HomeMy WebLinkAbout2012-08-21 Agenda and Support Documentation Town Council Work SessionVAIL TOWN COUNCIL
WORK SESSION AGENDA
VAIL TOWN COUNCIL CHAMBERS
75 S. Frontage Road W.
Vail, CO 81657
11:00 A.M., AUGUST 21, 2012
NOTE: Times of items are approximate, subject to change, and cannot be relied
upon to determine at what time Council will consider an item.
Public comments on work session item may be solicited by the Town
Council.
1. ITEM/TOPIC: Fire Station #2 Tour and Council Lunch 11:00 am (60 min.)
2.
ITEM/TOPIC: DRB/PEC Update (15 min.)
PRESENTER(S): Warren Campbell
3.
ITEM/TOPIC: Five year strategic capital plan. (60 min.)
PRESENTER(S): Kathleen Halloran
ACTION REQUESTED OF COUNCIL: Provide feedback regarding the five year
capital plan.
BACKGROUND: See attached memo.
STAFF RECOMMENDATION: Provide feedback regarding the five year strategic
capital plan in preparation for the 2013 Budget ordinance, with first reading
scheduled for October 16th.
4.
ITEM/TOPIC: Strategic Parking Plan Update (45 mins)
PRESENTER(S): Greg Hall Stan Zemler
ACTION REQUESTED OF COUNCIL: Provide direction on the plan presented
which can be finalized into a plan to be presented to the Town Council for adoption
at an evening session.
BACKGROUND: The Town council established a goal to develop a strategic
parking plan. Staff has had numerous work sessions regarding various aspects to
the long term parking solution. This is the most recent update in developing the
plan. The discussion will focus on strategies to address the long term deficit in
public parking spaces.
STAFF RECOMMENDATION: Provide the staff direction on the aspects of the
plan.
5.
8/21/2012
ITEM/TOPIC: Employee housing policy direction for the purpose of
developing updates and amendments for the Town of Vail Employee
Housing Strategic Plan (30 Minutes)
PRESENTER(S): Nina Timm
ACTION REQUESTED OF COUNCIL: Provide staff with housing policy direction
so updates and amendments can be developed for the Employee Housing
Strategic Plan.
BACKGROUND: The Town of Vail has recognized the need for deed restricted
employee housing within Vail. The Town quantified the need and set a goal when
the Employee Housing Strategic Plan was adopted on September 8, 2008. The
goal is “to ensure there is deed restricted housing for at least 30% of Vail’s
workforce within the Town of Vail.” Since the Plan has been adopted market
conditions have changed throughout Eagle County and numerous action items
from the Plan have been completed. With policy direction from the Town Council,
staff will work with the Vail Local Housing Authority and the Planning and
Environmental Commission, as required, to develop a list of proposed updates and
amendments for Town Council to consider adding to the Plan.
STAFF RECOMMENDATION: Provide staff with direction on the types of policy
and housing the Vail Town Council would like to focus on in order for staff and the
Vail Local Housing Authority to develop updates and amendment
recommendations for the Town of Vail Employee Housing Strategic Plan.
6.
ITEM/TOPIC: Ordinance No. 2, Series of 2012, an ordinance amending
Chapter 12-6, Residential Districts, Vail Town Code, pursuant to Section
12-3-7, Amendment, Vail Town Code, to establish a new zone district, Vail
Village Townhouse (VVT) District, and setting forth details in regard thereto;
and Resolution No. 7, Series of 2012, amending Chapter VII, Vail Village
Sub-Areas, East Gore Creek Sub-Area (#6), Vail Village Master Plan,
pursuant to Chapter VIII, Implementation and Amendment, Vail Village
Master Plan, to include recommendations related to a new Vail Village
Townhouse (VVT) District, and setting forth details in regard thereto.
(PEC110040, PEC110041) (30 minutes)
PRESENTER(S): Bill Gibson, Community Development Department
ACTION REQUESTED OF COUNCIL: The applicant requests that the Vail Town
Council approves Ordinance No. 2, Series of 2012, on second reading. The
applicant also requests that the Vail Town Council approves Resolution No. 7,
Series of 2012.
BACKGROUND: On November 14, 2011, the Planning and Environmental
Commission forwarded a recommendation of approval, with modifications, to the
Vail Town Council for the proposed Ordinance No. 2, Series of 2012, and ,
Resolution No. 7, Series of 2012, by a vote of 4-1-1 (Rediker opposed and Pratt
recused). The purpose of the proposed ordinance is to establish a new zone
district, the Vail Village Townhouse (VVT) District; and the purpose of the
proposed resolution is to establish related design guidelines as part of the Vail
Village Master Plan. The policy objectives of the new zone district and related
design guidelines are as follows: - Streamlining the development review process
by establishing a new zone district to specifically address townhouse properties.-
8/21/2012
Create incentives for redevelopment of existing townhouse properties. - Preserve
the existing residential character of the townhouse properties and the
neighborhood. On May 1, 2012, the Vail Town Council approved the first reading
of Ordinance No. 2, Series of 2012, by a vote of 6-0-1 (Foley opposed), with the
modifications that Section 12-6J-9 allows not more than one hundred twenty five
square feet of GRFA for each one hundred square feet of total site area (i.e. 1.25
GRFA ratio). The Vail Town Council tabled Resolution No. 7, Series of 2012, to
correspond with the second reading of Ordinance No. 2, Series of 2012. The Vail
Town Council held a subsequent public hearing on May 15th and a work session
on July 17th to further deliberate the proposed new zone district. On August 7,
2012, the Vail Town Council tabled the proposed ordinance and resolution, and
directed Staff to prepare amendments to the proposed new zone district to allow
an unlimited amount of GRFA, a lower building height limit of 38 feet, maintain the
current 30% landscape area requirements, and to add additional front yard
landscaping guidelines in the new zone district.
STAFF RECOMMENDATION: The Planning and Environmental Commission
recommends the Vail Town Council approves the second reading of Ordinance
No. 2, Series of 2012. The Planning and Environmental Commission
also recommends the Vail Town Council approves Resolution No. 7, Series of
2012.
7.
ITEM/TOPIC:
Information Update and Attachments:
1) VEAC August 14, 2012 Meeting Minutes (Kelli McDonald);
2) June 2012 Vail Business Review (Sally Lorton) (15 min.)
PRESENTER(S): Various
8. ITEM/TOPIC: Matters from Mayor and Council (15 min. )
9.
ITEM/TOPIC: Executive Session, pursuant to: 1) C.R.S. §24-6-402(4)(a)(b)
(e) - to discuss the purchase, acquisition, lease, transfer, or sale of property
interests; to receive legal advice on specific legal questions; and to
determine positions, develop a strategy and instruct negotiators, Regarding:
Discussion concerning negotiations regarding Ever Vail redevelopment and
Fire Station #2 redevelopment; 2) C.R.S. §24-6-402(4)(b) - to receive legal
advice on specific legal questions, regarding: proposed Charter amendment
ballot questions. (45 min.)
PRESENTER(S): Matt Mire
10. ITEM/TOPIC: Adjournment (4:15 p.m.)
NOTE: UPCOMING MEETING START TIMES BELOW (ALL ARE
APPROXIMATE DATES AND TIMES AND SUBJECT TO CHANGE)
-----------------------------------------------------------------------------------------------------
----
THE NEXT REGULAR VAIL TOWN COUNCIL REGULAR WORK
SESSION WILL BEGIN AT APPROXIMATELY 12:30 P.M. (or TBD),
TUESDAY, SEPTEMBER 4, 2012 IN THE VAIL TOWN COUNCIL
CHAMBERS
FUTURE AGENDA ITEMS:
Ongoing agenda items TBD: DRB/PEC updates - Warren - WS - 15 min.;
8/21/2012
Information Updates Attachments: WS - 15 min.; Executive Session items:
30 min.; Consent Agenda: 5 min.; Town Manager Report: Fire and ERWSD
updates - 5 min.
TBD:
Information Update and Attachments for 9/4: Event Promoter process (Kelli)
Ford Park discussion re: noise - Todd O./Greg Hall - WS - 30 min. - 9/4
Combined Ambulance District Presentation - Fred Morrison w/ Eagle Cty
Ambi. Dist. & Chris Montera w/ Western Eagle Cty Ambi Dist - WS - 20 min
- 9/4
Summer Activity Update - Chris Jarnot - ES - 15 min. - 9/4
View Corridor Amendments - George - ES - 30 min. - 9/4
Site Visit - Library - Pam Brandmeyer - WS - 10/?
Site Visit - Sundial Plaza - Gregg B. - WS - 30 min. - TBD
Ever Vail - George - 30 min. - ES - TBD
Recycling discussion - Kristen B - 30 min. - WS - TBD
Open Space Discussion with Toby Sprunk, Eagle County Open Space
Director - TBD
Housing Fee in Lieu Discussion – TBD
Gore Creek Water Quality Update - Bill Carlson - TBD
Outdoor Display Goods - George Ruther - TBD
Historic District - George Ruther - TBD
Sister City discussion - TBD
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Fire Station #2 Tour and Council Lunch 11:00 am
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: DRB/PEC Update
PRESENTER(S): Warren Campbell
ATTACHMENTS:
PEC results from August 13, 2012
DRB results from August 15, 2012
8/21/2012
Page 1
PLANNING AND ENVIRONMENTAL COMMISSION
August 13, 2012
1:00pm
TOWN COUNCIL CHAMBERS / PUBLIC WELCOME
75 S. Frontage Road W. - Vail, Colorado, 81657
**Order and times of agenda items are subject to change**
Members Present Members Absent
Susan Bird John Rediker
Luke Cartin Pam Hopkins
Michael Kurz
Bill Pierce
Henry Pratt
Site Visits:
1. Upton Residence- 4192 Columbine Way
20 minutes
1. A request for the review of a variance from Section 12-6G-6, Setbacks, Vail Town Code,
pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for the construction of a garage
within the setbacks, located at 4192 Columbine Way/Lots 25 & 26, Bighorn Terrace, and setting
forth details in regard thereto. (PEC120027)
Applicant: Anne Upton, represented by Pierce Architects
Planner: Bill Gibson
ACTION: Tabled to August 27, 2012
MOTION: Cartin SECOND: Bird VOTE: 3-1-1 (Kurz opposed, Pierce recused)
Commissioner Pierce recused himself from this item because his firm is representing the
applicant.
Bill Gibson gave a presentation per the staff memorandum.
Commissioner Pratt disclosed that he made a bid for this project, but did not receive the contract.
He also disclosed that he is working on other development projects with the legal staff of the
applicant; however, there is no financial benefit that would require him to recuse himself.
Tyson Dearduff, representative of the applicant, stated Bill Gibson did a great job outlining the
project and that he was available for comment.
Kerry Donovan, homeowner at adjacent Bighorn Condominiums, Units 5 and 6, was speaking on
behalf of herself and her brother who owns Units 3 and 4. She stated that she lives directly to
the south of the subject property. She stated her two primary concerns are that snow storage
currently occurs in the proposed driveway location and that the design of the driveway will result
in headlights shining into her building, specifically into the primary bedrooms. She had also
heard that the parking spaces, while not for a full time resident, were being offered for rent to
neighboring full time residents.
Diana Donovan, also an owner in the Bighorn Condominiums, stated that the applicant’s existing
building is in an existing setback. The proposed garage will only be 5.5 feet from the property
line, with less distance counting the overhang. She stated the snow storage will suffer, the
2 - 1 - 1
8/21/2012
Page 2
headlights will shine into the adjacent buildings, and that granting a variance will be special
privilege because no other unit has been granted a variance this impactful. She noted that there
are other locations for this garage on the site that would be more conforming with setbacks than
this proposal. She believes most variances have been granted to keep families in town and this
is a second homeowner, and this unit is a former duplex that was combined into a single-family
residence, thus removing the setbacks thru the middle of the house. She stated that there are
better locations for the garage that don’t require a variance. The negative impacts of headlights
will hit directly into the adjacent units. She stated no practical difficulty exists for this property
and this would be a grant of special privilege. She added that landscaping has been installed
within the parking easement. She identified the owners of the Bighorn Condominiums building
that were present in the Council Chambers.
Tom Fowler, one of the directors of the Bighorn Recreation and Sanitation Mutual District, stated
his concern. He also expressed concern about impacts of the proposal to the adjacent Bighorn
Condominiums. He said the directors had a meeting and came to the conclusion that Ms. Upton
had revised her original proposal in response to their input. There are still concerns from the
directors, but the effort made could be accommodated. He believes there were a few items that
should have been agreed upon by the applicant and the district before the PEC hearing,
including locations for snow storage. He commented that he had great respect for Ms. Upton’s
deceased father, an original developer of Bighorn Terrace and former resident of the subject
property, and wanted to maintain an amicable relationship between neighbors.
Wendy St. Charles, attorney with Sherman & Howard, representative of the applicant, stated she
wanted to clarify the organizational aspect of the Bighorn Recreation and Sanitation District and
that there is no legal home owners association. The district was formed in the 1960s for the
larger Bighorn subdivision which includes single-family residences, multi family and duplexes.
She explained that there is no common property, no legal documents, and no legal rights
between owners at Bighorn Terrace. She added that snow storage will not be permitted on the
Upton property as it is not an approved snow storage location and has damaged her clients
landscaping. She noted that parking is a chronic problem with seven units at the end of the cul-
de-sac, with two cars each, and only seven available common parking spaces.
Wendy St. Charles added that it is an older neighborhood that does not comply with zoning. The
site is large and could accommodate a garage but to save existing parking, they proposed this
proposal. She explained why other scenarios would not work for the neighbors, hence the
proposed location.
Commissioner Cartin asked about the requirements of the driveway and maintenance of the
common property.
Wendy St. Charles responded that the covenants were recorded with the entire Bighorn
subdivision in mind. There was no association created at Bighorn Terrace.
Commissioner Cartin asked who maintains the driveway.
Wendy St. Charles stated there are no assessments and no authority to assess. There is a
smaller group that collects money to pay for paving.
Commissioner Cartin asked where the parking is for the skate house. Wendy St. Charles
responded that the parking.
Kerry Donovan clarified that parking for the skate house is located on the west end of the
Bighorn Condominium’s parking lot.
2 - 1 - 2
8/21/2012
Page 3
Tom Fowler stated that the homeowner association is formalized, pays taxes and has annual
meetings. He said the name was chosen because the fire station site was originally the location
of the subdivision’s septic tank. He said it is not a loose disorganized area, and that it is
formalized. If there are problems for owners on the side facing Columbine Drive, the owner calls
him. He asked where the other Bighorn Terrace unit is located with a garage. Wendy St.
Charles responded Kathryn Benysh’s house, Units 7 & 8. Tom Fowler added an existing portion
of the that building was converted into a garage, rather than a garage addition being built.
Tyson Dearduff added some information about how the proposal came about due to the site
constraints and concerns from the neighbors.
Commissioner Kurz asked how the garage is connected to the existing house.
Tyson Dearduff responded that the garage was connected at its walls, but with no interior
connection. There is an outside door proposed for the garage.
Wendy St. Charles added that there have been no amending documents to the original district,
which is why there have been challenges to governance.
Commissioner Pratt asked about the parking easement.
Wendy St. Charles stated that the plat for Bighorn Terrace only dedicates the access and utility
easements for the driveway. She added that the parking easements have improvements built
upon them throughout numerous properties Bighorn Terrace.
Commissioner Pratt asked about the easement again, and whether the area is binding.
Wendy St. Charles stated that the easements were not dedicated. She added that there has
been no consistent treatment of these areas. The association proposed to amend the parking
areas to create real easements, but have not formally done so yet.
Commissioner Bird asked about the utility easement and whether it is recorded. Wendy St.
Charles stated it is dedicated on the plat.
Linda Moore, owner in the area adjacent to the proposed property, stated there was an
agreement in the 19808’s with the association to pave certain dedicated parking easement areas
and at that time, everyone gave up a portion of their private property. More recently, in 2007, the
Community Development Department suggested that the association file a survey with the town
to show the paved areas.
Bill Gibson stated the survey from the Town’s archives was in the packet, but the association’s
meeting minutes were not included. He clarified that private association agreements are not
germane to the Town’s zoning regulations.
Diana Donovan noted that the neighborhood was a legal mess. She stated that the parking map
shows the paved areas, property lines, etc showing each lot has some paved areas. She added
some clarification for other areas.
Commissioner Kurz agreed that the neighborhood was a legal mess. He stated there is an issue
with making the nonconforming situation worse, and that could potentially be a grant of special
privilege. He added that section 12-1-2, purpose, provides concern because the garage does
not provide adequate light for the neighbors. He was concerned about firefighting access,
2 - 1 - 3
8/21/2012
Page 4
utilities, vehicular turning, light, and character of the neighborhood. He said it’s using a shoehorn
to put this garage on the property.
Commissioner Bird recommended another design for this project be considered. She added that
it’s too vague as to who is responsible for what maintenance and that the whole association
needs to take a hard look at these issues and solve them. She stated she is not in favor of the
proposal due to the removal of mature trees and lack of integrity for the neighborhood. She
added there is no interior door to the house from the garage, so it could be moved elsewhere,
closer to the current front entrance of the house.
Tom Fowler added that Ms. Upton will heat the driveway which will help the snow storage
situation.
Commissioner Kurz stated that is not being considered in the deliberation.
Wendy St. Charles stated there is no way for the owner to get into their door because other
owners are parking in the adjacent parking spaces. She added that the owner is adding parking
and gets one more owner off the shared parking. She added that the zone district is supposed
to have covered parking and there is only one covered parking space in the whole neighborhood.
She identified how the current parking is an access problem that could potentially result in a
huge human safety issue.
Linda Moore stated she has come home without the ability to park immediately adjacent to her
home. While inconvenient there is not ownership of each parking space. The issue Ms. Upton
faces is no different than other owners.
Wendy St. Charles stated the difference between Ms. Moore and Ms. Upton’s situations were
different, with Ms. Upton’s front door being blocked by neighbor’s cars so that she couldn’t enter
her house.
Tyson Dearduff stated the reasons a garage could not be attached in other locations due to the
interior layout of the house.
Commissioner Cartin stated that the existing building on the south side complies with setbacks
today. When previous variances have been reviewed, the light, air, etc. criteria are typically
reviewed with just a few units not so close. He applauds Ms. Upton for her taking on this parking
problem, but there are many other issues that also need to be addressed. The exact layout of
the garage and the hammerhead driveway adjacent to another property are concerning. He’s not
opposed to a garage, but to this design for the garage.
Commissioner Pratt asked where the reduction would take place to reduce the garage to 300
square feet. Tyson Dearduff explained the proposed garage could be 2 feet narrower (13 feet
instead of 15 feet) and 2 feet shorter (23 feet instead of 25 feet) to reduce its size to 300 square
foot.
Commissioner Pratt asked Bill Gibson what other town policies comes into play. Bill Gibson
stated the Town does not govern how the parking at Bighorn Terrace operates, but the Town has
a long standing has a policy to encourage enclosed parking. He added that new enclosed
parking will need to be balanced with other factors such as impacts to the neighbors, light and
air, existing trees, etc.
Commission Pratt added the building to the south is not shown on the submitted site plan. He
asked who the existing utility easement and power lines serve. Tom Fowler commented that the
2 - 1 - 4
8/21/2012
Page 5
power lines serve all the Bighorn Terrace units. Linda Moore stated there are three transformers
are on the property, but they could not move them.
