HomeMy WebLinkAbout2003-07-15 Support Documentation Town Council Work SessionAGENDA
VAIL TOWN COUNCIL
WORK SESSION
12:30 P.M. TUESDAY, JULY 15, 2003
1. ITEM/TOPIC: Executive Session
• Town Manager Contract Negotiations C.R.S. 24-6-402(4)(e) (15 min.)
• Impact Fee, Vacant Store Fronts C.R.S. 24-6-402(4) (b) (15 min.)
• Tax Increment Financing C.R.S. 24-6-402(4)(b)(e) (30 min.)
• Contract Negotiations with Vail Resorts, Inc. C.R.S. 24-6-402(4)(e)
(10 min.)
• Fire Services Negotiations and Conference with Attorney
C.R.S. 24-6-402(4)(e)(b) (30 min.)
2. Judy Camp ITEM/TOPIC: 2004 Budget Discussion re: Major Revenue Items, Capital
Projects and Real Estate Transfer Tax (1 hr.)
ACTION REQUESTED OF COUNCIL:
Provide direction to staff regarding major revenue items to be included in
the 2004 budget; review first draft of Capital Projects Fund and RETT
Fund 5-year projections
3. Bill Gibson ITEM/TOPIC: Update of the Planning and Environmental Commission's
review of a request for a recommendation to the Vail Town Council of
proposed text amendments to Title 12, Zoning Regulations, Vail Town
Code, to amend the Gross Residential Floor Area (GRFA) regulations in
the Hillside Residential (HR), Single-Family Residential (SFR), Two-
Family Residential (R), Two-Family Primary/Secondary Residential (PS),
Residential Cluster (RC), Low Density Multiple-Family (LDMF), Medium
Density Multiple-Family (MDMF), High Density Multiple-Family (HDMF),
and Housing (H) districts, and setting forth details in regard thereto.
(30 min.)
ACTION REQUESTED OF COUNCIL:
Listen to a staff presentation briefly summarizing the applicant's proposal,
discussions from the Planning and Environmental Commission hearings
to date, and related policy issues. Provide staff with specific direction for
policy decisions directly and indirectly related to the proposed text
amendments.
BACKGROUND RATIONALE:
The Planning and Environmental Commission has held several public
hearings for the proposed text amendments, and their final
recommendations will be forwarded to the Town Council on Aug. 5.
4. George Ruther ITEMlTOPIC: DRB Update (10 min.j
Page 1
5. Frank Johnson ITEM/TOPIC: Quarterly Update on Vail Valley Chamber and Tourism
Bureau Activities (30 min.)
6. Information Update (5 min.)
7. Matters from Mayor and Council (5 min.)
8. Adjournment (4:30 P.M.)
NOTE UPCOMING MEETING START TIMES BELOW:
(ALL TIMES ARE APPROXIMATE AND SUBJECT TO CHANGE)
THE NEXT VAIL TOWN COUNCIL REGULAR WORK SESSION
WILL BEGIN AT 2 P.M. TUESDAY, AUGUST 5, 2003 IN THE VAIL TOWN COUNCIL
CHAMBERS.
THE NEXT VAIL TOWN COUNCIL REGULAR EVENING MEETING
WILL BEGIN AT 6 P.M. TUESDAY, AUGUST 5, 2003, IN VAIL TOWN COUNCIL CHAMBERS
Sign language interpretation available upon request with 24-hour notification. Please call 479-
2332 voice or 479-2356 TDD for information.
Page 2
MEMORANDUM
To: Town Council
From: Judy Camp
Date: July 10, 2003
Subject: Budget Discussion
I am attaching the following information for the budget discussion on Tuesday:
• Budget Calendar
• Major Revenue Analysis
• Real Estate Transfer Tax Fund Five-Year Projection
• Capital Projects Fund Five-Year Projection
Maior Revenue Anal
Per your discussion on July 1, the projected revenue from the lift tax has been increased.
The 2003 projection of $2,350,000 is based on actual revenue through May plus an
estimate for the remainder of the year at a level similar to last year. The 3% increase
proposed for 2004 is the average annual increase from 1997 through 2002.
Franchise fee revenue has also been increased based on the expectation that utility costs
will increase next year.
Parking revenue is projected at the same level in 2003 and 2004 as last year. This is
based on the 2002/2003 parking plan and will need to be adjusted for any changes made
for the 2003/2004 ski season.
RETT Five-Year Projection
The RETT Fund projection is balanced over five years. Per the Major Revenue Analysis,
Real Estate Transfer Tax is projected at $2,750,000 annually, an increase of $250,000
over prior estimates. This amount has been used to fund Village Streetscape projects.
Capital Projects Fund Five-Year Projection
The Capital Projects Fund projection shows a $3.6 million fund balance at the end of
2008. This allows -some flexibility in future projects such as additional Streetscape or
funding some Lionshead Redevelopment from the Capital Projects Fund.
Revenue includes two projects that have been submitted to Eagle County for inclusion in
the county capital budget -the East Vail Repeater Site and the Countywide Computer-
Aided Dispatch System/Records Management System. Although the County budget is
not yet final, these two projects were ranked highly and I expect that they will be
included in the final budget.
Village Streetscape is included through 2005 per the plan presented to the Streetscape
Committee on July 10`h and is subject to change based on the Committee's response to
the presentation. Streetscape projects may also be added beyond 2005. Additional
funding for Streetscape is included in the RETT budget.
