission and Design Review Board's April 8, 2002, comments, revised conceptual plans were submitted to the Department of 2 Community Development and additional meetings with the Planning and Environmental Commission and Design Review Board were scheduled. On April 22, 2002, the Planning and Environmental Commission reviewed conceptual plans for the re-designed Middle Creek development. The Planning and Environmental Commission's comments included the following: 1. Generally, the Planning and Environmental Commission was supportive of the change in design. 2. The massing needs to be broken down on the east pand west sides of the structure. 3. It was stated that that more units could be added on the east side of the building to reduce the mass of the building. 4. There were concerns expressed regarding the livability of the project and ensuring that the new design would be attractive to the public and the residents of the project. 5. There is a need to ensure that this project reflects the quality of the community, given its prime location in town. On May 1, 2002, the Design Review Board reviewed conceptual plans for the re- designed Middle Creek development. The Design Review Board's comments included the following: 1. The underground parking is a positive addition, helping greatly to minimize site disturbance. 2. .The project is taking on a better presence and identity of its own. 3. Look more at the A Building, specifically with regards to ,its height and relationship to the Frontage Rd. 4. The plaza and courtyard concept is good and will provide benefits. to the residents of the project. The Design Review Board again reviewed conceptual plans for Middle Creek at their June 19, 2002, meeting. In general, the Design Review Board was supportive of the design direction the applicant proposed. , On July 8, 2002, the Planning and Environmental Commission reviewed the plans for Middle Creek in a worksession format. In general, the Planning and Environmental Commission was supportive of the design direction the applicant proposed. On August 7, 2002, the Design Review Board conceptually reviewed the submittal for Middle Creek. The Design Review Board's comments focused on two major issues: 1. The east elevation needs additional consideration. Consider stepping it down, so that there are some one- or two- story elements on the east. 2. Building A and Building B appear to be two different architectural styles. Consider making these two buildings more consistent in design. On August 21, 2002, the Design Review Board again conceptually reviewed the proposal for Middle Creek. Generally, they were supportive of the direction that the proposal is moving. However, they expressed concerns regarding the execution of the concept. Specifically, the Design Review Board stated that additional consideration needs to be given to the massing of the individual buildings. They suggested bringing in 3 an independent reviewer to analyze the plans with respect to the Town of Vail's Design Guidelines. This has been done for multiple large projects, including the Vail Plaza .Hotel. The report from Winston Associates has been attached for reference. IV. On September 18, 2002, the Design Review Board conceptually reviewed the development plan for Middle Creek. Their comments focused mainly on the bulk and mass, roof forms, scale, and architectural theme of the proposal. Generally, the Design Review Board was encouraged by the changes made by the applicant from the last meeting. While they stated that there is still a lot of work to do with regards to the details of the project, they felt that the proposed bulk and mass were appropriate. ROLES OF THE REVIEWING BODIES A. Development Plan in the Housing Zone District Order of Review: Generally, applications will be reviewed first by the Planning and Environmental Commission for impacts of use/development and then by the Design Review Board for compliance of proposed buildings and site planning, and with the Town's Design Guidelines. Planning and Environmental Commission: Action: The Planning and Environmental Commission is responsible for final approval/denial of a development plan in the Housing zone district. The Planning and Environmental Commission is responsible for prescribing the following development standards: 1. Setbacks, 2. Site Coverage, 3. Landscaping and Site Development, 4. Parking and Loading, 5. Lot area and site dimensions,. 6. Building height, 7. Density control (including gross residential floor area). In addition, the Planning and Environmental Commission is responsible for reviewing the application for compliance with the following: Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties and the surrounding neighborhood. 2. Buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the site, the surrounding neighborhood and uses, and the community as a whole. 3. Open space and landscaping are both functional and aesthetic, are designed to preserve and enhance the natural features of the site, maximize opportunities for access and use by the public, provide adequate buffering between the proposed uses and surrounding properties, and when possible, are integrated with existing open space and recreation areas. 4 4. A pedestrian and vehicular circulation system designed to provide safe, efficient and aesthetically pleasing circulation to the site and throughout the development. 5. Environmental impacts resulting from the proposal have been identified in the project's environmental impact report, if not waived, and all necessary mitigating measures are implemented as a part of the proposed development plan. 6. Compliance with the Vail Comprehensive Plan and other applicable plans. Design Review Board: Action: The Design Review Board has no review authority on a development plan in the Housing zone district, but must review any accompanying Design Review Board application. The Design Review Board is responsible for evaluating the proposal for: 1. Architectural compatibility with other structures, the land and surroundings, 2. Fitting buildings into landscape, 3. Configuration of building and grading of a site which respects the topography, 4. Removal/Preservation of trees and native vegetation, 5. Adequate provision for snow storage on-site, 6. Acceptability of building materials and colors, 7. Acceptability of roof elements, eaves, overhangs, and other building forms, 8. Provision of landscape and drainage, 9. Provision of fencing, walls, and accessory structures, 10. Circulation and access to a site including parking, and site distances, 11. Location and design of satellite dishes, 12. Provision of outdoor lighting, 13. The design of parks. Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. ~. Town Council: Actions of Design Review Board or Planning and Environmental Commission may be appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the Planning and Environmental Commission or Design Review Board erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. 5 B. Conditional Use Permit Planninq and Environmental Commission: The Planning and Environmental Commission is responsible for approval/denial of a conditional use permit. The Planning and Environmental Commission is responsible for evaluating a proposal for: 1. Relationship and impact of the use on development objectives of the Town. 2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. 3. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking areas. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. 5. Such other factors and criteria as the Commission deems applicable to the proposed use. 6. The environmental impact report concerning the proposed use, if an environmental impact report is required by Chapter 12 of the Town Code. 7. Conformance with development standards of zone district Desiqn Review Board: The Design Review Board has no review authority on a Conditional Use Permit, but must review any accompanying Design Review Board application. Town Council: Actions of Design Review Board or Planning and Environmental Commission may be appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the Planning and Environmental Commission or Design Review Board erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. C. Major Subdivision Planninq and Environmental Commission: Action: The Planning and Environmental Commission is responsible for final approval/denial of a major subdivision. The Planning and Environmental Commission shall review the proposal and make a recommendation to the Town Council on the compatibility of the subdivision with surrounding uses, consistency with the Vail Comprehensive Plans, and impact on the general welfare of the community. Desiqn Review Board: Action: The Design Review Board has no review authority on major subdivisions. Staff: The staff is responsible for ensuring that all submittal requirements are provided. The staff advises the applicant as to compliance with the Zoning and Subdivision Regulations. 6 Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. Town Council: Actions of Design Review Board or Planning and Environmental Commission may be appealed to the Town Council or by the Town Council: Town Council evaluates whether or not the Planning and Environmental Commission or Design Review Board erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. V. APPLICABLE PLANNING DOCUMENTS Town of Vail Zoning Regulations (Title 12 Vail Town Codel Ordinance No. 29, Series of 2001, approved the rezoning of this site from Natural Area Preservation District to Housing zone district. Pursuant to Section 12-61-1, Vail Town Code, the purpose of the Housing zone district is as follows: The Housing District is intended to provide adequate sites for employee housing which, because of the nature and characteristics of employee housing, cannot be adequately regulated by the development standards prescribed for other residential zoning districts. It is necessary in this district to provide development standards specifically prescribed for each development proposal or project to achieve the purposes prescribed in Section 12-1-2 of this Title and to provide for the public welfare. Certain nonresidential uses are allowed as conditional uses, which are intended to be incidental and secondary to the residential uses of the District. The Housing District is intended to ensure that employee housing permitted in the District is appropriately located and designed to meet the needs of residents of Vail, to harmonize with surrounding uses, and to ensure adequate light, air, open spaces, and other amenities appropriate to the allowed types of uses. Section 12-61-3, Vail Town Code, identifies "public and private schools and educational intuitions, including daycare facilities" as a conditional use in the Housing zone district. For the Planning and Environmental Commission's reference, Section 12-16-1, Vail Town Code, identifies the purpose for a conditional use permit as follows: In order to provide the flexibility necessary to achieve the objectives of this title, specified uses are permitted in certain districts subject to the granting of a conditional use permit. Because of their unusual or special characteristics, conditional uses require review and evaluation so that they may be located properly with respect to the purposes of this title and with respect to their effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and surrounding properties and the town at large. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the town may prescribe to ensure that the location and operation of the conditional uses ,will be in accordance with development objectives of the town and will not be detrimental to other uses or properties. 7 Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. Town of Vail Subdivision Regulations (Title 13 Vail Town Code) Pursuant to Section 13-1-2, Vail Town Code, the purpose of the subdivision regulations is as follows: A. Statutory Authority: The subdivision regulations contained in this Title have been prepared and enacted in accordance with Colorado Revised Statutes title 31, article 23, for the purpose of promoting the health, safety and welfare of the present and future inhabitants of the Town. B. Goals: To these ends, these regulations are intended to protect the environment, to ensure efficient circulation, adequate improvements, sufficient open space and in general, to assist the orderly, efficient and integrated development of the Town. These regulations also provide for the proper arrangement of streets and ensure proper distribution of population. The regulations also coordinate the need for public services with governmental improvement programs. Standards for design and construction of improvements are hereby set forth to ensure adequate and convenient traffic circulation, utilities, emergency access, drainage, recreation and light and air. Also intended is the improvement of land records and surveys, plans and plats and to safeguard the interests of the public and subdivider and provide consumer protection for the purchaser; and to regulate other matters as the Town Planning and Environmental Commission and Town Council may deem necessary in order to protect the best interests of the public. C. Specific Purposes: These regulations are further intended to serve the following specific purposes: 1. To inform each subdivider of the standards and criteria by which development proposals will be evaluated, and to provide information as to the type and extent of improvements required. 2. To provide for the subdivision of property in the future without conflict with development on adjacent land. 3. To protect and conserve the value of land throughout the Municipality and the value of buildings and improvements on the land. 4. To ensure that subdivision of property is in compliance with the Town's zoning ordinances, to achieve a harmonious, convenient, workable relationship among land uses, consistent with Town development objectives. 5. To guide public and private policy and action in order to provide adequate and efficient transportation, water, sewage, schools, parks, playgrounds, recreation, and .other public requirements and facilities and generally to provide that public facilities will have sufficient capacity to serve the proposed subdivision. 8 6. To provide for accurate legal descriptions of newly subdivided land and to establish reasonable and desirable construction design standards and procedures. 7. To prevent the pollution of air, streams and ponds, to assure adequacy of drainage facilities, fo safeguard the water table and to encourage the wise use and management of natural resources throughout the Town in order to preserve the integrity, stability and beauty of the community and the value of the land. Town of Vail Land Use Plan The land use designation, according to the Town of Vail Land Use Plan, for this site is High Density Residential. The High Density Residential designation is described as follows: The housing in this category would typically consist of multi-floored structures with densities exceeding 15 dwelling units per buildable acre. Other activities in this category would include private recreational facilities, and private parking facilities and institutional /public uses such as churches, fire stations and parks and open space facilities. The Town of Vail Land Use Plan describes the Mountain Bell site as Tract 35 and states: The Mountain Bell microwave facility and two day care centers are located on a 25 acre site owned by the Town of Vail which is north of I-70. A portion of this site under the microwave facility is owned by Mountain Bell. Part of the entire site in located in an area of medium environmental hazards and should continue to remain in its present use, with possible expansions of the day care centers. It may also be an option for the cemetery, further discussed later. The Vail Land Use Plan includes the following goal statements which staff considers to be applicable to this request: i.0 General Growth/Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.2 The quality of the environment including air, water and other natural resources should be protected as the Town grows. 1.3 The quality of development should be maintained and upgraded whenever possible. 1.6 ~ Development proposals on the hillsides should be evaluated on a case by case basis. Limited development maybe permitted for some low intensity uses in areas that are not highly visible from the Valley floor. New projects should be carefully controlled and developed with sensitivity to the environment. 9 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5.0 Residential 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. 5.3 Affordable employee housing should be made available through private efforts, assisted by limited incentives, provided by the .Town of Vail with appropriate restrictions. 5.4 Residential growth should keep pace with the marketplace demands for a full range of housing types. 5.5 The existing employee housing base should be preserved and upgraded. Additional employee housing needs should be accommodated at varied sites throughout the community. Town of Vail Comprehensive Ogen Lands Plan The.Comprehensive Open Lands Plan recommends the following the Mountain Bell Site: Approximately half of the property is. intended for affordable. housing and the remainder of the site will remain open space. VI. VII. SITE ANALYSIS Zoning: Housing Land Use Plan Designation: High Density Residential Current Land Use: Open Space, Private Educational Institution Lot Area: 6.673 acres / 290,676 sq. ft. Buildable Area: 4.573 ac. / 199,200 sq. ft. Hazards: Moderate Debris Flow, Medium Severity Rockfall, Slopes in excess of 40% A complete site analysis is attached for reference. SURROUNDING LAND USES AND ZONING Land Use North: USFS land South: CDOT right-of-way East:. Open Space West: Residential Open Space Zonin N/A N/A Natural Area Preservation District (NAPD) High Density Multiple Family (HDMF) Natural Area Preservation District (NAPD) 10 VIII. REVIEW CRITERIA FOR A DEVELOPMENT PLAN IN THE H ZONE DISTRICT The following criteria shall be used as the principal means for evaluating a proposed development plan. It shall be the burden of the applicant to demonstrate that the proposed development plan complies with all applicable design criteria: A. Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties and the surrounding neighborhood. Adjacent uses to the project include the following: • Solar Vail - amultiple-family housing project currently zoned High Density Multiple Family. • Tract C, Vail Potato Patch - an open space tract currently zoned Natural Area Preservation District. • Parcel B, Spraddle Creek Ranch - an open space tract currently zoned Natural Area Preservation District. This property is adjacent to Lot 1. • I-70 Right-of-Way -land owned by CDOT but located within Town of Vail boundaries. As a road right-of-way, there is no zoning on the property. This property is adjacent to Lot 1. • White River National Forest -land owned by the United States Forest Service outside of the Town of Vail boundary. The applicant has described the architectural character of the proposed development as "European Hillside Village." .The primary characteristics of this architectural character include the following: • Strong vertical elements • Timelessness of materials • Feeling that the buildings developed over time • Vertical stepping of buildings • Irregular window placement • Simplicity of design • Focus on roof forms • Structures cascading down the hillside While the Planning and Environmental Commission and Design Review Board have been supportive of this general design philosophy, both Boards expressed a belief that the translation seemed to be lost in previous designs. Specifically, the exterior horizontal walkways, the lack of stepping of the buildings, the contemporary materials and design, and the roof planes did not seem consistent with the "European Hillside Village" concept.. The Planning and Environmental Commission and the Design Review Board have struggled with this issue in the last few meetings. The Design Review Board requested that staff retain the services of an independent consultant to review the proposal for Middle Creek, with specific reference to architecture, character, scale, massing and orientation. A report from Jeff Winston, of Winston Associates, has been attached for reference. The report looked at the following categories: 11 1. Appropriateness of the original concept. 2. Did the plan carry out the original concept? 3. Overall assessment of the revised plan. The report from Jeff Winston states that he believes the concept of a "Eurpoean Hillside Village" is appropriate for the site. Specifically, he states: 1 feel that the original decision of the Planning and Environmental Commission to support that direction was reasonable. The vertical massing of the buildings, and stucco exterior appear to be a reasonable response to the steep site, coupled with the challenge of maintaining affordability. No, it is not Tyrolean like Vail Village. However, as one approaches Vail from east or west there are many buildings along 1-70 that are not particularly Tyrolean, especially the buildings north of I-70. Yet, they are all part of the Vail backdrop. Many of these buildings are vertical in nature,- and have large stucco. components - 1 do not think the Middle Creek project will appear to be out of place. Jeff Winston lists the following components of the previous design that were not consistent with the "European Hillside Village" concept: • Horizontal balcony walkways • Exterior flat panels • Horizontal stepping of buildings • Vertical stepping of buildings • Roofs • Window placement • Materials • Building C courtyard • Building B courtyard The architect and developer worked closely with Jeff Winston to develop solutions to the issues listed above. Additional stair towers were added to Building A, to eliminate as many exterior stairways as possible. An additional stair tower was added to Building C to hide the exterior walkways and the exterior walkways were eliminated from the south elevation of Building B. Tne exterior flat panels werE removed where possible, and 5 ft. returns were added on the ones that remain. Jeff Winston recommends enclosing the stairways entirely, which staff believes will be further reviewed by the Design Review Board. The applicant has revised the horizontal and vertical stepping of the buildings was achieved through multiple methods. On Building A, additional stair towers have been proposed to create more horizontal movement. It is important to note that the additional stair towers are located within the 20 ft. front setback. The stepping of buildings has also occurred on Building B, through the elimination of a crawl space. The stepping on Building C occurred above the parking garage and on the southeast corner, where one two-bedroom unit was eliminated (a studio was added to Building A) and one three-bedroom unit was changed to atwo-bedroom unit. Staff believes that the applicant has effectively addressed the general issues which were identified by the Design Review Board, the Planning and Environmental 12 Commission, staff, and Winston Associates in regards to architecture, character, scale, massing, and orientation. However, staff believes that with a development of this size and mass, the proposal only works if the applicant can successfully execute the details of the Design Guidelines of the Town of Vail. Title 14, Vail Town Code, provides the Design Guidelines of the Town of Vail. Staff believes that the following guidelines must be addressed by the applicant, to the satisfaction of the Design Review Board: C. Building Materials and Design: 1. Predominantly natural building materials shall be used within the Town of Vail. The exterior use of wood, wood siding, wood shingles, native stone, brick, concrete, stucco, and EIFS may be permitted. Concrete surfaces, when. permitted, shall be treated with texture and color; however, exposed aggregate is more acceptable than raw concrete. The exterior use of stucco or EIFS with gross textures or surface features that appear to imitate other materials shall not be permitted. The exterior use of simulated stone or simulated brick shall not be permitted. The exterior use of aluminum, steel, plastic or vinyl siding that appears to imitate other materials shall not be permitted. The exterior use of plywood siding shall not be permitted. The exterior use of any building material, including those not specifically identified by this Section, shall only be permitted, unless otherwise prohibited by this Code, where the Design Review Board finds: a. that the proposed material is satisfactory in general appearance, architectural style, design, color, texture, and quality over time; and, b. that the use of the proposed material complies with the intent of the provisions of this Code; and, c. that the use of the proposed material is compatible with the structure, site, surroundiry structures, and overall ch«racter of the Town of Vail. 4. The majority of roof forms within Vail are gable roofs with a pitch of at least four feet (4') in twelve feet (12'). However, other roof forms are allowed. Consideration of environmental and climatic determinants such as snow shedding, drainage, and solar exposure should be integral to the roof design. 5. Roof lines should be designed so as not to deposit snow on parking areas, trash storage .areas, stairways, decks and balconies, or entryways. Secondary roofs, snow clips, and snow guards should be utilized to protect these areas from roof snow shedding if necessary. 9. Deep eaves, overhangs, canopies, and other building features that provide shelter from the elements are encouraged. 13 10. Fenestration should be suitable for the climate and for the orientation of the particular building elevation in which the fenestration occurs. The use of both passive and active solar energy systems is strongly encouraged. To summarize, staff believes that the building design with respect to architecture, character, scale, massing, and orientation is compatible with the site, adjacent properties, and the surrounding neighborhood. However, if the applicant cannot address the concerns of the Design Review Board with respect to the Design Guidelines, the bulk and mass must be re-evaluated by the Planning and Environmental Commission. B. Buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the, site, the surrounding neighborhood and uses, and the community as a whole. Staff believes that the uses proposed for the site are compatible with the site, the neighborhood, and the community as a whole. Specifically, the Early Learning Center provides amuch-needed service to the community and staff believes maintaining this use on the site is a benefit of the development plan. In addition, staff believes that housing on this site is a compatible use with the site, the neighborhood and the community as a whole. The proximity to the Village and Lionshead, the availability of alternate modes of transportation (including bus, pedestrian, bicycle), the proximity of recreational areas, etc., make this a favorable location for employee housing. In addition, staff believes that the separation of the Early Learning Center and the housing component are a positive element of the development plan. Previous proposals have mixed the parking for both uses, and staff believes that the current separation of the Early Learning Center and the housing is more appropriate for the site. The re-design of Buildings A and B have lead to changes in the site plan. Specifically, the new stair towers at Building A are located 15 ft. and 10 ft. from the front property line. As the addition is limited to stair towers, which staff believes to be a positive design solution to minimize exterior horizontal balcony walkways, staff believes this encroachment to be appropriate. On Building B, exterior walkways at ground level have been partially enclosed, encroaching 2 ft. into the 20 ft. front setback. The Early Learning Center is approximately 18 ft. from the front property line. Surface parking occurs within the rear 20 ft. setback, within 2 ft. of the Qwest property, and in the front 20 ft. setback by the Early Learning Center. In the Housing zone district, the Planning and Environmental Commission can allow encroachments into the 20 ft. setback, subject to the following findings: A. Proposed building setbacks buildings and riparian areas, environmentally sensitive areas provide necessary separation between geologically sensitive areas and other B. Proposed building setbacks will provide adequate availability of light, air and open space. 14 C. Proposed building setbacks will provide a compatible relationship with buildings and uses on adjacent properties. D. Proposed building setbacks will result in creative design solutions or other public benefits that could not otherwise be achieved by conformance with prescribed setback standards. Staff believes that the proposed setbacks meet the above criteria. The proposed setbacks provide adequate light, air, open space, and are compatible with buildings and uses on adjacent property. In addition, staff believes that the proposed setbacks area a result of creative design solutions which have lead to a more functional development plant. To summarize, staff believes that the buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the site, the surrounding neighborhood and uses, and the community as a whole. C. Open space and landscaping are both functional and aesthetic, are designed to preserve and enhance the natural features of the site, maximize opportunities for access and use by the public, provide adequate buffering between the proposed uses and surrounding properties, and when possible, are integrated with existing open space and recreation areas. The proposed limits of disturbance for the west portion of the property keeps development out of the riparian corridor and protects the existing Middle Creek. Staff believes that this is a benefit of .the development. In addition, more trees at the entrance to the development are retained than were retained by the previous proposal. The setbacks for the housing have been maintained at 20 ft., allowing for additional landscaping and berming to screen the uses than the previous design allowed. A recreation area of approximately 4,250 sq. ft. has been proposed. This recreation area is adjacent to Building C and has greater exposure to the sun than the previous ~ recreation area proposal. Staff believes that this criterion has been met. D. A pedestrian and vehicular circulation system designed to provide safe, efficient and aesthetically pleasing circulation to the site and throughout the development. Staff believes that the proposed vehicular circulation system is successful solution to access a difficult site. When possible, the existing circulation system is used to access the uses on the site. Staff believes that the proposed vehicular circulation system provides a safe, efficient, and aesthetically pleasing circulation to the site and throughout the development. In addition, the proposed bike and pedestrian path along the Frontage Road will provide access to the Main Vail Roundabout for the residents of Middle Creek. Staff believes that this is a positive benefit of the proposed circulation system. 15 Staff believes that the proposed bus stop and bus circulation pattern into the site is a. positive element of the proposed design. Pursuant to Section 12-61-8, Vail Town Code, development within the Housing zone district, the parking requirements are as outlined in Chapter 12-10, Vail Town Code. However, the Housing zone district does allow for a reduction. in the number of required parking spaces, subject to Planning and Environmental Commission review and approval of a parking management plan. Section 12-61-8: Parking and Loading, Vail Town Code, states: Off-street parking shall be provided in .accordance with Chapter 10 of this Title. No parking or loading area shall be located within any required setback area. At the discretion of the Planning and Environmental Commission, variations to the parking standards outlined in Chapter 10 may be approved during the review of a development plan subject to a Parking Management Plan. The Parking Management Plan shall be approved by the Planning and Environmental Commission and shall provide for a reduction in fhe parking requirements based on a demonstrated need for fewer parking spaces than Chapter 10 of this title would require. For example, a demonstrated need for a reduction in the required parking could include: A. Proximity or availability of alternative modes of transportation including, but not limited to, public transit or shuttle services. 8. A limitation placed in the deed restrictions limiting the number of cars for each unit. C. A demonstrated permanent program including, but. not limited to, rideshare programs, carshare programs, shuttle service, or staggered work shifts. The allocation of parking spaces is based on dwelling unit size. Chapter 12-10, Vail Town Code, requires 1.5 parking spaces for units less than 500 sq. ft.; 2 parking spaces for units 500 to 2000 sq. ft.; and 2.5 parking spaces for units over 2000 sq. ft. As proposed, the parking requirement would be as follows: Number and Type of Unit Parking ratio Total Spaces 45 studio units 1.5 67.5 29 one-bedroom units 1.5 43.5 24 two-bedroom units 2 48 44 three-bedroom units 2 88 Total 247 The applicant is proposing 269 parking spaces for the entire development site. The applicant is proposing 247 parking spaces for the proposed housing, meeting the parking requirement, as prescribed by .Chapter 12-10, Vail Town Code: The remaining 22 spaces are for the Early Learning Center. 1 However, the applicant is proposing a deviation to the parking requirement for the size of the parking spaces. As currently proposed, the parking spaces are configured as follows (housing only): 16 140 tandem spaces (56.7%) 107 single spaces (43.3%) 77 compact spaces (31 %) 25% is allowed by the Town Code 167 full-size spaces (69%) 211 covered spaces (85%) 36 surface spaces (15%) Previously, the applicant proposed to enclose 78% of the proposed parking. With this current submittal, the applicant is proposing to enclose 85% of the parking. Staff believes that this. is an appropriate percentage of enclosed parking for this site. The remaining surface parking must be screened with site walls, berms, or landscaping. Staff also believes that, while the tandem parking spaces are not necessarily convenient for the residents, the number of tandem spaces is appropriate. The alternative would be to provide additional surface parking to eliminate the need for tandem space, and staff believes that this would be detrimental to the design of the site. The parking for the Early Learning Center is discussed in Section X of this memorandum. . The .applicant has provided a parking management plan which is attached for reference. Should the Planning and Environmental Commission choose to approve the proposed development plan, this parking management plan .shall be included as part of the approval. Staff believes that the pedestrian and vehicular circulation system has been designed to provide safe, efficient, and aesthetically pleasing circulation to the site and throughout the development. E. Environmental impacts resulting from the proposal have been identified in the project's environmental impact report, if not waived, and all necessary mitigating measures are implemented as a part of the proposed development plan. The Environmental impacts and environmental impact report have been discussed in previous memos. Please refer to the staff memorandum dated August 12, 2002. The Hazard Reports have been updated for the current development plan. The reports indicate major changes from the previous reports. Specifically, the previous debris flow hazard mitigation previously included a mitigation wall adjacent to the creek. However, the report by Church and Associates, Inc., dated September 13, 2002, states the following: A deflection wall and soil berms were originally envisioned as the mitigation scheme for the project. However, after conducting field work, we believe there is a substantial risk that a Booth Creek type event could result in a plugged channel between the wall and the steep hillside to the north, and a later flow could overtop the dam and flow southwards towards the site. Another viable alternative is to individually protect each structure on the fan that is subject to a debris flow hazard by designing structures to resist the 17 forces of a debris flow. Based on our understanding of the project objectives and constraints, we believe the best course of action will be to protect the individual structures. The report states that the north wall of Building A and the west wall of Building C should be designed to resist forces from a potential debris flow event. The applicant has revised the north wall of Building A, incorporating the required 6 ft. mitigation as the north wall of the building. Staff believes that this is an acceptable solution to the hazard mitigation. The report also considers the rockfall hazard, which potentially effects Building C and the Early Learning Center. The report states that formal rockfall protection measures are not necessary, but that the developer should scale loose rocks from the slopes above Building C and the Early Learning Center during construction to reduce the risk for cosmetic damage. To summarize, staff believes that the environmental impacts resulting from the proposal have been identified and all necessary mitigating measures have been implemented as a part of the proposed development plan. F. Compliance with the Vail Comprehensive Plan and other applicable plans. The Town of Vail Land Use Plan contains goals which staff considers to be applicable to this request. The applicable goals include: 1.0 General Growth/Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.2 The quality of the environment including air, water and other natural resources should be protected as the Town grows. 1.3 The quality of development should be maintained and upgraded whenever possible. 1.6 Development proposals on the hillsides should be evaluated on a case by case basis. Limited development may be permitted for some low intensity uses in areas that are not highly visible from the Valley floor. New projects should be carefully controlled and developed with sensitivity to the environment. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5.0 Residential 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. 18 5.3 Affordable employee housing should.be made available through private efforts, assisted by limited incentives, provided by the Town of Vail with appropriate restrictions. 5.4 Residential growth should keep pace with the marketplace demands for a full range of housing types. 5.5 The existing employee housing base should be preserved and .upgraded. Additional employee housing needs should be accommodated at varied sites Throughout the community. Staff believes that the proposal is furthering the goals of the Town of Vail Land Use Plan by providing housing for employees. In addition, the proposal includes a variety of unit sizes, ranging from studio units to three-bedroom units. Proposed development has not encroached into the 40% slopes on the site, nor has it encroached into the riparian corridor along Middle Creek. The Comprehensive Open Lands Plan identifies the Mountain Bell Site as "approximately half of the property is intended for affordable housing and the remainder of the site will remain open space." The Comprehensive Open Lands Plan is intended to identify and recommend actions for the protection of sensitive land and open space, not as a guide for development of other properties. Staff believes that the proposal is in compliance with the Comprehensive Open Lands Plan, which identified a portion of this site for affordable housing. The Town of Vail Land Use Plan provides a land use designation for this site as High Density Residential. The High Density Residential designation is described as follows: The housing in this category would typically consist of multi-floored structures with densities exceeding i5 dwelling units per buildable acre. Other activities in this category would include private recreational facilities, and private. parking facilities and institutional /public uses such as churches, fire stations and parks and open space facilities. The Vail Land Use Plan describes the Mountain Bell site as Tract 35 and states: The Mountain Bell microwave facility and two day care centers are located on a 25 acre site owned by the Town of Vail which is north of 1-70. A portion of this site under the microwave facility is owned by Mountain Bell. Part of the entire site in located in an area of medium environmental hazards and should continue to remain in its present use, with possible expansions of the day care centers. It may also be an option for the cemetery, further discussed later. The potential use of this site as employee housing was not considered at the time of adoption of the Vail Land Use Plan. However, the Town Council and the Planning and Environmental Commission voted to amend the land use designation for this site from Open Space to High Density Residential, based on the need to for employee housing. Staff believes the proposal to be in compliance with the Vail Comprehensive Plan and other applicable plans. 19 X. REQUIRED CRITERIA AND FINDINGS -CONDITIONAL USE PERMIT In addition to the request for development plan approval as required by the Housing zone district, the applicant is requesting a conditional use permit for the relocation of the Early Learning Center to the eastern portion of the site. Schools, including day cares, are a conditional use in the Housing zone district. According to Section 12-16-1, Vail Town Code: In order to provide the flexibility necessary to achieve the objectives of this title, specified uses are permitted in certain districts subject to the granting of a conditional use permit. Because of their unusual or special characteristics, conditional uses require review and evaluation so that they may be located properly with respect to the purposes of this title and with respect to their effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and surrounding properties and the town at large. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the town may prescribe to ensure that the location and operation of the conditional uses will be in accordance with development objectives of the town and will not be detrimental to other uses or properties. Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. A. CONSIDERATION OF FACTORS: 1. Relationship and impact of the use on the development objectives of the Town. The Vail Land Use Plan identifies the following goals with regards to community services: 6.0 Community Services 6.1 Services should keep pace with increased growth. 6.2 The Town of Vail should play a role in future development through balancing growth with services. 6.3 Services should be adjusted to keep pace with the needs of peak periods. In addition, the Vail Land Use Plan states that this site is to be used for the future expansion of the ABC and Learning Trees Schools. Staff believes that this use is important to the Town of Vail and will have a positive impact on the Town. These schools provide a valuable service to the members of the community. 2. The effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities needs. 20 Staff believes that the relocation and expansion of the Early Learning Center on this site is a benefit to the Town. According to the summary provided by the applicant, the Early Learning Center will provide early learning services for 60 preschool age children, with 12 to 15 full-time staff members, and 2 part-time staff members. The Early Learning Center has approximately 4,630 sq. ft. of floor area, and includes a 4,103 sq. ft. outdoor play area. Staff believes that it is beneficial to have this use located on this site, which is centrally located in the Town of Vail. An important consideration in the review of this conditional use permit is the possibility for future expansion. Due to the amount and location of the parking, the proximity of the building to its property line, and the amount and location of play area, future expansion possibilities are limited. 3. Effect upon traffic with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the street and parking areas. The applicant has proposed 22 parking spaces for the Early Learning Center. Parking for uses not specifically listed in Chapter 12-10, Vail Town Code shall be determined by the Planning and Environmental Commission. A memo has been attached from the applicant which explores the parking requirements of other communities. The municipalities of Boulder, Denver, and Lakewood, these municipalities would require 18 spaces. In addition, staff has reviewed parking requirements as outlined in "Off-Street Parking Requirements" Planning Advisory Service Report Number 432. Some of the sample parking requirements noted in this report include the following: Aurora, CO -two spaces for each three teachers and one off-street passenger loading place for every eight pupils. With the proposed Early Learning Center, Aurora would require 18 spaces. Orange County, CA -one space per staff member, and one space per five students. With the proposed Early Learning Center, Orange County would require 27 spaces. The Public Works Department has done traffic counts at the Early Learning Center and has found that at times there are more than 25 cars at the existing facility to drop off children. The Planning and Environmental Commission sets the parking requirement for uses not listed in Chapter 12-10 of the Town Code. Some communities have extensive requirements regarding access and parking. Specifically, St. Louis County, MO, requires the following: Two spaces, plus one space for every employee on the maximum shift; a paved unobstructed pick-up space with adequate stacking area (as determined by the Department of Planning) shall be provided in addition to standard driveway and parking requirements, or one space for every six children; a safe 21 pedestrian walkway system (as_ approved by the Department of Planning) through parking areas fo the building entrance, with a safety zone a minimum of 15 feet in width between parking spaces and the front of the building entrance, .shall be provided in addition to standards driveway and parking requirements. The applicant has provided area for snow storage which meets the Town regulations, which state that an area equaling 30% of the paved area be provided for snow storage. Staff believes that the provision of the 5 "live" parking spaces at the entrance to the Early Learning-Center will improve both vehicular and pedestrian circulation into the Early Learning Center. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. Staff believes that the use is appropriate for the character of the surrounding area. The maximum height of the Early Learning Center is at 26 ft. The building is 2-story building, which staff believes is appropriate given the heights and mass of the adjacent employee housing. The proposed Early Learning Center is located 20 ft. from the side property line, and 18 ft. from the front property line. While the Housing zone district allows deviations from the 20 ft. setback, subject to review by the Planning and Environmental Commission, staff has concerns regarding the ability to buffer the building and the play area with adequate landscaping. This buffering is important when considering the noise level from I-70. The Vail Mountain School has recently installed an air- conditioning system because the windows of the classrooms cannot be open during class because of noise issues. Staff recommends that a landscaping and sound berm, which will include large trees, be included in the landscaping plan for the Early Learning Center. Because the play area is located up to the property line, there is limited room for landscaping on the applicant's property. As proposed, landscaping is located on the CDOT right-of-way. CDOT allows trees that are 4"+ in caliper to be planted within their right-of-way, provided that no trees are planted within 30 feet from the edge of the road. B. FINDINGS The Planning and Environmental Commission shall make the following findings before granting a conditional use permit: 1. That the proposed location of the use is in accordance with the purposes of the conditional use permit section of the zoning code and the purposes of the district in which the site is located. 2. That the proposed location of the use and the conditions under which it would be operated or maintained would not be detrimental to the public 22 health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 3. That the proposed use would comply with each of the applicable provisions of the conditional use permit section of the zoning code. XI. MAJOR SUBDIVISION A. GENERAL OVERVIEW OF A MAJOR SUBDIVISION Title 13, Subdivision Regulations, of the Vail Town Code establishes the review process and criteria for a major subdivision proposed in the Town of Vail. Pursuant to Chapter 13-3 (Major Subdivision) of the Vail Town Code, the first step in the review process is for the applicant to meet with a Town Planner to discuss the preliminary plan. Staff has met with the applicant on several occasions to discuss the proposal and address submittal requirements. Staff feels the applicant has successfully complied with the initial step in the review process. The Town of Vail is required to notify the following agencies that a major subdivision is proposed and that preliminary plans are available for review: a: Department of Public Works. b. Town Fire Department. c. Town Police Department. d. Public Service Company of Colorado. e. Holy Cross Electric Association. f. U.S. West g. Cablevision company serving the area. h. National Forest Service. i. Eagle River Water and Sanitation District. j. Vail Recreation District. k. Eagle County Ambulance District. I. Other interested agencies when applicable. The next step in the review process shall be a formal consideration of the preliminary plan by the Town of Vail Planning and Environmental Commission. The applicant shall make a presentation to the Planning and Environmental Commission at a regularly scheduled meeting. The presentation and public hearing shall be in accordance with Section 12-3-6 Vail Town Code. The applicant's appearance before the Planning and Environmental Commission on September 24, 2001, meets this public hearing and presentation requirement. The burden of proof that the application is in compliance with the intent and purposes of the Zoning Code and other pertinent regulations shall lie upon the applicant. In reviewing the preliminary plan, the Planning and Environmental Commission shall review the application and consider its appropriateness in regard to Town policies relating to: Subdivision Control; 23 2. Densities proposed; 3. Regulations; 4. Ordinances, resolutions and other applicable documents; 5. Environmentallntegrity; 6. Compatibility with surrounding land uses; and 7. Effects upon the aesthetics of the Town and surrounding land uses. The Planning and Environmental Commission shall have twenty-one days from the date of the review of the preliminary plan to approve, disapprove or approve with conditions or modifications, the major subdivision request. Within ten days of making a decision on the request, the staff shall forward the Planning and Environmental Commission's decision to the Vail Town Council. The Council may appeal the Planning and Environmental Commission's action. The appeal must be placed within seventeen days of Planning and Environmental Commission's action. If the Council appeals the Planning and Environmental Commission's action, the Council shall hear substantially the same presentation by the applicant as was heard at the Planning and Environmental Commission public hearing. The Council shall have thirty days to affirm, reverse, or affirm with modifications the Planning and Environmental Commission decision. The appeal hearing shall be held during a regularly scheduled council meeting. The final step in the review process of a major subdivision request, after Planning and Environmental Commission preliminary plan review, is the review of the final plat. At any time within one year after the Planning and Environmental Commission has taken action on the preliminary plan, a final plat shall be submitted to the Town of Vail Community Development Department. The staff shall schedule a final review of the final plat. The final review shall occur at a regularly scheduled Planning and Environmental Commission public hearing. The. review criteria for a final plat are the same as those used in reviewing the preliminary plan as identified in Section 13-3-4 of the Subdivision Regulations. According to Section 13-3-9: Commission Action; Public Hearing: The Planning and Environmental Commission shall review the final plat and associated material and information and shall approve, approve with modifications, or disapprove the plat within twenty one (21) days of the public hearing on the final plat of the subdivision or the final plat is deemed approved. A longer time period for rendering a decision may be granted subject to agreement between the applicant and the Planning and Environmental Commission. The Town of Vail has the ability to require certain improvements when approving a major subdivision. The following improvements shall be required by the applicant unless otherwise waived by the zoning administrator, Planning and Environmental Commission, or Council: 1. Paved streets and parking lots; 2. Bicycle and pedestrian path linked with the town system and within the subdivision itself; 3. Traffic control signs, signals or devices; 4. Street lights; 5. Landscaping; 24 6. Water lines and fire hydrants; 7. Sanitary sewer lines; 8. Storm drainage improvements and storm sewers; 9. Bridges and culverts; 10. Electric lines; 11. Telephone lines; 12. Natural gas lines; 13.Other improvements not specifically mentioned above but found necessary by the Town Engineer due to the nature of the subdivision. B. REVIEW CRITERIA FOR A MAJOR SUBDIVISION Chapter 13-3, Vail Town Code provides the criteria by which a proposed major subdivision is to be reviewed. Section 13-3-4: Commission Review of Application; Criteria, Vail Town Code states: The burden of proof shall rest with the applicant to show that the application is in compliance with the intent and purposes of this Chapter, the Zoning Ordinance and other pertinent regulations that the Planning and Environmental Commission deems applicable. Due consideration shall be given to the recommendations made by public agencies, utility companies and other agencies consulted under subsection 13-3-3C above. The Planning and Environmental Commission shall review the application and consider its appropriateness in regard to Town policies relating to subdivision control, densities proposed, regulations, ordinances and resolutions and other applicable documents, environmental integrity and compatibility with the surrounding land uses and other applicable documents, effects on the aesthetics of the Town. 1. Subdivision Control There are three lots being platted as part of this major subdivision request: Lot Zonin Lot Size Buildable Area Fronta e Lot 1 {lousing 6.673 ac. 4.573 ac. 1,145.75 ft. 290,676 s . ft. 199,200 s . ft. Lot 2 General Use 1.096 ac. Not applicable Via 40 ft. 47,742 s . ft. easement Tract A Natural Area 17.226 ac. Not applicable 1,545.02 ft. Preservation 750,365 s . ft. Lot 1, Middle Creek Subdivision: Lot 1 is zoned Housing zone district. According to Section 12-61-10: Other Development Standards, Vail Town Code: Prescribed By Planning and Environmental Commission: In the H District, development standards in each of the following categories shall be as proposed by the applicant, as prescribed by the Planning and Environmental Commission, and as adopted on the approved development plan: 25 A. Lot area and site dimensions. B. Building height. C. Density control (including gross residential floor area). Therefore, the Planning and Environmental Commission shall prescribe the minimum lot size and frontage requirements. Staff believes that the lot size of 290,675.9 sq. ft. and the frontage of 1,145.75 ft. are appropriate for this subdivision. Lot 2, Middle Creek Subdivision Lot 2 will remain zoned General Use. .According. to Section 12-9C-5: Development Standards, Vail Town Code: Prescribed By Planning And Environmental Commission: In the General Use District, development standards in each of the following categories shall be as prescribed by the Planning and Environmental Commission: 1. Lot area and site dimensions. 