HomeMy WebLinkAbout2004-09-07 Support Documentation Town Council Work SessionTOWN OF VAIL
WORK SESSION AGENDA
1:00 P.M., SEPTEMBER 7, 2004
VAIL TOWN COUNCIL CHAMBERS
75 S. Frontage Road W.
Vail, CO 81657
NOTE: Times of items are approximate, subject to change, and
cannot be relied upon to determine at what time Council
will consider an item.
1. George Ruther ITEM/TOPIC: PEC/DRB Update (10 min.)
2. John "JP" Power ITEM/TOPIC: Compensation and Benefits Study Follow-Up.
(30 min.)
3• ITEM/TOPIC: Information Update (10 min.)
4• ITEM/TOPIC: Matters from Mayor & Council (10 min.)
5. Matt Mire ITEM/TOPIC: Executive Session. (1 hr.)
- Conference.w/ attorney and negotiations Re: Gore Creek
Place and Lionshead Development .Improvement
Agreement. Pursuant to C.R.S. 24-6-402(4)(b)(e)
- Litigation Update C.R.S. 24-6-402(4)(b).
7• ITEM/TOPIC: Adjournment (3:00 P.M.)
NOTE UPCOMING MEETING START TIMES BELOW:
(ALL TIMES ARE APPROXIMATE AND.SUBJECT TO CHANGE)
THE NEXT VAIL TOWN COUNCIL REGULAR WORK SESSION
WILL BEGIN AT 12:00 NOON, TUESDAY, SEPTEMBER 21, 2004 IN THE VAIL TOWN
COUNCIL CHAMBERS.
Sign language interpretation available upon request with 24-hour notification. Please call
479-2106 voice or 479-2356 TDD for information.
PLANNING AND ENVIRONMENTAL COMMISSION
"' ' PUBLIC MEETING
~~~~~ , Monday, August 23, 2004
PROJECT ORIENTATION -Community Development Dept. PUBLIC WELCOME 12:00 pm
MEMBERS PRESENT
Ann Gunion
David Viele
Chas Bernhardt
Doug Cahill
George Lamb
Rollie Kjesbo
Bill Jewitt
MEMBERS ABSENT
Site Visits:
1. Lionshead Core Site Hotel - 675 Lionshead Place
2. Marriott Hotel -790 West Lionshead Circle
3. Verizon Wireless - 501 North Frontage Road
4. Nico Vail - 100 East Meadow Drive
Driver: George
Note: If the PEC hearing extends until 6:00 p.m., the Commission may break for dinner from 6:00 - 6:30 p.m.
Public Hearing -Town Council Chambers
2:00 pm
1. A request for a conditional use permit, pursuant to Section 12-7B-5B, Permitted and Conditional
Uses; Above Second Floor, Vail Town Code, to allow for the elimination of an existing dwelling unit,
126 Willow Bridge Road, Units 3A and 3B (Village Center Building A)/Lot K, Block 5, Vail. Village
Filing 1, and setting forth details in regard thereto.
Applicant: James L. Vincent, represented by K. H. Webb Architects
Planner: Matt Gennett
ACTION: Approved
MOTION: Bernhardt SECOND: Lamb VOTE: 6-0 (Kjesbo recused)
Matt Gennett gave a presentation per the staff memorandum. Bill Jewitt echoed staff's concern
with the loss of units within the Town of Vail. Doug Cahill agrees with Bill Jewitt but he feels the
combination will more in keeping with the Town of Vail's development objectives, including parking
capacity, as stated in the staff memorandum.
2. A request for a conditional use permit, pursuant to Sections 12-7H-2, Permitted and Conditional
Uses; Basement or Garden Level, and Section 12-7H-3, Permitted and Conditional Uses; First
Floor or Street Level, Vail Town Code, to allow for a conversion of existing lodge space to
conference facilities and meeting rooms/Lots 4 & 7, Marriott Subdivision and Lots C and D,
Morcus Subdivision, and setting forth details in regard thereto.
Applicant: Vail Corporation, represented by Mauriello Planning Group, LLC
Planner: Warren Campbell
ACTION: Approved
MOTION: Kjesbo SECOND: Lamb . VOTE: 7-0-0
Warren Campbell gave a presentation perthe staff memorandum. Dominic Mauriello gave a brief
presentation on behalf of the applicant. Bill Jewitt stated he is glad the tent will be gone. George
Lamb agreed with Bill Jewitt.
3. A request for a conditional use permit, pursuant to Section 12-6H-3, Conditional Uses;
High Density Multiple Family, Vail Town Code, to allow for a public utility and public services
use, located at 501 North Frontage Road (Solar Vail Condominiums)/Lot 8, Block 2, Vail Potato
Patch Filing 1, and setting forth details in regard to.
Applicant: Verizon Wireless, represented by Kelley Harrison, Closser Consulting
Planner: Bill Gibson
ACTION: Approved with conditions
MOTION: Kjesbo SECOND: Lamb VOTE: 7-0-0
CONDITIONS:
1) The applicant shall use only non-combustible materials in the construction of the screen
wall and ladder enclosure. Revised plans for review by the Design Review Board shall be
submitted no later than September 31, 2004.
Bill Gibson made a presentation per the staff memorandum. The Commission inquired of the
applicant as to the future expansion needs of cellular equipment. Mr. Klosser, the applicant, stated
that he could not speak to future needs, but this application would allow for the addition of greater
carrying capacity for Verizon.
4. A request for a conditional use permit, pursuant to Section 12-7A-3, Conditional Uses, Vail
Town Code, to allow for a business office, located at 100 East Meadow Drive, Units 16 and 17
(Vail Village Plaza)/Lot O, Block 5D, Vail Village Filing 1, and setting forth details in regard
thereto.
Applicant: Nico Vail, Inc., represented by John Slevin
Planner: Bill Gibson
ACTION: Denied (motion to approve failed due to tie vote)
MOTION: Viele SECOND: Gunion VOTE: 3-3-1 (Lamb abstained)
Bill Gibson gave a presentation per the staff memorandum.
Jay Peterson gave a presentation on behalf of the applicant. He noted that the Public
Accommodation zone district purpose statement anticipated real estate sales offices and that these
uses are an essential part of Vail's economy.
Kaye Ferry, representing the Vail Business Chamber, spoke to the fact that a real estate office off
of a first floor/pedestrian level space is not the direction this Town should take as first floor offices
have been a detriment in other resort communities and this would be a detrimental precedent to
set.
Jim Lamont referred to a study which was done in Aspen regarding the impacts of unrestricted real
estates offices in a community. He asked Russ Forrest to provide a copy of this study to the
Planning and Environmental Commission. Jim Lamont suggested placing a condition on the
application which would allow the office until the development objects had occurred. Once
redevelopment had occurred this would become a major retail area along East Meadow Drive.