A quick response vehicle for the Fire Department has been included for 2004 per the
recommendation from Almont and your direction. The $100,000 cost is a rough estimate
and additional information and a recommendation on vehicle specifications should be
available for the next Council meeting.
The Capital Projects Fund Projection includes the planning and design costs for
Lionshead as well as costs related to developing and implementing a TIF district.
Construction costs for Lionshead are not included because they are expected to be fully
funded by developer contributions, tax increment financing (TIF), Eagle County, CDOT,
and others. $3,750,000 has been included for the Lionshead Intermodal Site in 2007.
These costs will be partially funded from the Federal Grant Revenue projected in the
same year.
Conference Center costs will be included separately in the Conference Center Fund
budget and are not a part of the Capital Projects budget.
The West Vail fire station, Main Vail remodel, and new fire truck are not included in the
Capital Projects Fund because new revenue sources are being explored for fire capital.
Version 3
Changes Highlighted
Town of Vall
Proposed 2004 Budget Timetable
Contributions
Council criteria discussion 05/20/03 Complete
Deadline for return of packets 07/31/03
Commission on Special Events presentation to Council 07/01/03 Complete
Council evaluation of requests and direction for 2004 budget 08/19/03
Budget Guidelines
Council decision on VCBA & VVCTB funding 06/03/03 Complete
Council discussion of budget philosophy and timetable 06/17/03 Complete
Guidelines distributed to department heads 06/23/03 Complete
VRI presentation to Council on lift tax revenue 07/01/03 Complete
2003/2004 parking plan discussion 08/05/03
Streetscape Committee recommendation 07/15/03
Presentation of 2002 audit report to Council 08/05/03
Budget Preparation
Capital budget request for county funds submitted 06/13/03 Complete
Staff prepares departmental budgets 06/23/03 to 07/18/03
Council discussion of major revenue items 07/01/03 Complete
Council decision on major reuenue items 07/15/Q3
Council review of first draft of 5-year capital projection 07/15/03
Council review of first draft of 5-year RETT projection .07/15/03
Council review of second draft of 5-year capital projection 08/05/03
Council review of second draft of 5-year RETT projection 08/05/03
Town Manager reviews departmental budgets 07/27/03 to 07/29/03
Town Manager's budget complete 08/13/03
Council review of first draft proposal 08/19/03
Council review of second draft proposal and 5-year capital plan 09/02/03
Budget Documentation and Reporting
First reading of 2004 budget ordinance 09/16/03
Second reading of 2004 budget ordinance 10/07/03
First reading of mil levy certification ordinance 11/18/03
Second reading of mil levy certification ordinance 12/02/03
Mil levy certification deadline to Eagle County 12/15/03
Budget book submission 12/31/03
Calendar Printed 7/10/03
MAJOR REVENUE ANALYSIS
Sales Tax
County Sales Tax
Properly Tax Revenue
LHt Tax Revenue
Road ~ Bridge Revenur
Highway Users Tax
Parking Revenue
Franchise Fees
Construction Fees
1999 2000 2001 2002
Achral Actual Actual Ardual
15,111,367 15,368,598 15,734,387 15,264,581
1.8% 1.7% 2.4% -3.0%
459,664 517,260 511,870 491,952
-4.9% 12.5% -1.0% -3.9%
2,002,660 2,082,770 2,420,327 2,630,105
3.8% 4.0% 16.2% 8.7%
1,710,061 1,961,723 2,145,587 2,344,921
-16.3% 14.7% 9.4% 9.3%
423,671 466,024 477,279 492,166
-1.3% 10.0% 2.4% 3.1%
221,471 225,509 219,674 217,835
3.6% 1.8% -2.6% -0.8%
1,513,610 1,980,421 2,313,445 2,548,806
-6.8% 30.8% 16.8% 10.2%
564,419 576,904 628,427 580,372
2.9% 2.2% 8.9% -7.6%
516,999 606,671 789,170 854,377
(0.3) 17.3% 30.1 % 8.3%
2003 2003 2003 2004
Budget Through May Projection Proposed"
14,580,000 7,365,044 14,580,000 14,725,800
-4.5% -4.5% 1.0%
475,000 211,040 475,000 479,750
-3.4% -3.4% 1.0%
2,661,011 1,960,469 2,661,011 2,543,101
1.2% 1.2% -4.4%
2,188,920 1,723,688 2,350,000 2,420,500
-6.7% 0.2% 3.0%
485,255 171,905 485,255 464,000
-1.4% -1.4% -4.4%
209,861 62,037 209,861 205,000
-3.7% -3.7% -2.3%
2,300,000 1,995,617 2,550,000 2,550,000
-9.8% 0.0% 0.0%
602,500 205,424 602,500 614,500
3.8% 3.8% 2.0%
786,500 278,195 786,500 806,163
-7.9% -7.9% 2.5%
RETTTax 2,771,634 3,518,178 3,029,526 2,943,338 2,500,000 1,124,081 2,650,000 2,750,000
26.9% -13.9% -2.8% -15.1 % -10.0% 3.8%
All Other Revenue 10,293,881 7,474,985 7,081,393 6,555,874 5,786,983 3,029,424 5,786,983 5,931,658