2. Setbacks. 3. Building height. 4. Density control. 5. Site coverage. 6. Landscaping and site development. 7. Parking and loading. Therefore, the Planning and Environmental Commission shall prescribe the minimum lot size and frontage requirements. Staff believes that the lot size of 47,741.8 sq. ft. is appropriate for this subdivision. The frontage proposed for Lot 2 is via an existing platted access easement, which is 40 ft. in width Generally, the minimum frontage requirement within the Town of Vail varies from 30 ft. (residential zone districts) to 100 ft. (higher intensity commercial zone districts). Staff believes that given the current access and use of the site, the 40 ft. access easement provides acceptable access to the site. Staff believes that the intent of the frontage requirement has been met and no frontage requirement is necessary. Tract A, Middle Creek Subdivision Tract A will remain zoned Natural Area Preservation District. There are no minimum lot size or frontage requirements in the Natural Area Preservation District. Staff believes that the configuration of Tract A is appropriate for this subdivision. 2. Densities Proposed The proposed Middle Creek development will be clustered on Lot 1, which is 6.7 acres. No additional development is proposed on Lot 2 or Tract A at this time. 26 Lot 1, Middle Creek Subdivision Lot 1 is zoned Housing zone district, with a land use designation of High Density Residential, as approved in 2001 by the Planning and Environmental Commission and Town Council. The density allowed in the Housing zone district is prescribed by the Planning and Environmental Commission. The applicant is currently proposing 142 dwelling units on Lot 1. This is approximately 31 dwelling units per buildable acre and 21 dwelling units per gross acre. For comparison, the density allowed in Lionshead Mixed Use 1 is 35 dwelling units per acre; and 25 dwelling units per buildable acre in the High Density Multiple Family zone district. The land use designation of High Density Residential states that density in this designation would exceed 15 units per buildable acre. Staff believes that this density is appropriate for this subdivision, provided that in the proposed development meets the requirements of the Housing zone district. According to Section 12-61-1: Purpose, Vail Town Code: The housing district is intended to provide adequate sites for employee housing .which, because of the nature and characteristics of employee housing, cannot be adequately regulated by the development .standards prescribed for other residential zoning districts. It is necessary in this district to provide development standards specifically prescribed for each development proposal or project to achieve the purposes prescribed in section 12-1-2 of this title and to provide for the public welfare. Certain nonresidential uses are allowed as conditional uses, which are intended to be incidental and secondary to the residential uses of the district. The housing district is intended to ensure that employee housing permitted in the district is appropriately located and designed to meet the needs of residents of Vail; to harmonize with surrounding uses, and to ensure adequate light, air, open spaces, and other amenities appropriate to the allowed types of uses. Staff believes that the proposed density is appropriate for this site because it is compatible with surrounding uses. However, this density ensures that development on this site will be extremely complicated. This will lead to structures which are large in scale. Density of this magnitude must be tempered with good design. This proposal also addresses the demand for employee housing that the Town has identified as a critical need. Lot 2, Middle Creek Subdivision Lot 2 is zoned General Use zone district, with a land use designation of Public/Semi-Public. No dwelling units are proposed on Lot 2. The only allowable dwelling units in the General Use zone district are Type III employee housing units. Tract A, Middle Creek Subdivision 27 Tract A is zoned Natural Area Preservation zone district, with a land use designation of Open Space. Pursuance to Chapter 12-8, Vail Town Code, no dwelling units are permitted in the Natural Area Preservation District. 3. Reputations Lot 1, Middle Creek Subdivision Lot 1 is zoned Housing zone district. The Housing zone district regulations have been attached for reference. Pursuant to Section 12-61- 11, Vail Town Code, any development within the Housing zone district requires an approved development plan. Lot 2, Middle Creek Subdivision Lot 2 will remain zoned General Use. The existing use of the property as a public utility installation will continue. Any changes in use require an amendment to the approved development plan, subject to approval by the Planning and Environmental Commission. The General Use zone district regulations have been attached for reference. Tract A, Middle Creek Subdivision Tract A will remain zoned Natural Area Preservation District. The Natural Area Preservation District regulations have been attached for reference. 4. Ordinances, resolutions and other applicable documents The Vail Town Code and the Vail Land Use Plan are the applicable documents for review of this proposal. The issues relating to the Vail Town Code have been addressed previously in this memorandum. The Vail Land Use Plan contains goals which staff considers to be applicable to the major subdivision request. The applicable goals include: 1.0 General Growth/Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.2 The quality of the environment including air, wafer and other natural resources should be protected as the Town grows. 1.3 The quality of development should be maintained and upgraded whenever possible. 1.6 Development proposals on the hillsides should be evaluated on a case by case basis. Limited development may be permitted for some low intensity uses in areas that are not highly visible from 28 the Valley. floor. New projects should be carefully controlled and developed with sensitivity to the environment. 1.7 New subdivisions should not be permitted in high geologic hazard areas. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5.0 Residential 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. 5.3 Affordable employee housing should be made available through private efforts, assisted by limited incentives, provided by the -Town of Vail with appropriate restrictions. 5.4 Residential growth should keep pace with the marketplace demands for a full range of housing types. 5. Environmental Integrity According to the Town of Vail hazard maps, Middle Creek Subdivision is located within a Medium Severity Rockfall hazard and Moderate Hazard Debris Flow. Updated hazard reports have been attached for reference. The hazard mitigation has changed dramatically from the previous proposal. The report recommends that individual buildings be protect, rather than mitigation occurring adjacent to the creek. As .prohibited by Chapter 12-21 ~ of the Town Code, no development will be permitted on slopes greater than 40%. The lots have been configured to minimize the area of 40% slopes on Lot 1. An Environmental Impact Report has been completed by Stewart E~~vironmental Consultants, Inc., and has been attached for reference. The report states that while the proposed development of Lot 1 will have an impact on plant and animal communities presently inhabiting the property, the loss of the 6.5 acres does not represent a significant impact to plant and animal communities. The report recommends that all trash dumpsters need to be made bear-proof and exterior lighting will need to be minimized. The report additionally states that the impact to Middle Creek could include runoff from paved parking areas. A drainage study has also been included. The drainage report has been completed by Peak Civil Engineering, Inc., which is attached reference. The drainage study states that runoff from the proposed development will follow existing drainage patterns. A traffic study has been attached for review. The study states that the traffic generated by the proposal will be less than most apartment complexes of comparable size, due to the proximity to other modes of transportation. 29 6. Compatibility with Surrounding Land Uses Adjacent land uses to the entire Middle Creek Subdivision include the following: Solar Vail - amultiple-family housing project currently zoned High Density Multiple Family. Tract C, Vail Potato Patch - an open space tract currently zoned Natural Area Preservation District. Parcel B, Spraddle Creek Ranch - an open space tract currently zoned Natural Area Preservation District. This property is adjacent to Lot 1. I-70 Right-of-Way -land owned by CDOT but located within Town of Vail boundaries.. As a road right-of-way, there is no zoning on the property. This property is adjacent to Lot 1. White River National Forest -land owned by the United States Forest Service outside of the Town of Vail boundary. Staff believes that the subdivision is compatible with surrounding land uses. 7. Effects Upon the Aesthetics of the Town and Surrounding Land Uses The existing Mountain Bell tower and structure will not change with this application. Approximately 17 acres will remain open space. Lot 1 will be developed within the parameters of the Housing Zone District. According to Section 12-61-1'1: Development Plan Required: Compatibility With Intent: To ensure the unified development, the protection of the natural environment, the compatibility with the surrounding area and to assure that development in the Housing District will meet the intent of the District, a development plan shall be required. The review of the development plan for the site by the Planning and Environmental Commission and the Design Review Board include considerations regarding aesthetics. Approval of a development plan in the housing zone district requires that the Planning and Environmental Commission find that: Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties, and the surrounding neighborhood. The Design Review Board has reviewed the proposed development plan on numerous occasions to ensure compliance with the Town of Vail Design Guidelines. XII. STAFF RECOMMENDATION A. Development Plan in the Housing Zone District The Department of Community Development recommends that the Planning and Environmental Commission approve the applicant's request for development plan approval. Staff's recommendation is based upon the review of the criteria in 30 Section VIII of this memorandum and the evidence and testimony presented, subject to the following findings: 1. Proposed building setbacks provide necessary separation between buildings and riparian areas, geologically sensitive areas and other environmentally sensitive areas. 2. Proposed building setbacks will provide adequate availability of light, air and open space. 3. Proposed building setbacks will provide a .compatible relationship with buildings and uses on adjacent properties. 4. Proposed building setbacks will result in creative design solutions or other public benefits that could not otherwise be achieved by conformance with prescribed setback standards. 5. Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties and the surrounding neighborhood. 6. Buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the site, the surrounding neighborhood and uses, and the community as a whole. 7. Open space and landscaping are both functional and aesthetic, are designed to preserve and enhance the natural features of the site, maximize opportunities for access and use by the public, provide adequate buffering between the proposed uses and surrounding properties, and when possible, are integrated with existing open space and recreation areas. 8. A pedestrian and vehicular circulation system designed to provide safe, efficient and aesthetically pleasing circulation to the site and throughout the development. 9. Environmental impacts resulting from the proposal have been identified in the project's environmental impact report, if not waived, and all necessary mitigating measures are implemented as a part of the proposed development plan. 10. Compliance with the Vail comprehensive plan and other applicable plans. 11. The deviations to the parking requirement as outlined in Chapter 12-10, Vail Town Code, specifically regarding the number of compact spaces and tandem spaces, are acceptable and the Parking Management Plan will provide for adequate parking on the site. Should the Planning and Environmental Commission choose to approve the request, staff recommends the following conditions: 31 1. Prior to application for a building permit the developer shall enter into a Developer Improvement Agreement with the Town of Vail to construct the following off-site improvements: A. The North Frontage Road must be widened to accommodate aleft- turn lane. The current lane configuration shall be improved as follows (from North to South): 2.5' concrete curb and gutter, 6' asphalt shoulder, 12' westbound lane, 16' left turn lane, 12' eastbound lane, 6' asphalt shoulder, 2' gravel shoulder. All widened areas shall be constructed with a full depth pavement designed by an engineer. A complete 2" asphalt overlay will be required between the east (Main Vail Roundabout) and west road construction limits. All lane tapers shall meet the requirements of C-DOT. Guardrail shall be installed on the south side of the Frontage as required by C-DOT B. The 2.5' concrete curb and gutter shall match. the existing curb and gutter at the North Main Vail Roundabout and extend to the western most limits of the road construction. C. A 10' wide, 6" thick concrete pedestrian/bicycle path shall be constructed from the North Main Vail Roundabout to the western most limits of the road construction. D. The existing concrete box culvert that carries Middle Creek beneath the Frontage Road shall be extended to accommodate both the road improvements and the extension of the pedestrian path. A debris guard shall also be installed. E. A storm sewer drainage system shall be constructed, including inlets, storm sewer pipe, manholes, ditches, etc., as designed by an engineer, to adequately convey all 25-year storm run off in the area. F. Street lighting shall be designed and installed along the frontage road, and at a minimum placed at all intersection points. G. All necessary grading and revegetation shall be completed within the construction limits by the developer. H. The Town of Vail Public Works Department and C-DOT must approve all improvements. I. All proposed grading located off the subject property must be approved by the adjacent property owner. 2. As part of the final submittal for Design Review Board approval, the following additional information shall be submitted to the Department of Community Development: A. Retaining wall profiles and details. B. Final hazard mitigation plans and details. C. Final drainage study and design. (1:20 scale) D. Pavement design sections. 32 E. Final grading plans and details. (1:20 scale) F. All necessary easements including, drainage, pedestrian and an easement for the Town bus stop and area. 3. Prior to application for a building permit the developer shall submit a Design Review Board application, detailed final landscape plan, and final architectural elevations for review and .approval of the .Town of Vail Design Review Board. 4. Prior to application for a building permit the developer shall submit a construction phasing plan for review and approval by~ the Department of Community Development and the Department of Public Works 'for all improvements and construction on the site. 5. Prior to application for a building permit the developer shall submit a complete set of civil engineer drawings for all off-site improvements, including the improvements to the South Frontage Road for review and approval by the Department of Public Works. 6. Prior to application for a building permit the developer shall submit a complete set of plans to the Colorado Department of Transportation for review and approval of an access permit. 7. Prior to application for a building permit the developer shall submit a final exterior building materials list, a typical wall section and complete color renderings for review and approval by the Design Review Board. 8. Prior to application for a building permit the developer shall post a bond with the Town of Vail to provide financial security for the 150% of the total cost of the required off-site public improvements. 9. The applicant's proposal shall meet the intent of the Design Guidelines, as outlined in Title 14, Vail Town Code. This includes the following: a. Predominantly natural building materials shall be used within the Town of Vail. The exterior use of wood, wood siding, wood shingles, native stone, brick, concrete, stucco, and EIFS may be permitted. Concrete surfaces, when permitted, shall be treated wifh texture and color; however, exposed aggregate is more acceptable than raw concrete. The exterior use of stucco or EIFS with gross textures or surface features that appear to imitate other materials shall not be permitted. The exterior use of simulated stone or simulated brick shall not be permitted. The exterior use of aluminum, steel, plastic or vinyl siding that appears to imitate other materials shall not be permitted. The exterior use of plywood siding shall not be permitted. The exterior use of any building material, including those not specifically identified by this Section, shall only be permitted, unless otherwise prohibited by this Code, where the Design Review Board finds: 33 (i) that the proposed material is satisfactory in general appearance, architectural style, design, color, texture, and quality over time; and, (ii) that the use of the proposed material complies with the intent of the provisions of this Code; and, (iii) that the use of the proposed material is compatible with the structure, site, surrounding structures, and overall character of the Town of Vail. b. The majority of roof forms within Vail are gable roofs with a pitch of at least four feet (4') in twelve feet (12). However, other roof forms are allowed. Consideration of environmental and climatic determinants such as snow shedding, drainage, and solar exposure should be integral to the roof design. c. Roof lines .should be designed so as .not to deposit snow on parking areas, trash storage areas, stairways, decks and balconies, or entryways. Secondary roofs, snow clips, and snow guards should be utilized to protect these areas from roof snow shedding if necessary. d. Deep eaves, overhangs, canopies, and other building features that provide shelter from the elements are encouraged. e. Fenestration should be suitable for the climate and for the orientation of the particular building elevation in which the fenestration occurs. The use of both passive and active solar energy systems is strongly encouraged. If the applicant cannot comply with the Design Guidelines to the Design Review Board's satisfaction, the applicant shall return to the Planning and Environmental Commission for a review and approval of the development plan and the criteria for evaluation as outlined in Section VIII of this memorandum. B. Conditional Use Permit for the Early Learning Center The Community Development Department recommends approval for a conditional use permit to allow for a private educational institution. Staff's recommendation is based upon the review of the criteria in Section X of this memorandum and the evidence and testimony presented, subject to the following findings: 1. That the proposed location of the use is in accordance with the purposes of the conditional use permit section of the zoning code and the purposes of the Housing Zone District. 2. That the proposed location of the use and the conditions under which it will be operated or maintained will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 34 3. That the proposed use will comply with each of the applicable provisions of the conditional use permit section of the zoning code. C. Major Subdivision The Community Development Department recommends that the Planning and Environmental Commission approve the final plat for Middle Creek Subdivision located at a Part of the S1/2'of the SE1/4 Section 6, Township 5 South, Range 80 West of the Sixth Principal Meridian, based upon the criteria evaluated in Section XI of this memorandum and the evidence and testimony presented, subject to the following findings: That the application is in compliance with the intent and purposes of the Major Subdivision Chapter, the Zoning Ordinance and other pertinent regulations that the Planning and Environmental Commission deems applicable. 2. That the application is appropriate in regard to Town policies relating to subdivision control, densities proposed, regulations, ordinances and resolutions and other applicable documents, environmental integrity and compatibility with the surrounding land uses and other applicable documents, and effects on the aesthetics of the Town. Should the Planning and Environmental Commission choose to approve the request, staff recommends the following condition: 1. Prior to submittal for a building permit or within one year from approval of the final plat, the applicant shall submit two mylar copies of the final plat for Middle Creek Subdivision for recording with the Eagle County Clerk and Recorders. All easements are subject to approval by the Department of Community Development prior to recording. IX. ATTACHMENTS Attachment A: Reductions ~ttac.".ment B: Site Analysis Attachment C: Zone Districts Attachment D: Title Report Attachment E: Adjacents Attachment F: Applicant's Statements Attachment G: Environmental Impact Report Attachment H: Hazard Reports Attachment I: Traffic Studies Attachment J: Drainage Attachment K: Parking Management Plan Attachment L: Reductions of Plat Attachment M: Letters from the public 35 it I ~EC'D ~~~ ~. 3 2~C~ MIDDLE CREEK AFFORDABLE HOUSING MOUNTAIN BELL SITE VAIL, COLORADO s a F I N A L P E C S U' B M I T T A L SEPTEMBER 13, 2002 W COUGHLIN cg:. COtviPANY INC. S~m ODELL ARCHITECTS, P.C. ' Arrcirrrrucc P~cnninc lnxcc~orc L ry T I LAND USE SUMMARY UNIT SUMMARY PARKING SUMMARY SHEET INDEX iaa~ ~ ra • too - sw a rt • s ~~ ®rffaa . ~ wr +atuas¢tY.amp . a r fa-ai tilal+ arai mdm . Nm a ut.w.c m'v mm.[ . iml• mi alai Om4• t!•a•Wt w+~li rta• Iwr.wt 1®a~..uma. an lala ~. ila r . na lil flR a6Ur•Mt +iW4.7Aw! tq ni mlYa . ilm a . t!• 1mw[ a at6. aJY r . Aa R rm•Rlar•aat Y ~~ anm .n a.i mi - t lrem .l man .n /R Wne 164[•bf . ~ Im6 ~~ as+m ue ala mm wa vt un nwT . Iw r I lO l+t T mat m+ rR C •.a alt a•iamlam n - t lam fta •-laam ne wa to Tu rma . m~ a LL nM a IR T Ott ~~~ w.m momr®lu a+mv u[a .vs ~ mleoe fm s v aac arc asr ua 1 sa,s.pnr nYStnna•oa a - i aslmt n-lomYUeusf v. 1 •1a®7a16YW3f. a-iame 0•tafam'i m6YMa 1-l aalm TUe Ytff 1.1110 Tamr 1-rm7wY~T w-Jamb a-1®YU6u~f 1 -taam TYl6u Yf! qN6 na +m m fMi naYa . lur r F~ t71a1~ a stmluffm.Ya a•ilamel uam.au a-lamer ts+m•m w. 1 f]m6 t 1 fY~ i Nm+ WII~i IYD ~~ asmOY®Q na+0 maE 1®[ i s n /F4a r~ngaeq • N m.ov f+m • s um f.m g utl u~ml my . o R lri^f[. iftip Ml h+m IlmYl alm . M rm-f[ ffm p t +sm m n ~T ~ ~ lal-f[ f5[p • n kr..c 9.m•1 tY mom[ fm{ • 1 Pl Iimt Im mt1+i l1* . 7 f nm m., ~>a~ rl f.+fn m+fm W Ip41t f[a'00101M nl R.~fl llm/RiY+M YI t[. Df[M/a<~OOEM V Dlm f[M/tII a[nM R nl folnr d pSa[6Otfe d f[IOOIlO nI d IYYQbM w aY.i Im m..v e.. a muns.nu d maa YOn nl+ w au wr[na of fo[ rm d c®n a.m w~ u a¢mm.+tnona u rum u.mn s[ na u uam umf n nY n muml~nm av4+at nl Mai Ynn Mt a] a+ai YnO+.ieti W arai T Im n,i nl awtTlm num eu v lui Tnm na unn at ass Tim na unn 41 Iwalt T nml M LL'6 ~ W UDi TnmlMLLt+l of asai Tlm MLLnl a+ lali T Im ti un 1 nY la.e Tna nu wnl a9 lai T nID M LL'6 f na mis T e M a+ [a.u~c my nos nu w Iwo[ ul nYe w Iaca ul nli w a.as YUOm [I+m W asmcTtrm onaa W a+at T um ay+ri YI aas r am al+m w Iui Tf[te W Ima.tTII» w Immc T aos W fY+l uli OP P[Y Mii w arms v [ru W ]ma Rai w mm~au[ W l Im Kn[ w fa-f.m >rnt w fFf.a rra w f.a+a r>s ~'. W }+.M 1103 r ~~ MODIFICATIONS MITIGATION ~BY. SLOPE LINE EDGE OP BUILDMG FOO7~ G ~ ~M BN M~ D ~ ~ R7LL NOT ENnC~0.0ACSM ~ Eat F: ~~ .. S `~^ ~ :~ % b, ~~'` `fib P'%" f CyH ~ ~rl ~r bra `~ws ~ \, µ• M ~/7~y~ti ~~IVdN[G t. ~r z e' a,.. fit ~ ~+ ~ -` ~ f~~~~~N~~b1f/i -zez"."' r (a ~aI/~/` `~`\ ;~/ I ~ 1\ ~N! ~ c..\ j ~~ ~ T ~ ~ 1 1 " l11TF~= a~i g, '/` .-tI/%////i I 'I. I~ 5~~ TATEHf' !.~yA7 7u ~ ':;_i NOR .._. - -~: ~~ `~~ .j`\~b ila :: :: '~ ... _ .~~ ...... .. ;. , _ EXISTNG PARKJNG PI'+:: "~~. ""~~.. COI.LMUMTY '" ,,. VERTICAL LANDSCAPE PARIUNG AND TURNAROUND' E%i6TIL1C:+sreN~ ~..... '"'-' COTTONWOODS SETFIAI'K WILL ~'"'' CENTER/BUS `~CIRClI1.AT10N 'AUFFF.R'AREA IN SETBACK SCREENED 0.TD1 ~-~~-""'-~c'iRUYE;';"""'~~~........,~~""'--~~~~~~~~'~ AND ASPEN TO BE SCREENED BY STOP TOR'FA"., IRE: LANDSCAPn EVERGREEN PLANTINGS '~~~-""" """- '~ .. REMAIN EXISTING TREES ~... ........ •... ....... ......•...~ ...... AND EVERGREEN • ................... ....... ..: PLANTINGS Cl M~FCNlK 9F PLAN p-~~- • t o n ~iaa m~.z•. sw,w N aa,..sw a mu„ ~ c a r~r . a zcc'~ a L 7 SEti SEC 6 SITE 6 . L _ Q E c v SCALE 1'-400' n' u o - •,a• is U v ~ o S 6 _ ~ , : o00 v v NOM1Y YIP C1.1 \\ ~ \ w\\ ~--__---~~ YrtiI~R NaT1oNAL POR€Si --~ /~ ~~ ~~ \ u TRACT C ~ ' ~ '~- -__---- -. -`~-_` ~ ~ ~~I \ ~ ~_-_ VAIL POT r0 P~TC ` ~ ,o ~°'O-~ „----~ J- -~~~'" \ ~~~g ~ _~~ -`~ TowN of vaLY---=- ~~ aAES ~ ~ ~ .. vAIL PorA ItLae a.~ Y ~-: co- -FT-_ / ~ ~ 1 \\~~_ .'~~` ~ ~ \~• .~ \ o ~K ~~~_ - v 9i xe'w ~a10- '~--~neo »- ~~C~ ~V ~,,~ ~ A ~~ ~~ _ _ , ,~ _ ~_ ~ ~ . , _ x ~ ' .. NR000 12 311.DJ --: -~ - ~T7p - \_- s ~ , "^ J~ ~ ~+.~ 0 ~~ ~ ~- ~- ': J~ _~ ~ ~~ ,e _ _ _..__ .... - T. 101.3!' l~a><.n) -_ ._ ~0' wrc.m M. w ~ - ,u L- 30307 1w,. ..~ pm..rt tiw. ~'~ nr a- zo3.er „r ) M'iY1a':.u'";';3• .. - `.• .... Nc~ ~~'~-_ :, ~~ --- ~ ®- sn3vs3aw i.,>,,.....1 _ _.., ni mo T c Roeo ~ -_'_~-=_a_~,o~~ ~ ~ \ - m.,, „i-,w.m .ml ~ . ... - - -- ---- .. ...,_ - INTERS7A 7E HIGHWAY •.. ~ ...."' ~.~~ (NORTH IRON 7A p0' JO .. .`D'a":..'~J~ ',. CE RO ) xT17e'ov^R - oc~.pV `: J// _ (R.O.W) . _ ~..~ (ut ..pro. ie~ ~a.. LME TABLE ~ Y GECEND i i ~~~ / ~ ~ ~`~~ ~~~ i ~ '~ i / ~~ ~. ~ ~ ~ ~, ~ ~ __~ I \ i ~ ~~~~ MWNTAIN BELL I I \ ``~ A, ~ .. _'Nb ~_ ` _ T ~ ~~ ~ ra mn .. - _ 3 ~ ~, ~ _- ~ J _ _ ~ _ ___ ~~ Y ~-~ - rim~ ~a' a ~ ~ - ~. '- _ ~~-' ~_- ~ ~ `~ ~ room ~ CftAPHIC 9CALC I w ,rtr ) r~s~s> - - - _ - - ~ ~ ~ ~_ ~. _= - i, '. _ _ _- - I ~ ~ . ~J \< _ ~ i t` I ~ . ~ ~ ~~ J , ~ ; ~~ ~\ ~ ',mil \. ~ \ \ \ C J _ \ \ ! Nl rm .n ~~ n un~u~ 1 ~~ ~ ~ .. 1 / M ~ ~. t' ~ 1 '~ \ ~ I ~ [ ~ ..~ .:.~: I ~ ~~ ~ - ___ _ . -_ ~ I li . ~ • ~: ,k : . ~`:cd ~ .. ~ ~ ~ ti r °ua:o~ i GRAPHIC SCALE larml 1;~ ~ ,, - ~ ' .~ , ~ . ~~ ,.~ ~ ~ '~ ~~ ., ., .t., ~~ . , ~ . ti - - > ,• ~ ` \~ ~ ~ ~: l , ~ ~ ~ \ \ `~,\~ ~, \ I. \~ ~ ~ ~ ~ ~~ ~ . I" ~ \ \ .~ _ ~ , ~ I. ~ ` . ' ~ ~ - . _~ *~- `" =- . u -~ ~ _ _- . ,.- - $cv /~:.~ -_ __ __ ____ ___ ~ ~ _ k -'ti¢ _ t__- - _._ - .. nawm _ __'~ ~ _ t ~~ . ~~~ Y ' v w~ wm~ ~i~~ \~.- am.dmoty-_ -. __ .. ` ~ ~__ _` _ CftAPHIC SCALE t:~-~e n ~~ ----- _ ~~ _ ____~_ ~-.~ -.. ~- GRAPHIC SCALE k r>~-i~l---V~J ~ ~ ,~ »~µ~ X an ~~m vic m m ~~r~ ~( ~+ muinpe~Mi[vmio<x~µ ~~io na o.---•-~L .~~,~ ~~a O ^~o ~ s<w rm ~.n i ~--- .' --~ ~ ~ --i i i o-. ~ _r _ ~______- -.Lae.` U -_~ ~' r~_ ~_ \ \ ! - `~~' m /~,, ; /~ \ '~ /~ '~ '~ ~ ~~ ~ ~ \ ~ ~ ~ i r/I - \ ~ ~ ~ `~ r ~:'° u ~ ` i q .e u.... atm,,~ ` ~~ I ..° as .a -~`^dc ~~ A~iV~a ~~ ~ ~ ..a.. ~ •~v ~, ~~ _ _ J , ~., ~,~, ~ o A ' __ ___ __ - _ __ . -_ Ge _ - _ ' R _-_____-~__ __ r ~._c_ ~~ - __ ~ ~ - -- . _ _ _ ~ __ ~-~. _ ~--,r~ _ ' - _ - ~ _ - -~- - _ - ~ ---- ______~_____-___ _ _~_______________ ~J _ ______ _______~ ~_~_--_-__- m~. -~~-~ • LEGEND -- - -- ~ - _ - ~ - ~0 ` .- - .-- - / -H-o. ®~~~...o. --- -- ~~ GRAPHIC SCALE larn) ~. -.. - _ ':, GRAPHIC SCALE nnf _, _~_ _. _ _ _ _ ~ _.. .. __ \ `.:_~ ~... 1 , .....,.... . ~r ~~. -- - i .. _.. ~. _ - --_- ~_ --- _ ;. 'S .. a _, cRO« Q CRAPHiC SCALE .~ . e ~J~ i i - -- -- _~ /, ~ ~ ,\ ~~ ,-_ - - ' ~ \ /. '~ ~` \ I J C J I `` \ _ i ..:- __ ~_ ~ .. __ ~~ . _.. ~_ __ ~_ _ _ _ ____ __ _, -_- -- __ GRAPHIC SCALE ,. Inrm ~ _ IEGCNp PP.OiEC11t1G ExISIING vEGElA1lON O .. .. .._._ __._. ___-_ + tars to a An~~[o In) m n+tw [ wmr nm iIX ott`tw ~[w M~ PWt s5 O v`~>r'n~mm xri~RrM.°Irooot II.w2) - lEi! =' coeol x ~xwco Iq sw.>w4 ~'X `~ r~ to k Atlwri4 1]YI I~~~ ~~ bD f= F~~~1 1~-1 Q~ .~ c _ Q~~> aG a~ a~ a.. U a~ b b 000 000 __`~~ TREE REMOVAL 6 RETENTION PLAN ~~i '~ Y_ ~~~ ' T J I j. Y ~ ~~ O ~ ~ ~' ',,,'' ~ ~'. ~// a A .as .<~ '~, ~- --------~ -- /" ~'' nmxc rcs.rox ~Nr'vN I~~ B~~(DiN BE(( A ~ O p 00_.s O oo ~ /^ O ~~ -~ .~ .-._ ~_~ ....-_,r~~~ Fo rn.. O 1 1 MAiERIAlS IEGEND .. ~......~..r,.. I wu Is[[ ucM[K l~ :\V [owx[M1 Sirs i4[ fuuhlK wG'S) ® -__ LIGHTING IEGEND ~ ~~ l~u¢~ ttiwrtm~stn6 i rs rN n/~¢.u 't ~ nrWM wr rtntcrta nst[r ~ vows u voxN t m •w rtn~[snnw N .D ctY .. _ PLArlTING IEGEND '» a L. 4-. - ° U (swz[ /run-sm nouvsl Q ~ ' > ti~.p ct ~~oal ~n ea~s2t ~ a_((~l I~~v.va..+.1. rar. s c[["~~w ~ •+ewv4 seta i ~ s ...... (wean w.M Yio w. ~'°`° ~`~ aoo //YY tWr eopt iw61 V aW62G( uta m~ $11M..1 w. •5surtn IRRIGAiiDN SYSTEM ~~~ Uwsrv[rvw.zr~wwumtnRSS¢iz. mwwnw n rtrrxai v c~woKt NnO. ea0 p u[nx Fot ~siui 6N+ iK wx.Mn. a Mt tSUOUSnmu RrgY. c`~wnwouci imirtn x~oe xo-. >»t ann.c v[uort cn~aseKSis x[Mn[ . twav.~ou tr vor w „vo. ~~ m.oua cr[ ~[ u ..i[r i[mx[ true ru e[ UNDSCAPE PUN o --,~-- Lt~2 J ~ 1 ~ ( `' \ \ `` \ _ ~~\ -r---- _ \ROaER w Ku~.~w ° _1 . ~~'., . _ ,. I4 W I °~ 1 uaR wl \Y;, ~ ° `'`' ~ ti '~~ I mxtn / ~ •, c O(1 ~~a~ rwR[ 'tP(. L6( KM [R % ~ :~~ ~,Cl~i s[5/.C~nn•(S V'r 1 ~I RA ~"3 V a r.cMS alb n mxr xxw7 ~ i~ ~~, ., l a , `t~. 7 6 0 0 ~",,,~~~ 1'1~ch ~,. a[oG a ' ~ v ~ ' ,>e r .rte '-~' '~ ,..~ ~4~ \~\ Fa 7r ~I_ t} G'- f N ~ ~'r ~ ~- ~~ 4 t'~ f ~ 3 /„ ( siw~x 1 \ ~ ii MATCRIALS LEGEND s_L. num . 65 lu[ nnr¢rs PCY rp •/00..1 ~_ 151sR [xO4rs b4Y m u~i~~.o. /eo..l vmRVn uc co-crl~s s..z lm sti.rsrs wcta LIGN-r1G LEGEND a ~ `~ a`~,'~~ ~~~Ir: ~ al 1 w~rr,t,~ .~~~;,","" wWCVi art RR[na srsrtr c~s 6rmv+o;s .r..° ro rw R`0as~inw PLANTUdG LEGEND y ~ : ~d - v1[~t Wo[x~~a~pv6i. sx r n r E I w / a srt uwrs) ` / , ,~. Boa, „ ~ j('] ]f ~~ Knl I~Rr~aera 6mt~vrr rvl K i~.~, ~.., rl~ r r 101Y I. rK,r<,R. ~. ~:d~:.~ 5m..rmYL ..~,.A ~~~ a~~^~~~r~1.M t~L rr.,.,> ~~ ~ . , ~~a o.rrcm ~r~ sao .~ m.rm mis o ~~rs1,~~K~ ~ ~;w ~ - ~s~o ~`;~.'n ,. IRP.IGATIDN SYSTEM ,. -1 AY l ~"' .~ ~~ .a ~~- bd=~ ~=~o ~° ~, o ~3 1 N ~ ~' a~ U °~ b 000 000 LANDSCAPE PLAN `;;~ L03 L T ~ ~ J ~ F `1 of ~\ AI ``~ bfl ~\ `\ ~I ``~ \D/'fR `~ \Nf ~.rs~0inc K'~ '~ ~ ~ ~ I~ ~ ... ..,,.. 4. \ ~'~ (~ I ll .o. s<~ [~ _. ., ........ .. ;.. ;~~~.(-ia~,'.~,~7~51~;'~ ~~~ , i ~`-1.. ' emu,[[. i n: T., ~ ~ - .......... ....... C ERIALS LEGEND uis IsB `xra[is s is[[ [wu[[a ~~"V`°° o.es rw on~n w fo.leor 1. ~, mcmrz sous Is[[ [xcu<[ws wcS) 1iING LEGEND a on~~n - uc. ~.' m ..nn[S,[ wu/cur ~m xoi[rnssnn[u m~~roos rz `n[ r`.i`~n'c°S"rz~ wansew~ PLANiINC LEGEND w Lyn[ /uun srzu a~wsj ~. ~ o~. µf~ ~ s~.l ~[ .-~ m . w J/~~J~ / /J~ s~[ws ~cwwu [w[~m nwcx~m ~ > ~ /~ / / aecirnews .a..a lu«.,eM Q [wwcm x.irrt sm ~~ Sn..co Smz ~' len a¢ ~o a vm m nv w~vcs rww m~ [o-ul ~ rz[~[~e~~ ~wr IRRIGATION SYSTEM »o ¢ uw..n :vm nliua <ocv~s.~~c bonl~ NIE$, fq M dWini Nt IP[R u9 Sxsu6 wsrtw cwna ue[HUSw['S+o om [~ mrtus. meum~ n xvW,~xi r~m~.no: sea i.[c~,KU, euoiw mia6 p fK [SfwR6xw[xi rtAW. SM4[ & ~i9GrzU lHG ~ M[i i[. smurto x cx rM Su[ eumc mrtrs i c~wio~w~K v¢ V Sui[ u•rz. sw.x[ Sun .u u i Cq C .~ O a~ ~ o. _ ~ ~ . (O ~ m a Q ~ ~ ~ .se U b 000 LANDSCAPE PLAN .~ J ~ ~ T ra yr ,avr r.a I __ r____ _r i ~ r r ~ ~ ~ i I I ~ anmc ..ro nr. ~ ~-----' ~-----' I ay. I I ~ I O-•--•-•---•-•--- - ...... .; iX a----- --•---•-- ~ - ~ I -- -~ - --• •-• o------------ y.~ M o----- ._._.. ©- ~ r ~ J l J L `r ~.,. ~ MIIGI101 Wl i 1 n n n n T i T ~ _~ T I ~ 7 I I . j _ ------ _ ____ - I ~ { :. , 1 - - - - ~ ~K., c C C C v v v v m n rn n ~ n T d I ~ ~ i • n. ^ 8 ~ ~ 1 ----------- I ----- --- -~ - i----~ -- ------------ ~ ---- ----------- ------------~ _ __ ___. _ _. __ _ ____ -- - - _ __ _ . - _. _ ._ ------ I ------ --- -- -I -' _ u ~ 1 J lnl ' I ~ ~ - -- -- -- ; --1 J I I~ !~~ ~ x l ~ 1--- --- 1 I 1 ___ _ _ F=~ ~ I __._ . i ~ I i i i I I t I I I 'A' fOIRN RDOR PUM ~l ' I i Q~~~ i c c C C '-' mil/ t J t - ,- I Q I o----~- I I' b i i b 'ax x ~~ Y ~ ~ i , _ ---i t ~. 0 0 I b -----~-o ---~---~ - _ ~ L________1 -I- .~.~._.~.~. __. _._O _ I h f__~__l~!__~___ , J l____________1 I I b b ~~g~~ww ~ .---~-o --~---o ~~-~-------o -~-----~-~---~-~-o i I b . + J - ,_ I I I I I I I I I I '~ C C C S S S S S - - q-- - -I I --r-~-I - - U U (^~ ~ U U ~ e V --- - - U - U-1 - - ~ - I ~ - 4 - ~ - I - U c~ -- - S S S S V U v' _- I ~' - I -~ I I I I I ~ ~ a ~- N I N i s s~ s l s s s l s s l s c c c l c N ~ - .~ -$ ~ - - I- - -- -- - Y _ ~---------~--~- s s s i s s s. s i s j s c c c ~ c ~( Q (/'7 oJ, I I Iv I ~- -V -- ~-- ~ ~ - •I. t o U U -- ~ . I - :1 Z I ----- - - - ~ ~ ~ I U I ~ I I I I ~ ,,~,,_ I r~o~ ~~~~ ~~- I~ ~ I ( I i~ ~ -- ~ -~ I ~ ~~i-~ 1=1 s sis s s s s sus c c c c a ~~ ~ ICI ~ ~ ~ ~ ~~ r~ ^ « ~', .~:~ ~~- ` _ _o C., ~ ~ ~ ~ ~_ _ I (~_9~~ME'CPNS1161E`~9.7JRIN ~ ~ ~ . CCll M•„' - 't J J ~~ ~ P I ~ lJ J Q9~1a~c C nvmc ie~a w nr /Q ~ v ~euac r sago ~ ~ /b ~ g J .~ ~8~,~' ffx aaa ww _,~ ~ 8 { 7 I I I - 11 ~ ~ ~ (19A1MC'0' 106 NM _~ >~ r~ - -O - --0 +~ _ ___ /1, i 0 - _O tk- ~ - --0 - -O !>~ L ~ r 5 6 7 8 9 I I ~ I I I a 8 C n n n r_~ n ..w I ~ ~ ~ ~~~ i ~' ~ • - .....1 I 1~~. / .r r. .. u l1n= ' . ____~-uI____ __~.n____ ~ li J o _ I . ~.~ I ~ ,~J • I`~ ~ J~ -------~-------- ----- I / r. I ~~ I I I I 1 ,. I v ~ ~ r,~~ "" -. ,- J :I I II ^mV III ~~ 6: em as ~ -' an i oaa UR E - E61 5F. ~ lMT D~ M SF. g~N . __ t rlUlfR-IllSf. ~"'~~ ~, xOtt: Y[ 1/l' R001 PlAMS iCR wOO~ LOUf06 r1 UR C - FR Si. (1 UR l - @ SF. /1 URA - ]M SF. 0 a "`'zr n.K T ~ U ~ ~~ U J i__~ ~ °~ i=~ z.. ~~ ~__~ ~; ,~ i i ~ ~~ ion: SE[ i/B' ROOR RN6 fdt wUOr LOGfgxS ,~ 0 r.~~ ~~,~ m u. t J ~ -_ == «:~T--- --I ~ -~ ° a . ~, , ,~ ~~ ~~ ~~ -----~J ~l 9111ti'A' ESf QEMd ~~n •i~ L-----~--------------- ~ ~~ I ~ I ~ ~ ~ iii " a K.. I ~-------- i -------- ~ 1 -----L--'------~-------~~}~- 0 0 --- o __ o r,.._ o .~_..,..~ a .....d.. o ._..__ o ~__ a ~...._~ o __ o s.__ o _~ ~, Di ®~.~ ~i r~s+~r Q. r..w. ~i v.~~..~ Q .oar 0. ~ or~.r~ Qi ~~ Qo r~~o.r ~i err 0. sa~~rr Q •~omr.~ori Y - ~ J QQ QQ a~ o _~.~,__ o __d..d o --_- o ,m, o --- o ___ o .~~.._ o _.~ o ~ ___ o _.~ --- o ~....__ o -- o .®__ o ~--- 0 0._. o -- o .___ o ___ o -- o __ o s.~._ o ,.~... SEE SHEETS 1.2, 6J AND 6.4 FOR ROOF AND FLOOR HEIGtITS. `n) l41 E~1 E (ol C Eu/ A I .~- IY ~Y ~~~ ___ -- _= u ~~~ ~~ --- ------------ -------------------------------- ----------~-------~~j ---~.--'1------- ------------------------------------------- --t~~ rl eUiMC t' FAA fSE1~nl Q~K.. O O _.e. O --- p -~~- O R~•+ O -~- p .~~.~.. ~ ~~~ ~~~ O ~- O -m O °---~ O ~w- O ~- p ._~~. p ....... O !- O -~- O ~_~ p ..~.... -1 SEE SHEETS L2, 6.3 AND 6.4 FOR (1 ROOF AND FLOOR HEIGHTS. Y T I I I ~ ~ I I 1 p ~ ^ p ^ ^ - _ a a ^ p ^ ^ ~^aoa~^^ _ g_=- -_=-_ ^ ~ ~^aao~^^ - =~ _ ~~_o^ - =_ - oa ^^^ ^ g = ~ =g - _ o_ ^~e -- = - l ^^ ~ p ^ ^^ I!111 a VIII ^^ ^ p p ^ 9- _. ~~_~ p ^ ^^ ^^ ^ p ~ B p - -_ . __ __ ----_-_ -_ __ ~ -_- _- O p .~.~~.~ O ~-- O ~~ p -~-+-~ p .~~.~ O -+- O •--~-- p ~ ...~ O -~- p e..m~~ O ~~~ O °~--- O ~- p .~.v.., p --~*+- O ~- O -~-- p °"--+ p ....... o t' 4 4 4 4 4 ~ e 9 i . i T T T T T - + SEE SFIEETS 1.2, 6.3 AND 6.4 FOR ROOF AND FLOOR HEIGHTS. (j (~ (cj (oj ~j r~ ~~~ r~ ~~ O p ._ e....... O ®-~ O -~~ p -..,- p -~~,. p ..r_. O -~ O +-„-- p _ ..... p ~..~~~~ O -- O ~~~ O ----- O -- p .~.e~. p .~~.. p ~~ p ~~ p ~-..... p ..~.. ~- SEESHEETSI ROOEANDFL 0 p o_~ p -.e. p ~...., O --~- p ..~~.. O -~ p .~~~.. p ~ ~.~~. p e~.~~ O -~- O ~-~ p s~~ p ....~~ O -- p ._~_. p -..+-. O ~- p _.v p s.,.... p ..~.. 2 I v~.a r ~~~+%':~~r,.i;; ~ ~ ®r.. „~Ih~..~~IIII-.-illll=-iillli-.~ Jll m`.~ ... w _ , t ~.~ raw .~+~ +ua BIf11RL1E SLE 9EIVUON •• ••c o.~ '.' rtf ~ y~ pq f ~I M A. 1 Au/ ~ 8 A _._J v..~ Q SU1i 9EM171 v ~, „ ~•- ~iatatwia ~~~ 4 ~ S' ~ _ __ _ _ - _ MINDOW SCHEDULE ~ , _~ w 7.17-- ~ unf --- ---- ----- ----------------------- w 77.17__ T_ ~ ^_ ____ ____ _____ ~++i~~r r~ ~~ ~ ~ w 17.7__ 'r' ___ r ~!_ ~.. ____ ____ _____ ~~i3_________________________________________ ~~•~- ~•_•_~•~ w 17.7 " r ~ ~_ ____ ____ _____ ~yi__________________ rrw ________________________________________________________ fa 1. l__ T_ :~ ^_ ____ ____ _____ ~melrliw_________________________________________________________________________ ~~ 1. l__ 'r' ___ ~ !]_ .~ ____ ____ _____ !' +1___________________________________________________________________________ mr~~w~rr~ Tl. l__ 1' ` ___ _____ _ ______________________________________________ ____________________________ G a' C xr ll. l__ r ~_ _^__ ____ ____ _____ r r ___ ___ ____________________________ _________________________________________ l.:. ~ .rr N .mn i 17,T1__ ~ ___ _^__ ____ ____ _____ ___________ li 17.17__ ~ _~ ~_ ____ ____ _____ ~=5, _T~~ ____________________________________________________________________ 1 ______ __ ___ ___ ____ ____ _____ _______________________________________________________________________________ Q _ ______ __ ___ ___ ____ _ _ _____ _________________________________________ _________________ _____________________ ~_~ ~• l ______ __ ___ ___ ____ ____ _____ ______________ _________________________________________________________ ________ V] ~oe rr7 urr7 ________________________________________________________ 0 ___ _- - _ ' 1 ______ __ ___ ___ ____ ____ _ _ _ ___ ____ ___ ________________________________ y/ . ~-~~r ~ _ _______ ___ ___________________________________________________________________ _ / ~ ~ f ~ ~ \~ ` ~ ,~. _.- ~_\ ~ Yv _ ~ ~ ______ ______ __ __ ___ ___ ___ ___ ____ ____ ____ ____ _____ _____ _____________________________________________________________________________ __ _______________________________________________________________________________ 1-r _ -~ 4 A ~S pp ~-~oiwm ~ / . ~. ri r.~ ~- rK ~~ i ~.d~ ~ _ ~ ______ __ ___ ___ ____ ____ _____ _______________________________________________________________________________ y S V ~ ' s•n~K ~ ~- e~ V wS .a~u ~ ~.nmN ! ~ ~ ______ __ ___ ___ ____ ____ _____ _______________________________________________________________________________ --- ~ S f a£ O ~ s --rte-- --.... -~.~, -~r,.::, r --- ---- ----- ------------------------------------------------------------------------------- ~ --~ -~- ~ tFJO DE-r: 118 9LL ~ts f•rT ~~ ~ -~~° - - ~-- ~ (±1 tIDOf IE70 DEDt: IrB 9l - e ~ ------ .r r ~ r.~~ -- r ~ ~ ~( --- C ~ e.r Mr~a --- OTES ~. r.r . a.. ~ ---- .r~~. ~ ..a ---- a ----- ------------------------------------------------------------------------------- tItDO^ LE6Et0 r ®....r r ~ ~"' U ~ .~ NINDOM FRAME TYPES K•-- - -- - °° -~- ._. _. - ~-n.r N ~' ~ ~ ~-~~ ., _~ ° ... - ~K ..~ ~-~~ f ~ ~.m N I DOD -- ~ / i ~~~ opt. ~~l ~ _ e -- J ~ .r° v r _`y . +4... x •~ •••~~~ `~/~ ~.•~~•••~ - .rte ~ ~ m. x.,4,4... u ~ r~ e •••••~ ~ ' '~ I 1~ t~'t 1~Y YsY i'~t Y~'t TuY i~Y i~'Y -- :~:9D®IEE .~t,te 1 i i l n ttDDt SlL OEDL _ ___.. i'~1~_ - .m.V! \i ~r}91 OEOL _. -_ _ 11[f.E95 I'dfE3 I1[~Q~ TB?3 I~SdS IQ£Id 11g9~i ffiEH3 l~d$ llFf.di 1 c ~i~°' J •ra I v,e~ -~a~~ ... I I ~ 1 II~ I p.,.e~ .. ,..a ~-e~ +- ~~~ 1Bff e ~.,~ ~ e.w,~ ~r_ -•~::- e..n~~, ~ - ..a.~,~ . ,dx ~ m ~=.m..~ ~ sN ~ 'o ~~aM ~.~• ~.. ~„~ w ~~~~~ f . ,s r,'1. .tea- . ~I 8 O 1( - x u; '1,1,iah"~~~= r,~14 8270 O /r- _I,4~Y _ 8260 y ~ 6 c VolA Ira \ 10 i,. tia . 2 J s - - P ,.1E 'p 8250 a / I~ -8240 nar- r r "i•y p/ 1 ~ .l -----8220 INTERSTATE HlGl~.w--= 82 7 09~P11N/ T I P1N AY 70 NORT AI awt'A LEGEND: - _ .~~3p •u(aoraev.riw+l.u ~wrmmrorre - ~ ernRmwrn ~8Z f0_1 KEY PLAN: \ n EIIAAgD MiaECMtK 9R MiI ~_r-- ~Ir-r~ o 1 .~ \ \ ~ -` ................... j ,~ _ ..,. ~.~ ~. .. _.._ ;: ~~~ • . Q~AAQO M~M4CNUl 94 PW 1 LEGEND: `\sz2n ~~ ~~__ arnsEU wn x~imi6. amnmrora ns.:irpii.~ eriona ICFY PUN: ~/%~ F t t J J 1 T .... _ ri ~ .q ~ 11,, J t 10:00 AN. ~` r~~`-~ d_ ^ ~~ . ~r d: -.-lam` ~... y 1 { , ~r ~~ ~~ .: _ _ ~..~~- -_ Y I~ n SIN - SWR MAl1S@ YMCI ?I / X10®1 N r L:iG•sQ: eo .~ y a x b;~~ ~° ~ ~~g ~~ V .~ b b aoo ~O aoo SOD P.Y. ~~~ ~~ 91F-911 X01145 ~~ t 10:00 AY. ~~ ~: ~~ ~~_ eo .~ y 0 x u .~ b~~ '~ ~ ~~~ V u b b .., 000 X00 200 P.tl. ~~~ 9e-siu[ ~rss Q M6~ ~~ .~ 1 IQ00 AN. 1L `i.~~=. .. ~ _ . ~- ~ ~- a A. -~ ~ ~ "'~ ~: pp~ - i ~ ~ .F I'~ ~y`,~ J ~ i5 J ~` t ~ ` `, ",- ~ ~~ Z~!~ L 9'1ti4 -- ): 200 P.Y. Site Analysis Zoning: Housing Lot Size: 6.673 acres 290,675.88 sq. ft. Allowed Proposed Setbacks 20 ft. (deviations allowed by PEC) Early Learning Center North 20 ft. 162 ft. South 20 ft. 18 ft. structure 12 ft. parking East 20 ft. 20 ft. West 20 ft. NA Housing Building A North 20 ft. 60 ft structure 4 ft. parking South 20 ft. 10 ft. East 20 ft. NA West 20 ft. 265 ft. structure 51 ft. parking Building B and C North 20 ft. 112 ft. South 20 ft. 15 ft. East 20 ft. NA West 20 ft. 27 ft. Site Coverage 159,872 sq. ft. (55%) 49,980 sq. ft. (17%) Early Learning Center 3,990 sq. ft. Housing 45,990 sq. ft. Landscape Area 87,203 sq. ft. (30%) 203,113 sq. ft. (70%) Parking Early Learning Center PEC 22 spaces Housing Chp. 12-10 247 spaces Building Height (max) Early Learning Center PEC 26 ft. Housing PEC 79 ft. Allowed Proposed ~ Density PEC ~ ~ 21 du/acre 31 du/buildable acre m c a~ E t c~ Q GRFA PEC ELC Floor Area PEC Data Statistics Dwelling Unit Count 142 units Studio 45 units 1-Bedroom 29 units 2-Bedroom 24 units 3-Bedroom 44 units Floor Area by Building Building A 9,500 sq. ft. 24 Studio Units 1 Two-Bedroom (manager) Building B 7,749 sq. ft. 21 Studio Units Building C 88,460 sq. ft. 29 One-Bedroom 23 Two-Bedroom 44 Three-Bedroom Parking Total 269 spaces Surface Early Learning Center 22 spaces Housing 36 spaces Enclosed 211 spaces Full-size 167 spaces Compact 77 spaces Tandem 140 spaces 85,507 sq. ft. 4,630 sq. ft. ARTICLE I. HOUSING (H) DISTRICT SECTION: 12-61-1: Purpose 12-61-2: Permitted Uses 12-61-3: Conditional Uses 12-61-4: Accessory Uses 12-61-5: Setbacks 12-61-6:_Site Coverage 12-61-7: Landscaping and Site Development 12-61-8: Parking and Loading 12-61-9: Location of Business Activity 12-61-10: Other Development Standards 12-61-11: Development Plan Required 12-61-12: Development Plan Contents 12-61-13: Development Standards/Criteria for Evaluation 12-61-1: PURPOSE: The Housing District is intended to provide adequate sites for employee housing which, because of the nature and characteristics of employee housing, cannot be adequately regulated by the development standards prescribed for other residential zoning districts. It is necessary in this district to provide development standards specifically prescribed for each development proposal or project to achieve the purposes prescribed in Section 12-1-2 of this Title and to provide for the public welfare. Certain nonresidential uses are allowed as conditional uses, which are intended to be incidental and secondary to the residential uses. of the District. The Housing District is intended to ensure that employee housing permitted in the. District is appropriately located and designed to meet the needs of residents of Vail, to harmonize with surrounding uses, and to ensure adequate light, air, open spaces, and other amenities appropriate to the allowed types of uses. 12-61-2: PERMITTED USES: The following uses shall be permitted in the H District: Deed restricted employee housing units as further described in Chapter 12-13 of this Title. Passive outdoor recreation areas, and open space. Pedestrian and bike paths. 12-61-3: CONDITIONAL USES: The following conditional uses shall be permitted in the H District, subject to issuance of a conditional use permit in accordance with the provisions of Chapter 16 of this Title: Commercial uses which are secondary and incidental (as determined by the Planning and Environmental Commission) to the use of employee housing and specifically serving the needs of the residents, and developed in conjunction with employee housing, in which case the following uses may be allowed subject to a conditional use permit: Banks and financial institutions. Eating and drinking establishments. Attachment: C Health clubs. Personal services, including but not limited to, Laundromats, beauty and barbershops, tailor shops, and similar services. Retail stores and establishments. Dwelling units (not employee housing units) subject to the following criteria to be evaluated by the Planning and Environmental Commission: A. Dwelling units are created solely for the purpose of subsidizing employee housing on the property and; B. Dwelling units are not the primary use of the property. The GRFA for dwelling units shall not exceed 30% of the total GRFA constructed on the property and; C. Dwelling units are only created in conjunction with employee housing and; D. Dwelling units are compatible with the proposed uses and buildings on the site and are compatible with buildings and uses on adjacent properties. Outdoor patios Public and private schools and educational institutions, including day-care facilities. Public buildings and grounds. Public parks. Public utilities installations including transmission lines and appurtenant equipment. Type VI employee housing units, as further regulated by Chapter 12-13 of this Title. 12-61-4: ACCESSORY USES: The following accessory uses shall be permitted in the H District: Home occupations; subject to issuance of a home occupation permit in accordance with the provisions of Section 12-14-12 of this Title. Minor arcades Private greenhouses, tool sheds, playhouses, attached garages or carports, swimming pools, or recreation facilities customarily incidental to permitted residential uses. Other uses customarily incidental and accessory to permitted or conditional uses, and necessary for the operation thereof. 12-61-5: SETBACKS: The setbacks in this district shall be 20' from the perimeter of the zone district. At the discretion of the Planning and Environmental Commission, variations to the setback standards may be approved during the review of a development plan subject to the applicant demonstrating compliance with the following criteria: A. Proposed building setbacks provide necessary separation between buildings and riparian areas, geologically sensitive areas and other environmentally sensitive areas. B. Proposed building setbacks will provide adequate availability of light, .air and open space. C. Proposed building setbacks will provide a compatible relationship with buildings and .uses on adjacent properties. D. Proposed building setbacks will result in creative design solutions or other public benefits that could not otherwise be achieved by conformance with prescribed setback standards. , Variations to the 20 ft. setback shall not be allowed on property lines adjacent to HR, SFR, R, PS, and RC zoned properties, unless a variance is approved by the Planning and Environmental Commission pursuant to Chapter 17 of this Title. 12-61-6: SITE COVERAGE: Site coverage shall not exceed fifty-five percent (55%) of the total site area. At the discretion of the Planning and Environmental Commission, site coverage may be increased if 75% of the required parking spaces are underground or enclosed, thus reducing the impacts of surface paving provided within a development, and that the minimum landscape area requirement is met. 12-61-7: LANDSCAPING AND SITE DEVELOPMENT: At least thirty percent (30%) of the total site area shall be landscaped. The minimum width and length of any area qualifying as landscaping shall be fifteen feet (15') with a minimum area not less than three hundred (300) square feet. 12-61-8: PARKING AND LOADING Off-street parking shall be provided in accordance with Chapter 10 of this Title. No parking or loading area shall be located within any required setback area. At the discretion of the Planning and Environmental Commission, variations to the parking standards outlined in Chapter 10 may be approved during the review of a development plan subject to a Parking Management Plan. The Parking Management Plan shall be approved by the Planning and Environmental Commission and shall provide for a reduction in the parking requirements based on a demonstrated need for fewer parking spaces than Chapter 10 of this title would require. For example, a demonstrated need for a reduction in the required parking could include: A. Proximity or availability of alternative modes of transportation including, but not limited to, public transit or shuttle services. B. A limitation placed in the deed restrictions limiting the number of cars for each unit. C. A demonstrated permanent program including, but not limited to, rideshare programs, carshare programs, shuttle service, or staggered work shifts. 12-61-9: LOCATION OF BUSINESS ACTIVITY: A. Limitation; Exception: All conditional uses by 12-61-3 of this Article, shall be operated and coriducted entirely within a building, except for permitted loading areas and such activities as may be specifically authorized to be unenclosed by a conditional use permit and the outdoor display of goods. B. Outdoor Display Areas: The area to be used for outdoor display must be located directly in front of the establishment displaying the goods and entirely upon the establishment's own property. Sidewalks, building entrances and exits, driveways and streets shall not be obstructed by outdoor display. 12-61-10: OTHER DEVELOPMENT STANDARDS: Prescribed By Planning and Environmental Commission: In the H District, development standards in each of the following categories shall be as proposed by the applicant, as prescribed by the Planning and Environmental Commission, and as adopted on the approved development plan: A. Lot area and site dimensions. B. Building height. C. Density control (including gross residential floor area). 12-61-11: DEVELOPMENT PLAN REQUIRED,: A. Compatibility With Intent: To ensure the unified development, the protection of the natural environment, the compatibility with the surrounding area and to assure that development in the Housing District will meet the intent of the District, a development plan shall be required. B. Plan Process And Procedures: The proposed development plan shall be in accordance with Section 12-61-12 of this Article and shall be submitted by the developer to the Administrator, who shall refer it to the Planning and Environmental Commission, which shall consider the plan at a regularly scheduled meeting. C. Hearing: The public hearing before the Planning and .Environmental Commission shall be held in accordance with Section 12-3-6 of this Title. The Planning and Environmental Commission may approve the application as submitted, approve the application with conditions or modifications, or deny the application. The decision of the Planning and Environmental Commission may be appealed to the Town Council in accordance with Section 12-3-3 of this Title. D. Plan As Guide: The approved development plan shall be used as the principal guide for all development within the Housing District. E. Amendment Process: Amendments to the approved development plan will be considered in accordance with the provisions of Section 12-9A-10 of this Title. F. Design Review Board Approval Required: The development plan and any subsequent amendments thereto shall require the approval of the Design Review Board in accordance with the applicable provisions of Chapter 11 of this Title prior to the commencement of site preparation. 