Several Commissioners expressed the appropriateness of the use at this time and the need to fill
vacant store fronts. However, some Commissioners expressed concerns that long term this may
not be appropriate given the retail nature of the Sonneanalp redevelopment along Meadow Drive .
Bill Jewitt and Rollie Kjesbo stated that they opposed the application as it does not meet the
development objectives of the Town. George Lamb expressed concerns over the "tying" of the one
necessary parking space to the tenant space in question.
2
John Slevin, the applicant, stated that real estate sales are a form of retail sale and noted that this
is only an 850 square feet tenant space. He stated that a condition allowing the use for 10 years
may be acceptable, but a limit of 5 years will not be a financially viable option.
5. A request for a final review of a major exterior alteration or modification, pursuant to Section
12-7H-7, Vail Town Code, and a request for a final review of a conditional use permit, pursuant
to Chapter 12-16, Vail Town Code, to allow for the construction of the Lionshead Core Site
Hotel and the operation on a new private skier club, new lodge dwelling units and conference
facilities and meeting rooms on the first floor or street level floor of a structure, located at 675
Lionshead Place (a complete legal description is available for inspection at the Town of Vail
Community Development Department upon request).
Applicant: Vail Corporation
Planner: George Ruther
ACTION: Tabled to September 13, 2004
MOTION: SECOND: VOTE:
CONDITIONS:
George Ruther gave a presentation per the staff memorandum dated August 23, 2004. The
Commission then reviewed a 3-D model presentation of the proposed development process.
6. A request for a final review of a major amendment to a special development district (SDD),
pursuant to Section 12-9A-10, Amendment Procedures, Vail Town Code, to allow for an
amendment to SDD #6, Vail Village Inn, to allow for the conversion of existing common area to
new gross residential floor area (GRFA), located at 68 East Meadow Drive/Lot O, Block 5D, Vail
Village Filing 1, and setting forth details in regard thereto.
Applicant: Carlos Rojas
Planner: Matt Gennett
ACTION: Tabled to September 13, 2004
7. A request for a recommendation to the Vail Town Council for the establishment of Special
Development District No. 38, Manor Vail Lodge, to allow for the redevelopment of the Manor
Vail Lodge, and a request for a conditional use permit to allow for the construction of Type III
Employee Housing Units, pursuant to Section 12-6H-3, Vail Town Code, and a request for a
conditional use permit, pursuant to Chapter 12-6H-3, Public or Commercial Parking Facilities
or Structures, Vail Town Code, to allow for the sale of 30 parking spaces, located at 595 Vail
Valley Drive/Lots A, B, & C, Vail Village 7th Filing, and setting forth details in regard thereto.
Applicant: Manor Vail, represented by Zehren and Associates
Planner: Warren Campbell
ACTION: Tabled to September 13, 2004
8. A request for a final review of a minor subdivision, pursuant to Chapter 13-4, Minor Subdivisions,
Vail Town Code, to amend the locations of the existing building envelopes; and a final review of a
variance from Section 12-21-10, Development Restricted, Vail Town Code, to allow for construction
on slopes of 40% or greater, located at 1390 Buffehr Creek Road/Lots A, B, C, and D, Residences
at Briar Patch, and setting forth details in regard thereto.
Applicant: Residences of Briar Patch Homeowner Association, represented by Zehren and
Associates
Planner: Bill Gibson
ACTION: Tabled to September 13, 2004
3
9. A request for a final review of a minor exterior alteration, pursuant to Section 12-7A-12, Exterior
Alterations or Modifications, Vail Town Code, to construct an enclosure for King Ludwig's patio,
located at 20 Vail Road (Sonnenalp Resort of Vail)/Lot L, Block 5-E, Vail Village Filing 1, and setting
forth details in regard thereto.
Applicant: Sonnenalp Resort of Vail, represented by Resort Design Associates
Planner: Elisabeth Eckel
ACTION: Withdrawn
10. Approval of Minutes
11. Information Update
Chamonix Master Planning Process
Suzanne Silverthorn
The applications and information about the proposals are available for public inspection during regular
office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The
public is invited to attend the project orientation and the site visits that precede the public hearing in the
Town of Vail Community Development Department. Please call (970) 479-2138 for additional
information.
Sign language interpretation is available upon request with 24-hour notification. Please call (970)
479-2356, Telephone for the Hearing Impaired, for information.
Community Development Department
Published August 18, 2004 in the Vail Daily.
4
DESIGN REVIEW BOARD AGENDA
August 18, 2004
WNOF~VA~ ~ 3:00 P.M.
PUBLIC MEETING
PUBLIC WELCOME
PROJECT ORIENTATION /LUNCH -Community Development Department
MEMBERS PRESENT
MEMBERS ABSENT
Pete Dunning
Joe Hanlon
Diana Mathias
Bill Pierce
Margaret Rogers
SITE VISITS
1. Marks Residence - 2685 Bald Mountain Road
2. Sonnenalp - 20 Vail Road
3. Marriott Parking Structure - 790 West Lionshead Circle
4. Rogers Residence - 799 A&B Potato Patch Drive
5. Schumacher Residence - 755 East Potato Patch Drive
6. Vail Heights Condominium Association - 2059 Chamonix Lane
7. Vail Mountain Lodge --352 East Meadow Drive
Driver: George
12:OOpm
1:30pm
PUBLIC HEARING -TOWN COUNCIL CHAMBERS 3:OOpm
1. Swearing in of Pete Dunning by Lorelei Donaldson, Town` Clerk
Mr. Dunning was sworn in after the consent agenda was approved which is why there is a vote of 4-0-0
on several agenda items.
2. Lionshead Core Site Hotel DR604-0305 George
Final review of a major exterior alteration
675 Lionshead Place/(a complete legal description is available for inspection at the Town of Vail
Community Development Department upon request).
Applicant: Vail Resorts Development Company, represented by Braun Associates, Inc .
ACTION: Tabled to September 1, 2004 .
MOTION: Rogers SECOND: Mathias VOTE: 5-0-0
CONDITION(S):
3. Lionshead Core Site Hotel DR604-0416 George
Final review of utility project and temporary landscape modifications
675 Lionshead Place/(a complete legal description is available for inspection at the Town of Vail
Community Development Department upon request).
Applicant: Vail Resorts Development Company, .represented by Mauriello Planning Group, Ltd.