Commissioner Pratt added that if there is an easement of 20 feet, if so it would impact numerous
properties. Commissioner Pratt asked whether new trees are being proposed. Bill Gibson
stated that there is no specific ratio required by the Town Code, but the Design Review Board’s
policy is typically a foot-for-foot when possible. The applicants have not yet submitted a design
review application and are not showing any tree replacement on the site plan for the variance.
Commissioner Pratt asked if the 9x19 parking space will be reserved for the applicant.
Wendy St. Charles stated the existing space adjacent to the proposed driveway will continue to
be common.
Commissioner Bird requested clearer plans be submitted.
Commissioner Pratt stated this is a conflict between personal property rights and historic use. He
noted his support for a garage, but not as designed. He added that the criteria for a variance
have not been met because of the impacts to the neighbors, light and air are too great. He
recommended the applicant revise the garage design. He asked the applicant if they would like
to be tabled the application or have the Commission vote on the proposal as submitted.
Wendy St. Charles requested that this item be tabled to a future hearing.
Commissioner Pratt clarified the Commission’s expectation that if tabled the application would be
revised.
Wendy St. Charles asked for design direction from the Commission.
Commissioner Pratt stated the redesigned with less impact to the neighbors’ property to the
south, and that as currently submitted the design does not meet the criteria for a variance.
Commissioner Kurz stated his opposition to the motion because the encroachments to the south
will overcrowd the area. He commented that the neighborhood needs to deal with parking and
Ms. Upton needs to have access to her house.
20 minutes
2. A request for the review of a conditional use permit, pursuant to Section 12-9C-3, Conditional
Uses, Vail Town Code, to allow for public utility and public service uses (equipment room for
communications equipment), located at 1289 Elkhorn Drive/Unplatted, and setting forth details in
regard thereto. (PEC110032)
Applicant: Town of Vail, represented by Crown Castle
Planner: Rachel Dimond
ACTION: Approved with condition(s)
MOTION: Kurz SECOND: VOTE: 5-0-0
Rachel Dimond gave a presentation per the staff memorandum.
Glen Bernard, from Crown Castle, stated he did not have anything further to add.
The Commissioners asked that the staff ask the Design Review Board pay specific attention to
the faux tree treatment.
2 - 1 - 5
8/21/2012
Page 6
15 minutes
3. A request for a recommendation to the Vail Town Council for a prescribed regulations
amendment, pursuant to Section 12-3-7, Amendment, Vail Town Code, to amend Chapter 12-22,
View Corridors, Vail Town Code, to allow for the maintenance of adopted view corridors
impacted by vegetation, and setting forth details in regard thereto. (PEC120029)
Applicant: Town of Vail
Planner: Warren Campbell
ACTION: Recommendation of Denial
MOTION: Kurz SECOND: Cartin VOTE: 5-0-0
Warren Campbell gave a presentation per the staff memorandum.
Commissioner Cartin noted his opposition to the proposal. He believes this proposal is counter
to the Town’s policies. Visitors to Vail appreciate natural vegetation. The trees protect the health
of the creek and screen lesser desirable elements from view.
Commissioner Kurz agrees with Cartin and believes natural mature vegetation is what makes
Vail, Vail and not the buildings. He believes views from the parking deck should include trees.
Visitors need to walk through Town and access the mountain to experience Vail. He felt that this
was an environmental issue and not a DRB issue as trees are a part of the environment.
Commissioner Bird agreed with Cartin and Kurz.
Commissioners Pierce and Pratt had no comment.
Commissioner Kurz made a motion to forward a recommendation of denial.
Commissioner Pierce clarified the proposed language allows landscaping modifications to be
discussed.
Commissioner Pierce asked for clarification about who an applicant could be?
Warren Campbell clarified that it would likely be the Town of Vail, but it could be a co-applicant
with some private property owners. The adopted viewpoints begin on public property, but the
encroaching vegetation could be located on private property.
60 minutes
4. A request for a recommendation to the Vail Town Council, pursuant to Section 12-3-7,
Amendment, Vail Town Code, for prescribed regulations amendments to Title 12, Zoning
Regulations, and Title 14, Development Standards, Vail Town Code, to require restoration of
watercourses and riparian areas, and setting forth details in regard thereto. (PEC120011)
Applicant: Town of Vail
Planner: Rachel Dimond
ACTION: Tabled to August 27, 2012
MOTION: Kurz SECOND: Cartin VOTE: 4-0-0 (Pierce departed during this item)
Siri Roman with Eagle River Water and Sanitation District made presentation about the current
health of Gore Creek, the factors affecting creek health, and opportunities to improve the creek
health.
Commissioner Kurz asked how often the creek is measured.
2 - 1 - 6
8/21/2012
Page 7
Linn Brooks of Eagle River Water and Sanitation District clarified that sampling is conducted
twice per year.
Commissioner Kurz identified the need for long term planning and an improvement plan to
address the creek given the short term changes in climate such as flooding last year and drought
this year. He asked if he will see bugs in the creek during his lifetime.
Linn Brooks noted that some changes, such as pollutants, can be address in a short time frame,
but other issues are longer term.
Commissioner Pierce departed.
Kristen Bertuglia, Community Development Department and Tom Kassmel, Public Works
Department, presented an overview of action taken, and not taken, by the Town of Vail to
address creek health. Tom Kassmel described the ongoing maintenance of creek outfalls. He
also discussed storm water run-off issues and the various Town stream back restoration
projects.
Kristen Bertuglia described road sand/cinder and de-icer use and clean-up. She described the
Town’s weed and pine beetle spraying operations.
Commissioner Byrd asked who regulates the sedimentation from the Matterhorn Bridge project.
Tom Kassmel described how some sedimentation will occur, but it is managed within Army Corp
of Engineers standards.
Commissioner Byrd asked why the creek is not allowed to return to its natural state east of the
International Bridge. She added that the Town mows that property while we want homeowners
to stop mowing and the same type of maintenance.
Kristen Bertuglia stated that public use areas should be concentrated and limited to avoid the
entire stream tract being trampled.
Commissioner Pratt asked how mag-chloride can be mitigated and how to convince CDOT to
use less.
Tom Kassmel noted that CDOT has been using less, but has no policies to his knowledge to
stop its use.
Commissioner Kurz asked if it is measured so its impacts to the creek can be measured.
Lynne Brooks noted that an increase in chlorides has been measured in the creek as more mag-
chloride is used more often as a de-icer.
Commissioner Kurz noted the safety need for mag-chloride, but is concerned about its impact to
the creek.
Commissioner Pratt asked if certain plant species could mitigate the salt.
Commissioner Cartin asked for additional details about the Town’s oil/sand separators and how
they are or aren’t regulated.
Tom Kassmel provided the specific information.
2 - 1 - 7
8/21/2012
Page 8
Commissioner Cartin also asked about the volume of cinders used and the exploration of
alternative materials. He noted that cinders specifically are detrimental to trout spawning beds.
He also asked for an update on the State’s 303D listing of Gore Creek. Kristen Bertuglia noted
that the entire creek is provisionally listed.
Kristen Bertuglia and Tom Kassmel described stream bank stabilization projects.
Brian Kessler, Town of Vail environmental intern, described the Town’s public outreach and
education programs conducted this summer.
Kristen Bertuglia described the Town’s involvement with River Watch monitoring program and
other projects such as upcoming sustainable building codes.
Commissioner Cartin asked if the Town will be giving away trees again this year.
Kristen Bertuglia noted that Trees for Vail will be held again this fall.
Commissioner Kurz asked what other organizations and governmental bodies are contributing to
funding.
Kristen Bertuglia identified the Town’s current financial partners.
Scott Todd, Vail Recreation District, described the Vail Golf Course management practices for
protecting Gore Creek. He described the methods used to prevent nutrient and chemical inputs
into the creek. He noted that they also test Gore Creek chemical and dissolved solids levels
three times per year to monitor any impacts to the creek. He described numerous operational
components such as the fertilizer/irrigation system, equipment wash stations, snow management
guidelines, tree spraying policies, and stream back stabilization and erosion control projects. He
also discussed flooding issues and future drainage/storm water run-off projects at the golf
course. He also discussed the golf course pond system. He identified the partner organizations
involved with water quality at the golf course.
Commissioner Pratt asked where the irrigation water is obtained during drought years like this
summer.
Scott Todd described the current system of obtaining water from Gore Creek.
Commissioner Cartin asked how the pond algae are managed.
Scott Todd described the current management practices.
Commissioner Cartin asked if the VRD has pursued specific environmental certifications. Scott
Todd clarified that they are certified by the Audubon Society and maintain those certifications.
Commissioner Cartin asked about the availability of the water testing results.
Scott Todd described opportunities for additional information sharing with other agencies/interest
groups.
Commissioner Cartin noted concerns about the straight stretches of Gore Creek along the
frontage road and opportunities for the Town and the golf course to jointly improve the creek
habitat in this area. He asked for additional information about the state 303D listing.
2 - 1 - 8
8/21/2012
Page 9
30 minutes
5. A request for a recommendation to the Vail Town Council for a prescribed regulations
amendment, pursuant to 12-3-7, Amendment, Vail Town Code, to allow for amendments to Title
12, Zoning Regulations, to amend the development review process, and setting forth details in
regard thereto. (PEC120010)
Applicant: Town of Vail
Planner: Rachel Dimond
ACTION: Tabled to August 27, 2012
MOTION: Kurz SECOND: Cartin VOTE: 4-0-0
6. A request for a recommendation to the Vail Town Council on prescribed regulation amendments
to Section 12-13-5, Employee Housing Unit Deed Restriction Exchange Program, Vail Town
Code, pursuant to Section 12-3-7, Amendment, Vail Town Code, to allow for amendments to the
employee housing unit deed restriction exchange program review process, and setting forth
details in regard thereto. (PEC120017)
Applicant: Town of Vail
Planner: Bill Gibson
ACTION: Table to September 10, 2012
MOTION: Kurz SECOND: Cartin VOTE: 4-0-0
7. Approval of July 23, 2012 minutes
ACTION: Approved
MOTION: Kurz SECOND: Cartin VOTE: 4-0-0
8. Information Update
An update on the Vail Village Townhouse District was provided.
9. Adjournment
MOTION: Kurz SECOND: Cartin VOTE: 4-0-0
The applications and information about the proposals are available for public inspection during regular
office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The
public is invited to attend the project orientation and the site visits that precede the public hearing in the
Town of Vail Community Development Department. Please call (970) 479-2138 for additional
information.
Sign language interpretation is available upon request with 24-hour notification. Please call (970)
479-2356, Telephone for the Hearing Impaired, for information.
Community Development Department
Published August 10, 2012, in the Vail Daily.
2 - 1 - 9
8/21/2012
Page 1
DESIGN REVIEW BOARD AGENDA
PUBLIC MEETING
August 15, 2012
Council Chambers
75 South Frontage Road West - Vail, Colorado, 81657
**Order and times of agenda items are subject to change**
MEMBERS PRESENT MEMBERS ABSENT
Tom DuBois
Andy Forstl
Brian Gillette
Rollie Kjesbo
Libby Maio
PROJECT ORIENTATION 12:30pm
SITE VISITS
1. Vail Valley Medical Center- 181 West Meadow Drive
2. FRB Ventures LLC Residence- 366 Forest Road, Unit B
3. Mill Creek Property Residnece – 303 and 305 Mill Creek Circle
4. Vail Golf Course- 1775 Sunburst Drive
5. Public Works Facility- 1309 Elkhorn Drive
6. Blume Residence- 2673B Cortina Lane
MAIN AGENDA 3:00pm
1. Mill Creek Property Residence DRB120216 / 10 minutes Rachel
Conceptual review of a new residence (single-family)
303 and 305 Mill Creek Circle/Lot 3, Block 1, Vail Village Filing 1
Applicant: Mill Creek Property LLC, represented by KH Webb Architects
ACTION: Conceptual, no vote
2. FRB Ventures LLC Residence DRB120358 / 10 minutes Rachel
Conceptual review of an addition (bathroom, bedroom, dining, kitchen)
366 Forest Road, Unit B/ Lot 2, Block 1, Vail Village Filing 3
Applicant: FRB Ventures LLC, represented by KH Webb Architects
ACTION: Conceptual, no vote
3. Mountain C.I. Holdings Limited DRB120318 / 10 minutes Bill
Final review of new construction (duplex)
2801 Snowberry Drive/Lot 9, Block 9, Vail Intermountain
Applicant: Mountain C.I. Holdings Limited, represented by Martin Manley Architects
ACTION: Approved with condition(s)
MOTION: Gillette SECOND: Forstl VOTE: 5-0-0
CONDITION(S):
1. The applicant shall paint the stucco base of the western and eastern building masses Spectral
32132 from the ground to the belly band of the story above on the west, north, and south elevations
prior to final inspection.
2 - 2 - 1
8/21/2012
Page 2
4. Blume Residence DRB120335 / 10 minutes Rachel
Final review of a minor exterior alteration (fence)
2673B Cortina Lane/ Lot 6, Block A, Vail Ridge
Applicant: Robert Blume, represented by Aaron Hoffman
ACTION: Tabled to September 5, 2012
MOTION: Gillette SECOND: Maio VOTE: 5-0-0
5. Anderson Residence DRB120281 / 10 minutes Bill
Final review of an addition (entry, bedroom)
4515 Bighorn Road, Unit A/Lot 6&7, Block 1, Bighorn 3rd
Applicant: David and Cathy Anderson, represented by Martin Manley Architects
ACTION: Approved with condition(s)
MOTION: Gillette SECOND: Kjesbo VOTE: 5-0-0
CONDITION(S):
1. The applicant shall replace the removed aspen tree on a foot-for-foot basis prior to final
inspection.
6. Vail Valley Medical Center DRB120341 / 10 minutes Bill
Final review of a minor exterior alteration (trash enclosure)
181 West Meadow Drive/Lot E, Vail Village Filing 2
Applicant: Vail Valley Medical Center, represented by Ryan Magill
ACTION: Approved with condition(s)
MOTION: Gillette SECOND: Kjesbo VOTE: 5-0-0
CONDITION(S):
1. The applicant shall cover all exposed concrete walls on the both the trash enclosure and the
oxygen bunker with stucco and paint the stucco to match the stucco on the newest addition to the
medical center building prior to final inspection.
2. The applicant shall submit additional details about the proposed trash enclosure gate for further
review by the Design Review Board prior to application for a building permit.
7. Crown Castle DRB120352 / 15 minutes Rachel
Final review of new construction (communications antennas, equipment structures)
1309 Elkhorn Drive (Public Works Facility)/Unplatted
Applicant: Town of Vail, represented by Crown Castle
ACTION: Approved with condition(s)
MOTION: Gillette SECOND: Kjesbo VOTE: 5-0-0
CONDITION(S):
1. The applicant shall install two monopoles with communications equipment, with no faux tree
components, to be painted dark bronze, with final color to be approved by Staff.
8. Vail Golf Course DRB120317 / 15 minutes Bill
Conceptual review of new construction and a minor exterior alteration (temporary structures)
1775 Sunburst Drive/ Unplatted
Applicant: Town of Vail, represented by Vail Recreation District
ACTION: Conceptual, no vote
STAFF APPROVALS
ALA Property Investments LTD DRB120259 Warren
Final review of a new sign (construction)
1377 Vail Valley Drive/Lot 5, Block 3, Vail Valley
Applicant: ALA Property Investments LTD, represented by J.L. Viele Construction
2 - 2 - 2
8/21/2012
Page 3
Graham Residence DRB120260 Rachel
Final review of a new sign (construction)
123 Willow Place Unit 3/Lot 5, Block 6, Vail Village Filing 1, Summers Lodge Condo
Applicant: Richie and Kim Graham, represented by J.L. Viele Construction
Village Center Building A DRB120305 Rachel
Final review of changes to approved plans (exterior materials)
124 Willow Bridge Road/Lots C&K, Block 5E, Vail Village Filing 1
Applicant: Village Center Association, represented by Kyle Webb
Miner Residence DRB120306 Rachel
Final review of a minor exterior alteration (deck, façade)
5030 Prima Court/ Sundial Phase I
Applicant: Todd and Melisa Miner, represented by Architectural Services P.C.
Riggs/Smith Residence DRB120311 Warren
Final review of an addition (living room)
4939A Meadow Drive/Lot 12, Bighorn Subdivision Addition 5
Applicant: Jeffrey Riggs, represented by Carl Mueller
Berry Residence DRB120312 Rachel
Final review of an addition (living room, deck)
4770 Bighorn Road (Racquet Club Townhomes)/ unplatted
Applicant: Mark and Susan Berry, represented by SRE Builders
Barrett Residence DRB120320 Rachel
Final review of a minor exterior alteration (landscaping)
275 Beaver Dam Road/Lot 40, Block 7, Vail Village Filing 7
Applicant: Tim Barrett, represented by Terrill Samura
Brinkman Residence DRB120325 Warren
Final Review of a minor exterior alteration (landscaping)
2693 Cortina Lane/Lot 8, Block A, Vail Ridge
Applicant: Brinkman, represented by Nedbo Construction
Lion Square Lodge North DRB120329 Warren
Final review of a sign application (temporary sign)
660 West Lionshead Place/Lot 8, Block 1, Vail Lionshead Filing 3
Applicant: Lion Square Lodge North Homeowners Association, represented by Carrie Henderson
Kontny Residence DRB120330 Warren
Final review of a minor exterior alteration (deck)
3846 Lupine Drive/Lot 13, Bighorn 2nd Addition
Applicant: Mario Kontny, represented by John Krueger
Turley Residence DRB120331 Warren
Final review of a minor exterior alteration (doors)
1151 Casolar Del Norte/Lot 8, Block A, Lion’s Ridge Filing 1
Applicant: Marshall Turley, represented by Matt Sayre
Cohen Residence DRB120333 Tom
Final review of a minor exterior alteration (landscaping)
265 Beaver Dam Road/Lot 40, Block 7, Vail Village Filing 1
Applicant: David and Elizabeth Cohen
2 - 2 - 3
8/21/2012
Page 4
Johnson Residence DRB120334 Warren
Final review of changes to approved plans (door, sidelights, window)
1195 Vail Valley Drive/Lot 14, Block 6, Vail Village Filing 7
Applicant: Susan Johnson, represented by GPSL Architects
Timber Ridge DRB120327 Warren
Final review of a minor exterior alteration (deck)
1280 North Frontage Road West/Lot 1-5, Block C, Lion’s Ridge Filing 1
Applicant: Town of Vail, represented by Chris Farrington
Eagle River Water and Sanitation District DRB120332 Warren
Final review of a minor exterior alteration (landscaping)
1745 West Gore Creek Drive/Lot 5, Vail Village West Filing 2
Applicant: ERWSD, represented by Chad Salli, Town of Vail
Ross DRB120336 Tom
Final review of a minor exterior alteration (landscaping)
1297 Vail Valley Drive/Lot 1, Block 3, Vail Valley Filing 1
Applicant: Gussie Ross
ALA Property Investments Ltd DRB120337 Warren
Final review of changes to approved plans (landscaping)
1377 Vail Valley Drive/Lot 5, Block 3, Vail Valley Filing 1
Applicant: ALA Property Investments Ltd, represented by GPSL Architects
Sunlight North HOA DRB120338 Warren
Final review of a minor exterior alteration (stairs, gas meters)
2475 Garmisch Drive/Lots 5&6, Block H, Vail Das Schone Filing 2
Applicant: Sunlight North Homeowners Association, represented by Burke Harrington
Grompf Residence DRB 120339 Warren
Final review of a minor exterior alteration (deck)
2448 Garmisch Drive Unit 2/Lot 4, Block G, Vail Das Schone Filing 2
Applicant: Justin Gompf, represented by Burke Harrington
Vail 967 LLC DRB120340 Warren
Final review of changes to approved plans (driveway)
967 Vail Valley Drive/ Lot C, Block 6, Vail Village Filing 7
Applicant: Vail 967 LLC, represented by K.H. Webb Architects
Public Works DRB120342 Warren
Final review of a minor exterior alteration (windows)
1309 Elkhorn Drive/unplatted
Applicant: Town of Vail, represented by CRC Design & Remodel
Stoever Residence DRB120343 Warren
Final review of minor exterior alteration (landscaping)
2427 Chamonix Lane Unit 3/Lot 21, Block A, Vail Das Schone Filing 1
Applicant: Arthur Stoever
Ward Residence DRB120345 Warren
Final review of a minor exterior alteration (landscaping)
1875 West Gore Creek Drive/Lot 24, Vail Village West Filing 2
Applicant: Tom and Jana Ward, represented by SHC Nursery and Landscape
2 - 2 - 4
8/21/2012
Page 5
Wong Residence DRB120346 Rachel
Final review of a minor exterior alteration (patio doors, stain)
2329 Chamonix Lane/Lot 10, Block A, Vail Das Schone Filing 1
Applicant: Glenda Wong, represented by Tom Warzecha
Reimer Residence DRB120347 Warren
Final review of a minor exterior alteration (landscaping)
3090 Booth Creek Drive/Lot 8, Block 3, Vail Village Filing 11
Applicant: Art Reimer, represented by Joe Webster
Henkes Residence DRB120348 Bill
Final review of a minor exterior alteration (patio, landscaping)
2824 Snowberry Drive Unit B/Lot 17, Vail Intermountain
Applicant: Andrew Henkes
St Louis/Vail Connection Residence DRB120349 Rachel
Final review of a minor exterior alteration (deck)
5030 Prima Court/ Sundial Phase I
Applicant: St Louis/Vail Connection, LLP
Hook Residence DRB120350 Bill
Final review of a minor exterior alteration (gas stove termination cap)
4640 Vail Racquet Club Drive Building 10 Unit 1/Unplatted
Applicant: Edward Hook, represented by Sue Hobrock
Mill Creek Property LLC DRB120354 Rachel
Final review of a minor exterior alteration (landscaping)
303 Mill Creek Circle/Lot 3, Block 1, Vail Village Filing 1
Applicant: Mill Creek Circle LLC, represented by Jeff Kissane
Broughton Residence DRB120357 Warren
Final review of a minor exterior alteration (fence)
864 Spruce Court/Lot 12, Block 3, Vail Village Filing 9
Applicant: Joe Broughton, represented by Matt Hansen
Vossler Residence B12-0358 David
Final review of a minor exterior alteration (shingle repair)
5110 Grouse Lane/Lot 8A, Vail Meadows Filing 1
Applicant: Richard Vossler, represented by Matt Sayre
The applications and information about the proposals are available for public inspection during regular office
hours in the project planner’s office, located at the Town of Vail Community Development Department, 75
South Frontage Road. Please call 479-2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479-2356,
Telephone for the Hearing Impaired, for information.