12-61-12: DEVELOPMENT PLAN CONTENTS: A. Submit With ~ Application: The following information and materials shall be submitted with an application for a proposed development plan. Certain submittal requirements may be. waived or modified by the Administrator if it is demonstrated that the material to be waived or modified is not applicable to the review criteria, or that other practical solutions have been reached. 1. Application form and filing fee. 2. A written statement describing the project including information on the nature of the development proposed, proposed uses, and phasing plans. 3. A survey stamped by a licensed surveyor indicating existing conditions of the property to be included in the development plan, including the location of improvements, existing contours, natural features, existing vegetation, watercourses, and perimeter property lines of the parcel. 4. A title report, including Schedules A and B4. 5. Plans depicting existing conditions of the parcel (site plan, floor plans, elevations, etc.), if applicable. 6. A complete zoning analysis of the .existing and proposed development including a square footage analysis of all proposed uses, parking spaces, etc. 7. A site plan at a scale not smaller than one inch equals twenty feet (1" = 20'), showing the location and dimensions of all existing and proposed buildings and structures, all principal site development features, vehicular and pedestrian circulation systems and proposed contours and drainage plans. 8. Building elevations, sections and floor plans at a scale not smaller than one- eighth inch equals one foot (1/8" = 1'), in sufficient detail to determine floor area, circulation, location of uses and scale and appearance of the proposed development. 9. A vicinity plan showing existing and proposed improvements in relation to all adjacent properties at a scale not smaller than one inch equals fifty feet (1" _ 50'). 10. Photo overlays and/or other acceptable visual techniques for demonstrating the visual impact of the proposed development on public and private property in the vicinity of the proposed development plan. 11. An architectural or massing model at a scale sufficient to depict the proposed development in relationship to existing development on the site and on adjacent parcels. 12. A landscape plan at a scale not smaller than one inch equals twenty feet (1" = 20'), showing existing landscape features to be retained and removed, proposed landscaping and other site development features such as recreation facilities, paths and trails, plazas, walkways and water features. 13. An environmental impact report in accordance with Chapter 12 of this Title unless waived by Section 12-12-3 of this Title. 14. Any additional information or material as deemed necessary by Administrator. B. Copies Required; Model: With the exception of the model, four (4) complete copies of the above information shall be submitted at the time of the application. When a model is required, it shall be submitted a minimum of two (2) weeks prior to the first formal review of the Planning and Environmental Commission. At the discretion of the Administrator, reduced copies in eight and one-half inches by eleven inches (8 1/2" x 11") format of all of the above information and additional copies for distribution to the Planning and Environmental Commission, Design Review Board and Town Council may be required. 12-61-13: DEVELOPMENT STANDARDS/CRITERIA FOR EVALUATION: The following criteria shall be used as the principal means for evaluating a proposed development plan. It shall be the burden of the applicant to demonstrate that the proposed development plan complies with all applicable design criteria: A. Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties and the surrounding neighborhood. B. Buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the site, the surrounding neighborhood and uses, and the community as a whole. C. Open space and landscaping are -both functional and aesthetic, are designed to preserve and enhance the natural features of the site, maximize opportunities for access and use by the public, provide adequate buffering between the proposed uses and surrounding properties, and. when possible, are integrated with existing open space and recreation areas. D. A pedestrian and vehicular circulation system designed to provide safe, efficient and aesthetically pleasing circulation to the site and throughout the development. E. Environmental impacts resulting from the proposal have been identified in the project's environmental impact report, if not waived, and all necessary mitigating measures are implemented as a .part of the proposed development plan. F. Compliance with the Vail Comprehensive Plan and other applicable plans. 12-9C-1 CHAPTER 9 SPECIAL AND MISCELLANEOUS DISTRICTS ARTICLE C. GENERAL USE (GU) DISTRICT SECTION: 12-9C-1: Purpose 12-9C-2: Permitted Uses 12-9C=3: Conditional Uses 12-9C-4: Accessory Uses 12-9C-5: Development Standards 12-9C-6: Additional Development Standards 12-9C-3 12-9C-2: PERMITTED USES: The follow- ing uses shall be permitted in the GU District: Passive outdoor recreation areas, and open space. Pedestrian and bike paths. (Ord. 21(1994) § 10) 12-9C-1: PURPOSE: The General Use District is intended to provide sites for public and quasi-public uses which, because of their special characteris- tics, cannot be appropriately regulated by the development standards prescribed for other zoning districts, and for which devel- opment standards especially prescribed for each particular development proposal or project are necessary to achieve the pur- poses prescribed in Section 12-1-2 of this Title and to~ provide for the public welfare. The General Use District is intended to ensure that public buildings and grounds and certain types of quasi-public uses per- mitted in the District are appropriately locat- ed and designed to meet the needs of resi-. dents and visitors to Vail, to harmonize with surrounding uses, and, in the case of build- ings and other structures, to ensure ade- quate light, air, open spaces, and other amenities appropriate to the permitted . types of uses. (Ord. 21(1994) § 10) 12-9C-3: CONDITIONAL USES: A. Generally: The following conditional uses shall be permitted in the GU District, subject to issuance of a con- ditional use permit in accordance with the provisions of Chapter 16 of this Title: Churches. Equestrian trails. Golf courses. Helipad for emergency and/or commu- nity use. Hospitals, medical and dental facili- ties, clinics, rehabilitation centers, clinical pharmacies, and ambulance facilities. Major arcade. Plant and tree nurseries, and associ- ated structures, excluding the sale of June 2000 Town of Vail 12-9C-3 trees or other nursery products, grown, produced or made on the pre- mises. Public and private parks and active outdoor recreation areas, facilities and uses. Public and private schools and educa- tional institutions. Public and quasi-public indoor com- munity facility. ' Public buildings and grounds. Public parking facilities and structures. Public theaters, meeting rooms and convention facilities. Public fourist/guest service related facilities. Public transportation terminals. Public utilities installations including transmission lines and appurtenant equipment. Seasonal structures or uses to accom- modate educational, .recreational or cultural activities. Ski lifts, tows and runs. Type III employee housing units (EHU) as provided in Chapter 13 of this Title. Water and sewage treatment plants. B. Proximity To Parking Required: The following conditional uses shall be permitted in accordance with the issu- ance of a conditional use permit, pro- 12-9C-5 vided such use is accessory to a park- ing structure: Offices. Restaurants. Ski and bike storage facilities. Sundries shops TourisUguest service related facilities. Transit/shuttle services. (Ord. 6(2000) § 2: Ord. 21(1994) § 10) 12-9C-4: ACCESSORY USES: The follow- ing accessory uses shall be permitted in the GU District: Minor arcade. Other uses customarily incidental and ac- cessory to permitted or conditional uses, and necessary for the operation thereof, with the exception of buildings. (Ord. 21(1994) § 10) 12-9C-5: DEVELOPMENT STANDARDS: A. Prescribed By Planning And Environ- mental Commission: In the General Use District,. development standards in each of the following categories shall be as prescribed by the Planning and Environmental Commission: 1. Lot area and site dimensions. 2. Setbacks. 3. Building height. 4. Density control. June 2000 Town of Vail 12-9C-5 5. Site coverage. 6. Landscaping and site development. 7. Parking and loading. B. Reviewed By Planning And Environ- mental Commission: Development standards shall be proposed by .the applicant as a part of a conditional use permit application. Site specific development standards shall then be determined by the Planning and Envi- ronmental Commission during the review of the conditional use request in accordance with the provisions of Chapter 16 of this Title. (Ord. 21(1994) § 10) 12-9C-6: ADDITIONAL DEVELOPMENT STANDARDS: Additional regula- tions pertaining to site development stan- dards and the development of land in the General Use District are found in Chapter 14 of this Title: (Ord. 21(1994) § 10) Town of Vail 12-9C-6 June 2000 12-8C-1 CHAPTER8 OPEN SPACE AND RECREATION DISTRICTS ARTICLE C. NATURAL AREA PRESERVATION (NAP) DISTRICT SECTION: 12-SC-1: Purpose 12-8C-2: Permitted Uses 12-SC-3: Conditional Uses 12-8C-4: Accessory Uses 12-8C-5: Development Standards 12-8C-6: Parking And Loading 12-8C-7: Additional Development Standards 12-8C-3 not preclude improvement of the natural environment by the removal of noxious weeds, deadfall where necessary to protect public safety or similar compatible improve- ments. (Ord. 21(1994) § 10) 12-8C-2: PERMITTED USES: The follow- ing shall be permitted uses in the NAP District: Nature preserves. (Ord. 21(1994) § 10) 12-8C-1: PURPOSE: The Natural Area Preservation District is designed to provide areas which, because of their environmentally sensitive nature or natural beauty, shall be protected from encroach- ment by any building or other improvement, other than those listed in Section 12-8C-2 of this Article.'The Natural Area Preserva- tion District is intended to ensure that des- ignated lands remain in their natural state, including reclaimed ~ areas, by protecting such areas from development and preserv- ing open space. The Natural Area Preser- vation District includes lands having valu- able wildlife habitat, exceptional aesthetic or flood control value, wetlands, riparian areas ,and areas with significant environ- mental constraints. Protecting sensitive natural areas is important for maintaining water quality and aquatic habitat, preserv- ing wildlife habitat, flood control, protecting.. view corridors, minimizing the risk from hazard areas, and protecting the natural character of Vail which is so vital to the Town's tourist economy. The intent shall 12-8C-3: CONDITIONAL USES: The following conditional uses shall be permitted in the NAP District," subject to the issuance of a conditional use permit in accordance with the provisioris of Chapter 16 of this Title: Equestrian trails, used only to access Na- tional forest system lands. Interpretive nature walks. Parking, when used in conjunction with a permitted or conditional use.. Paved and unpaved, nonmotorized, bicycle paths and pedestrian walkways. Picnic tables and informal seating areas. Other uses customarily incidental and ac- cessory to permitted or conditional uses and necessary for the operation thereof, Town of Vail - 12-8C-3 12-8C-7 with the exception of buildings._ (Ord: 21(1994) § 10) 12-8C-4: ACCESSORY USES: Not appli- cable in the NAP District. (Ord. 21(1994) § 10) 12-8C-5: DEVELOPMENT STANDARDS: Not applicable in the NAP Dis- trict. (Ord. 21(1994) § 10) 12-8C-6: PARKING AND LOADING: Parking and loading require- ments will be determined by the Planning and Environmental Commission during the review of conditional use requests in accor- dance with the provisions of Chapter 16 of this Title. (Ord. 21(1994) § 10) 12-8C-7: ADDITIONAL DEVELOPMENT STANDARDS: Additional regula- tions pertaining to site development stan- dards and the development of land in the Natural Area Preservation District are found in Chapter 14, "Supplemental Regulations", of this Title. (Ord. 21(1994) § 10) Town of Vail ©7i12i2002 15:21 COUGHLIN ~„3367©7162 ______ _ NU.~il~b Wei -. .. ' ~ w~ wti+w • -~. - . 1 . ../ ~...• M..vr fir. r1• MJ I-..1 I.M 1 VI GVjC 4 V / iV w' . ~ Date: 06.2&Z002 Property Address: US VVE.SII PA~i. 8uyerlBorrower: 'I`Or ~ Ah°i~RM11VED SetterlQ Wr-cr: THS MOUNTAIN STATES TEC.EPHONE AND TELE.iiRAPH COP1~'A1VY, A COLO&iD0 CURP7RATL03V, AS TO PARCEL 1 TOWN OF VAII, .~ MUNICIPAL CORAORATION, AS TO PARCEL 2 [[you have arty iTiq~uirf~~ or require tt~rther o~i®tahce, piesse contact one of the numbers below: For CSasilg Assicatance: Bor Titb` Asslstancc Vai] 'TYde Dept. Roger AvUa 108 SI FRDNTAG$ AD. W. X203 P. O. BOX 357 VAQ.,, CO 81657 PMne: 970-X76-727. b'BGt: 470-476-4.53a EMe6i: isvila®ltgc. CWo PJeed a map or ditecdot~s far your upcomfng dosing? Creek out La»d 7'itie's web site Bt ~vw~.Itgc.tora cur 40 office Mcatlan9. P3TIMA7~~CF-RTIFF~PS r 9195.41 Taap CCII4s7w"r i.~and 1'`tle t~rr~aer~yr .. _ ~~rracrs our Order Number: VC27~rf36 TOTN. SZ?5.oo xCIANK YOi] FOR YOLtR gRD1tB! ~ttarFernnnt- r1 07i12i2002 15:21: ~' COUGHLIN ~ 3036707162 rrom ~.ana i ~it i e -- • -~ " "~i~ ~' ~o .,un wuc ~~: ai: ~a nm «iu ~ ., NO:~806 D03 •.mGrO r ; oa T. 41 , , r~l~e a v~ 1.v Chicaga Tlfle Isisurance Contp$r~ ALTA COMMITM}iNT Schedule A Property Address: US'VVP,ST' PARCEL 1. Ef[ective pate: April 2b, 2~Ot11 at 5:00 P. ~ Z. Policy to he Issued, ahri Proposed Insured: Inform~on finder Proposed Ittsttt+ed: TO $~ p~~FBI3 Our Order No. Yc~7?~~36 Cuet. Red 3. The c9tate or Intetsest in the land described or referred to 9n this Camrpitmetlt and covered bereib is: A iH'eE Slnupic 4. 'IYtle to tl:e estate ar interest wveted ttere~n i9 at the etYect9~o date horeoY vested in: THE MOUNTAIN S~TATiss T~PHONF AND TII.EGRAPH COMPANY, A COii~ORADO CQRPQitATION, AS TO PA$Cf~ l 1'OWI+i 4F 1'A1T., A. MLJIVICIPAL CORPORdTIOQV, AS I1D P'AAC sF'1~,,~ 5. The land referred to In this Commitrnettt i9 descrifbed as foltox~s: SEE ATTACHE PAGR(S) FORLt~GAL DESCRIPTItIa!l 07i12i2002 15:21 COUGHLIN ~ 3©36707162 . . _ _ _ . _ . __.. _-. ...__..~~. a.+crritnv - .. N0.806 D04 ~30a625tt8: e 5 11 •~ ~. LBYAI. ~~TiCN PARCEI.1 Our Order No. V[~i7?A34 A TRACT Ok' LAND IN TI3E SOIIT~3EAST ONR-QUAR7,'ER, SOUTHEAST Oi~QUAATER, SRG"I`iON 6, ToWNSYIa'a 5 SOUTH, RANGE, ~o WEST OF THE bTI3 P. M., EAGLE COUNTY, COIARADO, @nORS PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNIIY6 AT n POIr[T B1~1G 1290.20 FEEL' NOIiTIi 36 DE.GRFES O1 MZIVUT$5 ?S SFC~1l )S W1~ST IFftOM ?~~ SOU'!'_....+IST CL`.~=t L"F uEC: I^N 6, .'^~.C'.i318'~a'aP S #Tir3, 1iAi~U%n. $"i i^.'.Sa"I' f]k' THE 6TH P.M.; TEiENCE NORTH 00 DEGRE~5 00 MINUTI~S 180.11 FEET; TY3ErJC$ NORTH 8d DHGREF,S 34 MTrfUTIIS WEST 1x3.67 F'&ET; TI3~TCE SOUTF3 b0 DEGR8~:9 091~'iRVUTES W&5T 107.00 FE8'I'; TFIIoZ~'CE SOUTH 26 DEGREES 1? NIII~TCJTES WEST 3225 FEI~`I'; THENCE SOUTIi 88 DEGAS 30 ~fIIVUTES WEST 120.00 FEET; T2I$NCF SOl'JTI3 36 DEGREES 23 ~UTisS 3t SECONDS WEST GS.,7A F8&T; THENCE SOUTH 83 DEG~REi~S 36 30 b`EC.ONDS ffAST 411.93 FEED TO'iHE POINT OF' H$GIlVNIIVG, COUNTY OF EAGLI?, 5TA'I~ OF COLORADO: TOGETHk~ WtI'>:~ AN EASEMENT FOR ACC&SS ?O AND 8GR&~;.5 FROM TI3E A80V&DES("1lIBED TRACT ]BY PED~TRIAN, VEHICULAR, AND MOTOR TRAI~FLC, FOiR AERIAL AND BU1~D TE~L..EPHONE ANL~ EC.ECTR[C POWER L,IIVI?S AND P'OR BI.7RIFA WATER, SEWER, GA.S, AND OR'Hk'Ii UTII.ITI~:S TO SAKI) TRACT OVER AND ACR05S THE FOLLOWING DESCRffiED PRUPEATY, TO r'V[T: A TRACT OF LAN^ IN THE SOUTHEAST ONFsrQUA3~l'TT~R, SOUTHEAST ON&QI7AATER, SDCIYON 6, TOWNSHIP 5 SOUTfI, RANGE SO WB4I' Off? T13E 6TH P.M., EAGf.E COUNTY, COIARADO, MaRB PARTICULARLY I~ESCRiAl~] AS FOLLOWS: BEG~iINNG AT A 1'OII+IT BFLNG 1170.20 FEET NOItTA 36 I)EG~ES Ol MYr1UTI3S 25 ~COND 3 VEST Fa.,OA'! THE SOUT*,3F.AST CCIZNE3t OF SECTigN b, T'OWNS.hZP 5 SOUTH, RANG 80 WLST aF T$$ 6TH P.IvL; THENCE SOUTH 00 DEGR$&S 00 hDNU'C'6S a0.2~5 FERT; TF3ENCE N~TLi S3 DEGREES 36 MLIVI]TFS 30 SECONDS WEST 38,2.46 FF~; T~IENCS SOUTH 15 DEGREES 49 MWUT1iS W~5'I' 871.16 FEET" TO TH8 NORTH RIGHT OF ~VVAY L~ OF INITERS'['ATE 70; T~d~CE NORTH 74 DE.OREBS Z1 MINUTES 35 SECONp 3 WEST x0.00 FEET ALONG TA& NORTH RTC P 08 9VAY LINE OF ItV'iERSTATS 70; THENCE NURTA 25 DEGR~S 49 MLNUTES EAST 2ZZ.20 F!?~ ['; THE!`1CE 50UTH 7B:] D'EGR~ 36 M>T1CJT8S 3o SECONDS EAST 41L93 F'EET' TO THIS E'~OAMT'I` alb Bi~,®v~vm~c, COIJt~TY OF FAGLF, STATE a~ cOLOIeADO. NOT& TI3& FINAL. POLICY DOES NOT IIV ANY WAY GUARANTY OR INSURE THT~ pIMEA1$ [OIVS OF THE AT30V$ DIiSCRLHED LAND, T~ LEGAL Ui'IOly IS DERIVRD FROM THB CHIN O1~ TTI7.E AND ONLY AN ACCURATE SURVEY CAN D~ TAF DIMEN&ION9. PAS, 2 A TRACT OP LAND IN THE SOUTH HAL2p' OF' TIiF 50UTHEAST QIJARTRR, $E~C'I'ION 6, To'WNSHIP 5 SOUTH RANGE 80 i'V~'T 027 THE 6TH PRINCIPAL 141E+3tIDYAN, EAGLE COUN'['1.', COLORAI~q MC7~Rl~ FARTICUI,ARLY DRSCRLBBD AS FOLLOWS: BEtRIVNINGAT A POINT T"HA~' 1$ N OQ DSGRK'PS ZS NIINITIT$16 SE>LOND3 W A DISTANCE C$ 686.60 FAT FRiD1YI THE 50UTEiE,AST C+ORNF.R OF SECTION 5, TOWNSFIIP 5 SOUTH, RANG d0 WEST OF T[3E 6TH I'RINC[PAL MER[D[AN, IjIIP1C~-THE TRUE PO1NT OF BEGINNING; ALSO.BEIIVG A POI~'T OlY TTY; NOR'I'FIKKY.Y RIGHT OF WAY OF INTI~RSTA'1"E 70; TI~NCE N 00 DEG: ZS MIl~IiJTES 16 SECONDS W ALONG THE FAST Y.IIVF OF SAID SECT.ON 07i12i2002 15:21 ....,. ~..r,.. , , ~ . COUGHLIN ~ 3036707162 ~ ~ i av ~wu LV1IL ~.v..~a,.~t MM 1gN1 N0.806 . o~a~~nc a r~cyn ~ ui iv Our Under Na. V~Z72436 6 A DISTANCE OE 633.40 bpi; ' THENCE N 89 D~;GREFS 2~ MINUTES 2I SECONDS W A DI5TANC'& OF ~633,7b b''EET TO A POINT ON TFI$ FAST BOUNDARY LINE OB VAIIJPOT'ATO PATCH FILINGr, TIi~1'CE S 00 pExREES 07 MIIVUTES 12 SECONDS E ALONG SAID FAST AOUNUARY LINE A DISTANCEF: Ola' 35 L.21 FEET TO A POINT t)N A G'URYF, SAID CURVE ALSO BBdNG ON THE NOATH~:RLY RDG~In' OTi WAY OF INTFItS'T'ATS 70; THENCTs ALONG SAID NORTI~AY.Y RIGHT OF vVAX oN THE F'OLLOWiNGB COC1 1) A DI,S'TNACE OF 204.62 FB'I' AI.CING T$K AAC OB' A CUAYE TD TTY RIGHT, SAID CUR'7E l~AVQ1G A CEN27iAI. ANGLE OF 02 DEGREES ~6 N.QNU'rES 18 5FCOND9, A RADI[JS OF 3990.0 FEET, ANA A CHi)RD BEARII~IG N 85 DEGREES 31 1ti3INUTP510 SECONDS E A D[STA1o1CE CF 204.60 FEET; 2) N 8A DF.G1tEE6 13 MIl~7UTFS Ob SECONDS E A DISTANCE OF 211.80 FAT; 3) N 84 DEGREES i5 A9IlVUT&S SO S'E(.'ONAa E A DISTANCE OF' 319.70 FEOT!'; 4) S 79 DDS :i6 MiA1UTFS Z8 SECONDS E A D7S'INCE OF 434.4Q BST; 5) S 69 DFGREES'S hIINUTF-~5 21 SECpAIDS E A DISTANCE OF 303.20 FEET; 6) S 74 DEGRES.S :;1 I~IINUTffi 3S SECONDS E A D15TANCE OF 204.70 SE6T; 7) S 83 DEGREES 36 MINUTES 29 SECONDS E A DISTANCE OF 8?~6.30 FEET; 8) S 71 DF~E5 :3 MINUTES 45 SECONDS E A DLSTANCE OF 19b.10 b'1~'F%'I"PO TAE TRUE POINT OF BEC'1NNAVG, COUNT4' ~' TAGLE, STATE OF COLORADO. EXCF.TT' THAT PO!EZ.TION OF LAND DESCRII9ED IN R'ARRANTY DEED, RECEP'iTON 11~i010, '300K 218, PAGE 419, FRF:i] 4F RECORD IIV TF~ OFFICE OF CLERK AND ABiCOADFR OF EAGLE COUNTY, COI.QRt-DO: NOTL's TAE FINAL PC7LICY DOES I'dOT IN ANY WAY GUAI6tA.N7'i~ OR IN&U1zE'IHE DA1~156ONS ~3N TIIE ABO'yE rU~SGRI$ED LAND, Tl~ 'LEGAL DFSCRTPZ:ON IS DEAI~BA b'RI1M THl~ Ci3A Q'P'~ TITLE AND ONLY AN ACCURATFi SURVEY CAN DETERZVlAVE TH$ D1M~ISIONS. D05 ti• t i L' 07i12i2002 15:21 COUGHL I ~I -= 303_6707162.. Nu • t~eb WvJb' ~v.,•+co 1 ~ a~ x 1 ~ • ~ ~ ~ uNl biY 1M~ ~ ~ L ~ ~; _ ~ ~-~ •~ / •/ Li. JY11 tvVG iV . Jy..ai JyYI 17ii/ 1 • f '.{~{~- O 171 J,V -. ALTA COMMITik~[ENT ' :edule B • Segtian I (Requirements) Our fhder No. V C27?A36 The tnllo~ving are the rec~uiret11e7tts to be complied with: Iteru (a) Payment m or far tt~ eccourn u'[ the Mors or 1'nArtgagolra o4 the ittU cottsideratian for the e~6tte ar interest to be hind. ?fin (h) ?:a~r!:sx;m~:sxN) c:~a:ttrg t.~ estate ar ts~t~:se m ~ it>gu:ed must ~ exec+~tea ~ ciui~ filed Iar record, to-~vit: IteTn (c) Paytaera of ~dl taRes, ctrm'ges or a~essments leQied azrd weed agedngt fire sut~ject premC~s wt Bch are due Ord pepable. Its (d) Additiorsai tr:gait~ments, tf 82V' ti9selosetl betaw: T>;IIS cON~IT L5 F(?R WI~ORMATiOTi t7NLY, AND Mo POIdCY WILL BE l5&U13U PC1Ti&UANT K~RET t]. 07/122002 15:21 COUGHL i', ~ 3036707'162 N0.806 D07 :3o~azs„d: q,• ' r Turn ~asnu. ~ ~ ~ ~ r. .. ... _ ._. ..i i• i cu .~Wn tvuc av. ~i..+~, wri ~wNr - f ayC ~ V 1 1VT .; • .. ,•, ALTA COIVIMITM$NT .-:-_. .. Schedule B • •Se+ctlon Z (fiareept9otw) Our order Na. VC27243b T'he poiisy or policies to Ibe Issued rv111 aon[atn euc~pttons W tiye fallowing unless the same aro disposed of to the satisfactiop of tiie Company: 1. Rigtats or claitr~ of xarttes to posseselan not shovm by the pubYls records. Z. ~setacr>ts, or clai~• of eavetAe31L9, nut shovrn by rite public rocnrds, 3. IRscrepmicYes, cordlicfe in l~otmdary line9, siwrtage to anen, encroachments, and ally facts which a cot~:t tttttvey ttetd hxspecUon o[ the ptermses would dtsclase aM which ~v+e not Shawn by the ptti~ic eECOt~ds. 4. A1~ tYet~ of t~I;ht ro ,~ lien, Yor service, labor or tnamttel thetetaPone or hereed'ter flnrtshEd, Yrnposed a}r lttw tad itiatslwwn b ~it+e pul~fic records. S. Defect, liens, ern:olntuances, adverse clNras or other matters, it' auk, treated, first appealing 1n tir pttblis recot~de or atsachtng suhse~t to the eft~ctiPe date Iremof but priar to lice dace the proposed itxared acgnlres of re Ord for vaY~ the estate or irm~r+est or mortgage thereon covered b9 this Conntgitmeat. 6. '!`sites or special assessmenp w?dch aro -not shown as exietMg ]ier-s by the pudic rrcords.o the Tbeaslaer's office. 7. X.iens [or unp~ld wsaer.aad setiver cheeges, i[ ate.. ~. In addition, the oeveter's policy will be gutlject faa the mnt+ig~e, ii st{q, rio~d In Section 1 of Schedule $ h:tse~ 9. RIGb1'Y' t?8 YRIaPIi18TOR O)B' p 'Y~IIV ORT.oDB TO EKTRACT,tND Rb,'MdV$ I1JS URE T1~F'ItEFROtY! S1i0ULD THE 3AMF BE FOUND TD PENSl".~tATE 1;R IrViTRS$L'I' THB F$F..I~. ~i AS RESERVED 7N UNPI'F~ STATES PA71'sT]T RECORD$D A~tAY 2A, 1904, IN BtXJK48 AT PA6~ 543. 1.0. ItTG~T t?F WAY lrOil D1T~S UR CANATS CD'4VSTRUCT'ED 8Y Tlil~ AUTI~R7T'Y OF THR UNPIEA STATES AS RF.4Tti.IiVFD 7.N UNfI'FD STA'k'TS i?A'I'~lYT RECt]ADED tbZAY 24, 794A, ~N )gO('tT,. dE AT PAGE 5'03. 11. WATERAND V{irATERRIGATS, DTY'C):I AND DCi'CH Iut~s. 1Z. R1GHT OF' WA Y 40 FEET IN WIDTH AS ApSCR1BSi? IN CONDEMNATION FOR RIGHT OF 4VAY AFi'A.RDED T'O THB UNITED STATES OF AMERICA IN INSTItDM]iN'T REOORDI~ AUGUST l.Z, 1935 IN SOUK llti A:f PAGk 349. 13. ]?IGHT OF '4~YAY AS (TRAIVTLD TO TFIE 6TATE OF+' COLdYtADQ IN lNSTRUMSNT RI3+CC1liD8D ~1NF $, 7.940 RY BOOK 1Z7 AT PAGE 4bti. 14. RIGHT OF WAY AS GRANTED 'I~Q THE FL,RMTNG LUtkiHER ANR f-+fERCANTILB COMPANY IN 07i12i2002 15:21 COUGHLIN ~ 3036707162 ~. ~•• ~~~~. ~ •~~~• ! 1 1 f.V rr11 i.VV6 iV •Jl•JL NM MVI NU.806 Wb8 n u...ae,a ~ i ec ac y:' 1 t r,{>yC~ It Vt .W r ALTA. COIVIMITI~RNT.,,__,,..•_ ScFv~dule B .Section Z (Kxceptiuaa) Our Order Na. V ~'~?,A36 T?se policy or policies to lie issued rc911 contain exceptions to the Poliowing unless tine same are disposed of to the sati!afnction of the Company INSTRUMENT RECORDED JANUARY l3, 1943 IN BOOK I27 AT PAGE b53. 1S. RIGHT OB WA Y ~ ISEA2EI~TT A;? G?~RNTED TO C.".5 :tA ti^'u'.I :T.,~S, IiVC, IA' ?wTS i r~L'i+r"~ i REC.'ORDID FEBRLiARY I7, 1966 IN. BOOK 192 AT PAt~ 149 AND I1V BOOK 192 AT PAGE 16i ANA RFi7CORpI~ MARrCF! 4, 1966 IN HOOK 193 AT PAGE 203 AND AT PAGE ZQ7. 16. EASEMENT AS GILINTEA TO YAR.'Pl'ATr~RANb SANITATION DISTRICT liV INSTSUM~'7' RECORDl~ APRYi. 7, 19b6 IN BOOK I92 AT PAGB 365. 17. TEAN6, Ct7NA1TlO;VS AND PRO'V'IST<3NS OF NONEXCI.USi'VE UNDfiRGKOUATD RIG~IT OB WA Y EA8FI~NT A8 C~-NTTI3 TO NQLY CROS5 FI:ECTRIC ASSOCWTION, IIVC. RECORDED JIAVg ltif, 1994 iN AOPK b<lZ AT PACrE 344. 18. 8XFa7'ING LEASES ~-ND TFd~TANCiES. 07/lc/2002 15:21 _~ COUGHLIN ~ 3036707162 N0.806 D09 _,._. ••i i : .... .~..n r..VL w..r.L.d+. ro7 wvl +~°-03fi257 1B5 7i 10:' 11 r~ujie v vl iu T.AA1b TITLE~GL'r~I?~-.N~'88 COMPANY 'DISCLOSURE STATEI'rt6NTS Note: Ptustmnt Gs I:RS iu.li-122, nogce Is hereby given thata A) Tftc subject teat ptupelly tttay be located ftr a specla) ta:dng distticL B} A Certif)cate oi' Taxes Dtre listlrg each t~acia:g joalsdict9an rtt~ be ohtalrted [tqm the County Treastavr'a authot~ed agFer>t C) Tile irifotmatjou regat+ditrg ~peCfal disfrlcte and qte boumdarfea o[ such disWets trsay be obtafrted ftvr:.~ the Baatd of Glunty Comrnisaloners, the Ca:adSy Clerk and Retarder, or the Coun>;y Assessor. No6e: 8tfectlve September 1, 1937, CAS 3t1-10-406 tegtnire$ that aU do~amrenh t~elved for teaordlrtg or filing in ~ cietBC arxi ='ecl~'sie:'s o[~ce s,`sil . c+tttain a 4op n~trgtn of at least one Jnc3t std a IeTt, right aced batL Ku ~n at a! feast mre tali of an inch. The cleric artd recorder trray refuse to tea-tst or file ate' document that doer cwt contorny except ttsat, the regldr+erigrrrt !br ttm top shalt sot apply to docwnent using torctrs on wtach space i9 pvvlded far t+ecots[fng ar t911ng itnfamuldon at the top trrargl7t oC tqe docutrtetrt. Nate: CoIarado pfvS~slon oC Innocence R~egudatlarrs ~S-1, C o[Argde VIl reqult~s that'~Jverr tltle r>sti~ shall be naspons~lbie for all matters which appear of rewrd prior to the titae of tecors$rrg whrne~rer the title er:tity conduct the closing and t4 rPSponmlhle for recording orYilhtg of legal tlloctaTrerit8 resulting from the tramactian wtrtieh wag closed' : Fmvided prat Laml Tide Guarantee Cow candu>rts fJie claeiag of qte in9teed a-er-sactlon arM Ls tPSporv~ilrle for rrcordlrtg the legal docrntreatts Pf,ou~ the trmttsacdon, ezceptlott ntttaber 5 wAl not appear am ttte Ol~Ynac"s 1Yge Policy xrd the I.endE~ Policy caber, facetted. .None: A~4tsnstl~r~e rraxhaaric's lien jxvbection for the Owtyer may be +rvnileble (typically txy deietiort o[ F.xoepttun na 4 a1.' Schedule H, Section 2 at the Cotrrrnttmrrd trnm the Qwner's PaNcy to be i-~-'d1 upon compifaigce with the iallovging aottdltlot>g: A) The Oand described i» Schedule A of this cotnrrdtrQtent must be a single ierptly residence wtdch ittdttdes a rondonrirdma ar towtrhottse twit. $} No labor ar ma0er[als haul been tlardshed by rnechanfcs ar meMNa1•men farpurposes of cotutnusion on the land desctfiaed In Scitedsrie A of this Catmnltmerrt wifJdn Cite past 6 tttottdw. G) The Cntrspazag mist receive art apfrropriglae at#davit ltu#etrmif~ing life CotttpatQ+ agatrtst tnE$led mecBanfc`s and tttt~riai•men's 1ie'r>s. O) Tire Can~ttq ma.~t reeefve paytttettt o1. ttte ®pprvprfatr pretnlran. Fo} Ii there has been c~at~atxucdon, hnptv,remettt9 or rts~or.repaita undertaken oft the )xoperty pP be prrrcferecd 'vritldrt stx rooWh4 lrtior to the DaOe aC the Comrttitroerrt, the rvqu~itw»enb to obinln coverage inr imtteeotdeti liens +wl1t fiacludeC disCiosarre oC cattalo cotrsttucuorr ittfarroe!lorr flrt~clal triWrntaffnd ss Ya tba seller, the bedlder and or tfie eotrtractot; payment oT the apprapidate pterrdua?at>y executed Icy A~etnent satlsFectory to the eoa~ea~, atrt, ally addltiorml regttft~ as mtLy be necessary at6er an e7ratnit~tiott at the aioresafd irrfnrrnatlon b3' fife Carapeody. , Ne coverage will be given under arp~ circwusCEufces for labor or medal [or whlth the 9nsured has cuttpnrcted fot or agreed fa pay. Noter Ptidsuant to CRit 111-11-I.33, notice fs heretry given: A} That there fs recorched evidence that a mineral estate hag bees severed, leased, or othet~vise conveyed Gom the s~utaee estate slid that there is s substantial likelihood that a tMt+d pae4y holds same ar ail ill in oil, gas, other minerals, or gcathermal energy in the property; acrd B) That such mfriehal estate tttay irttlude ttte Nght to enter atu! use the ptapetty without the surface owlter"s pe.rtpdssiaR This notice apFltleg to c~~rner's polfq+ commitments eotaee~in3ng a nrineral sevetnrwe lrrstzuttlertt exception, 8r exceptiois, In Schedule B, Sectlan 2 Nolhigg herein ear>sained will be deemed to obllgute the comp~ar-y bo provide arty oC fire coverages re[czreit to herein unle;~ the above candlgotn are fully satisfied. 07/12/2002 15:21 COUGHLIh!-~ 3036707162 N0.806 D10 • JVJOLJ 1 1 iy~ g 1 1 1 1 V .~~ ~ ~~ ~ : * ~ 'l JOIlYT NOTICR OF PRIVACY POLICY Fidelity National Ii'ihsz^t?tl Grasp at CormpanfeslChicago Title Insurance Company and Y~and Tide G~,,,x htee Company July ~, zool We !'ecag[dve and m, s!t the privacy expectatiott9 of todgp's con9uruers and the rernetrt9 0[ ap~icAi ie 1'edetal anti slate peivaep laws, Pfe believe that meld you aware of how we u9e your ltonpuhTlc persona) irtYormat;c~n ("P9eesane! Iniaret>atiotr'~, arrd u~ whom it is dfaclase~ w111 form the basis tar s rrlationship of trust between us acrd the public that we serve This Ftlvary Stateretent pr+ovidea that explarra0lon. We reserve the right to ettsnge tins Frivr~ Statetr~emt cram tame to time cattsl90ent with appiirable prlvary taws. In the course oY our business, we may collect Personal Infarmatfott about you Irom the following soli trceat a From aJagolfcatim~s or ot#>erfotr~ w8 t+eceige Iti'~i:a cst vr;,cr.: as:."scrizcti ropteset~tve; '~ '~`rtnm yon tesuls3ctions with, ar r~trm the aetylces iteitrg periotmed bx, us, a~ aifGitisOw, or oChets; " From otu• lnterrnd web silts; ~' FraAa the public razcard9 mairdedned by goverrgtbetttal enpll+;s that we either obtain dfreetty trom those etulti~v, ar from our aliitiatea or others; and " Frain co~mpx ~~r other t'ejlordng agetu`aies. Our Policies Regardit-g the Protes:tfan aY the Cottfitientfafitgend Security of'Yow PCtsopa] Iutnrtnailon We rrea#atal~dcal, clectror~c and pracedutBl safegi~rds to protectyour Peraoaai IttCottttatlass $nra uner~arized access or f on. vt~e 11rr11E Guess to the Peraotml Infomoatlon anty to those oyee& who need rich ecerss itr cotmectlon with prnvf ding products ar services to you or Par other legitimate bps purposes. Our )?olicies and Practices Regarding the Sharing of Your Petsohal Irttarmatlon We may share yaw Arsons! it~rtrmdon with our aig9liates, such as lttsurance corr~~aNes, operas, and otta:t teat estate settlerner-t servS::e providers. 1dYe also rrmy dleclase yau¢~ Fe~arrtil Infnrtr~at(otu ° to ~, t~raketf~ or rept~eentagvta Gd provide yau with services you have cerprested; ~ to pariy untractaea or sQrvice prvvidens wha provide .services or pertarm ttrar4seWg or other' Ycmdians on our I~ehalt; and ° 'to others wi;M ~?erro roe erger hue joint marfoedrrf; egreerr~rrts for products or serw9ces drat roe believe yap rrtsly fSltd oP intent In aslclltion, we will ditretose yot>r Retaohal IrrfotuiAt+on wden yop direct or pave >~ petmtss~ion, when roe ar: required by iaw Oo dv sv, ar when eve suvQect it~elent or crfmi~l acti'vitles. We e>sa lr~+ dladase yt-trr F~o7p-1 Irfannatlon when otttervrlse pemritted bP appllcahte }u'ivaa~~yy iaws swch ~, for exattrgfle, when 4lsebs~ i$ :ieeebed w e~orcr our tights ~tlstng aut al arty agtrfrp2nt, dransocdan ar r+etMionsMp with yott Otre of the 9mpasiant n:spons[biiltfes aP eottye ai our ~tiared oompar,fcs fs to record docuanerrts br the public dDtttala Such ducutger.is nr~ conlaln your Persona[ It~otrrratlan. Right to Access Your Persane) Itiiatmatiod and Ability to Con^ecct >trrors Or Request Changrs Oe pelet3orr Cet'taih states afford you IFrc right tv access your Plersaaat firrtormaaon acrd, tttder ceriain cit'cutr~taROes, ba :~trd alit D~ whom yo>ar P'etsonal Irdoratafion has been d13rlosed. Alro c~rtafn state fiord on Qre tig~rt Go i~egaest corrnctla~ a~oendroerri or deletion of your Petssreai Ittfornast~on. We r~esetve; the r~ht, where permdtted lyy I Aw, to drarge a reoaorrable toe to caner the en915 ]recrttied iirt ta~,spoirding pu such mcptesta. Ai] request4 suDrtdtBed to the F9deifty Alational )!9ltrearncfal Gr+oop of Carnpr~s/Chieago'Ilfle Itt~ruance Cotrq~y steal! be in wtittirtg, atu! deUvered ca ibe following addt+esat Peivary Compliance OfOcer ~d~elit~yy 1VstioZ?s! F1tia1tdal, It>oc. 4050 Cslle Real, Stine Z?A Sim Barber CA 93110 Multiple Products ar Servire~ It vye px'ovide yon with bore than one t9rtanc9sl pt~duct ar 9ervlce, pau Wray receive tr,ote Cheat arse privacy n otice from m. We apalagize f'or arq• 4lticorwerdence the Wray cause yon, 6'osta ~uv.t?oa..t~tx Fred G. Steingraber Revocable Trust Greenwich Realty Holdings LLC Sequel Capital Corp. 61 ~ Warwick Road 1082 Riva Glen 737 N. Michigan Avenue #2150 Kenilworth, IL 60043 Vail, CO 81657 Chicago, IL 60611 21010530100] & 210105301002 Ronald & Kristine Erickson 5123 Lake Ridge Road Minneapolis, MN 55436 210105301005 210105301003 Lee & Charlene Raymond 4642 Meadowood Road Dallas, TX 75220 210105301006 210105301004 Oscar Tang 600 - 5`h Avenue New York, NY 10020 210105301007 Franco D'Agostino 848 Brickell Avenue #810 Miami, FL 33131 210105301008 J. Richard & Gay Steadman c/o Flynn Steadman 6161 S. Boston Cir Englewood, CO 80111 21010530101] William & Julie Esrey 2624 Verona Road Mission Hills, KS 66208 210105301014 Evergreen Lodge at Vail Ltd 250 S. Frontage Road Vail, CO 81657 210106401020 Vail International 300 E Lionshead Circle Vail, CO 81657 210106402057 Rajendra & Neera Singh 3801 Belle Rive Terrace Alexandria, VA 22309 210105301009 Rose F. Gillett Revocable Trust 1315 Spraddle Creek Road Vail, CO 81.657 210105301012 Spraddle Creek Estates Maintenance 1221 Brickell Avenue Miami, FL 33131 210105301015, 16, 17, 18 Town of Vail 75 S. Frontage Road Vail, CO 81657 Colorado Dept. of Transportation Office of Public Information 4201 E Arkansas Avenue Denver, CO 80222 Bjorn Borgen Founders Financial Center 2930 E Third Avenue Denver, CO 80206 :?10105301010 SC Mountain Top LLC 485 Madison Avenue 24`h Floor New York, NY 10022 210105301013 Solar Vail Sonnenalp Properties Inc. 20 Vail Road Vail, CO 81657 USA, Sec. of Ag., US Forest Service C/o White River National Forest . Post Office Box 948 Glenwood Springs, CO 81602 Mr. Jim Yates 914 Spraddle Creek Road Vail, CO 81657 Attachment: E THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12-3-6 of the Municipal Code of the Town of Vail on September 23, 2002, at 2:00 P.M. in the Town of Vail Municipal Building. In consideration of: A request for a worksession to discuss a proposed major exterior alteration; a conditional use permit to allow for a fractional fee club in the Public Accommodation zone district; a variance from Section 12-7A-2 (Permitted Uses), Vail Town Code, to allow for retail uses in excess of 10% of the total gross residential floor area of the structure; and a variance. from Section. 12-7A- 10 (Landscaping & Site Development), Vail Town Code, to allow for a deviation from the total landscape area requirement, located at 20 Vail Road, 62 E. Meadow Drive, and 82 E. Meadow Drive/Lots K & L, Block 5E, Vail Village 1St Filing. Applicant: Sonnenalp Properties, Inc., represented by Braun Associates, Inc. Planner: George Ruther/Warren Campbell A request for a recommendation to the Vail Town Council of a proposed major amendment to Special Development District No. 4, Cascade Village, Development Area B, to amend the setback requirements as indicated on the approved development plan, located at Coldstream Condominiums, Unit # 25, 1476 Westhaven Drive /Lot 53, Glen Lyon Subdivision. Applicant: James and Jane Kaufman, represented by Fritzlen Pierce Architects Planner: Allison Ochs A request for a final review of a final plat of Lots 11 and 12, Block 2, Vail Village 12th Filing, and Tract C, Block 1, Vail Village ,12th Filing, located at 3160 N. Frontage Road East and 3010 N. Frontage Road East and setting forth details in regards thereto. Applicant: Vail Mountain School, represented by Braun Associates, Inc. Planner: Russ Forrest A request for a recommendation to the Vail Town Council, to allow for text amendments to Title 11, Sign Regulations, Vail Town Code, and setting forth details in regards thereto. Applicant: Town of Vail Planner: Russell Forrest A request for a final review of a final plat for a major subdivision; a request for a final review of a conditional use permit to allow for a private educational institution and development plan approval to construct employee housing; and setting forth details in regards thereto, located at the site known as "Mountain Bell"/an unplatted piece of property, located at 160 N. Frontage Rd./to be platted as Middle Creek Subdivision. A full metes and bounds description is available at the Community Development Department. Applicant: Vail Local Housing Authority, represented by Odell Architects Planner: Allison Ochs The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office, located at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend project orie and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call 479-2138 for information. ~,~, _(;~ 1 ~~ Middle Creek Affordable Housing Development ci innnnnov. The Middle Creek Affordable Housing Development seeks to establish affordable employee housing for the residents of Vail. It will provide 142 units of affordable housing, a community center, and an early learning center on a 6.673 acre site. The site is located adjacent to the Mountain Bell building, between the Vail Village roundabout and the Lionshead pedestrian bridge. The proximity to the center of town presents the possibility of atransit-oriented development, reducing the use of the automobile in favor of pedestrian and bus traffic. The development does provide 248 parking spaces meeting the Town of Vail standards. The Middle Creek developi~nent contains 3 residential buildings (A, B, and C), and the early learning center. Building A is situated on the bus pull-out and houses community center functions as well as living units. Building B and C are clustered to preserve open space. The buildings step up the slope from south to north responding to existing grades; inspired by European hill town massing. All building heights respect the existing Mountain Bell tower, reinforcing its image. Building C includes covered, structured parking for 211 automobiles, significantly reducing the need for surface asphalt on the site. The density is 21.3 dwelling units/acre, and over 60% of the site is open space (both natural and landscaped). non~onnn. The 142 units of affordable housing are divided into four separate unit types: studio, 1, 2 and 3 bedroom units. The majority of the units are three bedroom or studio units. Some unit types incorporate variations, providing a wide range of unit choices to accommodate many types of living situations. Building A contains the cormunity center on the ground level with studio units above. The community center will contain a leasing office, laundry facilities, Attach~er~t: F resident's lounge, mailboxes, etc. There will be a Town of Vail bus stop directly in front of this building. The composition of building A with the bus stop will establish this as the entry into the Middle Creek development. The new early learning center will replace the existing ABC/Learning Tree Child Care Center on the site. It will serve up to 60 children and 12-15 staff with a gross area of approximately 4,800 square feet. The early learning center contains five classrooms, a studio, a kitchen and an outdoor play area. SITE: The Mountain Bell site is arranged around four axes, which create distinct view corridors and organize the site as a whole. Two of these axes direct the eye to the existing Mountain Bell tower, reinforcing this significant piece of the Town of Vail's architectural heritage. The west portion of the site preserves the existing mature vegetation and makes use of a portion of the existing roadway to the Mountain Bell tower. The existing natural landscape will be an effective screen from the west and help nestle the new construction into the site. The buildings are clustered around the base of the Mountain Bell Tower thereby minimizing surface asphalt and creating efficient pedestrian circulation. There is significant open space and separation between the clustered residential buildings and the early learning center to the east. This open space corridor provides a strong connection to the existing natural areas to the north. The site organization of the development maximizes open space by clustering buildings, effectively reducing the visual density of the project. The bus stop is placed just inside the main entrance of the development, allowing easy and safe transit access and minimizing curb cuts. The early learning center, near the eastern edge of the development, has both privacy and a direct connection to the surrounding open space. The buildings step down to the south and east reflecting the slope of adjacent grade. Pedestrian circulation is well defined by walks and patterned paving connecting residential buildings to a continuous bike path along the south edge of the parcel. PHASING PLANS: There are no anticipated phasing plans in place at this time. However, in an effort to begin site work in the fall of 2002, the developer may seek a site work permit after all appropriate approvals have been received. REVIEW CRITERIA FOR A DEVELOPMENT PLAN IN THE H ZONE DISTRICT: A. Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties and the surrounding neighborhood. This development respects and incorporates the existing architecture of the town of Vail. The character and scale of the buildings reflects the existing "European mountain village" feel of the town. The Mountain Bell building, a significant Vail architectural landmark, maintains its status as a centerpiece of the development. The orientation of the buildings provides solar access and creates south-facing open spaces. The clustering of buildings minimizes the visual density of the development. B. Buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the site, the surrounding neighborhood and uses, and the community as a whole. This development provides needed housing for the working population of Vail. Within the development, units are provided for individual workers as well as working families. The Mountain Bell Site will be atransit-oriented development, reducing automobile usage in favor of bus and pedestrian traffic. The density of the buildings allows more room for open spaces and natural areas. The development plan successfully introduces a large amount of housing while remaining sensitive to the prominent nature of this site. C. Open space and landscaping are both functional and aesthetic, are designed to preserve and enhance the natural features of the site, maximize opportunities for access and use by the public, provide adequate buffering between the proposed uses and surrounding properties, and when possible, are integrated with existing open space and recreation areas. The clustering of the buildings on the site reduces the visual impact. The spaces around the buildings themselves are pedestrian plazas where residents can interact. Between the residential and early learning areas of the development, a landscaped area provides a separation and a natural area of open space. A bicycle and pedestrian path will connect the development to the pedestrian bridge to the west. A structured outdoor recreation area has been integrated into the site using berming and landscaped features. Natural trails provide connections within the site and to the surrounding open space. D. A pedestrian and vehicular circulation system designed to provide safe, efficient and aesthetically pleasing circulation to the site and throughout the development. A central spine of vehicular circulation allows efficient access and takes advantage of the elongated east-west axis of the site, creating a maximum 5% grade. There is parking under or near each building. The entire site is served by a Town of Vail bus stop and abicycle/pedestrian path which will ultimately connect to the pedestrian bridge, reducing the need for cars overall. Pedestrian circulation within the site takes place along a corridor which follows the central spine yet remains separate from vehicular traffic. E. Environmental impacts resulting from the proposal have been identified in the projects environmental impact report, if not waived, and all necessary mitigating measures are implemented as a part of the proposed development plan. Yes, these impacts have been- identified in the environmental impact report, and will be implemented as a part of the proposed development plan. A preliminary mitigation plan has been submitted to the PEC, and a mitigation specialist has been retained to finalize the construction plans. °' 09/20/2002 09:38 3036707162 ODELL ARCHITECT F'A(~t by/b5 Ear y Learning Center at Middle Creek Affordable Housing The =arly Learning Center n:places the ABC-Learning Tree Child Care center currc::ntly on the Mountain Bell site. The new building will house 5 classrooms, a studio area, kitchen, adminis~:rative and outdoor play areas. it will accommodate 12-15 staff members and serve up to 60 children from the ages of 2 to 5-1l2 in a caring and educational envircanment. The nature of the proposed use is further described in the summary pi ~~gram provided. RELATIONSHIP TO DEVEL.~~PMENT OBJECTIVES: The Early Learning Center replaces an already existing childcare center on the Mountain Bell site. There should be no additional impact on the Town of Vail Dev~:lopment Objectives. EFFECT ON PUBLIC FACILITIES AND AREAS: As tl~e proposed Early Learning Center replaces a use which already exists on the IVlountain Bell Site, it sh~~vld have no additional measurable effects on public facif ities areas. EFFECT UPON TRAFFIC: This: information is listed in tl~e provided traffic study. COIJIPATIBILITY ISSUES: Cor'siderable measures will be taken to separate the busy activities of the houising development from the quieter activities of the early learning center. The Early Learning Center is on the East end of the site, separated from all of the 09/20/2002 09:38 3036707162 ODELL ARCHITECT PAGE 03/05 livinc units. There is a separ'~~te entrance from North Frontage Road providing access to 22 parking spaces dedicated to the Early Learning Center facility. A turn:;~round provides easy drop off for patrons and provides the required marn:uvering space for emergency vehicles. Because of its position on the east~:rn end of the site, the ELC has access to the open space surrounding the Mou stain Be11 site as well. Ire addition, the adjacency of the housing and chilclcare uses provides resi~fients of the development with the opportunity to fulfill their child-care needs on-sits:, enhancing the nature of this transit-oriented development. CHI-.RACT_ER: The character of the Early Lr:arning Center should benefit the surrounding area. The siting of the new ELC nkjar Frontage Road will allow it to take on a new visit:ility, separate from the 1ti9iddle Creek development itself and the Mountain Bell building. It will become a beacon in the community as a center of learning and a place for young childra3n. 09/20/2002 09:38 3036707162 ODELL ARCHITECT PAGE 04/05 Summary Earl earning Center Pro m Summa The Early Learning CE:nter is an all-day school program. The ages of the chilcren range from 2 to 5-1!.? years. The ELC building has an approximate gross floor area of 4,800 square feet on two floors. The area on the first floor, approximately 3,990 square Feet, is dedicated to classrooms and children's are~is. Administrative functic-ns occupy approximately 830 square feet on the secc:~nd floor. An outdoor area with a gross area of approximately 4,100 square feet resides to the east and west of the early learning center. This area will con•lain toddler and preschoctil play areas. Numbers: Up 90 15 toddlers (2 to 3 ye~~rs) 45 l:~reschool age children (~~ to 5-112 years) 12 staff full-time members irnd 2 part-time staff members Parking:. There are 17 parking space::3. Rrovided, which has been accepted by the ABC- Lez:rning Tree staff. Main Elements: Tw+:~ toddler classrooms serving up to 8 children each (45 sf per child ~ min. 360 sf) Three preschool classroom~c serving 15 children each (45 sf per child ~ min. 675 sf ) A s•:udia for large projects 09/20/2002 09:38 3036707162 ODELL ARCHITECT PAGE 05/05 •, c Kitcl•~en for snack preparation (including refrigerator, stove, microwave and sink) Administrative area for staff Toddler playground (75 sf pet child =min. 1200 sf if all children are out at the same time) Preschool playground (75 sf per child =min. 3375 sf if all children are out at the sam•~ time) ~.. Environmental Impact Report for the proposed N~iddle Creek Village Vail, Colorado Prepared by: Stewart Environments! Consultants, Inc. Consulting Engineers and Scientists Fort Collins, Colorado August 2001 Attachment: G ~..~. ;, ~. TABLE OF CONTENTS I;. INTRODUCTION ......................................................................... II. PURPOSE .................................................................................. III. PROJECT BACKGROUND AND DESCRIPTION ..................... Site Concept ....................................................:.......................... Building Concept ........................................................................ IV. SITE DESCRIPTION AND ENVIRONMENTAL INVENTORY.. Location ...................................................................................... Zoning ......................................................................................... Site Usage .................................................................................. Hydrologic Conditions ................................................................ Geologic Conditions ................................................................... Biotic Conditions ......................................................................... V. ENVIRONMENTAL CONCERNS iaND RECOMMENDATIONS VI. OTHER ENVIRONMENTAL CONDITIONS .............................. A. Land Acquisitions and Displacements ................................... B. Land Use and Zoning ............................................................. C. Visual Conditions ................................................................... D. Air Quality .............................................................................. E. Noise .......................................................:.............................. F. Light Pollution ......................................................................... G. Flooding ................................................................................. H. Navigable Waterways and Coastal Zones ............................. I. Traffic and Parking .................................................................. J. Energy Requirements and Potential for Conservation ........... K Construction Page ........... 1 ........... 1 2 ..... 2 ........... 2 .......... 3 ........... 3 .......... 3 .......... 3 ........... 3 4 5 7 L. Aesthetics .....................................................................................................:......................................... 10 M. Community Disruption ........................................................................................................................... 10 N. Secondary Development ....................................................................................................................... 11 O. AGENCIES AND PERSONS CONSULTED ........................................................................................ 11 VII. SUMMgRY ...............................................................................................................................................11 VIII. ASSESSOR QUALIFICATIONS ............................................. FIGURES 1. Location Map 2. Aerial Photo 3. Site Map 4. Photographs APPENDICES A. Eagle County List ..................................................... 