-27.4% -5.3% -7.4% -11.7% 2.5%
Total Revenue 35,589,437 34,779,043 35,351,085 34,924,327 32,576,030 18,126,924 33,137,110 33,490,471
-2.3% 1.6% -1.2% -6.7% -5.1 % 1.1
Version 3
Changes Highlighted
Comments
Per Council Discussion
Same increase as sales tax; same
historical relationship to sales tax
Reduction in assessment ratio
applied to market values
5-year trend
Reduction in assessment ratio
applied to market values
Trend is down; based on miles
of highway
Same as 2002 Actual; will be less if
"free after three" comes back
Inflationary increase; based on utility
utility company revenues
Inflationary increase; potential revenue
from increased activity will be offset by
increased casts of processing
Lowest of 5-year actual
Inflationary increase; subject to
review of individual items
Major Revenue Analysis 030715 7/10/03
Version 1
Real Estate Transfer Tax Fund
Five-Year Summary of Revenue and Expenditures
REVENUE
Real Estate Transfer lax
Golf Course Lease
Lottery Revenue
Land Exchange Proceeds
Project Reimbursements
Interest Income & Other
Recreation Amenity Fees
Total Revenue
EXPENDITURES
Annual Maintenance
RETT Collection Costs
Rec. Path Capital Maintenance
Alpine Garden Support
Tree Maintenance
Street Furniture Replacement
Black Gore Creek Sand Mitigation
Bear Proof Containers
Park, Path & Landscape Maintenance
Subtotal Maintenance
Recreation Path/Trail Development
Trail Signs
Trailhead Development
North Trail
N. Frontage Rd. (School to Roundabout)
Gold Peak to Soccer Field
Village Streetscape Design & Implement
Frontage Road Bike Trail
Subtotal Pathways
Capital Maintenance
Raw Water Project
Playground Safety Improvements
Pirete Ship Park -Per Safety Plan
Big Hom Park -Per Safety Plan
Red Sandstone Park -Per Safety Plan
Nature Center Bridge Replacement - Fo
Public Art
Subtotal Capital Maintenance
Park Development
Ford Park Playground Improvements
Donovan Park
2002 2003 2004
Actual Amended Proposed
(Unaudited) Budget Budget 2005 2006 2007 2008 Project Information
2,943,253 $ 2,500,000 $ 2,750,000 $ 2,750,000 $ 2,750,000 $ 2,750,000 $ 2,750,000
106,137 109,300 112,579 115,956 119,435 123,018 126,709
22,321 20,000 20,000 20,000 20,000 20,000 20,000
320,220
109,859 38,286
122,576 85,000 50,000 50,000 50,000 50,000 50,000
8,254 15,000 10,000 10,000 10,000 10,000 10,000
3,632,620 2,767,586 2,842,579 2,945,956 2,949,435 2,953,018 2,956,709
87,000 87,000 137,500 137,500 137,500 137,500 137,500 Collection fee remitted to the General Fund
180,309 240,000 135,200 140,608 146,232 152,082 158,165 Capital maintenance of the town's rec. path system
56,460 56,460 58,708 61,056 63,499 66,039 68,680 For maintenance of gardens
97,364 75,000 60,000 60,000 60,000 60,000 60,000 Provide additional trees to Veil's public areas
19,114 20,000 25,000 25,000 25,000 25,000 25,000 Additions and replacement of street furniture
50,000 105,978 100,000 100,000 100,000 100,000 100,000
17,000 18,000 9,500 10,000 In TOV parks
760,093 823,011 857,281 892,991 930,198 968,969 1,009,369 Ongoing path, park and open space maintenance; assumes
1,267,340
1,425,449
1,383,189
1,427,155
1,462,429
1,509,589 2003 reductions are permanent
1,558,714
104,546 40,365
20,000 20.000 20,000 20,000 20,000 20,000 Improve Vailheads
42,739
0 650,000
335,000 Fund Path from Red Sandstone Pedestiran Brdg to Roundabout
139,363
410,637
1,750,000
1,500,000
1,250,000
1,250,000 Bike paths -portion of Vail Valley Drive Project
1,250,000
1,050,000 Construct widened 6' shoulders along all frontage roads; first
286,648 806,002 2,420,000 1,520,000 1,270,000 2,320,000 1,270,000 priority is Blue Cow Chute to East Vail
26,231 249,720
70,651 32,605
300,000
225,000
200,000
rd 37,228
27,620 108,380 75,000 75,000 75,000 75,000 75,000
161,730 690,705 300,000 275,000 75,000 75,000 75,000
51
2,956,202 200,000
Convert parks from treated water to raw water
F:1Users\FINANCE\BUDGET\budget041Capital\030715 1
Printed 07/10/2003
Version 1
Real Estate Transfer Tax Fund
Five-Year Summary of Revenue and Expen ditures
2002 2003 2004
Actual Amended Proposed
(Unaudited) Budget Budget 2005 2006 2007 2008 Project Information
White Water Park 98,713 110,000 Funds 3rd hole at Whitewater Park
Gore Creek Promenade Bridge 25,028 100,000
Red Sandstone School Soccer Site 143,116 2,936
Lionshead Park 100,000 690,000
Booth Creek Park Redevelopment 250,000 ReconsVuct park
Subtotal Park Development 3,223,110 412,936 0 0 350,000 690,000 0
Open Lands
Snowberry 300,000
Open Space Acquisition _
Subtotal Open Lands 0 300,000 0 0 0 0 0