2 - 2 - 5
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Five year strategic capital plan.
PRESENTER(S): Kathleen Halloran
ACTION REQUESTED OF COUNCIL: Provide feedback regarding the five year capital plan.
BACKGROUND: See attached memo.
STAFF RECOMMENDATION: Provide feedback regarding the five year strategic capital plan
in preparation for the 2013 Budget ordinance, with first reading scheduled for October 16th.
ATTACHMENTS:
5 Yr Cap
8/21/2012
TO: Vail Town Council
FROM: Finance Department
DATE: August 16, 2012
SUBJECT: Five-year capital plan
I. SUMMARY
Discussion of five-year outlook for the Capital Projects Fund, the Real Estate Transfer Tax
Fund and the Vail Reinvestment Authority Fund.
II. DISCUSSION
Historically the town has funded all capital projects through the Capital Projects Fund, and later
through the Real Estate Transfer Tax fund for eligible projects. Now the town has more options
and several of the town’s more recent (and future) major projects have other sources of funding
including: Vail Reinvestment Authority bonds and other Tax Increment Financing (TIF) revenue;
Conference Center Fund re-allocation; cost sharing with the Vail Recreation District; and
reallocation from related items previously budgeted.
The Vail Reinvestment Authority (VRA) provides funding for projects within Lionshead including:
the now completed Lionshead Transit Center $5.8 million; Lionshead Welcome Center $7.9
million; Library Remodel $2.2 million with another $50,000 from library grants for technology
upgrades; and Sundial Plaza $850,000.
Projects funded with reallocated Conference Center funds include: the Clubhouse at the Vail
Golf Course and Nordic Center $3.8 million with $1.15 million contributed by the Vail Recreation
District and $1.8 million reallocated from related RETT capital line items for a total of $6.8
million; Ford Park Fields $3.5 million with an additional $2.8 million reallocated from related
RETT capital line items for a total of $6.3 million; and Ford Amphitheater renovations $2.1
million with additional funding from Vail Valley Foundation.
Future projects not currently included in this 5-year plan:
Financing the new municipal building and potential re-financing of Timber Ridge are not
included in this first pass at the five-year capital plan. Also not included is any incremental
parking other than the CDOT requirements.
For the new municipal building, staff has identified certificates of participation or cash as the
best financing alternatives. Previous estimates of the total cost of the project were $15 million
with an updated estimate expected for Council’s meeting on September 4. Sale of a portion of
the municipal site for the medical office building will generate $5 million which can be directed
3 - 1 - 1
8/21/2012
Town of Vail Page 2
toward this project leaving a balance of approximately $10 million to be funded. Based on
current projections, there is sufficient cash in the Capital Projects Fund to provide $10
million of net cost for the municipal building. If circumstances change, certificates of
participation could be issued with the municipal building as collateral at any time, even after the
building is completed and placed in service.
Although there is financing in place for Timber Ridge, the current arrangement is not
sustainable. The property was purchased in 2003 primarily through variable rate taxable bonds
guaranteed by a letter of credit drawn on US Bank. These bonds are repaid from project
revenue and currently have $17,740,000 of bond principal outstanding. US Bank renewed the
letter of credit on July 15th of this year, but increased the letter of credit fee from 1.25% to
2.50% - a difference of approximately $225,000 annually – and also increased the required debt
service coverage ratio from 1.15 to 1.20. These increases, coupled with a significant drop in
rental income starting in 2010, make the current financing unsustainable. A review of financing
alternatives this spring indicated a need to pay down at least a portion of the debt in order to
refinance under the current variable rate bond structure or through other methods including
certificates of participation or bank financing. A potential redevelopment of the property by Vail
Timber Ridge LLC failed to materialize and was discontinued in December. A different team of
developers is currently looking at the property with an October 15th date to respond with a
proposal, if they feel it is feasible. If nothing comes of the latest initiative, staff will re-look at
financing alternatives; however, the ability to refinance the entire debt is unlikely. Staff
recommends keeping General Fund balances at approximately the current level to
provide flexibility in the future if the Timber Ridge Affordable Housing Corporation board
needs to request funds to stabilize the Timber Ridge debt.
If the town pursues additional permanent parking spaces, the cost could be in the range of
$22 million to $32 million and financing would need to be evaluated. However, incremental
parking revenue would not be sufficient to support this level of debt and there would clearly be a
net cost to the town.
Projects included in the current 5-year plan:
Staff has reviewed and updated the previously-approved five-year capital plan from the 2012
budget process. Attached documentation for your consideration:
• 5-Year Detail of the Capital and RETT Funds
• 5-Year Detail of the VRA capital budget
• Projects not currently included in the capital budgets, with potential funding sources
identified (“Unfunded List”)
• Supporting documentation for capital items made up of many smaller projects (such as
Facilities Capital Maintenance). See the reference code at the left of the capital project
name on the 5-year worksheets, for example C-1 or R-1.
Capital Projects Fund
Annual revenue for this fund is projected at an average of $9.4 million per year, not including
federal grants, assuming the same split of sales tax revenue with 61% going to the General
Fund and 39% to the Capital Projects Fund. Annual capital maintenance costs average $2.9
million per year. This leaves approximately $6.5 million of cash funding available each year for
larger projects such as neighborhood road reconstruction, parking improvements, variable
message signs, etc. In March of 2010, Council determined that General Fund reserves are
sufficient to cover unforeseen capital items as well as a General Fund shortfall and additional
3 - 1 - 2
8/21/2012
Town of Vail Page 3
reserves in other funds are not necessary. The five-year strategic capital plan presented today
results in an ending fund balance of $20.1 million in 2017 before inclusion of the municipal
building project.
Plan revisions/additions:
• Neighborhood Roads were pushed out by one year, with Rockledge Road (a shared
project with the Eagle River Water & Sanitation District) planned for 2014. Remaining
East Vail road reconstructions are planned for 2015, 2016 and 2017, respectively.
• Neighborhood Bridges were also pushed out by one year, with Nugget Lane and Bridge
Road bridges to be designed in 2014/2015 and constructed in 2016/2017. Both of these
bridges have support from federal grants totaling $1,024,800.
• Eight buses are scheduled for replacement in 2016, totaling $3,524,000 ($440,500 per
bus).
• Business Systems Replacement includes $350,000 to replace the Community
Development permitting software in 2013. This project was originally planned for 2011,
but was deferred. Now staff is experiencing significant compatibility issues due to the
age of the system (16 years). This project has been reviewed by the IT steering
committee, and will undergo a request for information (RFI) process in order to expedite
selection of a vendor. Several vendors were reviewed two years ago, but the steering
committee agreed that a new review is prudent given the rapid pace of technology
changes.
• The town's phone system infrastructure is also in dire need of replacement after a 15-
year life span. This expenditure of $150,000 is requested for 2013 to coincide with the
town's two-year interim location and will set the stage for the new municipal offices.
• A request for $60,000 in 2013 relates to a hardware appliance required for the upcoming
Intergraph software update purchased by the Dispatch Services Fund. Intergraph is the
software used by both the 911 call center as well as the town's public safety
departments.
• With audio-visual equipment in many town buildings such as Donovan Pavilion, the
municipal building, the Grand View room at the Lionshead Welcome Center, the West
Vail Fire Station and the Vail Library, staff is requesting an annual maintenance account
to provide funding for repair and/or replacement of this equipment. Some replacement
in Donovan Pavilion is anticipated for 2013 at a cost of $30,000, and annual
maintenance is estimated at $10,000 per year.
• An increase to the fiber optics / cabling systems maintenance account is requested for
2013 (for total expense of $39,000) to replace cabling in the Vail Transit Center, the
Public Works administration building and at the East Vail Fire Station. Annual
expenditures range from $15,000 to $21,000.
Reductions to cost were reflected within the town's capital maintenance programs such as
Parking Structures, Facilities and Capital Street Maintenance. Over the five-year span, these
progams were reduced by more than $2.2 million in either appropriate project deferrals or
updates to cost estimates. Another $1.4 million was removed, originally budgeted for road
improvements and rockfall mitigation in connection with proposed redevelopment of Timber
Ridge.
3 - 1 - 3
8/21/2012
Town of Vail Page 4
RETT Fund
Annual revenue for this fund is projected at an average of $4.3 million per year. Annual capital
maintenance costs average $2.7 million per year. This leaves approximately $1.6 million per
year of cash funding available for larger projects without the utilization of fund balance. The
RETT fund balance is projected to be $7.7 million by the end of 2017.
Plan revisions/additions:
• A bike lane from Red Sandstone to Buffehr Creek has been scheduled one year earlier
(now in 2015) at a reduced cost of $1.5 million. Original cost was $2.1 million.
• A bike lane on the south frontage road from the Vail Cascade to the West Vail round-
about was originally planned for 2016 at a cost of $1.6 million. This project is now
proposed with two phases (2013: from West Vail roundabout to Matterhorn and 2014:
from Matterhorn to Vail Cascade) at a cost of $1.1 million in total ($500,000 savings).
• Proposed improvements to the Gore Valley Trail include $425,000 in 2013 for the
section behind the library (from Lionshead to W. Meadow Drive) and $250,000 in 2014
to rebuild the section from Matterhorn to the W. Vail Conoco.
• Replacement of the temporary skate park located on the top of the Lionshead parking
structure is proposed at an estimated cost of $260,000. A permanent skate park was
planned for 2016 at an cost of $1.0 million, but a location has yet to be determined. The
permanent skate park has been removed from the capital plan for now, as a new
temporary skate park will last another five years.
• The town’s portion of a project to improve six portals into Ford Park is requested at $1.0
million in 2014. Vail Valley Foundation has committed to matching this contribution.
The following projects were updated with increases to cost:
• Street Furniture replacement was increased for 2013 and 2014 due to requests for an
increased number of bike racks and benches throughout town. Later years were
reduced for annual maintenance. Net increase over the five years totals $60,000.
• Park/Playground Capital Maintenance was adjusted by $25,000 over the five-year period
to account for changes to park and playground improvements. These improvements
include playground surface refurbishing, replacing bear-proof trash cans,
painting/staining of play structures, picnic shelter additions/repairs, and fence
maintenance.
Cost reductions include nearly $100,000 of savings over four years in annual park and
landscape maintenance and $22,000 of savings in recreation path maintenance during 2013.
There is also $1.1 million in cost reduction for bike lane projects on both the north and south
frontage roads.
Capital maintenance and replacement of assets managed by the Vail Recreation District (VRD)
will be updated during the annual capital meeting with VRD based on the terms of their lease.
The attached capital plan is based on the prior years' maintenance programming and estimates,
although no significant changes are anticipated. Any maintenance items for the Golf Clubhouse
were removed in light of the upcoming remodel. For more details on individual projects, please
refer to page R-4 and R-5.
3 - 1 - 4
8/21/2012
Town of Vail Page 5
Vail Reinvestment Authority (VRA)
Several projects are proposed over the next five years, as reflected in the Capital Projects Fund.
The VRA will reimburse that fund those projects, totaling just over $9.0 million over that time
period. The VRA fund balance is projected to be $3.6 million by the end of 2017.
“Unfunded” Project List
This represents projects not currently included in the five-year capital plan, but with potential
funding sources identified. The list has been updated for the removal of projects that are
proposed for funding, and the addition of “newly-identified” projects including items related to
recent input from Council members such as CDOT parking at Middle Creek, landscape
improvements at the East Vail Interchange, suggested modifications for the Vail Golf Course
and Nordic Center project, path lighting from Red Sandstone to the pedestrian overpass and the
reconstruction of the bike path on the north end of the pedestrian overpass.
Please provide staff with feedback regarding prioritization or changes to any projects. As they
are approved and funded/financed, projects will be transferred to the appropriate capital
budget(s).
Staff is requesting feedback from Council on the following:
• Is there support for the projects currently included in the 5-year strategic plan?
• Regarding unfunded projects, are there projects that should be included in the 5-year
plan? Do you want to change the priority of any projects, or assign a priority to the
“newly-identified” projects?
II. NEXT STEPS
Staff will use Council’s input in developing the Town Manager’s budget (includes General,
Capital, RETT and other funds), which will come before Council for a first look on September
18th and ordinance readings on October 16th and November 6th. The Vail Reinvestment
Authority budget resolution will be presented on November 6th as well.
3 - 1 - 5
8/21/2012
Increased cost
Revisions / newly added project
AmendedReduced cost
201220132014201520162017Project Information
Revenue
Total Sales Tax Revenue:18,900,000$ 19,580,000$ 20,167,000$ 20,772,000$ 21,395,000$ 22,037,000$ 2013 flat with actual 2011 collections; 3.6% above 2012 projected; 3% per year thereafter
Sales Tax Split between General Fund & Capital
Fund 61/3961/3961/3961/3961/3961/39
Sales Tax - Capital Projects Fund7,370,000$ 7,636,000$ 7,865,000$ 8,101,000$ 8,344,000$ 8,594,000$
Use Tax1,000,000 1,000,000 1,020,000 1,040,400 1,061,208 1,082,432 No major projects assumed; 2% annual increase after 2013
Federal Grant Revenue828,000 - 240,000 240,000 544,800 - 2012: Matterhorn bridge reconstruction, 2014-2016: Bridges at Nugget Lane and Bridge Rd
Other State Revenue- 200,000 - - - - CDOT share of funding for Simba Run Underpass study (50/50 with TOV)
Lease Revenue188,160 192,660 197,295 197,295 197,295 197,295 Per Vail Commons commercial (incr. every 5 years) and residential leases
Employee Housing Fee-In-Lieu70,000 - - - - - Recognize YTD collections
Project Reimbursement174,435 - - - - - 2012: $111K shared costs for I-70 Noise projects (homeowners $8K, CDOT $93K and ERWSD $10K); $28,783 energy
rebates; $34,652 reimb from VRD for tenant finishes in Welcome Center office space
Earnings on Investments and Other67,500 57,295 70,176 84,504 93,353 86,974 0.5% on available fund balance
Total Revenue9,698,095 9,085,955 9,392,471 9,663,199 10,240,656 9,960,701
Expenditures
Maintain Town Assets
Bus Shelters 30,000 30,000 30,000 30,000 30,000 30,000 Annual maintenance
C-1Parking Structures670,000 600,000 620,000 680,000 675,000 690,000 2012 - 2017 various repairs including deck topping replacement, expansion joint repairs, ventilation, HVAC, plumbing and
other structural repairs; There is an offset from VRA for maintenance in LH Pkg structure (see transfer near bottom of sheet)
C-2Facilities Capital Maintenance914,799 592,000 471,000 508,000 293,000 255,000 2012 - 2017 various repairs to town buildings including the upkeep of exterior (roofing, siding surfaces, windows, doors),
interior finishes (paint, carpet, etc), and mechanical equipment (boilers, air handlers, etc).
Gore Range Condo Units 2E, 2W & 3W 30,000 - - - - - 2012: Gore Range townhome special assessment for exterior improvements such as stairways and decks (3 units)
Creekside Housing Improvements385,000 - - - - - Plumbing; electrical wiring; roofing, asbestos and mold remediation; 4 units were completed in 2010; 4 more in 2011;
complete remaining 4 units and replace exterior siding, stairs and decks in 2012
Donovan Park Pavilion50,000 - - 720,000 - - 2012: $50K furniture replacement; 2015: $400K to change ventilation & improve noise, $270K to replace heating/air system
and $50K furniture replacement
Street Light Improvements 50,000 50,000 50,000 50,000 50,000 50,000 New street lights and to refurbish residential lighting
C-3Capital Street Maintenance1,000,078 735,900 979,000 1,213,300 952,600 1,196,800 On-going maintenance to roads and bridges including asphalt overlays, patching and repairs
Relocation of Recycling Center140,000 - - - - - Relocation of recycling center currently at Community Development parking area; This project will be completed prior to the
municipal site redevelopment
Flood Incident repairs349,192 - - - - -
Relating to flood repairs: Reconstruct a portion of Rockledge drainage improvements, Big Horn Creek culvert
repair/replacement at Columbine and Spruce Way, Booth Creek improvements to mitigate future flooding of culverts, tennis
courts and playgrounds.