14 ~~ I. INTRODUCTIO Odell Architects, PC retained Stewart Environmental Consultants Inc. to perform an Environmental Impact Assessmel~t of the proposed Middle Creek Village development. The property is located adjacent to the Mountain Bell facility, directly north across Interstate 70 from Vail Village. The proposed project consists of multi-family housing constructed on a 6.5-acre site owned by the Town of Vail. l~he purpose of the project is to provide affordable housing for people currently employed in Vail, who are presently living in or near the community. The project owner is Coughlin and Company, 140 East 19th Ave., Suite 700, Denver, Colorado 80203-1035. The site location is depicted on Figures 1 through 3. Photographs of the site are. provided as Figure 4. II PIIRP(1SF The purpose of performing the Environmental Impact Assessment is to achieve the following objectives: A. Availability of Information: To ensure that complete information on the environmental effects of the proposed ftroject is available to the Town Council, the Planning and Environmental Commission, and the general public. B. Environmental Protection A Criterion: To ensure that long-term protection of the environment is a guiding criterion in project planning, and that land use and development decisions, both public an~~ private, take into account the relative merits of possible alternative actions. C. Review and Evaluation Procedure: To provide procedures for local review and evaluation of the environmental effects of proposed projects prior to granting of permits or other authorizations for ~:ommencement of development. D. Avoid Geologic Hazard ,4reas: To ensure that the buildings are not constructed in geologic hazard areas, by way of illustration, flood plains, avalanche paths, rockfall areas, where such hazar~~ cannot practically be mitigated to the satisfaction of the Planning and Environment;~l Commission and the Town Council. E. Protect Water Quality: l~o ensure that the quality of surface water and ground water within the Town of Vail will be protected from adverse impacts and/or degradation due to construction activities. [Orcl. 37 (1980) 10: Ord. 19 (1976) 14: Ord. 8 (1973) 16.100) 2850-001 Environmental Impact Report Page 1 of 14 Middle Creek Village Vail, Colorado PROJECT BACKGROUND AIND DESCRIPTION Site Concept The initial conceptual design approach for Middle Creek Village housing is meant to reflect a new model of multi family hou:>ing in mountain communities. The site parameters and community context were the prune motivators for the layout of the buildings and parking; however, the solution incorporates some planning principles of a more "urban" nature. The buildings are arranged aroun~~ a pedestrian oriented "street" which creates an axis running east to west across the site. The "street" rises to the center of the project, following the contours of the site. Entries into individual units as well as project amenities will occur along the path, and it is envisioned to include both hardscape and landscape areas. The pedestrian street will be an active place reminiscent of other village centers in the community. Encouraging the use of alternate transportation, our team proposes to work with the Colorado Department of Transportation and the Town of Vail to create a project specific transit stop, as well as develop pedestrian and bi~:ycle access from the site into town. These are accessible to the residences along a central pe~~estrian spine that runs down the hill and through atwo-story opening in the center building, ending at the proposed transit stop.. Given that a large segment of the market for this project will be seasonal employees, our team believes the daily use of the automobile can be minimal. Consequently, the relationship between the car and the building is downplayed in our solution. Separating vehicle parking from tf~e buildings allows the project to create a pedestrian oriented "village" character and allows the buildings to be sited closer together, thus visually reinforcing this image. This is similar to the exterior pedestrian spaces created by the architecture at areas such as Bridge Street in Vail Vill~~ge and Lionshead Village. The siting of the parking areas behind the buildings will also help shield views of the lots from the frontage road and from across the valley. The Early Learning Center has teen sited to the far eastern edge of the site, but is easily accessible from the residences on the loop road. This configuration provides a nicely separated site for the children's facility. The overall site concept adheres closely to the existing contours of the site. The buildings rise and fall across the length of the ~;ite with the terrain, creating an undulating profile that further reinforces the "village" concept. Building Concept Further reinforcing the "village" concept, the buildings are designed as three separate building types. All the buildings will be one unit deep, creating cross flow ventilation and economy of construction. There are no enclose=d walkways or stair towers, as the site allows the majority of units to be accessed at grade. Int~;rnal floor plans will develop stacked plumbing cores, and the mix of units will be designed to minimize structural offsets and maximize construction simplicity. Each of the six residential buildings includes cone-story element on the end which houses laundry and storage facilities for that building. The building orientation creates maximum 2850-001 Environmental Impact Report Page 2 of 14 Middle Creek Village Vail. Colorado southern exposure for every unit. The fact that the buildings are simply one unit deep creates excellent opportunities for flow-through ventilation. Our proposal will incorporate highly efficient mechanical and electrical designs. We believe on a scale of zero to five our development will achieve a five, or the highest efficiency rating available. Since all units are accessed from grade or a small stair, there are no interior corridors to heat or cool, further enhancing overall energy efficiency. Please refer to our preliminary LEED evaluation in Section VI-J for additional information on energy and sustainability. The overall character of the building design is meant to reinforce the "village" concept, with varying building types, massing, and styles creating a cohesive whole. Stylistically, we will incorporate the tradition of Vail Valley architecture while maintaining an economical design. This can be achieved by the judicious use of distinct design elements throughout the project. In a cost sensitive project, forms may be simple, but the sensitive use of massing, scale, and rhythm can create an architecturE~ that is respectful of, and complimentary to, the surrounding architecture of Vail Valley. The ~;xciting architectural design and pedestrian street space will create a of choice for potential employees. IV. SITE DESCRIPTION AND ENVIRONMENTAL INVENTORY Location The subject property is an irregular shaped, approximate 6.5-acre mountainside site; its location is described as a part of the South '/2 of the Southeast '/4 of Section 6, Township 5 South, Range 80 West of the 6'h PM, Tovvn of Vail, Eagle County, Colorado. The property adjoins the existing Mountain Bell property located north of the I-70 North Frontage Road. Zoning A majority of the subject site is Presently zoned "NAPD" (Natural Area Preservation District), and a small portion of the site ~vvhere two early learning centers are located is zoned "G" (General). The proposed project will require rezoning the 6.5-acre site to the designation "H" (Housing). Site Usage The property is owned by the Town of Vail. Onsite development includes two small wooden structures presently housing early childhood learning centers. They are located directly east of the offsite Mountain Bell structure. Site development plans call for demolition of the two early childhood learning facility structurE~s with construction of a new learning center at the southeast portion of the site. The remainder of the site is undeveloped open land except for the existing road and parking area that serves the off-site Mountain Bell facility and the onsite early learning facilities. The proposed use of the property was described in Section I, above. Hvdroloqic Conditions No surface bodies of water are located on the proposed project site. Onsite surface drainage is mainly via sheet flow and is generally southerly, although the western portion of the site likely drains to Middle Creek, located oft site just to the west of the entry road. A man-made drainage 2850-001 Environmental Impact Report Page 3 of 14 Middle Creek Village Vail, Colorado channel adjoins the eastern side ~~f the Mountain Bell structure. Soil and drainage issues are described in reports provided under separate cover by Koechlein Engineering and Peak Land Consultants, Inc. Geologic Conditions A geologic report by RJ Irish, Consulting Engineering Geologist, Inc. is provided under separate cover. Biotic Conditions Ecologically, the property is located in the Montane Zone at elevations of approximately 8,220 to 8,300 feet above mean sea level ~~n a southerly aspect. Regarding plant communities, the site is described as complex as it contains elements of several communities. These include Montane Grasslands and Mixed Mountain Shrubland located on the eastern portion of the mountainside with Aspen stands occurring at the southeastern portion of the site. These communities include representati~ies of most of the life forms of the plant kingdom including ferns, grasses, forbes, shrubs, anti trees. Native and non-native vegetation is present including invasive species of noxious weeds. The western area of the property is mainly Montane Riparian Forest dominated by Narrow-leaf Cottonwoods (Populus angustafolia) and a scattering of Thin-leaf Alder (Alnus incana) rind Aspen (Populus tremuloides). Presence of Aspen as well as species of invasive weedy forbes indicate the likelihood of past disturbance such as fire. Climax community species such pis Colorado Blue Spruce (Picea pungens) are located off site higher up the Middle Creek drain~~ge, but Blue Spruce and other climax community trees were not observed on site. Wildlife uses the site; large mammals including deer and elk browse on the Serviceberry and Current located in the Mixed Mountain Shrubland Community. Other mammals including Black Bear, Coyote, Fox, Rabbits, Chipmunks, Golden-mantle Ground Squirrels, Pocket Gophers, and other rodent species likely feed ~3nd/or inhabit the site. Reptiles, such as species of Garter Snakes also likely inhabit the site. No major wildlife migratory routes appear to be located, on site. Although Middle Creek is located off site directly west of the property's western boundary, the creek is not likely used as a rriigratory corridor. Interstate70 and development adjoining the south side of I-70 preclude use of the corridor for migratory use. Middle Creek is contained within a culvert from the north side of I-70 to its confluence with Gore Creek south of I-70. No known threatened or endangE:red species of plants or animals have been identified at the site. However, no onsite survey,; for such species are known to have been performed. .The Colorado Natural Heritage Program's Conservation Status Handbook (1999) lists the status of various animals, plants, and plant communities found in Eagle County. A copy of the Eagle County list is provided in Appendix: A. We recommend having the Colorado Natural Heritage Program perform a GIS "Environmental Review" of the subject site anti adjacent area. The review searches known ecological information regarding the status ~~f plants, plant communities, and animals within a specified radius of the subject property. ThE~ review will report the status of these communities. Middle Creek, a relatively pristine stream that likely contains Native Cutthroat Trout, traverses the adjacent property to the west of the subject site. The creek flows out of a saddle located to 2850-001 Environmental Impact Report Page 4 of 14 Middle Creek Village Vail, Colorado the north upslope from the site. It flows southerly down slope, jogs west around the Mountain Bell building, and then flows southerly for approximately 150 feet paralleling the west side of the entry road to Mountain Bell. It enters a culvert beneath I-70 and the associated frontage roads and flows through the culvert south of I-70 to its discharge point into Gore Creek south of the interstate. Gore Creek flows westerly to its confluence with the Eagle River near Minturn. The existing creek channel ma~~ not be the historic creek channel. Stream modification (channelization) appears to have Seen conducted upstream of the culvert adjacent to the entry road. This 150-foot reach is likely the closest location of the stream to the subject property. The stream bank, as well as its associated vegetation, appears disturbed along this reach. Observed vegetation was mainly upland in nature with both native (Western wheat grass- Agropyron sp.) and non-native species of grasses (brome-Bromus enurmus), as well as invasive noxious weeds (See Figure 4 photographs, page 2). Upstream from this reach and off site from the subject property, a riparian corridor of wetland vegetation adjoins the stream channel. Adjoining the east side of the entry road, adjacent to its 150-foot north/south orientation, is a Narrow-leaf Cottonwood (Populu~: angustifolia) community. This species is referenced in the U.S. Department of the Interior, Fish and Wildlife Service publication, National List of Plant Species That Occur In Wetlands: Intermountain (Region 8). Its indicator category is listed as "Facultative", which is described as "Equally likely to occur in wetlands or nonwetlands (estimated probability 34%-66%). The presence of this community may be due to a former location of the stream channel or may be due to high groundwater conditions existing near the stream channel. The Narrow-leaf Cottonwood Community continues to the north (off site) and south (on site) of the entry road after the road turn;; east. Figure 4 Photographs, page 2, depicts the entry road along its east/west orientation witf-~ the Narrow=leaf Cottonwood Community adjoining both sides of the road. The presence of this community is an indicator of the potential existence of wetlands; it~ does not necessarily confirm their presence. Actual wetland existence can only be determined by performing a wetland assessment, which not only considers vegetation type, but also investigates other factors including the presence of hydric soils and wetland hydrology. Montane Environmental Solutions of Vail, Colorado is presently investigating wetland issues at the site. A letter regarding the status of their investigation is provided under separate cover. V. ENVIRJNMENTAL CONCERPJS AND RECOMMENDATIONS The proposed Middle Creek Village will impact plant and- animal communities presently inhabiting the property. Site development including earth moving activities and building/parking lot construction will strip a majority of the existing native and non-native vegetation and displace wildlife from the approximate 6.5-acre site. However, existing vegetation and wildlife are not site specific. Surrounding property to the north, east, and west contain vast square miles of similar plant communities, wildlife habitat, and wildlife species. The loss of these 6.5 acres does not represent a significant impact to the plant and animal communities. Displaced wildlife will find and inhabit nearby similar habitat. 2850-001 Environmental Impact Report Page 5 of 14 Middle Creek Village Vail, Colorado Landscaping including grass, shrubs, and trees will cover a minimum of 30% of the developed site. Middle Creek Village will be sensitively integrated into environmental surroundings. Birds, insects, and possibly small mammals will utilize the landscaped areas, which will mitigate some habitat loss. The presence of Middle Creek Village will have impacts on use of adjacent property by wildlife -- particularly large mammals. Increased human presence and reflected light may influence adjoining habitat use. Adjoining property is private so that residents of the village should not be using adjoining properties. Human/bear interaction is possible. All trash dumpsters will need to be covered and otherwise made bear proof. Lighting designed to reduce reflected light and conform to the Town of Vail building code will be incorporated into the site design. Impact to Middle Creek from, surface runoff will be minimized. Potential impacts include grease/oil runoff from paved parking areas and sand/gravel runoff from winter sanding of roads. The location of accumulated snow piles resulting from plowing will be addressed. The piles will be located such that snowmelt containing grease, oil, silt, sand, and gravel do not impact Middle and Gore Creeks. Any such contaminants discharged to Middle Creek may impair water quality of the creek and potenti;~lly impact the fisheries of both Middle and Gore Creeks. Engineered drainage swales, berms, dikes, etc. will be incorporated into the project design to prevent impact to Middle Creek. Construction will be in accordance with all applicable local, state, and federal regulations and standards. If dewatering is required during construction, water will be retained on site. A:s previously referenced, drainage issues are addressed in a report under separate cover. Montane Environmental Solutions is performing a wetland assessment. As previously referenced, a potential exists for the existence of jurisdictional wetlands in the vicinity of the Narrow-leaf Cottonwood Forest located adjacent to the existing access road. The presence. of this community is an indicator of the potential existence of wetlands; it does not necessarily confirm their presence. We recommend performing a wetland assessment conforming to US Army Corps of Engineers (The Corps) guidelines. If on-site wetlands are identified, several alternatives are available. The~;e include: 1) establishing development setbacks from the wetlands 2) wetlands can be taken through the 404 Permitting process and replacement performed to mitigate the loss or 3) if the wetlands are below minimum surface areas established by the Corps„ they may be removed and built upon. If on-site jurisdictional wetlands are identified, The Corps is the agency regulating such matters. A parking facility is proposed at a location just east of the Mountain Bell structure. Middle Creek lies north and west of this area. Impacts to the riparian corridor and wildlife using the corridor adjacent to Middle Creek will to be minimized. This can be accomplished by constructing the parking area as far as possible from Middle Creek. Drainage issues as previously referenced are also a concern in this area of the site. Engineered drainage swales, berms, dikes, etc. will be incorporated into the project design to prevent impact to Middle Creek. 2850-001 Environmental Impact Report Page 6 of 14 Middle Creek Village Vail, Colorado VI. OTHER ENVIRONMENTAL CONDITIONS A. Land Acquisitions and Displ~~cements The impact is "Generally Not Significant". Approximately 6.5 acres of land is required; the developer/project owner is Coughlin and Company, 140 East 19"' Ave., Suite 700, Denver, CO 80203-1035. The Town of Vail owns the land. It is proposed that the Town of Vail will lease the site to the developer fora 53-year period at which time the property will revE~rt to the Town. Two displacements will .result frorn implementation of the proposed project. The ABC and the Learning Tree early childhood learning centers will be displaced. The existing buildings will be demolished, and new facilities will be constructed at the southeastern portion of the site. State regulations require a full IJational Emissions Standards for Hazardous Air Pollutants (NESHAP) asbestos inspection of the buildings prior to demolition. If the inspection identifies asbestos-containing materials, regulations require their removal prior to demolition of the buildings. No minority communities, households, or minority-owned businesses are located on site, and therefore, will not be impacted by any potential negative environmental concerns such as noise, air, or water pollution; or from the ~:onstruction of the facility. B. Land Use and Zoning The impact is "Generally Not Significant". A majority of the subject site is f~resently zoned "NAPD" (Natural Area Preservation District), and a small portion of the site where two early learning centers are located is zoned G. The proposed project will require rezoning to the designation "H" (Housing). C. Visual Conditions Parking areas will be located ber~ind housing thereby shielding it from view from the Town of Vail. Overall project form and messing is in character with existing Vail Village. The height, mass, and materials that will be u:~ed in the proposed Middle Creek Village will convey a sense of permanence and contextual anti regional appropriateness. D. Air Quality The impact is "Generally Not Significant". The project will conform to all aE~plicable local, state, and federal air quality regulations and standards, including, but not limited to those regulating odor, dust, fumes of gases, which are noxious, toxic, or corrosive, and suspended solid or liquid particles. 2850-001 Environmental Impact Report Page 7 of 14 Middle Creek Village Vail, Colorado Fireplaces will not be installed in 1:he development thereby eliminating wood smoke. There will be no balconies or decks that would provide space for grills or barbecues. There may be a grill in a public area of the complex. The Middle Creek Village project is designed to discourage vehicle usage and encourage other modes of transportation such as buses, biking, and walking. TDA of Colorado performed a transportation impact analysis rec~arding the proposed Middle Creek Village. Their report is provided under separate cover. 'the report indicates that the impact of traffic generated by the proposed project will be "Generally Not Significant". E. Noise The impact is "Generally Not Significant". Stewart Environmental identified no noise-sensitive land uses on adjacent properties. The proposed site is located adjacent to the north side of I-70. The noise from the interstate is far greater than any that would be produced by the development. F. Light Pollution The Middle Creek Village development will have minimal light trespass from the residential buildings. G. Flooding The impact is "Possibly Significant". ' Peak Land Consultants, Inc. addresses flooding issues in a report provided under separate cover. H. Navigable Waterways and Coastal Zones The impact is "Generally Not Significant". The proposed site is not located near or affected by a navigable waterway or a coastal zone. I. Traffic and Parking The impact is "Generally Not Significant". TDA of Colorado performed a traffic study. Their report is provided under separate cover. J. Energy Requirements and Potential for Conservation The impact is "Generally Not Significant". The proposed project is expected to result in energy conservation. The Vail Affordable Housing Project, Vail, Colorado incorporates principles of sustainable design and utilizes design strategies to reduce its energy and environmental impact. The U.S. Green Building Council's 2850-001 Environmental Impact Report Page 8 of 14 Middle Creek Village Vail, Colorado Leadership in Energy and Environmental Design (LEED) rating system is here used as a preliminary sustainable design mE~asure of the project. As it is currently.writien, LEED version 2.0 is a system designed to rate new .and existing commercial, institutional, and high-rise residential buildings. It specificall~~ rates low-rise residential projects. The USGBC is currently developing a residential version of the LEED rating system. Nevertheless, the sustainable design principles embodied in LEED v. 2.0 serves as useful goals, guidelines, and measure for sustainable features of the Vail Affordable Housing Project. The LEED rating system consist: of seven prerequisite criteria and 32 user-selected criteria organized into five categories: • Sustainable Site Developrr~ent • Water Efficiency • Energy and Atmosphere • Materials and Resources • Indoor Environmental Quality LEED is a voluntary, consensus-based, market-driven building rating system based on available proven technology that evaluates environmental performance from a "whole building" perspective over a building's life cycle. The following preliminary LEED analysis incorporates input from the design team to more accurately evaluate the conceptual design of the Vail Affordable Housing Project. K. Construction The impact is "Generally Not Significant". Construction of the Middle Creek `Jilage is anticipated to commence in March 2002 and will last for approximately 18 months, therefore any construction impacts will be temporary and of short duration. All construction staging will be located on site and construction activities predominantly will be confined to this site. Contractors will be required to obtain the necessary permits and comply with all relevant town, state and federal regulations regarding construction and safety. Potential construction impacts are described below. Noise No noise-sensitive land uses are located on adjacent property. Construction hours and noise levels will comply with the Town of Vail policies. Disruption of Utilities It is anticipated that there will be no disruption of utilities, and therefore no significant impact with this activity. construction of all .utilities to serve the site will be contained within the proposed site. Disposal of Debris and S 2850-001 Environmental Impact Report Page 9 of 14 Middle Creek Village Vail. Colorado Demolition of two building~~ is required as previously referenced. All construction debris will be disposed at an approved landfill and transported on designated truck routes. The general contractor will be responsible for on-site cleanup and disposal of debris. Soil fill may be required to elevate buildings above the 100-year flood plain. Disposal of soil is not required. Water Quality and Runofi~ Project construction will n~~t impact existing water quality. The general contractor will comply with water quality requirements for site construction to meet state water quality regulations. Best Man~~gement Practices (BMPs) will be implemented during construction including the use of erosion control measures. Access and Disruption of Traffic City streets will not have any significant impact since the site is located directly off the I- 70 North Frontage Road. Any frontage road diversions will be addressed with a detour plan. Air Quality and Dust Control Standard construction practices and BMPs will be used to control and minimize onsite dust and emissions. Safety and Security Standard construction safety measures will be observed on site. Town of Vail police will ensure security. Disruption of Businesses; No businesses are located in the immediate vicinity of the project area. L. Aesthetics The impact is "Generally Not Significant". The height, mass, and materials that will be used in the proposed Middle Creek Village will convey a sense of permanence and contextual and regional appropriateness. In addition, the facility design will promote an orderly circulation and efficient integration of buses, other vehicles, and pedestrians. M. Community Disruption The impact is "Generally Not Significant". No businesses or residential sectors will be disrupted or displaced, and no segments of the community will be isolated as a re:~ult of this proposed project. 2850-001 Environmental Impact Report Page 10 of 14 Middle Creek Village Vail, Colorado N. Secondary Development The impact is "Generally Not Significant". The proposed project will not generate secondary development. The project is an outcome of the community's determination to provide affordable housing for people already employed in Vail and are presently living in or near the community. The proposed housing project indirectly addresses the cause of traffic-related problems. O. AGENCIES AND PERSONS CONSULTED Agencies and Personnel Colorado Division of Wildlife, Vail Area -Bill Andree, Wildlife Conservation Officer Colorado Natural Heritage Program at Colorado State University- Beth Van Dusen Denver Regulatory Office, U.S. Army Corps of Engineers, Terry McKee Colorado State University, Department of Entomology, Phyllus Pineda References Used 1. Colorado Natural Herit;~ge Program, Conservation Status Handbook, Volume 3, No. 2, May 1999. 2. Fish and Wildlife Seniice, US Department of the Interior, National List of Plant Species That Occur ire Wetlands: Intermountain (Region 8), Biological Report 88, May 1988. 3. Mitsch, WJ & Gosselinl;, JG, Wetlands, Van Nostrand Reinhold, 2~d Ed, 1993. 4. Kittel, G., E. Van WiE~, M. Damm, R. Rondeau, S. Kettler, A. McMullen, and J. Sanderson. 1999c. A Classification of Riparian Wetland Plant Associations of Colorado: User GuidE~ to the Classification Project. Colorado Natural Heritage Program, Colorado State University, Fort Collins, CO 80523 VII. SUMMARY Odell Architects, PC retained Stewart Environmental to perform an Environmental Impact Assessment of the proposed Middle Creek Village development located in Vail, Colorado. Based on the findings contained in this report, the following conclusions have been drawn and opinions and recommendations m:~de: 2850-001 Environmental Impact Report Page 11 of 14 Middle Creek Village Vail, Colorado Findings, Conclusions, Opinions and Recommendations The proposed Middle Creek Village development is located adjacent to the Mountain Bell facility, directly north ;cross Interstate 70 from Vail Village. The proposed project consists of multi-family housing constructed on a 6.5-acre site owned by the Town of Vail. The project will not promote secondary development. The purpose of the project is to provide affordable hou~~ing for people currently employed in Vail who are presently living in or near the commcanity. The project owner is Coughlin and Company, 140 East 19th Ave., Suite 700, DenvE~r Colorado 80203-1035. 2. A majority of the subject site is presently zoned "NAPD" (Natural Area Preservation District), and a small portion of the site where two early learning centers are located is zoned G. The proposed project will require rezoning to the designation "H" (Housing). 3. Environmental issues regarding the proposed project are addressed in reports provided under separate cover. ~rhese include a) geologic hazards - RJ Irish, Consulting Engineering Geologist, Inc., b) drainage issues -Peak Land Consultants, Inc., c) soils - Koechlein Engineering, ancj d) traffic - TDA of Colorado. 4. Wetland issues were idE;ntified and are addressed within this report. Montane Environmental Solutions of vail, Colorado is presently performing an in-depth investigation of the wetland issues. A letter regarding the status of their investigation is provided under separate cover. 5. Wildlife uses the site; IargE~ mammals including deer and elk browse on the Serviceberry and Current located in the Mixed Mountain Shrubland Community. Other mammals including Black Bear, Coyote, Fox, Rabbits, Chipmunks, Golden-mantle Ground Squirrels, Pocket Gophers, and other rodent species likely feed and/or inhabit the site. Reptiles, such as species ~~f Garter Snakes also likely inhabit the site. No major wildlife migratory routes appear to be located on site. Although Middle Creek is located off site directly west of the propE~rty's western boundary, the creek is not likely used as a migratory corridor. Inter;state70 and development adjoining the south side of I-70 preclude use of the corridor for migratory use. Middle Creek is contained within a culvert from the north side of I-70 co its confluence with Gore Creek south of I-70. 6. No known threatened or endangered species of plants or animals have been identified ai the site. However, no on-site surveys for such species are known to have been performed. The Colorado Natural Heritage Program's Conservation Status Handbook (1999) lists the status of various animals, plants and plant communities found in Eagle County. A copy of the Eagle County list is ,provided in Appendix A. We recommend having the Colorado Natural Heritage Program perform a GIS "Environmental Review" of the subject site and adjacent area. The review searches known ecological informati~~n regarding the status of plants, plant communities and animals within a specified radius of the subject property. The review will report the status of these communities. The proposed Middle CreE~k Village will impact plant and animal communities inhabiting the property. Site development including earth moving activities and building/parking lot 2850-001 Environmental Impact Report Page 12 of 14 Middle Creek Village Vail, Colorado construction will strip a majority of the existing native and non-native vegetation, including noxious weeds, and displace wildlife from the approximate 6.5-acre site. However, existing vegetation and wildlife are not site specific. Surrounding property to the north, east and west contain vast square miles of similar plant communities, wildlife habitat and wildlife species. The loss of these 6.5 acres does not represent a significant impact to the plant and Minimal communities. Displaced wildlife will find and inhabit nearby similar habitat. 8. The presence of Middle Creek Village will have impacts on use of adjacent property by wildlife, particularly large mammals. Increased human presence and reflected light may influence adjoining habitat use. Adjoining property is private so that residents of the Village should not be usincl adjoining properties. Human/bear interaction is possible. All trash dumpsters will need to be covered and otherwise made bear proof. Lighting designed to reduce reflect~:d light and conform to the Town of Vail building code will be incorporated into the site design. 9. Impact to Middle Creek from surface runoff will be minimized. Potential impacts include grease/oil runoff from paved parking areas and sand/gravel runoff from winter sanding of roads. The location of accumulated snow piles resulting from plowing will be addressed. The piles will be located s~ich that snowmelt containing grease, oil, silt, sand, and gravel do not impact Middle and Gore Creeks. Any such contaminants discharged to Middle Creek may impair water quality of the creek and potentially impact the fisheries of both Middle and Gore Creeks. Engineered drainage swales, berms, dikes, etc. will be incorporated into the proje~:t design to prevent impact to Middle Creek. Construction will be in accordance with all ~~pplicable local, state, and federal regulations and standards. If dewatering is required during construction, water will be retained on site. 10. A parking facility is proposed at a location just east of the Mountain Bell structure. Middle Creek lies north and west of this area. Impacts to the riparian corridor and wildlife using the corridor ;adjacent to Middle Creek will to be minimized. This can be accomplished by constructing the parking area as far as possible from Middle Creek. Drainage issues as previously referenced are also a concern in this area of the site. Engineered drainage swales, berms, dikes, etc. will be incorporated into the project design to prevent impact to Middle Creek. 11. Two displacements will result from implementation of the proposed project. The ABC and the Learning Tree early childhood learning centers will be displaced. The existing buildings will be demolish=d and new facilities will'be constructed at the southeastern portion of the site. State regulations require a full National Emissions Standards for Hazardous Air Pollutants (NESHAP) asbestos inspection of the buildings prior to demolition. If the inspection identifies asbestos-containing materials, mitigation (abatement/removal) per regulations will be performed prior to demolition of the buildings. 2850-001 Environmental Impact Report Page 13 of 14 Middle Creek Village Vail, Colorado VIII. ASSESSOR QUALIFICATIONS Stewart Environmental has performed environmental consulting services for more than 2,800 different clients since 1980. With a staff of 25 professional engineers, scientists, and technicians, Stewart Environment~31 is qualified to perform environmental impact assessments. The following is a list of key Stewart Environmental personnel and their responsibilities on this project: Richard G. Patterson, PE -- Project Administrator Robert J. Blinderm~3n, REPA -- Environmental Scientist Mr. Patterson (registered profes:~ional engineer) provided overall project administration and project review. Mr. Blinderman (M.S. Natural Sciences, M.S. Industrial Science, registered environmental property assessor, and certified asbestos inspector) performed the records review, site reconnaissance, interviews, local governmental official contacts, and prepared the report of the findings of the environmental impact assessment. Mr. Patterson reviewed the final assessment report. This report was: Prepared by: Robert J. Blinderman Environmental Scientist Under the direction of: Richard G. Patterson, PE Vice President 2850-001 Environmental Impact Report Page 14 of 14 Middle Creek Village Vail, Colorado ',, I ( I~,;>>_`\ !`,,4',(~( =11;, ~1i I~ 11 ~I - --- II.jIIII~tIVI~I 1 'tl''''.JII;'%/ / ii ---J-;~ j, ~ ~/; /r (I ';~ \~\\--- ~; I ,'/\.~,\\,, t, i ! /i ~ // I J +r.••l~__.. ~~~!;%.' 1.1 ~' ~~~- III/'/%' /~ r,- i~~'~ /f' /' J ~\ I I / ~: i/i ~/~~ lT\i 1, I I l,' ' •fr /'~(• /Ir~/I \ ~\ ~-//r~~/ / •,{ , !~1~~/ i/,6~ / +/1 '/ / / -'/ ~r'~~l ~ •\ i~~;?, ~li~!//,~~i.~fll`I ~I~I !'; ~)/fl;•=_~ •'~,//~'I +!;!r I+ifl! (/;i_~ i ///! \~_..\\ t° I `% '''i ~ ! ~.., ~'/, - -_ :, -' /i;~ ,;~/ ~/' 1',1 ;+ I I I+I I'll i i i ,` i ly:jV~ I~ / 1 .--~<~~~~. , Il. ,•t`\,, ~.yOfiLT~- '~/ '~~ I';~/ /';, ~ I I } I III .\_.~~`\ ,~ 1, i' `; /,'I 'II~ ~~\'~~. ~``C,~(~ ^-~// \/:(•~')i' I, I'y-_- !Y/ ~ ii. i'/''' ~ I I 1 I I f '~: ~. ~ -~ I . r l.~ol ~1' t_ -'~.~~ i)~I ,, ~t ~,} If l1 ~ c _:voc ,~(~,);,; \~~:'',\,\::.~- %':~ /' ~~~;;~ ~/rr ~ ,'•}'t ~ I t ~~ _ :/: h~• -'' /' 1 ,•'i!l 'r~ II li,_~~=-~- _ 1 / `~1\~.,~~,~ '.!:~1' ~(~~ ~ t 1. I ~I •, ` ~/~ ~~= ;~~ ~-__- --~ ~! ~+ ( ,I '/~I. = ~ , // i•.\\.1'`11 ~~rt. A I ~ 1 4 'I I1 t. '`/ /'''•- ~\~,_`-~__ /' r 1 1 (f III ' / i :`•. ~ _ _ ~; f ''///, _'•.i ,~.`'`` t`111 LI• i`~`•\` '.~1\t^~`i '( ~~+~ .I `,\~' II I( ~\\`~}}`,'`}~t ~I ,,1' \ ,I l t11'~1\ /~.r'Z'~~~ _ ~_\/. I• i I ~ 11 ~ ^~. ~1~1'~•:\ .\~...i: '~,\ \ \~.~~~J•/ ~;,II11,{ ~',,'i ,r~.1t,' ~'',` I •.~- ~ //, //.~.` _ ~07C~-- -// \. ,__\ ,\ ~\;.I t., ,;,`~:~\i~-~'\`'~\ ~ ~ -,%; 11 l; ~-_-~_=Kilt ''114i/i:~,ll ~' ,`.. '•.~`'! i'\ ', ~, I,'\'• \,= ~%-i/ ~ \~~. ~~~_'-''~ -- ::-K~; ,~, ,`-...-y-- :t1{\~\ \\`~'^• ~~` \\~~\~' i !11 Tr ~~'„~ I' 't •1~1 •~ t 1',I ., \ ~ r~ ~~. _ _ - Sr'../i'l \}• \\`^ J,..~; ,, 1;~:~\ :~'Y-'-~-~~,\ ~ \ /' %I ~~I j,~--_J:, 11+1,1,1 ~fl if '' i r 1 \ ~- _ ~'•,~\ \=- ~ .- '/i _ 1 /. ~-} i `.\ __..,I .'-,,.1~ ~^ _ - ~ \\ \`~1~_IIt III II~~ l' /i nIJ~~ I'I~ ~ ~, '•~_ _ ~~l- it - _ -'1\``,.`J~' =% t~ `~~ -~•1t IY~. J~ \ /~\~ .•:i:..',11 ~+ii11.f1 1 - I/ i /~ %: /.~ ~~'1~•3;'~ ;~; ;rr-.,.,,~:-;,i ,..,i 1 ',',i.~.;;1 ~~ I~,,, .-~,.,l,,;t;7; f ',~ I ~ I I -'~~_ -1,1~''.~ /% /:%~ / j. ~ /i- ' /~ /•~".~ 1.,;:.:~a;- _=__-- .'`~-_=in ;,1 'tt.',\': - ~~ _ .%i ../~ jl,/~rJ ;:yl 1 ) I I ~ ,~ is -•/: ~ . ~ ,' /. ~_~- ,~:~;~,~.}~~Z._ __` -•T'i'~~'~f I'i~.''I t}, - =/h: -...; .~if ~~~/~~ " i• ,l I I /~/. ~~~~;.~/ .~/% /!/ ~/~ ~~'/J ` ~. \-.~«- \„'`~.`( , i~ r ' i~ , t',',~ ~` -" ~ / nt (5~i:i~~wly/ ,/%,i:~ ~ I ~ I •. i /,1~/'~%%L~ l:~/:'i ~ 1 ' /'/'',/ (~ L- _- _v~ ~J~J~~'~j)~\.~~~.,I~' ('!.\' I' `ltt.', ~lV~_':~',_`-%'=.--'--Ji/%l~~i ~~:;/! I'Il~•v'\`tl %f;'/. ;~171t II,~ I /~/, \\.~ ` -- -- ---- •~1~~loi ~'~ I~',, ^\\ "i a ~- = ~~"`' _ -.ifi/. •%%~7 1 ~., `t ~ 'I ~~'~~.-''i~~./. I , I~ t ~, ~ -~ _ - ~~~~I!r.l ~~~, ;'1 ~'1'`,I~ ,`RV\~:~:";x--may-. -- _ ~•~.i~!'.I~i1 ~lSl l;'\ ,~\~ i-~/:,{t',If \ .', `.\. `~\~%~-__-..\__~ _-%'lLr^-1i '` l ~ i' I' III \~._I~~ ~-_ ~ \-\1'/frl ~~,~'-' ~~\`'~_ = //I `' 1l`\ \ \\ ~' ~~'/`~~j--=' ~,"~='.cr--=- .' _ ~1'J'r~l ). ,!I `vr rti~~ \`~-- =~l/,'~^,y'~I, I\~,'.1 ~`\\ iij~l \`, ~(\'\`~.~\ ~` ~ %~ __ - ---_ ','_ -~: ~' "~- z SITE ~~ \' ~\~~.'. __ _, /' %_: __=B~c~ -!` <;-/'' • j~j.* _ -- _ - - _ - - - _-_~ _ --A.y ~ - LOCATJON ^-yam ~~ \., . ---: %r= ;\\~,--- - -=;t~ per,}>' --'~!;~':fi=_-- -- - -_~. "`=i~~ ,~r_-{ -~.~~r-,'~~. ,\ -___ _ -- ____~: .:: =yam - -- : ~: ~- ~'•'~' : ~ L-.. - • - V a i_ - -..--'~`tiI - ., ,Y. `-:' - `ti~'~~ ICJ{ , ~Y:i~t ' ' _ '~- •../'-r 'y~~~~,_ .t! ,'a'=~^ _ __ _ __ - _ ~•• -,-'~-~'#-.IEI ~.~-:;4- -;f:-'_'.-Y y~.::T-~~ rte. , `~„ c. ,,.~ ,~~ - - .. ~ ~\.~.• ,y ,~~'•, y- y _ - '~ '-i-..iii yyi ~_ ~'''i ~•j .i ``,}. ./ //. .~' -- - - `•„ _ ..\.\\_.i - -> ^= ~,{ ''./~ ' ~ I ...-._.~~'~~:. Imo- '- - ~~ // D~•.~I}Ill \~, ~/ / _ --Jh..'~` `^~•~... -•-' -4 ~...= 1` ` \I\~'~~' 1(11 _ }.I ~•,1 I 1 I ~` ' r'~'~- ^• ~I ` _ '~!~i 1,Iri'.'ijl~ i _ ~~ _~~t: -~. _ _...~~~;~. `tea.::. - `.t~~,ti4' , `'~~ ~.~.'.a.; ~I•,I 1, / //-~~~•`~__ ~/i -- ~t I-I~ I I, __ -,.~., ,~-~". ~ .,~1 ~--~`..--~.:: v~ ,iV I' :f.>.;:'~`C';) I If, ;! \'_~___- ~~- ~.~! I ! I, I ~\' - - -- _- _ ^~'' .'`~_ --t.~aoo_'.~~ '`,\~\. I ~~, t I/ v i,. / ~ ~1 II /,_y _ - ~~eo~ 1 ,, '~lr)~ ICI _--- - ~`-_ -~ _ -'a \\,\~~ \'. y';"%~ ! III. r,i• ~.~..: •~~'--lit i-____-'- __--~~'-`_ ~ .';!~ l~ \\\ , ~ 14't' ~'' I j =\= 1, fJ( ('I !;`~~`.S`-=/ ~ J=~~ /l~~l lli'%' ^~6~. _ ('... ~'-- _ -.~-_~~~-~yj~'`__ _.~-y\,\\:\\\.\,.•1, ,.l lllnl' ~~ ~(I 1 ~~ ~1 ~II 1.1 .' L\\~_-__`~^ ~-i"\'- SOURCES: N VAIL WEST, COLO. VAIL EAST, COLO. W E 0 1/2 1 MILE NW/4 MINTURN 15" QUADRANGLE NW/4 MINTURN 15" QUADRANGLE 39106-F4-TF-024 39106-F3-TF-024 1970 197o S SCALE 1:24,000 Photorevised 1987 Photorevised 1987 DMA 4763 III NW -Series V877 DMA x763 III NE -Series V877 CONTOUR INTERVAL 10 FEET PROJEC7 MJ MBER PROJECT ' ~ ~=~r:4 STrWART EtVVIRONN!ENTAL 2350-009 ivfrddle Creek Village FIGURE 1 ..c4r. y "= CONSULTANTS, INC. DATE Vail, Colorado LOCl~TION MAP :..v~~.i Consulting Engineers and Scientists August 2001 ~~ ~ -~~~:,; STEN'ART ENVIP,ONMI:NTAL PRO.E C' NV nnBER 2850-001 ~' z-(~~--~ PROJECT Middle Creek Villaoe FIGURE 2 '~~ `~'`-~=~ CONSULTANTS, INC. ~J oATE Vail, Colorado AERIAL PHOTO ~ Consulting Engineers and Scientists >' August 2001 ~ N ~,y~ STEWART ENVIRONMENTAL "~`,a'~ CONSULTANTS, INC. '~ COn5uL1uJC ENGUJEERS A1ap SQENTi515 M~2sso-ooi c MIDDLE CREEK VILLAGE FIGUR enucusr 200o Nrs VAIL, COLORADO E 3 51TEMAP Appendix A Conservation Status Handbook, 1999 Eagle County, Colorado p. 147 - 149 County: Eagle Amphibians Scientific Name Common Name 8u~o borens pop 1 boreal toad (Southern Rocky Mountain population) Birds Scientific Name Common Name Accipitcr gentilis Northern Goshawk Aegolius f~utereus Boreal Owl Amphispizn belli Sage Sparrow Buccphnln islnndica Barrow's Goldeneye C~pseloides Wiser Black Swift Fnlco prregrinus nnatum American Peregrine Falcon Grtts cnnndensis fnbidn Greater Sandhill Crane Fish Scientific Name Common Name Gila robustn roundtail chub Oncorlt~nclrus clarki pleuritinrs Colorado River cutthroat trout Mammals Scientific Name Common Name Gulo gulo wolverine L~n1 cnnndensis lynx Plecotus toumsendii pnllescens Townsend's big-eared bat subsp. Mussels and Snails Scientific Name Common Name L~nnrn stn~nnlis swampy 1}~mnaea Plant Commuruties Scientific Name ~ Common Name AB1E5 LASIOCARPA-PICEA Montane Riparian Forests ENGELMANNII/ALNUS ING9NA ABIES CAS10C,9RPA-PICEA Montane Riparian Foresr_s ENGELNIANNII/MERTENSIA C;L1AT.9 ABIES LASJOC.9RPA-PICEA Montane P.iparian Forest ENGELMANNII/SAL1 X DRUMMONDIANA ALNUS INCANA-CORNUS SERICEA Thinleaf Alder-Red-Oiser Dogwood Riparian Shrubland ALNUS INCANA/MESIC FORB Thinleaf Alder/Mesic Forb Riparian Shrubland BETUL9 OCCIDENTALIS/MESIC FORB Foothills Riparian Shrubland CARDAMINE Alpine Wetlands CORDIFOLIA-MERTENSIA C,9REX AQUAT/LIS Montane Wet Meadows CNHP Status and Ranking Regulatory Status Tracking Global State Agency Federal State Status Bank Rank Sensitive Status Status Y G9T7Q 57 FS C E CNHP St atus and Ra nking Regulatory Statvs Tracking Global State Agency Federa] State Status Rank Rank Sensitive Status Status W GS S3B, FS/BL P GS 52 FS P GS S3B, Y GS 5'_B, BLA1 SC Y G4 S3B FS Y G4T3 53B, LE Y GST4 52B, FS T CNHP Status and Ranking Regulatory Status Tracking Global State Agency Federal State Status Rank Rank Sensitive Status Status Y G2G3 52 BLM SC 1' G9T3 53 FS/BL SC CNHP Status and Ra nking Regulatory Status Tracking Global State Agency Federal State Status Rank Rank Sensitive Status Status Y G~S S7 FS E Y GS Sl FS E Y GdT4 S2 BLM CNHP Sta tus and Ran king Regulatory Status Tracking Global State Agency Federal State Status Rank Rank Sensitive Status Status Y GS S2 CNHP Sta tus and Ranking Regulatory Status Tracking Global State Agenry Federal State Status Rank Rank Sensitive Status Status Y GS SS Y GS SS Y GS 54 Y G3G~1 S3 Y G3G4Q S3 Y G3 52 Y G9 54 Y GS 54 r .+ G9REX SCOPULORUM-C.9LTHA Alpine Wetlands LEPTOSEP,9I~1 CAREX UTP.ICULATA Beaked Sedge Montane Wet lvleadows CORNUS SERICEA Foohthills Riparian Shrubland DANTHONIA INTER1vIED1A 1,4ontane Grasslands DESCHAMPS/A Mesic Alpine Meadows CESP/TOSA-LIG USTICUM ELEOCHARIS QUINQUEFLORA Alpine Wetlands UNIPERUS Xeric Western Slope Pinyon-Juniper OSTEOSPERMA/ARTEMISIA Woodlands /UNIPERUS SCOPULORUJvI/CORNUS Riparian Woodland SERICEA P1CEA PUNGENS/ALNUS INCANA Montane Riparian Forests PINUS EDULIS-/UNIPERUS Xeric Western Slope Pinyon-Juniper OSTEOSPERMA/STIPA COMA TA Woodlands POPULUS ANGUSTIFOLIA-UNIPERUS Montane Riparian Forest SCOPULORUM POPULUS ANGUSTIFOLIA-P1CE.9 Montane Riparian Forests PUNGENS/.9LNUS INCANA POPULUS ANGUSTIFOLIA/ALNUS Montane Riparian Forest I NC.9 NA POPULUS ANGUSTIFOLIA/CORNUS Cottonwood.Riparian Forest SERICEA POPULUS ANGUSTIFOLIA/SAUX !Jarrowleaf Cottonwood Riparian Forests ER/OCEPHALA VAR. LIGULIFOLIA-SHEPHERDIA POPULUS TREMULOIDES/ACER Montane Riparian Forests GLABRUM QUERCUS GAMBEL/1-AMEL.9NCHIER Mixed Mountain Shrubland UTAHENSIS SAUX Lower Montane Willow Carry D R UMM OND IA NA/CALAMA GR OSTIS CANADENSIS SAUX DRUJ~IMONDIANA/IvIESIC FORB Drummonds Willow/Mesic Forb SAUX E;VGUA/BARE GROUND Coyote Willow/Bare Ground SAUX MONTICOLA/CALAh1AGROSTIS Montane Willow Carr C.NADENSIS SAUX MONTIC0111/C.9REX Montane Riparian 1Nillow Carr UTRICULATA SAUX JvIO1JTICOLA/MESIC FORB Montane Riparian 1Nillow Carr SAUX PLANIFOLIA/CALAMAGROSTIS Subalpine P.iparian Willow Carr CANADENSIS ~SALIX PLANIFOLJA/CALTHA Subalpine Riparian Willow Carr LEPTOSEPAL9 SAUX WOLFII/C.9REX UTRICUL^1T.9 Subalpine Riparian Willow Carr SHEPHERDIA ARGENTE.9 Foothills Riparian Shrubland Plants Scientific Name Common Name Botn~chium lunnrin Common Moonwort G/priprdiwn fnscindanun Purple Lady's-Slipper Drnbn rechfiirdn Mountain Whitlow-Grass Eriophorum nlfniaurr vnr neogncum Altai Cottongrass G~rnocnrpium dn~opferis Oak Fern Lnmrorchis ensifolin Canyon Bog-0rchid Lislern borrnlis Northern Twayblade Y Gd 59 Y GS 54 Y G~+ S3 Y GU S3S9 Y GU SU Y G4 S3S4 Y GS SU Y G~! S2 Y G3 53 Y GU SU Y G2G3 52 Y G4 59 Y C3? 53 Y G-I 53 Y G7 Sl Y G2 5752 Y G3G5 SU Y G3 53 Y G•1 Sa Y GS SS Y G3 S3 Y G3 53 Y G3 S3 Y G3 S3 Y G4 S4 Y G~ S3 Y G3G4 S7 CNHP St atus and Ran king Regulator} Status Tracking Global State Agency Federal State Status Rank Rank Sensitive Status Status Y GS S?53 Y G-J 53 FS Y G3? S2 Y G4P 53 FS Y GS 5753 Y G4GST3? 53 Y G4 52 BLM tae L~roporfiuni roinotirnuu unr pun~rns Stift Clubmoss Y GSTU SU L~copodiuru Aubium Stiff Clubmoss Y G57U SU penstcrnon a~nthoplion~s Middle Park Penstemon W G3G9 5354 Penslenion hnrringronii Harrington Beardtongue Y G3 S3 FS/BL Plnlnnthern spnrstflorn nnr ensifolin Canyon Bog-Orchid Y G4GST3? S3 .~ n WETLAND DELINEATION REPORT MOUNTAIN BELL SITE VAIL, COLORADO TABU OF CONTENTS SECTION PAGE NUMBER I. INTRODUCTION II. VICINITY AND GENERAL SITE DESCRIPTION ...................................._.I III. WETLAND DESCRIPTION A. HYDROLOGY ......................................._....................................._..._._.........2 B. SOILS ..................................................................................................................:......:.. 2 C. VEGETATION ..........................................................................................._......2 IV. METHODS USED......_ ............................................_................................._....................................3 V. RESOURCES .........................................................................................................................................3 APPENDICES: FIGURES FIGURE 1- SITE VICINITY, WEST VAIL, COLORADO, USGS 7.5 MINUTE QUAD FIGURE 2 -OVERALL SITE PLAN FIGURE 3 -1~1~ETLANDS ADJACEM TO SOUTH END MIDDLE CREEK FIGL[RE 4 -1~VETLANDS ADJACENT TO NORTH END MIDDLE CREEK PHOTOGRAPHS DATA FORMS USGS 7.511~[INUTE QUAD VAIL WEST COLOIZ.ADO FIGURE 1 SITE VICINITY MAP MO(~TAIN BELL SITE VAIL EAGLE COLIIVIl',COLOI~DO ~:r,.. \VETLAND DELINEATION REPORT MOUNTAIN BELL SITE, VAIL EAGLE COt_INTY', COLORADO I. INTRODUCTION Montane Environmental Solutions, Ltd. (Montane) was retained by Odell Architects, (Client) to identify jurisdictional wetlands that may occur on the `Mountain Bell Property' adjacent to the North Frontage Road in Vail, CO. The Site is proposed for an affordable housing community. The detailed description of the property is the SE 1/4 of Section 6, Toumship 4 South, Range 80 West, West 106° 22' 49", North 39° 38' 46" (Site). It is accessed from the main Vail Interchange, west on the North Frontage Road for approximately 200 yds, then first right on Mountain Bell Road, signposted for a day care center. The delineation was conducted on September 27 and October 15, 2001 as part of planning efforts to develop an affordable housing community for the Town of Vail. II. VICINITY AND GENERAL SITE DESCRIPTION The 6-7 acre property is situated on south facing slopes overlooking I-70 and the main Tov~~n of Vail. Due to its southerly aspect the surrounding slopes are generally dry with sagebrush and stands of aspen. The property, knov~m locally as the `Mountain Bell' Site is the existing home of the US West radio tower (to remain) and a small day care center (to be incorporated into the new development). Native vegetation in the vicinity is sagebrush on the dry south facing slopes, however Middle Creek runs along the north and west property boundary. The creek, combined v~~ith evident seeping from the steep slopes above has created riparian cottonwood forest_~ over much of the west end of the Site. The East end of the site is significantly drier with sagebrush and open aspen woodlands. III. WETLAND DESCRIPTION The entire Site was visited and any wetlands identified, except for the parcel west of the US west tower and north of die access Road (identified as QWest on FIGURE 2). This area is a moist riparian cottonwood forest and may have areas of wetland. It is not proposed for construction as part of dais project. Wetlands were found only in the immediate vicinity of Middle Creek. In the lower stretches of Middle Creek, near die frontage road, up to where the access road swings away from the creek, (FIGURE 3) wetlands are very narrow fringe riverine, with steeply incised banks likely due to the road building. Middle Creek was not delineated to the west of the US West building until the north end of the building where the US West property meets the site of potential boulder retention site, north of Wetland Delineaion - Mouraain BeA Site, Vail p.1 the tower (FIGURE 4). Wetlands north of die US West tower are narrow fringe in places but have a better developed floodplain v~ith less steeply inci.~ed banks that the lower stretches adjacent to the roads. There are side channels from the creek however they appear to be active for insufficient time or frequency to have developed wetland vegetation. Sample point 1 was taken in cottonwood woodlands at the south-v-~est corner of the site between Mountain Bell Road and the Frontage Road. No wetlands were identified. A. HYDROLOGY The narrow fringe riverine wetland is supported by the high water flows of the creek and its alluvial aquifer. Middle Creek is a low order perennial creek originating on the mountain slopes above the Site. A gaging station is located on the stretch adjacent to the Frontage Road. USGS hydrological data indicates that Middle Creek peaks in June with average daily discharges of approximately 70cfs. B. SOILS There are no soil maps available for the Vail area. Sampled soils were sandy clay loam with moderate chroma. In the upper reaches of the creek, deep pockets of duff are evident of rich soils associated v~~ith the riparian woodlands. C VEGETATION The wetland is a mosaic of riparian and wetland species. Narrowleaf cottonwood (Populus angustifolia) woodlands dominate the west portion of the Site, grading into drier Aspen (Populus tremuloides) woods and then finally into open sagebrush (Seriphidium tridentatum). Wetlands were very narrow fringe adjacent to Middle Creek with a poor herbaceous understory. Some of thi`~ could. be attributed to the late season delineation. WETLAND VEGETATION UPLAND VEGETATION Aconitum columbiannum Amelanchier alnifolia Alnus tenuifolia Populus tremuloides Distigea involucrata Prunus virginiana Heracleum lanatum Rosa u~oodsii Mertensia ciliata Populus angusti folia Salix sp Sunda sericea Wetland Delineaion -Mountain Bell Sitc, Vail p.2 IV. METHODS LLSED The wetland delineation methods used were in accordance with the U.S. Arm~Corps of Engineers Wetlands Delineation Manual, January 1987. A routine on-site inspection for 'Areas Equal to or Less than 5 Acres in Size' was performed. The data for the sampling points included vegetation and hydrology indicators. Soil pits were dug in the different vegetative communities to a depth of 16- inches. They were used to identify the presence of reduced soil conditions; depth to saturated soil, and depth to free water. Wetland boundaries were determined by the percentage cover of hydroph}rtic plant species (obligate, facultative wet, and facultative), indicators of wetland hydrology, the presence of hydric soils, and topography. V. RESOURCES 1. U.S. Army Corps of Engineers (1987), Wetland Delineation Manual. 2. U.S. Fish and Wildlife Service (1988), National List of Plant Species that Occur in Wetlands Re ion 8 . 3. Weber, W.A. (2001) Colorado Flora:(West.ern Slone) 3`d Ed Colorado Associated University Press. Wetland Delineaion - Mm~.ntain BeU Site, Vail p.3 70WN OF VA (»oac zee, rnac aen) Davao ~~ _-~ _ __~_~ SEYA"1t {D73F~ Po1/ F1LY. - ffi14, - pfV Wi F1LV. - e1D1 - WV IN (N) E1LV. - 6101 ~IV IN (!7 SNB EIIV. - e1D1 ~~-~ ~~_~~~~ ~~~/ 6.Y~.----1'i r, _.._---1~-------- _-~-- - --~~f .---- _ ~ ~~ ~- !51 EiEY. - 6141{.jam MV WT ELEV. - eue.e ~- v iN EIEV. - ezTs IH ~ ELEY, _ Guar i ~~~_ . '~ ~ _~- acv, - ezla.e' OUT ELEV. - ez».e' ~-._ x M ~s; aEV - er~.c~ . u ncv. As~~d ~' a,'\, ~. a': _ \7 \ ~., . - - ~ ~ cane R~[w ~w 21a PnOE i_(BOO/I bt2, I • • , • ~_ ~ ~- ~''° °~ -- /~ v !-i buy ~L1E6 ~"'---\ i w' ~ 1- /`,. ~,~,,: „. 72' Gum. _ 'wti'~:~. ~.r{'.;,.: ~~~-- ."=_-__- - `-- --~-- ~-- - ~~ 81s.Jp' ~_~ ^'-•, y Cam' _ _`_~V.;>:.~ iir=.ems.:` _^~~!a..r.A_•~,_~ ------__-- `~~... _~='-==-~' ~` ~__ FIGURE 2 OVERALL SITE P r~ ~~` .~=-~--~-_ ~~ - .:. _:~~. ~..•~• .;.,,;,•.::~,. •.`;^r., ....;~'- Tf~ sov`' ~'~-~~~ ~~ ~. i .~--' RIM ELEV. INV OUT ELEV_ NV IN (N} ELEV. NV IN (E) ELEV. '~ ____ ~~~/ E R M LE - ~`~ IM ELEV. = 6223.fi NV OUT ELEV. = 8214.6' NV IN (S) ELEV = 8214.9' NV i~(E) ELEV = 8214.9' _ SEWER M OLE RIM ELEV. = 8214.7' INV OUT ELEV. = 8203.5 V IN (N) ELEV. = 8203.9' ~ ~ 1-2 ,E) STUB ELEV. = 8203.8 ~* ,~ ... .~ ~ .. ~°°° ~'. ~ L ~- ~ O •AND ~' r w N ~;: ;;,. 7,.,r .:;,,,.,.< MOON ~. °!:_r, ~" t ~i~ . _ r:~. a r - SAV11 PLE ~~ _ Po r ~~ $,2,2 ~ ~~"... v -•7y.~:, ~ ~ ~ r uJ5 1{). •rl.1• ~F ..~ ~ '• :eS, !;:fit of """~ ~. ;y;:ti. :.q.}..,.~..~,c~..~. ~.:~ ;, FIGl1R F 3 WFTI .AN17~ ,AT~LAC-FNT TC~ SC~r rTt-I FND MIDDLE CREEK ~ ~~ .. ~~ 10l~9!?001.11:56 Ft11 9704768616 - --- - J- ~V~1\\ = 8243.4 = 8228_fi'-~ G = 8236.3"1 S P = 8228.7 Z • ~ DG 0 PAN ~'N D D ~~ CENTERLINE OF 10 HOLY CRO ELECTRIC r SSOCIATI EASEMENT ~: ;•,.=;:.';;= : • '~ ~ ~ -~ BOOK 642, PAGE 344) . . = ' , /, ;'~~.:-:; : 1:~~'-~; 'r.,, -i.;r'=='';x>~- • EXISTING ; K:.. ~. " ~ ^'~~~°'~;: - ,-~~'' 100 MOUNTAIN u,`~ ' _ ~~.:~r~y:t;~','' _- :~'.'S:'~•-' - _ '.:~;~.k;='r':` BELL RD ~~ ~ ELECTRICAL `; ~`~-... -::.- ~; d`~;:: ~i ~ TRANSFOR E _ , .;; , yy ~ ~,a, 2 ~ 8. PAGE' ` ,~ ..,.. ,...,~.,,,~ ;~ =i..