Project Management
Parks and Landscaping 90,465 76,531 78,827 81,192 83,627 86,136 88,720
AIPP 56,792 58,496 60,251 62,058 63,920 65,837
Subtotal Project Management 90,465 133,323 137,323 141,442 145,686 150,056 154,558
Total Expenditures 5,029,293 3,768,415 4,240,512 3,363,598 3,303,115 4,744,645 3,058,272
Revenue Over (Under) Expenditures (1,396,673) (1,000,829) (1,297,933) (417,641) (353,679) (1,791,627) (101,563)
Beginning Fund Balance 6,522,668 5,125,995 4,125,166 2,827,233 2,409,592 2,055,913 264,285
Ending Fund Balance S 5,125,995 S 4,125,166 S 2,827,233 S 2,409,592 S 2,055,913 Z 264,285 S 162,722
F:\Users\FINANCE\BUDGET\budget041Capital\030715 2 Printed 07/10/2003
Version 1
SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE
CAPITAL PROJECTS FUND
2002 2003 2004
Actual Amended Proposed
Unaudited Budget Budget 2005 2006 2007 2008 Projectlnformation
Revenue
Sales Tax $ 4,926,729 $ 5,765,425 $ 5,890,320 $ 5,949,223 $ 6,008,715 $ 6,068,803 $ 6,129,491 40% of total sales tax allocated to Capital Projects in 2003
Federal Grant Revenue 2,046,386 870,000 830,000 974,160 4,536,000 1,344,000 Bus replacements & Intennodal
Lease Revenue 201,980 150,000 150,000 150,000 150,000 150,000 150,000 Lease revenue from City Market & employee housing
CDOT Reimbursement 1,000,000 - Reimbursement for the roundabout construction
Parking Assessments 12,340 - Revenue from Parking Pay-in-Lieu Program
Buy-Down Program 8,842 1,000,000 Sale of Deed Restricted Units Purchased by the Town
Sale of Assets
Transfer from Heavy Equipment Fund 748,334
650
000 -
- Sale of Old Town Shops & portion of land in West Vail
Project Reimbursement ,
94
632
215
000 To Fund Town Shop Improvements
Eagle County Grant Revenue , ,
555
000 Gymnastics facility & E. Vail repeater
Interest Income & Other
188,590
45,000 ,
45,000
45,000
45,000
45,000
45,000 Countywide Computer Aided Dispatch& E. Vail Repeater
Total Revenue 7,831,447 9,221,811 7,510,320 6,974,223 7,177,875 10,799,803 7,668,491
Expenditures
Equipment Purchases
Document Imaging
Software & Hardware U
rades 32,640
192
019 100,170 40,000 40,000 40,000 40,000 40,000 OCE maintenance, software upgrades, contract position
pg
Web Page Development/Ewmmerce ,
15
400 58,000
34
6
0 172,000 42,000 58,000 72,000 43,000 Desktop OS upgrades, replacement PC's, server upgrades
Eagle County CAD / RMS Project ,
1
515 ,
0
138
485 12,000
250
000 12,000
50
000 12,000 12,000 12,000 Web / FTP / E-Commerce development and upgrades
Radio System , , , , 50,000 50,000 50,000 County wide Computer Aided Dispatch /Records Mgmt System
East Vail Re
e
t 82,901 - 2 new stations 8~ radio towers. Towers partially reimbursed
p
a
er 320,000
Fire Truck
ORV for Fire Dept 735,000 Replace pumper; refurbish Aerial Pumper
Repower Buses
152,000 100,000
126
000
126
000 -Quick Response Vehicle
Replace Buses
20,509
2,475,490 ,
1
264
000
1
010
400 , Replace transmissions and engines to extend useful life
GPS for Buses ,
,
150,000 ,
,
150,000
375
000 3,834,000
800 MHz radio system 151,898 152
372 ,
Other , Principal and interest payments for lease/purchase
Subtotal Equipment Purchases
496,882
3,431,117
2,114,000
1,304,400
661,000 181,000
1,090,000 300,000
4,279,000 Principal and interest payments for lease/purchase
Capital Maintenance
Bus Shelter Replacement 9,998 30,000 10,000 30,000 10,000 30
000 10
000
Bear Proof Trash Containers 40
000 , ,
Capital Street Maintenance
Parking Structur
M
i
t
706,053 ,
832,947
740,000
890,000
932,000
1,032,000
950,000 In the Village
Preventive maintenance, patching, overlays and seal coats
e
a
n
enance .45,000
Parking Structure Improvements
General Facility Improvements 585,594
12 435,000 340,000 420,000 525,000 440,000 460,000 Various Parking Structure Improvements
Subtotal Capital Maintenance 4,765
1
426
410 470,000
1
852
947 519,000
1
609 280,000 375,000 360,000 340,000 Various Facility Capital Improvements
,
, ,
, ,
,000 1,620,000 1,842,000 1,862,000 1,760,000
Street Reconstruction
Vail Valley Drive -Design 17,070 142
930
Vail Valley Drive -1st Phase ,
340
000 Vail Valley Drive Golden Peak to Sunburst, and Mill Creek Circle, with
, Reconstruct Vail Valley Drive in segments
030715
1
07/10/2003
Version 1
SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE
CAPITAL PROJECTS FUND
2002 2003 2004
Actual Amended Proposed
Unaudited Budget Budget 2005 2006 2007 2008 Project Information
Subtotal Street Reconstruction 17,070 482,930 - - _ _
Buildings & Improvements
Library Building Remodel 2,083 85,000 Remodel of the Library Public Restrooms & janitorial closet