Fire Truck Replacement590,000 - 620,900 - - - 2012 replace pumper truck from 1994; 2014 replace pumper truck from 1999
Town-wide camera system12,000 23,000 12,000 15,000 15,000 15,000 $12K per year for replacement of cameras and equipment (89 cameras and 4 recorders around town so far); Recorders cost
$7-8K each; cameras range from $800 - $3800 each; Replacing three DVR's in 2013
Audio-Visual capital maintenance- 40,000 10,000 10,000 10,000 10,000 2013: $30K for replacement of entire A/V system at Donovan; $10K annual maintenacne / replacement of audio-visual
equipment in town buildings such as Donovan, Municipal building, Grand View, LH Welcome Center, etc.
Document Imaging105,000 30,000 30,000 30,000 30,000 30,000 Annual maintenance, software licensing, and replacement schedule for scanners and servers
Software Licensing40,000 48,000 40,000 40,000 40,000 40,000 Upgrade Microsoft products on all equipment; renew licenses in future; Increased costs from vendors
Hardware Purchases94,000 50,000 50,000 50,000 50,000 50,000 Scheduled rotation of PCs, printers and servers
Data Center (Computer Rooms)15,000 15,000 15,000 15,000 15,000 15,000 Based on annual replacement schedule of security and power systems for 3 computer rooms
Website and e-commerce61,700 31,000 12,000 12,000 12,000 12,000 Internet security & application interfaces; website redevelopment (2012 -2013)
Fiber Optics / Cabeling Systems in Buildings23,000 39,000 21,000 15,000 15,000 15,000 Cabling / Network Infrastructure; to repair, maintain & upgrade; Replace cabling in VTC, Public Works and Fire Station 1 in
2013; QMoE fiber ring in 2013 (Fiber to connect our town office locations and prepare for new phone system)
Network upgrades35,000 60,000 40,000 30,000 30,000 30,000 Computer network systems - replacement cycle every 3-5 years; 2013 replacement of switches and routers
Phone System Infrastructure35,000 150,000 - - - - Replace infrastructure for 15-year old phone system; Replace phone system in Q1 2013
Business Systems Replacement 400,000 350,000 - - - - 2013 replacement of Community Development permitting software; 2012 Replace 15-year old financial system; Both
projects reviewed by an internal IT steering committee
Public Safety System 59,000 61,000 50,000 50,000 50,000 50,000
Annual capital maintenance of "County-wide "Computer Aided Dispatch/Records Mgmt System"; includes patrol car and fire
truck laptops and software used to push information to TOV and other agencies; TOV portion of annual Intergraph software
maintenance
TOWN OF VAIL 2013 PROPOSED PLAN
Capital Projects Fund
Five-Year Summary of Revenue and Exenditures
- 6 -
3 - 1 - 6
8/21/2012
Increased cost
Revisions / newly added project
AmendedReduced cost
201220132014201520162017Project Information
TOWN OF VAIL 2013 PROPOSED PLAN
Capital Projects Fund
Five-Year Summary of Revenue and Exenditures
Radio Tower (R56) 60,000 - - - - - 2012: Town's portion of wireless communication equipment upgrade - Radio tower will be replaced and location moved
from outside of Council chambers to outside of Dispatch center; Offset by Dispatch $10K below
Intergraph upgrade (Public Safety)80,000 60,000 - - - - TOV portion of upgrade to computer-aided dispatch system; 2013 required upgrade of Oracle applicance relating to the
Intergraph system upgrade
Police in-car cameras; replacement- 41,000 - - - - Upgrade mobile vision cameras in cars purchased 6 years ago
Police Breathalizer replacement10,000 - - - - - State mandated replacement of 13-yr old equipment; may eventually be offset with grant revenue
Police Rifle Replacement21,250 - - - - - Replacement of 21-year old rifles (17 units)
Total Maintenance5,260,019 3,005,900 3,050,900 3,468,300 2,267,600 2,488,800
Enhancement of Town Assets
CDOT Required parking630,000 534,000 218,000 - - - 2012: LionsHead and guardrail in West Vail on N. Ftg Rd; 2013: Safeway; 2014: Cascade
Vail Village Info Booth1,100,000 - - - - - Remodel, including addition of restrooms and guest enhancements
Vail Village Info Booth pull off lane250,000 - - - - - Pull off lane in front of Vail Village info booth for short term parking and to provide an area for an RV or larger vehicle to pull
in for information
LionsHead Info Booth25,000 - - - - - Demolition of old LionsHead Information Center
Guest Services Enhancements/Wayfinding1,519,110 1,100,000 1,000,000 - - - Guest information improvements town-wide, including pedestrian signage, parking structures, banners at VV & LH and
variable message signs
Guest Service Enhancements: LH Welcome center354,700 Transferred from Welcome Center project based on Council-approved plan for expenses relating to design and hard cost of
media, signage, etc.
East Vail Fire Station- - - - 775,000 - Renovation of station
Main Vail Fire Station150,000 1,750,000 - - - - Renovation of station
Energy Enhancements1,133,021 - - - - - Implementation of energy audit enhancements (incl. reimb from VRA, RETT, and GF)
Fire Equipment32,000 - - - - - $12K Thermal image camera for new truck; $20K set of equipment for ladder truck
East Meadow Drive-Streetscape Heat380,000 - - - - - Reconstruction of E. Meadow Drive bus path from La Bottega to start of Solaris
C-4Neighborhood Road Reconstruction10,000 25,000 620,000 4,475,000 4,300,000 4,250,000
East Vail roads; $25K in 2013 and $420K in 2014 for shared project with ERWSD on Rockledge Rd; 2014 also includes
$200K for planning / design of roadwork (construction in 2015) on Columbine, Spruce Way/Dr., Streamside, Nugget, Glen
Lyon, & Willow Ct; 2016/2017 projects include Meadow Dr./Ln, Juniper,Main Gore, Ute, Black Bear, Snowshoe & Grouse
Ln; Vail Valley Drive pushed to 2018
C-5Neighborhood Bridge Reconstruction1,151,815 - 300,000 300,000 1,000,000 700,000 2012: Matterhorn Bridge reconstruction with partial funding from federal grant; Nugget Lane and Bridge Rd bridges design
in 2014/2015 and construction in 2016/2017; also partial funding from federal grants.
Parking Entry System / Equipment- - 600,000 - - -
Replace parking system in both structures (LH parking structure system had been scheduled for replacement in 2006);
Better financial reporting and potential to interface with variable message signs and other parking systems across town; To
co-incide with LH parking entrance improvements because would include the booth attendant stations. Postponed from
2013 to 2014Radio Equipment replacement (pub. works, pub.
safety)48,000 - 693,000 - - - Replacement of 2008 radios for PW, Fire, PD
Hybrid Bus Battery Replacement 55,000 - 385,000 - - - Scheduled replacement: 1 in 2012; 7 in 2014; Estimated life of 6 years
Replace Buses1,245,978 - - - 3,524,000 - 2012: 2 Hybrid buses; 2016: 8 buses scheduled for replacement ($440.5K per bus)
Timber Ridge Legal/Zoning17,315 - - - - - Consultants, legal, etc. related to potential redevlopment project
Total Enhancements8,101,939 3,409,000 3,816,000 4,775,000 9,599,000 4,950,000
New Assets
Municipal Redevelopment880,209- - - - Estimated costs for architecture and design $513K plus project management $247K; Based on approved contracts; $120K
for developer agreement with Triumph
Chamonix Site Infrastructure - Housing - 1,400,000- - - - Could be phased (1st phase approx. $880K); infrastructure costs only
Simba Run Underpass (VRA)- 400,000 - - - - Feasibility study - funded by VRA; CDOT sharing 50% of costs (see revenue above)
Welcome Center (VRA)923,444 - - - - - Completion of the project; Includes $34K reimbursement from VRD for tenant finishes; Funded by the Vail Reinvestment
Authority (see Transfers below)
East LionsHead Portal (VRA)2,116,289 - - - - - Design work approved by Council Feb 1st; Funded by the Vail Reinvestment Authority (East LH Circle)
West LionsHead Portal (VRA)772,500 - - - - - Design work approved by Council Feb 1st; Funded by the Vail Reinvestment Authority (Concert Hall Plaza)
Library Remodel (VRA)2,101,728 - - - - - Funded by the Vail Reinvestment Authority (see Transfers below); This project adds additional community space on main
level, with offices and community room on basement level; includes elevator as required by code
LionsHead Parking Structure Entry (VRA)- 200,000 1,000,000 - - - Improve entry area into LH parking structure including booth attendant stations prior to 2015 World Alpine Ski Champs;
2013 design; 2014 construction
Frontage Road improvements (VRA)- - 3,000,000 - - - From LH Parking structure to Municipal building to coincide with new LH parking structure entry; funded by VRA (see
transfers below)
Sundial Plaza fountain & surround (VRA)850,000 - - - - -
Fountain needs to be removed or significant repairs/replacement; Stairways; Adjoining park could be improved rather than
try to find a location for a new LH park. A "new" LH park was on Unfunded list for $800K; $285K of this amount would be to
improve the connection of walkways up toward First Chair
East LH Circle pathway to Dobson (VRA)- - - - 890,000 - Improve connection from the E LionsHead bus stop to Dobson
Dobson Plaza (VRA)- - - - 1,075,000 - Redevelop the center plaza of Dobson for better flow of bus traffic, people traffic (concerts)
West Vail Fire Station 7,500 - - - - Final bills for West Vail Fire Station
- 7 -
3 - 1 - 7
8/21/2012
Increased cost
Revisions / newly added project
AmendedReduced cost
201220132014201520162017Project Information
TOWN OF VAIL 2013 PROPOSED PLAN
Capital Projects Fund
Five-Year Summary of Revenue and Exenditures
Buy-down Program552,118 - - - - - Carry forward program funding
Buy-down Program Funded by Pay -in-Lieu537,803 - - - - - Carry forward current balance of program funding: Housing funded directly by Pay-in-Lieu fees collected from developers
I-70 Noise350,183 - - - - - Utility relocation for Bald Mountain berm extension
Underground Utility improvements121,200 - - - - -
Two projects: East Vail on Bighorn Rd and Golf Course to Ford Park; Reimbursements from homeowners totaling $55,000
($5K from East Vail and $50K from residents near golf course), Vail Rec District ($15K) and Holy Cross directly funding
$43,000 for East Vail project
Total New Assets:9,212,974 2,000,000 4,000,000 - 1,965,000 -
Total Capital before Financing22,574,932 8,414,900 10,866,900 8,243,300 13,831,600 7,438,800
Debt Service and Financing
Debt Service on Outstanding Bonds2,088,346 - - - - - Annual debt service; Bonds will be paid off by 2013
Timber Ridge Debt Service Guarantee925,000 - - - - - Annual debt service guarantee - requirement of TR debt
Total Debt Service and Financing:3,013,346 - - - - -
Total Expenditures25,588,278 8,414,900 10,866,900 8,243,300 13,831,600 7,438,800
Other Financing Sources (Uses)
Transfer from Vail Reinvestment Authority9,035,574 1,710,000 4,340,000 350,000 2,315,000 350,000
2012: LH Portal improvements $2.9M, Sundial plaza $850K, $2.0 Library remodel, CDOT-Required parking $102K in LH,
LH Pkg mtc $365K, LH Welcome Center $1.1M, Guest Svcs $710K; Energy enhancements $953K; 2013: Guest Svcs
$500K, $400K Simba Run Underpass feasibility study, Parking entry system $300K, LH Pkg entry $200K; LH Pkg
mtc$310K; 2014: LH Parking structure entry $1M, Ftg Rd improvements $3M, LH Pkg mtc $340K; 2015: mtc $350K; 2016:
East LH Circle pathway to Dobson $890K, Dobson Plaza $1.1M, LH Pkg mtc $350K; 2017 $350K LH Pkg mtc
Transfer from General Fund50,000 - - - - - Transfer from GF from Library grants for Library renovation of community room
Transfer from Dispatch Fund10,000 - - - - - Transfer from Dispatch for Radio Tower project
Revenue Over (Under) Expenditures(6,794,609) 2,381,055 2,865,571 1,769,899 (1,275,944) 2,871,901
Beginning Fund Balance18,448,73911,654,13014,035,18516,900,75618,670,65517,394,711
Ending Fund Balance11,654,130 14,035,185 16,900,756 18,670,655 17,394,711 20,266,612
*Promissory note due from Childrens' Garden of
Leaning included in ending fund balance - not
spendable
5,000
- 8 -
3 - 1 - 8
8/21/2012
Increased cost
Revisions / newly added project
AmendedReduced cost
201220132014201520162017
Revenue
Real Estate Transfer Tax 3,835,000$ 3,871,000$ 3,987,130$ 4,106,744$ 4,229,946$ 4,356,845$ Less than 1% higher than 2012 budget; Base sales make up 70% of total projection for 2013
Golf Course Lease126,888 129,426 132,014 134,655 137,348 140,095 Annual lease payment from Vail Recreation District 2% annual increase - deposited to "Recreation
Enhancement Account" (accompanying expenditure listed below)
Intergovenmental Revenue20,000 20,000 20,000 20,000 20,000 20,000 $20K Lottery fund proceeds
Project Reimbursements1,165,000 15,000 - - - - 2012 VRD portion for Golf Course Clubhouse construction
Recreation Amenity Fees10,000 10,000 10,000 10,000 10,000 10,000
Earnings on Investments and Other68,000 46,789 39,404 34,777 30,040 36,898 0.5% on available fund balance
Total Revenue5,224,888 4,092,215 4,188,548 4,306,175 4,427,334 4,563,838
Expenditures
Maintain Town Assets
R-1Annual Park and Landscape Maintenance1,350,140 1,373,854 1,410,884 1,448,395 1,483,001 1,523,188 Ongoing path, park and open space maintenance, project mgmt
Management Fee to General Fund (5%)191,750 193,550 199,357 205,337 211,497 217,842 5% of RETT Collections - fee remitted to the General Fund for administration
R-2Rec. Path Capital Maint93,395 98,339 104,796 104,837 103,362 111,040 Capital maintenance of the town's recreation path system
Tree Maintenance90,000 65,000 65,000 65,000 65,000 65,000 Regular maintenance for tree health within the town (spraying, removing, new trees); scale spraying on town-
owned property at approx. $120 per tree; Initiating tree-planting program for lost trees
Forest Health Management195,000 195,000 195,000 195,000 195,000 195,000 Pine beetle mitigation in conjunction w/ forest service; Wildfire prevention measures
Street Furniture Replacement25,000 75,000 75,000 - 10,000 25,000 2013 and 2014 increased requests for bike racks and benches throughout town; also includes annual
replacement or capital repairs
R-3Park / Playground Capital Maintenance85,000 89,000 90,500 87,500 82,000 87,500
Minimal increases across years; Annual maintenance items include projects such as playground surface
refurbishing, replacing bear-proof trash cans, painting/staining of play structures, picnic shelter additions/repairs,
and fence maintenance
Glen Lyon Bridge- - - 150,000 - - Re-decking of recreation path bridge; too large a project to include in annual rec path captial maintenance
Alpine Garden Support85,620 65,620 66,932 68,271 69,636 71,029 2012: Council approved one-time capital of $20K for water feature and $65K of operating; 2013 request is
$100K, but assume flat until Council review; 2% increase in later years
Eagle River Watershed Support62,000 62,000 62,000 62,000 62,000 62,000 2012 includes off-cycle funding of $12K for regional water quality monitoring; 2013 request is $97K, but assume
flat with 2012 amended until Council review
Public Art - Operating92,657 94,005 95,885 97,803 99,759 101,754 Art in Public Places programming
Environmental Sustainability250,000 250,000 250,000 250,000 250,000 250,000 Environmental Sustainability programs
Total Maintenance2,520,562 2,561,368 2,615,354 2,734,143 2,631,256 2,709,353
Enhancement of Town Assets
Flood Incident repairs1,050,000 - - - - - 2012 repairs to culverts, drainage, etc
Streambank/tract mitigation200,000 1,500,000 - - - 2012 planning; 2013 implementation **estimate only**; Waiting for water district study
Skate Park - temporary- 260,000 - - - - Replacement of temporary skate park; a permanent site has not been identified. Estimated cost of a permanent
site is $1.0M
Trailhead Development / Improvement50,000 - - - - Improve trailheads; Continued need through 2012 (one trail per year)
ADA Compliance w/ VRD10,000 - - - - - New ADA regulations went into effect 2011; Need to replace drinking fountains at all parks ($2K each)
Bike Lanes: East Vail1,150,000 - - - - - 4 miles of bike lanes (6 foot shoulders) to be added prior to CDOT overlay project; first priority is Blue Cow
Chute to East Vail; path from Vail Mtn School to E. Vail exit
Bike Lanes: N. Ftg Rd- - - 1,500,000 - - Bike lane shoulder from Red Sandstone school to Buffehr Creek
Bike Lanes: S. Ftg Rd- 600,000 500,000 - - - Bike lane shoulders: In 2013 from West Vail roundabout to Matterhorn; 2014 from Matterhorn to Cascade to be
done in conjuction with Cascade CDOT parking project
Gore Valley Trail- 425,000 250,000 - - -
2013: Reconstruct Gore Valley Trail between LH and W. Meadow Dr. (behind Library); $425K for concrete;
Asphalt is also an option at $315K; 2014:from Matterhorn to W.Vail Conoco $250K to rebuild (preferred) or
$150K to patch and overlay
Red Sandstone Park - Per Safety plan197,630 - - - - - Reconstruction of playground per safety plan
Ford Park Safety Improvements- - - 304,000 - - Ford Park playground built in 2000; improvements scheduled for 2015
Ford Park Portal Improvements- - 1,000,000 - - - TOV portion of improvements to six portals into Ford Park; Matching contribution from Vail Valley Foundation
Booth Creek Playground- - 385,250 - - - Previously in 2012; deferred to 2014
Booth Creek Park redevelopment- - - - 1,340,000 Previously in 2012; deferred to 2017
Donovan Park - - - 304,000 - - 2015 safety improvements to playground / park
Public Art - General program / art335,878 80,000 80,000 85,000 85,000 85,000 To purchase sculptures, artwork, art programs and events; remainder is re-appropriated each year to
accumulate enough funds
Public Art - Winterfest33,494 - - - - - Annual Winterfest event; approximate cost of $25K per year; rely on donations
Total Enhancements3,027,002 2,865,000 2,215,250 2,193,000 85,000 1,425,000
TOWN OF VAIL 2013 PROPOSED PLAN
SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE
REAL ESTATE TRANSFER TAX
- 9 -
3 - 1 - 9
8/21/2012
Increased cost
Revisions / newly added project
AmendedReduced cost
201220132014201520162017
TOWN OF VAIL 2013 PROPOSED PLAN
SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE
REAL ESTATE TRANSFER TAX
VRD-Managed Facility Projects
Recreation Enhancement Account- 129,426 132,014 134,655 137,348 140,095 Transferred 2012 balance to Golf Course Clubhouse redevelopment as intended by this reserve account -
funded by annual lease revenue
R-4Golf Course - Other 151,635 4,489 108,967 4,276 97,498 -
2012: replacement of maintenance storage building; Improvements to golf course: 7th tee box retaining wall,
11th and 17th hole bridges;improvements to maintenance building including stucco, wood trim and soffits; Mtce
Storage building
R-5Dobson Ice Arena416,774 3,480 14,475 105,721 13,166 - 2012: upgrade of louver system, replacement of doors, refurbishment of wood exterior and landscape
improvements; renovate changing rooms and restrooms
R-5Ford Park / Tennis Center Improvements428,910 2,768 12,270 69,006 9,785 - Upper bench improvements; outbuilding improvements at ball fields
R-5Athletic Fields - 2,848 15,604 3,764 18,254 - 2014 and 2016: asphalt overlay of parking lot
R-5Gymnastics Center1,978 - - - - -
R-5Nature Center10,646 - - 8,971 63,330 - 2012 wood open rail fencing
Total VRD-Managed Facility Projects1,009,943 143,010 283,330 326,393 339,380 140,095
New Assets
Golf Course Clubhouse (CCF)6,712,761 - - - - -
Re-appropriation of prior estimate for design and architecture; plus transfer of $1.26M from prior clubhouse
capital maintenance budget; $1.15M reimbursement from VRD, allocation of Recreation Enhancement Funds
$504K and Conference Center funds of $3.8M (Total project cost estimated at $6.8M)
Ford Park Fields (CCF)6,297,340 - - - - -
Added transfer of $342.6K from Ford Park/Tennis, transfer of $200K from Ford Park Improvements budget and a
transfer of $2,256,185 from Ford Park Management Plan budget. Consolidating dollars already in previous
budgets and adding use of $3.5M in Conference Center Funds for total project estimated cost of $6.3M
Public Restrooms370,000 - - - - - Restrooms at lower bench of Ford Park
Total New Assets:13,380,101 - - - - -
Total Expenditures19,937,608 5,569,378 5,113,934 5,253,536 3,055,636 4,274,448
Other Financing Sources (Uses)
Transfer from Conf Center Fund6,785,000 - - - - - Transfer from Conf Center Funds for Golf Clubhouse ($3.8M) and Ford Park Field projects ($3.5M), net of
$515K transferred in 2011 for planning/design
Revenue Over (Under) Expenditures(7,927,720) (1,477,163) (925,386) (947,361) 1,371,698 289,390
Beginning Fund Balance17,285,6059,357,8857,880,7236,955,3366,007,9757,379,673
Ending Fund Balance9,357,885$ 7,880,723$ 6,955,336$ 6,007,975$ 7,379,673$ 7,669,063$
- 10 -
3 - 1 - 10
8/21/2012
VAIL REINVESTMENT AUTHORITY
2012
Amended20132014201520162017
Revenue
Property Tax - LionsHead TIF2,784,000$ 2,784,000$ 2,945,000$ 2,945,000$ 3,092,000$ 3,092,000$
Property Tax - Vail Square Metro Districts385,000 385,000 404,000 404,000 424,165 424,165
Federal Subsidy for Build America Bonds173,343 173,343 173,343 173,343 173,343 173,343
Earnings on Investments32,000 33,000 41,000 41,000 41,000 41,000
Total Revenue3,374,343 3,375,343 3,563,343 3,563,343 3,730,508 3,730,508
Operating Expenditures
Professional Fees25,000 25,000 25,000 25,000 25,000 25,000
Management Fee 41,680 55,680 58,900 58,900 61,840 61,840
Treasurer's Fee -LionsHead TIF62,520 83,520 88,350 88,350 92,760 92,760
Treasurer's Fee -Vail Square Metro Districts11,550 11,550 12,120 12,120 12,725 12,725
Vail Square Metro District Pass Through373,450 373,450 391,880 391,880 411,440 411,440
Total Operating514,200 549,200 576,250 576,250 603,765 603,765
Debt Service
Principal445,000 460,000 475,000 490,000 500,000 500,000
Interest618,778 605,203 591,178 577,928 564,928 564,928
Fiscal Agent fees2,200 2,200 2,200 2,200 2,200 2,200
Bond Issuance costs-
Total Debt Service1,065,978 1,067,403 1,068,378 1,070,128 1,067,128 1,067,128
Total Expenditures1,580,178 1,616,603 1,644,628 1,646,378 1,670,893 1,670,893
Excess of Revenues Over Expenditures1,794,165 1,758,740 1,918,715 1,916,965 2,059,615 2,059,615
Other Financing Sources (Uses)
Debt Proceeds
Transfer Out - Capital Projects Fund
LionsHead Transit Center(61,172)
LionsHead Welcome Center(1,127,518)
Guest Services Enhancements/Wayfinding(709,916) (500,000)
Library Remodel(1,977,228)
East LionsHead Portal (VRA)(2,116,289)
West LionsHead Portal (VRA)(772,500)
Energy Audit Enhancements(953,951)
LionsHead Parking Structure Entry- (200,000) (1,000,000)
Frontage Road improvements (LH Pkg to Muni)- (3,000,000)
Parking Entry System / Equipment (LH only)- (300,000)
Bike Lanes: Westwind to LH Pkg Structure-
CDOT-Required Parking(102,000)
Sundial Plaza fountain & surround(850,000)
East LH Circle pathway to Dobson- (890,000) -
Dobson Plaza- (1,075,000) -
Simba Run Underpass Feasibility study- (400,000)
LionsHead Parking Structure Capital Maintenance(365,000) (310,000) (340,000) (350,000) (350,000) (350,000)
Total Other Financing Sources (Uses)(9,035,574) (1,710,000) (4,340,000) (350,000) (2,315,000) (350,000)
Net Change in Fund Balance(7,241,409) 48,740 (2,421,285) 1,566,965 (255,385) 1,709,615
Beginning Fund Balance10,143,991 2,902,582 2,951,322 530,037 2,097,002 1,841,617
Ending Fund Balance2,902,582$ 2,951,322$ 530,037$ 2,097,002$ 1,841,617$ 3,551,232$
- 11 -
3 - 1 - 11
8/21/2012
Unfunded Capital Projects
Note: Costs are preliminary estimates
VRARETT
Capital Projects
Fund
Priority I
Parking Expansion - LionsHead$22.0M - $36.2M
Subtotal: Priority I: 27,000,000 - -
Priority II
Main Vail Round-about Major Reconstruction3,600,000 Per Transportation Plan
West Vail Round-about Major Reconstruction 1,000,000 Per Transportation Plan
Road redevelopment per master plan3,400,000 S. Frontage Rd - LionsHead (Muni building to LH Parking structure)
Road redevelopment per master plan 5,000,000 S. Frontage Rd - LionsHead (LH Parking structure to VA shops)
Road redevelopment per master plan8,400,000 S. Frontage Rd
Road redevelopment per master plan13,400,000 N. Frontage Rd
Subtotal: Priority II: 8,400,000 - 26,400,000
Priority III
Simba Run Underpass19,500,000
Town Shop Improvements 9,225,000
Subtotal: Priority III:19,500,000 - 9,225,000
Newly-identified unfunded projects:
CDOT Parking Requirement - North Frontage Road (West of W Rdabt)1,817,000 Both sides of the road (30+ days); Staff does not recommend funding at this time; Could pursue discussion with CDOT
regarding ownership
CDOT Parking Requirement - Middle Creek950,000
Golf Clubhouse1,000,000 Increased costs due to suggested modifications
East Vail Interchange450,000 Landscaping improvements
Bike Path - Reconstruction175,000 On north end of Pedestrian Overpass
Path Lighting170,000 Add lights on pedestrian path from Red Sandstone to Pedestrian Overpass
Bike Lanes (shoulder only)1,624,000 S Frontage Rd - LH Parking structure to municipal building
Bike Lanes (shoulder only)650,000 Westwind to LH parking structure
Bike Lanes (shoulder only)495,000 VA Shop to Westwind
Bike Lanes (shoulder only)450,000 Cascade to VA Shop
Basketball court near Red Sandstone250,000
School moved its playground area, leaving a void and flat area large enough for a full basketball court. This cost estimate
includes the continuation of a path up to the court and surrounding landscape, etc. Operating costs would be similar to court at
Donovan: approx $10K every 10 years to resurface the court
Subtotal: Newly Identified: 1,145,000 4,119,000 2,767,000
Funding Resource Options:
Projected Fund Balance (over next five years):3,551,232 7,669,063 20,266,612 *Does not take into account use of Capital Project Funds for Municipal redevelopment
Funding Available from Vail Resorts for Additional Parking4,300,000
Federal Funding$ TBD
Eligible for funding from
- 12 -
3 - 1 - 12
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:Parking Structure Mtce-$ 600,000$ 620,000$ 680,000$ 675,000$ 690,000$
Project Code:CMT007
Project Manager:John Gallegos
Vail Transportation Center
Concrete and Caulking Repairs20,00030,00030,00030,00030,000
Equipment Replacement25,00030,00030,00030,00030,000
Expansion Joint Replacement30,00030,00030,00025,00025,000
Hot Water Heater
Deck Sealing 250001000030,00030,000
Deck Topping Replacement5,0001500060000
Elevators75,000100001000010,00010,000
Ventilation System Repairs35,00035,00035,00030,00030,000
Flooring10,00010,00025,00010,00010,000
Fire System Replacement25,00025,00025,00025,00025,000
Electrical and Lighting 10,00010,00010,00030,00030,000
Painting and Rust Control20,00020,00020,00020,00020,000
Paint Stripes15,00020,00025,00015,00015,000
HVAC and Plumbing 5,00030,00030,00030,00030,000
Interior Finishes10,00015,00015,00015,00015,000
Locker Replacement
Roofs, Walls, Doors 10,00015,00015,00015,00015,000
Security5,0005,0005,00015,00015,000
Structural Inspection15,000
Structural Repairs10,00020,00020,00020,00020,000
Automatic Doors - Terminal Bld.20,00020,000
Terminal Building10,000 10,000
Windows5,0005,000 5,000 5,000 5,000
Vail Information Center15,00015,000 15,000 20,000 20,000
Ski Museum15,00015,000 15,000 20,000 20,000
Terminal Building15,00015,000 15,000 20,000 20,000
Parking Booths10,00045,000 10,000 10,000 10,000
Lionshead Transportation Center
Expansion Joint Replacement25,00025,00025,00025,00025,000
Concrete Repairs25,00025,00025,00025,00025,000
Equipment replacement30,00015,00010,000 10,000
Fire system Replacement10,00010,00010,0005,0005,000
Flooring
Electrical and Lighting 30,00030,00030,000
Deck Sealing 5,00010,00010,00010,00010,000
Deck Topping Replacement50,00020,000 50,000
Interior Finishes5,00010,00010,0005,0005,000
Painting and Cleaning25,00025,00025,00030,00030,000
Stripe painting15,00010,00010,00010,00010,000
Roofs, Walls, Doors 15,00010,00010,00020,00020,000
Structural Inspection20,00020,000
Structural Repairs30,000 30,00040,00040,000 40,000
Snowmelt Stairs
Roofs, Walls, Doors, Windows
Interior Finishes
Subtotal LionsHead280,000 230,000 275,000 270,000270,000
C-1
3 - 1 - 13
8/21/2012
Capital Budget - Project Detail2012 20132014201520162017
Project Name:Facilities914,799$ 592,000$ 471,000$ 508,000$ 293,000$ 255,000$
Project Code:CMT005
Project Manager:John Gallegos
Community Development building
Stucco patching / painting (10 yrs)
Window repair (10 yrs)
Door replacement
Roof - damage only
Roof replacement (2020)
Interior walls and ceilings (6 yrs)
Interior flooring (13 yrs)
Kitchen update incl. appliances (2018)
Restrooms - remodel
Boilers (2) (2023)
Air handling unit relacement (2023)
Furnace (2023) and expansion tank (2024)
Hot water heater (2020)
Fire Station I (East Vail)
Misc. Repairs5,000 5,000 5,000 5,000 5,000
Stucco patching / painting (10 yrs)
Wood siding clean & paint (5 yrs) ; Replace 20178,225 20,000
Window repair (10 yrs)
Door replacement 6,000
Overhead garage doors7,500
Wood decks - rebuild
Facility interior: carpet (15 yrs)
Facility interior: paint (7 yrs)5,000
Hot water heater (2025)
Compressor - replacement3,125
Radiant Heat tube replacement (2022)7,500
Exhaust extraction system replacement (2017)
Generator replacement (2027)
Fire Station II (Main Vail)
Stucco patching / painting (10 yrs)
Wood siding clean & paint (5 yrs) ; Replace 20177,990
Wood siding replacement
Window repair (10 yrs)
Door replacement
Overhead garage doors12,500
Sloped roof replacement
Gutters, Downspouts and Heat Trace
Facility interior: carpet (15 yrs)
Facility interior: tile floor
Facility interior: paint (7 yrs)
Hot water heater 1,875 1,875
Radiant Heat tube replacement (2022)
Exhaust extraction system replacement (2023)
Generator replacement (2028)
Fire Station III (West Vail)
Misc. Repairs5,000 5,000 5,000 5,000 5,000
LibraryMisc. repairs5,000 5,000 5,000 5,000 5,000
Wood siding clean & paint (5 yrs) 23,700
Window repair (10 yrs)5,100
Door replacement (2018)
Metal reoofing (2020)
Skylights mtce ; replacement 20224,300
Facility interior: carpet (12 yrs)
Kitchen (2018)
Restrooms (2)17,000 17,000
Boiler (1) replacement (2025)40,000
Expansion tank for boiler3,100 5,000
Hot water heater (17 yrs)
Air Handling unit (2023)
Air compressor (2021)
Fire panel (2026)
Security system27,500
Lionshead Welcome Center
Misc. Repairs5,000 5,000 5,000 5,000 5,000
C-2
3 - 1 - 14
8/21/2012
Capital Budget - Project Detail2012 20132014201520162017
Project Name:Facilities914,799$ 592,000$ 471,000$ 508,000$ 293,000$ 255,000$
Project Code:CMT005
Project Manager:John Gallegos
Lionshead Transit Center
Misc. Repairs5,000 5,000 5,000 5,000 5,000
Police Dept ** Will be adjusted based on plans for Muni redevelopment
Stucco patching / painting (10 yrs)73,190
Wood siding (6 yrs) 7,638
Stone Veneer (10 yrs)
Windows and doors.(10 yrs)7,920
Rebuild balconies35,100
Roof (2017)
Gutters and downspouts (2017)
Subsurface concrete parking repairs (8 yrs)12,000
Interior Finishes48,000 35,000 46,000 40,000 20,000 20,000
Interior flooring (13 yrs)
Kitchens (2) one in 2015; second in 20178,000
Locker rooms and restrooms (16 yrs)42,500
Boiler replacement (3)11,250 75,000
Re-tube Boilers (5) (10 yrs)25,000
Circulation pumps (3 yrs)5,626
Expansion tanks (4)12,500
Hot water heaters (2) (17 yrs)1,500
Air Handling units (2)152,000 45,000 45,000 25,000
Interior Cooling units (4) (2017)
Parking garage heaters (5)6,875 6,875
Rooftop units (7) (2023)
Exterior Air conditioning units (2) (2027)
Electrical equipment (switch panels) (9) (2026)
Fire panel8,125
Elevator drive and controls 43,750
Elevator cab remodel10,000
Public Works Administration
Damaged sections of heated walkways (8 yrs)2,188
Wood siding clean & paint (5 yrs) 10,810
Window repair (10 yrs)7,344
Roof 80,000
Facility interior: carpet (15 yrs) (2018)
Facility interior: paint (10 yrs)5,512
Kitchen update incl. appliances5,000
Restrooms (2) (15 yrs)8,500
Boiler replacement10,000 10,000
Circulation pump (13 yrs)
Expansion tank (2018)
Hot water heater replacement2,750
Public Works Shop and Bus Barn
Heated concrete slabs - minor mtce (3 yrs)1,250
Heated concrete slabs - replace damage (7 yrs)5,000
Wood siding clean & paint (5 yrs) 82,250
Wood siding 25% replacement (5 yrs) (2021)
Window repair (2020)
Doors: cyclically repl. Locks, weather stipping (3 yrs)
Metal door repair (5 yrs)1,375
Window replacement (25% every 5 yrs)18,375 - -
Overhead garage door 11' (replace section 25%) (4 yrs)91,149
Overhead garage door 22' (replace section 25%) (4 yrs)35,000 15,000 15,000
Steel doors ( replace section 25%) (7 yrs)94,525
Roofing (replace portion 30%)45,000
Restrooms remodel8,750 8,750
Locker rooms (2018)
Boiler replacement
Expansion tank replacement (2018)
Circulation pumps (3) (5 yrs)28,875
Hot water heater replacement3,125 3,125
Furnace replacement (2 of 9 total)16,376
Radiant Heat tube replacement (5 yrs): Bay62,813 62,813
Radiant Heat tube replacement (5 yrs): Bus barn (2017)
Compressors (2018)
Vehicle service lift replacement (2)20,000
Vehicle paint booth - replace air cleaning unit24,375 24,375
Exhaust extraction system replacement18,750
Fuel level monitor system replacement18,750
Water recycle unit replacement (2017)
Bus Wash Equipment45,000
C-2
3 - 1 - 15
8/21/2012
Capital Budget - Project Detail2012 20132014201520162017
Project Name:Facilities914,799$ 592,000$ 471,000$ 508,000$ 293,000$ 255,000$
Project Code:CMT005
Project Manager:John Gallegos
Fire panel (2021)
Snowmelt Boilers
Annual Maintenance/repairs75,000 40,000 40,000 50,000 50,000 50,000
Lift Stations
Ford Park 80,000
Vail Valley Drive80,000
Ski MuseumMis. Repairs5,000 5,000 5,000 5,000 5,000
Facility interior: carpet (2018)
Restroom 6,250
Hot water heater replacement (18 yrs)
Air conditioning unit (2022)
Vail Village Info Center
Heated concrete slabs - replace damage (7 yrs)
Stucco patching / painting (10 yrs)43,914
Stone Veneer (6 yrs)
Windows and doors.(10 yrs)
Restroom (15 yrs)
Facility interior: tile repair (10 yrs)
Facility interior: paint (6 yrs)
Transit Offices
Heated concrete slabs - replace damage (7 yrs)3,188
Stucco patching / painting (10 yrs)47,292
Stone Veneer (6 yrs)1,250
Windows and doors.(10 yrs)6,192
Skylights maintenance (10 yrs)24,960
Skylights replacement 25% (7 yrs) (2018)
Facility interior: carpet (13 yrs)18,350
Facility interior: tile repair (10 yrs)1,500
Facility interior: paint (6 yrs)20,140
Restrooms and locker rooms (15 yrs)105,000
Buzzard Park
Stucco patching / painting (10 yrs) (2018)
Wood siding repairs (5 yrs) 25,615
Window repair (10 yrs)8,640
Doors: cyclically repl. Locks, weather stipping (3 yrs)4,375
Railings maintenance (5 yrs)1,800
Railings replacement (2018)
Stairways and landings: wash and seal (4 yrs)2,490 2,988
Roof (2023)
Gutters, downspouts and heat trace (2023)
Washers and dryers replacement8,750
Boiler replacement25,000
Expansion tanks (2018)
Circulation pump replacement (7 yrs)1,500
C-2
3 - 1 - 16
8/21/2012
Capital Budget - Project Detail 2012 20132014201520162017
Project Name:Capital Street Mtce1,000,078$ 735,900$ 979,000$ 1,213,300$ 952,600$ 1,196,800$
Project Code:CMT004
Project Manager:Tom Kassmel
Charlie Turnbull
Description of project:
Streetscape repair75,000 60,000 64,000 67,000 70,000 74,000
Pavement Inspection18,000 - 20,000 - 22,000
Data Collection/Intern- - - - - -
Stripping28,500 29,000 30,000 32,000 34,000 35,000
Crack Seal- - - 115,000 - -
Aspahlt Patching60,000 50,000 80,000 53,000 90,000 60,000
Concrete Repair50,000 45,000 64,000 46,000 70,000 52,000
Guardrail Repair10,000 12,000 45,000 13,000 14,000 50,000
Surface Seal252,559 - 380,000 205,000 150,000
(Columbine, Spruce Way/Drive, Streamside East/West, Nugget
Glen Lyon, Willow Ct.)