~; ~~ 4, ~, ~ 4 i r~~yr i, o - x~ """~ _ v~ ~"=}i; :;;'~„ Y:'~i'A kS_ .~A~`,.:.r:;~,:n'€:r,,~r:.~,,,~,1w ,+yn,; ti{J._... ~':."~.''",L'`%P:S ..,_ °~. ~. ..~/;; ;,ri .`t,`.t`i gar: ";~f:;>r, FIGURE 4 1~JETLANDS ,ADJACENT TO NORTH END 1~~11DDLE CREEK (N,~IRROVb' TO 1h'IDER FRINGE RI~~ER fNFI 2V C~~a2 ~~ ~~@~~~ ~ ~v , ~~G S ~~.~p~N •'19 p~~V- ~ V PHOTOGRAPH I AND 2 MIDDLE CREEK LO`'VER STRETCH NEAR FROMAGE ROAD ~ t ~ >y,. ~ _ .:~ ~~ .,;. ~ '~` - - - - - -- --~.. r ~~ PHOTOGRAPH 3 MIDDLE CREEK UPPER STRETCH BEHIND US WEST BLDG MORE OVERGROWN PHOTOGRAPH 4 RIPARIAN WOODLAND ADJACENT TO CREEK WITH S[DE CHANNELS DATA FORM ROIdTINfi Y4/ETLANO DETEpN1I1dAT10N' (1987 CCE tNetlands Delineation ~~ Project/Site: u - I ) Applicantl0~wner: P Investipatoi~: N ic~m,v~s 12ti.~ icvh•• Do Normal Irircurrutances exist on the slte7 la the site significantly disturbed (Atypical Situation)1 Is the area a potential Problem Areal {If needed, explain on reverse.) VEGETATION pominmt r1~nt Sn~dtt ~1 ~c or 2. V 5 Q U c~tl h• ~ ~ i O~, ~_ lavtoi~~i per alrni GoI~U ~ CU- a:~_a S n 6. ., .. --~--_ e. 7. ~~ s. -_ tira~m of Dom~n~rtt tp~ci~s ffirt ~n Odl., FACW w FAC I~xcludinp FAC-). R~markt: ~, HYDI~OLOGV . .;~ '~''_"~6~"8'De1a (D+scrEbo k~ 11«ner~1; w ~ ~, ~'9d~+,::~t,;~:~" ~strtiwit; L;du. ~t Tid• Geup~ f _ it;~, • ,.._ A~ritd rhotoQnpha , r~ '' No Rio~ttffiac~ ~p~ AvsiiaDl~ . ;`:'~u,~ ~``fidtlt"•f?bniv*tlor`ts:"" . ,q / ~ 1 I~~w .11".14 :~. ~ •. 11~~;11~,i1,. ~. r RLtI 40 ~[tYUrrt SQ~: ~ti• / i ( ~.r'iS Wadard FI~lo41! irdcaaaot~ ~ ....,<,,:; :. • ... ~~ ~dat~d ~.. . ,~ 4at~snd in ttRP~ 12 Inolw •' • ~ ~ wwr UAtitlus ,~. Drfh Lbws . ~ . ~v ~-~~ hrt~ in 1~,q~ d anda .. 1,. . . ' a ~ ~ K 5 1 . , , ~ r:.. j ~ ` {~~ `Z L~ t'1 ~' I, _.~~ L ... 1*i 'f'Y { 1 ~.~Lv... , • Dats: • ~ .~ ~-- __ County: State: CCU ~'~ Community ID: ~a '~ Transact ID: Yas ~ o Pbt. iD: ~Z l?ymir-~rR r'lerrt St»d~t •fti~rum or 1. ~_ ~_ ~o. tt, __ 12. __. _~_ U, 14. 16. tt. -- ..._._ w'~ :!! ~;r. ~f 1 ~ YN• .. a SDILS wt~p unto N.R+• n ~ Cni IS V1~la-Pr7e ~'~„ °.~ (soon srd Mlassl; - Fi.W pb,.rvsdarr Confirm NIM+p~d TYp~] Y~• No TsxonomY (8ubproupl: p~gfilr Q~rotiotton• ~ T~s, Conondoru, vtx Cola Mattf• Cdon Mottf~ ~~pth ~ R~n~etuf~ lIC. Jir,C, h.~~ bvri~zo~n-, ~ ; r•• Moi~tl (Mun~~ll Moi~tl I~ 3~2 --. - . C C~tn o(u CI c,.~,~ ~ o a~.~n. __ - ----.:- ._ ---- - y Ftydrl0 SON i11d1WiOfTf _ ~I~tOW~ _ tfrdo E~p~ sulft'di~ Odor Aquio Mdsnw ~op~ .. ~ 11d++dn0 CrndFderr alsrd or LorrQrortr Colas ~sawkss 1~ph Orpsnlo Cormnt~in 6ualsw L~yst In Sandy Soil Oryr+is Sernick+p Mr >tond~ 6oY~ _ uoad on Low1 Ftpiri~ SSW 4Mt _ t3rsrad cn tiotioer Filydrio J<~ LJat _ Od»r tII~~ M Ran~ric+s! 1- WETLAND DETERMINA710N Yss~ (Grdsl ~ lCirols) ~p~is Vspsutfon hnartl . Wsdsrd HYdrdoQY Prsssrttl Yee FtYdrb soils hnsntl YM is tlrFs 6~rW tolru YVItNn s Wstland>' Ys~ No RMiMflei2 ~ C'l;Eftc~ ~1 ~ ~'l {. ~ { ~~ i,'e, ~ [~ ~.-;,.k U..,~ "~'f '\:7~~F;''~r• r r :~ ~" l%Z,'ic~Z,R,.~. C~GtS i~1 ~~-(7 . S I o ~c ~~ r~~ L>ov~e i.-~~~~ ( t~t~ ~ ~f~ ~ i;• ca b c~;~ -,~,~n w ~vc1 i c:{ ~~rJ _ . ~ . ro Y BATA FORM ROUTINE YVETLAND DEi~M~AT10ly' (1987 COE Wetlands Qeline$tion aianuaq • ProjecVSite: I"Y~ d vvt''h ~ ~l .fir U Dsts: ~ -~'~ ~ ~',~ Applicant/Ovvner: /''r~.,l.c ~~Y. ~,~ .'e Investipato~: /?_.,i r<'.~•^; ~ State: .:0~ • Do Normal Circumstances exist on the she? ~ Yu 'Nsa ' Community ID: Is the site sipnifirantly disturbed (Atypical Situatlon)1 ~ • ~ Tratuect ID: Is the area a potential Problem Areal Yu No Pbt.10• (If needed, explain on roverse.) ~ "`'~`~- VEGETATION pomfmnt Punt S~ecier 1. I .S ~'r~Gr~+ ! I~it~1~1J1:r„t ~n tretun ieator r -~ -~ C. ppmirunt f'iem Sn~d~t ~Tfttlm or or •. 2. 'V~ G. l ~tit.t C~ ~ P t' (~..0 s 10. e._ ». ~. ~s. ~• 10. i Ihrcarrt of Domtrwrt Sp~dras tfiat an O$1. FACW ~ FAC (~xcludinp FAC•). . Rarnarics• '~~,<f,~~ /~~..te 1cr.aso~rti-. ,. l~c~b~c~ovs V~~,~~:trc,:. -tc~~, cl:Gt`; ~~.~!/ ;.,, HYDROLOGY _ R~oordod Qav fDs~er~ in Ra+narhn); Wadand FtrdroloQY irdiostarx . _ lim~rxn, Le~~, er Tid• Gmupm hknary kx~tors: . _ OtMr No Raoordad Datt, Avaaabl• tiaarratad in Uppw 12 Chaf»a -' _ w~ IMa~ica f)ritt Urea - iadirrnrrt Dopodta Fuld Dba~rvatlont: _ piatnap~ Ptirttsrria (n Wudar~da ~aeondary kxliwtors f2 er nrora rsqulr~dl: Depth o.f Surfaerr Water. ~_~ t~dEtad Root Clrrnb in llppar 12 k+ohas - • Water-ccain.d La.rw D+pth to Fna Waur in P7>r ~_~ _ . ' _ Leod Ski Sex~r~r pb N1G~rtrsl Taal Depth to batutNtad SoB: .__.__~~n-1 _ ~QtMt (Explain in Ramarkd R~mari~s: .' '/ SOILS ~ u~t t~l.rr-. l5oriox awed ~haol' ,_ ~ l/i~11~ I/! l~C't~ S n! ~ S J ~l. V(,! (,( _ Drainsw Ciass2 , F}oW Obs.rw tlan . Taxonomy (Subproupl: ~ Co~tiirm µ+f'p~ Typ`7 Y.. No plofil. D~tatiotion: ' D.pth µauix Cdor Motif. Cdon I~Aott1. TdRUro~ Conar.donu, • es horizon IMvn~•il Moftti IMun~.il Moi~tl ~b~ndanc~ICon mt St_r~cnro •tc -- --- ti. ~~ ~~ ' l~d1~0 SaII lndiaatoni . _ FBrdo Eplp~don ,_ F~ph Orasr~io Cor1wR In Suriow (~ayar in SardV Soil• Sultldlo Odor ~ Orpar~la atrsrci~q M lliar~Qt/ sotto . Aquto Moi.turn ~opirtw _ ll~tad on LoNI tt~rto s.t+s l.fot .. 1lduoinp C.~ndltions ~ Llr~sd en f{atbtNt Fftldtta 1{oiM List . Glo~d ox Low-Clxwtr Colors ' _ Ot!>tt lE~1aM+ M f~r+~+i R~rwfca - It f~" WETLAND DETERMINATION F~Frdrophydo Vapatnion hx+•Rtl Y.. (Clydo) W~dand -lydtdoQy Pt~sornT YM FifVdtia SoA• rrt-sontl Yn (Cirol~l M t3ti• b~nfl ~olr~ ~W^ a W~tlandl 'foo No Rwr-wkas 1 • IG~("2. S~C.c.SC~v~ ,SC~%~-o st~,t.r.~ c,~{.,1.~.-.~_~,~ a c s ~(f~a.~ cn~~.rr~ c~.~;~~~~__~..~,~. d1 ~.~_~ ., ~~ e. &vG~ ~:~ 1~;1.. ,~~,~:~.~.;~ j,, p~w~~~~c~ 1~~~~1 ~~; ~ - h L Ue~s~"7~z~.~.. Sep 12 02 09:38ai ~'~~~~~~ H & Associates fnc®p~ ~ ~' - -- CH~RC ~~ ~v. ~ ~ ~~~~ a ~. ENGINEERS & GEOLOGISTS September 13, 2002 Michael Coughlil~ & Company Attn: Michael Coughlin 140 East 19th Avenue, Suite 700 Denver, Colorado 80203 Subject: Geological Investigation of Debris Flow and Rock Fall Hazards and Mit::gation Recorrunendations Propose3 Meddle Creek Affordable Housing Project Vail, Eagle County, CO Job No. 14613 1dTr. Co>igh:in: As requested, Cl-IURCH & Associates (Church) and Art Mears, P.E. Inc. (Art Mears) have studied the geologic hazards related to debris flows and rock falls at the subject site. The purpose ~~f our work is to summarize our findings and recommend mitigation measures for the planned stru~:tures. This report describes the geology of the site .area .and discusses the geologic hazards present. Art Mears will present design criteria for the structures under separate cover. The project Structurrl Engineer and the project Architect (Odell Architects) will incorporate the design criteria into tae building designs. Koechl~:in Consulting Engineers Inc. is providing. geotechnical recomrnendatians for the proposed development. R. J. Irish performed an Engineering Geologic Hazard Study for the project, as prese;rated in a report dated August 16, 2001. BACKGROUND AND SITE CONDITIONS p.2 The subject property is located in Vail, Eagle County, Colorado. The lot is north of the I ']0 Frontage Road and west ~~f the old Vail exit of Interstate 70. The site is .located in a part of the South 1/2, Southeast 1/4, oP Section 6, Township 5 South, Range 80 West. Affordable, multi-family structures are proposed fo~~ the parcel. The concept grading plan prepared by Peak Land Consult~.nts and the Development Plan Drawing A1.0 by Odell Architects indicate three housing buildings ,ire planned, Buildings A and B of moderate size, and a larger Building C. Existing structures include a 1Vlountain jell telephone building and tower and an Early Learning Center. The Early Learning Canter (ELC) will be moved into a new building in the southeast corner of the site. An access road and parking lots were created for the Mountain Bell building and ELC, with associated cuts and fills to a r laxrmum of about l0 feet hi;;h. Yard areas have also been created on the slope, with smaller cuts a~td fills. The westeri~l and noahern portion of the site are. wooded with cottonwood, aspen, and fir, while the pastern portion i ~ covered with grass and bushes with scattered aspen trees. The property is located on an alluvial fan complex emanating from Middle Creek on the north side of the Vail Valley. Gore Creek runs in the valley bottom and drains to the west. The grour..d surface in the parcel slope: down to the south, and the elevation in the planned building areas ranges from R~Stn CENVER w50t Wadsworth Boulevard Wheat Ridge, CO 80033 Attachrttent: N .~~.~ aFq q,;» Fax: 303,463.9321 Sep 12 02 09:38<3 Geol ogica . Investigation . ob No. 14613 Page 2 to 821 ~ feet. E edrock on the north side of the valley is comprised of the Minturn Formation, consisting of sandstone, conglomerate, siltstone, shale, and limestone. A portion of tale Bedrock Geolo>?ic, Surficial Deposits and Potential Geolo ig c Hazard Map Eagle County. Colorado by Allen Miller, Consulti 1g Geologist, 1977-78 is presented as Figure 1. The base maps for this study were prepared by Charles S. Robinson & Associates. The Minturn Formation is a Pennsylvanian age deposit described as medium to coarse-grained, gray to reddish-brown, sandstone, ccnglomeritic sandstcme, thin beds of reddish-brown siltstone, and sandy and silty shale and prominent pinkish-gay to gray limestone beds. The property lies on an alluvial fan, and bedrock is only e~pcsed on the steeper slopes northwest of the site and in the channel of iYliddle Creek. The alluvium consists of gravel :o boulder size rock fragments in a matrix of silty sand. Boulders typically range hom 1 to 3 feet near the sitf, but boulders up to 6 feet in diameter occur in the area. The slopes to tl~e north are mantlecf with glacial deposits called Moraine. The Morainal deposits consist of boulders, cobbles, gravel, sand and silt deposited at the margins of the glaciers that once tilled the. Vail vt lfey. These lateral Moraines cover the slopes north of the site up to an elevation of about 8800 tc 9000 feet. When ~~~e observed the channel of Middle Creek north of the site, we noted that the moraine was present on the east side of the valley but the west side had thin colluviunl over bedrock or exposed bedrock. Erosio-i since the end of the last .Ice age has removed much of the Moraine and jeposited it in the Valley bottom as well as in the alluvial fan underlying the site. DEBR[S FLOV'~S p.3 :During times of heavy precipitation or rapid snowmelt, water is concentrated on the slopes above the valley bottonm ~md nins off quickly, creating floodwaters and occasional debris flo Ns. At the relatively high elevation of the Vail area, debris flows are typically created during periods of rapid snotivmelt and nit heavy precipitation from thunderstorms. The drainage basin uphill of the fan is relatively large, ~n the order of 6 or 7 square miles, and the slopes are steep but usually c~~vered with vegetation. For this type of basin, debris flows are typically generated by relatively infrequent slope zailures within tie drainage basin, which introduce large amounts of unconsolidated m~~terials into Middle Creek acid floodwater transports it downstream and ultimately to the fan. 13y comparison, smaller and steeper basins with abundant loose materials on the valley sides generate mare frequent but oil4n smaller debris flows. In order for debris flows to occur, several conditions must exist, ~.ncluding 1)•sufiicient available unconsolidated debris, including soil, rock, and organic material, 2) steep slopes, and 3) a potential for undrained conditions to develop within the initial floe mass. In a soil saturated from snow melt or during, rain, the pore water pressure within the soil increases and only a slight increase in e;cternal stress can induce flow mobilization of debris {liquefaction). Some researchers have suggested the stress increase necessary to cause a failure can be as rrunor as load transfer from swaying trees, small ground vibrations, or strong wind gusts. The relatively tine grained nature of the soil developed on the Minturn Formation increases the risk of undrained a~nditions to occur ill soil singe the Minturn Formation is comprised of sedimentary bedrock with abu Zdant fines, such as shale, ; iltstone, sandstone, and conglomerate. Debris flows are unique in th;it they can transport very large rocks, and can actually gain mass during the flow process. M;css wasting processes typically accumulate coarse materials in existing drainage channels above the fan, where r, apid water runoff from intense storm events or rapid snowmelt causes the coarse material ~ to slide or flow downhill. ~dlmen an area of lower slope gradient is reached, the channels often become blocked tivith debris, and floodwater from higher in tlme basin becomes temporarily blocked behin 1 the debris dams. Once enough water accwnulates, the blockages re-mobilize and debris flows can re;,ult. Sep 12 02 09:38<3 p.4 Geologica l Investigation fob No. 1~6i3 Page 3 An examination of the channel of Middle Creek disclosed source areas on the valley sides, where oversteepened s open in Morainal and Colluvial materials apparently fail periodically aLd introduce soil and rock in~:o the stream channel. We noted slope failures of various ages on both ~ lle east and west sides of thc; channel upstream of the fan. An area of oversteepened Morainal deposit was noted on the past side ~f the 1~liddle Creek channel about 200 feet upstream of the fan. We also noted what nay be old debris flow deposits within the channel at one location .about 500 feet above the fan and what appears to be an old landslide deposit on the east side of Middle Creek about 1000 feet above the fan. An exa:.nple of the kind of deposit that may help to generate debris flows is the landslide deposit 1abeIed c~ds3 (Quaternary age debris slide) on Figure 1 which exists about 3500 feet north of the fan on the w~:st side of the Middle Creek channel. This landslide was apparently devel sped within he colh~vial material and slid downhill to the valley bottom. A similar phenomenon occurred in Booth Creek ea;~,t of the site in May 1984, where a large debris slide and flow occurred on the west side of Booth Creek. This slide (and manly others that year). was initiated at an elevati~~n of about 9400 feet when water issued from bedding planes and fractures within the bedrock ar;d saturated slope materials, causing them to flow downhill into the channel of Booth Creek where a debris flow :filled the creek ~,hannel and almost reached the water treatment plant. The event reportecly occurred over a period of days and included many "pulses" of debris flows. The alluvial fan was examined as part of our study. The active channel of Middle Creek is now Iocated on the extreme western edge of the alluvial fan, but this has not always been the case. Middle reek has moved back and forth across the fan over geologic time as the active channel was blocked ;~y soil and the v~ater charmel was diverted from the area of the soil deposit, The area from the active stream channel i o about 200 feet east shows evidence of numerous gullies and debris tlc w lobes. In this area., old ch.rnnels exist between raised lobes of bouldery materials.. This area appears to be the location of the r.iost recent debris flows on the fan. By comparison, the area from 200 to about 500 `eet east of the present channel is fairly uniform in cross-section. We noted a prominent debris flow deposit about 550 feet east of the channel. This lobate deposit is located south of a fenced yard and is about 5 feet thick. Numerous boulders with a nominal size of about 3 feet in diameter exist within and on the deposit. This deposit and associated field observations are the basis for the design recolnmendatior.sprwented in the Art Mears report. A deflection wall and soil berms were originally envisioned as the mitigation scheme for the project. i-3owev~r, after conducting field work, we believe there is a substantial risk that a Booth Creek type event could rest.lt in a plugged channel between the wall and the steep hillside to the north, and a later flow could overtop the dam and flow south towards the site. Another viable alternative is to individually pro~:ect each sfiructure on the fan that is subject to a debris flow hazard by d~;signing the structures to res: st the forces of a debris flow. Based on our understanding. of the project objectives and corrsi~~aints, we believe the best course of action will be to protect the individual structures. As stated in the Art Mears report, structures at risk are Buildings A and C. RECOM112ENI-ATIONS :debris Flow Ha::ard In order to mitigzte the debris flow hazard for this project, we recommend designing the north wall of Building A and the west wall of Building C to resist forces from a potential debris flo« event. The site has been modeled by Art Mears in order to determine these forces, and his report should be consulted for derailed recommendations. Affected structures should be designed for appii~able forces Sep 12 02 09:39:a Geological Investigation J ~b No. 14613 Page 4 from the ground surface to 6 feet above the ground surface. The entire north building wall of Building A will lie extended 6 feet without openings, and designed to resist the applicable forces. The Dumpster enclo;~ure building located north of Building A will not be occupied, so it will aot need to be designed to resist applicable forces. The west side of Building C will need to be d signed for debris :low forc~s, but since the wall is not normal to the flow direction, the forces are reduced.~A retaining. wall d ~sigrred for the applicable forces will be installed west of the northtive~ t comer of Building C to p'otect the areas where windows exist. The solid metal door on the west side at the southwest co~•ner should be designed to resist applicable forces, as well as the remainin3 west wall without opening ~. The proposed mitigation scheme will be fully compliant with terms of Chapter 21 of the Fail hazards ordinance. The mitigation will not deflect flows onto adjacent public or private property. Rockfall Hazard p.5 We observed the slopes above the site to evaluate the potential for rockfall. Portions of the project area are shown on Vail hazard maps a lying within a "moderate severity" rockfall hazard area. Based on the development plan and our observations, structures that could potentially be effected are Building C a.nd the Early Learning Center (ELC). We examined the slopes above there proposed structures during; our field work in order to evaluate the risk of rock-fall on asite-specific oasis. There are no bedrock +~utcrops above the area of Building C and the ELC that could contribute rocks to the building area. Any rockfall hazard present is related to cobble to boulder sized rocks cont.iined within the Moraine deposit covering the hillslope. While some Large boulders several feet across are partially exposed on the hillslope, we did not observe any that appeared to present a signifi~;ant risk of dislod€;ing naturally within the project Life, assumed to be 100 years. Several smaller rc cks, usually about l foot in diameter or less, have rolled down the hill in recent years and stopped near the bottom of the hill. Roc)•:s of this size, while possibly able to slightly affect the exterior finish of tl-e stnrctures, do not present a significant risk of structural damage, and- we do not believe formal roekfall protection measures are needed. Construction activities may dislodge some rocks from the slope, which should be removed along with any rocks that are noted to be loose on the slo} e above cut areas. The developer and owner should scale loose rocks from the slopes above Building C and the ELC curing construction to reduce the risk for cosmetic damage. In general, the anticip~aed removal area is the steeper slopes below an elevation of about 8380 feet, and not the more gentle ;lopes above this elevation..~ccess to the slope should be restricted since foot tragic on the slope r.iay dislodge rocks. We should observe the area during construction to help guide this process. LIMY'I'ATIOI` S It is important to realize that the risks from geologic hazards cannot be completely eliminated with engineered structures, and that the owner(s) must accept the risk of property damage as;,oocated with the hazard zone on the fan. As stated in the Art Mears report, our recommendations are based .on a reasonably foreseeable event with a return period on the order of 1000 years. Due to geologic uncertainty, it is possible that events larger than assumed herein could occur. We believe, the outlined approach will provide an acceptable level protection for the planned structure and is a reasonable approach for t.ie field conditions, except for the lowest risk approach, which is avoiclance by not buiidirg on the site. We make no warranty of performance of the structures, either expressed or implied. We should review the completed design when available, as well as field conditions during SPp 12 02 09:40<1 Geologica t Imrestigarion fob No. 14613 Page 5 constn:ction. Ot:r analysis and recommendations are specific to this site and the planned 1;onstruction as described herein and we should be contacted to re-evaluate our findings and recommendations if plans change. tiVe appreciate the opportunity to be of selyice for this project. If you have questions, plf,ase contact our office. Sincerely, Church snd Assclciates, Inc. ~~~~ <<~~ David f~. Cushman, CPG l~nginec:ring Geclogist DAC 3 copies sent Attachment j 5 ~`E~F.'kOFFSs i W ~06 B~9•: O ~.. A u~ ..: ~ ~ N • ~••~ y' W~i.On_'4 (.'IICFIMP.OV 1 copy to Arthur :[. Mears, P.E. Inc. 555 County Road 16 Gunnison, CO 81230 i. copy to Odell pzchitects, P.C. Attn: Lee Mason 32065 Castle Court, Suite 150 Evergreen, C:0 80439 Faxed to 303-67C-7162, Attention Tony Nutsch p.6 1 copy to Peak L~md Consultants, Attn: Mark Tarrall 1000 Lion's Ridge Loop, Vail, CO 816` 7 SeP 12 02 09:,40.] ._- ~~ ~..,,,.. 0 P•~ I ~ •' ~1~ " '~ ' • .•' ,mil ~... ~' •~. Vii: :% ~ \o ~, i; ... ~.`. ~ O r n~~ Vii) . ~~ ~~~ =' ~~ /i Qds3 -Debris Sides, letter in parenthesis indicates unit that failed ?Pm -.~2inturn ]~oimation Qm - T~oraine Qaf - Alluvial F ~n Scale 1:24,000 ...::: r. _ r 1'' ^ ._ Vi'm', ~.~ ~y -~ '"~- ' ~% ' Vii,') ~ ,~-~-- Map of Surficial Deposits Job No. 14613 Figure 1 06/,1,4/2002 16:37 9706413236 AP.T N1EAP.S PAGE 01 ARTHUR I. MEARS, P.E., INC. Natural Hazards Consultants SSS County Road 16 Gunnison, Colorado 81230 Te11Fax: 970-641-3236 artmcars (sp rm ii.com August 14, 2002 Mr. Michael P. Coughlin 140 E. 19~' Avenue, Suite 700 Denver, C() 80203-1035 RE: Debri:rflow dynamics analysis and mitigation design criteria -Middle Creek, Vaif Dear Mr. Coughlin: The attache reports findings of my debris-flow analysis at the Middle Creep, affordable Housing site in Vail. This report consists of (a) a brief summary of the debris flow potential and site observations, (b) an analysis of the debris-flow- dynamics, and (c) mitigation design performance specifications. The section of flow potential and site observativris is expanded in the report by David Cushman of Church & Associates, and should be studied for more detail. Please contact either Mr. Cushman or myself if you have further questions. Sincerely, Arthur I. Mears, P.E. Avalanche control engineer Mass Wasnng • Avalanches • Avalanche Canrrol Engineesing 08/7.4/2002 16:37 9706413236 AP.T MEAP.S 1 REPORT OBJECTIVES AND LIMITATIONS As discussed with Odell Architects (the project architect), and David Cushm<<n of Church anti Associates, this report has the following objectives: PAGE 02 a. Evaluation of the debris-flow potential at the affordable housing side; b. Calculation of the debris-flow dynamics through appropriate modeling techniques that take field observations into account; c. Proposal of mitigation at buildings; and d. {:alculation of debris-flow loading potential on the proposed mitigation. This report also has the following limitations, which should be understood b~~ all those relying on the findings, conclusions, and recommendations. a. 1'he analysis is site-specific, thus applies only to the Middle Creek site; b. 1'he mitigation recommendations depend on the Odell Architects c evelopment plan "A1.0," undated; this was the latest available a.3 of tl~e July, 2002 field work; any substantial changes to these plans nay invalidate the findings and recommendations of this report; c. C:aiculations of debris-flow dynamics assume a reasonabl~r foreseeable event with a return period on the order of 1000 years (103' years); extraordinarily large events with sizes in excess of the event assumed here could occur. 2 FIELD OBSERVATIONS The field otservations are discussed in further detail in the accompanying report by David C Ashman. Primary observations are outlined below. 2.1 ~Maior debris-flaw source areas. Atypical potential source area (~~reas ~n+here poten#ially unstable slopes exist) is shown on Figure 1, an enlargement to a scale of 1" = 500' of the U_S. Geological Survey ~~uadrangle map. Large-volume (in excess of 10,000 yd3) exist o~i :steep southeast-facing slopes approximately 500 feet above the !Middle Creek channel. Additional source areas also exist an the west :>ide of the valley farther to the north or to the south of tha# shown on 1=figure 1. The large Booth Creek debris flow of May, 1984 started in ;~n area similar to the one shown. 2.2 Iytinor debris-flow source arses. Minor source areas also exist within :mall landslide features on the east side of the valley a short dist~~nce s~bove the old (deactivated) U.S. Geological Survey gaging station. 'these landslides are too small to show on Figure 1. 2.3 I~revious flows. The Middle Creek channel has extensive prior dE~bris 11ow and flood deposits. These consist of boulders (up to 3 feet iri diameter), smaller rocks, soil, and vegetative debris. The flow deposits are lobate in shape within the channel and on the alluvial fan 08x1,4/2002 16:37 9706413236 ART MEARS PAGE 03 2 above Interstate 70, characteristic of debris flows. The lobes are up to 5 feet in thickness. A 3-foot diameter rock is considered to be of the size to be used in design for impact at the buildings and is consistent with observations. 2.4 Frequency of flows. Definitive estimates of debris-flow frequenc~~ were not obtained and may be impassible to estimate accurately because of mixing by many floods and small debris-flow events. only nearest "order of magnitude" (con-ect to the nearest factor of 10) estimates can be made. Based on our experience, we doubt the return period of large flows reaching to the alluvial fan could be as long as 10,000 years (1040 years) ar as short as 100 years (102'0 years). We assume, therefore, that the return period lies in'the n~nge of 1,000 ~~ears (1030 years) and probably lies between 300 and 3000 years (102-5 to 103-5 years). More accurate estimates may be po:,sible using detailed radio-carbon dating of buried soil horizons, but we doubt such studies would be fruitful given the propensity for mixing of soil layers by floods and flows within the channel. Furthermore, to our knowledge, such studies have not been done at other locations vrithin the Town of Vail. 2.5 the alluvial fan characteristics. The current alluvial fan is shown on ~ihe detailed topographic map (Figure 2) provided courtesy of Tor~~ Kassmel of the Town of Vail. This fan consists of debris that has Keen transported down Middle Creek by floods and debris flows ttnd .s intermixed with glacially-transported boulders from upper Bootlt ~~reek and the high-elevation basins to the east and north. The IVlountain Bell Road, the large communication tower, the early- learning center, and parking lots have been excavated into this fc n. 3 DEBRI~~ FLAW MODELING 3.1 Limitations of modeling. Procedures for mathematical modeling cif debris flow are available and have been used at various areas i:hroughout the United States and elsewhere. Ail of these models are ;subject to some undefinable degree of uncertainty because ttlq friction ~~nd other resistive terms used in the models are not known but rr;ust Ise estimated. We feel such modeling is of limited applicability here. 'the Middle Creek flows, similar to those observed at Vail in 1984, result as unstable soil and rock avalanche and slide into flooding tributary channels during heavy spring runoff. The flows begin a:~ unstable, saturated soil is "pushed" off steep slopes by groundwater biped through and between sedimentary rock layers. This is exactly what occurred in many of the 42 local soil-slip landslides, debris ;avalanches and debris flows of 1984. Such events do not lend themselves to typical hydraulic modeling, but instead, suggest an avalanche-type or "inertial-type" model in which the initial 08/14/2002 16:37 9706413236 ART MEARS PAGE 04 landslide/debris avalanche stage moves at relatively high speedf; and quickly decelerates to slower speeds in the stream channels. 3.2 Modeling applied. We applied atwo-dimensional, three-campon~snt, stochastic mode! to the avalanche/debris flow process at Middle Creek. This is kinetically similar to an avalanche model but the parameters that control the output of the model were modified to simulate field observations. The results are summarized graphically on Figure 3. A high speed of approximately 20mis is attained on the steep slope but a more "steady-state" velocity of approximately 6 - 10 m/sec (20 - 33 #t/sec) is maintained in the central channel above the alluvial fan. Velocity measurements of the massive Booth Creek flows were not made in 1984, but visual estimates made by myself suggest speed maxima in the 4-5 rNsec (13-18 ft/sec) range in the upper channel. We assume, therefore, an impact speed of 4m/sec (13 ft/see) at the proposed housing units on the alluvial fan because ihis is consistent with the 1984 observations and the modeling results. This speed was used in the development of design criteria. 4 MITIGATION DESIGN CRITERIA 4.1 Elements of the design criteria. These consist of three elements: (a) the impact pressure, (b) the impact height, and (c) impact of boulders ~n the flow. The magnitudes of these parameters depend on the ~ocation and orientation of building surfaces exposed to the flow. 4.2 ,Impact surfaces. These consist of the uphill (north) facing walls cif i~uilding "A" (which is exposed to normal impact) and the west-facing Nall of building "C" (which is exposed to reduced normal impact a.nd shear). These are summarized on Figure 4 which indicates the magnitudes and vertical distributions of the debris-flow design lo~~ds. 4.3 Solid impact of boulders. Building walls are also exposed to impFict i~rom the 3-foot diameter design boulders which could be carried in the 11ow. The impact of a solid boulder differs from the impact of the fine- ~~rained material and small rocks comprising the matrix of the mu~1 ~nrhich produces the impact pressures defined in Figure 4. The Moulders produce point loads. For flexible construction elements such .as beams, structural deflection must be considered in computing the impact force, P. Equating the kinetic energy of the 3-foot design Moulder with work expended in bending deflection yields the relationship p = (M V2 K) °'S, where M is the mass of the 3-foot bc~ulder 1;2,333 Ibs or 72.4 "slugs"), V is the impact velocity (13 ftlsec~, and K is stiffness factor. For a simple cantilever beam, K = 48 EI/L , wh~3re I.I is beam stiffness and L is length. The relationships expressed ~~bove indicate that flexible structural members are more efficient in resisting impact than stiff ones. The actual expression for stiffne~;s will probably differ from that given depending on structural engineering details and would need to be considered in fine! engineering. 68/,14/2602 16: 37 9766413236 AP,T I~IEARS PAGE 65 4 FI~~URE 4. Design loads on exposed walls of Duiktings A" (north- fai:ing) and 'C" (wesf-fadng). Impact ofboulders are not Included and ca n be calculated in a manner slmNar to that of Sedlon 4.3. .. - .. r,r Build' a~A,, . r ! . .. ~ I .._.~. ~.o ~~ ,» Bitiid~~t "G" 1 1: I ~~ ~. ~ ~ , ... ~ .. -r. }?~,p~ 6.0 ~t ~SA~~ {3hear on bui].d~ng "C" la ~ o~ noxmaJ. g~easvxe 4.4 ,Additional considerations. Windows and doors should be avoided on 1:he north side of building "A" and the west side of building "C" unless i;hey are designed for impact of debris and rocks. 4.5 ,~Iternate mitigation. An alternate form of mitigation considered Haas ~:onstructing a deflecting wall on the south side of the channel ab~~ve t:he parking area and existing Nlt. Bell building. This alternative was rejected because field work conducted on July 30, 2002 indicates {a) major flows (similar to the Booth Creek flow of 1984) would quick y fill in the channel, and (b) small, low-viscosity flows could be deflect~1d by :such a berm downstream onto adjacent property, in violation of ~,hapter 21 of the Vail hazard ordinance. 4.6 i~ompliance with Vail Hazard ordinance. The proposed mitigation will Ise fully compliant with terms of Chapter 21 of the Vail hazards ~>rdinance. The mitigation will not deflect flows onto adjacent public ~x private property. i? 08/18/2002 09:00 9706413236 ART MEARS PAGE 02 5 5 RaCKI=ALL Ttie north wall of building °C" is indicated on Vai! hazard maps as lying within a "moderate severity" rockfall hazard area. The steep terrain directly above the building ri:~es approximately 60 vertical feet and does contain some small, (< 1 foot long) potentially unstable boulders. Some of these appear to have roll~:d to the proposed location of the north wall of building "C." Such rockfall events would not damage the building and are such rare events that mitigation is not recommended. Report pre pared by, C'~~~~~ ~ti~~ ~ Arthur I. Mears, P.E. 08.!14/2002 16:37 9706413236 ART MEARS PAGE 07 ~.r ~ ` ~~ , ' -w.a ~~`~ i .' ' s w ~ ~ ~. • :. .~ ~s ~. ~~ ~ ~. ~~ f ~,.: ~-- -=" ~ -~` ~-+, ~- ".~~. i ~7 ~rrW tiV ~~~A` ~-_ '~~ ~~ ~ ~, ^ 1 ~~ w„ i ~ b -- _.,,.,....,,.a- , ~--- '+ ~ ~'Y i w-- ..- --- - 1-D TopoQaad~ Copyrf~M O 1999 DeLanu Yernwdh, ME 01096 Source I~lr. UBG4 ~-~----+Z00 R Suk: I :6,000 Deall: 1d-4 ~tum: NAD27 FIGURE 7. ,_oCatlon map showing hypothetical kxatlat of a major, "9ooth-Creek type° ;low. Such an event was used in hazard quantlficahon. SmaslJer unstable slopes were also loc ~ated on the east side of the channel below ~ 400 feet elev8tion. SCALE: 1 " _ X00' L~~~. VA= ~`~J ~~~ FIGURE 2. Detailed topographic map of the Mid Creek alluvial tan (location of this project) showing potential 1lmTts of a ma/or flow durfr-g current (July, 2(102) cortditlona. Newlyproposed bulklings and landsc~~ping may alter flow dlr~sction_ SCALE.' 9" = 900' RG,t D I6',E T 0R!24/2002 16:37 9706413236 ART MEARS PAGE 08 LE/7,4/2002 16:37 9706413236 589 particles start £zom top segment i.~ ~ ... ,~ /. ' c:\p1k\middle creek fLow.txt Path drops: 251 m FxiCtion mu 0.11 log M/D d 2.00 Random R -~ 0.4 0 0 Alpha o 15.9 degrees ART MEARS PAGE 09 1482 particles deposited. ~ Front stops at X ~ 913 m ....... ............Front Speed (max ~ 19. 8 m/s) ______Meen speed (max ~ 20.4 m/e) Deposition (not to scale) . Exit and view distributions in your file c:\plk\zesults.txt FIGURE 3. Grap,iica! dasplay of stochastk computer model used to simulate flow along centerline. Not to scale. H~~ ENVIRONMENTAL ~c~-~ ACOUSTICS AND VIBFATION CONSULTING July 12, 2002 Otis Odell, AIA Principal Odell Architects 32065 Castle Court, Suite 150 Evergreen, Colorado 80439 Dear Mr. Odell, This letter provides an update to the original noise analysis conducted for the Middle Creek Affordable Housing Project in Vail, Colorado (Ref Letter from Hankard Environmental, Inc. to Odell Ard~itects dated 1/28/2002). The reason for this update is because the layout of the original design has been changed, thus the noise analysis had to be revisited. As with the original analysis, the purpose of this study was to compare the calculated overall interior noise levels for fire proposed structures to the U.S. Department of Housing and Urban Development (HUD) interior noise goal of 45 dB(A) (Ref: The Noise Guidebook, U.S. Department of Housing and Urban Development, 1991). The updated analysis shows that the proposed Middle Creek Affordable Housing project will achieve the IIUD interior noise goal of 45 dB(A) using standard exterior wall construction. It should be noted that this analysis was conducted using peak-hour (loudest-hour) traffic conditions, which typically only occur for a total of about two or three hours per day. The following provides an explanation as to how the exterior and interior noise levels were calculated, followed by the results and comparison to the HUD interior noise goal. Noise Level Calculation Metlzodolobry Similar to the original analysis (Ref Letter from Hankard Environmental, Inc. to Odell Architects dated 1/28/2002); the exterior noise levels were predicted based on measured noise levels at the site, topography of the site, peak-hour traffic volumes and speeds provided by the Colorado Department of Transportation, and an updated design layout provided by Odell Architects as shown in Figure 1. Noise levels were predicted for each structure on the top floor using its nearest location to I-70, which typically corresponds to the loudest location. Primary factors that affect the noise levels include the distance of the structure to I-70, the location of any barriers or berms that block the I-70 traffic noise, and the amount of sound absorption by the ground. As with the original analysis, no significant noise bamers were found between I-70 and the proposed structures, and no ground absorption was applied to the calculations as the proposed structures are significantly elevated. Thus, the results of the analysis should provide a near worst-case scenario. '-~ .....~AAido ' - ~.:. y; 103 East Simpson Street • Lafayette, Colorado 80026 phone: (303) 666-0617 fax (303) 666-1053 • www.hankardinc.com ~° ti LEGEND ® =noise level prediction location ~ -previous structure locations f_ ~ - O ~ =current structure locations ~tyN r~.~` -`. `. ~ i i `~-~ 4----!~ -- ~ i ~ ~ ~~ I_ ~ ~ _ __! , _ ___ ~ ___ o ~ o NORTI-I FRONTAGE ROgp IN~RSTATFH/Gyw Ay~~ a n 0 a ~ <~.! ~ _ _' ~ m'~6 ~,~ o a; z o ~ N z y H~~ ENVIRONMENTAL ---- - A000STIC+ nN0 VIBRATION CONSU KING Results and Comparison to HUD Noise Guidelines The results provided in Table 1 show the predicted interior and exterior peak-hour noise level for the front facade of each structure nearest to I-70. The standard amount of transmission loss for exterior wall construction of26 dB(A) was used (Ref. Noise Control for Building and Manufacturing Plants, Layman N. Miller, BBN, 1981, Table 6-7). Note that one assumption made here is that all windows are operable but closed, and that they cover no more than 10-20% of the exterior wall area. TABLE 3 UPDATED INTERIOR AND EXTERIOR NOISE LEVELS FOR THE 1VIIDDLE CREEK AFFORDABLE HOUSING Proposed Description Exterior Peak-Hour Standard Exterior Wall Construction Interior Peak-Hour Structure Noise Level Transmission Loss Noise Level ( ---) (---) ~dB~A)) ~~~A)) ~dBIA)) Building A apartments with 69 26 43 cormnunity center Building B apartments 67 26 41 Building C apartments with semi- 68 26 42 underground parking Building D daycare center 64 26 38 As shown in Table 1, the predicted interior noise levels are below the 45 dB(A) specified in the HUD guidelines (Ref: The Noise Guidebook, U. S. Deparbne~~t of Hozrsing and Urban Development, 1991). These results were similar to the original analysis, as the locations of each newly designed structure did not move significantly nearer or further away from I-70 as shown in Figure 1 on the previous page. As with the original analysis, it was assumed that standard exterior wall construction consists of a 4" exterior wall with '/z" thick gypsum wallboard on the inside, '/z" thick plywood on the outside, and acoustically absorbent material (i.e. fiberglass) loosely f lling the cavity. Standard windows were assumed to be double paned with a 0.2" airgap. Additionally, because these multi-family structures have exterior doors opening directly to the outside, all doors facing I-70 were assumed to be solid core wood (or acoustically similar material) that is 2" thick (or a density of 8 Ib/ftZ) and well gasketed. Thank you for involving us with this project. Please call if you have any questions, or we can be of further assistance. Sincerely, ;~ ~ -~ Jeff Cerjan Senior Engineer UPDATED Middle Creek Affordable Housing Interior Noise HUD Comparison page 3 Traffic Impact Assessment For the Proposed Middle Creek Residential & Early Learning Center Development Vail, Colorado Prepared for Odell Architects, P.C. Evergreen, Colorado Prepared by TDA Colorado, Inc. 820 16'" Street, Suite 424 Denver, CO 80202 (303) 825-7107/FAX (303) 825-6004 January 24, 2002 Updated July 12, 2002 Attachment: I ~Lliddle Creek Traffic Impact Sirsdy Table of Contents INTRODUCTION .................................................................................................................................. 1 EXISTING AND FUTURE ROAD CONDITIONS ............................................................................... 4 NORTH FRON'T'AGE ROAD .................................................................................................................:.... 4 VAIL ROAD ........................................................................................................................................... 4 I-70 INTERCT-TANGE RouNDASOUTS ....................................................................................................... 4 E~STING LEVEL OF SERVICE ................................................................................................................. 4 North Frontage Road ........................................................................................................................ 4 1-70 Main Vaillnterchange North Roundabout .........:........................................................................ 5 ProjectAccess .................................................................................................................................. S PROJECT TRIP GENERATION .......................................................................................................... 7 Residential Trips ............................................................................................................................... 7 Learning Center Trips ....................................................................................................................... 7 Town Bus Trips ................................................................................................................................. 7 PROJECT TRIP DLSTRIBUTION ........................................................................................................ 8 FUTURE TRAFFIC CONDITIONS ...................................................................................................... 9 FUTURE VOLUIv1ES ................................................................................................................................ 9 FUTURE LEVEL OF SERVICE WITH PROJECT ............................................................................................ 9 Residential/ll~ta Bell Access .............................................................................................................. 9 Early Learning CenterAccess ........................................................................................................... 9 North Frontage Road, Two-lane Roadway ......................................................................................... 9 RECOMMENDED PROJECT ROAD IIVIPROVEMENTS ............................................................... 12 Left Turn Lanes .............................................:................................................................................ 12 Right Turn Storage Lanes ............................................................................................................... 12 Right/Left Turn Acceleration Lanes ................................................................................................. 12 SUMMARY OF FINDINGS .............. ............................................................................................. 13 APPENDIX A .........................................................................................................................................A LEVEL OF SERVICE WORKSHEETS, AM & PM PEAT{ HOVRS ...................................................................A Figures Figure 1 Vicinity Map .............................................................................................................................. 2 Figure 2 Site Plan ..................................................................................................................................... 3 Figure 3 Existing Peak Hour Volumes ...................................................................................................... 6 Figure 4 Peak Hour Volumes at Buildout ................................................................................................ 11 Tables Table 1 North Frontage Road Peak Hour Level of Service ......................................................................... 5 Table 2 Vehicle Trip Generation ........:...................................................................................................... 7 Table 3 Peak Hour Level of Service at Buildout ........................:............................................................... 9 Table 4 North Frontage Road Level of Service ........................................................................................ 10 i 'T®A Page 1 Middle Creek Trafu Impact Study INTRODUCTION This report describes traffic conditions, now and in the fixture, in the vicinity of the planned Middle Creek residential and adjacent daycare development in Vail along North Frontage Road. The 6'/z-acre sloping site is west of the Main Vail Roundabout adjacent to the "Ma Bell" communications tower and an existing daycare center, Figure 1. A single access drive serves both existing uses. The Middle Creek project consists of 142 affordable apartment units and a contemporary early childhood learning center, replacing the exiting center. The mix of studio, 1-, 2- and 3-bedroom units is structured to the affordable (deed restricted) housing market for Vail Valley workers. The estimated 315 tenants are likely to be singles and couples employed in the mountain resort service sector. Studio units (64 dwellings) will comprise just under half of the total unit mix. As shown in Figure 2, The new childhood learning center will be situated east of the residences and will have separate access and parking. A total of 245 surface parking spaces will be provided for the residential portion of the project and an additional 20 will be part of the Teaming center site. Residents will have good alternative transportation choices. The site is convenient to three Town free bus lines serving North Frontage and the Town's transportation center in Vail Village. A bus turnout alongside the main entrance will permit on-site boarding and alighting. Pedestrian walks will connect with the Town's trail system. The Town's in~own bus system and transportation center area '/4-mile walk/bike to the east and south. The I-70 pedestrian overpass connection to Lionshead Village is '/z mile (10-minute walk) west of the site. This report describes the expected trip making characteristics of tenants and day care patrons and workers, evaluates existing and expected future traffic operating conditions in the vicinity and lastly, it addresses the need and scale of suggested access and circulation improvements. This report contains the following sections: • Introduction • Existing & Future Road Conditions • Project Trip Generation and Distribution • Future Traffic Conditions • Recommended Road Improvements • Summary of Findings • Appendix A: Level of Service Worksheets 'T®A ~~ SANDY LN. ~XrS7L r~ ' med. o. ,, ~ ~ ~, ,, ~. Ll~iV~ ~~ D L1o~5~E z r~ v1 L ~ ,~ a 0 ~ FOREST ' NORTH No Scale :• . ~' ... . s-r .... .-r...:r....:r.. . .. .. .............. ..... ................. ......... e~:. ............................ ............... ...... ..... .... ... ........... ....... ~:1 '~'~'1 BELL-. R0. ®M ~:~ ` >:1 ~-- ~ r _v:r .- 1- Sp~~ =1 ::i ~t- ~~ E LIONSNEAO CIR. ~~' ~ ;::a •,a :~ ~ j O :; r I ~•~~t Tr.r .~.Tr:r Jr • ~ /Y/ / MEAOOW ~ / C Q'• p~E c, ~~eek ~~` 0~ R ® ~~P x E \ ~, x~ OAM ~~ Rp ~ R O • ~ ~ x ~. 2 W ~L,R ROC~"G EOC f- ~ ~~ ~~ m SCN ~ ~ • 9Q ....... ........................ `. .., i ..................... • NC,~~ ~~~.. MILL ...'~.~ \ Vicinity Map Middle Creek Development FIGURE 1 'T'®A •. ., :~~.. __ . ( J A~iddle Creek Traffic Impact Study TDA Colorado Inc. _.. .. - ...-- ......8400 ... _ - ___ : ' '• \\i. ' .. _ . __, B4$-0- - .- -- -----•-- .. _.. _ _ . - _ - _... _.. -. ._..- (Iq]-ARD _ 4E4~.SLOPELWE -__.. _ .- ~ EDGE DP ByD.DD79 '~ ~ .._. - - .- _ _. ._. __hETIGALON.-.._.. ..__. ._. _-PDUNDATION (GUII)J1iGC ,~~} '. _ __..-.._ ~ ._.._ _ -- I, ... .. _.__.. -. ._. _.._..._--. ._ .___ WQ.I.NO7 ENGROAC NCO' ~. ... _.._ _.._. _ FFIi . --. ~ WALL _ .. .._ - .~ , . .. ~ ~. - _ _. - ... _.._ .__ - 8350- ..._.... ~... _- -' i _ ----- - I - _ _.. ., .- - - . - _._... _ _ - _- ~ i~l -- - . __ - _ - __ -. - .- - _ / \. • '` - - -_ - " - _._ -- ~ ~. ~ ,. `, . -. "~ .. .. ,• - ~.._ - - , .. _.. _ 8300---- -..-. __ - - ._ -- \ ~ ~_ _ ... __ -_.._- y , ~~_ ~~ ~~ \. --_-_ ~ _ -I-_8400- ~ _.~ ~f' ~ ~' ~ ~~;._._ _ ` ` - ~-8350 ~' _ • ~ _ ~ .. • _ - - ~-~~ /r j + , . ' ~ -_~ _ ~,~_ _ 8290 ~ ~ 280 ~- ~ I ~~ r; ~ °^ _` ~ -~ -~` ' - ~~_~~ l~ 8270 _, -~~ ~-, _ - _ , \ ;~,_~ ~ ~ ~-8260'. \ ~ , `. , - -_- = ~ -- -_ _ _ - -~. ~ 8250 ~ _ ~~. -~_ _.. _ _ _ _ - -' - '_ M - --- _ _^~`~` ~~_ 8240 ~_ `~- - - _=~- - _ _ _'~... - - - -- - _ ~ _ ~ _._ _ _ _ ~ ~ 8230 _-- ~-~_ __ - - - ' -'- -NOAIN - _ ' -`_•~ -- -8220 - `_ ... __- EaAD_•-.-.-.-.-._. ---- __- _ __ INTHRSTATS HIGHWAY 7 ' - -'- - - -'-'- --'-'- -•- - - - - - - _ _ - - - _. __- _ _ _ _ _ _ _ -~- - _,_ - II ~__ _. .. - .. _._._ - • ----- _. r _ _._,_. ~ EXISCIIJG PARKING Ii7 TRASH COMAIUTHTY VERTICAL LANDSCAPE PARKING AND TURNAROUND IDG.STINO ASP817 _- _"._..-'-. - - - - _ - - - ~ - - - _ - • _ COTTONWOODS SETBACK WII.I. ENCLOSURE CENTER /BUS CEiCUI.ATiON 'BUFFER' AREA IN SETBACK SCREENED 87TH GROVE - - , - - `"': AND ASPEN TO BE SL7tffilED HY STOP TOWER (RE: I.ANDSCAPB) HVERGREEN PLANTIN09 REMAIN flX13TING TRHES ~ ~} `~(\j\~\~\/\) AND EVERGREEN -- - - S I {,e P~G 1 V - PLANTINOS - Middle Creek Development Figure 2 ~PACHIIECIURAt SITE PLAN _ '°"7/12/02 3 ~i~f.4a..:...-. Page 4 Middle Creek Traffic Impact Study EXISTING AND FIITURE )GOAD CONDITIONS This section describes existing and future traffic conditions along North Frontage Road in the project vicinity. , North Frontage Road North Frontage Road is a two-lane frontage road within the I-70 right of way. Graded shoulders vary from four to eight feet in width. It connects the Main Vail and West Vail interchanges serving lodgings, the Town post office and commercial uses along the north side of the road and roads branching offto slope-side home sites. The alignment is essentially straight with gradual vertical curves that follow the gently rolling terrain. Posted speed is 35 mph in the project vicinity. Peak hour traffic counts performed recently' suggest a traffic volume of about 6,000 vehicles per day passing the site. Vail Road Vail Road connects Vail Village to the I-70 interchange and the frontage roads serving each side of the interstate highway. The two-lane road flares to add lanes at the roundabout approaches. South of interchange two-lane Vail Road intersections with West meadow Drive and Willow Road are Stop-sign controlled. I-74 Interchange Roundabouts The Main Vail I-70 interchange roundabouts were the first modern roundabouts constructed in the state of Colorado. The South Frontage Road roundabout is the largest in the state at a 200- foot outside diameter. The North Frontage Road roundabout is the smallest in the Vail Valley at 120-foot diameter. Counts taken at the North Frontage Road leg indicate PM peak hour volumes of 220 entering vehicles and 750 exiting vehicles of which 3S came from the I-70 westbound off ramp. The North roundabout functions effectively as a single circulating lane, although vehicles can physically travel two abreast around the circulating lane. E~sting Level of Service Level of service (LOS) is a method used for evaluating roadway traffic operating conditions. It is dependent on many factors including traffic volumes, percent heavy vehicles, lane and shoulder widths. The level of service is determined by calculating the delay experienced by each vehicle. This delay is assigned a letter between A and F representing the length of delay. At LOS A motorists will experience little or no delay. At LOS F motorists will experience slap and go conditions and extensive delay. Delay is used as a measure of comfort, convenience and maneuverability of the driver. Delay for the affected. intersections was determined using Highway Capacity Software, implementing methodology in the Highway Capacity Manual, 1994 updated 1997, Transportation Research Board. The intersection capacity analysis worksheets are included in Appendix A. North Frontage Road For atwo-lane, 35-45 mph roadway with 11-foot lanes and 4-foot shoulders, limited passing opportunities and uninterrupted flow the service volumes for each level of service range from 125 vehicles per hour at LOS A to 1,755 vph at LOS E, as shown in Table 1. The observed (December 2001) peak hour volume along North Frontage Road at the project access is about 415 vehicles in the 8:30 to 9:30 AM peak hour and 535 vehicles during the 4:15 to 5:15 PM peak, Accordingly, current two-lane roadway operation is LOS C in the AM and PM peak periods. Peak Land Consultants, Inc. Thursday 12/13/01 'i'®/O Page 5 Middle Creek Traffic Impact Study I-70 Main Vail Interchange North Roundabout According to Lief Ourston, the Town's roundabout operations consultant, peak hour volume entering the roundabout is 2,233 vehicles and at this level the roundabout is operating in the LOS A range. This indicates there is a considerable capacity reserve available at the north roundabout. Table 1 North Frontage Road Level of Service Middle Creek Maximum Service Flow Volume LOS Vehicles per hour A 125 B 330 C 610 D 915 E 1,755 Source: TDA Colorado using HCS two-lane highways. Project Access Morning and afternoon turning movement counts at the existing Day Care/Ma Bell access drive are shown in Figure 3. The highest single movement, 28 westbound right turns from North Frontage Road, occurs during the 8:30 to 9:30 AM peak hour. During the PM the highest movement was 15 left turns to eastbound North Frontage Road (toward the I-70 interchange) followed by 141eft toms from the eastbound direction. Daycare trips appear to be linked westbound frontage road trips in the AM and the return eastbound trips in the PM. The prevailing flow of through traffic is eastbound in the AM and westbound in the PM. '~'E3A Figure 3 Residential and Early Learning Center Access AM (PM) Existing Peak Hour Volumes Middle Creek Development N^RTH No Scate Existing Daycare/Ma Bell v~ ~Iage- a. Page 6 Page 7 Middle Creek Traffic Impact ,S'tudy PROJECT TRIP GENERATION Project vehicle trip estimates are based on The Institute of Transportation Engineers publication Trip Generation, 6``' Edition, 1997. This document is a compilation of trips rates derived from traffic counts at similar uses throughout the country. Most ITE residential trip rates are from traffic counts at suburban settings with little or no access to public transit. Residential Trips The Middle Creek project is located along a high service transit corridor with good pedestrian and bike linkages to Vail and Lionshead Villages. A majority of tenants are expected to work in Vail establishments where long-term (i.e. `worker") on-site daytime parking supply will be at a premium for much of the year.. We anticipate Middle Creek residents will be less inclined to travel locally by car for work and personal business trips than their "I'I`E-apartment" counterparts. Accordingly, we expect daily residential vehicle trips will be in the order of 20% less than the ITE derived rate and peak hour vehicle trips will be one-quarter to one-third less than the ITE rate. Urban centers with high all day parking costs and good transit access can have transit mode splits of 25 to 40% in the commute periods. We believe Middle Creek residents could readily exhibit a collective 30% walk/bus/bike mode split in the commute periods. With these project- specific adjustments we estimate at buildout the residential use will generate 753 daily, 52 AM and 61 PM peak hour vehicle trips, see Table 2. Learning Cenfer Trips The early learning center will have 15 employee and short term spaces. Parents typically park for five to 15 minutes for the morning drop off and evening pickup. Using ITE rates for a Day Care Center, the center is expected to generate about 470 trips per day and about 75 vehicle trips during each peak hour. Table 2 Estimated Vehicle Trip Generation Middle Creek Development Vail, CO Land Use Size Type Dail Day Care 15 Employees 468 Apartments2 142 Dwellin s 753 Total - 1,221 AM Peak !n Out PM Peak In Out 41 9 35 43 37 41 41 20 49 77 78 62 127 139 Source: Trip Generation 6th Edition, Institute of Transportation Engineers, 1997. 