Hud Wirth Land 2,598,231 -
Fireinfrastructure improvements 663 179,337 Design costs
Fiber Optics in Buildings 70,000 15,000 15,000 15,000 15,000 15,000 Cabling /Network Infrastructure
Dobson Ice Arena 5,738 9,262 Vail Recreation District - to expand capacity
Way Finding Improvements 28,202 100,000 Signs in town, on I-70, & in parking structures -adds maintenance
Town Shop Imp -Storage Project 972,435 552,565 Complete project
Donovan Park Pavilion 686,184 2,156,631
Indoor Recreation/Gymnastics 195,000 Move to Avon temporarily; Red Sandstone site
Subtotal 8idgs /Improvements 4,293,536 3,347,795 15,000 15,000 15,000 15 000 15 000
Streetscape Projects
West & East Meadow Drive 231,677 247,323 1,182,000 Construct Streetscape plan, drainage, lighting. public art and landscapi
Village Streetscape 170,332 29,668 1,867,000 787,000 Design in 2002; additional funding from RETT
Subtotal Sreetscape Projects 402,009 276,991 1,867,000 1,969,000
Housing Program
Mountain Bell Housing 36,239 -
Ruins 8,415 -
Buy-Down Program
limber Ridge 18,054 1,100,000 100,000 100,000 100,000 100,000 100,000 Purchase Price of Deed Restricted Units, Includes $100k Subsidy
940,000 925,000 $925K Replenishment reserve
Subtotal Housing Program 62,708 2,040,000 1,025,000 100,000 100,000 100 000 100,000
Lionshead Redevelopment
Lionshead Master Plan 29,198 120,802 350,000 Design costs to implement Town improvements: Construction
Intermodal Site costs for Lionshead Redevelopment will be funded from developer
Subtotal Lionshead Redevelopment
29
198
120
802
350
000 3,750,000 contributions, TIF, Eagle County 8 other sources.
, , , 3,750,000
Other Improvements
Parking Study
Loading and Delivery Studies
Street Light Improvement Program
Drainage Improvements
Vail Today
i-70 Noise
Memorial Park Loan
Subtotal Other Improvements
5,690 -
8,396
58,797 50,000 50,000 50,000 50,000
10,736 142,960 75,000 75,000 75,000
23,718 10,000
247,500
50,000
98,941 508,856 125,000 125,000 125,000
Finish Project
50,000 50,000 Add new street lights and refurbish residential lighting program
75,000 75,000 Continue implementation of drainage master plan
Total before Transfers
125,000 125,000
6,826,754 12,061,438 7,105,000 5,133,400 2,743,000 6,942,000 6,279,000
030715
2
07/10/2003
Version 1
SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE
CAPITAL PROJECTS FUND
2002 2003 2004
Actual Amended Proposed
Unaudited Budget Budget 2005 2006 2007 2008 Project Information
Transfer for Debt Service 2,328,929 1,878,449 2,337,897 2,422,154 2,236,200 3,233,497 2,321,825 To fund debt service on all Town bonds
Total Expenditures 9,155,683 13,939,887 9,442,897 7,555,554 4,979,200 10,175,497 8,600,825
Revenue Over (Under) Expenditures (1,324,236) (4,718,076) (1,932,577) (581,331) 2,198,675 624,306 (932,334)
Beginning Fund Balance 10,020,101 8,695,865 3,977,789 2,045,212 1,463,881 3,662,557 4,286,862
Ending Fund Balance $ 8,695,865 $ 3,977,789 $ 2,045,212 $ 1,463,881 $ 3,662,557 $ 4,286,862 $ 3,354,528
030715
3
07/10/2003
~.
MEMORANDUM
TO: Town Council
FROM: Community Development Department
DATE: July 15, 2003
SUBJECT: Update of the Planning and Environmental Commission's review of a request for
a recommendation to the Vail Town Council of proposed text amendments to
Title 12, Zoning Regulations, Vail Town Code, to amend the Gross Residential
Floor Area (GRFA) regulations in the Hillside Residential (HR), Single-Family
Residential (SFR), Two-Family Residential (R), Two-Family Primary/Secondary
Residential (PS), Residential Cluster (RC), Low Density Multiple-Family (LDMF),
Medium Density Multiple-Family (MDMF), High Density Multiple-Family (HDMF),
and Housing (H) districts, and setting forth details in regard thereto.
Applicant: Vicki Pearson, et.al.
Planner: Bill Gibson
DESCRIPTION OF THE REQUEST
The purpose of this discussion is for the Staff to provide an update of the Planning and
Environmental Commission's review of a request for a recommendation to the Vail Town
Council of proposed text amendments to Title 12, Zoning Regulations, Vail Town Code,
to amend the Gross Residential Floor Area (GRFA) regulations in the Hillside Residential
(HR), Single-Family Residential (SFR), Two-Family Residential (R), Two-Family
Primary/Secondary Residential (PS), Residential Cluster (RC), Low Density Multiple-
Family (LDMF), Medium Density Multiple-Family (MDMF), High Density Multiple-Family
(HDMF), and Housing (H) districts, and setting forth details in regard thereto.