ACTION: Approved
MOTION: Rogers SECOND: Hanlon VOTE:5-0-0
4. Marks Residence DR604-0342
Final review of a minor alteration
2685 Bald Mountain Road/Lot 8, Block 1, Vail Village Filing 13
Applicant: Susan Marks
ACTION: Denied
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
5. Hubbard / Schmid Residence DRB04-0330
Final review of new construction
2683 Cortina Lane/Lot 7, Block A, Vail Ridge
Applicant: Trent Hubbard / Stefan Schmid, represented by John G. Martin, Architect, LLC
ACTION: Approved
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
6. Sonnenalp /King Ludwig's Restaurant DRB04-0345
Conceptual review of a minor alteration
20 Vail Road/Lot L, Block 5E, Vail Village Filing 1
Applicant: Resort Design Associates
ACTION: Conceptual - No vote
7. Schumacher Residence DRB04-0353
Final review of plans for a residential addition
775 Potato Patch Drive/Lot 19, Block 1, Vail Potato Patch
Applicant: Randolph Schumacher, represented by Daniel Frederick
ACTION: Conceptual - No vote
8. Vail Heights Condominium Association DR604-0336
Final review of a minor alteration
2059 Chamonix Lane/Lot 76, Vail Heights
Applicant: Vail Heights Condominium Association Phase 111
ACTION: Tabled to September 1, 2004
MOTION: Hanlon SECOND: Rogers VOTE: 5-0-0
Bill
Bill
Elisabeth
Elisabeth
Warren
9. Cogswell Residence DRB04-0308 Elisabeth
Final review of a minor alteration
1090 Vail View Drive, Uriit 14/Lot B1, Block B, Lions Ridge Filing 1
Applicant: John Cogswell
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITION(S):
1) The applicant shall match all proposed materials to existing materials at the time of
construction.
10. Lionshead Arcade Condominium Association DRB04-0393 Elisabeth
Final review of changes to approved plans
531 East Lionshead Circle/Lot 3, Block 1, Vail Lionshead Filing 1
Applicant: Lionshead Arcade Condominium Association, represented by Fritzlen Pierce
Architects
ACTION: Tabled to September 1, 2004
MOTION: Mathias SECOND: Dunning VOTE: 4-0-1 (Pierce Recused)
v
11. Vail Mountain Lodge DRB04-0340 Elisabeth
Final review of change to approved plans
352 East Meadow Drive/Lot Tract B, Vail Village Filing 1
Applicant: Zehren and Associates, tnc.
ACTION: Denied
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
12. Marriott Hotel DRB04-0399 Warren
Final review of minor alteration
790 West Lionshead Circle/ Lots 4 & 7, Marriott Subdivision and Lots C and D, Morcus Subdivision
Applicant: VAMHC Inc., represented by Mauriello Planning Group, LLC
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
CONDITION(S): _
1) The applicant shall match the dimensions of the new columns to those existing and a minimum
of a 14 inch dimension must be present from the face of the columns to the face of the glass
window system. Revised plans depicting these revisions shall be submitted to staff for review
and approval prior to submitting for a building permit.
13. Haley Residence DRB04-0392 _ . Elisabeth
Final review of minor alteration
3988 Lupine Drive/Lot 2A, .Block 2, Bighorn 1S` Addition
Applicant: Valerie Haley, represented by Plath Construction, Inc.
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITON(S): .
1) The applicant shall use the thicker of the two available metal shingle roofing systems at the
time of construction.
14. Schubert Residence DRB04-0388 Elisabeth
Final review of minor alteration
1457 Green Nill Court/Lot 5 Glen Lyon
Applicant: Fred and Maria Schubert, represented by TCC Roofing
ACTION: Tabled to September 1, 2004
MOTION: Hanlon SECOND: Dunning VOTE: 5-0-0
15. Meyer Residence DRB04-0387 Elisabeth
Final review of minor alteration
4424 Streamside Circle East/Lot 10A, Bighorn 4'h Addition
Applicant: John and Victoria Meyer, represented by Enis Moran
.ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITON(S):
1) The applicant shall paint the existing railings on the west side of the duplex to match the
railings on the east side of the duplex and shall construct the railings on the rear of the west side
to match those on the front side of the duplex in style and color; all work to be done prior to final
inspection.
16. Duncan Residence DR604-0407 Elisabeth
Final review of minor alteration
767 Potato Patch/Lot 27, Block 1, Vail Potato Patch
Applicant: Raymond T. Duncan, represented by Plath Construction
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITON(S):
1) The applicant shall use the thicker of the two available metal shingle roofing systems at the
time of construction.
17. Rogers Residence DRB04-0352 Matt
Final review of plans of a residential addition
799 A&B Potato Patch Drive/Lot 28, Block 1, Vail Potato Patch
Applicant: Architectural Services, represented by Danny Swertfeger
ACTION: Approved with condition(s)
MOTION: Mathias SECOND: Dunning VOTE: 4-0-1 (Rogers recused)
CONDITIONS:
1) The applicant shall have the chimneys be finished with the approved stucco color at the time of
work.
18. Vail Viking, Ltd. DRB04-0386
Conceptual review of new construction
4916 Juniper Lane/Lot 4, Block 5, Bighorn 5th Addition
Applicant; .Vail Viking Ltd., represented by Fritzlen Pierce Architects
ACTION: Conceptual - No vote
19. Children's Garden of Learning DRB04-0415
Final review of minor alteration
129 North Frontage Road/Mountain Bell
Applicant: Children's Garden of Learning
ACTION: Approved with no conditions
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
20. Bailey Residence DR604-0262
Conceptual review of a residential addition.
4257 Nugget Lane/Lot 1, Bighorn Estates a resubdivision of Lots 10 & 11
Bighorn Estates
Applicant: Jim Bailey, represented by Gwathmey Pratt Schultz Architects
ACTION: Conceptual - No vote.
21. Tyrolean Chalet, LLC DRB04-0338
Final review of a minor exterior alteration
400 East Meadow Drive, Unit 9/Lot 5D, Block 5, Vail Village Filing 1
Applicant: Tyrolean Chalet, LLC, represented by Suman Architect
Tabled to September 1, 2004
22. Wester Residence DR604-0312
Final review of a minor alteration
4301 Columbine Drive, Unit D/Lots D&E, Village on Bighorn Creek
Applicant: Paul Wester, represented by Woods of Old Millworks
Tabled to September 1, 2004
Matt
Matt
Elisabeth
Matt
Elisabeth
23. Harvey / Navas Residence DR604-0404 Bill
Final review of change to approved plans
2610 Bald Mountain Road/Lot 32, Block 3, Vail Village Filing 13
Applicant: Libby Harvey
Tabled to September 1, 2004
24. Telemark Townhomes DR604-0278 Elisabeth
Final review of a minor alteration
1090 Vail View Drive and 1083 Lions Ridge Loop/Lot 61, Block B, Lions Ridge Filing 1
Applicant: Telemark Townhome Association
WITHDRAWN
25. Timberfalls Swimming Pool House DR604-0245
Final review of a minor alteration
4500 Timberfalls Court/unplatted
Applicant: Karl Edgerton
WITHDRAWN
Staff Approvals
Faling Residence DRB04-0354
Final review of minor alteration
2883 KinnikinnicWBlock 4, Vail Intermountain
Applicant: PDQ Enterprises, Inc.