1. Day Care Center, ITE Land Use 565 2. Apartment, ITE Land Use 220, adjusted to 80% of ITE daily & 70°~ of peak hour. Town Bus Trips Although not part of the project per se, buses entering and leaving the residential access drive are added to the project peak hour volumes for operational analysis purposes. The three bus routes serving the site operate at 30-minute frequency in each direction producing 12 bus trips (6 in, 6 out) per hour. These trips are added to project access trips to arrive at total access drive trips. 'T®A Page 8 Middle Creek Traffic Impact Study PROJECT TRIP DISTRIBUTION Middle Creek residential trips will distribute over the surrounding road system based on trip origin or destination, and ease and directness of travel. New residential trips will travel west on the frontage road for food shopping, mail and other local personal business trips. More distant trips outside the Town will be oriented east toward the I-70 interchange. Accordingly, we distribute 50% of residential trips to the west and 50% east of the site. Day care trips, which tend to be linked to other trips, are distributed similar to existing entering and exiting patterns. . T'®~4 Pagc 9 tbliddle Creek Traffic Lnpact Study FUTURE TRAFFIC CONDITIONS Future conditions were analyzed assuming project buildout by 2003. An annual background growth of 3% was assumed for the vehicle volume along North Frontage Road not related to the project. This accommodates moderate continuing residential development along the North Frontage Road travelshed. For future analysis we applied the ITE trip rates to early learning center. These are somewhat higher than the observed peak hour day care volumes and are assumed to account for added business due to updating the facility. Future Volumes Figure 4 illustrates peak hour volumes expected at the intersection of North Frontage Road and Middle Creek Residential and Learning Center-accesses. The highest turning movement will be westbound right turns - 31 entering the Learni~ Center access in the AM and a similar volume entering the residential driveway in the PM peak hour. The highest left turn entering volume will be 26 vehicles turning into the Learning Center drive in the PM peak hour. Future Level of Service with Project Tables 3 and 4 depict level of service at the two access drives and along two-lane North Frontage Road at buildout of the planned Middle Creek housing development and the new Learning Center, respectively. Capacity analysis worksheets are attached as Appendix A. ResidentiaU Ma Bell Access This Stop-sign approach will operate in the LOS B range for both the AM and PM periods. This is a very acceptable level for peak hour operation at a property access intersection. Left turns from the site will experience short delays (LOS B) in the AM and PM peak hours. Early Learning Center Access Similar to existing, this approach will experience short delay (LOS B). Left turns out of the site will have short delays, (LOS B). Table 3 PM Peak Hour Existing/Buildout Level of Service North Frontage Road/Middle Creek Project-Accesses Residential Learning Center Movement Access Access Southbound Left -IB '°'IB Westbound Right -/A A/P; Source: TDA Colorado, Inc. Using Hc;S unsignaiizea r,iieiyaia. North Frontage Road, Two-lane Roadway North Frontage Road east of the project is expected to carry approximately 460 AM and 610 PM peak hour vehicle trips. At this volume, two-lane North Frontage Road will continue to operate at LOS C during both peak hours. '~®~ Page 10 Middle Creek Traffic Impact Study Table 4 North Frontage Road Level of Service Middle Creek Development 2-Lane North Frontage Road Exisfing Buildout AMIPM AM/PM Volume 415/535 465/610 LOS"` C/C C/C * See Table 1 ~~~ Figure 4 Residential and Early Learning Center Access AM (PM) Future Peak Hour Volumes @ Buildout Middle Creek Development i' \ NORTH No Scale U U ~ Q ~ M U ~ ~ ~ --~ ~ ~' ~ O N N ~ ~ ~ ~~ -m.,...~ ,° ~ ~L N ~~ Earl y ~--- ~- ~ `~' ~y ~,~ -~ Learning ~ (23) F~ ~ ~ ~^ Center _;~~ ~~ ~ 242 ~~ (26) F 2sg Nosh Fronta (204 ge Rd. Page 11 Page 12 Middle Creek Traffic Impact Study RECOMMENDED PROJECT ROAD IMPROVEMENTS Several improvements are suggested at the Middle Creek project access intersections in conformance with the CDOT State Highway Access Code (see Figure 2), These changes reflect the 35 mph posted speed of North Frontage Road, peak hour volumes portrayed in Figure 4, and the Category F-R (frontage road) classification of the facility. Left Tum Lanes At 23 vehicles in the PM peak hour, the residential access is projected to be near the 25 vehicle per hour left tum threshold for warranting a left turn storage lane per the Code. This volume includes 3 westbound Town buses' As a matter of safety, we advise constructing a left turn storage lane at the residential access. The projected (for operational analysis) left turn volume of 26 vehicles for the Leaming Center access would just exceed this threshold. Accordingly, the left turn lane widening for the residentiaUMa Bell access should extend to the new Leaning Center access. The portion between the two drives can be stripped as a two-way left turn lane and thus serve as a left turn staging lane for left turns out of the residential access. This center lane will provide a larger, more comfortable effective left turn radius for buses fuming left out of the site. Right Turn Storage Lanes Neither access meets the 50-vph threshold required to warrant right tum lanes. Although a right tum lane would aid Town of Vail busses entering the property, widening for the center turn lane described above precludes additional North Frontage Road widening along the property's steep frontage. Right/Left Turn Acceleration Lanes Right or left turn acceleration lanes are not needed per the Code at this project for either access. The two way left tum lane suggested above will serve as a short left turn staging/acceleration lane for left turns leaving the site. T'~~ page 13 Middle Creek Traff c Impact Study SiJM114ARY OF FINDINGS A combined total of about 1,220 vehicles per day will use the two proposed Middle Creek residential and new learning center development access drives. Residents are intended to be employed at nearby Town shops, restaurants and business establishments. Daily site-generated traffic is expected to be about 20% less than a similar 142-unit apartment complex in a typical suburban setting. Similarly, the combination of daytime parkuig cost and availability in Vail and Lionshead Villages, proximity to Vail Village and, front door access to three of the Town's free bus routes suggests 30% less than typical site trip generation during the AM and PM commute periods. Peak period operation (level of service) of each access approach will remain in the same short delay range (LOS B) as the existing day care/Ma Bell access drive. Left turns from North Frontage Road will experience little or no delay in most cases. Left turn storage lanes are needed at each access drive per State Highway Access Code criteria. The new center lane can be striped as a Two Way Left Turn Lane. As such, the improvement will facilitate left turns (including Town buses) out of the residential site. Right turn deceleration or acceleration lanes are not needed per the Code. The volume of project traffic added to North Frontage Road will not cause a change in two-lane 35 to 40 mph highway operation. The road will continue to operate in the LOS C range, with PM operation nearing the low end of the of the LOS D service range. The nearby I-70 Main Vai] north roundabout intersection has considerable reserve capacity to readily accommodate traffic added by this project. 'li'®A Middle Creek Traffic Impact Study Appendix A Existing and Buildout (2003) Level of Service Worksheets, AM & P1VY Peak Hours T®/A HCM Unsignalized Intersection Capacity Analysis 2' North Frontage Rd. & Day Care DW 2/11/2002 Movement ._ ~~.: EBL~ ~~EBT WBT„ 5/VBR ~ rSBC,.~SBR _ '- ~ ..< ,_,;,:, ...,,. ,, Lane Configurations ~' '~ ~ ~ Sign Control Free Free Stop . Grade 0% 0% 0% Volume (veh/h) 9 .222 .157. 28 `9~ 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 10 _ 241 .171 .:.30 10 18 _ . Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) _ Median type , Nohe Median storage veh) vC, conflicting volume ; . 201 .. _ . 447: "` " 186 vC1, stage 1 conf vol vC2, stage 2 conf vot ..~. - tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 99 ~ 98 98 cM capacity (veh/h) 1371 565 856 . ~ _ ~ . Direction;;Lane#.. .,F4~:~:q_EB.1__-~/VB.1_ ~:S631,~:~SB;2~ _~~~7-~~,~y~r,r:~ •<...~..~:~r... •~~,_~~_ -~ 1 Volume Total 251 201 10 18 Volume Left 10 0 10 ; ,0 . . . Volume Right 0 30 0 18 cSH 1371 1700 565: :856 Volume to Capacity 0.01 0.12 0.02 0.02 Queue Length (ft) 1 0 1 2 Control Delay (s) 0.4 0.0 11.5 9.3 Lane LOS A B A Approach Delay (s) 0.4 0.0 10.1 Approach LOS B . Irite~section Summary_`. -~~-~- ~ .~ - y ~;~~,~`-y~r - - - - ~; ~4~--, `f~-°r- }r - Average Delay 0.8 Intersection Capacity Ut ilization 25.2% ICU Level of Service A Baseline Synchro 5 Light Report Existing AM Peak Hour tdadensmal-It51 HCM Unsignalized Intersection Capacity Analysis 2: North Frontage Rd. & Day Care DW 2/11/2002 .-~Y~~ Movement ~ ~~1,~`EB-LEBT =V116T.:4WBR;t SBLSBR " ;~~::.' ,r. ~ _~,r~~~ ~- ' `~~" ~ `'~ ? ~~ ~:~ Lane Configurations a' '~ ~ ~ Sign Control : `_ Free Free Stop Grade 0% 0% 0% Volume (veh/h) _ ` 14 200; ' 314 6 . 15 8 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h). .::15 :. 217 341. 7 16 9 . Pedestrians Lane Width (ft) . Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type _ ~. -;`.; None ,. ;:: Median storage veh) vC, conflicting volume . ' `=348 : , : 592 .:345 - vC 1, stage 1 conf vol vC2, stage 2 conf vol ,. ~ : ., :._ : .. tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) „ . tF (s) 2.2 3.5 3.3 p0 queue free % 99 - 96 99 cM capacity (veh/h) 1211 463. 698 ti „ ... ~ .._ ....-n..- ~ B ~~ c~~ B 2~ _ ~ JTS~~__S-A S ~ •~T/~A-h•1)+N- ~ yC 4~. ~~~ 1.~.. Y ..~ ~ ~ ~~~ 5 ~~~w:r :~~-~~ ~~~ ~ B 1 ~~ Z Lane # i D fi : '~ .~"~ irec on; ,. : ~Y : _... ~ ..> . ~. _ .._~ ~~... , . _ . _. . ~. >.. _ n.: :~. : ._ _ , Volume Total 233 348 16 9 Volume Left 15 0 16 _ 0 Volume Right 0 7 0 9 cSH 1211 :1700 :. `~ 463 ' 698 Volume to Capacity 0.01 0.20 0..04 0.01 Queue Length (ft) _1 0 3 1 Control Delay (s) 0.6 0.0 13.1 10.2 Lane LOS A ` B B Approach Delay (s) 0.6 0.0 12.1 Approach LOS : B .-^~^"~„"'fiT1E"".'sY~'-^'ic -^.5°-E-L.~q"5-~'rs+.` ..~-R /"21~y'Z""'-s,°.r-T~r' .t T.cy ~"r.•~~~~'e -,trc",~«,~---~:'`r _..~!~~~'t~~",'~.._~;3 Inte~secfion`Summary ~ ~~ -°~ ..~-~~ :~> _ _ .,r~,-~=~- ,-1--_~ - _ Average Delay 0.7. Intersection Capacity Utili zation 28.4% .IC U Level of Service A Baseline Synchro 5 Light Report Existing PM Peak Hour tdadensmal-It51 _ HCM Unsignalized Intersection Capacity Analysis '- 1 ~ North Frontage Rd. & Apartment DW 2/11/2002 ;~EBL~ _~EBT~ :WBT, ,'1~BR ,~~SB~~{PSBR ~.=_~. `- ~ ~- ~ ~_<~,_,.~,..~1 ,:. a r: _~x,~~::~- Movement , ' . : Lane Configurations . ~' '~ ~ - ~ Sign Control Free Free :. Stop ... Grade 0% 0% 0% Volume (veh/h) 7 ` 242 .' 170: ;8 :`. - 24 .;., 25 .... Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 8 263 ... 185: ;.. .._ 9 26 27 Pedestrians Lane Width (ft) ' Walking Speed (ft/s) Percent Blockage ,,;_ Right turn flare (veh) Median type ,. None -.. Median storage veh) vC, conflicting volume. 193 467. 189 vC1, stage 1 conf vol vC2, stage 2 conf vol .. tC, single (s) 4.4 6.6 6.3 tC, 2 stage (s) tF (s) 2.5 3-6 3.4 p0 queue free % 99 - . :.. .. - -.., 95 .., 97 , .. cM capacity (veh/h) 1214 526 828 ..... ~ .. .r..~ SB~~r B1 ~ 1~1/ ~ ~EB~-~ # ~ Lane cti Di „N.~i~~'~°'.._. ~ 1.. - S 'E.~'~ '~ J~1 h+sx'~v~et~~°S L .[ ~i~_ 31 ~:~ ~-~:~-M 5 ,.::_. rr~~.~:..,,~~~...a..-==---- :; ~~~;,1 t ~-~ , .~ .:~.-_. ~ S6 2~'-~~; _ on, , re ,~ _ , , _ : . : Volume Total 271 193 26 27 Volume Left 8 0 ::::. 26 0 Volume Right 0 9 0 27 cSH 1214 .1700 : 526 828.: Volume to Capacity 0.01. 0.11 0.05 0.03 . Queue Length (ft) 0 . _ 0 . .: 4 3 Control Delay (s) 0.3 0.0 12.2 9.5 Lane LOS A B ... A Approach Delay (s) 0.3 0.0 10.8 Approach LOS B _ z'~£_.~.,_ ~.~.~ _ P ~: ~~..?r t;~,-~_~~_~ 3 -~~3 ,_ ~~, : ~section~Summary ~~"~~-~ mot"-~'~- ,~-~ Inf e _ . . .. , ~~. Average Delay 1.3 Intersection Capacity Uti lization 25.9% ICU Level of Service A Buildout Synchro 5 Light Report B Baldgya 2003 AM Peak Hour Total Traffic tdadensmal-It51 HCM Unsignalized Intersection Capacity Analysis 2: North Frontage Rd. & Day Care DW 2/11/2002 Movement `~ti4~ ~~~~ EBL DEBT ~WBT'~WBR~=-~°SBL-e SBR-~~ ,...,~~F_..~~~:._~~..~ ' ~'~' ~~' ~~_ Lane Configurations c~' '~ ~ ~ Sign Control , Free .Free Stop , Grade 0% 0% 0% Volume (veh/h) 10 °: ` 265. : 156. ;31. 12 22 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 , Hourly flow rate (veh/h) :. 11.. .288 170. 34 . 13 .. 24 :_ Pedestrians Lane Width (ft) _.: :. . :. Walking Speed (ft/s) Percent Blockage ... : ::. ,... :.. ~. . Right turn flare (veh) Median type - None Median storage veh) vC, conflicting volume 203 496 ,186: vC1, stage 1 confvol vC2, stage 2 conf vol ':; . :. , tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) . tF (s) 2 2 3.5 3.3 p0 queue free % 99 ,: . 98 ~ 97 cM capacity (veh/h) 1368 529 856 ~ ~~ Direction Lane # ° ~. EB 1 a WB 1.,,~SB 1, .~SBy2,~ ~ _ ~~,~ ~~,~ ~, Tom, _~ :> ~.~~ , ~}:~r~- ' _ _..~ ...,:r__. .,.~..~... .,~ _ ....: ..... .... x,:. ~ ...___...~ ...:.._ _.. _ .. . Volume Total 299 203 13 24 Volume Left 11 0. 13 _. 0 _: Volume Right 0 34 0 24 cSH 1368 1700 529 .:` ' 856 Volume to Capacity 0.01 0.12 0.02 0.03 Queue Length (ft) 1 0 - 2 .: :: 2 Control Delay (s) 0.3 0.0 12.0 9.3 Lane LOS A B . A Approach Delay (s) 0.3 0.0 10.3 Approach LOS B Inte~section`Summary ~ ~ ~'"`~~~ „'~"~' r `- ~~~ u ~ n:, ~ ,~l~-°,~~~,-~~.~..~:~~~y~~ . Average Delay 0.9 Intersection Capacity Utilization 28.5% I CU Level of Service A Buildout Synchro 5 Light Report B Baldgya 2003 AM Peak Hour Total Traffic tdadensmal-It51 HCM Unsignalized Intersection Capacity Analysis 1 ~ North Frontage Rd. & Ap artment DW 2/11/2002 __. -~--~ ;-. , EBL~ EBT -~ ` ~ WBT~IIBR rte= BL~;wSBR ~ ~ ~.-~~ ~` w'" ~.4 F„ ~ _: 3 Movement _ :: ~ _ ... ~ ~ - . ~, . ....: .: -. -x- ---~ :... . ,.,.: .: ~ Lane Configurations ~' '~ ~ ~ Sign Control ,. <... Free Free Stop Grade 0% 0% 0% ... Volume (veh/h) :-.:: , . .:'.23 . . 217 ;350 . . 24 .... '.13 13 _. . Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) :. ..25 ` .236 380 26 : 14 14 Pedestrians ,.. Lane Width (ft) Walking Speed (ft/s) Percent Blockage - . . Right turn flare (veh) Median type None . Median storage veh) .. vC, conflicting volume. _,.,407 - ;. 679 393.. _ ... ... _ vC1, stage 1 conf vol vC2, stage 2 conf vol ,. :. - . tC, single (s) 4.3 6.6 6.4 tC, 2 sta e s , :. _ . tF (s) 2.3 3 7 3 5 .. p0 queue free % 98 - 96 98 ' cM capacity (veh/h) 1081 375 608 Direction ~~L na a#'=~E6;1~;~ W6;1=~ SB _1 ~ S62~ .~ ~ ~- T~ ~,.~;t = r~~~~"~~~ Volume Total 261 407 14 14 Volume Left . .. ` . 25 0 14 .. ._ 0 . _. . Volume Right 0 26 0 . 14 cSH 1081 1700 375 608 Volume to Capacity 0.02 0.24 0.04 0.02 Queue Length (ft) 2 0 3 2 - Control Delay (s) 1.0 0.0 15.0 11.1 Lahe LOS A . B B Approach Delay (s) 1.0 0.0 13.0 Approach LOS B '~Tn+r+r ~•^'~~T~~~ ~T1 J'-.' C ,t _~~.~ r-'a -..C"~,. ..1._. ~~ '. 3 - ,i~. vl~=~ Irite~section Summary ~ ~- ~. ~ ~~ ~ - s -~- - - Average Delay 0.9 Intersection Capacity Utilization 31.6% ICU Level of Service A Buildout Synchro 5 Light Report B Baldgya 2003 PM Peak Hour Total Traffic tdadensmal-It51 HCM Unsignalized Intersection Capacity Analysis 2: North Frontage Rd. & Day Care DW 2/11/2002 Movement ~'~' _~ EBL~,EBT~=WBT,~-.W.~B,Rg SBL ~ ~SBR,~ ~.?J ~k Lane Configurations ~' '~ ~ ~ Sign Control Free Free ,.. ; . Stop .. ;. - Grade 0% 0% 0% Volume (veh/h) 26 204 362 :': ''11 .. 27 14 :.-:_. '..: Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vehlh) 28 222 .393 ; ` 12 .. _ 29 :. 15 .:.. Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type ;: , : None ,: Median storage veh) vC, conflicting volume 405 39,9. , ..... . ~` 678 . , .. . vC1, stage 1 conf vol . vC2, stage 2 conf vol .. ,. , tC, single (s) 4.1. ' 6.4 6.2 ,_ tC, 2 stage (s) . -.:. ; . ..:. . . tF (s) 2.2 3.5 3.3 - p0 queue free % 98 . 93 ..: 98 ' _ .. . ` cM capacity (veh/h) 1153 408 650 ~ : ~ SB ~1~~~56- 2~ ~ ~~: r~~:~ ;; : ~Lane # EB 1 WB 1 ctio p ~ ry ~, - ~~~ J ~~-~ -~ .~° n ire ~ .. _ .. Volume Total 250 405 29 15 Volume Left 28. 0 -: 29 :;, 0 ':' -. - - Volume Right 0 12 0 15 cSH 1153: ,:1700 408 650 - Volume to Capacity 0.02 0.24 0.07 0.02 Queue Length (ft) 2 0 6 2 Control Delay (s) 1.1 0.0 14.5 10.7 Lane LOS A B B Approach Delay (s) 1.1 0.0 13.2 Approach LOS B. ... _..___. _.-....... . -•.~..,,.,...~.- 3~-,.r ~°r ~: S--~c- .a :-?n'fr"'~ ~;~•~'n"'°°"•"°''-.c ~'mF- .. i+--4.5"-rr..--° ~ r•--m-=-3 ~r~c--~'~'~, F ,~r~ r , ~~, ~,~ ~ z ~_ ~ E ~~: s ,~ ~°~.:~.~,~,~~~.-- ~ ~, ~ tion"summar ~ ~- I t y ersec n .~ z . _~ Average Delay 1.2 Intersection Capacity Utilization 32.1% ICU Level of Service A Buildout Synchro 5 Light Report B Baldgya 2003 PM Peak Hour Total Traffic tdadensmal-It51 PEAK LAND SURVEYING, INC. PEAK CIVIL ENGINEERING, INC. 970-476-8644 FAX 970-476-8616 • 1000 LION'S RIDGE LOOP ^ VAIL, CO 81657 970-726-3232 • FAX 970-726-4343 78436 US HWY 40, P.O. BOX 1680 ^ WINTER PARK, CO 80482 Septemer 13, 2002 Allison Ochs ToV Department of Community Development 75 South Frontage Road Vail, CO 81657 Re: Middle Creek Village Preliminary Drainage Report Addendum Dear Allison: The Preliminary Drainage Report for Middle Creek Village, dated August 27, 2001, proposed a sedimentation pond at the southeast comer of the proposed development. Due to design changes and recommendations, site constraints will make a pond impractical for the proposed development. In lieu of a sedimentation pond, several measures will betaken to promote stormwater runoff water quality. A curb and gutter and storm sewer system is proposed to carry ~tormwater through the site. The drainage system is designed with curb inlets and sand oil separators. Per Town of Vail standards, the proposed Type 13C curb inlets are designed with a 1.5' sump below the inlet to capture sediment from runoff. Additionally, two sandloil separators are proposed to capture sediment and oil from parking lot, access drive, and snow melt runoff. A preliminary layout of these measures is shown on the grading and drainage plan. A fmal sizing of the drainage improvements will occur in the Final Drainage Study for Middle Creek Village, during the building permit submittal. All improvements will be designed per Town of Vail Standards. The proposed system will facilitate sedimentation fiom site runoff. Additionally, "Best Management Practices" will be implemented during the construction process to ensure appropriate erosion control and water quality measures are taken. Erosion control throughout the construction process will consist of silt fence, straw bales, and check dams. Please do not hesitate to contact me should you have any questions. Sincerely, 7~8~ ~ Mark B. Tarrall Peak Civil Engineering, Inc. Attachment: J P:\Mountain Bell Site\]039\Docs\diainage addendum.doc PEAK LAND CONSULTANTS, INC. Preliminary Drainage Report For Middle Creek Village Town of Vail, Eagle County, Colorado August 27, 2001 Prepared For: Odell Architects Prepared By: Peak Civil Engineering, Inc. 1000 Lions Ridge Loop Vail, Colorado 81657 Hydrolow Summary Table West Exist. West Prop. East Exist. ~ East Prop. 2.8 ac 14.7ac 10-Year 2.5 cfs 3.3 cfs 7.0 cfs 11.3 cfs Q 100 -Year. 6.7 cfs 7.6 cfs 27.2 cfs 32.8 cfs ~'Vater Quality Issues Proposed inlet design will include additional depth in accordance with Town of Vail standards to facilitate sedimentation. Proposed sedimentation pond at the southeast corner of the project site will also act to promote sedimentation and infiltration of runoff from the site. All swales will be grass lined or lined with rip-rap when water velocities and slope mandate. Additionally, silt fence and straw bale dikes will be used throughout the site during the construction process. Proposed Drainage Improvements Proposed drainage improvements include extension of the existing Middle Creek culvert to the north, catch basins in Mountain Bell road at both the southwest entrance and the southeast entrance to the site, and culverts under the Mountain Bell road entrances to accommodate the north frontage road drainage. Hydraulic calculations for the drainage improvements are included in the appendix. Conclusions Runofffrom the proposed development will follow existing drainage patterns. The proposed sedimentatio„ hasin will serve as a v~~ater quality feature to promote sedimentation and infiltration. Catch basins will have additional depth to further facilitate sedimentation. Inlets, catch basins and culverts will be designed to safely pass the 10-year event. Surface drainage improvements will be designed to safely pass the 100-year event without damage to property. As the site plan is refined, this drainage study will need to be updated. Introduction The Middle Creek Village site is a parcel of land in the Town of~Vail, located in the Southeast '/a of Section 6, Township 5 South, Range 80 West. The site is north of the north frontage road of I-70 approximately '/4 mile west of the main Vail interchange. The attached vicinity map shows the project location. The existing site proposed for development is approximately 8.1 acres and includes the existing Mountain Bell Road and the. Qwest (old Mountain Bell) microwave tower building. The proposed development plan consists of 8 multi-unit buildings with related parking and appurtenant structures. Mountain Bell Road would be extended through the site to create a loop to and from the north frontage road. Existing Hydrolo~y Middle Creek passes through the property from north to south approximately 250 feet west of the existing Mountain Bell Tower building. The Middle Creek drainage basin is approximately 6 square miles and is included in the Flood Insurance Study of the Town of Vail dated November 2, 1982. The hydrology of the drainage basin will remain largely unchanged as a result of the proposed development. The 100 year floodplain based on stream depth, as shown on flood profile panels 07P thru 09P, has been delineated and is included in the appendix. The westerly 1/3 of the proposed development site (2.8 acres) is within the Middle Creek drainage basin. The existing Mountain Bell Tower building, parking lot and driveway to the north frontage road occupies 0.9 acres of the proposed development site. The easterly 2/3 of the site (5.3 acres) flows south to the roadside ditch along the north frontage road which flows east toward Spraddle Creek. All hydrology calculations in this study utilized the Rational Method. This method has been shown to be appropriate for calculating the hydrology of small drainage basins of fewer than 100 acres. Runoff coefficients were taken from the Urban Drainage Man~~~l, Denver Regional Council of Governments, Table 3-I, and rainfall intensities were taken from the Town of Yail "Intensity -Duration -Frequency Curves ". The table and curves are presented in the Appendix. Proposed Hydrolow The development of the existing site will utilize the existing drainage basins with 1/3 of the site draining to Middle Creek and 2/3 of the site draining to the north I-70 frontage road ditch. Approximately 9.4 acres of offsite drainage flowing through the site are included in the rational method calculations. Proposed drainage patterns through the site will approximate the existing conditions. No detention is proposed for the site. The summary table presents the results of the study with hydrology calculations shown in the appendix. Appendix :•y =d ~: •r~4~ _-.~ }~ "~ rY'a*u*~f1 ~y ~.Y _"'~' '3" r::~' _ ,' 1:. < ~~, m =,~ :.~ ,,. 3 is}_. •3 Z O :~ 4 U O J 3 .D m m 0 a~ cn .-, a~ m C (D C O ~~ I ~ ` o a I PROJECT LOCA710N ~ A a o j e J ~ ~ (' -. O. ~ ~ W V ~~ r g z ~ sQo I ~~ ~ ~"""S*„~ ,o ( W w W ~ J Q f ~ U Z Q i Uw ~ ~ OS~ I p j tR Up191[/.p a1tCy~ / N t f R o 1 aTATt ~ ~ ~ ~ ~ SEC 6 5 ~ Z s sEC . a ToNr+sHiP s sounii 3 ~_~ I o \\ / ~ ~» I ~ ~' ~ / ~ I \ ~ j ~ L_~ ~ 1 , I / •~: b ~~ ~, ~oav er. oa anaxa .E NTS ~.~R o~Te a/zo/m .~''~~ CL ~RaI~V~;GE CP,ITERIA r1ANUAL TABLE 3-1 (92) RECOI•;~~ENDED•RUNCFF COEFF[CIEr•1TS AND PERCENT IMPERVIOUS LAND USE OR SUP.FACE CHARACTERISTICS Business: Commercial Areas • Neighborhood Areas P.esidential Single-Family _ Multi-Unit (detached) Multi-Unit (attached) i. 1/2 Acre Lot or. Larger • Apartments . I ndus tri a 1:_._ ~ Light Areas ~`'~~s--= Heavy Acres ~ ~- i ~=:> _ _ ~'"~'~.~: - Parks ,. Cemetari es : ~ -•- PERCENT FREQUENCY . IMPERVIOUS 2 5 10 100 -- Playgrounds . _ ?' School s -- -~ . • ~ _ ~ -- - - ~::r` - ~ P.ailroad Yard Areas~:-~~ Undeveloped Areas: RUr+OFF 95 _ .87 : .87 - ~ , . 88 ~- .89 -. . 70~ .60 .6~ .70' .80 * .40~ .45 .50 ~ .60 • - 50 .4~ . 50 .60 __._,-70-,. - 70 .60 .65 ~ .70~ .80 "~_ ` _~Y~r- :~~--=~' --~ .,. 7 .10 18 .25 ..5 - LL~-~z::»- .. - -- -.. - - - •- _ _. - ~'~~~_ -_•.}-~~ ate-. 13 15 :-20 ~ .30 .50• - ---~-.~:~:r:~: -^ ~~~ ~- _ - .......~...r- p t'-xa ~ a ;f~.._._~ _~ _,~,. 20 .20 - - .25 ~ •--- . 3~5~ - .45 _ _ `_;:. ,z~~s - ; _ ~:~:ri~ ~, ~, Histor-ic Floai Analysis- 2 = (See "Lawns") • • X ;~.~•G ..~..,; `~"" - -M;-`-=--~=~ _ ~_ - ~~ Greenbelts , Aar - • - ^~ -- ~.' Offsite Flow Analysis 45 .43 .47 _ 55 . 65 _ _ ~ -xf-- X~ "~~'~' (when land use not defined) . ~ . ' ::~: r==-~` Streets: -•-- -- --- Paved ~ 100 .87 .88 .90 .93 _ - Gravel (Packe~) _ 40 .40 _ .45 •` .50 .60 - = - _ ~f"~"'"~ . Drive and Walks: - ~ 96 ~ 87 87 ~ 88 -- -89- -~•~ - "".;r . . . c .. ~ ".~i_ s .~ Roofs : 90 .80 .85 .90 .90 . . ~'" lawns, Sandy Soil ~ 0 .00 ~.01 .05 .20 ,- Lawns, Clayey Soil ~ 0 ~ .OS .15 ~.25 .5C - NOTE: These Rational Formula coefficients. may not be valid for large b asins. = f~ • *See Figure Z-1 for percent impervious. ~~: DRCC>G URBAN STOR~1 , DRAINAG'c~ CRITERIA ~ ~{ANUAL ~ 1~1-1-90 ~t~~:n:' ngnt~~tr,c n~.in ~i nnn r'lnn~'rnr~i r..~r.,. ~T ~:=' ~.'; ``"•' ~ '~.~~^ ~. .~ _ 4 - ~~ 1 i:l a ^.~t: - ~~ 3 ~:,~: . 1i~ ~ .~~~.. r .. ti ~.t~~.~~ .. > t. kr'.r2'.+~'= i;:1 ~^~ . .. x~ ~ yS . t . ~r:~~ :~;YT :~ ;f ~)• ::a: • ~ +'i.Y~ 1111 TENS1 T Y - DURAT~QN --~ ~~ FREQUENCY CURVES . ~ . . _: ~: . s,..... 30 ~ 4U 50 ~ 60 C TAME MINUTEST . - Hydi-oloay Calculations II II,'~: /' .. L~.'•f ll~' ~~? ~: p~l(r3hn o,4e,~/,~"~;/~ha:~___-!~lr•~, {ii\!_/ 11 ~11 ~,~ ~`~ ._ ~' .7i~ ;' ~ f ,~;.' .~:'•_..f_ ~ ,. ,t?4>.,, 111 .... - ...'• .i r „o::. 'e~ It .: S ~ ' ~ J c., ~r i? .~ ,: _ - _./~ r e ~ . sr-y/:C J/ ~ ._ ~ ...~ -'' j11 l I : ., jl,' (11 , ) I ';`- , /~~ ~ ~~ ~' .. ,' / /1 - - ~~~ ,,///~~- ,_,x„ ..~ ~ ~ _ .~'ll'I ',r, it/'I'~I;''•, t (yt ~ // \' ~'•1: ~;' -sue.^~- •°~S, ~ i/=' ~ --~~~~~~~~~' ~~j~ ~~ " 1 •/~ 'l/~ ~//>'8.:' /. :4 '1 ~\.~L~~~..~.. ~~, ~\ 1~ ,1/ 11 II' .1'.•l 1i11 [ ~ `~ s.' 1 ~\'- "' ~ ~~;`c": /-~ ~-_~-~ \ \ , )/ i' lip ,'+~(II •., J ~-~.. Ill - Z [ I, -'_ , .~;~~~'--~-/ /.i, _;~. 1, 10 jai ~ Q: .. ~ ~/! ~ ~ l - .!, ; . ( / J ~ ; ~-\ \ ~ 1 11 1111:1,;, -•a? > Z I 1 --~ 1 ~;. - ~ _ '~` ~' ~~ I- \\\\.9~.~c \1`'~:.-~~~`~_'~~'-~ `~~~~ glolpna,n.'~•ll,~,Illi Q U~ ~' ~ ~' ~ I r\,.\111`.": '~'`-;'%~~/ ~ -~`.` ;~~~I \ I)/ :~~~, ~. - - i t . ~ ~ ___-___ 1 ~~~ ., ,`x,11„~~~I~j- .~--~ ,:~, •, _ j .-1; _ I N;' ~~'-"t: ~~~J ~~1'))Il 1'.1j:. ./, I _.~ .;~ 7 - __ ~~'r 1`1 ~ ~II. CU .. \ ~`~ lI1~~. ~/, II, ~~~\ '•)}l,l;. ~~~ << I ~t<<~ , ,.~%~; ==-.d+no i L \,~~~~ \~', \~ - , r! I love ./ ~ ( // CJ , ~>: I ~~ ~°~ ~ r ~ II as ~/ ' /.%' ~/~ j/// ~'~~ ~" ~ -" ~ ~ ~ ~ r o `~~~ ~ ~~ I~r,J!" '~j~ll I I I '/ a/;/~/~ ~/ '//i~j~ -~~-r -~~ /i~~ I, ,r~ / \ I j /~. ~ ,r/ . \ - \ l I ~~ _ ._ - -_ /I1 I ~ __-__ -. -_--_ .=- - - -- - .. ;. ~.: ..: .~ .` _._ - .,.... 5 // /. 1. _...• - ~ ,•... _- _a.` - - ! 'y~.~,~` ~ rr'{ ~..~ - t -~~. _ _ ~ :~ ~ ~ ot~ G' 7 f ~. >• .1/ :.•" DRAMt e--e ) lid" \ ~//~-~ ~ ~ •~ e ~ --~-- _ % . 1 ~~~~ { fr `, e - Bl ~, -r-. C _ ,.. ~ o~,~ '~ I . - :8.,_ :;,,+~ .e~ I \ B . ~ - __. ~.~r'/i/ .. .. Bill //. ~ .. ~~/r~ %/. _ o, u~-IEE c SCALE= i' = 3000' 1 0 a 0 a 0 J W Z ~ Q ?- m ~ Z 5~~ W Z w.. W ~ ~ ~.~ W ~ W` J ~ J. ~ Z Q F ~ ~ ~a<~!. :'Z~` 3:: o. E-.:. '.; ; ;~:; ~~ ~~ ~.~ .~ .+®s ,~ a~ mru,m SI-~T MIDDLE CREEK VILLAGE 8/21/01 WEST DRAINAGE AREA -EXISTING CONDITIONS RATIONAL METHOD TOTAL AREA = 2.8 AC Job No. 1039 By: GKM C1 - PVMT & BLDG 0.7 AC C10 =. 0.88 C100 = 0.89 Runoff Coefficient - C from Table 3-1, Urban Drainage C2 -FOREST 2.1 AC C10 = 0.25 C100 = 0.50 Runoff Coefficient - C :n from Table 3-1, Urban Drainage C10= (0.88x0.7)+(0.25x2.1)/2.8 0.41 C100 = (0.89 x 0.7) + (0.50 x 2.1) / 2.8 o.so TIME OF CONCENTRATION "; T1 =SHEET FLOW, 300 FT @ 40%. ~:_ T1 (10 yr) _ (1.1 - 0.41) x Length ^1/2 / S ^1/3 16.23 min. ;Y'~~~ ~i T1 (100 yr) _ (1.1 - 0.60) x Length ^1/2 / S ^1/3 11.78 min. r~;; ~ ~' -~~ T2 =SHALLOW FLOW, 550' @ 40% ~ n = 0.025 ~, A/p = 6/13 - 12'Wx0.5'd - V10 = 1.49 / N x (A/P)^ 2/3 x S^ 1/2 11.78 fps s = 0.11 ~ ;= :: V100 = V10 11.78 fps ,;~~~: - T2 (10 yr) = 550' / 11.78fps x 60 0.78 min. . `- , :" T2 (100 yr) = 550' / 11.78fps x 60 0.78 min. '`_~~` ~a - ~ ` ~ TOTAL Tc10 = 21.4 + .8 = 17.0 min. ~ ~~ ~{ '~ra'.~ TOTAL Tc100 = 11.8 + .8 = 12.6 min. {1R1 .. ,-~- i '~~~ :r . f INTENSITY (I) = Intensity (I) from ~~=~t ~' ' Town of Vail IDF curves ~_ V ;<:t'. 1 100 = 4.0 in./hr. PEAK FLOW RATE (Q) Q, =CIA Q 10 = (0.41) x (2.2) x (2.8) = 2.51 cfs Q 100 = (0.60) x (4.0) x (2.8) = 6.69 cfs MIDDLE CREEK VILLAGE RATIONAL METHOD TOTAL AREA = 14.7 AC C1 -FOREST 14.7 AC C10 = 0.25 TIME OF CONCENTRATION T1 =SHEET FLOW, 300 FT @ 40%. T1 (10 yr) _ (1.1 - 0.25) x Length ^1/2 / S ^1/3 T1 (100 yr) _ (1.1 - 0.50) x Length ^1/2 / S ^1/3 T2 =SHALLOW FLOW, 950 FT @ 66%. 10' WIDE, 0.5' DEEP V10 & V100 = 1.49/n x (A/P)^.67 x S^.5 V10 & V100= 1.49/n x (5/11)^.67 x .66^.5 T2 (10yr) = 950 / 14.3 x 60 T2 (100yr) = 950 / 14.3 x 60 8/22/01 EAST DRAINAGE AREA -EXISTING CONDITIONS Joti No. 1039 BY~ GKM C100 = 0.50 Runoff Coefficient - C from Table 3-1, Urban Drainage T3 =CHANNEL FLOW, 500 FT @ 9%. ROADSIDE DITCH - 2' DEEP 3:1 SIDES, n = 0.05 V10 ~ V100 = 1.49/n x (A/P)^.67 x S^.5 V10 & v100 = 1.49/n x (12/12.6)^.67 x .09^.5 T3 (10yr) = 500 / 8.7 x 60 T3 (100yr) = 500 / 8.7 x 60 TOTAL Tc10 = 19.9 + 1.1 + 1.0 = TOTAL Tc100 = 14.6 + 1.1 + 1.0 = INTENSITY (I) (Vail IDF Curves) _ 110= 1100= PEAK FLOW RATE (Q) Q =CIA Q 10 = (0.25) x (1.9) x (14.7) _ Q100= (0.50)x(3.7)x(14.7)= 19.92 min. 14.06 min: n = 0.05 14.27 fps A/p = 5/11 - 10'Wx0.5'd .. s = 0.66 1.1 min. 1.1 min. n = 0.05 A/p = 12/12.6 s = 0.09 8.65 fps 1.0 min. 1.0 min. 22.0 min. 16.1 min. 1_9 in./hr. Intensity (I) from Town of Vail IDF curves 3.7 in./hr. 6.98 cfs 27.20 cfs ~:;.:;;: -.;;; 0 - ..-+__.___..._._.__._._.-...~___...__.._..__...._.__-.___-.___...____._ .._.._.~__. _.,. ____.._ _....~.... __ w .,.o SAS ~R,~pNY • s ~0'~C, ~~aR Nis/rs ~Sr / ~ ~ O se / j Q I O ~ % I zo W Q U ~ 4 m ~ ' , J W ~ I ~ z ~ ~ 5 Q~ ~? w~qW k~s r ?.g qcs//y g ~ /` t ~ ~ Q U p w fAS S ~. .: ~ 14, BAS/iy ' I _1 ~ J 0 *0 /~ AC / ~ ~ ~ Q ..'1 ` - . i 0 0~ Ist % 7 ~ ~ O r S >,, .fit 7 ,F, ~ y' 14 '---- ~ -._ _ _ _ ~„ .... ._ TM __ - - - NOR ~~ ~ _ _ _ r r " _ _ _._.'_r _ .~. -__ ~\ ~ ._ ;;' _ . .,. _. ~. -- .::.: _ ..' _ ~-------- ~ __ _ / i A `~',r`~ OMNM: ON ocsa,m er. aat RCNE'AED: .C rLC xeF to7o OAIpL•~_~~~~~ rot J1-CG 1 SCALES 1' = 200' 1 n' .. >... ' ..a.•cr~'.4.a~i..Y. ~LF.tt.~- ~.t. . . _MC;}.' ..~.. . ~ i. .a .-W .. _ .. MIDDLE CREEK VILLAGE 8/21/01 WEST DRAINAGE AREA -DEVELOPED CONDITIONS RATIONAL METHOD TOTAL AREA = 2_8 AC Job No. 1039 BY: GKM C1 - PVMT & BLDG 1.3 AC , C10 = 0.88 C100 = 0.89 Runoff Coefficient - C from Table 3-1, Urban Drainage C2 -FOREST 1.5 AC C10 = 0.25 C100 = C10= (0.88x1.3)+(0.25x1.5)/2.8 C100 = (0.89 x 1.3) + (0.50 x 1.5)12.8 TIME OF CONCENTRATION T1 =SHEET FLOW, 300 FT cLD 40%. T1 (10 yr) _ (1.1 - 0.88) x Length ^1/2 / S ^1/3 T1 (100 yr) _ (1.1 - 0.89) x Length ^1/2 / S ^1/3 0.50 Runoff Coefficient - C . from Table 3-1, Urban Drainage 0.54 0.68 13.07 min. 9.82 min. T2 -SHALLOW FLOW, 550' cLD 40% V10=1.49/Nx(A/P)^2/3xS^1/2 V100 = V10 T2 (10 yr) = 550' / 11.78fps x 60 T2 (100 yr) = 550' / 11.78fps x 60 TOTAL Tc10 = 13.0 + .8 = TOTAL Tc100 = 9.8 + .8 = INTENSITY (I) _ 110= 1100= PEAK FLOW RATE (Q) Q =CIA Q 10 = (0.54) x (2.2) x (2.8) _ Q 100 = (0.68) x (4.0) x (2.8) _ 11.78 fps 11.78 fps 0.78 min. 0.78 min. 13.8 min. 10.6 min. 2.2 in./hr. 4.0 in./hr. 3.34 cfs 7.63 cfs n = 0.025 A/p = 6/13 - 12'VVx0.5'd s = 0.11 Intensity (I) from Town of Vail IDF curves ;~ H~ ~h~> ..; ~2 „~ :.,; - =-~: F.~..~ ::,:~ ~.err•= -~ ~~:. • ~`~ `,~~-? l,y .. :; ,~ z,; _ :-~: >~ /;y; ~~; ~,:,; ;::: MIDDLE CREEK VILLAGE 8/22/01 EAST DRAINAGE AREA -DEVELOPED CONDITIONS RATIONAL METHOD TOTAL AREA = 14.7 AC Job No. 1039 By: GKM C1 -FOREST 12.0 AC C10 = 0.25 C100 = 0.50 Runoff Coefficient.- C from Table 3-1, Urban Drainage CZ - PVMT i~ BLDGS 2.7 AC ' C10 = 0.88 C100 = 0.89 C10= (0.25x12.0)+(0.88x2.7)/14.7= 0.37 C100 = (0.50 x 12.0) + (0.89 x 2.7)114.7 = 0.57 TIME OF CONCENTRATION T1 =SHEET FLOW, 300 FT @ 40%. T1 (10 yr) _ (1.1 - 0.37) x Length ^1/2 / S "1/3 17.21. min. T1 (100 yr) _ (1.1 - 0.57) x Length ^1/2 / S ^1/3 .12.38 min. T2 =SHALLOW FLOW, 950 FT @ 66% 10' WIDE, 0.5' DEEP V10 & V100 = 1.49/n x (A/P)^.67 x S^.5 n = 0.05 A/p = 5/11 - 10'Wx0.5'd s = 0.66 ...~ ~~;~~: - - =~~~; - ; .: ~s :S?= ;w._. ry V10 & V100= 1.49/n x (5/11)^.67 x .66^.5 14.27 fps T2 (10 yr) = 950 / 14.3 x 60 1.1 min. T2 (100 yr) = 950 / 14.3 x 60 1.1 min.. T3 =CHANNEL FLOW, 500 FT @ 9%. CURB & GUTTER - 6" DEEP, n = 0.013 V10 & V1 u0 = 1.49/n x (A/P)^.67 x S^.5 V10 & v100 = 1.49/0.013 x (3.5/14.5)^.67 x .09^.5 13.27 fps T3 (10 yr) = 500 / 13.3 x 60 0.6 min. T3 (100 yr) = 500 / 13.3 x 60 0.6 min. TOTAL Tc10 = 17.2 + 1.1 + 0.6 = 18.9 min. TOTAL Tc100 = 12.4 + 1.1 + 0.6 = 14.1 min. INTENSITY (I) _ 110 = Z.1 in./hr. 1100 = 3.9 inJhr. PEAK FLOW RATE (Q) Q =CIA Q 10~= (0.37) x (2.1) x (14.7) = 11.29 cfs Q 100 = (0.57) x (3.9) x (14.7) = 32.77 cfs .n = 0.013 A/p = 3.5/14.5 - 14'Wx0.5'd s = 0.09 Intensity (I) from Town of Vail IDF curves a ~,; y:4 -~~' - ~~J~ ?;ti mcreek culv2 (1600x 0 jp g) .» ,, 12 Ox24b e 1a~ ~ s '<~Y,{~" ,~,•,~ ro !'t +">:1#1p~ is d~ .' 3~ Y~ ~t~iT' ` .s'~l Y'~.T("Y~ r ~.~ „~ ,s~ :~' .'^x? I;: '~a6 ~,a r: .~+ r y.. ,i„ .: : ti~ ~~ r'•~.~i~^+~,If t t +~ f 'F'f. ; f ryx~(~ ~~' T' f .. ~J~~i~'1'f r~ f. ~ I~ 1 ~FY °x'~.~ ~; ~ ~ i~ry~` !iE~ {~ tY'~ tG I. ~~~' y~~.i~ ~`1':'/~~~~`~3£Yq~ ~Ft,~ t ~"%ll~"~t ~~4~~ ~i !' } .~, ~~ ...- ~ 3r~,..t~3 ~q~~,X f ~Yh l i.. i1Y~ t ~ j yk'.. k j~~~ ~.ljr^~.~~7~ Zr'~ -. ~~ ..« rc^.t ~i t ~ .4 k,S + _, ~.~.~ixk ~ p`h•u ~"jfu'~ ~! r i , sir, ~t y ; ~ r ~~' ~ih t~x < ~_~ t~~~ r ~! - ¢lF~: S~Gf ~t4'!S<:n c ~~ .,_r kt: ~.~~~". fig.. ~' / :~ ..~ y.,~ Y j~{~~a~ r IN ~..FI~~;1~~"~'~~ ,. ' !'jr r i~l. i5i k r t fi9+~'w" ~^~~i: ~ ~y ~f ~ ,~ <' `4~ I`r z ~. ~ 1F,.is ~ 1 ~I' - ~ ~ _ . 1 ~` S ~.I ;i '~ .< , I f ~,.; F 1 s ~ ~,' r ~ . ~ i{..,.zl ~„ /f ~ ~~r~ J~q~i.'k"'4 , ~~ '~~, i 1 ~+ 3: ~} ,=~Y~ g< .:~w' - ~"~ ~-rt~ ~~ s t {{~ <`,~ ~ ~{r, ~l < i;5 ,i,~, P ~,ir, t ~ ~li~f~ ,"r 5`.;!~. 1~ 1 I ~ ~7 ~~;.. i ~6 ~t'i Tt; i ~ ~5 i tyy.„'c'" ~ ~ t ~ r~ ~} it t t w r it ~ ~Y ~~t ~~ a74i1 f~ r ~•G~ r!/ .+J t {f ~ t ,~ ~:"r, ~ `f I ~, i l 1 ..a :7::j ! tf /t j•~3; ,r r.ti ,f /,~F r :fzt rr~ f ~ ~ ~ S~ !~. ! r r! IIYt ~~ LsP r ~1, ~ 4+ti~ ,, ~ f '(d t < .t rs j,~G~~"•y °1,5~•it ~r.j ~~f ~ {~~~L4~~~i{t.~~f r{~~"f ~'~'`ll ~ ~t~~ `r~ ~ -'I• ~f f! .~ i { ~~~ r ~ ! :~:t .,! i ` uj ,r '"ks ~~(~~t~t r iC G, 'r ~G^'!t 1 „i-:~ff< ti' :;i 2[ s tj.,~ ~ F i ! ,~,r~ ,~r ~ <4 r t ~ ..; ~t ~ti t i ,it I' ,II r ~`ti;;'!1fyYo y~.F~~1F~~7fy`~~~~E'~% 1 <yi»~~ v'~,,~Jr~,, ~ ,~~~ z ;t ft ~~. +' 1 t:?' 1 ! 1 rz ~" /G~'5iSt ~ r : 11 >~•~?'isl, .fi, ~Sfr.Ixr:~:~%~{ :~~Jf >> ,,t.t':tTj~t,.t 't;s ~ ~ iC%:yij: r,.~~''r s "~c t 7 1 t-~ .~`<~'' ,.t.'` s w .q .:r:. a,:: i< '!i .7. ~.~,l:.q~jj>/.`~v T~,.,!, .tr~ .C 71 ':.i~.{4 y~ ~!~ Y, 5 :i '<;. l.iti_(i t;~:;.~r..Yt7, 1~YI G,r Glk r. ri ,tt,.¢.a ~ x > ,~ r y -4~ 7 ;i'~ i~tl!,.i,, :f~Y 'ii :i':~iFl,'=:y.1 ['..5~~i~. i~: i~~Yr~, Ii h~ ;~~-Tr •Jt .r ~,.!1.. :i v:'', f1.1~'~J:~.~f14.'fr4fTt ,•n!F~ eG ~.P o ~ ~:r..: e4r I~~t~;f ,';, .~~,l:i~. .t it .. .3 ,~.!i311.,.~.:>•'21 ?.. ::11J, ',~~?,?r~ .,, 'l f/v .+~',r5' X~r ~~y. {~.,c-~','Y~ x. ~4Lfr La~A' > „~S,F t t1 771s;N~Y ~~}'. ~ r `:4(,~$~a~~~{,( ~r •.,, ,i _ .~.~','i e~' _. -•.3,,~ vyv .--...fir. -"~ r.,`,ti, , ' f`,'.6` ! ,~ 7 jig' I 1 - ~ ' `.1'.l. • i ,n"<'ft~~i j~c~ 'J' e~~;l, y Sr~lh<}~i!t~,,lc ~{ ~Y`','lF`~tiir ~f,,f~ '; r.. ~7-. lh~~41 t' ,~a +` "}, F ~~~ IS ~t' r'I riY1(l~~l " YCj ~i' '',x(.~' d'r jh` :a!- ?j rXr- .y,• a ~ ~^y r~ p ~~`,~~; -f ti F II r ~i~" ! ~i h a ~ !~ rI ~ ~ ~' e ~ x~ , d J'~f+'~~;a~"oiJtct. '~% a, -x~ •" ,-'-~wx a. !. ,u _ m~" ~~^~'~.~; ~~' ~.:~': ~ ?. ~W.f3?ti:~'..~'~.v" i r R ~ t~' ~ 11 ,~~ ~ .! ~~~ r : _ ~ 6y . a M.~ ` ~" f rF ! i< 4~>E ,.I x ~ ~` ( `; ~'r~ . rtty,}.t t w~J, ~ t~~tl i~~. iGr~~'f ~~~~. ~ ~ 3; ;pf ~. -''~ ~_ ti ~ ` ,p~ .. ,~. ~1 ti r~ '~ t µ. ~ y ~''~ ~~I sl , s tj~ r~tdk~~,„~fi ~~'~ V~'-~" t.~ ~~4~'~ ~ r ~~~ -.I - ! ` t ~ 1 a ~~yf ~. .r~i^ l'~. 1 ~-f .Y yi.~, +•~~ Y>~ ~i,i.,r~ ,j~ .~~ ~t~~~ ~f~~ - ~ M~ ~.~.~. ,!} ,~`G Ify~ .-ryl '~ ~~ VV ,h~ 't ~~f "IY~ 'i~ F : "'T ~?`~.. D _ i f. ~G 1 -j kG.. ~ :R" ~ ~ i '< . ~~,~} ji ~"tr,,")~~jf"~('(~` ~'.4& ~,rK /r h ~i 1 ~f i• >*~i'~ 7ad:}~, ~ . - y ...t, _,"' -,` f . I , ~~ ~ 1 ~:: ,1}' ~ K. •~E-~~ /~Tk ~ G S..',( tl~r`~,'T?~,Y`G, ~r..~,b ~~ ~ ~ !~'.,•~ F ~' l ~ ~~ ~ c Y _~ f q~, ( ~ ~. r a •~„ .~. _ ~,~~~ ~. ~~~~ r'~A ~~~ ~ J ~ ~ y ,~ IJ.h y Y fipr j, ,:~~ t rT ~ Y ,,~~, ~a , y ~{/~ ~A~~~~'. ~~ ~, .t4; '~.4 . }3~~ 1 , ~'~ r. 1. ., tY ° ~, F. rF ~~~~St~ x' ~t ~~ J~'t~S '~J~rIP ~~{.i";%ix. o _'4~~ w ',..~~f ~ , a ~ .,4, ; ~. ~~s ~' " ~ y ~+' £}~,~ ~ , •+ ~., ti ,, f k qty ~i, ~~y " }~` !r .S 1 ,K-< 7~ n ~ Uc 11 ~,uu r~ ~ I Y ~~ t1,., r`~; - q x`-' Y' ~ . ~ 9 1 ~ • ~};y~ }' ~~._. PI, o"' ~*~t a. ~i l ~t 2d ~ c '~ rr• ~. 1 r~` • '~ ~ ~ B'. ~~7 '..I i.9~ ry ~+fffrrjr Y~'1'/'' ',~ha~`'.'~' ,r`'~)r .m ^vc y-> t ! ~: fih, xi' d ! ~",~I'Q.,~'i'F." 13,` ,'!~' F t X z ~r"ril! A td7 1 k ,I fi"" ~,i 4' ~^{.,k s.. a ,x { ~ t y ~ + +'~/ .~ ~~~~ ! ~~. N p . ~ ~a~ ..,~`~.,~~ `"e "~°LF i ---^i- t~ ~Yy~i.~•t ~ -~a okra ~ c ~~~;~ ~ S~ r ~ ~ ~a P ~`I' .• ~t>'7 '~`' a i~b'`f' :_r ~{I+r-,q I' >. ~~ j--~ ~ ".n *~ r c s ';:.*~'.t~a ~•S Sr rtf •L Yt tJ L'M .~ I,'J r ~/'-;rj l~'~".~ s'' ~k: ~ ~r ~~,~;`~a~' ~ 'rd'Ft :cwt '~~- ~.~~'s~ ~ > ~ i a 4 Y !1 ,~~ir'~' .~ ~ .:„ ~' , ~ i~1 J ~ ~f. < ~1~~~, r ~ (^,l . 9 .T 31~' fa w ~ ° ~` r '"zhrA xt,~`.+I ~ 'n'~lr ~~' t ,,: ! - _ ,~~~,,~,~~~qq ~ .. fl 6 ,,»~ ~ ~ 1 y '~ 9 r ~< tr y',c.~ .z -,.»~ r.-~ ~z. ai .: ; _ _........_ .....,.., .S.a>.... .:s3f.° ~ : o+C.. _^ n:: I ~ ; f'., n.n. -,... R..A... .. .. N4 .1~,..i...a ~QS-~-r~~,,~.~ l-~~~~I~all 8-z3_o ~ MIDDLE CREEtC VILLAGE 8/22/01 HYDRAULIC CALCULATlOiVS INLETS: SUMP CONDITION Use D&L I-3386 Grate Open area = 2.5 sf Ponding Depth = 0.5 ft K = 0.7 (30% clogged) C = 0.6 entrance loss coef. ORIFICE EQUATION - V = C x (2gh)^7/2 and Q = KVA '.' ..=.7 'SF V = 3.4 fps ;..3n ~~~ ,~< Q = 6.0 cfs ~ -~`"fit; West Drainage Area - Q10 = 3.4 cfs Q100 = 7.6 cfs _ -.~:,. ~~.~:~~r ; ~ 2 -Inlets (one on each side of Mt. Bell Road - 6 cfs X 2 = 12 cfs Qt o n' - ~r - 0 ~c / ~..:~,~~ :? ~ 3.1ti~ `..Z~ • :='$ East Drainage Area - Q10 = 11.3 cfs, Q100 = 32.8 cfs 4 ~. J,Y ~'" `' _r. 2 -Inlets (one on each side of Mt. 8eii Koad - 6 cfs X 2 = 12 cfs (~ fv '~%~ - Q ~~ `~ `=i -i`~. ~~ ~~~~~ Side Inlet Catch Basin Franie .~:. and Cover =;. ~~ ~• ~~ ,~ _~ j f3/4' Appx. Wt. 91 lbs. 1/2.1 21 3/4' 5/16' ~3%4' 8 1/4' t Concave Gutter:lnlet:Frame..`~~-: and Grate ,^ _ , ~' n• ~3 V r- ~---- L_ zD l2~ ' 21' 31 V2' a /2, 4 .~ L ~39 3/ 2.. r- e ~ L 39 VI•~ ' 18 VI' ey- ~.. xf~ Ste. [ 3c.~ T t Curb:lnlet Frames aril Gates ~ ~~ >- ~ !~° s-i VANE GRATE e bra 7 2T L~' ~23 1/~•~ II - r_ ~ ;'~ I ~ ~ 23 V~' ~ ~. ]3 3/~' h "' t'•~19 i/2' 1/2--~ -~ t.~ 1 7/B'J L t t/e'J L Y-j 21 ]/~' ~_ L - Catalog No. T e of Grate I-3440 2 Sided Concave I-3442 2 Sided Flat I-3444 • 3 Sided'Concave ._~ SUPPLY Total Wei ht Catalo No 340 I-3446 340 I-3448 360 I-3450 Appx. Wt. 590 lbs. 32 /1' ~5 L2'~ Z 3. OR 1-SIDED ~RAlIE Type of Grate 3 Sided Flat Total We 360 4 Sided Concave 380 4 Sided Flat 380 95 Available with: 'A' Grate Table Rating Table for Circular Channel Project Description Project File c:\ e.fm2 Worksheet 18" CULVERT Flow Element Circular Channel Method Manning's Formula Solve For Discharge Constant Data Mannings Coefficient 0.010 . Depth 1.30 ft Diameter 18.00 in Input Data Minimum Maximum Increment Channel Slope 0.005000 0.050000 0.005000 ft/ft Rating Table Channel Slope Discharge Velocity (ft/ft) (cfs) (ft/s) 0.005000 10.09 6.20 0 010000 14 26 8 77 (~ ~ n = ~~~ ~ c ~ 5 (~ /L '~ 0.015000 17.47 10.74 0.020000 20.17 12.40 0.025000 22.55 13.86 0.030000 24.70 15.1.8 . 0.035000 26.68 16.40 " 0.040000 28.53 - 17.53 0.045000 30.26 18.59 0.050000 31.89 19.60 FlowMaster v5.15 08/22/01 04:43:52 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Table Rating Table for Circular Channel Project Description Project File 'pe.fm2 Worksheet 24"CULVERT Flow Element Circular Channel Method Manning's Formula Solve For Dischar e Constant Data Mannings Coefficient 0.010 Depth 1.75 ft Diameter 24.00 in Input Data Minimum Maximum Increment channel Slope 0.005000 . 0 050000 0 005000 ft/ft Rating Table Channel Slope Discharge Velocity (ft/ft) (cfs) (ft/s) 0.005000 21.85 7.50 0.010000 30.90 10.60 0.015000 37.84 12.98 /~ ~~ Q r e n = 33 c-~S / S r-e~ ~~ 0.020000 0 43.70 14.99 , v s E 2 ~''~ ~ ~ ~5 °~a M-„ .025000 48.86 16.76 , 0.030000 53.52 18.36 - 0.035000 57.81 19.83 0.040000 _ 61.80 21,20 0.045000 65.55 22.49 0.050000 69.09 23.70 osizvol 04:42:53 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1 666 =.a ;:: ;~'F ~,l a.Cr FlowMaster v5.15 Page 1 of 1 Middle Creek Village Parking Management Plan The Middle Creek development provides all of the parking spaces that are required by Town Code, for a total of 247 spaces. Of these, approximately 85% of the residential spaces are covered, and 70 slots (140 spaces) are in a tandem configuration. There are a total of 68 units that are either 2-bedrooms or 3-bedrooms. Each of these will be assigned to a tandem slot. That leaves only two additional tandem slots, which will be assigned to two of the studio or 1-bedroom units. This can be easily accommodated since each of the studio and 1 bedroom units has 1.5 spaces provided for it. Allocation and As~sianment of Parking Spaces It is anticipated that each unit (except perhaps I studio ui:it) will have available to it a parking space(s) within the parking structure. There are 211 covered spaces, which we anticipate would be allocated as follows: Number COVERED Total Unit Type of Units Per Unit Allocation Covered Spaces 2 Bedroom Units 24 1 covered tandem 48 3 Bedroom Units 44 1 covered tandem 88 Studio Units 44 ** 1 covered single 44 1 Bedroom Units 27 1 covered single ~ 27 1 Bedroom Units 2 1 covered tandem 4 _ Total 141 ** 211 ** 1VOTE: In this allocation, there would be l additional studio unit that would not have a covered parking space. This reconciles the total unit count to 142 units. Surface spaces will be available for visitors, or for second cars for the studio and 1 bedroom units. All tenant cars will be registered with the leasing office and will have some sort of identification on the car itself (hang tag or sticker). Attachment: K FINAL PLAT MIDDLE CREEK SUDDIVISION PART OF THE S''/z, OF THE SE% SECTION 6, TOWNSHIP 5 SOUTH, RANGE 80 WEST OF THE SIXTH PRINCIPAL MERIDAIN TOWN OF VAIL, COUNTY OF EAGLE, STATE OF COLORADO LER TIFICAIE OF DEDICATION AND ONTIERSHIP _xct xt ! vio xprm •cxt_~_•xv xrzM.l! won.v R M rtuowx! Odt (q ~1 x ii sl >" n v a~ ,w el v t7 m el ix vR >le+a~e mxt v rvrze>tc•w .n M ~elr (AC w M vro ywm x ~ , (v M swrve•!i w ~nR a Ux! M M swrx d.•+m. sdM.sr w!-durz•. stCMU 4 toxrasxir a sw(x, !t V M am •.•~ [.¢[ COUxrv COlwAa0. udf rMlMA(AV MlMnam Y (vLL Y 5[Cnd l caW 0 e rtci~ M satin ro nrt wwM izxr r nr ux rt[t rot r~x[iwxsv y ~BM~+lgx rx M loxx tt v~~, t0.[ Cwxn, c0.oe~0o..r D ,a0 0 mrza ~ .! - -t4i faxxleM1xrCxA wL f. N RA NOT ~: t Dxrz a LAa%v: l~dfl. aam. IItvw !. R•R mvlY(!2 - tat•.•Y ( anx,~7/.tt ux[ v M >atMlfr d!•tpt V • wxo:rte mmMiiwrx mu m m camMn ru~c.~i. omoe.~ cvrout(m •v •a enf Ro• x•U •(.5 ttm~ID ta• M 0.mut x4urpt lnlRr Cddn[a •v •.. wiDt cdM•x! fwx¢exa ¢¢lOSt, !2 A!rz! /x(M( (A l00i. M.Idxl.9 M(!v 9 t![~rz! VTMd[ 611T~/,n di,OxlPix! •xo M(lvw! PnfL !f0.[ nwro>m4 iMC PO xo+4Mtomt ~ nu s~ tid pr M NluCi nwcm to t xvny r•A „• ~• .l !a0 r.t.. L CL!•o~~Y01[ Md (w t~ln LAND USE SUMMARY im (m •.., • a.u m tl;M •G[! wRa6PYt! 9rz AM VrMnp Ri.l ! l..M! .p1O nTLE cERnncATE M (m[ mrz (w _ di s Aa. ae__ PLANNING AND ENVIRONMENTAL COMMISSION CERTIFCATE (wfi _ wv > rnotm ~ •e. m~ ue wxxPnwt4 mw9ot SURVEYOR'S CERTFICATE _ t•(UL ~•xt9c ~ w [cxR[rt ~t~v cw+i~n. ion (xi trc.(xirziw .~xo a rt:swn a~iK (mi us(rtxn quo ar.i'~in ~ so r •eonemm mawo e[ liwa.9u~e u.ud'~O w caw..a .n .rnc.u Arnarm ~pTV, t wx[ >r M (uO xt0 II4 l(r! _ Axv o A0. CERTIFICATE D< TA%ES PAID ~M dR••d[a, W ~q[!v tat inaM aLL M lu0dt d r.R! Rufalm d n0 Ml Y{ r.p'N M1 ~uQtf P rtK nr.i{ Mrza !p _ D!v P fie. Sam CLERK AND RECORDER'S CERTIFICATE A'¢OV rte, d • K_ uq 4 aiav Rcv!m .t Mm1Wlxa- SH~'ET ~ 0 2 m: loRK roe Ke. Imo r FINAL PLAT MIDDLE CREEK SUBDIVISION PART OF THE S%, OF THE SETS SECTION 6, TOWNSHIP 5 SOUTH, RANGE 80 WEST OF THE SIXTH PRINCIPAL MERIDAIN TOWN OF VAIL, COUNTY OF EAGLE, STATE OF COLORADO .~f} TRACT C VAIL POTATO PATCH ~~~ LOT BB ~ ~ al VAIL POTATO PATCH p4p k B` ~I 1 11 GRAPHIC SCALE ~~-~ 34° _ _ lunar) 1 Ineh - 100 !L 1x1 NUt%1'00'E I! 100.00' ~` _ ~ jl ~,.~` ~ mr (. °' 1 xdC.aSww ttemf R f w nomn.x ~. s ;'~ .. ~ :a (~~- ewxe s]sea\ is a~nr .on n °~ "~ e w 39 ~mn rn `~ WHITE RIVER NATIONAL FOREST (U. S. F.S.) Se97YJ0'E - 2eJ{.9J' pa~rn•w _ 3uue• ai9) (Na+nl LME se, s2M scc. e> TRACT A OPEC SPACE om • wulm~mau~.o+i q LINE TABLE -~ J19.70' 3 H ,~~•~~`r SLOT 2 ° 9 ~ ~ ° •., ~ 1 og V LME lENOM BCaRING ~ it ua9t ~ ~~ n4 ONe e0 Y - 770'87 ff],y { u ua.m en¢t p ~ 'La w ln [a.wNUna+z ec - i . ~qr v0~9 R~rix ,OT 1 ~ ^ _ 4 Li l1 es. .' 110 00' SJ6' 0'w SeB'JO'00'w },t _ ~„ 21 ~ 49®) vM1,n 4aKNf M Y/ . leme m,0. .•~' e,e) ~ >•O1J Y.r .x (MV w.e~awlw~N) a.GO \ ^ O N 9 r ~ LJ La . J3.IJ' 10).00' S36'I ]'p0'w S60O9'00'w ! eaeey~~ ~ /~ r I w 91 ~ 1 , ~~~,j~~ r ~ 7 ~L \ ~ V C p '~'1 t LS l6 Li 3 0.00' ' wpp»p'pp"N ' - I 8e0T18'a7Y/ - 711.BD' ~ _ _ t ~'~a). _,44 .. ._.. .._. ...... ..._+r ~IfY t ~ ; vu Iwu Ota) lie- ~ ~ ~ ~~_ I.em nml > r t ~ .r ~ ~ ^ > 5 r Le u.BJ 13 5. J' sesJe JO N15_ 9:OO: I ~ ~~ _ m.v ~> ar r ~ ~ ~ un¢xe ~ ~a \ _ ~ vwn .. i v 1 , , w ~ Della ~ 077{'JY leranr oe[9) 1 \ W Llo Ltl . .0.25 - -w ° V.' a'~ ~ R. 5990.00' ~ ~I T~ 101.78' pm v'o[LO) N74ZS'89Y -09.70' Iarn'at-mw °Q° N ms 46•b SJ N -~ ~ IN ~• 9 iz ltJ ,o .SJ' ~' ro' S01Ye'3~ w u°oJ6' . 1-7026Y'um..r xa> ~ 1 ~ ~~~ ca-Se3zTx'wlNn>.,rre®> ~ r x x~4.¢ n ° i ~ INTERSTAT ) nusyet_ ar ope \ ~ '••. ~ ~ .... m \Q.. e - x sw u5 L19 P.a n 1 i{ C I nme . eo oe n la ~,LI~ ~ EHIGHW No. 70 (NORTH FpONTA ' 4 ~' CE OAO) (R.O.W'.) • N717L'O9'N - 198.00' Isnv'at - ,x.lr aee) ~ ~ (m Wn4lx rtej~\~ ~~~)unn G o I St/,• SE]L SEC. 6 ` e. t \>l,~~,N;m'.a°x.,w ~~ ~I ~I &~~N , ~I ~ ~ ~~ ~~ ~~ " R ~ wit•'srzn:oii~ ~ ~ rwxB 1N' uw Iwu w srnYOr [ en2x.a ¢ox¢w] lu...> SeB'JB'{]'W - 217{.9{' -._-._ c.u .¢unvx `rxu x epe9wl (w]rav mi¢a Nsax) (CALL) 9 se + 86B7e'{T^N -690.{2' (CALL a -.--. -.-- _-.--._-.Z_.--. t¢xo 9' xwmw w wv7,i - :r epadq wxu¢wl (e LN.) -._-.--.--.-- --.-_.-_._- __ 60 M' 1970.62' ._74:. ~-_ --.--.-_.- .-_._- ` .__.--.-_._- x roprq ]9' alww0. CY eerapa uownexi pe.NJ N6B'JB'{TE - 29{]]T (YUi) xr y~~' 4wxw w mppp N¢.00.wa ] l 10.wI ~ ' rw T wea w a' f,~ r¢si f] r¢ao Y wue w w e' tv¢w[n roar. eo.a]. a¢0. wNNa o ~\ ~~~ SHEET 2 of 2 r. r~~ , f JOHN F. MALO 333 LOGAN STREET, SUITE 100 DENVER, COLORADO 80203-4089 August I5, 2002 Town of Vail Town Council 75 South Frontage Rd., West Vail CO 81657 Gentlemen: As a past president of the Board of the All Seasons Condominium Association, I write you to strongly oppose the proposed Mountain Bell Affordable Housing Project. The need is apparent, but the choice of location is disastrous. We all want to keep the environs and architecture at Vail as originally conceived by its founders. This is what makes Vail aesthetically beautiful. Lionshead is an example of bad planning. Let's not follow this thinking in the core village area. I can't imagine approaching Vail and looking at this proposed monster as I drive in. What will visitors think? Other areas are available and you, as members of the Town Council, can certainly find a better location that the one proposed. Sincerely, i John F. Malo Vail Resident since 1966 B-1, All Seasons JFM:bc Attachment: M 1 Vail, CO 81657 Please contact the Association should you have questions or concerns regarding this issue. Post Office Boa 238 Vail, Colorado 81658 Telephone: (970) 827-5680 Voice Mail/FAX: (970) 827-5856 e-mail: Deaz: Mayor and Town Council Planning and Environmental Commission Design Review Board UWe, as property owner's, believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty anal world-class scenic image of Vail's main entrance. We urge the Town of Vail to significantly reduce the size of the housing project or move it to a more appropriate venue. While we all recognize the importance of affordable employee housing, we urge the. Town to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all other resorts, employee housing should not be the first visual visitors will encounter. Truly affordable employee housing should not be attempted. where it is neither appropriate nor affordable. Signed: ~~z~ ~ ~~~~-mac-- Print Name: `,~.L~yl~•i cD+P. ~ 3y pia; /a•s ~ ,~~ Co% S~,S~ Co ~ayaF 4of4 .~~ ~. Lodge August 12, 2002 Town of Vail Planning & Environmental Commission Department of Development 75 South Frontage Road Vail, CO 81657 . Dear Commission & Development Staff: Having reviewed plans for Middle Creek I wish to voice both ,support and concern about the project. First, I do favor development of reasonably priced employee housing that is of respectable quality, thus encouraging .residents to behave with respect for their surroundings and neighbors. The Mountain Bell/Middle Creek location seems appropriate to this use as it is close to work and hopefully residents would be encouraged to utilize public transportation or walking to work rather than further impacting Vail's limited parking. My concerns are based upon the anticipated price of rents in the units and the size and balance of the structures on the site. Ali our employees are conscious of rents and many struggle to make ends meet although they work two or more jobs. If at all possible, keeping rents per bedroom below $650 per month would be important. Second, the sketches of the proposed buildings appear to be imposing and too much for the small site. Granted, the Mountain Bell tower and the school are not examples of exceptional architecture, however, I feel that what is proposed it out of scale with the natural landscape. Further, when passing through the roundabout, this will be a primary introduction to Vail. An oversize building on this site simply is nor appropriate. As a neighbor across the street (Interstate) and as both a business owner and resident of Vail, I urge you to consider how the views of the building from the east and from the south will be impacted. It may be necessary to scale the development down in order to maintain an attractive balance and not overdevelop the site. Sincer ly, l~G~%" amela Stenmark General Manager General Partner 250 South Froritage Road West • Vail, Colorado 81657 970-476-7810 • FAx 970-476-4504 • www.evergreenvail.com ~" . ~ -~ ~ ~ ~~c ~ ~ ~~;D /fit ~ n.