II. BACKGROUND
Since staff's April 15, 2003, update to the Town Council of the Planning and
Environmental Commission's deliberations of proposed text amendments to the Town's
gross residential floor area (GRFA) regulations, the Commission has held further public
hearings to discuss the proposed text amendments. Staff has also discussed the
proposed text amendments with the Town of Vail Design Review Board on two
occasions. Additionally, on May 22 and June 5, 2003, the Town staff facilitated focus
group discussions with approximately 25 local architects, builders, developers, home
owners, planners, and realtors to discuss the proposed text amendments.
The Planning and Environmental Commission is scheduled to make a final
recommendation on the proposed text amendments at its July 14, 2003, public hearing.
The Commission's final recommendations will be formally forwarded to the Town Council
on August 5, 2003.
The following is a brief summary of the Planning and Environmental Commission
discussions since staffs April 15, 2003, update to the Town Council:
June 9, 2003: Staff provided the Planning and Environmental Commission with
the input received from the Design Review Board and the GRFA focus groups:
1
Design Review Board comments:
Apprehensive about eliminating GRFA limits in the residential zone district.
Eliminating GRFA limits will place a greater burden on the Design Review
Board to control bulk, which may be difficult only using design guidelines.
• Updating the existing design guidelines with photographic examples may be
helpful regardless of any changes to the GRFA regulations, as long as the
existing flexibility of the guidelines is maintained.
• The Design Review Board's decisions can be subjective, and should not be
made more subjective by eliminating GRFA limits.
Significant increase in development potential on larger lots is a concern.
• Simplified form of GRFA or an FAR (floor area ratio) should be maintained.
• Simplified form of GRFA or FAR should be measured from the exterior of a
building and basement areas (as defined by the building code) may be
excluded.
Focus group comments:
• Accepted GRFA reform "principles":
o GRFA reforms should be simpler to understand, implement, and
enforce.
o GRFA reforms should be equitable.
o GRFA reforms should address related Town zoning regulations.
o GRFA reforms should not negatively impact property sales or values.
o Government should not regulate the interior use of homes.
o GRFA reforms should improve compliance with building and fire
codes.
o GRFA reforms should not dramatically increase development
potential
• Accepted GRFA reform alternatives:
o No changes to the existing GRFA regulations.
o Eliminate GRFA (including adjusting other regulations such as site
coverage and design guidelines).
o Convert to a volumetric measurement system.
o Simplify the existing GRFA regulations (including options such as not
counting below-grade spaces as GRFA, measuring GRFA from the
outside face of exterior walls, and simplifying the calculations by
eliminating credits, etc.).
• Evaluation of GRFA reform alternatives:
o No change to the existing GRFA regulations was unanimously
eliminated as a viable alternative.
o Converting to a volumetric system was unanimously eliminated as a
viable alternative due to its complexity.
o Eliminating GRFA was considered a viable alternative:
Pro's:
^ Simplifies the architectural design process.
^ Simplifies the review process.
^ Eliminates illegal construction and encourages safer
construction.
• May encourage improved safety.
• Treats neighbors equally.
^ Allows homeowners to utilize existing house volumes.
^ Doesn't adversely affect property values.
^ Eliminates government regulation of interior uses.
Con's
^ More pressure on the Design Review Board to control the
size of homes.
2
^ Encourages flat roofs to maximize volume.
^ Encourages "office building" like box-shaped homes.
^ Increases site disturbance.
^ Impacts numerous other Town regulations..
^ Significant increase in development potential unless other
regulations are changed.
^ Requires adjustments to site coverage and/or building height
calculations and design guidelines.
o Simplifying GRFA (including not counting below-grade spaces as
GRFA, measuring GRFA from the outside of exterior walls, and
simplifying the calculations) was considered the best alternative:
Pro's:
^ Maintains the existing system.
^ Simplifies the review process.
^ Doesn't effect other Town regulations.
^ Doesn't adversely affect property values.
^ Doesn't significantly increase development potential.
^ Encourages be#ter design than eliminating GRFA (doesn't
encourage flat roofs or box-shaped buildings).
^ Treats neighbors equally.
^ Less incentive for illegal construction.
^ Much less regulation of interior uses.
^ More politically acceptable alternative.
Con's:
^ Continues to regulate interior uses.
^ Some loop holes can still be exploited.
^ Some details of how to simplify GRFA are unresolved.
June 23, 2003: Staff presented the Planning and Environmental Commission with
three gross residential floor area (GRFA) text amendment alternatives:
• Option A-Modify GRFA definitions and calculations
• Option B -Modify GRFA definitions and calculations, plus not count
basements as GRFA
• Option C -Eliminate GRFA limits
At its June 23, 2003, public hearing the Planning and Environmental Commission
evaluated the three options and determined that Option A was not satisfactory.
The Planning and Environmental Commission then directed staff to draft
additional text amendments to address Options B and C.
On July 14, 2003, the Planning and Environmental Commission is scheduled to
make a recommendation to the Town Council for the proposed text amendments
to the gross residential floor area (GRFA) requirements. Staff will provide the
Town Council a brief summary of the Commission's actions at the Council's July
15, 2003, afternoon worksession.
Currently, Town Staff is recommending that the Planning and Environmental Commission
consider text amendments to the gross residential floor area (GRFA) regulations that will
simplify the definitions and calculations of GRFA that do not exclude basements from the
GRFA calculations. Staff believes that the same ends achieved by excluding basements
from GRFA calculations may be achieved by adjusting the amount of allowable GRFA.