Stempler Residence DRB04-0348
Final review of minor alteration .
1046 Homestake Circle/Lot 4, Block 6, Vail Village Filing 7
Applicant: Gerald Stempler represented by A Cut Above Forestry
Hawkwood Inc. DR604-0355
Final review of changes to approved plans
483 Gore Creek Drive/Lot S, Vail Village Filing 4
Applicant: Ned Gwathmey
Seven Vails Corporation DRB04-0375
Final review of a minor alteration
1837 Alpine Drive/Lot 49, Vail Village West Filing 1
Applicant: Pepper Etters
Richmond Residence DRB041-0136
Final review of changes to approved plans
1090 Vail View Drive, Unit 3/Lot B1, Telemark Townhouse
Applicant: Horst and Wilda Richmond
Fischer Residence DRB04-0341
Final review of a minor alteration ~
2457 Chamonix/Lot 14, Block C, Vail Das Schone Filingl
Applicant: Bruce Fischer
Elisabeth
Joe
Clare
Elisabeth
Elisabeth
Bill
Elisabeth
Carlson Residence DRB04-0343
Final review of changes to approved plans
1094 Riva Glen/Lot 4, Spraddle Creek Subdivision
Applicant: Jay Carlson
Talisman Condominiums DRB04-0347
Final review of a minor alteration
62 East Meadow Drive/Part of Lots I&K, Block 5E, Vail Village Filing 1
Applicant: Talisman Condominium Association represented b Frederick Haynes
Purchase Residence DR604-0350
Final review of changes to approved plans
1310 Greenhill Court/Lot 17, Glen Lyon subdivision
Applicant: Michael Lauterbach
Godwin Residence DRB04-0364
Final review of minor alteration
586 Forest Road, Unit A/Lot 3A, Block 1, Vail Village Filing 6
Applicant: Donald and Carmen Godwin represented by Nedbo Construction
Weltner Residence DRB04-0377
Final review of changes to approved plans
1260 Westhaven Circle/Lot 29, Parcel A&B, Glen Lyon
Sample Residence DR604-0369
Final review of a residential addition
1881 Lions Ridge Loop/Lot 13D, Block 3, Lions Ridge Filing 3
Applicant: Michael Sample
Kronenberg Residence DR604-0366
Final review of a residential addition
1881 Lions Ridge Loop, Unit 5/Lot 5D, Block 3, Lions Ridge Filing 3
Applicant: Mike and Jennifer Kronenberg
Antonius Residence DR604-0365
Final review of a residential addition
1881 Lions Ridge Loop/Lot 7D, Block 3, Lions Ridge Filing 3
Applicant: Jeffrey Antonius
Frampton Residence DRB04-0357
Final review of change to approved plans
14 Beaver Dam Road/Lot 34, Block 7, Vail Village Filing 1
Applicant: Susan and Harry Frampton represented by Piper Architecture
Gorsuch Residence DRB04-0372
Final review of change to approved plans
1193 Cabin Circle%Lot 4, Block 2, Vail Valley
Applicant: David and Renie Gorsuch, represented by Resort Design Associates
Matt
George
Matt
Elisabeth
Warren
Warren
Warren
Warren
Bill
Bill
Schumacher Residence DR604-0409 Joe
Final review of minor alteration
775 Potato Patch East/Lot 19, Block 1, Vail Potato Patch
Applicant: Randy Schumacher represented by Master Sealers
Saalfeld Residence DRB04-0383 Warren
Final review of change to approved plans
2478 Garmisch Drive/Lot 27, Block A, Vail Das Schone Filing 1
Applicant: Tom and Kim Saalfeld
Leever Residence DR604-0397 Warren
Final review of change to approved plans
1397 Vail Valley Drive/Lot 6, Vail Valley Filing 1
Applicant: Mr. and Mrs. Daniel Leever, represented by Custom Mountain Architects
Marriott Parking Structure DR604-0351 Warren
Final. review of change to approved plans
790 West Lionshead Circle/Lots A,B,C, Morcus Subdivision
Applicant: Vail Corporation, represented by Mauriello Planning Group
Robinson /Scott Residence DR604-0410
Final review of minor alteration
3964 Bighorn Road/Lot 5E, Gore Creek Park
Applicant: John Robinson and Doug Scott
Joe
The applications and information about the proposals are available for public inspection during regular office
hours in the project planner's office, located at the Town of Vail Community Development Department, 75
South Frontage Road. Please call 479-2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479-2356,
Telephone for the Hearing Impaired, for information.
~J
DESIGN REVIEW BOARD AGENDA
,' September 1, 2004
~}~~~ , 3:00 P.M.
PUBLIC MEETING
PUBLIC WELCOME
PROJECT ORIENTATION /LUNCH -Community Development Department
MEMBERS PRESENT
Peter Dunning
Joe Hanlon
Diana Mathias
Bill Pierce
Margaret Rogers
SITE VISITS
MEMBERS ABSENT
1. Affa Residence - 4094 Lupine Drive
2. King Residence - 272 West Meadow Drove
3. Link Residence - 3977 Lupine Drive
4. Schubert Residence -1457 Green Hill Court
5. Rickman Residence -1495 Lionsridge Loop
6. Concert Hall Plaza - 616 West Lionshead Circle
7. Bigos Residence -1834A Glacier Court
8. Lionshead Core Site Hotel - 675 Lionshead Place
9. Vail Viking Ltd - 4916 Juniper Lane
10. Tyrolean Chalet - 400 East Meadow Drive
Driver: George
PUBLIC HEARING -TOWN COUNCIL CHAMGERS
1. Affa Residence DRB04-0422
Conceptual review of a residential addition
4094 Lupine Drive/Lot 5, Bighorn Subdivision
Applicant: Roger and Marlyn Affa, represented by JMP Architects, Inc.
Conceptual review: no vote
2. King Residence DRB04-0420
Final review of a residential addition
272 West Meadow Drive/Lot 9, Vail Village Filing 2
Applicant: James V. King, Jr., represented by Beth Levine, Architect
Approved with no conditions
MOTION: Rogers SECOND: Hanlon
VOTE: 5-0-0
11:30am
1:OOpm
3:OOpm
Bill
Bill
~,
3. Link Residence DR604-0423 Bill
Final review of a minor alteration
3977 Lupine Drive/Lot A, Block 1, Bighorn Subdivision Addition 1
Applicant: Patricia Link, represented by A Cut Above Forestry
Approved with no conditions
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
4. Schubert Residence DR604-0388 Elisabeth
Final review of a minor alteration
1457 Green Hill Court/Lot 5 Glen Lyon
Applicant: Fred and Maria Schubert, represented by TCC Roofing
Tabled to September 15, 2004
MOTION: Rogers SECOND: Dunning VOTE: 5-0-0
5. Rickman Residence DR604-0400 Matt
Final review of a minor alteration
1495 Lionsridge Loop/Lot 2, Block 3, Lionsridge Filling 2
Applicant: Patricia Rickman, represented by VMDA
Tabled to September 15, 2004
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
6. Concert Hall Plaza DRB04-0394 Matt
Final review of minor alteration
616 West Lionshead Circle/Lot 1, Block 1, Vail Lionshead
Applicant: Kim Hughes, represented by O'Bryan Partnership Architects
ACTION: Approved with conditions
MOTION: Rogers SECOND: Hanlon VOTE:.5-0-0
CONDITON(S):
1. That the applicant only has approval to repaint the exterior of the building the proposed body
color ("Willow Mist") and repaint the interior with their proposed color ("Chenille White") in
association with this application.