~ B ~~ S ~~~ = ~o S~ ~ ~ r3~~G C~~~~~~~ l ~ ;~ Pas ~ -~ d ~ s~ ~ ~ ~~- ~~ ~,c a J '~ ,~ ~ ~ ~~~ zE' ~ ~ ~ ~ ~ 5~~~ rr ~ r ~ I ~~~~ ~ ~ a tai. ~ / • .~ ~~ ~ 0 S r Qc3/~~aJ~s, ~~ ~~~L ~d~ __ ~r ^ ~ --~ a ~ D ~ 7s 7J I .~t.J ~] ~~P - ~,~ S~ ~ cc ~~~ ~ ~ da~a~ ~~ ~~sr r _, a ~~ t ~ i If ~~ rS ~~PJ ~ ~ ~ t d,~ --~. ~ac~ Jn~~ Na S//~/o ~Z ~-R- „G"' i a ~ sus . ~~ .w,. w ~ ~ {~ -tom. ~/~~ ~ ~ / c` G~~ ~~ vauuq'a6~x~ . ~~ ~; ~ - ~~~ ~ ~a ~-~ ~Q~~ ~~ ~ 3 U~ ~-~6-330 • ARTHUR KELTON JR 225 WALL STREET VAIL, COLORADO 81657 970-476-7990 TO MAYOR LUDY KURZ THE P.E.C. THE DESIGN REVIEW BOARD PLEASE COUNT ME AMONG THOSE OPPOSED TO THE OVER DEVELOPEMENT OF THE "MOUNTAIN BELL" SITE NOW DESIGNATED MIDDLE CREEK. THIS SITE WAS ONLY REZONED TO ALLOW .FOR 40 EMPLOYER OWNED UNITS, NOT THE ENLARGED DESIGN ON THE TABLE TODAY. THIS IS THE ENTRANCE TO THE TOWN OF VAIL, THE FIRST IMPRESION THAT THE VISITOR IMPRINTS. NPLEAESE RECONSIDER THE DENSITY AT THIS LOCATION AND SPREAD IT TO OTHER AVAILABLE SITES SO AS TO MAINTAIN THE INTEGRITY OF THE RESORT EXPERIENCE. ART 8/1 ,. ELAINE KELTON' 1034 'HOMESTAKE CIRCLE VAIL, COLORAD..O 8.1657 970-476-5411 DEAR MAYOR KURZ .PLANNING & ENVIRONMENTAL COMMISSION . DESIGN REVIEW BOARD YES,, WE NEED INTEGRATED LONG TERM AD SEASONAL HOUSING: YES; UVE NEED EMPLOYER, OWNED HOUSING.. YES, WE NEED A.LOT OF IT. BUT WE DO NOT.NEED ALL OF IT IN ONE LOCATION, ESPECIALLY ONE WHICH 18 SO VERY VISIBLE AT THE "FRONT DOOR TO VALL". THE ALTERNATIVES ARE AVAILABLE,TO SPREAD THE UNITS NEEDED: THE "HUD WIRTH PARCEL" AND THE TIMBER RIDGE SITES COULD PER. HAP.S ABSORB THE NEEDED UNITS. EACH.OF THE ALTERNATE LOCATIONS WOULD ALSO HAVE AVAILABLE PUBLIC TRANSPORTATION: 1NE NEED TO CONSIDER AS THE IROQUOIS NATIONTH~E.IMPACT ON.TH E "SEVENTH GENERATION".BUILDING THE LARGEST SINGLE PROJECT AT THE ENTRANCE OF THE . TOWN -THE 1ST THING. SEEN AS YOU EXIT 1-70 AND THE.VIEW FROM THE MOUNTAIN AS YOU SKI-DOWN AT THE.END OF EVERY DAY DOESN'T FEEL SYMPATHETIC TO ALL WE ESPOUSE AS A WORLD CLASS RESORT. .LASTLY, PLEASE DO NOT FORGET THAT THISLAND WAS ORIGINALLY DESIGNATED OPEN SPACE AND THE REMOVEABLE OF THIS TRACT WAS. DONE TO .CREATE A SMALL POCKET OF 40 EMPLOYER HOUSING UNITS: SINCERELY, t .ELAINE KELTON - ~ ~~ , ~~ 4~ ~ ~~ ~~ ~-e~y , ~--~ 3z 5 l~ e~ ~~-c-~ 9~~-~~~~~~65 Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Site -Proposed high-density housing ~,~ . _ . From: "DIANA DONOVAN" <dianamdonovan(c~msn.com> To: "Pam Brandmeyer" <pbrandmeyer~ci.vail.co.us> Date: 8/12/02 12:53 PM Subject: Fw: Mountain Bell Site -Proposed high-density housing ----- Original Message ----- From: Ronald Snow To: towncouncil@ci.vail.co.us Sent: Sunday, August 11, 2002 5:12 PM Subject: Mountain Bell Site -Proposed high-density housing Gentlemen, We have just learned of the effort to change this dedicated open space to high-density development. We understand that this site was donated to the town as a permanent open space and to preserve the entry to Vail as a mountain community and not as a congested urban core. Violation of this trust by public officials should not be considered under any circumstances and should result in forfeiture of the property if this is your intent. This site is very steep and cannot be developed in any fashion without considerable compromise to its natural character. Any efforts to design a "hidden" development project, let alone ahigh-density use are impossible and incompatible with this site. The location is not remote from neighbors willing to protect it from irrational development but is central to all of our daily lives each time we enter the village and each time we traverse its corridors. This is not the impression that our visitors and residents should have of the Vail experience. On behalf of all owners and residents, please do not indulge in planning that is so short sighted. The Lionshead improvements and other. Village plans have proceeded with much more deliberation and thoughtful planning. High-density additions on open space must be deliberated and planned even more thoroughly. Sincerely, Ron and Mary Snow 401 Scorpio 135W Meadow Dr. Ron Snow Do You Yahoo!? HotJobs, a Yahoo! service -Search Thousands of New Jobs file://C:\Windows\TEMP\GW} 00001.HTM 8/12/02 Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Affordable Housing Project ~~~ ~:x: From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 8/12/02 12:50 PM Subject: Fw: Mountain Bell Affordable Housing Project ----- Original Message ----- From: <Mjoemchugh@aol.com> To: ,<towncouncil@ci.vail.co.us> Cc: <jflamont@vail.net> Sent: Sunday, August 11, 2002 12:05 PM Subject: Mountain Bell Affordable Housing Project > We are East Vail property owners and believe that the proposal for the > development of the Mountain Bell site is not compatible with the desired > beauty of Vail's main entrance and is in direct conflict with the planned > "Front Door" project intended to improve and beautify Vail's main access. > The size and design of the proposed project are grossly inconsistent with the > upscale image Vail tries to convey. > Additionally, we understand that the cost of the project will render the > necessary rental rates decidedly unaffordable to the overwhelming majority of > the seasonal employees for whom it is intended, thereby defeating the purpose > of the entire project. > The alternative proposal set forth by Gail Steadman in the August 7th issue > of the Vail Daily makes a lot more sense from many perspectives. > Sincerely, Brenda & Joe McHugh, 4014 Bighorn Road, Vail Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Site Proposal From: "DIANA DONOVAN" <dianamdonovan(amsn.com> To: "Pam Brandmeyer" <pbrandmeyer~ci.vail.co.us> Date: 8/12/02 12:48 PM Subject: Fw: Mountain Bell Site Proposal ----- Original Message --- From: Scorpio404 To: towncouncil@ci.vail.co.us Sent: Sunday, August 11, 2002 11:19 AM Subject: Mountain Bell Site Proposal Dear: Mayor and Town Council Planning and Environmental Commission/Design Review Board We, as property owners, believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty and world-class scenic image of Vail's main entrance. We urge the Town of Vail to significantly reduce the size of the housing project or move it to a more appropriate venue. While we all recognize the importance of affordable employee housing, we urge the Town to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all other resorts, employee housing should not be the first visual visitors will encounter. Truly affordable employee housing should not be attempted where it is neither appropriate nor affordable. There seems to be much more appropriate land available (i.e. the ruins") for this purpose. Thank you for your consideration in this matter. Debora Morris and S.J. Prapuolenis Scorpio #404 file://C:\Windows\TEMP\GW } 000O1.HTM 8/12/02 Page 1 of 1 Pam Brandmeyer - Fw: Day Care Center From: "DIANA DONOVAN" <dianamdonovan(cr~msn.com> To: "Pam Brandmeyer" <pbrandmeyer~ci.vail.co.us> Date: 8/12/02 12:18 PM Subject: Fw: Day Care Center ----- Original Message ----- From: EMercyjr@aol.com To: towncouncil@ci.vail.co.us Sent: Saturday, August 10, 2002 8:28 AM Subject: Day Care Center Members Of the Vail Town Council: I am writing to express our support for two critical issues which will impact the long term viability of Vail as an outstanding national resort. The day care center should be expanded at its present site. It is an essential employee benefit which is much needed and is a logical use that would be compatible with the site. Affordable housing must be a priority. ~If Vail is to thrive as a destination resort it must be able to attract service employees in large numbers. Without housing this simply will not be possible. Sue and Gene Mercy Villa Cortina 330. flP•U('•\Vl,~;nr-ln.z,c\TFMR\~;WlOMfl~ NTM R/1?/n2 Page 1 of T Pam Brandmeyer - Fw: Mountain Bell Site ,,.._. From: "DIANA DONOVAN" <dianamdonovan(c~msn.com> To: "Pam Brandmeyer" <pbrandmeyer(r~ci.vail.co.us> Date: 8/12/02 12:09 PM Subject:. Fw: Mountain Bell Site ----- Original Message ----- From: andy wiessner To: towncouncil@ci.vail.co.us Sent: Friday, August 09, 2002 3:34 PM Subject: Mountain Bell Site Dear Council Members, am supportive of putting affordable housing at the Mountain Bell site, but hope that in approving any project you will keep the following in mind: 1.the project be of sych a size as to blend into the terrain and forested area in the vicinity. In particular, the taller trees on the site should be preserved and the building(s), landscaped so that visual intrusion is minimized; 2. I think the drawings I have seen which involve a 5 story structure(s), have buildings which are probably too high for that particular location. Can the height be lowered to 2-3 storiesd so that it is similar to the majority of the other developments on the north frontage road? 3. Parking should be underground. 4. VERY IMPORTANTLY IN MY MIND, THERE SHOULD BE SOME SORT OF BRIDGE OR WALKWAY TO VILLAGE SO THAT PEOPLE CAN GET THERE ON FOOT. The current underpass at the Vail I-70 exit too narrow (icy in winter) is not adequate for people to travel by foot. It either needs to be widened...or some sort of foot bridge put across/under the Interstate.lf foot access is not provided, there will be a traffic problem at the rotary. If a foot path is too expensive...then, at least, a bus stop should be put at the entrance to the housing project.. Thank you for considering my views. Sincerely. Andy Wiessner te1:970-476-6136 file://C:\Windows\TEMP\GW } ()0001.HTM 8/12/02 Page 1 of~ 1 Pam Brandmeyer - Fw: Mountain Bell Site From: "DIANA DONOVAN" <dianamdonovan(a~msn.com> To: "Pam Brandmeyer" <pbrandmeyer~ci.vail.co.us> Date: 8/12/02 10:54 AM Subject: Fw: Mountain Bell Site ----- Original Message ----- From: SANewsam@cs.com To: towncouncil@ci.vail.co.us Sent: Thursday, August 08, 2002 4:20 PM Subject: Mountain Bell Site Dear: Mayor and Town Council Planning and Environmental Commission Design Review Board As a property owner, I believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty and world-class scenic image of Vail's main entrance. Please, significantly reduce the size of the housing project or move it to a more appropriate venue. While we all recognize the importance of affordable employee housing, I urge you to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all other resorts, employee housing should not be the first visual visitors will encounter. Truly affordable employee housing should not be attempted where it is neither appropriate nor affordable. Sara A. Newsam ri -iir._~.r•--~----~-rr~.rn~~~innnnni TTm~.~ 4/17/!17 Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Project ~~~ ~~ From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer(a~ci.vail.co.us> Date: 8/12/02 10:31 AM Subject: Fw: Mountain Bell Project ----- Original Message ----- From: <MWK1851@aol.com> To: <towncouncil@ci.vail.co.us> Sent: Thursday, August 08, 2002 9:24 AM Subject: Mountain Bell Project > Dear Mayor and Town Council, I am President of the Alphorn Condominium Association at 121 West Meadow Drive. I speak for all of our owners when I express concern about the proposed Mountain Bell Project.. The massive size of the employee housing building is totally inappropriate for the entrance to Vail. Attractiveness to our visitors is a high priority, as well as space to house our employees. We highly oppose the present plan and feel that it must be re-visited in another form. Thankyou for your consideration, Margie Kell > file://C:\Windows\TEMP\GW } 00001.HTM .8/12/02 Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Site From: "DIANA DONOVAN" <dianamdonovanLmsn.com> To: "Pam Brandmeyer" <pbrandmeyer(~ci.vail.co.us> Date: 8/12/02 10:30 AM Subject: Fw: Mountain Bell Site ----- Original Message ----- From: Gretchen Busse To: Vail Town Council Sent: Wednesday, August 07, 2002 7:39 PM Subject: Mountain Bell Site Mr. Mayor and Town Council, We as property owners, believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty and scenic image of Vail's main entrance. We urge the Town of Vail to move it to a more appropriate Iocation..We urge the Town to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all major resorts, employee housing should not be the first visual visitors encounter. Truly affordable employee housing should not be attempted where it is neither appreciate nor affordable. Len and Gretchen Busse Pam Brandmeyer - Itr twn of vail vs mountain bel.dat Page 10 ,. _,. _ .,. _d .. .., ^^D^F^D^D^~^F^8^DPaul J. and Katherine W. Dudzinski 3309 Canadian Park Way Fort Collins, CO 80524 and Skaal Hus I, Unit #4 141 W. Meadow Drive Vail, CO 81657 August 7, 2002 Town of Vail Town Council 75 South Frontage Road, West Vail, CO 81657 e-mail <towncouncil@ci.vail.co.us> Fax: 970-479-2157 Dear: Mayor and Town Council Planning and Environmental Commission Design Review Board We, as property owners, believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty and world-class scenic image of VailOs main entrance. We urge the Town of Vail to significanly reduce the size of the housing project or to move it to a more appropriate venue. While we all recognize the importance of affordable employee. housing, we urge the Town to preserve and protect Vail~s image as visitors first enter our b^~eautiful Village. As at all other resorts, employee housing should not be the first visual visitors will encounter. Truly affordable employee housing should not be attempted where it is neither appropriate nor affordable. We are well aware of the exciting plans that are being created for all of Vail, including the Vail Front Door and Lionshead, etc. and are anticipating playing our part in helping it happen. We would be much less interested in participating if this ill conceived project at the Mountain Bell Site goes through in its current form. It is not congruent to create a well conceived upgrade to our Village, and to try to use outdated, less than attractive, plans for the actual entrance from the interstate. We hope you will reconsider at this important stage in planning, as the future outcome will be of great importance to Vail as a whole. Sincerely, Paul J. Dudzinski, M.D. Katherine W. Dudzinski z^YYN^^^d^^^DSET,^YY.H^^^OYYY^YYY^F^6^b^"^^=p^'/<^^^^^8^^^^^YY6^YY"^^ ^=p^'/4DSET°^yji.H^^€^Lst^YYY^YYY^F^"^^^^'/<^^^'^6^^^^^yji^^^"^^^6^^^^^^jiy6^yji" ^^^=p^'/4DSUM'^^Paul DudzinskiHDNI^STYL^oe^0^yji^D^STYL^F^~^^^F^"^F^a^F^T^F Page 1 of 7 Pam Brandmeyer - Fw: From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 8/12/02 10:26 AM Subject: Fw: ----- Original Message ----- From: <Bill_Morfon@jackmorton.com> To: <towncouncil@ci.vail.co.us> Sent: Wednesday, August 07, 2002 3:29 PM Dear Mayor and Town Council Planning and Environmental Commission Design Review Board: I have reviewed the plans, size and scope of the building for the proposed Mountain Bell Site. I just wanted to drop you this note to tell you that I believe that it does not fit with the look and the image of the main entrance to Vail. I had spoken with several of you, and again via this note encourage you to significantly reduce the size or move it to a more appropriate location. All of us recognize the importance of affordable employee housing, but from all that I can assess, I don't believe it's truly affordable nor appropriate. Sincerely, William Morton .~. ~ ~~. ~... ~ \mi,w .Tn\!".[l )1 /~/1!1/lll TTTT R X~~ /~11 Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Site opposition 33"..S:~r4%`F+81",/'~?:.i:.:.i?P.~4Y:~~F1F(+fti~iY dNF:'~.~~:~•:@f?}!.M.rPL9B3s~.fi.~4;~Y*_iRa.. ... .' ... np1Vri'tfd'.~fi.'~dPNt~.lS°aAV1kR1 .. . From: "DIANA DONOVAN" <dianamdonovanLmsn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 8/12/02 10:21 AM Subject: Fw: Mountain Bell Site opposition ----- Original Message ----- From: <Mikhaley@aol.com> To: <towncouncil@ci.vail.co.us> Sent: Wednesday, August 07, 2002 10:33 AM Subject: Mountain Bell Site opposition > Dear Mayor & Town Council, Planning and Environmental Commission Design > Review Board: > We as property owners, believe that the size of the proposed affordable > housing project at the Mountain Bell site is incompatible with beauty and > world-class scenic image of Vail's main entrance. > We urge the Town of Vail to significantly reduce the size of the housing > project or move it to a more appropriate venue. While we all recognize the > importance of affordable employee housing, we urge the town to preserve and > protect Vail's image as visitors first enter our beautiful village. As at all > other resorts, employee housing should not be the first visual visitors will > encounter. Truly affordable employee housing should not be attempted where it > is neither appropriate nor affordable. > Sincerely, > Mike Haley > 1860 Meadow Dr., #3 > Vail, CO file://C:\Windows\TEMP\GW } OOOOI.HTM 8/12/02 Page 1 of 1 Pam Brandmeyer - Fw: Mountain Bell Site Project e'Ri^iuMriY=-:~,"bT3~"^:da,~'~a:w.'s.MSi~i`k.NfY.Sltw~fAWri1MS35~.%r ~~.. .kS~AV~.~. J`~d'SNSEOY3Yl~G.d..aklt _... .. .. ~ Y't':5~'£34Rk:AMF°I4F.dsL"Si°", S.NX9A*. .3tA.'hM1.919~6MgPX.t~M From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 8/12/02 10:14 AM Subject: Fw: Mountain Bell Site Project ----- Original Message ----- From: "Ginny Culp" <gculp@vail.net> To: <towncouncil@ci.vail.co.us> Sent: Monday, August O5, 2002 9:46 PM Subject: Mountain Bell Site Project > Dear Town Councilperson, > I'm worried that we are awfully close to starting something that isn't > going to deliver what anybody wants. I'm worried about wlio is in the. > driver's seat on this Middle Creek (Mountain Bell site) housing project. > My concerns include: > 1. Vail resident's assets and tax dollars are going to build rental > housing for employees of businesses in the Town of Vail. I don't > believe this is an appropriate use of taxpayer dollars. I think it is > fine if the TOV builds housing for THEIR employees, but I believe > building/providing housing for private business's employees ought to be > done by private sector money. > 2. There are those who think this is costing the TOV nothing. Wrong. > The value of the land at the entrance to Vail is worth.how much would > you think? Leasing it on a very long-term basis at no cost is not > helping the taxpayer get any return on a huge asset. Additionally the > council has spent tens of thousands of dollars in the planning phases. > 3. The entrance to Vail will be changed forever. It is like putting > TimberRidge as our first greeting to guests. (Yes, once a town council > thought TimberRidge looked good!) > 4. I understand that the rents will shake out at a minimum of $650 a > bed. Is that affordable'? Given the site, costs could easily escalate > resulting in even higher rental rates. > Additionally I have concerns, given the current economy, that this > project may actually ~e underfunded. Touay's dollars are not what they > were a month ago. I'm uneasy that there will be lots of corner cutting > in the construction. Once it is started, if the project isn't completed > by the developer, who pays to have it completed? Bonding doesn't cover > the full cost of the project, does it? > There will be much redevelopment in Vail Village and Lionshead in the > next five years. This will provide a perfect opportunity to include > employee housing in the new designs and to have the right people paying > for it..the employers. And they will have more interest in making the > units look good and fit into their location. > I urge you to think more carefully about this important decision. I > believe there'are better ways to serve the employee and the residents of > Vail. > Ginny Culp ~-, ~,r,~«. <-----~mr~.rr<~~~innnnni iTrrr,r R/17/(1') Paul J. and Katherine W. Dudzinski 3309 Canadian Park Way Fort Collins, CO 80524 and Skaal Hus 1, Unit #4 141 W. Meadow Drive Vail, CO 81657 August 7, 2002 Town of Vail Town Council 75 South Frontage Road, West Vail, CO 81657 e-mail <towncouncil@ci.vail.co.us> Fax: 970-479-2157 Dear: Mayor and Town Council . Planning and Environmental Commission Design Review Board - We, as property owners,~believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty and world-class scenic image of Vail's main entrance. We urge the Town of Vait to significanly reduce the size of the housing project or to move it to a more appropriate venue. While we all recognize the importance of affordable employee housing, we urge the Town to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all other resorts, employee housing should not be the first visual visitors will encounter. Truly affordable employee housing should not be attempted where it is neither appropriate nor affordable. We are well aware of the exciting plans that are being created for all of Vail, including the Vail Front Door and Lionshead, etc. and are anticipating playing cur part in helping it happen. We would be much less interested in participating if this ill conceived project at the Mountain Bell Site goes through in its current form. It is not congruent to create a well conceived upgrade to our Village, and to try to use outdated, less than attractive, plans for the actual entrance from the interstate. We hope you will reconsider at this important stage in planning, as the future outcome will be of great importance to Vail as a whole. Sin erely, '~ Paul J. Du inski, M.D. ,. Katherine W. Dudzinski HARLEY G. HIGBIE, JR. 1600 Broadway, Suite 1400 Denver, CO 80202 303-861-42 30 Fax 303-830-1465 August 12, 2002 The Town of Vail Vail, CO 81657 We are very much aware of the need for employee housing. During Vail's very first winter we were forced to bed down employees in the laundry room of The Lodge, causing Jack Tweedy and me to try to initiate an employee housing project. We failed. As much as we favor the concept, the proposed project at the Bell site is too big and too prominent. It would be unfortunate for the entrance to Vail to be defined by a housing project. Our image is too important. A smaller building that is well-hidden, or another location, would be our preference. Sincerely, Lorraine and Harle Hi 'e gr i 07/29/2002 19:56 9704762933 KASSON CO Thursday, August 08, 2002 Dear: Mayor and Town Council Planning and Environmental Commission Design Review Board We, as Vail property owners, have studied the plans for the Mountain Bell Site and are quite disturbed. Too denude this site of its beautiful trees to build such a large (an not very attractive) structure seems out of synch with our desire to have Vail a more beautiful place in which to live and to visit. We suggest the Town of Vail significantly reduce the size of the housing project or move it to a more appropriate venue. Affordable employee housing is important. But locating it at our main entrance, in its current configuration, seems to defeat the purpose of a more attractive Vail. Signed: Elna and Bruce Kasson PAGE 01 rams~hor~ 416 VAIL VALLEY DRIVE PHONE (970) 476-5646 VAIL, COLORADO 81657 August 7, 2002 Town of Vail Town Council 75 South Frontage Road, West Vail, CO 81657 Dear Mayor and Town Council FAX (970) 476-0301 For several months we have been following the discussions regarding the Mountain Bell Site. The size of the project proposed for this site is not compatible with the world class image of Vail. This project is the entry to Vail and the first impression for guests and residents alike. We urge the Town of Vail to either significantly reduce the size of the housing project or move it to a more appropriate location. Although we understand that affordable employee housing is critical for the Town, we also believe first impressions is a critical issue to Vail as well. We have only one major entry to Vail and this is not the appropriate location for affordable housing. We urge you to evaluate this issue carefully as the effects of this decision are very long term. Sincerely _ ~,\ i ~- a~ J 1 No ' n D. Kurtz, Presi nt Rams Horn Condominiu Association -,, ~ Page 1 of 2 Nina Timm - Fw: Opposition to Middle Creek Affordable Housing Project From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 4:12 PM Subject: Fw: Opposition to Middle Creek Affordable Housing Project --•-- Original Message ----- From: "Bill Rodkey" <cartilagedoc@hotmail.com> To: <towncouncil@ci.vail.co.us> Cc: <editor@vaildaily.com> Sent: Friday, August 23, 2002 12:06 PM Subject: Opposition to Middle Creek Affordable Housing Project > Dear Vail Town Council: > I wish to express my strong objection to the "Middle Creek" > affordable housing project on the Mountain Bell site. I am quite concerned > that such an edifice will forever defile our beautiful mountain and > desecrate our quaint village environment. Please understand that I am not > opposed to affordable housing, but rather I am opposed to this project at > its current location. > Based on the information I have seen as well as what I have read in the > Vail Daily, I am unable to comprehend how this development possibly could be > deemed as "affordable" housing. Will any of our local employees truly be > able to afford the rents in such a place? I honestly doubt it. > Furthermore, if my information is correct, these apartments will be quite > small, making the cost per square foot comparable to many mid-level (or > higher) units in and around Vail. Who does the Town Council actually think > will live in theses units? Please be honest with yourselves as well as the > citizens of this valley, especially those of us who are full•time, > year-round residents and home owners. > In the past thirteen years I have observed many property owners, both > residential and commercial, "jump through hoops" and spend untold amounts of > money to comply with the many restrictions placed upon them. This fact is > true even in those cases when the property owners simply wanted to upgrade > their properties for the sake of appearance and in support of what is best > for all of us who live and work here. Now, it seems that this Middle Creek > project is being given green lights at every intersection with little or no > opposition from the TOV in spite of strong opposition from the citizens. To > whom do you owe your allegiance? file://C:\windows\TEMP\GW } OOOO l .HTM 09/03/2002 Page 2 of 2 > Please consider the alternatives to this project and to this site. I am > certain that there are sites that would be less technically challenging and > more amenable for building than the Mountain Bell property. You know better > than I what other possibilities exist, so why not look at those other sites > and suggestions with open minds? That would benefit all of us. > Please, for the sake of alf Vail Valley residents, do not allow this > project to proceed at this location. > Very sincerely, > Bill Rodkey > Join the world's largest e-mail service with MSN Hotmail. > http_//www_hotmail _com Page 1 of 1 Nina Timm - Fw: Re send of previous letter re Mountain Bell Affodable Housing plan From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 3:44 PM Subject: Fw: Re send of previous letter re Mountain Bell Affodable Housing plan ----- Original Message ----- From: <OWHY@aol.com> To: <towncouncil@ci.vail.co.us> Sent: Sunday, August 25, 2002 11:13 AM Subject: Re send of previous letter re Mountain Bell Affodable Housing plan > I have resent this message because the first time my name and address were > not on it. > > To Town of Vail Council: > Please rethink your plans for this site. As I have read for the past couple > of years the town is very serious about upgrading the Village and Lionshead > with remodeling and cleaning up existing structures and roads in the area. > when I was in Vail last winter there was specific mention made of Vails > "front door" entry just off I.70. All those who commented on it wanted that > area to reflect the "new and improved" look of Vail. Now just to the side of > that "front door" you propose to develop a site which will be more in > keeping with the worst of Lionshead as it was developed. I think that it is > commendable that you want to put in affordable housing at this site, but it - - > should be in keeping with the plans that you have for the village from the > beginning of its life. You do not want to have to go back and try and > redevelop the site into something more in keeping with your plans for an > improved Vail look. Keep the scale and the look in keeping with what you > have planned for the village. > Sincerely, > Diane L. Otto > 124 Willow Bridge Road > Unit 5CD > Village Center > Diane L. Otto file://C:\windows\TEMP\GW } OOOO 1.HTM 09/03/2002 Page 1 of 1 Nina Timm - Fw: Mountain Bell From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 4:03 PM Subject: Fw: Mountain Bell ----- Original Message ----- From: Eustaquio Cortina To: towncouncilC~ci.vail.co.us Cc: glamb slifer.net Sent: Friday, August 23, 2002 4:35 PM Subject: Mountain Bell I attended the past meeting and heard many opinions To me we are missing the boat Bob Lazier presented aproject -and there was enormous discussion of 4 or 6 foot height -the building looks great and is the same stories as of today but with all mechanical new items needs the extra foot per floor to acomadate mechanical Mountain Bell project will affect all people comming to Vail, skiers on the mountain, highway traffic, at least I will see it a couple of times achy -these buildings will benefit 150 + families IDEA -sell property and develop 12 lots or so -what ever is convinient -sell lots, purchase land in a not so visible location and do the needed employe housing. Where is the next big question, I have no idea, but there will be a good place to put such a BIG and visible building Thanks Eustaquio Cortina 20 year resident in Vail 970 471 0626 www_eustaquioco._rtma.com MSN Fotos: la forma mas facil de compartir e imprimir fotos. Raga clic_aqu% Page l.of 1 Nina Timm - Fw: Middle Creek Houseing Plan From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/29/2002 3:03 PM Subject: Fw: Middle Creek Houseing Plan ----• Original Message ----- From: "Catherine E Douglas" <cmdoug@iopener.net> To: <Towncouncil@ci.vail.co.us>; <Schofieldjbs@cs.com>; <jump-arch@Mountainmax.net> Sent: Wednesday, August 28, 2002 12:34 PM Subject: Middle Creek Houseing Plan > When we fist heard of the employee housing idea on the Middle Creek location,we were in favor of the thought.However,one should never asume anythig.We did.We visualized atractive buildings like the employee houeing on Sandstone Road opposite the Potatoe Potatoe.That architecture would be more tasteful,more in keeping with Vail's alpine atmosphere less cospicuous,more tasteful,and not as objectionable.Why Italian?This is Vail.The architects had no feeling of the community.The present plan resembles a prison;cold and stark. We think the Worth property shuold still be considered.Does the town need 140 units???We doubt it.West Vail would be more lagical with all the amenities within walking distance. We are long time property owners['63],and fultime residents who take pride in our town.Please!!!! do not do something foolish that can not be rectified. Respectfully, Cathie > and Morgan Douglas > [Pardon the typing errors] file://C:\windows\TEMP\GW} OOOOI.HTM 09/03/2002 Page 1 of 2 Nina Timm - Fw: Mt. Bell From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 2:15 PM Subject: Fw: Mt. Bell -•--• Original Message ----- From: "Judy Berkowitz" <Judy@HPBAssoc.com> To: <towncouncil@ci.vail.co.us> Sent: Monday, August 26, 2002 7:12 PM Subject: Mt. Bell > To: The Mayor > The Planning Commission > The Town Council > As longtime Vail homeowners, we would like to express our hope that you will > reconsider the masss and scope of the proposed Mt. Bell site. The idea of > placing a high density, low esthetic development at the entrance to our > Village is ill conceived and should prompt a thorough investigation of the > both the real needs of the town employers/employees and how best to satisfy > these needs. As we heard at the recent PEC meeting, an after September 11 > re-evaluation needs to be undertaken so that we are not just responding to > perceived but perhaps unrealistic assessments and move in the the direction > that is most appropriate given the changing economic climate of Vail. > As you climb up Vail mountain and look down toward the Village as I recently ~ - >did this summer, it is clear that the landscape would be horribly affected > by this project which will loom as the large and out of scale development it > is. The same vista will assault our downhill skiiers as they end their day. > Right now we have a chance, and an obligation, to preserve the character of > Vail and not allow such massive developments that could radically alter the > perception and reality of our world class resort. > We urge the Council and the Commission to look into reducing the scale of > this project and to preserve as much of the open space as possible. > Sincerely, > Judy and Howard Berkowitz Page 1 of 1 Nina Timm,- Fw: Middle Creek Housing -YES From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 3:19 PM Subject: Fw: Middle Creek Housing -YES ----- Original Message ----- From: BJKSKI aol.com To: towncouncil@ci.vail.com Cc: jacaro vail.net Sent: Sunday, August 25, 2002 9:23 PM Subject: Middle Creek Housing -YES I'm a voting resident of Vail and writing you in support of the proposed Middle Creek rental development for local employees on the site commonly known as the "Mountain Bell" land. Many years ago I lived in a trailer court which was located in within the current Town Of Vail boundaries and later lived iri one and two bedroom condominiums (located in Vail Village) with up to 3 roommates to make it affordable. These living arrangements certainly helped make me and my roommate more productive and happy employees enjoying a very short commute to work (I parked my care for the ski season) and knowing I was part of a great and caring community. The need for employee housing grows every year, and while the Town Of Vail has made strides in providing for- sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community as well as the economy. This location in particular has the advantages of being on the Town's bus and bike routes, as well as being within walking distance of Vail Village and Lionshead. My wife and I live in the Sandstone area of Vail and will be able to see this housing development which certainly will not trouble us. I have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that this housing development is very appropriate at this site. For over 23 years I was a principal officer (CFO) of a Denver based investment banking firm (which I helped start) involved in financing affordable housing throughout the United States. If you have any questions please do not hesitate to contact me at 479-0761 or by a-mail at kent erickson@newmanfs.com. Sincerely, R. Kent Erickson 1139 Sandstone Dr. Vail, CO 81657 file://C:\windows\TEMP\GW} 000O1.HTM 09/03/2002 Page 1 of 1 Nina Timm - Fw: Middle Creek Housing Proposal From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 2:53 PM Subject: Fw: Middle Creek Housing Proposal •••-- Original Message ----- From: "Nancy Byers" <nancyb@mountainmax.net> To: <towncouncil@ci.vail.co.us> Sent: Monday, August 26, 2002 8:38 AM Subject: Middle Creek Housing Proposal > Dear Council Members: > I wrote before that I was against employee housing on the Mountain Bell > site. What concerns me more is not housing on that particular site as much > as the size, density and cost of the project. Will it really be > "affordable" when it's completed? Or is this another Donavan Park debacle > that the TOV will then need further compensation by raising our taxes? > I find the size and density of this plan almost as offensive at our town's > entrance as the proposed and approved VVI project, which I think is totally > inappropriate. Massive, tall buildings are not in character to the TOV let > alone at the entrance. Neither project invites me to leave I-70 to enjoy a ' > special experience. > Thank you, > Nancy Byers > 352A Beaver Dam Cir. > Vail, CO. 81657 ELAINE KELTON 1034. HOMESTAKE CIRCLE VAIL; COLORADO 8.165.7 970-476-54'11 ARTHUR KELTON JR 225 WALL STREET VAIL, COLORADO 81657 970-476-7990 TO MAYOR LUDY KURZ THE P.E.C. THE DESIGN REVIEW BOARD PLEASE COUNT ME AMONG THOSE OPPOSED TO THE OVER DEVELOPEMENT OF THE ''MOUNTAIN BELL" SITE NOW DESIGNATED MIDDLE CREEK. THIS SITE WAS ONLY REZONED TO ALLOW FOR 40 EMPLOYER OWNED UNITS, NOT THE ENLARGED DESIGN ON THE TABLE TODAY. THIS IS THE ENTRANCE TO THE TOWN OF VAIL, THE FIRST IMPRESION THAT THE VISITOR IMPRINTS. NPLEAESE RECONSIDER THE DENSITY AT THIS LOCATION AND SPREAD IT TO OTHER AVAILABLE SITES SO AS TO MAINTAIN THE INTEGRITY OF THE RESORT EXPERIENCE. ART 8/12 S//a/o ~ ~~ ~ .~ ~d~ ~~~ ~ ~,~ ,.~ ~~. _ ~ use a ~ s {mss ~ ~ w~C.~a.6 ~, ~ ~ ~ 1~.~~ ~ ~~ ~ ~vw~da68x~ lei ~'~~ ~ 3 /~ .. __ U~ ~~6-330 .?~ ~--~ -~~ ..a -~- _, ~~-,--*- ~~ .~L, ~~~ ~~~~ -~-a .~ ~~ -~-~ tea`- ~°.-,~ ~~ 1 ~ ~ - ~. ~~ T"~ ~ ~~~- ~2d~u ~ ~o S c c ~ ~J r~ ~ ~ G C~~~~~~~ C C' ~O~ titc,C ~rJQl~ /f~~ ~ ~d J~C ~L ~ ~=} ~ G CJ~ r~ ~ Z ~- o a 1 . ~~ ` ~ ~ ~~L ~ C ~ ~ ~ d ~ ~ 8 ~C~- sC ~ ~ NG ~ 1 ~ ~ o ~~ : T f ~ ~ ~ ~a1 ~ 6 S ~t c~~ ~ ~ s ~ a ~~~ ~~ ~~.a P~ R ~a ~Ra ~ ~~~ s~Fg ~~~ ~ r ~~ ~ ~ ~~ -',sue z ~ ~ '~~~~,u M ~ ~~' ~ C- ~~~ ~ w ~~ .c ~.. _~ ~ rah. '~ ~ a ~ ~. say J < < d~ ~Q _..._ ~ r~ ~ ~' ~- ~J A ~w ~ 5 i ~ i-~ ~ ~ b ~ ~~ ~1~ d ~1 1 s ; ~~ rS ~ i~~ ~ ~ ~,~..~ L ~o ~ x-13 r ~ `~ ~ o~~~i~G d~a~ ~~ ~~Sr c~ CCU ~ ~ - ~ r4 i /f ?~ rS ~~~J ~ ~ i ~d ~t t ~ ~~~ ~ ~. `<,..., s~ca~~sn~cy PO Box 4923 Vail, CO 81658 www.eaglevalleyalliance.org Ph: (970)479.2940 F: (970)479.2952 August 20, 2002 Town of Vail 75 S. Frontage Road Vail, CO 81657 Vail Town Council: I'm writing this letter in support of the proposed Middle Creek employee housing development for the following reasons: meeting the need for housing for locals near the pedestrian village, meeting that need in a clustered, low-impact environmentally responsible manner, and offering an automobile-free lifestyle for those able to live and work in Vail. An estimated 500 vehicles a day consume parking spaces daily in Vail for commuting workers alone, using up valuable finite parking that otherwise should be available to guests. According to the Sonoran Institute report on Population Employment, and Personal Income Trends for Eaale Coun ,gross income outflows outpaced inflows by around $57 million in 1999 alone, an indication of employees living outside Eagle County and commuting in daily to work. This disparity has steadily increased over the past 12 years. Not only are dollars being taken out of the local economy, but employees are being sentenced to long daily commutes just to have a place to call home. The environmental impact of commuting alone can be assessed in the following manner: The average daily commute in Eagle County is 18 miles. Ninety-one percent of commuters travel via single-occupancy vehicles. Given an average gas mileage of 20 mpg, providing local housing versus commuting workers in for 256 employees each year would save roughly 93,075 man hours, 83,768 gallons of gasoline, eliminate 838 tons of C02 emissions, or the equivalent of planting 349 acres of trees. Of course this doesn't include cost of roads, vehicles themselves, impacts to wildlife, sedimentation from road sanding, insurance, vehicular accidents, etc. In addition, plans for the development are to meet or exceed LEED or BuiltGreen Colorado environmental design standards, acting as a model for energy and water efficiency, sustainable site design, indoor air quality, and renewable material use. In 2000 when SKI magazine rated Vail as the #4 resort in the country, two weak points of the survey responses reflected Vail as being (a) too "old", and (b) too expensive. Adding an element youth and affordability near the village would add vibrancy and a piece to the community that otherwise seems to be lacking. The proposed Middle Creek development is beneficial with regards to the three criteria of sustainability: good for the local economy, good for the environment, and benefits community in the form of improved quality of life and retention of local employees. As a representative for the Eagle Valley Alliance for Sustainability, we endorse the proposed development. Sincer , Adam Palmer w flugust 2(3, 2(3t~Z Vail Town Council 75 South Frontage Rond ... Vail, CO 81657 Dear Council Members, T am concerned that the proposed Middle Creek rental development is in danger of being scrapped. If we continue to concern ourselves solely with the aesthetic needs of the ultra rich, we will soon find the hole in our infirastructure beyond repair. A town needs to have people to run it. If we can't provide affordable living conditions within that town, who wi II be .there 'to answer the 911 cal Is, or tare f or the sick, or teach our children? It is time we put some serious effort into making living here affordable for the people who keep this town going, and not just in keeping those with seep pockets from living too near- anyone who rnighT - offend their sensibilities. - --~-- i ncer=eiy, t ~~~ ~ area Zadkovic Vail Town Council 75 South Frontage Road Vail, CO 81657 towncouncil@ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell.° The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that the project is very appropriate at this site. Please feel free to contact me should you have any questions. ~.,~~ j~ ~i76- 737 Vail Town Council 75 South Frontage Road Vail, CO 81657 towncouncil@ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that the project is very appropriate at this site. Please feel free to contact me should you have any questions. :=-i ~~'-~-~ i ~ . ---- G~ c,~cJLr ~ f ~ f~6~t~~ Zd~27~,~.~- ~~~~ ~lu~ ~~ Vail Town Council 75 South Frontage Road Vail, CO 81657 towncouncil@ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year; and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the density, rental rates, and elevations of the proposed development plan, and . feel that the project is very appropriate at this site. Please feel free to contact me should you have any questions. ~~~~~~ S r~k ~ M, ~e~b;~ ~nm ~o~U ~j5 N 1~~qo ~ ~1~ ~Ql~ w1i ~'~ ~~c~5 ~~ ~~q „~ SQL ~~~ Vail Town Council 75 South Frontage Road Vail, CO 81657 towncouncil@ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that the project is very appropriate at this site. Please feel free to contact me should you have any questions. ~~tti,~c~ J Vail Town Council 75 South Frontage Road Vail, CO 81657 towncouncil@ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of_being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that the project is very appropriate at this site. Please feel free to contact me should you have any questions. ~dd -I~AGIC_ ~c.s~ 1-eacl~~~ 'i (970) 479-2,452 fax I am writing in support of the proposed Middle Creek rental deWelopment fofi local ~ employees on the site comt~tonly im,own as "Mountain Hell." The need for employee housing grows every year, and while the Taws of Vail hay made strides in providing ~ for-sale options, an affordable rental development is miuch needed_ ~ Residents living within town boundaries are essential to the year t-ound viability of the community, as well as the economy. Thi9 location in pa~-ticulaa-has the advantages of being on the Town's bus route and bike path, as well as being within wallung dSstance of Vatl Village and I,ionshead. I have reviewed the project and support it. Knowing that all of the co~ponentg of -~ the project may not meet all of the demands altd preferences of all mennbers of the community, it is important that the Middle Creek housing DevelopmenR proceeds and const~lction begin as soon as possible. C4~~y ~.,~h ~ CH(z~sf~~ k.fZot-iA VAtc.._ ~~Q~'T ~c~c~ (~1q3 ~~ - fin[ ~/ aPP~1 ~~ ~F' -7~l rte. pr~7~~ c.~ff o C~k~ ~.~' Z ~c ~ -ro ~rvt ~ c.~ l~ ~~ . ~--r ~-~ 0 9 / 12 / 0 2 THU _ 0 8 : 2 3 _FA%_,,,~ n,.", y~»ZOOZ rune: 7:01:16 PM ~10 01 Aget of4 Vail Town Catmcii 75 South ~+'rontage Road Vail, Co 81657 towncouncil~a~ci.vaiLco.us r97m ~~q_~s~cn ,,,.,,.._ ~~r ~ ~ ..... ..... ...,- Front \Y'tiA 1'0: Jnuiitn• lwme V:ul Tu~~•n Cow~cit 7~ Suutli 1~ i•ontage Road `'aii, Co 8YG~7 Date: 4.+~ '_UU2 1 oue: ti:2~: sip Pti tuwncouiicilcrcici.vail. co.trs (970) X379-1li6U p}lone (97U) 479-2452 fax ,. X :un writuig in support of the proposed .1liddle (.'reek rental development for local employees on the site commoiily l.~io~~~t as "M1lountavt 13e.ll." The need fur emplo;~'ee housing grows every year, and while the '1 o\rn of V'uii has made strides in providisig f'or-sole options, an at~ordable rent:>Z development is much needed. Residents litfing ~vitlun town boundai~es are essential to the yeat• romid viability of the coinmwtaty, as well as the ecunom3'. "Plus location in particular has the advantages of being on the 1'orili's bus route anti bike path, as well as being ~`'itlw~ wall.~uig distance of Fait ~'illace :utd Lionsliead. I har•e revie~~•ed the project and support it. ltitto~~vta that :ul oi'the components of the project may not meet all ol'the. den,aniis and preferences of all members of the connnunity, it is impot•tant that the J~~liddle Creek Housvig Development proceeds and construction begin as soon as possible. ~.--~ :` ~ ~ ' ~~ ~~~A L ~ os-, d w ~ ~ ~~. ~~ ~~~w~ ~ ~~~ L ~~ ~ rase ~ ors SEP-11-02 WED 04 52 PM BRANDESS-CADMUS REAL EST FAX N0. y~104~fb31~~ Drum; YCUA To: Muic Csdmi.. D+tc. 9J9h_p0_ Tura: 7:13:34 PM Vail Town Council 7S South Frontage }fond Vail, C'o 81657 townco~mciinci.vail.co.us (970) 479-1860 phone (970) 479-2dS2 fax I ann writing in support of the proposed Middle Creek re>,tul development fo1- locni employees on the site commonly known as "lYloimtain Be1L" The need fur employee housing grows every year, and while the Town of Vail haq mndc strides in providut<g fur-sale optio»<s, Rti affordable rental development is much needed. Residents living within town boundaries arc essential to the yesu• round viability of the comnmin~ty, ns well us the economy.l'lus locution in paaticular has tlic ndvantAges of being on the Town's Ens route and bike path, ns well as being within wlilkia~g distance of Vail Village :md Liorishend. I have reviewed the project and support it. knowing that all of for components of the pr~Ject may hot u~eet all of the demands and preferences of all membeT-s of the community, it is important that the Middle Creek HouRing Development proceeds and conwtnlction begin ag soon as possible. ~1~~~L~ct `t~~/~'z I`rl ~ l~t~ C' ~ ~ ,~v l''~,~vt ~ C'+~ ~~w~u s ~.~~3c~~~~c~S~i r. u i Pngc4 of4 SEP-11-2002 12 59 FROM SLOPE ENTERPRISES IU 4r7~4~~ r.e~i~e~l Vail, Town Council 75 South Frontage Road Vail, Co 8X657 •- towncouncil ci.vaiLco-ns (970) 479-18G0 phone (970) 479-2452 faY Y am writing ~ support of the proposed Middle Creek rent~The needd fortemployee employees on the site commonly known ~ "Mountain Be11. roviding housing grows every yam, and white the Town of Vail has made strides un p for-sale options, an ~'oI-dable rental developme¢t ~ much needed. ~rithin town boundaries are essential to the year round viability of Residents living location in particular has the the comInnnitY, as well as the economy. This as well as being within advantages of being on the '1'owri's bus route and bike patlx, wing distance of Vail Village and Y,iopshead. I have reviewed the project and supdpea~ p~f~nc~esoo~ all m mpben of the the project_may not meet aIt of the pevclo ment proceeds communit7'+ it ~.v unporiant that the fiddle CreekHousing p and construction begin as soon as possible. ~_ < i ~'~`G"`a- -t~-` ~~~ ~ TOTAL P.01 9-11-2002 2:08PM FROM FINISHING TOUCH/NAIL 1 970 949 8501 F'.1 veil Towns Couae7 73 South Frontage Road Vail, Co 81657 toH'ncoundl(a~d.vnll.co.us (970) 479-18G0 phone (97~) 479-Z45Z fsu I am writing in support of the proposed Middle C'rerk rental development for local employees on the site. comtnnanly know~~ ax "Mountain Rell." 7'he need for employee housing grows every year, and wh;Ue the Town of Vail has made strides in providiuig for-sale options, an afToi~dable rental development is much needed. Regident_a living veithin town boundaries arc esse~rtini to the year ronYid W3.ubillty of the co~nniunity, as well as the eeondn~y. '1'I-is 1ocaHot~ In pattlculai~ ha.4 tl~e advantages of being on the Town's bas route and bike path, ar+ well as bcln~ within waIldng distance of Vail Village and Lio~-shead. I have reviewed the proje~~t and support it. Knowing thstt uIl of the componends of the project may not meet aII of the demands aQd preferences of all members of the community, it is important. that the 1Viiddle Creek Housing Development proceeds and construction begin as soon gs possible. r ~~©~ e ~,~ ~ ~ ~~ ~ ~ 1 ~ . , ,,,~. ~ ~(~r~~i ~ v.. . SEP-10-02 03:10 . •:.p . i i PM GALATYNLODGE i ~ `'ull 'ToH•n Counrll 75 5outlt FtY,rituge Ruat3 i i Vtdi. C:o $1657 t~H•ncow~cili7:cL~• .ro.us (97U) X79-1560 pitr.-ne (970) .t79-~.iS2 faY Du:: Y• t.n:GY~ Tin ~ ::T~:~6 r~Vi 9704790102 I ~i711 -tTitl~t~ lri yPpport of the pn~posecl 1Iiddle C.'rc`c•L• IYnta1 develupitient f~i• )Deal i emplo~'tca un the site ronuno~~ll' lon~mn as ••;1lountuh~ Be$." The nerd for emplu3'ce houah~e grov~•tc rver~• ye-v. and while the Town cf t':+11 hay ttwde strides in provldit>$ for-gale uptlor,a, an xlloidable rental d~•elupment !s much neetltd. i Residentr II~'llt~ R'ithLt town buaridvrieF are e3yt'ntL+l to the }~rar rn.ur.d ~'lnhilit~ o! . j the couunurdq', ar well as the aconoml'. 7'hl9 luc~ttlon !n pu'tict~ar has the nd~',ants~cs of being on the Ttmu'a bus route :~.nd bike p:ttlt, a! tt'ell as Dcurg ~'Ithln w'silicing tllstattce of Yai11't~InEe wtd L1o>L~ttead. I have revleN.yd the pro,~cct anti support 11. I~na~tiirlg thst uil of the compustent~- of the pt~a~ert ntuy trot tnert all olfhe d~~ntandy iutd preferer~res of a- mernbc rs of the communlt}. It lr hnparlant that tl-e'1411die C'rerk Aousin~ Ar~'elvpmept proceeds and cor,Mructlon I-egin as soon as poaeible. C'~,~z ae~..-.---- .. ~.. ~.:~.: ~.~ ~r~" ~~~ P.O1 Yyit ~ .N •i ., Page 1 of 1 Allison Ochs - Fw: From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/30/2002 1:38 PM Subject: Fw: ----- Original Message ----- From: "Robert Schilling" <robs@gorerange.org> To: <towncouncil@ci.vail.co.us> Sent: Thursday, August 22, 2002 10:26 AM > To the Town Council, > I am in support of the proposed middle creek development. I moved to Vail > with my family in the early 1970s. I am a registered voter in Vail. I > would like to see both rental accomodations as well as low-cost ownership > opportunities there. > Good luck and if you have any questions you may call me at work. > Respectfully, > rob > Robert Schilling > Marketing and Events Coordinator > Gore Range Natural Science School > (970) 827-9725 ext. 18 > robs@gorerange.org > "Where nature has a way of teaching..." file://C:\Windows\TEMP\GW}00003.HTM 09/11/2002 09/ 10/ 2002 13 - 45 rr~vn: ~~c~a 'r•~: ora. ~~.~~ f. ". ~."... ,~• ?4. ~: :,'.: ~.:: . 7,' i~ n~,• ~~, z... .r• ~.:. .~5,; Vail T 75 Soi Val, tov~r (9T_ 4) I a~rv Re: the= I h~vi the=.•p~ CVY7IYI and .~~ 9704765274 LNDMK CLO CAB & KNGS •~~:y;~~:r.r;'.' • gatc vl4liuuz_Ttmc:7:~2:;7~i F'M ~'`'':; ::: ' Tip - : ^ .. x Y .,, ~Lt: ~.. t ' ~ ~. ~ ' ~J~y `F~ 'ty• ,.17,n... .i..v~~y i? 3' ~-t ~ ~.~.,; .,.5 •r... . liilt~;'a'k:~ii~entai development for locAi ~'~:c:• Cyli,:tn: dell." The need for ehrnployee: titii~~i'yaiti,has made 9iridea in'providing piiiaC~l~~s;ariucfi needed. ' °;p. ~,.,. ~sSe~itialto: the.year round viabilit)~ of ' ~~.~;~i;ola?yi. p3rtic ular has the . g':'~ioe path; as well as being r~tltin ~dr.:. icy,auppQrZ~::KitiovlHgtnatall of the compone~ris of g~~of`~1~~.sett¢ciid~t'ey$~9?~~'ei~eit~es of aIi members of the it'~}~t''.t1e~,Nfiddle~:.r~Ciz~DUyLig Development proceeds +- :t, .. . f.. t:.: •:~ r,:, " ;, - _ •••ti • '} . ~ • ~` •:A •- + •`^,^ _ . ~~., ; i,'"! PAGE 01 Pagr i oT4 S~.Y-lU-UL lU~ U1~41 Yl7 UHK1~l1HN1H LUlllit; hAX NU. ylU4/EjU4/U I'. U1 Vail Town Council 75 South b^rontagc Road Vail, Co S 1657 towncouncil(a7ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax 1 am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year, and whi]c the Town of Vail has made strides in providing for-sale options, an s~ffordable rental development is much needed. Rcsidenls living within town boundaries arc essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the project and support it. I~nowing that aII of the components of the project inay not meet all of the demands and preferences of all members of the community, it is important that the Middle Creek Housing llevelopment proceeds and construction begin as soon as passible. ~~~ ~~~ ~i ~.,~ ~~ cl ~~ u.a. cci crc io. uo 7 r u•i i ouLOO H~~ItK1l;HIY bKl tJCUH NAr7E 0101 • ~ ~~~.. ~.o.'a u . a un n~3grns Data 7/91200: Timc: 6:04:20 PM Page 4 W'4 Vail Town Council 7S South ~rontsige Road vul, co sz6s7 towncouiucil~ci.v ail.co. ess (9'7U) 479-X860 phone (970) 479-2452 fax I sun whiting in support of the proposed Middle Creek rental dcveloplnent for low emp]oyees on tlse site commonly ]mown as "Mowsta~ BeIL" The need for employee luosisfug grows every year, and while the Town of Vail has made strides in providing for-sale options, sin affordable rental develop~tnent is much needed. Residents livixug within town boundaries are esserntial to the year rowed viability of the comurnunity, as 'well sts the economy. This locution lin particular has the advantages of beiUtg on the Town's bas route ssnd bike path, as well as being within waIlting distance of Vail Village and Lior~shead. I have reviewed the project and support it. Knowing that all of the components of the project rnaf not meet all of flue demands and preferences of all ltnembers of the community, ft is fmportatit dust the Middle Cyreck Housfng Development proceeds swd construction begin as soon as possible. S~.x~a/1 \~.c ~ ~ u~~nc~,~ ~ ~c~2~,~~ earn w,,~v~ ~ moo. r-'~~ `'~ ~~~, J C~vti~ c~Sc1~( 1~, g~~ ~- ~~ec ~ e~a~ sk', ~Xe~j-,o ~~ ~~~1)~2 From VCBA 7'0: KidS~wrt llate: yIYfZWS lrrm: Y:94:49 rM ~ ~~ w ~ n Vail Tower Council 75 South Frontage Road Vail, Co 81G57 tow~ncouncil [ni ci.vail.co.us (9'70) 479-1860 phone (970) 479 2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need Tor employee housing grows every year, and while the Town of Vail has made strides in pro~~ding for-safe options, an affordable rental development is much needed. Itesidcnts living within town boundaries arc essential to the year round viability of the conununity, as well as the economy, This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within w•alldng distance of Vail Village and Lionshead. I have reviewed the project and support it. I~noR~ing that all of the components of the project may not meet aIt of the demands and preferences of aIl members of the community, it is important that the Middle Creek Housing Development proceeds and construction begin as soon as possible. `~ ~~.t ]S ~'z~^ j' SPOT SINCE 1978 lZ2VaGMCoforado 8165715330 (9701476-3200 FAX (97Df 476.8577 kidsport(4vail.net 1'd LLS8-9Lt+-OL6 Roea,~l fined ~ uo.