Asphalt Mill & Overlay- 250,000 - 425,000 655,000
Drainage Improvement405,169 150,000 110,000 67,000 315,000 74,000
Storm Water Management23,153 55,000 57,000 60,000 63,000 66,000
Bridge Improvement34,729 60,000 60,000
(Meadow Drive/Lane, Juniper, Main Gore Drive/Circle,
Ute Ln., Black Bear, Black Gore, Snowshoe, Grouse Ln.)
Sub Total939,110 669,000 890,000 1,103,000 866,000 1,088,000
Contingency (~10%)/Misc.60,968 66,900 89,000 110,300 86,600 108,800
Streetscape repairMaintnenace of streetcape areas
Pavement InspectionBi-Annual Surface Pavement Inspection of all the Town Roads. This allows us to montior and evaluate road conditions.
Data Collection/InternCollect and update GPS data inventory(Draiange, Street Lights, Signs, etc…)
StrippingStripe all of the Town roads
Crack SealSeal cracks within all of the town roads. Townwide every 5 years. Spot sealing every year.
Aspahlt PatchingFull depth and skin asphalt patches as needed throughout the town.
Concrete RepairConcrete repair thorughout the town.
Guardrail RepairGuardrail repair throughout the town.
Surface SealSlurry and Chip seals on town roads as part of the towns pavement maintenance program.
Asphalt Mill & OverlayAsphalt mill and overlays on town roads as part of the Town's pavement maintenance program
Drainage ImprovementDrainage Improvement projects throughout the town.
Storm Water ManagementMaintenance of Storm Sewer System, contract cleaning, water quality improvement programs.
Bridge ImprovementMinor Bridge improvements as identified in the biannual bridge inspection reports.
ContingencyUnforseen Capital Street Maintanence issues that come up throughout the year
C-3
3 - 1 - 17
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:
Neighborhood Road Reconstr.167,882$ 25,000$ 620,000$ 4,475,000$ 4,300,000$ 4,250,000$
Project Code:CSR007
Project Manager:Tom Kassmel
Description of project:
Vail Valley Drive Reconstruction
Design
ConstructionMost of this will roll to 2012 since we delayed this project waiting for ERWSD info.Postponed
Rockledge Draiange Improvement/Joint ERWSD
Design60,000 25,000 Complete Design as needed
Construction50,000 420,000 Delayed by ERWSD due to
Potato Patch work
East Vail Road Reconstruction Phase I
(Columbine, Spruce Way/Drive, Streamside East/West, Nugget
Glen Lyon, Willow Ct.)
Design200,000 Postpone one more year
Construction4,125,000 Postpone one more year
23,153
East Vail Road Reconstruction Phase II&III34,729
(Meadow Drive/Lane, Juniper, Main Gore Drive/Circle,
Ute Ln., Black Bear, Black Gore, Snowshoe, Grouse Ln.)
Design350,000 Postpone one more year
Construction4,300,000 4,250,000 Postpone one more year
C-4
3 - 1 - 18
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:
Neighborhood Bridge Reconstr.1,151,815$ -$ 300,000$ 300,000$ 1,000,000$ 700,000$
Project Code:CSR008
Project Manager:Tom Kassmel
Description of project:
Matterhorn Bridge Reconstruction
Design
Construction *offset by $828K in grant revenue1,151,815
Nugget Lane Bridge Reconstruction
Design- 300,000
Construction- 700,000
Bridge Rd Replacement
Design300,000
Construction1,000,000
C-5
3 - 1 - 19
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:Annual Park Mtc1,350,140$ 1,373,854$ 1,410,884$ 1,448,395$ 1,483,001$ 1,523,188$
Project Manager: Lois Hart
Description of project:
Staffing & Benefits799,035 809,824 834,119 859,142 884,917 911,464
(18 seasonal landscapers and 7 full-time equivalents)
includes irrigation; landscape architecture; seasonal full-time
landscape supervisors
Contract Labor 147,000 147,000 151,410 151,410 151,410 155,952
(tree spraying, park restroom cleaning, skate p- - - - -
weed management, pest control) - - - - -
Prof Dev & Dues9,100 9,100 9,100 9,100 9,100 9,100
Water & Sewer84,800 90,000 92,700 95,481 98,345 101,296
Other Utilities40,597 41,565 42,812 44,096 45,419 46,782
Trash Removal12,000 12,000 12,000 12,360 12,360 12,360
Repair & Mtce (buildings, irrigation, fountains, e56,500 63,500 65,405 67,367 69,388 71,470
Janitorial Supplies13,500 13,500 13,500 13,905 13,905 13,905
Chemical Supplies13,000 13,000 13,000 13,390 13,390 13,390
Flowers & Landscaping Supplies74,102 74,102 74,102 76,325 76,325 76,325
Other Operating supplies17,830 17,830 17,830 18,365 18,365 18,365
Heavy Equipment Charges (internal charge for 82,676 82,433 84,906 87,453 90,077 92,779
R-1
3 - 1 - 20
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:
Rec Path Capital Mtce93,395$ 98,339$ 104,796$ 104,837$ 103,362$ 111,040$
Project Code:RMT001
Project Manager:Gregg Barrie
Description of project:
Pedestrian Bridge Inspection Report 15,000 20,000
Pedestrian Bridge Recommendations (contract)10,000 20,000 5,000 5,000 5,000
Pedestrain Bridge Recommendations (TOV)2,500 2,500 2,500
Recreation Path directional signage repair15,000 7,500 10000
Dowd Junction engineering7,500 3,000
Deer Screen repairs2,500 2,575 2,652 2,732 2,814
Replace Deer Screen25,000
Path Lighting electric bill1,654 1,737 1,824 1,915 2,011 2,111
Seeding7,500 7,725 7,957 8,195 8,441
Vegetation Control along shoulders1,082 1,114 1,147 1,182 1,217 1,254
Striping500 500 500 500 500 500
Drainage Repairs General11,330 11,670 12,020 12,381 15,000 17,500
Asphalt Repairs General11,330 11,670 12,020 12,381 20,000 22,500
Unforseen Projects/Maintenance10,677 11,000 11,330 11,670 30,000 30,900
Facilities HEO position ( seasonal)19,323 17,923 17,923 18,461 18,461 18,461
R-2
3 - 1 - 21
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:Park / Playground Cap Mtc85,000$ 89,000$ 90,500$ 87,500$ 82,000$ 87,500$
Project Code:RMT009
Description of projects:
General Projects
Playground surface refurbishing-$ 9,000$ 9,500$ 10,000$ 10,500$ 11,000$
ADA Drinking Fountains7,500$
Irrigation Wireless Conversion Startup6,500$
Irrigation Wireless Conversion Stations (5/year)4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$
Replace bear-proof cans ($ 1,150ea )6,000$ 6,000$ 6,000$ 6,000$ 6,000$ 6,000$
General Painting/staining etc1,500$ 1,500$ 1,500$ 1,500$ 1,500$
COMMUNITY PARKS
Donovan Park
Add small picnic shelter in grass area by b.ball
Expand concrete at existing shelter7,500$
Resurface Basketball court, 60' x 105'8,500$
Relandscape main entry - east10,000$
Replace b-ball goal pads1,500$
Ford Park
ADA Improvement playground acccess - rubber/conc
Playground paver repair, tree rings, shade area
Resurface Basketball Court6,000$
Repair concrete walk around turf (200 sf +/-)3,500$
Replace net on suspension bridge2,500$
NEIGHBORHOOD PARKS
Bighorn Park
Repair willow fence3,500$
Picnic Table Pad2,500$
Steps west end playground5,000$
Widen Picnic Shelter Concrete4,500$
Plant trees west of picnic shelter2,500$
Plant stream stabilization1,500$
Irrigation overhaul (combine raw and tap water systems)6,000$
Playground seating under 5-12 structure2,500$
Booth Creek Park
Buffehr Creek Park
Picnic shelter15,000$ 25,000$
Reduce sod area10,000$
Ellefson Park
Reduce sod area10,000$
Pirate Ship Park
Restain structure5,500$
Red Sandstone Park
Stephens Park
ADA compliance large play structure11,000$
Pave paths to playground 1600 sf -$ 15,000$
Add grill at playground500$
Stephens stream bank repairs3,000$
POCKET PARKS
Covered Bridge Pocket Park
Paver gravel walkway
Flagstone walks (SW corner)2,500$
Gore Creek Promenade
Intermountain Pocket Park
Kindel Park
Mayor's Park
Staub Park
Willow Park
Gen Maintenance, Landscaping and Improvements15,000$ 20,000$ 25,000$ 40,000$ 60,000$ 65,000$
R-3 3 - 1 - 22
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:Golf Clubhouse-$ -$ -$ -$ -$ -$
Description of project:
Re-appropriation:
Low slope roofing
Stucco repairs
Boiler system & hot water heater
Heat & circulation pumps
Concrete walkways15,810 823
Concrete drainpans1,899
Rooftop HVAC unit replacement
Other repairs2,689 5,638
ADA - Elevator & Restrooms
Clubhouse parking lot - asphalt overlay/crackseal
Contingency
Capital Budget - Project Detail 201220132014201520162017
Project Name:Golf Course 151,635$ 4,489$ 108,967$ 4,276$ 97,498$ -$
Description of project:
Re-appropriation: 7th hole retaining wall,11th & 17th hole bridges114,917
5th hole retaining wall
1st Hole Timber Path
1st Hole bridge3,422
15th hole bridge11,406
11th hole pedestrian bridge9,869
14th hole bridge3,421
11th hole pumphouse856 51,595
Golf Maintenance Building
Structure17,791
Garage Doors11,920
Exterior storage building (falling down)
Other maintenance building repairs (stucco, trim)19,913 4,600
Hot water heater / storage tank1,978 7,295
Asphalt driving and parking area4,489 94,498
Overhead radiant heat systems8,896
Wood privacy fencing
Golf Storage Building
Structure
R-4
3 - 1 - 23
8/21/2012
Capital Budget - Project Detail 201220132014201520162017
Project Name:Dobson416,774$ 3,480$ 14,475$ 70,138$ 13,166$ -$
Description of project:
Door repairs/replacement50,000
Louver system upgrade120,000
Electric panel upgrade
Hot water storage tanks / system122,122
Refurbish wood exterior25,000
Landscape plan26,157
Exhaust stacks4,619
Central Air units
Restrooms / Locker rooms56,460
Interior Lighting- 59,874
Boiler/Domestic circulation system- - - 1,958
Other17,035 3,480 14,475 5,645 11,209
Capital Budget - Project Detail 201220132014201520162017
Project Name:Ford Park / Tennis Courts428,910$ 2,768$ 12,270$ 69,006$ 9,785$ -$
Description of project:
Walkways12,270
Clubhouse roof55,068
Tennis center roof repairs27,819
Outbuilding / Retrooms347,269
Tennis Court Retaining walls
Tennis Court Fencing
Tennis center locker rooms42,183
Lighting10,140
Other1,500 2,768 13,939 9,785
Capital Budget - Project Detail 201220132014201520162017
Project Name:Athletic Fields-$ 2,848$ 15,604$ 3,764$ 18,254$ -$
Description of project:
Asphalt parking lot overlay- 15,604 18,254
Other2,848 3,764
114,917
Capital Budget - Project Detail 201220132014201520162017
Project Name:Youth Services-$ -$ -$ -$ -$ -$
Description of project:
Furnaces
Other
Capital Budget - Project Detail 201220132014201520162017
Project Name:Gymnastics Center1,978$ -$ -$ -$ -$ -$
Description of project:
Concrete walkways1,978
Mechanical improvements
Capital Budget - Project Detail 201220132014201520162017
Project Name:Nature Center10,646$ -$ -$ 8,971$ 63,330$ -$
Description of project:
Wood siding and trim8,971
Wood open rail fencing10,646
Windows23,663
Steep Slope roofing33,796
Other5,871
R-5 3 - 1 - 24
8/21/2012
MEMORANDUM
TO: Town Council
FROM: Public Works Department
DATE: April 6th, 2010
SUBJECT: Capital Street Maintenance and Pavement Management
________________________________________________________________________
The Town of Vail currently maintains 32 miles of paved roads, of which all but ~7 miles
have been reconstructed since 1988. Currently the only town roads that have not been
reconstructed since 1988 include; Mill Creek Circle, portions of Vail Valley Drive, and
East Vail (in general all roads east of exit 180, with some exceptions). Prior to the start
of the neighborhood reconstruction projects in 1988, road disrepair was the number one
neighborhood problem, as indicated by the 1989 and 1990 citizen surveys. Since that
time 25 miles of roads have been reconstructed and a more diligent maintenance and
preventative maintenance program has been established thru both physical
maintenance activities and policy directives. The reconstruction and maintenance efforts
can be recognized by the trend of the citizen survey input shown on the attached graph.
Pavement Inspections/Ratings
In the mid 1990’s the town began inspecting road conditions and in 2001 we began
tracking the conditions based on the industry standard inspection criteria developed by
the US Army Corps of Engineers (ACOE). Since that time the town has completed four
townwide inspections of our existing pavement infrastructure. This data is used to better
understand pavement condition and assist staff in determining where maintenance
dollars are best spent to extend the life of each pavement section. The ratings for the
town’s roads are shown in the tables attached, each showing all four inspection year’s
Overall Condition Index (OCI), also know as Pavement Condition Index (PCI); the first
being sorted by the first year’s inspection (2001) and the second sorted by the latest
inspection (2009). Also attached are graphs which show the OCI trends for the overall
town, overall OCI town trends by zone, and overall detailed OCI ratings by zone with a
list of corresponding major maintenance activities for that period.
As depicted on the tables and graphs the Town’s maintenance program has brought the
Town’s roads up from an average rating ~70 in 2001 to an average rating of ~85 in
2009. It is the town’s goal to maintain the majority of our roads in a “satisfactory” to
“good” level rating, between 70-100 (see standard PCI rating scale below). We currently
have 80% of our roads at that level today. This success is largely due to the
investments made in asphalt overlays over the past 4 years. Without such investments
it is estimated that we would currently only have ~25% within a satisfactory level.
The below graph shows the generally accepted pavement deterioration curve. The time
to failure is relative to the traffic loading, environment, and original design and
construction. As the graph depicts, pavements deteriorate extremely fast once they drop
below the “Fair” category and maintenance and rehabilitation costs increase
substantially. This is why it is importation to continuously complete preventative
maintenance on all pavements rated as “fair” to “good”.
3 - 1 - 25
8/21/2012
The ACOE has developed a rating system that is based on 15 distresses that can be
seen in a pavement, ranging from weathering to alligator cracking to potholes. The OCI
or PCI is developed based on an algorithm of the amount of distress, multiplied by the
severity of the distress and the type of distress. Different distress are weighted based
upon its structural or ride quality impacts. A structural type distress will reduce a rating
more significantly than a ride quality type distress. For example, a road that is
completely alligator cracking will rate significantly lower than one that is completely
weathered. This is because alligator cracking indicates pavement/structural failure and
weathering is an environmental distress that effects the wearing surface only. The later
may be remediated with a surface seal whereas the alligator cracking must be fixed by
total reconstruction/full depth patching.
High severity Alligator
Cracking
3 - 1 - 26
8/21/2012
Medium Severity Weathering
Many of the roads that the town has not reconstructed (i.e East Vail pre overlays) exhibit
excessive alligator cracking indicating pavement/structural failure, a distress that can
only be covered up for a short time with a “bandaid” overlay. A permanent fix requires
reconstruction. These particular roads are ~34 years old, but were not “properly”
constructed originally. They existed as gravel roads until 1976 when they were paved
over as a result of the opportunity when Vail Pass was constructed.
Maintenance Goals
Our maintenance goal is to maintain “satisfactory” levels on the majority of our roads and
provide adequate preventative maintenance for all roads reconstructed after 1988 in
order to extend their design life to or beyond 50 years. Those roads never reconstructed
or reconstructed prior to 1988 (those mentioned above), generally already have
deteriorating pavements and/or subgrades and have been maintained with “bandaids” to
keep them in satisfactory condition until an opportunity/budget to reconstruct them is
available. These “bandaids” are not expected to last as long as preventative
maintenance treatments placed on reconstructed roads. For example, the asphalt
overlays placed in East Vail over the past 3 years are expected to last in satisfactory
condition for ~5 to 8 years instead of a typical 15 to 20 years when placed over a
reconstructed/new road. This is because of the poor condition that the pavement was in
prior to the overlay, which speeds up deterioration of any new surface treatment.
Road Reconstruction
This year we plan on reconstructing Mill Creek Circle in conjunction with an ERWSD
waterline and sewer project. Mill Creek Circle has not been reconstructed since its
original construction in 1967. Vail Valley Drive was expected to be reconstructed along
with Mill Creek Circle, however its reconstruction has been postponed to some time in
the future to be determined. The East Vail road reconstruction projects have been most
recently pushed out to 2012 and 2013, however they are currently considered unfunded,
but do show up in the 5 year budget.
Road reconstruction not only provides a new road and structural subgrade to start from,
it also provides needed drainage improvements and safety enhancements, that help
extend the life of the roads and provide a safer environment for vehicular and pedestrian
traffic. Drainage improvements are a critical component to extending the service life of
any pavement structure. Any introduction of water into the pavement structure (which
includes the surface material and up to 4’ below the surface) via surface penetration
(cracks, voids, etc…) or subsurface migration thru groundwater, shallow ditches, or
3 - 1 - 27
8/21/2012
surface water running too close to the pavement edge, often causes premature
pavement failure. These failures are generally structural failures due to
shifting/consolidating soils from groundwater flow and expansion/contraction of moist
soils due to the typical freeze-thaw cycles, which are severe in our climate. Drainage
can be kept away from the pavement structure by various means; adequate cross-slope
within the paved surface to shed water to the side of the road, gutters or roadside
ditches to carry water away into an adequate storm sewer system, or subsurface
permeable drain systems to capture groundwater and carry it away from the pavement
substructure. By providing these types of drainage improvements, along with adequate
structural subgrade and pavement, a roadway should last a minimum of 50 years or
significantly longer as long as adequate preventative maintenance is provided.
Maintenance Treatments
The combined effects of traffic loading and the environment will cause every pavement,
no matter how well-designed/constructed to deteriorate over time. Maintenance and
rehabilitation are what we use to slow down or reset this deterioration process.
Maintenance actions, such as crack sealing, surface/slurry seals and patching help slow
the rate of deterioration by identifying and addressing specific pavement deficiencies
that contribute to overall deterioration. Rehabilitation is the act of repairing portions of
an existing pavement to reset the deterioration process generally done by milling and
asphalt overlaying an existing deteriorating pavement.
The general maintenance schedule the Town budgets to is as follows;
x Crack Seal: On an as needed basis and generally every 5 years Town wide.
x Asphalt patching: On an as needed basis for emergency and routine repairs
x Surface/Slurry Seals: Generally on a schedule of every 5-7 years
x Asphalt Overlays: Generally on a schedule of about every 15-20 years for newly
constructed roads and ~10 years for pavements older than 20 to 30 years.