2. That the applicant does not have approval to construct the proposed timber/stonelcanvas entry
structures in association with is approval.
7. Bigos Residence DRB04-0413 Elisabeth
Final review of a minor alteration
1834A Glacier Court/Lot 23, Block 2, Lion's Ridge Filing 3
Applicant: James J. Bigos
ACTION: Approved with one condition
MOTION: Rogers SECOND: Dunning VOTE: 5-0-0
CONDITION(S):
1. That the applicant replace the cottonwood trees to be removed with 4 - 2'/z "caliper aspen
trees in the approximate places marked on the applicant's site plan, to the east of the existing
driveway.
r
8. Lionshead Core Site Hotel DRB04-0305 ~ George
Final review of a major exterior alteration
675 Lionshead Place/(a complete legal description is available for inspection at the Town of Vail
Community Development Department upon request).
Applicant: Vail Resorts Development Company, represented by Braun Associates, Inc.
ACTION: Table to September 15, 2004
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
9. Vail Viking Ltd. DRB04-0395 Matt
Final review of new construction
4916 Juniper Lane/Lot 4, Block 5, Bighorn 5"' Addition
Applicant:. Vail Viking Ltd., represented by Fritzlen Pierce Architects
ACTION: Approved with no conditions
MOTION: Mathias SECOND: Hanlon VOTE: 4-0-1
CONDITON(S): (Pierce recused)
10. Tyrolean Chalet, LLC DR604-0338
Final review of a minor exterior alteration
400 East Meadow Drive, Unit 9/Lot 5D, Block 5, Vail Village Filing 1
Applicant: Tyrolean Chalet, LLC, represented by Suman Architect
WITHDRAWN
11. Wester Residence DRB04-0312
Final review of a minor alteration
4301 Columbine Drive, Unit D/Lots D&E, Village on Bighorn Creek
Applicant: Paul Wester, represented by Woods of Old Millworks
WITHDRAWN
12. Schumacher Residence DRB04-0353
Final review of plans for a residential addition
775 Potato Patch Drive/Lot 19, Block 1, Vail Potato Patch
Applicant: Randolph Schumacher, represented by Daniel Frederick
WITHDRAWN
Staff Approvals
Kelleher Residence DR604-0370
Final review of minor alteration
2005A West Gore Creek Drive, Casa del Sol
Applicant: John and Cynthia Kelleher
Mertons Residence DRB04-0378
Final review of minor alteration
5112 Grouse Lane/Lot 8, Vail Meadows Filing 1
Applicant: Dave Mertons represented by A Professional Service, Co.
Caster Residence DR604-0398
Final review of minor alteration
2490 Bald Mountain Road/Lot 17, Block 2, Vail Village
Applicant: Mary Caster represented by Master Sealers, Inc.
Matt
Elisabeth
Elisabeth
Joe
Joe
Joe
!,
Rechter Residence DRB04-0384 Warren
Final review of change to approved plans
4917 Juniper Lane/Lot 5, Block 4, Bighorn 5~' Addition
Applicant: Samuel Rechter, represented by Duane Piper
Harvey Residence DRB04-0404 Bill
Final review of a minor alteration
2610 Bald Mountain Road/Lot 32, Block 2, Vail Village 13th Filing
Applicant: Libby Harvey
Pearson Residence DRB04-0371 Bill
Final review of a residential addition
303 Gore Creek Drive, Unit 2A/Lot 2, Block 5, Vail Village Filing 1
Applicant: Gregory Bartock
Harris Residence DRB04-0358 Bill
Final review of plans for minor alteration
2528 Arosa Drive/Lot 7, Block C, Vail Das Schone Filing 1
Applicant: Burke Harrington Construction
Lionshead Arcade Condominium Association DR604-0393 Elisabeth
Final review of changes to approved plans
531 East Lionshead Circle/Lot 3, Block 1, Vail Lionshead Filing 1
Applicant: Lionshead Arcade Condominium Association, represented by Fritzlen Pierce
Architects
Krohn Residence DR604-0402 Elisabeth
Final review of minor alteration
2771 Kinnikinnick Road, Unit 7E/Lot 2, Block 4, Columbine North, Vail Intermountain
Applicant: Michael D. Krohn
RAD 4 Colorado, LLC DRB04-0363 Matt
Final review of a residential addition
4475 Gten Falls Lane/Lot 7, Forest Glen Subdivision
Applicant: RAD 4 Construction, represented by Nott Design Construction, Inc.
Verizon Wireless DR604-0208 Bill
Final review of a minor alteration
501 North Frontage Road/Lot 86, Block 2, Vail Potato Patch Filing 1
Applicant: Verizon Wireless, represented by Closser Consulting
English & Associates, LTD. DRB04-0380
Final review of change to approved plans
265 Forest Road/Lot 21, Block 7, Vail Village Filing 1
Applicant: English & Associates, LTD.
Matt
Robason Residence DR604-0385 Matt
Final review of change to approved plans
1139 Sandstone Drive/Lot 5, Indian Creek Townhomes
Applicant: Randy and Donna Robason, represented by Steven Riden, AIA, Architect, P.C.
Pal Residence DRB04-0389 Matt
Final review of change to approve plans
254 Beaver Dam Road/Lot 23, Block 7, Vail Village Filing 1
Applicant: Joe Pal represented, by Steven Riden, AIA, Architect, P.C.