~eyS e9S~0T ZO OT daS FROM Plaza Gallery -Vail CO Vail Toni Council 75 South Frontage Road Vail, Co 8167 tOWnCO11~Ci1(Q:CLV$iI CO QS (970) 479-1860 phone '(970) 479-2452 fa: FAX N0. 970 476 6017 Oct. 10 2002 12:14AM P1 1JAtt~~/IOQ~~f Thnc:1~40:3iA!rt •- 141ge i oCi I atn w,rlting in support of the proposed 1blIddle Cree); rental development for local employees on the site commonly known as "Mountain Bell,+' The need #'or emplo3•ee housing grown every year, and w--bile the Town of Vail has made ~ttides in providing for~ale options, an atpordable rental development is much needed, Residents l3vinP within towln boundaries are essentSal to the year round viabllft~• of the commtuiity, as weD as the econolaltiy, This location ir; partleular ~ the advantages of being on the Tom's bus route and bike path, as weII as bein8 +vithQt walking distance of'VaII Village and LiobsheAd. i have re~ciewed the project and support It. Knowing that all of the components of the project may not meet all of the demands and preferenee9 a! all members o! the community, it is important that the Middle Creek Housing Aevelopme~nt proceeds and con>attuMion begin as goon as po3sible. .. ~ ~: ~~ ~' !~~-~ ,. ~~ Sep 10 02 08:56a Rmsden Davis & Fowler RE 970-476-8637 p.l Vail Town Council 75 South Frontage Road Vail, Co 81657 towncouncil ci.vail.co.as (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountai~i Bell." The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residcrits living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the project and support it. K~iowing that all of the components of tl~e project may not meet all of the demands and preferences of all members of the conununity, it is important that the Middle Creek housing Development proceeds with the project. The design, height scale and massing may need fine tuning tv fit tl~e area better. I want to see the housing but it also must be visually pleasing to the eye and a design fitting for Vail. 1 have heard many Vail residents say they agree with the location of the development, but fee! tl~e design does not fit in with being to tall and not a attractive exterior. Sincer<e1,..~. Kurt Davis ~p„ ~~6f..+~ dti-l:i-NL d4:dt3 G.o~'~.T~gH PIERS ID=9704760313 P.01 Vail Town Council . 75 South Frontage Road Vail, CO 81657 towncouncil@ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the adv~~ntages of being on the Town's bus route and bike path, as well as being within walking distance: of Vail Village and Vonshead. 1 have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that the project is very appropriate at this site. Please feel free to cornact me should you have any questions. ~/~e FROM : FAX N0. Aug. 26 2002 06:39PM Pl Vail Tawn Counul 75 South p'rontag® Road Vatl, CO 81657 towncouncii~ci.vail_co. us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed Middle Creek rental development for local empioyees on the site commonly known as "Mountain 6ell_" The need far employee housing grows every year, and wfiile the Town of Vail has made strides in providing for-sale options, ar. affordable rental development is m~ needed. Res{dents living within town boundaries are essential to the year round viability of the community, as welt as the economy. This location in parriicular has the advantages of being an the Town's bus route and bike path, as well as being within walking distance of Vai Ylla$e and Lionshead. I have reviewed the density, rental rates, and etevations~of the proposed development plan, and feel that $ie project is very appropriate at tftis site. Please feel free to contact me should you have arty questions. C,~-' / tf76 _ `f`f~2- Page 1 of 1 Nina Timm - Fw: yes, for Middle Creek housing From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 3:20 PM ' Subject: Fw: yes, for Middle Creek housing ----- Original Message ----- From: BJKSKI@aol.com To: towncouncil@ci.vail.co.us Sent: Sunday, August 25, 2002 6:48 PM Subject: yes, for Middle Creek housing To: Vail Town Council From: Barbara Krichbaum, 1139 Sandstone Dr #3, Vail Date: August 25, 2002 I am writing in support of the proposed Middle Creek development. The town needs this type of housing in order to continue to attract employees that will help us to maintain our fame as a "world class resort". I have only praise for the location! As a member of the Parking Task Force I realize that this location will keep cars out of town. Any other location for this type of housing will only add to our employee parking problems! Please continue to vote for this project. Don't allow the non-resident home owners to control this issue. Sincerely, Barbara Krichbaum ri_.iii.~__.__a___._~-rr.r,rn~~~innnnni TTm~.r nnin~i~nn~ Jt1V l t5T A Vall Town Counal 75 South Frontage Road Vail, CO 81657 towncvuncil~ci,vail.co.us (970) 479-1860 phone (970) 479-2452 fax tS-LtJ-L a~uurm ;~ommun~tyueveiopmeni~ ~/U4f7L4~L;~F 1/ 1 am writing in support of the proposed Mlddle Creek rental development for local employees on the site commonly (mown as "Mountain Bell " The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. Rasldents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the density, rental rates, and elevations of the proposed development plan, and feel that the project is very appropriate at this site. Please feel free to contact me should you have any questions. ~~ ~ ~~~ _~,!~ ,P1~.~~ .j~-~ ~ ~ ~/~_- ~~I ~ ~, ~~~ ~ ~y~ ~~ ~ ~c~L~~y~/ .,~'~~~~ C~ ~`~ ~/0 ~c/c ~~J ..c'U,~~, -Lv~,c, y~%'~e~¢ ~-~ ,roc, ~~~H~~'~. ~~,`~` Edo ti~ i~cw ~ .-~e~~~~ LZ ' -~~ ~R--sue ,~GGT.~~I~Lw ~ `~~~~~`~ .~i' UUl,~.f~ J ~' Cj~n~r~~~ ova-~~',~,C .~ .~~~ ~a~~ ~ ~ ~~~ ~~~~~~ ~i~.s-~' ,~ ~~~ -- ~ ~~ ~ ~~r ~ ` (i jL4-w JCR. V s -y_ ~ ~ /~ ~ ^ . l~~Q V~..,`~ ti-t~sL~ •~~-c,2- i~'~L~ /~C~-d2-~ ~-^-~3~ ~z 1 G~ j' r ~ V ~ ~ ~ `~ ~~ ~r ~, _~'~ , ~ ~J '~-- ~ ~ 3 ~~-~. T0: VAIL TOWN COUNCIL AND PLANNING COMMISSION FROM: MARKA~ MOSER -1880-MEADOWRIDGE #4, VAIL, 476-5SZ2 RE: PROPOSED HOUSING ON THE MOUNTAIN BELL SITE With a Rotential rental !.snit coming on the market in Vail, I .have been polling several other owners of rental units as to what is the current fair market value for. a year's lease in~ Vail: Several owners of property in~ Vail have told me that they are having to adjust downward the $1,500 rental price for a year's lease on atwo-bedroom, two bath with a loft unit they have rented for several years. They will definitely have to lower the price considerably.in order to negotiate a year's lease. And even with a lower-priced prodoct that has been recentl}~ rernode~ed and ~t.pdated; they doubt they will be able .to obtain a year's lease on their property. This signals to me that rentals are becoming far more available, so to add to that market today would be a big mistake. I also feel that the product being offered in this building wo-old b.e much $ma11e~ fo.r the,pric.e. being charged than r~r~rry u-nits alre2d~y fn tkre~ rental mar-ket. This carp hardly be considered "affordable." I fee! the town should not be in the rental market, except for those rental units that are specifically for their own employees. Business owners should acquire units for rent to their own employees. Timber Ridge and St~nbird~ ire Lionshead are examples of what happens when there are loge numbers of rental units on one small area. It becomes seasonal employee housing for single workers. Families don't want to have anything to do with it, because it is not a nice place live. Check out the drug use and dealing occurring in these housing areas. !. Have- a!-so~ researched that the most sought affef onus of housing are studios or one bedroom units where full-time, year-around single employees or a married couple may live affordably, without roomates. A far better cption for the town to pursue would be housing such as that in the Commons and Ellefson Park where year-around employees of Vail cari~ be assisted in purchasing their awn hor~e~. A~ homeowner cares about their property;.a renter often does not. Please reconsider this development of a valuable piece of Vail real estate, and do not consider putting it into an already overbuilt rental pool. Page 1 of 1 Allison Ochs - Fw: Mt. Bell From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/26/2002 2:15 PM Subject: Fw: Mt. Bell ----- Original Message ----- From: "Judy Berkowitz" <Judy@HPBAssoc.com> To: <towncouncil@ci.vail.co.us> Sent: Monday, August 26, 2002 7:12 PM Subject: Mt. Bell > To: The Mayor > The Planning Commission > The Town Council > As longtime Vail homeowners, we would like to express our hope that you will > reconsider the mass and scope of the proposed Mt. Bell site. The idea of > placing a high density, low esthetic development at the entrance to our > Village is ill conceived and should prompt a thorough investigation of the > both the real needs of the town employers/employees and how best to satisfy > these needs. As we heard at the recent PEC meeting, an after September 11 > re-evaluation needs to be undertaken so that we are not just responding to > perceived but perhaps unrealistic assessments and move in the the direction > that is most appropriate given the changing economic climate of Vail. > > As you climb up Vail mountain and look down toward the Village as I recently > did this summer, it is clear that the landscape would be horribly affected > by this project which will loom as the large and out of scale development it > i~. The same vista wil: as~uult our downhill skiiers as they end their day. > Right now we have a chance, and an obligation, to preserve the character of > Vail and not allow such massive developments that could radically alter the > perception and reality of our world class resort. > We urge the Council and the Commission to look into reducing the scale of > this project and to preserve as much of the open space as possible. > Sincerely, > Judy acid Howard Berkowitz file://C:\Windows\TEMP\GW} 00002.HTM 08/30/2002 x HERMAN FAMILY TBADING COMPANY 0201 WARD PA$HWAY HANSAS CITY, MO 04113 . August,8, 2002 Town of Vail Town Council 75 South Frontage Road, West Vail, CO 81657 near M..ayar a.nd Town Council; As a property owner and fulltime resident, I believe that the size of the proposal for the Mountain Bell Site is incompatible with the beauty and world-class scenic image of Vail's main entrance We urge the Town of Vail to significantly reduce the size of the housing project or move it to a more appropriate venue. While eve al] recognize the importance of affordable employee housing, we urge the To~~m to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all other resorts, employee housing should not be the first visual visitors would encounter. Truly affordable employee housing should not be attempted where it is neither appropriate nor affordable. I know you as a resident don't want a bulky eyesore to be the first impression visitors will have of our village. Si::cerely Michael E. Herman ^~~ leaver La111 I~vi:aCt Vail, Colorado 81657 pxoxs: e1o-361-3aa.n~ c-mail: mike®hermanftc.com FAX: 81 O-363-7H39 - rush®hCrmanfrc.COm Mr. & Mrs. Henry Beck 3037 East Lake Road Skaneateles, NY 13152 August 9, 2.002 TOWN OF VAIL Town Council 75 South Frontage Road, West Vail, CO 81657 Dear: Mayor and Town Council Planning and Environmental Commission Design Review Board We believe that the size of the proposal for the Mountain Bell Site is incompatible- with the beauty and world-class scenic image of Vail's main entrance. We urge the Town of Vail to significantly reduce the size of the housing project or move it to a more appropriate venue. While we all recognize the importance of affordable employee housing, we urge the Town to preserve and protect Vail's image as visitors first enter our beautiful Village. As at all other resorts, employee housing should not be the first visual visitors will encounter. Truly affordable employee housing should not be attempted where it is neither appropriate nor affordable. Sincerely, ~/ - / //~ Helga B' ck :.. •• Hen Scorpio Property Owners #405 T0: VAIL TOWN COUNCIL AND PLANNING COMMISSION FROM: MARKA MOSER - 1880 MEADOWRIDGE #4, VAIL, 476--5522 RE: PROP©5ED HOUSING ON THE MOUNTAIN BELL SITE With a potential rental ! ~r~it coming on the market in Vail, I have been polling several other owners of rental units as to what is the current fair market value for-, a year's lease in~ Vail: Several owners ~ of property ir~~ Vail have told me that they are having to adjust downward the $1,500 rental price for a year's lease on atwo-bedroom, two bath with a loft unit they have rented for severa! years. They will definitely have to lower the price considerably .in order to negotiate a year's lease. And even with a lower-priced product that has been recently remade-{ed and ~r.pdated; they doubt they will be able .to obtain a year's lease on their property. This signals to me that rentals are becoming far more available, so to add to that market today would be a big mistake. I also feel that the product being offered in this building would b~e much $malle.r fo.r the,pxice. being charged than rrtarty u-nits already to the rental mafiket. This can hardly be considered "affordable." I feel the town should not be in the rental market, except for those rental units that are specifically for their own employees. Business owners sheuld acquire units for rent to their own employees. Timber Ridge and Sunbird~ in Lionshead are examples of what happens when there are 1-d'fge numbers of rental units on one small area. It becomes seasonal employee housing for sin-gle workers. Families don't want to have anything to do with it, because it is not a nice place live. Check out the drug use and dealing occurring in these housing areas. I. have- also researched that the mast sought attef units of housing are studios or one bedroom units where full-time, year-around single employees or a married ccuple may live affordably, without roomates. A far better option for the tcwn to pursue would be housing such as that in the Commoris and Ellefson Park where year-around employees of Vail cari• be assisted in purchasing their own hor~e~. A~ homeflwner cares about their property;.a renter often does not. Please reconsider this development of a valuable piece of Vail real estate, and do not consider putting it into an already overbuilt rental pool. ~ . ~^~--~~ ~ ~ 1. a~ ~ ~ ~.~ ~ ~. ~ ~ Qh.~-vw~ ~--o n-r~x- 'f~-'~-- t'-`--J~- '~ ~~--~ ~ ~-1~~ ~ ~ ~~, ~~~ VIP ~Cd U g/~5-~- 97D-~7~~~~GS ~ ~ ~ ~--~ ~ - ~ . --~-T _ ~--~-~'~-J ~ ~~. ~~ ~ ~ ~ ~~ - ~~ , ~- y- iJ ,- it .~-/ U ~~ ~ -~-~~ ~~ 3~ S V~ ~ ~ a g~~ s-~- 4711 _d~/_ ~~~~ g/ja/o.~ y, ~~. ~-~ ~~~~ ~ ~~ ~ .~ ~ dam-. G~ ~''~ ~, ~ ~~ ~ ~~ ~1tz~IiDZtui~ ~Q !'~I'~uG1~a.6Fhc7S 0 ~; ~ • ~`~ ~i3 /~ U~ X76-330 ELAINE KELTON 1034 HOMESTAKE CIRCLE VAIL, COLORADO 81657. 970-476-5411 DEAR MAYOR KURZ . PLANNING & ENVIRONMENTAL COMMISSION DESIGN REVIEW BOARD YES, WE NEED INTEGRATED LONG TERM AD SEASONAL HOUSING. YES, WE NEED EMPLOYER OWNED HOUSING. YES, WE NEED A LOT OF IT. BUT WE DO NOT NEED ALL OF IT IN ONE LOCATION, ESPECIALLY ONE WHICH IS SO VERY VISIBLE AT THE "FRONT DOOR TO VAIL". THE ALTERNATIVES ARE AVAILABLE TO SPREAD THE UNITS NEEDED: THE "HUD WIRTH PARCEL" AND THE TIMBER RIDGE SITES COULD PERHAPS ABSORB THE NEEDED UNITS. EACH OF THE ALTERNATE LOCATIONS WOULD ALSO HAVE AVAILABLE PUBLIC TRANSPORTATION. WE NEED TO CONSIDER AS THE IROQUOIS NATIONTHE IMPACT ON THE "SEVENTH GENERATION" BUILDING THE LARGEST SINGLE PROJECT AT THE ENTRANCE OF THE TOWN -THE 1ST THING SEEN AS YOU EXIT 1-70 AND THE VIEW FROM THE MOUNTAIN AS YOU SKI DOWN AT THE END OF EVERY DAY DOESN'T FEEL SYMPATHETIC TO ALL WE ESPOUSE AS A WORLD CLASS RESORT. LASTLY, PLEASE DO NOT FORGET THAT THIS LAND WAS ORIGINALLY DESIGNATED OPEN SPACE AND THE REMOVEABLE OF THIS TRACT WAS DONE TO CREATE A SMALL POCKET OF 40 EMPLOYER HOUSING UNITS. ~1. SINCERELY, ELAINE KELTON ~7QL. /~ , oZ~ ARTHUR KELTON JR 225 WALL STREET VAIL, COLORADO 81657 970-476-7990 TO MAYOR LUDY KURZ THE P.E.C. THE DESIGN REVIEW BOARD PLEASE COUNT ME AMONG THOSE OPPOSED TO THE OVER DEVELOPEMENT OF THE "MOUNTAIN BELL" SITE NOW DESIGNATED MIDDLE CREEK. THIS SITE WAS ONLY REZONED TO ALLOW FOR 40 EMPLOYER OWNED UNITS, NOT THE ENLARGED DESIGN ON THE TABLE TODAY. THIS IS THE ENTRANCE TO THE TOWN OF VAIL, THE FIRST IMPRESION THAT THE VISITOR IMPRINTS. NPLEAESE RECONSIDER THE DENSITY AT THIS LOCATION AND SPREAD IT TO OTHER AVAILABLE SITES SO AS TO MAINTAIN THE INTEGRITY OF THE RESORT EXPERIENCE. ART I 8/ 12 ~o~ - ~ ~o S c~nJ~~~G C~f~6~~~~ CCU ~a~ ~~~~vQ`r~ /i~rG. ~d Jrt1CrL ~r~ r~ ~} lJ G c~,s r~ i Z ~_ d a l i ~1 ~ ~ o ~~ : 'T~ ~ ~ r~,J` ~ b S ~ CUB ~ ~ s rv d ~' ~ ~~~ ~~~ ~~~~a~R ~o ~~~J~~'~ s~F~ ~~~ ~- ~ ~} c r ~ -~ _ ~ ~' a ~' ~;~ ~ a !J ~c. ~/ s a ~ J < < d tit ~ Q ~ d t~ ~~a~ ~,_, ~ ~J ~ ~~. ~ 5 ~ !~ i ~ ~ b c~ I~l~ r1 ~ d ~ ~ I S o ~~ l S ~ Qc~~~~d`~~5, ~~-,~~ ~d ~ ti~r~~3d~~ ~~ ~~r ~~ S ~v ~ ``~ ~~ ~~5 r ~ 5 ~ cC~ ~ ~~ .~~s~ 1 a~~ N a ~~~~ ~f}~~~ ;-~c r d d~ a ~ ~h~ ~U ~ S ~ "; -f-f rS ~~QJ~ r~ i fd~ a ~+ ~iA c ~ _ ~ b b ~. r e~- I f ~ ~ 5 U L ~ L, .5 ` ~~" ~'" ~ ~ 's ,.~ t~ ~ 5. ~li 6 U-% ~ ~ 7L". ~ , (T ~ ~1' t ~ ~G. ~i 1 (~ -- - ~ t b ~. ~. ~~~ L 1'~ ~i~ •~ ~ ~, ~- I~ t 1~, ~"G 1ri. ~ Cl.~' ~ ~ , l~ 1 ~ ~~i-~ . ~ ll S- l~ `~9 c l~' lam' `~ ~t ~,~ ~~~(,~. ~=~ C~B-tv~~~-+~-iC6 i:~ ~r ~~~~ ~ ~ 1~-~C ~ ~rb ~~ ~~d ,. ~~~,~.~ ~ ~ -~~,~ (4~~~~C~ ~r~~K ~~~~G~+d~~l ~ ~ l9~or~~~ ~ ~"t~l ~~ 6 ~,cc~.C~~~:~ S~Vc;~i~~~[~, r~~ s-~d.YiS ~~lr-~.3 ~ ~~~~ ~,u~ llfk~~~ ~" l9 ~~l L` t ~i 5 G tJ ll~~ ~. ~ `1L ~v ~ ~r~s. i G- ~ ~ (~ Ciz ~ ~~ U~ ~ ~S~~l~.t~z'v C~ ~ Y~ ~~ ~ ~~ ~ ~. e ~~ ~ ~~ G~ cK c~ ~ ~ ~i'C ~.- c,~ r' ~, ~>; `fz- ~~ z w-tr~~~ LLB ~ ~ i 5 fi~~ ~ ~,-~ (,~ ~ ~- .~ ~-i,~,d ~.~ ~~ ll e~{~, ~., ~.-~ ~ ~-(,U ~ I~ G ~.: a-s U 4' ~rt/ V"'~"~r C.. I v~ ~ ~t~~ ~ i~~d-~`~~ '- - 6 ~. ~~l ~'-i' i; 1 ' ~ ~\ / ~ '~ ~ ' I L ~ CT (~~ / /~ ~ ~ ~ ~ ~ _ ,. [/ 7 ~ 7 ~1`-L7 .~.-vl' lr`~ ~~ ~~ ~~: n ! ~ ~ /~ ~ 1~ .. ,~ J ~U~~ / / ~~i ,,/ l ~ ~ -~ -~ ~ ~.. Page 1 of 1 Allison Ochs - Fw: Middle Creek From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/16/2002 8:18 PM Subject: Fw: Middle Creek ----- Original Message ----- From: Malin Johnsdotter To: towncouncil@ci.y_ail_co_us Sent: Monday, September 16, 2002 4:11 PM Subject: Middle Creek Hello Members of Vail Town Council My name is Malin Johnsdotter -Zeltman and I live on Sierra Trail in West Vail. I have been here since 1986 and I work as an ski instructor in the winter time. I am only a resident of the USA so I cannot vote, but I have paid taxes here in Vail and Colorado since 1986. Now when I have choosen to live full time here in beautiful, but noisy Vail I am really concerned about the future of my home town. I want guests come to Vail and feel as they have come to small, friendly village where everything is in lesser scale than the big cities most of our guests come from. Therefor I am writing you about my concern about the hight and scale of Middle Creek. We all know Lionhead and we all recognize the problem with Lionshead, how big the buildings are, how ugly the whole Lionshead is. Please think about that when you decide to build an other complex of 6 stories buildings in the heart and at the entrance of our mountain village where at least I want my skiing guest to feel as they are in the mountains far away from the stress at home. Compare Vail with other European ski resorts as Zermatt, Argentiere and you have the picture. I am not against affordable housing. I am one that would have needed it, I am just against the BIG SCALE of Middle Creek as the first thing our guests, who are the providers for us to be able to live and work here, should see when they come to Vail. Please do not repeat the mistakes from Lionshead. Thank you Malin Johnsdotter Malin Johnsdotter-Zeltman 1779 Sierra Trail # A VAIL, CO 81657, USA Ph (970) 479-5597 Fax (970) 479-7345 Cell (970) 376-6526 E-mail: malin vail.net file://C:\Windows\TEMP\GW } 00003.HTM 09/17/2002 Page 1 of 1 Allison Ochs -does the Town ~~~ant to risk lawsuits down the road From: "Gay E-Mail" <gsteadman@gwest.net> To: "Town Council" <towncouncil@ci.vail.co.us> Date: 09/12/2002 8:18 PM Subject: does the Town want to risk lawsuits down the road Does the Town council want to risk future lawsuits >from renters at Middle Creek who might get sick from living so close to the >microwave tower? It has not been proven that long term exposure to the >levels of radiation emitted by this type of installation are harmless. I suggest that research be done by the council to determine whether it is sensible to put a large number of people in that location under those circumstances. Thank you, Gay, Steadman Page 1 of 1 Allison Ochs - Fw: Mountain Bell site From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/16/2002 10:08 PM Subject: Fw: Mountain Bell site ----- Original Message ----- From: GaX E=Mail To: Town Council ;Vail Dail Sent: Thursday, September 12, 2002 8:08 PM Subject: Mountain Bell site We need an answer from the Town Council as to why members >have not chosen the very large, underutilized land on which their office >sits for affordable housing for employees.....is it because the choice >is too logical? The bottom floor could accommodate municipal offices, >there could be underground parking, and the top 5 or 6 floors could house >employees. There wouldn't be any need for a pedestrian overpass since >the employees would be living on the Village side of the highway. Are our elected representatives "NAYS" (Not Above the Town Staff )? NIMBYs (Not in My Back Yard) and NAYS are alot alike; NIMBYs just >seem to be more vocal. Thank you, Gay Steadman file://C:\Windows\TEMP\GW} 00003.HTM 09/17/2002 Page 1 of 1 Allison Ochs - Fw: Vote no on Middle Creek housing as proposed From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/16/2002 10:10 PM Subject: Fw: Vote no on Middle Creek housing as proposed ----- Original Message ----- From: Helen & Bob Fritch To: towncouncil.@ci,v_ail_co.us Sent: Thursday, September 12, 2002 3:40 PM Subject: Vote no on Middle Creek housing as proposed towncouncil cz,ci.vail.co.us Vote no on the Middle Creek housing development as now proposed. I have been asked to write you about this development by the VCBA but, as is so often true, I do not agree with their endorsement of this project as proposed. I am not apart-time resident nor do I live in Spraddle Creek. I am a permanent resident of downtown Vail, and I am a business owner in Vail. I do think we need employee housing in Vail, even at the Mountain Bell site. But this project is too large and too high, and the rents are too high to be called "affordable housing." It is not even very attractive. Bob Fritch ri,... ii~.\~xr.~a,..,,~\TFT~TD\(`_\x71 f1l1(1l12 i7TT~iT noii ~i~nm Page 1 of 2 Allison Ochs - Fw: Middle Creek From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/11/2002 2:00 PM Subject: Fw: Middle Creek ----- Original Message ----- From: Tom_Mu_Ilen_West_Vail_Liquor Mart To: Vail_Town..Council Sent: Monday, September 09, 2002 7:30 PM Subject: Middle Creek Dear Town Council, I am writing this a-mail in support of the proposed Middle Creek housing development. It is my opinion that this would be a positive step in satisfying the need for seasonal and full time housing options within the Town of Vail. I was able to move to Vail because the. West Vail Liquor Mart offered (and continues to do so) housing within walking distance to the store. That was in 1988 and I was 25 years old. I moved to Vail without a car and was able to enjoy a very satisfying lifestyle working and living in West Vail, taking the bus to the Village for skiing and night life. I did not purchase a car until I had lived in Vail for about two years. Since that time I have become a homeowner and a partner at West Vail Liquor Mart. I am not suggesting that everyone who moves to Vail and lives in employee housing will become a business owner and a permanent resident, but if the option to have a place to live was not available I probably would not have decided to move to Vail. I simply had other options that would have made more sense to me at that time. There are many reasons why this site makes sense for Vail. The proximity to the Village and Lionshead will mean that a person will not have to drive to work. It will allow employees to get to work on time allowing them to begin serving Vail customers much easier than a commute from 10-20+ miles to the. West. In other words employees will not be late to work due to snowy roads, accidents and car problems. This will be a positive site with the increased employee population needed with the redevelopment of Lionshead and the expectation that the proposed conference center-will be built. It will help relieve employee related congestion in the parking structure. If Middle Cr Lek is not built the population that would have lived there will spend their dollars where they live, and that will not be in Vail. Middle Creek will offer easy access to the retail services area of West Vail and keep tax dollars in the Town of Vail. . I have read that some business owners in Vail feel that the location for Middle Creek is wrong because it will be an eyesore at the front door of Vail and people will not want to come to Vail because of this perceived eyesore. This is just not true. Vail is celebrating it's 40th year. In those 40 years people (many of the same people) have continued to come to Vail despite all of the development and visual changes over the years. Another argument that I hear is that of homeowners in close proximity to Middle Creek are against it for similar reasons and fear of property values declining. I can recall a similar argument occurring when the Town of Vail built employee housing near Potato Patch. I do not think that property values in Potato Patch have suffered at all in the past few years. Middle Creek has far more positives than negatives and I would like to see the town council support its development. Tom Mullen Gore Valley Enterprises West Vail Liquor Mart 2151 N. Frontage Road Vail, CO 81657 ftee//C'~\Windcws\TEMP\GWI00003.HTM 09/16/2002 Page 2 of 2 970-476-2420 ..Vail Town Council Page 1 of 1 Allison Ochs - Fw: Middle Creek Project From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/11/2002 2:00 PM Subject: Fw: Middle Creek Project ----- Original Message ----- From: Steve Si_monett To: towncou.ncil@ci.vail.co_us Sent: Tuesday, September 10, 2002 8:22 AM Subject: Middle Creek Project Please see this form letter as my complete support for this project-Steve Simonett Vail Town Council 75 South Frontage Road Vail, Co 81657 to~vncouncil ._ ci.vail.co.us (970) 479-1860 phone (970) 479-2452 fax I am writing in support of the proposed A'Iiddle Creek rental development for local employees on the site commonly known as "Mountain Bell." The need for employee housing grows every year, and while the Town of Vail has made strides in providing for-sale options, an affordable rental development is much needed. _ .Residents living within town boundaries are essential to the year round viability of the community, as well as the economy. This location in particular has the advantages of being on the Town's bus route and bike path, as well as being within walking distance of Vail Village and Lionshead. I have reviewed the project and support it. Knowing that all of the components of the project may not meet all of the demands and preferences of all members of the community, it is important that the Middle Creek Housing Development proceeds and construction begin as soon as possible. file://C:\Windows\TEMP\GW } 00003.HTM 09/16/2002 Page 1 of~3 Allison Ochs - Fw: The Middle Creek Project From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 08/30/2002 6:11 PM Subject: Fw: The Middle Creek Project _...... ----- Original Message ----- From: <markconvail@juno.com> To: <towncouncil@ci.vail.co.us> Sent: Friday, August 30, 2002 5:30 PM Subject: The Middle Creek Project > Dear Vail Town Council, > I have lived in and around Vail off and on since 1978. I have watched this town grow and develop. I have never participated in town government, until now. > I am opposed to the Middle Creek Project as it is being proposed. I believe it will be a White Elephant to the Town of Vail if it is constructed. I have based my opinion on the following points. I appreciate your time in reading this email. > • As far as I know, there has never been a study done to see what are the current and future needs of employee housing in our valley: If affordable housing is warranted, let us consider building pockets of employee housing around Vail that really encourage a viable, dynamic, and diverse community spirit. > • Avon is currently building the Village of Avon. 2300 homes and condos will be built in the next 3-5 years in this development. Edwards is developing Berry Creek, 1800 homes are proposed for this area. These areas are connected to Vail with at good bus system.. I believe some of the affordable housing needs will be satisfied with these new developments. > • I have been told the T.O.V. has 2 other parcels that should be considered for affordable housing - by the T.O.V. maintenance facility and between Chamonix Ln. and Arosa Dr. in West Vail. These are great locations, easily accessed on the free T.O.V. bus route, they also are located in areas where pedestrian and vehicle traffic would not be so invasive. > • The design of Middle Creek is appalling. It is worse than Timber Ridge (Valley High =Valley Sty). It consists of 3 buildings, one being 5 stories high. (The Planning Commission just rejected a proposal by the Tivoli Lodge for a new 4-story structure, as it was in the TOV "view corridor" and did not fall in the Town's master plan. So why is a 5 story structure at our front door OK?) The design is in no way aesthetically pleasing. There are no balconies; they are block buildings that could be made with prefab housing units. The Town did a nice job with Vail Commons, Garmish Dr. and Sandstone Dr. affordable housing. Why can they not think about the architecture that will be at our front door for years to come? Look at the River's Edge in Avon. Look at the Tarnes at the base of Beaver Creek. Vail Resorts, with their tight corporate shoestrings, managed to build some nice looking employee housing, economically. WWII i i~nn~ Page 2 of 3 > • The original proposal by the TOV was to have a 42-unit facility that would be purchased by employers for employee housing. Now the town has placed a $6 million value on this property (which I believe was deeded to the T.O.V. by Vail Resorts as open space). They want to lease this land to the Developer for 50 years for free (and then what?). The Developer and the Planning Board have stated that this sight must have 142 units to make it economically viable. Why? If so, use another sight or use less of the land (less units) and declare the rest of the space "open space" as it was originally deeded. > ~ This is the "Front Door" to Vail. Think what it's like to drive into Keystone, Copper Mountain, Winter Park Village, or even Avon. It's all about the money. Not the views, not the Alpine atmosphere, it's about how to get as many units into one space, to increase revenues. That is not why people are attracted to Vail. It is not why most of us live here. As a community, I believe we would be doing ourselves an injustice by allowing this project, in it's size, shape and scope to proceed. > > • There has been no discussion or information provided by the TOV on how it is going to handle the increased pedestrian and vehicle traffic that will arise should the project be developed. 300 - 500 individuals will be trying to get to and from town as fast as possible. The Developer has a bus stop included. Believe me, it'll be faster to walk to town. So, like at Timber Ridge, we will have a steady stream of people crossing N. Frontage Rd., I-70, and the round-abouts (we all know how visitors have trouble enough maneuvering them, without increased traffic). And who will monitor the parking at the Middle Creek facility, when all the parking structures in Vail are full, and parking on frontage road is full, and skier/boarders know it's an easy walk from Middle Creek? > • The rents proposed would be in actuality 65-70% of an employee's NET income (the numbers presented by the developer were based on GROSS income). If an employee had a family, this would mean the other bedrooms would not be occupied by a "wage earner", making it economically impossible for the employee to live there. The Developer's numbers were based on each room being occupied by a wager earner. > • The Developer also reserved the right to rent a percentage of the units out at a higher rental rate, if the income of the individual could provide for that. Who will monitor this? The Developer will also ac±.as the Rental - Management Company. Who will monitor this to be sure fair practices are being followed? > • The Town and Eagle County have $13 million set aside for this project. The Developer said it would take $22 million to build. Who will pay the difference? How can the TOV take on yet another huge debt, with the Lionshead redevelopment and Donovan Park looming in the near future? > In today's Vail Daily there is an article that's tenor is pro Middle Creek. They suggest that it is the rich homeowners (ie: Spraddle Creek owners) who are opposing this project. The writer didn't do her homework. I have spoken to numerous Vail locals and they agree that the size and design is completely inappropriate for the Town of Vail. Many even question the location. Please understand that many of these people work during the day and are unable to attend Planning or .Council meetings, and therefore have only been aware of the upcoming project since the recent coverage in the Vail Daily. I believe more community awareness would most likely provoke the need to rethink the Middle Creek Project by the Town Council. > > I appreciate your time and effort. Again, please seriously rethink Middle file://C:\Windows\TEMP\GW } 00003.HTM 09/ 11 /2002 Page 3 of 3 Creek. > Thank you, > Constance H. Miller Rug 31 02 01:26a Jan Eric Strauch Jan Eric Strauch TO: VAIL TO' -VN COUNCIL DATE: 10 SEPTEMBER 2002 RE: MIDDLE CREEK I am writing to urge a NO vote on the Middle Creek Project. 9709269212 Convenient and afforda ale employee housing continues to be a critical need to the long-term economic heath and stability of the Vail community. BUT as currently designed, Middle Creek is not the answer for the following reasons: TOO MASSIVE for the location. The design does not fit into the quaint alpine resort character of the village, will architecturally detract from Vail's "world class" tourism appeal, and will create serious vehicular and pedestrian access problems. TOO HIGH RENTAL 1 tATES. The proposed cost to tenants is good but not so earth shattering to justi Fy the investment and other negative impacts. TOO LITTLE ECONO VIIC DIVERSIFICATION. Housing projects, historically, work better when they s ~ttraet a relatively wide range of incomes. It may be a mistake to f .elp solve the employee-housing problem with such "big bites". Instead, T urge the council to tocus_more on purchasing and deed restricting available homes, requir ng new development, such as planned in Lionshead, to include a fair number o f employee units, and building smaller apartments for sale and/or rent_ p. 1 Ja~ Eric Strauch Page 1 of 1 Allison Ochs - Fw: middle creek project From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/01/2002 3:25 PM Subject: Fw: middle creek project ----- Original Message ----- From: ImGussieR.@aol_com To: towncouncil@ci,_v_ail.cous Sent: Sunday, September 01, 2002 3:10 PM Subject: middle creek project To the Vail Town Council: Some of you I know and some I do not. I feel I am an average Vail resident having lived and worked here for 25 years. I am against the Middle Creek development. First and foremost the TOV cannot take on another Huge debt. l feel this project is too big for the site, poorly planned and not needed. The development in Avon and Edwards will provide thousands of new units to buy and rent in the very near future. feel the town should look at smaller sites through out the town to put a few employee units. Please vote against this project, once it is built we will regret it for ever. If major employers of Vail say we do not need it, please listen to them. Also it seems so. unfair for all commercial building, and homes in Vail to have a high standard, but employee housing does not. Gussie B Ross a Vail homeowner. 476-1809 Page 1 of 1 Allison Ochs - Fw: middle creek project From: "DIANA DONOVAN" <dianamdonovan@msn.com> To: "Pam Brandmeyer" <pbrandmeyer@ci.vail.co.us> Date: 09/01/2002 3:25 PM Subject: Fw: middle creek project ' ----- Original Message ----- From: ImG_ussie_R.@aol.com To: towncou,ncil@civailco.us Sent: Sunday, September 01, 2002 3:10 PM Subject: middle creek project To the Vail Town Council: Some of you I know and some I do not. I feel I am an average Vail resident having lived and worked here for 25 years. I am against the Middle Creek development. First and foremost the TOV cannot take on another Huge debt. I feel this project is too big for the site, poorly planned and not needed. The development in Avon and Edwards will provide thousands of new units to buy and rent in the very near future. I feel the town should look at smaller sites through out the town to put a few employee units. Please vote against this project, once it is built we will regret it for ever. If major employers of Vail say we do not need it, please listen to them. Also it seems so unfair for all commercial building, and homes in Vail to have a high standard, but employee housing does not. Gussie B Ross a Vail homeowner. 476-1809 file://C:\Windows\TEMP\GW}00003.HTM. 09/11/2002 Design Review Report MIDDLE CREEK AFFORDABLE HOUSING 16 September 2002 To: Bob McLaurin, Russell Forest, Allison Ochs, Nina Timm and members of the DRB and Planning & Environmental Commission: From: Jeff Winston This letter is an overview evaluation of the Middle Creek Affordable Housing project as it has evolved over the past two weeks. When invited to provide input into the design review process, the mission presented to me was, "what changes can be made, without major revisions to the buildings, that will bring it more closely in line with the original intent of tl~e project and the character and spirit of Vail? " After an initial review session with staff, we thought it would be valuable to have the Applicant (Mike Coughlin) and his architect (Otis Odell) be part of the dialogue. They agreed, and participated in several review sessions, in my office and theirs, and have been very responsive. They have made almost all of the changes that were suggested and/or that we evolved together. The changes not implemented are either minor (not significant to the overall concept), or items that create costs disproportionate to the results achieved or are of a more detailed, aesthetic nature that appropriately will be worked out with the DRB after initial PEC approval has been granted. In the course of the review, we considered several aspects: 1. Appropriateness of the original concept The original direction suggested by the Applicant, and as I understand, endorsed by the PEC, was that of an Italian (Europiean) hill town. Is the `hilltown' concept appropriate for Vail? I reviewed the collage of photographs of Italian hill towns prepared by Odell, and found the original concept a compelling image, especially given the steep montane backdrop of the site. 1 feel that the original decision of the PEC to support that direction was reasonable. The vertical massing of buildings, and stucco exterior appear to be a reasonable response to the steep site coupled with the challenge of maintaining affordability. No, it is not Tyrolean like Vail Village. However, as one approaches Vail from east or west there are many buildings along I-70 that are not particularly Tyrolean, especially the buildings north of I-70. Yet, they are all part of the Vail backdrop. Many of these buildings are vertical in nature, and have large stucco components-I do not think the Middle Creek project will appear to be out of place. It is also worth noting that although the Middle Creek project is at Vail's front door, it is not actually visible from I-70 for any great distance from the east or west. From the east it is screened until the very last minute (entering the off-ramp) by the Spraddle Creek hill. From the west, the Bell tower, the landforms and mature trees screen much of the proposed buildings. Design Review Commenu3.doc Page 2299 PEARL STREET, SUITE 100 ~ BOULDER, CO 80302 ® 303-440-9200. FAX 303-449-691 I ~ jtwinston@winstonassociates.com Design Review Comments Middle Creek Affordable Housing--Vail Winston Associates 2. Did the plan carry out the original concept? As we looked at the 8/16/02 version of the plans, we noted several components that seemed not consistent with the original "hilltown" concept. In general, in addition to trying to capture more of the spirit of the "hilltown" forms, we also looked at eliminating or modifying elements that appeared contemporary, so as to capture a timeless, old world character. The elements that were addressed included: a. Horizontal balcony walkways-the vertical massing of Building A that was so strong in the massing model, appeared to have been foiled by a particular placement of stair towers that required long exterior balcony walkways to reach them. The heavy wood railings on the balcony walkways accentuated the horizontal lines. In some cases, the balconies extending around comers further contradicted the vertical massing of the buildings. Renaedy.• The debris wall and amount of building below grade precluded moving the balcony walkways to the north side of Building A. Therefore, additional stair towers were added so as to reduce the extent of horizontal balcony walkways needed. Putting a wall around these exterior stairs to create towers in stucco and/or stone would make them appear to be vertical building elements and gave further variation to the building facades. In the latest set of plans (9/] 3/02) the return walls are only 5' long, enclosing the landing. I recommend fully enclosing the stairs so that the tower attaches to the building. To further reinforce the stair as a part of the building perhaps an arched opening could be created where the walkway enters the stair tower. Extending the roof plane out over these stair towers also reinforces them as elements of the building form (rather than as additions). The balcony walkways that remain will be further de-emphasized by having wrought-iron railings with a light, European quality such as is found in southern Italy and France. On Building B the balcony walkways were removed entirely from the south elevation. The applicant is considering adding "Opera balcony" railings on a few windows to add more variety and interest to the facade. b. Exterior flat panels-Exterior flat panels were originally added to both Building A and B to screen the horizontal balcony walkways. However, revealing the edge of the panel gave the wall a thin, and decidedly `modern' quality (only achievable with modern construction materials and methods), almost afalse-facade wall.. Remedy: On Building B, the flat panels were removed entirely, except at the lowest level, where they are proposed of stone, also with retun;s on each end to appear as building extensions. Canopy roofs extend to add variety and give the appearance that they might have been added after the original construction. On Building A, the balcony entries could not be moved to north side of the building (see a. above). Although adding south side stair towers shortened the balcony walkways, several are still required. The wall panels are helpful in masking the horizontal extent of these walkways.tHowever, to make the panels more an extension of the building, they given a 3' return on each end .Similar to the stair towers, the connection to the building could be further strengthened by adding an archway entry over the walkway. The panels are now proposed to be of stucco (rather than the vertically jointed hardy-board that added to the thin, temporary look). The panels are further enlivened with a random placement of windows to further relate them to the main building mass. We suggest additional window openings, perhaps adding more variation in size and an asymmetrical placement. If the panels can be made t Internally the additional 3' o depth will be used for exterior storage for the apartment units. Design Review Commenu3.da ~ Page Z 2299 PEARL STREET, SUITE 100 ~ BOULDER, CO 80302 ~ 303-440-9200. FAX 303-449-691 I ~ jtwinston@winstonassociates.com Design Review Comments Middle Creek Affordable Housing--Vail Winston Associates integral to the building, they will add to the horizontal stepping back and forth of the south facade of . Building A. c. Horizontal stepping of buildings-in general we (and apparently the PEC) felt that there was not enough horizontal `movement' (stepping back and forth) of the vertical walls, that the building facades were too flat. Remedy: As noted above, the addition of stair towers and `returns' at the ends of the flat panels added much more variation to the facade of Building A. In Building B, the westernmost segment was moved south approximately 10', providing additional `stepping' of the facade of the building. This stepping is reinforced by the gradual stepping down of the roofs. On Building C, the southwest corner (above the parking garage, was pushed 8'to 10' north, creating a significant `step' in the vertical facade. The roof of the garage will be treated a terrace, with handrails along the edge. d. Vertical stepping of buildings-in comparison with the `hilltown' images, the Middle Creek buildings didn't exhibit the same kind of vertical stepping, especially at the eastern end where the building should step down to the surrounding terrain. Remedy: At the east end of Building B, the 6' to 8' crawl space was deleted, allowing the easternmost building element to drop an equivalent amount. At Building C, on the southeast corner, a unit was eliminated, dropping the building height from 3 to 2 stories. In the northeast corner, a 4' crawl space was eliminated, and that portion of the building lowered an equivalent amount. Further, in this location a 3 bedroom unit was changed to a 2 bedroom unit, allowing a portion of the roof to be lowered further. Finally, at the high part of the roof in the northeast quadrant asouth-facing gable end was removed, which allows the roof to cascade down, further reducing the vertical mass of the building. , e. Roofs-the `hilltown' images, and the early massing models; there are many roof planes but with a general consistency of direction-generally following the ground contours. In the examples, occasionally the roof cascade is broken by gable ends perpendicular to the main mass of roofs. The previous Middle Creek design had much of the same character, but a number of large, prominent, south-facing gable ends tended to dominate the composition. Another feature of the `hilltown' images is thick roofs that are the resutlt of the use of clay tile. Since the is not appropriate for Vail, an alternative material must be found. Remedy: Several prominent south-facing gable ends were removed. A few were retained to maintain variety in the roofline. It is important to make the roofs significant. As mentioned above, clay the is not appropriate, nor is the stone (similar to slate) that would be found in northern Europe. The applicant has indicated an intention to fmd a very high profile (with a lot of relief in the surface) roof material. We encourage this as well as consideration of thicker facia (to increase the apparent mass of the roof), broader overhangs and perhaps a more extensive use of the timber angle brackets shown on the stair towers. f. V1'indow placement- very symmetrical and repetitious window placement gives a somewhat modern quality to the architecture. The irregular placement of windows will add to the `hillside' character of the proje4t. Design Review Comments3.doc Page 3 2299 PEARL STREET, SUITE 100. BOULDER, CO 80302 0 303-440-9200. FAX 303-449-691 I . jtwinston@winstonassociates.com Design Review Comnsents Aliddle Creek Affordable Housing--Vail Winston Associates Remedy: A certain randomness has been added via the placement of windows in the exterior panels. We encourage even more windows, and adding even more irregularity to the windows shown. g. Materials-The use of timeless materials will do much to add a touch of old world charm to the building. Unfortunately, the need for affordability works against extensive use of some of the most timeless materials (stone, slate, etc.). The horizontal and vertical joints shown in the stucco walls of the 8/16/02 plans added a decidedly contemporary character to the buildings, not unlike the geometrical pattern of Vail Spa, e.g. Remedy: In the highly visible portions of the building the applicant has eliminated hardy-board in favor of exterior stucco. The applicant is exploring techniques to avoid vertical and horizontal jointing in the stucco. Vertically jointed hardy-board has been retained for cost reasons in the interior and north side portions of the buildings, since these areas have low visibility from I-70 and the North Frontage Road. The amount of stonework previously shown has been expanded and consolidated in several very visible elements-the facade of the sales office (visible from the drive-up/bus plaza), the campanile/stair tower at the east end of Building A, the building extensions along the base of Building B, and the garage facade on the southwest comer of Building C. We would very much encourage even more stone in one or more of the south and southeast vertical elements of Building C. However, we also recognizing that the applicant has already made a number of changes that will increase costs. h. Building Ccourtyard-the stairs that serve Building C were all located around the exterior periphery of the building. While this meets egress requirements and works well with the vertical circulation from the parking garage, it would also leave the internal courtyard largely inaccessible. Some of the horizontal balcony walkways on the upper levels of the courtyard will be visible from the outside. Remedy: An additional stair tower is proposed on the north side of the Building C courtyard. This will not only provide additional circulation, and bring more life to the courtyard, but also tend to mask the balcony walkways beyond. i. Building Bcourtyard-the courtyard on the north side of Building B (also the pedestrian entry into the couryard ~f Building C) appeared to be a little too narrow as an exterior space. Remedy: Shifting the west end of Building B to the south has opened up the courtyard to the west (near the drop off circle in front of the parking garage). The applicant is also considering rotating Building B counterclockwise, pivoting around the southeast corner, to further opening up the pedestrian plaza. 3. Overall assessment of revised plan Overall, rather than trying to achieve a Tyrolean treatment, our goal was to maintain the `Italian hilltown' image as originally proposed. The key to achieving this look is to create vertical building mass, with significant stepping in the forms, both horizontally and vertically. We feel that the changes incorporated in the latest revision have achieved that goal to a significant degree. A complementary goal was to create a building of Old World, timeless character-one that would appear to have been there for hundreds of years. The key to this objective is to avoid building elements, materials and treatments that would have a `contemporary' image. Much of this has been accomplished by removing many of the exterior building panels and converting the remaining ones to appear as building extensions. Other approaches include irregular window placements, use of stone on signature features (towers), using stucco extensively, avoiding joint lines, eliminating strong horizontal balconies, roof treatments etc. Although Design Review Comments3.doc Page sf 2299 PEARL STREET, SUITE 100. BOULDER, CO B0302 ~ 303-440-9200 ~ FAX 303-449-691 I . jtwinston@winstonassociates.com Design Review Comments Aliddle Creek Affordable Housing--Vail Winston Associates progress has already been made in many of these areas, there is still room for additional refinement. However, these are to a large degree aesthetic issues that can, and should, be worked out in greater detail and study with the applicant, staff and DRB once initial authorization to proceed has been given by the PEC. .~ Design Review Comments3.doc Page 2299 PEARL STREET, SUITE 100. BOULDER, CO 80302 ~ 303-440-9200. FAX 303-449-691 I ~ jtwinston@winstonassociates.com