Staff believes that the creation of additional exemptions and exclusions from the GRFA
regulations will only propagate, not solve, the problems associated with the Town's
current GRFA regulations (i.e. complexities, loop holes, inequalities, etc.).
III. STAFF RECOMMENDATION
The Community Development Department is requesting that the Town Council listens to
a staff presentation briefly summarizing the applicant's proposal, discussions from the
Planning and Environmental Commission hearings to date, and related policy issues; and
then provides staff with specific direction for policy decisions directly and indirectly related
to the proposed text amendments.
4
r
DESIGN REVIEW BOARD AGENDA
Wednesday, July 2, 2003
3:00 P.M.
PUBLIC MEETING
PUBLIC WELCOME
PROJECT ORIENTATION /LUNCH -Community Development Department
MEMBERS PRESENT
Clark Brittain
Bill Pierce
Hans Woldrich
David Viele
Margaret Rogers
SITE VISITS
1. Windstream Condos - 4295 Columbine Drive
2. Parks residence - 4246 Columbine Drive
3. Vail East Lodging - 4093 E. Spruce Way
4. Children's Garden of Learning - 551 N. Frontage Rd.
5. Middle Creek -160 N. Frontage Road
6. West Vail Lodge - 2211 N. Frontage Road
7. Gerstenberger residence -1320 Greenhill Court
8. Dooley residence -Lodge at Vail, Unit 338
9. Vail Village Inn -100 E. Meadow Drive
12:00 pm
2:00 pm
Driver: George
PUBLIC HEARING -TOWN COUNCIL CHAMBERS 3:00 pm
Windstream Condos DRB03-0245 Warren
Final review of proposed re-paint
4295 Columbine Drive/Lot 7, Block 3, Bighorn Subdivision 3~d Addition
Applicant: Windstream Condo Association
MOTION: Woldrich SECOND: Pierce VOTE: 5-0
Approved with 2 Conditions:
1. The applicant shall paint all vents and stacks on top of the roof Elkhorn
Cactus (8654M) to match the siding and roof color.
2. The applicant shall paint all stucco areas Desert Tumbleweed (8723M), all
siding, window trim, and the roof Elkhorn Cactus (8654M), and all shutters
on the building either Wilderness Green (8626N) or Western Reserve
(8716N) as an accent to the proposed re-paint.
2. Ransburg residence DRB03-0248 Matt
Final review of proposed tree removal
463 Beaver Dam Road/Lot 5, Block 4, Vail Village 3~d Filing
Applicant: David and Alexandra Ransburg
~~,~.
11
.Y
1 TOWR' OF ti'AIL ~
MEMBERS ABSENT
M
MOTION: Pierce SECOND: Rogers VOTE: 5-0
Approval with 1 Condition: That the applicant replaces the removed evergreen tree
with two, 20' tall spruce trees on the site. The two new trees shall be planted by
no later than October 15, 2003.
3. Children's Garden of Learning DRB03-0200 Allison
Final review of proposed play area
551 North Frontage Road /Lot 8-A, Block 2, Vail Potato Patch
Applicant: Eagle County School District, represented by ARC
MOTION: Woldrich SECOND: Pierce VOTE: 5-0
Consent Approved with 5 Conditions
1. The applicant shall provide revised drawings of the boulder retaining walls,
including a 4 ft. bench between walls, a single tier wall, and a PE stamp for all
walls over 4 ft. in height. This shall be submitted with the building permit
application.
2. The applicant shall indicate the proposed revegetation material on the site plan.
This shall be submitted on the building permit application.
3. The applicant shall indicate a limits of disturbance fence on the site plan. This
shall be submitted with the building permit application.
4. The applicant shall provide a bond for removal of the temporary fence by
September 1, 2003.
5. The applicant shall use a fencing material that matches the existing fence at Red
Sandstone Elementary.
4. Middle Creek DRB02-0060 Allison
Final review of proposed landscape plan
160 N. Frontage Rd./Lot 1, Middle Creek Subdivision
Applicant: Vail Locai Housing Authority
To approve the MSE wall with the 3 colors blended.
MOTION: Brittain SECOND: Woldrich VOTE: 5-0
To approve the roof material in thunderstorm gray
MOTION: Brittain SECOND: Rodgers VOTE: 3-2 (Viele/V1/oldrich)
5. Gerstenberger residence DRB03-0210
Final review of proposed exterior alterations
1320 Greenhill Court/Lot 16, Glen Lyon Subdivision
Applicant: Allen Gerstenberger
MOTION: Pierce SECOND: Woldrich VOTE: 4-0
Tabled to July i 6, 2003
6. West Vail Lodge DR603-0152
Conceptual review of proposed addition and exterior alterations
2211 N. Frontage Rd./Lot 1, Vail Das Schone 3`d Filing
Applicant: Raj Bhakta
MOTION: SECOND: VOTE:
Conceptual - no vote
Allison
Matt/Allison
2
7. Dooley residence DRB03-0196 Matt
Final review of proposed window replacement
Lodge at Vail ,Unit 338, 174 E. Gore Creek Drive/Lots A,B & C, Block 5C, Vail Village 1St
Filing
Applicant: Thomas and Barbara Dooley, .represented by Slifer Designs
MOTION: Hans SECOND: Margaret VOTE: 5-0
Consent approved.
8. Vail East Lodging DRB03-0225 Elisabeth
Final review of proposed re-roof
4093 E. Spruce Way/Lot 4, Bighorn Subdivision 3~d Addition
Applicant: Woody Kiehl
MOTION: SECOND: VOTE:
Tabled to July 16, 2003.