Richmond Residence DRB04-0136
Final review of change to approved plans
1090 Vail View Drive, Unit 3/Lot 61, Telemark Townhomes
Applicant: Horst and Wilda Richmond
Bill
Martin Residence DRB04-0379 Elisabeth
Final review of a minor alteration
26736 Cortina Lane/Lot 6B, Block A, Vail Ridge
Applicant: Patrick F. Martin, represented by Mauriello Planning Group, LLC
Vail Heights Condominium Association DR604-0336
Final review of a minor alteration
2059 Chamonix Lane/Lot 76, Vail Heights
Applicant: Vail Heights Condominium Association Phase III
Town of Vail Picnic Tables DR604-0440
Final review of a minor alteration
Town of Vail Parks (Donovan, Buffher, Sandstone)
Applicant: Town of Vail
Sodergren Residence DR604-0441
Final review of a minor alteration
2449 Arosa Drive/Lot13, Block C, Vail Das Schone
Applicant: Brian and Paige Sodergren
Beck Residence DRB04-0376
Final review of a residential addition
1522 Buffehr Creek Road, Unit D42/Tract C, Valley Condo
Applicant: Kevin Beck
Town of Vail Public Works Shops DRB04-0427
Final review of change to approved plans
1289 Elkhorn Drive/Unplatted
Applicant: Town of Vail, represented by John Gallegos
Warren
Joe
Joe
Warren
Elisabeth
The applications and information about the proposals are available for public inspection during regular office
hours in the project planner's office, located at the Town of Vail Community Development Department, 75
South Frontage Road. Please call 479-2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479-2356,
Telephone for the Hearing Impaired, for information:
~ ,.
DESIGN REVIEW BOARD AGENDA
August 18, 2004
~N~F ~YI~L , 3:00 P.M.
PUBLIC MEETING
PUBLIC WELCOME
PROJECT ORIENTATION /LUNCH -Community Development Department
MEMBERS PRESENT
Pete Dunning
Joe Hanlon
Diana Mathias
Bill Pierce
Margaret Rogers
MEMBERS ABSENT
SITE VISITS
1. Marks Residence - 2685 Bald Mountain Road
2. Sonnenalp - 20 Vail Road
3. Marriott Parking Structure - 790 West Lionshead Circle
4. Rogers Residence - 799 A&B Potato Patch Drive
5. Schumacher Residence - 755 East Potato Patch Drive
6. Vail Heights Condominium Association - 2059 Chamonix Lane
7. Vail Mountain Lodge - 352 East Meadow-Drive
12:OOpm
1:30pm
Driver: George
PUBLIC HEARING -TOWN COUNCIL CHAMBERS
3:OOpm
Swearing in of Pete Dunning by Lorelei Donaldson, Town` Clerk
Mr: Dunning was sworn in after the consent agenda was approved which is why there is a vote of 4-0-0
on several agenda items.
2. Lionshead Core Site Hotel DR604-0305 George
Final review of a major exterior alteration
675 Lionshead Place/(a complete legal description is available for inspection at the Town of Vail
Community Development Department upon request).
Applicant: Vail Resorts Development Company, represented by Braun Associates, Inc .
ACTION: Tabled to September 1, 2004
MOTION: Rogers SECOND: Mathias VOTE: 5-0-0
CONDITION(S):
3. Lionshead Core Site Hotel DRB04-0416 George
Final review of utility project and temporary landscape modifications
675 Lionshead Place/(a complete legal description is available for inspection at the Town of Vail
Community Development Department upon request).
Applicant: Vail Resorts Development Company, represented by Mauriello Planning Group, Ltd.
ACTION: Approved
MOTION: Rogers SECOND: Hanlon VOTE:5-0-0
4. Marks Residence DRB04-0342 Bill
Final review of a minor alteration
2685 Bald Mountain Road/Lot 8, Block 1, Vail Village Filing 13
Applicant: Susan Marks
ACTION: Denied
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
5. Hubbard / Schmid Residence DRB04-0330 Bill
Final review of new construction
2683 Cortina Lane/Lot 7, Block A, Vail Ridge
Applicant: Trent Hubbard / Stefan Schmid, represented by John G. Martin, Architect, LLC
ACTION: Approved
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
6. Sonnenalp /King Ludwig's Restaurant DR604-0345
Conceptual review of a minor alteration
20 Vail Road/Lot L, Block 5E, Vail Village Filing 1
Applicant: Resort Design Associates
ACTION: Conceptual - No vote
Elisabeth
7. Schumacher Residence DRB04-0353 Elisabeth
Final review of plans for a residential addition
775 Potato Patch Drive/Lot 19, Block 1, Vail Potato Patch
Applicant: Randolph Schumacher, represented by Daniel Frederick
ACTION: Conceptual - No vote
8. Vail Heights Condominium Association DRB04-0336 Warren
Final review of a minor alteration
2059 Chamonix Lane/Lot 76, Vail Heights
Applicant: Vail Heights Condominium Association Phase III
ACTION: Tabled to September 1, 2004
MOTION: Hanlon SECOND: Rogers VOTE: 5-0-0
9. Cogswell Residence DRB04-0308 Elisabeth
Final review of a minor alteration
1090 Vail View Drive, Uriit 14/Lot B1, Block B, Lions Ridge Filing 1
Applicant: John Cogswell
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITION(S):
1) The applicant shall match all proposed materials to existing materials at the time of
construction.
10. Lionshead Arcade Condominium Association DRB04-0393 Elisabeth
Final review of changes to approved plans
531 East Lionshead Circle/Lot 3, Block 1, Vail Lionshead Filing 1
Applicant: Lionshead Arcade Condominium Association, represented by Fritzlen Pierce
Architects `,
ACTION: Tabled to September 1, 2004
MOTION: Mathias SECOND: Dunning VOTE: 4-0-1 (Pierce Recused)
1
'r
11. Vail Mountain Lodge DR604-0340 Elisabeth
Final review of change to approved plans
352 East Meadow Drive/Lot Tract B, Vail Village Filing 1
Applicant: Zehren and Associates, Inc.
ACTION: Denied
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
12. Marriott Hotel DRB04-0399 Warren
Final review of minor alteration
790 West Lionshead Circle/ Lots 4 & 7, Marriott Subdivision and Lots C and D, Morcus Subdivision
Applicant: VAMHC Inc., represented by Mauriello Planning Group, LLC
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 5-0-0
CONDITION(S):
1) The applicant shall match the dimensions of the new columns to those existing and a minimum
of a 14 inch dimension must be present from the face of the columns to the face of the glass
window system. Revised plans.depicting these revisions shall be submitted to staff for review
and approval prior to submitting for a building permit.
13. Haley Residence DRB04-0392 _ Elisabeth
Final review of minor alteration
3988 Lupine Drive/Lot 2A, Block 2, Bighorn 1St Addition
Applicant: Valerie Haley, represented by Plath Construction, Inc.
ACTION: Approved with condition(s) .
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITON(S):
1) The applicant shall use the thicker of the two available metal shingle roofing systems at the
time of construction.