Crack seal products are used to fill individual pavement cracks to prevent entry of water
or other non-compressible substances such as sand, dirt, rocks or weeds. Crack
sealant is typically used on early stage longitudinal cracks, transverse cracks, reflection
cracks and block cracks. Crack filler material is typically some form of rubberized
asphalt or sand slurry. Before applying crack sealant, cracks need to be routed out and
cleaned. Crack sealing is best done in moderate temperatures (spring or fall) and is
most effective if performed immediately after cracks develop.
Patches are a common method of treating an area of localized distress. Patches can be
either full-depth where they extend from the pavement surface to the subgrade or partial
where they do not extend through the full depth of existing pavement.
Full-depth patches are necessary where the entire depth of pavement is distressed.
Often times, the underlying base, subbase or subgrade material is the distresses root
cause and will also need repair. Partial depth patches are used for pavement distresses
like raveling, rutting, delamination and cracking where the depth of crack does not
extend through the entire pavement depth.
Patching material can be just about any HMA or cold mix asphalt material as well as
certain types of slurries. Typically some form of HMA is used for permanent patches,
while cold mix is often used for temporary emergency repairs.
3 - 1 - 28
8/21/2012
Slurry seal is a homogenous mixture of emulsified asphalt, water, well-graded fine
aggregate and mineral filler that has a creamy fluid-like appearance when applied and is
used to (1) treat existing pavement that exhibits moderate to severe raveling due to
aging or (2) to improve skid resistance. A slurry seal contains aggregate and can thus
correct minor surface defects in a variably textured surface - filling cracks and voids,
sealing weather-tight, and providing color and texture delineation in a single pass (ISSA,
2001b).
Non-structural overlays do not involve extensive structural design and generally
contribute little, if anything, to a pavement's structural capacity. Non-structural overlays
are generally thin surface overlays on the order of 1.0 in. to 2.0 in. that are used to
replace an existing wearing surface and restore a deteriorating pavement surface,
improve ride quality, correct minor surface defects, improve safety characteristics such
as skid resistance and drainage, enhance appearance, reduce road-tire noise.
Structural Overlays are designed to add structural support to the existing pavement.
Because of this, they are structurally designed and are thicker than non-structural
overlays.