9. Alpenrose DR603-0072 Matt
Final review of a proposed addition and major exterior alteration
100 E. Meadow Drive/Lot 0, Block 5D, Vail Village 1St Filing
Applicant: Edna & Claus Fricke, represented by Fritzlen Pierce Architects
MOTION: Viele SECOND: Brittain VOTE: 3-0 (Pierce recused, Rogers
not present)
Approved with 1 Condition: That the applicant submits the proposed exterior deck
railing treatments to the Community Development Department for review and
approval by staff.
10. Parks residence DRB03-0217 Warren
Conceptual review of proposed new single-family residence
4246 Columbine Drive/Lot 20-5, Bighorn Subdivision, Resub of Lot 20
Applicant: Timothy C. Parks, represented by Miramonti Architect PC
MOTION: SECOND: VOTE:
Conceptual - no vote.
11. Vail Village Inn DRB03-0190 Matt
Final review of proposed repaint
100 E. Meadow Drive, Lot 0, Block 5D
Applicant: Village Inn Plaza Phase V Condo Assoc
MOTION: Bill SECOND: David VOTE: 4-0
Tabled to July 16, 2003.
Staff Approvals
La Cantina DRB03-0206 Allison
1 Display Box and 2 window signs
241 E. Meadow DrivelTract B&C, Block 5D, Vail Village 1St Filing
Applicant: Richard Wheelark
Village Center DRB03-0224 Judy
Temporary site development sign
122 E. Meadow Drive/Lot K, Block 5E, Vail Village 1St Filing
Applicant: Village Center Association
Klinga/Birch residence DRB03-0220 Elisabeth
Re-roof
1773 Shasta Place/Lot 13, Vail Village West 2"d Filing
Applicant: Kathy Birch
Hyatt residence DRB03-0230 Allison
Deck extension
1200 Ptarmigan Road/Lot 1A, Block B, Vail Village 7th Filing
Applicant: Eileen Hyatt
Slifer Designs DRB03-021.5 Judy
New sign
230 Bridge Street/Lot B, Block 5, Vail Village 1St Filing
Applicant: Slifer Designs
Christiania DRB03-0229 Judy
Replace fire damage same for same and paver path addition
356 Hanson Ranch Road/Christiania
Applicant: Christiania Lodge
Sunwood at Vail Condos DRB03-0195 Elisabeth
Deck reconstruction
4507 Meadow Drive/Sunwood at Vail
Applicant: Sunwood at Vail Condo Association
Vail Resorts DRB03-0132 Warren
Facility wash
862 S Frontage Rd. West/Unplatted
Applicant: Vail Corp
Dyroff residence DRB03-0182 Warren
Addition, landscape improvements
1451 Buffehr Creek/Lot 6, Cliffside
Applicant: Matthew C. Dyroff
Ford Park School House DRB03-0237 Judy
Re-roof
841 Vail Valley Drive/Vail Village 7th Filing
Applicant: Town of Vail
Glenn residence DRB03-0243 Allison
Wall addition
2389 Chamonix Road/Lot 16, Vail das Schone 1St Filing
Applicant: Joanne Glenn
Hannen residence DRB03-0239 Warren
Addition
4
Millrace Condos, 1320 Westhaven Drive/Cascade Village
Applicant: Kevin Hannen
Rigney residence DRB03-0202 Matt
Window & skylight addition'
Lodge at Vail, 402&404, 174 E. Gore Creek Drive/Lots A,B&C, Block 5C, Vail Village 1St Filing
Applicant: Lee & Heidi Rigney
West Vail Mall DRB03-0216
Delete awnings
2171 N Frontage Rd West/Lot 2A, Vail das Schone 3~d Filing
Applicant: West Vail Mall Corp
Village Center DRB03-0218
New skylights
122 E Meadow Drive/Lot K, Block 5E, Vail Village 1St Filing
Applicant: Stanley & Cecil Schocket
Village Center DRB03-0219
New skylights
122 E Meadow Drive/Lot K, Block 5E, Vail Village 1St Filing
Applicant: Banner Properties Inc
Gore Creek Meadows DRB03-0233
Re-roof
5020 Meadow Drive/Unplatted
Applicant: Gore Creek Meadows Association
Walker residence DRB03-0238
Replace deck
5089 Gore Circle/Lot 9, Block 2, Bighorn Stn Addition
Applicant: Steven A. Walker
Evergreen Lodge DRB03-0214
Re-paint same-for-same
250 S Frontage Rd West/Lot 2, Block 1, Vail Lionshead 2"d Filing
Applicant: Evergreen Lodge at Vail LTD
Cohen/Joss residence DRB03-0244
Re-roof
1467 Greenhill Court/Lot 10, Glen Lyon Subdivision
Applicant: Ellenore Joint Ventures
Vail International DRB03-0160
Landscaping addition
300 E. Lionshead Circle/Lot 4, Block 1, Vail Lionshead 2"d Filing
Applicant: Vaillnternational
George
Bill
Bill
Elisabeth
Allison
Allison
Judy
Matt
The applications and information about the proposals are available for public inspection during
regular office hours in the project planner's office, located at the Town of Vail Community
5
Development Department, 75 South Frontage Road. Please call 479-2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479-
2356,Telephone for the Hearing Impaired, for information.