14. Schubert Residence DR604-0388 Elisabeth
Final review of minor alteration
1457 Green Nill Court/Lot 5 Glen Lyon
Applicant: Fred and Maria Schubert, represented by TCC Roofing
ACTION: Tabled to September 1, 2004
MOTION: Hanlon SECOND: Dunning VOTE: 5-0-0
15. Meyer Residence DR604-0387 Elisabeth
Final review of minor alteration
4424 Streamside Circle East/Lot 10A, Bighorn 4th Addition
Applicant: John and Victoria Meyer, represented by Enis Moran
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITON(S):
1) The applicant shall paint the existing railings on the west side of the duplex to match the
railings on the east side of the duplex and shall construct the railings on the rear of the west side
to match those on the front side of the duplex in style and color; all work to be done prior to final
inspection.
16. Duncan Residence DRB04-0407 Elisabeth
Final review of minor alteration
767 Potato Patch/Lot 27, Block 1, Vail Potato Patch
Applicant: Raymond T. Duncan, represented by Plath Construction
ACTION: Approved with condition(s)
MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
CONDITON(S):
1) The applicant shall use the thicker of the two available metal shingle roofing systems at the
time of construction.
17. Rogers Residence DRB04-0352 Matt
Final review of plans of a residential addition
799 A&B Potato Patch Drive/Lot 28, Block 1, Vail Potato Patch
Applicant: Architectural Services, represented by Danny Swertfeger
ACTION: Approved with condition(s) .
MOTION: Mathias SECOND: Dunning VOTE: 4-0-1 (Rogers recused)
CONDITIONS:
1) The applicant shall have the chimneys be finished with the approved stucco color at the time of
work.
18. Vail Viking, Ltd. DRB04-0386 Matt
Conceptual review of new construction
4916 Juniper Lane/Lot 4, Block 5, Bighorn 5'h Addition
Applicant: Vail Viking Ltd., represented by Fritzlen Pierce Architects
ACTION: Conceptual - No vote
19. Children's Garden of Learning DRB04-0415 Matt
Final review of minor alteration
129 North Frontage Road/Mountain Bell
Applicant: Children's Garden of Learning
ACTION: Approved with no conditions
. MOTION: Rogers SECOND: Hanlon VOTE: 4-0-0
20. Bailey Residence DRB04-0262 Elisabeth
Conceptual review of a residential addition
4257 Nugget Lane/Lot 1, Bighorn Estates a resubdivision of Lots 10 & 11
Bighorn Estates
Applicant: Jim Bailey, represented by Gwathmey Pratt Schultz Architects
ACTION: Conceptual.- No vote.
21. Tyrolean Chalet, LLC DRB04-0338 Matt
Final review of a minor exterior alteration
400 East Meadow Drive, Unit 9/Lot 5D, Block 5, Vail Village Filing 1
Applicant: Tyrolean Chalet, LLC, represented by Suman Architect
Tabled to September 1, 2004
22. Wester Residence DR604-0312 Elisabeth
Final review of a minor alteration
4301 Columbine Drive, Unit D/Lots D&E, Village on Bighorn Creek
Applicant: Paul Wester, represented by Woods of Old Millworks
Tabled to September 1, 2004
23. Harvey / Navas Residence DRB04-0404 Bill
Final review of change to approved plans
2610 Bald Mountain Road/Lot 32, Block 3, Vail Village Filing 13
Applicant: Libby Harvey
Tabled to September 1, 2004
24. Telemark Townhomes DRB04-0278 Elisabeth
Final review of a minor alteration
1090 Vail View Drive and 1083 Lions Ridge Loop/Lot 61, Block B, Lions Ridge Filing 1
Applicant: Telemark Townhome Association
WITHDRAWN
25. Timberfalls Swimming Pool House DRB04-0245 Elisabeth
Final review of a minor alteration
4500 Timberfalls Court/unplatted
Applicant: Karl Edgerton
WITHDRAWN
Staff Approvals
Falirig Residence DRB04-0354 Joe
Final review of minor alteration
2883 Kinnikinnick/Block 4, Vail Intermountain
Applicant: PDQ Enterprises, Inc.
Stempler Residence DRB04-0348 Clare
Final review of minor alteration
1046 Homestake Circle/Lot 4, Block 6, Vail Village Filing 7
Applicant: Gerald Stempler represented by A Cut Above Forestry
Hawkwood Inc. DRB04-0355 Elisabeth
Final review of changes to approved plans
483 Gore Creek Drive/Lot S, Vail Village Filing 4
Applicant: Ned Gwathmey
Seven Vails Corporation DRB04-0375 Elisabeth
Final review of a minor alteration
1837 Alpine Drive/Lot 49, Vail Village West Filing 1
Applicant: Pepper Etters
Richmond Residence DR6041-0136 Bill
Final review of changes to approved plans
1090 Vail View Drive, Unit 3/Lot B1, Telemark Townhouse
Applicant: Horst and Wilda Richmond
Fischer Residence DR604-0341 Elisabeth
Final review of a minor alteration ~
2457 Chamonix/Lot 14, Block C, Vail Das Schone Filingl
Applicant: Bruce Fischer
Carlson Residence DRB04-0343
Final review of changes to approved plans
1094 Riva Glen/Lot 4, Spraddle Creek Subdivision
Applicant: Jay Carlson
Talisman Condominiums DRB04-0347
Final review of a minor alteration
62 East Meadow Drive/Part of Lots I&K, Block 5E, Vail Village Filing 1
Applicant: Talisman Condominium Association represented b Frederick Haynes
Purchase Residence DR604-0350
Final review of changes to approved plans
1310 Greenhill Court/Lot 17, Glen Lyon subdivision
Applicant: Michael Lauterbach
Godwin Residence DRB04-0364 .
Final review of minor alteration
586 Forest Road, Unit A/Lot 3A, Block 1, Vail Village Filing 6
Applicant: Donald and Carmen Godwin represented by Nedbo Construction
Weltner Residence DR604-0377
Final review of changes to approved plans
1260 Westhaven Circle/Lot 29, Parcel A&B, Glen Lyon
Sample Residence DR604-0369
Final review of a residential addition
1881 Lions Ridge Loop/Lot 13D, Block 3, Lions Ridge Filing 3
Applicant: Michael Sample
Kronenberg Residence DRB04-0366
Final review of a residential addition
1881 Lions Ridge Loop, Unit 5/Lot 5D, Block 3, Lions Ridge Filing 3
Applicant: Mike and Jennifer Kronenberg
Antonius Residence DRB04-0365
Final review of a residential addition
1881 Lions Ridge Loop/Lot 7D, Block 3, Lions Ridge Filing 3
Applicant: Jeffrey Antonius
Frampton Residence DRB04-0357
Final review of change to approved plans
14 Beaver Dam Road/Lot 34, Block 7, Vail Village Filing 1
Applicant: Susan and Harry Frampton represented by Piper Architecture
Gorsuch Residence DR604-0372
Final review of change to approved plans
1193 Cabin Circle/Lot 4, Block 2, Vail Valley ~~
Applicant: David and Renie Gorsuch, represented by Resort Design Associates
Matt
George
Matt
Elisabeth
Warren
Warren
Warren
Warren
Bill
Bill
Schumacher Residence DRB04=0409
Final review of minor alteration
775 Potato Patch East/Lot 19, Block 1, Vail Potato Patch
Applicant: Randy Schumacher represented by Master Sealers
Saalfeld Residence DRB04-0383
Final review of change to approved plans
2478 Garmisch Drive/Lot 27, Block A, Vail Das Schone Filing 1
Applicant: Tom and Kim Saalfeld
Joe
Warren
Leever Residence DRB04-0397 Warren
Final review of change to approved plans
1397 Vail Valley Drive/Lot 6, Vail Valley Filing 1
Applicant: Mr. and Mrs. Daniel Leever, represented by Custom Mountain Architects
Marriott Parking Structure DRB04-0351 Warren
Final review of change to approved plans
790 West Lionshead Circle/Lots A,B,C, Morcus Subdivision
Applicant: Vail Corporation, represented by Mauriello Planning Group
Robinson /Scott Residence DRB04-0410
Final review of minor alteration
3964 Bighorn Road/Lot 5E, Gore Creek Park
Applicant: John Robinson and Doug Scott
Joe
The applications and information about the proposals are available for public inspection during regular office
hours in the project planner's office, located at the Town of Vail Community Development Department, 75
South Frontage Road. Please call 479-2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479-2356,
Telephone for the Hearing Impaired, for information.
To: Vail Towri Council
From: John Power and Stan Zemler
Date: September 7, 2004
RE: COMPENSATION AND BENEFITS FOLLOW -UP
Council will find attached requested base pay benchmark comparisons and a total
compensation review.
BENCHMARK COMPARISONS:
Per the Council's request, included is more detailed information regarding the
compensation analysis process. First, Exhibit I. Benchmark Actual Pay
Comparisons show the actual pay data from our target market. Provided are
benchmark comparison jobs which reflect entry, mid-level, and management
positions. The difference between the seven organizations and TOV data
demonstrates the deficiencies to market in a number of critical job categories,
most notably in Community Development.
Next, several analyses are conducted to study the data. Exhibit II Actual Base
Practice Comparison shows lines that compare the pay practices for each
organization across all of their positions.
In addition, for specific positions we look at data graphically as in Exhibit III
Comparison for Senior Planner. The boxes show the ranges for each of the
organizations, each. organizations average is a dot within the box and the bar that
runs across the entire page is the average for alI the organizations.
Exhibit IV. Range Maximum Comparison shows lines that compare the maximum
allowable pay for each organization across all of their positions. TOV range
structure provides control precluding TOV from leading the market.
TOTAL COMPENSATION COMPARISON:
Adding health care and pension costs to an average base salary of $40,000 TOV is
more cost effective on a total compensation comparison. (Exhibit V. Total
Compensation Comparison)
Health care costs at TOV ($649 per employee per month) are 24% less than the
Colorado Municipal League average ($804 per employee per month).
TOV full pension cost (combined full-time and seasonal) is 14.5% of total
payroll.
RECOMMENDATION
The TOV will match the target market average and over time move the goal to
focus on becoming a 60% payer.
Re-affirm the target market for emergency service sworn officers is the Denver
front range.
Continue to make incremental adjustments in benefit design to contain costs.
F:ANers\Compensation Review\200a\Council Memo.- 8-7-2004.doc
I. BENCHMARK ACTUAL PAY COMPARISONS EXHIBIT I
JOB TOV Aspen Avon Breck S-Boat Pitkin CO Eagle CO Summit
CO
Entry Labor 29,ggg
Records Specialist 33,359 38,257
Building Inspector 47,428
Bus Supervisor 43,373
Systems Engineer 51,952
Sr. Planner 53,199 61,235
Chief Building Official 61,634 79,768
Com Dev Director 77,534 92,331
30,769 34,940 26,681 31,387 32,244
34,386 28,281 30,728
42,276 53,372 52,723 46,211
46,001 48,691
63,319 61,204 57,200
54,496 57,096 57,304 58,282 54,316
68,223 66,934 75,733 73,183
98,302 86,008 94,848 94,994
I.I. POLICE OFFICER RANGE MAX COMPARISONS
• FRONT RANGE MARKET AVERAGE $60,000
• TOV RANGE MAX $57,363
F:~Pers~Compensation Review~20o4 Benchmark Actual Pay Comparisons.doc
EXHIBIT II
TOWN OF VAIL
120000 1
100000
80000
m
t/1
m 60000
...
Q
40000 -
20000
0 - --
0 200 400 600 800 1000 1200
Points
--CIE--Eagle Cty.
-~ Breckenridge
~ Aspen
Pitkin Cty.
• Vail
Steamboat
-- Summit Cty.
r -Avon
1400
Actual Base Practice Comparison
August, 2004
Exhibit III
Senior Planner
40, 000
~
TOV
Aspen
Avon
Breck
S-Boat
Eagle•CO ~
Summit CO
min j 45,830 46,654 49,901 44,125 47,062 46,597 45,031
~ actu2l 3,199 61,235 54,496 _ 57,096 57,304 ~, 58,282 _ _ 54,316_
average
- ' C 56,561
--- 56,561 56,561 56,561 56,561
- 56,561
~--- 56,561
max 1 65,309 64,397 67,573 66,188 65,784 67,054 63,048
EXHIBIT IV
TOWN OF VAIL
Range Maximums Comparison
August 2004
120000
100000
N 80000
m
ca
Q
60000
40000
20000
- -11~•~ Breckenridge/Eagle/Pitkin
- • - Vail
~E-Summit
Steamboat
~-Aspen
~. Avon
0 200 400 600 800 1000 1200 1400
Points
EXHIBIT V
COMPENSATION + BENEFIT* COMPARISON
SEASONAL LABOR
~~~ AV E RAG E
BASE 30 Eu}Q- 30,000
PENSION :
45a 1.5% 1,860 6.2%
TOTAL .~: ~Q 4~Q ~ ~ 31,860
SENIOR PLANNER
~`C~~ ~ ~~ ~ ~ ~ AV E RAG E
BASE ~53, ~ 9~~~ ~ ~ - ~' 57,121
HEALTH 7 ?88 fi44~JMt~- - 9,648 804/MO
PENSION ~ 8 591 16.15°!0 6,968 12.2%
BENEFIT COST x8,379 16,616
f9 578 - 73,737
*Reflects major cost elements of health and pension. Does not
include benefits required by law (VI/C/UI) or disability/life benefits
which are standard employer coverages.
F:1PerslCompensation Review12004 TOTAL COMPENSATION COMPARISON.doc
I. TOV vs. C M L AVE RAG E
PENSION BENEFRS COMPARISON
~ee~
H~.TM iNSU~cE coMP~wsoN
soo4