3 - 1 - 29
8/21/2012
Town of Vail Street Overal Condition Index
OCI by Street
IDDescriptionLengthZone2001200520072009
2270Westhaven Dr1340Cascade100.0097.0079.5685.60
8208Bridge Rd173East Vail99.7098.36100.0091.00
8196Lupine Dr480East Vail98.0077.8276.1074.00
8204Bridge Rd200East Vail97.4077.41100.0091.65
8192Lupine Dr1760East Vail96.6085.32100.0095.07
5030Homestake Cir406Main Vail95.0085.34100.0080.40
4115Hanson Ranch Rd B230Main Vail94.0075.17
1010Bellflower Dr800Intermountain93.9090.5390.9079.09
4032Meadow Dr East490Main Vail93.6065.45
5000Cabin Cir227Main Vail93.5089.08100.0066.93
8180Willow way308East Vail93.0079.0393.9096.00
2170Matterhorn Cir1195West Vail91.1088.3177.9054.08
5050Eagles Nest Cir185Main Vail91.0082.80100.0085.00
2025Meadow Ridge Rd313North West Vail90.0065.40100.00100.00
5015Hornsilver Cir255Main Vail90.0079.39100.0077.20
5990Elkhorn845Main Vail90.00100.0082.1875.20
8200Bridge Rd253East Vail89.5084.60100.0088.00
4130Mill Creek Cir135Main Vail89.2046.1149.0935.90
2150Geneva Dr898West Vail88.3081.7782.2277.82
2040Buffehr Creek Rd6008North West Vail88.2781.44100.00
4075Vail Rd591Main Vail88.2080.9183.00
6020Springhill Ln451Main Vail88.0062.85100.0056.33
6035Sunburst Dr2395Main Vail87.9084.4096.1283.74
5046Fairway Ct166Main Vail87.7079.60100.0075.70
6030Sunburst Dr1195Main Vail87.3573.84100.0079.00
2030Buffehr Creek Rd1197North West Vail87.0080.5173.34100.00
5010Hornsilver Cir273Main Vail86.8084.14100.0074.40
2155Lucerne Dr380West Vail86.6076.2478.8077.68
2010Circle Dr456North West Vail86.0079.2696.46100.00
8010Grouse Ln427East Vail85.5064.3165.59100.00
4090Willow Place478Main Vail85.5075.6973.3565.44
6010Vail Valley Dr1130Main Vail85.4072.6195.1069.58
4010Vail Valley Dr2136Main Vail85.2062.2156.3895.18
3120Red Sandstone Rd1634Sandstone85.0375.6676.78100.00
2180Matterhorn Cir1793West Vail85.0073.9566.7654.40
1000Kinnickinnick Rd1240Intermountain84.4781.0882.0369.75
4040Meadow Dr West1520Main Vail84.4563.8665.14100.00
2090Chamonix Rd780North West Vail84.0076.2956.33100.00
4101Bridge St530Main Vail83.94
4100Gore Creek Dr1790Main Vail83.8572.1598.6782.09
4140Willow Bridge Rd422Main Vail82.78
5040Ptarmigan Rd1771Main Vail82.6078.9399.2077.32
3060Lions Ridge Loop743Sandstone82.5078.7784.29100.00
2070Chamonix Ln2750North West Vail82.3582.3572.79100.00
2000Lions Ridge Loop5272North West Vail82.2883.0381.32100.00
6000Vail Valley Dr1963Main Vail82.0039.3166.8854.34
2185Matterhorn Ct370West Vail82.0076.4273.7053.80
8210Bighorn Rd861East Vail81.6589.8268.2570.65
3100Red Sandstone Ct283Sandstone81.0090.1488.53100.00
4110Hanson Ranch Rd A268Main Vail79.6054.97100.0095.00
2080Chamonix Ln2349North West Vail77.9676.6475.70100.00
5045Fairway Dr619Main Vail77.5082.8094.0085.80
3045Forest Rd440Main Vail76.8038.94100.00
2140Gore Creek Dr West2494West Vail76.7889.1580.17100.00
2190Alpine Drive1536West Vail76.6080.5595.50100.00
8020Ute Ln229East Vail76.400.0085.7879.76
3070Vail View Dr1616Sandstone76.2378.9475.68100.00
8190Lupine Dr390East Vail76.0079.0497.40100.00
2165Matterhorn Cir186West Vail76.0083.8464.1437.59
4034Meadow Dr East500Main Vail75.0481.23
4065Spraddle Creek Rd3797Main Vail74.7980.4976.88100.00
7040Booth Falls Ct658Booth Creek Falls73.9064.0751.21100.00
4060Lionshead Cir West1269Main Vail73.9084.8296.0090.20
2230Sierra Trail631West Vail73.7071.7971.80100.00
4120Village Center Rd282Main Vail73.7049.8682.77
8070Gore Cir1622East Vail73.4766.8054.8298.00
2020Meadow Ridge Rd660North West Vail73.4084.0095.40100.00
7080Falline Dr1600East Vail72.9359.8051.9049.34
1050Larkspur Ct136Intermountain72.5577.2084.88100.00
2125Davos Trail1275North West Vail71.9067.1995.00100.00
3085Sandstone Dr950Sandstone71.6579.3186.33100.00
3040Forest Rd1875Main Vail71.1347.07100.00100.00
2115Arosa Dr.675North West Vail70.8086.96100.00100.00
3 - 1 - 30
8/21/2012
8150Columbine Dr1157East Vail70.750.0057.90100.00
3020Forest Rd3105Main Vail70.7289.9697.6088.40
7050Booth Falls Rd200Booth Creek Falls69.9057.6650.00100.00
2300Greenhill Ct1457Cascade69.70100.00100.0091.97
1005Kinnickinnick Rd1053Intermountain69.6380.7670.5858.66
7070Katsos Ranch Rd1473Booth Creek Falls69.2782.4075.7098.33
1980Moraine Dr800North West Vail69.1051.3458.62100.00
2120Davos Trail188North West Vail68.2063.7194.00100.00
4108Hansen Ranch Chute68Main Vail67.6899.55
7010Aspen Ct191Booth Creek Falls67.6054.9653.3652.60
6900Manns Ranch Rd910Booth Creek Falls67.5073.8368.6590.00
8230Bighorn Rd3255East Vail67.2484.5171.4369.50
2145Shasta Pl263West Vail66.8086.2983.0073.20
3090Vail View Dr430Sandstone66.6081.64
7000Aspen Ln822Booth Creek Falls66.4071.5674.8052.24
1025Basingdale Blvd586Intermountain65.40100.00
8162Spruce Way1060East Vail64.9595.00100.0084.48
8065Main Gore Dr1045East Vail64.8071.47100.0093.16
8220Bighorn Rd5700East Vail64.6494.7588.6584.75
2160Matterhorn Cir233West Vail64.2090.0089.0087.00
4035Meadow Dr East510Main Vail63.74
2110Arosa Dr1654North West Vail63.4363.1099.33100.00
3000Beaver Dam Rd.2778Main Vail62.8881.0280.3499.20
4070Vail Rd930Main Vail62.6066.2164.98100.00
3130Potato Patch Dr7280Sandstone62.4980.5176.3981.60
3010Beaver Dam Circle771Main Vail62.4068.5364.94100.00
1030Snowberry Dr1740Intermountain62.0085.5587.2158.86
8158Columbine Dr653East Vail61.5575.4074.8361.26
8050Main Gore Dr1708East Vail61.4328.4858.96100.00
3030Rockledge Rd1098Main Vail61.3065.6377.3968.52
8160Spruce Way789East Vail61.206.5560.3648.82
4990Chalet Rd216Main Vail61.0014.2993.00
4030Meadow Dr East443Main Vail61.0085.3899.6089.00
8130Streamside Cir West770East Vail60.9557.4653.0434.07
8175Spruce Ct64East Vail60.7092.2088.00100.00
2100Garmish Dr1738North West Vail60.1771.1698.00100.00
8030Black Bear Ln516East Vail60.1074.7890.4082.95
7030Booth Creek Dr200Booth Creek Falls59.0084.8083.6077.50
1020Basingdale Blvd1197Intermountain58.5078.8062.0256.04
5020Vail Valley Dr4048Main Vail58.1385.8388.9985.22
8120Streamside Cir East1599East Vail57.6071.2477.4872.19
2290Westhaven Cir3675Cascade57.38100.0098.9595.15
8166Spruce Way1689East Vail57.1747.6192.6590.22
8090Juniper Ln1458East Vail57.0360.4390.0085.03
3080Sandstone Dr1383Sandstone56.9579.4971.47100.00
7060Booth Falls Rd975Booth Creek Falls56.8065.7560.89100.00
8100Meadow Ln973East Vail56.4558.13100.00100.00
7015Bald Mountain Rd3200Booth Creek Falls55.8071.4265.54100.00
4105Gore Creek Dr680Main Vail55.7041.5473.9383.38
8080Meadow Dr1879East Vail55.1060.9097.5388.57
3150Ma Bell Rd510Main Vail54.76
2200Alta Dr.120West Vail54.5097.0085.2680.31
1040Larkspur Ln896Intermountain54.0083.9262.30100.00
8000Snowshoe Ln386East Vail53.5067.4270.00100.00
8155Columbine Dr1250East Vail53.2086.9091.7093.45
7020Booth Creek Dr1142Booth Creek Falls52.8083.5880.2577.96
2130Cortina Ln1750North West Vail51.9585.7094.32100.00
8145Glen Falls Ln578East Vail50.0077.9055.48100.00
1990Glacier Ct327North West Vail50.0079.7684.17100.00
4050Lionshead Cir East1334Main Vail48.9535.6797.4275.50
8060Main Gore Dr521East Vail47.7570.28100.0093.35
8040Black Gore Dr847East Vail47.0526.2888.5083.58
8110Meadow Dr2550East Vail46.3773.1886.0581.76
8142Nugget Ln100East Vail45.0054.7571.4050.75
3105Sandy ln385Sandstone43.7071.4174.35100.00
8140Nugget Ln570East Vail43.1076.2688.0086.80
8170Spruce Dr185East Vail41.2075.0473.2069.46
4080Willow Rd635Main Vail40.2055.9861.64100.00
8240Bighorn Rd2520East Vail38.7048.6741.2137.78
4135Mill Creek Cir1614Main Vail34.4034.8843.4141.53
2275Westhaven Dr310Cascade28.44100.00100.0097.00
3050Lionshead Place430Main Vail0.0099.42
2095St. Moritz Way1000North West Vail100.00
4112Hanson Ranch Rd A210Main Vail97.44
1007Kinnickinnick Ct200Intermountain0.0052.4040.97
4045Meadow Dr West142Main Vail
Average OCI70.5771.8081.1884.73
3 - 1 - 31
8/21/2012
Town of Vail Street Overal Condition Index
OCI by Street
IDDescriptionLengthZone2001200520072009
7015Bald Mountain Rd3200Booth Creek Falls55.8071.4265.54100.00
7040Booth Falls Ct658Booth Creek Falls73.9064.0751.21100.00
7050Booth Falls Rd200Booth Creek Falls69.9057.6650.00100.00
7060Booth Falls Rd975Booth Creek Falls56.8065.7560.89100.00
8000Snowshoe Ln386East Vail53.5067.4270.00100.00
8010Grouse Ln427East Vail85.5064.3165.59100.00
8050Main Gore Dr1708East Vail61.4328.4858.96100.00
8100Meadow Ln973East Vail56.4558.13100.00100.00
8145Glen Falls Ln578East Vail50.0077.9055.48100.00
8150Columbine Dr1157East Vail70.750.0057.90100.00
8175Spruce Ct64East Vail60.7092.2088.00100.00
8190Lupine Dr390East Vail76.0079.0497.40100.00
1040Larkspur Ln896Intermountain54.0083.9262.30100.00
1050Larkspur Ct136Intermountain72.5577.2084.88100.00
3010Beaver Dam Circle771Main Vail62.4068.5364.94100.00
3040Forest Rd1875Main Vail71.1347.07100.00100.00
3045Forest Rd440Main Vail76.8038.94100.00
4040Meadow Dr West1520Main Vail84.4563.8665.14100.00
4065Spraddle Creek Rd3797Main Vail74.7980.4976.88100.00
4070Vail Rd930Main Vail62.6066.2164.98100.00
4080Willow Rd635Main Vail40.2055.9861.64100.00
1980Moraine Dr800North West Vail69.1051.3458.62100.00
1990Glacier Ct327North West Vail50.0079.7684.17100.00
2000Lions Ridge Loop5272North West Vail82.2883.0381.32100.00
2010Circle Dr456North West Vail86.0079.2696.46100.00
2020Meadow Ridge Rd660North West Vail73.4084.0095.40100.00
2025Meadow Ridge Rd313North West Vail90.0065.40100.00100.00
2030Buffehr Creek Rd1197North West Vail87.0080.5173.34100.00
2040Buffehr Creek Rd6008North West Vail88.2781.44100.00
2070Chamonix Ln2750North West Vail82.3582.3572.79100.00
2080Chamonix Ln2349North West Vail77.9676.6475.70100.00
2090Chamonix Rd780North West Vail84.0076.2956.33100.00
2095St. Moritz Way1000North West Vail100.00
2100Garmish Dr1738North West Vail60.1771.1698.00100.00
2110Arosa Dr1654North West Vail63.4363.1099.33100.00
2115Arosa Dr.675North West Vail70.8086.96100.00100.00
2120Davos Trail188North West Vail68.2063.7194.00100.00
2125Davos Trail1275North West Vail71.9067.1995.00100.00
2130Cortina Ln1750North West Vail51.9585.7094.32100.00
3060Lions Ridge Loop743Sandstone82.5078.7784.29100.00
3070Vail View Dr1616Sandstone76.2378.9475.68100.00
3080Sandstone Dr1383Sandstone56.9579.4971.47100.00
3085Sandstone Dr950Sandstone71.6579.3186.33100.00
3100Red Sandstone Ct283Sandstone81.0090.1488.53100.00
3105Sandy ln385Sandstone43.7071.4174.35100.00
3120Red Sandstone Rd1634Sandstone85.0375.6676.78100.00
2140Gore Creek Dr West2494West Vail76.7889.1580.17100.00
2190Alpine Drive1536West Vail76.6080.5595.50100.00
2230Sierra Trail631West Vail73.7071.7971.80100.00
4108Hansen Ranch Chute68Main Vail67.6899.55
3050Lionshead Place430Main Vail0.0099.42
3000Beaver Dam Rd.2778Main Vail62.8881.0280.3499.20
7070Katsos Ranch Rd1473Booth Creek Falls69.2782.4075.7098.33
8070Gore Cir1622East Vail73.4766.8054.8298.00
4112Hanson Ranch Rd A210Main Vail97.44
2275Westhaven Dr310Cascade28.44100.00100.0097.00
8180Willow way308East Vail93.0079.0393.9096.00
4010Vail Valley Dr2136Main Vail85.2062.2156.3895.18
2290Westhaven Cir3675Cascade57.38100.0098.9595.15
8192Lupine Dr1760East Vail96.6085.32100.0095.07
4110Hanson Ranch Rd A268Main Vail79.6054.97100.0095.00
8155Columbine Dr1250East Vail53.2086.9091.7093.45
8060Main Gore Dr521East Vail47.7570.28100.0093.35
8065Main Gore Dr1045East Vail64.8071.47100.0093.16
4990Chalet Rd216Main Vail61.0014.2993.00
2300Greenhill Ct1457Cascade69.70100.00100.0091.97
8204Bridge Rd200East Vail97.4077.41100.0091.65
8208Bridge Rd173East Vail99.7098.36100.0091.00
8166Spruce Way1689East Vail57.1747.6192.6590.22
4060Lionshead Cir West1269Main Vail73.9084.8296.0090.20
6900Manns Ranch Rd910Booth Creek Falls67.5073.8368.6590.00
4030Meadow Dr East443Main Vail61.0085.3899.6089.00
8080Meadow Dr1879East Vail55.1060.9097.5388.57
3 - 1 - 32
8/21/2012
3020Forest Rd3105Main Vail70.7289.9697.6088.40
8200Bridge Rd253East Vail89.5084.60100.0088.00
2160Matterhorn Cir233West Vail64.2090.0089.0087.00
8140Nugget Ln570East Vail43.1076.2688.0086.80
5045Fairway Dr619Main Vail77.5082.8094.0085.80
2270Westhaven Dr1340Cascade100.0097.0079.5685.60
5020Vail Valley Dr4048Main Vail58.1385.8388.9985.22
8090Juniper Ln1458East Vail57.0360.4390.0085.03
5050Eagles Nest Cir185Main Vail91.0082.80100.0085.00
8220Bighorn Rd5700East Vail64.6494.7588.6584.75
8162Spruce Way1060East Vail64.9595.00100.0084.48
6035Sunburst Dr2395Main Vail87.9084.4096.1283.74
8040Black Gore Dr847East Vail47.0526.2888.5083.58
4105Gore Creek Dr680Main Vail55.7041.5473.9383.38
4075Vail Rd591Main Vail88.2080.9183.00
8030Black Bear Ln516East Vail60.1074.7890.4082.95
4100Gore Creek Dr1790Main Vail83.8572.1598.6782.09
8110Meadow Dr2550East Vail46.3773.1886.0581.76
3130Potato Patch Dr7280Sandstone62.4980.5176.3981.60
5030Homestake Cir406Main Vail95.0085.34100.0080.40
2200Alta Dr.120West Vail54.5097.0085.2680.31
8020Ute Ln229East Vail76.400.0085.7879.76
1010Bellflower Dr800Intermountain93.9090.5390.9079.09
6030Sunburst Dr1195Main Vail87.3573.84100.0079.00
7020Booth Creek Dr1142Booth Creek Falls52.8083.5880.2577.96
2150Geneva Dr898West Vail88.3081.7782.2277.82
2155Lucerne Dr380West Vail86.6076.2478.8077.68
7030Booth Creek Dr200Booth Creek Falls59.0084.8083.6077.50
5040Ptarmigan Rd1771Main Vail82.6078.9399.2077.32
5015Hornsilver Cir255Main Vail90.0079.39100.0077.20
5046Fairway Ct166Main Vail87.7079.60100.0075.70
4050Lionshead Cir East1334Main Vail48.9535.6797.4275.50
5990Elkhorn845Main Vail90.00100.0082.1875.20
5010Hornsilver Cir273Main Vail86.8084.14100.0074.40
8196Lupine Dr480East Vail98.0077.8276.1074.00
2145Shasta Pl263West Vail66.8086.2983.0073.20
8120Streamside Cir East1599East Vail57.6071.2477.4872.19
8210Bighorn Rd861East Vail81.6589.8268.2570.65
1000Kinnickinnick Rd1240Intermountain84.4781.0882.0369.75
6010Vail Valley Dr1130Main Vail85.4072.6195.1069.58
8230Bighorn Rd3255East Vail67.2484.5171.4369.50
8170Spruce Dr185East Vail41.2075.0473.2069.46
3030Rockledge Rd1098Main Vail61.3065.6377.3968.52
5000Cabin Cir227Main Vail93.5089.08100.0066.93
4090Willow Place478Main Vail85.5075.6973.3565.44
8158Columbine Dr653East Vail61.5575.4074.8361.26
1030Snowberry Dr1740Intermountain62.0085.5587.2158.86
1005Kinnickinnick Rd1053Intermountain69.6380.7670.5858.66
6020Springhill Ln451Main Vail88.0062.85100.0056.33
1020Basingdale Blvd1197Intermountain58.5078.8062.0256.04
2180Matterhorn Cir1793West Vail85.0073.9566.7654.40
6000Vail Valley Dr1963Main Vail82.0039.3166.8854.34
2170Matterhorn Cir1195West Vail91.1088.3177.9054.08
2185Matterhorn Ct370West Vail82.0076.4273.7053.80
7010Aspen Ct191Booth Creek Falls67.6054.9653.3652.60
7000Aspen Ln822Booth Creek Falls66.4071.5674.8052.24
8142Nugget Ln100East Vail45.0054.7571.4050.75
7080Falline Dr1600East Vail72.9359.8051.9049.34
8160Spruce Way789East Vail61.206.5560.3648.82
4135Mill Creek Cir1614Main Vail34.4034.8843.4141.53
1007Kinnickinnick Ct200Intermountain0.0052.4040.97
8240Bighorn Rd2520East Vail38.7048.6741.2137.78
2165Matterhorn Cir186West Vail76.0083.8464.1437.59
4130Mill Creek Cir135Main Vail89.2046.1149.0935.90
8130Streamside Cir West770East Vail60.9557.4653.0434.07
1025Basingdale Blvd586Intermountain65.40100.00
3150Ma Bell Rd510Main Vail54.76
4032Meadow Dr East490Main Vail93.6065.45
4034Meadow Dr East500Main Vail75.0481.23
4035Meadow Dr East510Main Vail63.74
4045Meadow Dr West142Main Vail
4101Bridge St530Main Vail83.94
4115Hanson Ranch Rd B230Main Vail94.0075.17
4120Village Center Rd282Main Vail73.7049.8682.77
4140Willow Bridge Rd422Main Vail82.78
3090Vail View Dr430Sandstone66.6081.64
Average OCI70.5771.8081.1884.73
3 - 1 - 33
8/21/2012
Vail Pavement Condition Index
Townwide Average
All Inspections
60.00
70.00
80.00
90.00
100.00
20002001200220032004200520062007200820092010
Year
OCIOCI By Street
3 - 1 - 34
8/21/2012
Vail Pavement Condition Index
Average by Zone by Street
2001 & 2009 Inspections Only
60.0
70.0
80.0
90.0
100.0
20002001200220032004200520062007200820092010
Year
OCI
Booth Creek Falls
Cascade
East Vail
Intermountain
Main Vail
North West Vail
Sandstone
West Vail
3 - 1 - 35
8/21/2012
Vail Pavement Condition Index
Average by Zone by Street
All Inspections
60.0
70.0
80.0
90.0
100.0
20002001200220032004200520062007200820092010
Year
OCI
Booth Creek
Cascade
East Vail
Intermountain
Main Vail
North West Vail
Sandstone
West Vail
Maintenance
Booth Creek
2002 Slurry Seal
2009 Overlay
Cascade
2005 Reconstruct
East Vail
02-03 Slurry Seal
07-08 Overlays
Intermountain
2004 Slurry Seal
NW Vail
2006 Overlays
2009 Slurry Seals
Sandstone
2003 Slurry Seal
2009 Overlay
West Vail
2004 Slurry Seal
3 - 1 - 36
8/21/2012
**In 1990 and 1989 the number one Neighborhood Problem was Road Disrepair
Town Resident Satisfaction of Quality of Street Maintenance
& Road Reconstruction Dates
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
19881990199219941996199820002002200420062008
Year
Rating
RatingsRatings Trend
1988 Main Vail198
7 NW V
ail
1989 Sandstone1990 Intermountain1990 Matterhorn1991 Booth Creek1991 Spraddle 1995 Golf Course1995 W.
2000 Lupine/Bridge 2005 Westhaven
2009 Meadow Ln/Columbine2009 Larkspu
r
2009 W. Forest Rd.2009 W. Meadow2008 Beaver Dam/Willow Rd2003 Spruce Way2001 Westhaven 2004 E. Forest Rd 1999 Buffehr Creek2002 Cortina
Year of Reconstruction -Vail
Year of Reconstruciton- ERWSD
Year of Reconstruction- Joint
3 - 1 - 37
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Strategic Parking Plan Update
PRESENTER(S): Greg Hall Stan Zemler
ACTION REQUESTED OF COUNCIL: Provide direction on the plan presented which can be
finalized into a plan to be presented to the Town Council for adoption at an evening session.
BACKGROUND: The Town council established a goal to develop a strategic parking plan.
Staff has had numerous work sessions regarding various aspects to the long term parking
solution. This is the most recent update in developing the plan. The discussion will focus on
strategies to address the long term deficit in public parking spaces.
STAFF RECOMMENDATION: Provide the staff direction on the aspects of the plan.
ATTACHMENTS:
Staff memo
Public and Private Public Parking inventroy List
2007/2008 Mater Transportaion Plan parking deficit update chart
West Vail Businesses Parking Options
8/21/2012
To: Town Council
From: Greg Hall, Stan Zemler
Date: August 21, 2012
Subject: Strategic Parking Plan Update
I. PURPOSE
To provide a 10 year plan for public parking in the Town of Vail and develop
strategies to achieve Councils goals related to parking.
II. BACKGROUND
The Town of Vail during its history has been required to deal with parking issues and
today is no different than in the past. Parking issues are dynamic and change
overtime. The following is the wrap up of the previous parking discussions and a
plan which provides steps moving forward to address the issues.
Current Goals
• 15 days of South Frontage Road winter overflow parking
• 15 days of South Frontage Road summer overflow parking
• Increase the current supply by 400 spaces based on 2007/2008 season
numbers to meet an existing deficit to maintain 15 days of winter overflow
parking.
o The Town and private sector have successfully since this time
provided additional spaces to reduce the required number today to a
59 -199 space deficit, see attachment for further detail.
• Over the next 10 years, some additional spaces are required to meet future
demand, which was predicted to be 600 additional spaces over a 25 year
period.
• Efficiently manage the current supply of town parking spaces
Current Parking Plan Policy Objectives
• Service to Core Markets
o Customers and guests of commercial villages
o Skiers
4 - 1 - 1
8/21/2012
Town of Vail Page 2
o Employees
• Manage the Yield –currently the peak and non peak periods as well as cost
to benefits are only associated with passes
• Simplify the Product
• Design Program so it is Revenue Neutral
• Increase Safety
Current Parking Plan Guidelines
– Strongly encourage the use of transit, carpooling/vanpool
– Recover transit enhancement costs through parking
– Parking cost increases will be borne by parking
– Encourage turnover of short term parking spaces
– Pass prices reflect a relative value received based on the daily rate (i.e.
season cost is based on 22 weeks at daily rate or discounted daily rate)
– Strictly enforce parking violations
Are the goals, policies and guidelines aligned moving into the future?
III. PARKING ISSUE DISCUSSION
Defining the parking problem and what solutions or improvements are needed
The Town Council over the years has identified various issues, affirmation of the
issues is important in order to prioritize desired outcomes.
Some issues have been clearly stated such as:
• Limit any overflow of frontage road parking to less than 15 days in both winter
and summer
• Shortage of existing inventory
• Running efficient parking operations from both a cost as well as utilization
standpoint
Other issues staff would like additional direction on:
• Desire to phase out the use of north frontage road parking
• Provide availability of additional close in structured parking for guests
• Limit the extent (volume) of the large overflow parking surges
• Summer overflow parking demand now exceeds winter
4 - 1 - 2
8/21/2012
Town of Vail Page 3
While other issues are inherent in discussing parking, these issues need to be
understood regarding trade offs and timing:
• Predictability of the parking demands earlier to address the readiness of
operations
• Cost of providing parking inventory is expensive and requires land as well
• Difficult to quickly and easily produce increased parking supply
• Flexible operational goals/policies need to change from time to time
• Trying to satisfy various users, with varying desires of parking location and
price during the day, season and year.
Proposed Additional Parking Goals
• Continue management techniques to reduce the need to invest significant
capital funds to increase the supply
• Reduce the cost of managed parking
• Create flexibility in the plan to easily adapt to changing conditions
• Efficient use of existing parking supply
• Increase the parking supply
• Supply may move but don’t diminish the total number of spaces available
IV. PARKING SUPPLY DISCUSSION
Current Conditions
Today the town of Vail owns and operates 2700 parking spaces as outlined in the
attached parking space chart.
There are also 524 paid privately owned and operated public spaces. Many of which
have been added in the past several years, with a great majority being used in an
interim basis.
There are also a variety of locations with free varying time availability spaces known
to workers and visitors throughout town which equals 482.
The total number of paid and free public parking spaces is 3706 spaces.
In addition, there has been the creation of 350 private parking or private club spaces
which has reduced some burden on the public spaces.
See attachment for additional detail.
4 - 1 - 3
8/21/2012
Town of Vail Page 4
Supply goal
The Town of Vail has a current deficit of 59 -199 spaces today, again see
attachment for detailed explanation.
In addition to the current deficit of 59-199 spaces, in the next ten years the town
should pursue 200-300 additional spaces to meet the town’s long term goals for
future growth as well as the long term unreliability of some of the private sector
public spaces.
The total town goal would be to pursue 259-499 spaces assuming the current public
supply is maintained.
Potential Opportunities to Increase the Parking Supply
1. Maintain the current use of CDOT South Frontage Road overflow spaces --
reducing the number would require making up the shortfall elsewhere at a
significant increased cost. Cost as budgeted $480,000 for 2012 and $212,000 in
2014.
2. Ever Vail 150-200 early action spaces – this could provide a significant addition
to the parking supply in 2013. Cost to the Town $0.
3. Ever Vail 400 publicexpanded spaces when development is complete -- this
provides significant additional structured spaces in the future. Cost to the town $0
at Ever Vail, some incremental costs if constructed at the Lionhead Structure,
however far less than the cost per space without Vail Resorts contribution. The
difference in cost could be offset at the time by the $ 4.3 M Vail Resorts
commitment.
4. Maintain the supply of parking on the North Frontage Road – trading the location
of these spaces to another location could hurt the goal of in increasing the total
supply, These spaces are relatively inexpensive compared to other alternatives.
NFR west of WV Roundabout
o CDOT retains ownership of the road $ 20,188/space
o Town of Vail takes over ownership of the road $ 555/space and
annual maintenance costs
Safeway $ 9,057/space
Middle Creek $ 24,393/space
5. Town of Vail provides additional surface spaces Ford Park and South Frontage
Road previously identified – there are issues with many of the locations
4 - 1 - 4
8/21/2012
Town of Vail Page 5
identified, the locations are not as desirable as close in structured spaces
however the cost per space is more reasonable than structured spaces. Cost
range is $ 35,000-$62,000/space
6. Town of Vail provides additional Lionshead structured spaces as previously
identified – undertaking this task as only a Town of Vail project is undesirable
compared to working in cooperation with other opportunities as the town has
done in the past. Cost range is $90.000-$125,000/space.
7. Provide incentives to the private sector to offer current available spaces for use
to the general public through code amendments or potential financial incentives
backed by the Town of Vail, Vail Resorts or other parties – this can be
accomplished if the economics and conditions exist to work out for all parties,
may not be sustainable as a long term solution as the private sector may back
out at a future date if not properly secured, issues do develop concerning
general public confusion regarding expectations on operating rules and pricing
Cost per space could be $0 to the Town of Vail, to some annual cost per space
offset.
8. Provide development incentives to construct new privately operated public
parking spaces – this can be accomplished if the economics and conditions exist
to work for all parties, this can be established as a long term solution, issues do
develop concerning general public confusion regarding expectations on operating
rules and pricing. Cost per space is $0 to the Town of Vail
9. Aggressively manage the parking demand to free up spaces being occupied by
users who may shift transportation modes or travel patterns – actions are
sometimes seen as punitive and come across as favoring different user groups
over other user groups. Incentives are harder to manage and require necessary
accounting controls. Cost to the Town is little capital investment, however usually
some additional operating costs. The true cost is in potential customer
dissatisfaction.
V. DISCUSSION OF PARKING STRATETIGIES
1. Modernization of Town of Vail parking operations to achieve efficiencies and to
maximize use of existing parking spaces
• What
o Modern technologies to allow prepayment to increase flow and
reduce cost of operations
4 - 1 - 5
8/21/2012
Town of Vail Page 6
o Real time information on parking availability to inform users prior to
arriving
o Real time parking availability information within the garage levels
o Greater use of real time data in parking operations decisions
o Automated systems to reduce the cost of parking operations
• How
o implement the use of parking operation experts in state of the art of
operations/efficiencies and technologies
Bring on board in order to observe the 2012-2013 winter
operations
Establish the desired goals and agree on outcomes
propose alternatives which meet the desired goals
review alternatives and provide recommendations during
2013
If any additional data or test are needed to take place during
2013-2014 season
procure equipment and changes from desired vendors for
installation summer 2014
• When
o Replacement of equipment is budgeted in 2014. Replacement
would be operational in November 2014
2. Secure use of the South Frontage Road for 15 days of both winter and summer
use from CDOT and FHWA long term
• What/when
o a) Lease with CDOT sets criteria and lists the following
improvements 2012
o b) Vail Town Shop to Vail Valley Drive Widening to meet criteria
2011
o c) Vail Valley Drive to Roundabout Restriping to meet criteria 2012
o d) Install guardrail and bus stop in west Vail 2012
o e) Helipad to Vail Resorts Shop Widening to meet criteria 2012
o f) Cascade Crossing Shopping Center to past Cascade Club
widening to meet criteria 2014
• How
o a) , b) and c) complete
4 - 1 - 6
8/21/2012
Town of Vail Page 7
o d)150,000 budgeted project designed and reviewed by CDOT bids
being solicited construction fall
o e) $480,000 budgeted project designed and CDOT reviewing bids
being solicited construction this fall
o f) $218,000 budgeted project in 2013, but will be shifted to 2014 to
coincide with the CDOT lease will be designed in 2013
o Lease will need to be renewed based on the progress of the lease
requirements
3. At a minimum maintain the current supply of parking spaces
• What
o Spaces and lots currently used for parking should not be lost or the
parking will need to be replaced elsewhere to maintain status quo
• How
o Ensure parking spaces are not lost after projects are completed
Golf course will increase parking
Municipal Building will increase parking
Vail Resorts will employee parking spaces will be at no net
loss
Ford Park will maintain the number of parking spaces
North Frontage Road parking spaces remain in the mix
• When
o When projects develop
o As required per the CDOT lease timelines
4. Increase the supply of parking
Vail Resorts
• What
o Vail Resorts to provide 150-200 spaces as an early action to Ever
Vail
Define operations of spaces going forward
o Vail Resorts will provide a total of 400 spaces if Ever Vail is
constructed
o Once Ever Vail is built out there will be 200 additional spaces
above all the development requirements at Ever Vail and 200
4 - 1 - 7
8/21/2012
Town of Vail Page 8
additional public parking spaces either at the Lionshead Parking
Structure or Ever Vail
• How
o Negotiate with Vail Resorts regarding Ever Vail public parking
requirement
To provide early action spaces
Provide 200 spaces in the first phase of Ever Vail at Ever
Vail
Final 200 spaces at Ever Vail to be funded by Vail Resorts or
200 spaces at Lionshead Parking Structure to be funded by
Vail Resorts at the value equivalent of Vail Resorts providing
the spaces at Ever Vail
o Plan and design an expansion of the Lionshead Parking Structure
• When
o Early action spaces will be in use for 2013-2014 winter season
o Additional 200 will be built with the first phase of Ever Vail
o Final 200 spaces will be built at Lionshead Parking Structure or Ever
Vail once the early action spaces are eliminated or when the final
phases of Ever Vail begins
Town of Vail
• What
o Town of Vail provides additional surface parking spaces previously
identified
o Town of Vail provides additional structured parking spaces
previously identified
o Town of Vail provides for and increase in additional parking spaces
above the of Ever Vail spaces provided at the Lionshead Parking
Structure when an expansion occurs based on Ever Vail timing
o Town of Vail partners with potential projects to expand the
availability of parking
Private Sector
• What
o Incentives are provided for participation of the private sector in
providing spaces to the general public
o Incentives are provided for the development of private sector
owned and operated public or semi public parking spaces
• How
4 - 1 - 8
8/21/2012
Town of Vail Page 9
o Town of Vail provides code amendments with potential incentives
for both short term use and long term development of private
spaces
o Town of Vail and others may offer financial incentives for use of
the spaces
o Town of Vail and others may lease the use of spaces for shorter
term situations
5. Parking Operation policies should be reflective of both short term and long term
strategic goals
• What
o Ensure maximum use of spaces
o Encourage carpooling and use of transit which reduces demand
o If the demand exceeds the supply manage the demand down
o If supply exceeds the demand relax the demand but not to the
point of exceeding the supply
o The parking spaces are in demand by many interests balance the
use and availability of the spaces to achieve the town’s desired
outcomes for each user group
• How
o Set polices to align to achieve the desired results in the short
term, as well ensuring the policies are in alignment with long term
strategies
• When
o Annually
6. Summer parking management
• What
o Currently only Ford Park is managed
o Difficult to achieve behavior changes on a volunteer basis
o Vail Resorts announced Epic Discover Summer programs which
will put pressure on the summer demand
o Currently summer overflow exceeds winter overflow
• How
o Discuss management strategies and have staff provide
management options for consideration
o Decide what management strategies to implement
• When
4 - 1 - 9
8/21/2012
Town of Vail Page 10
o In review of the Epic Discover program or sooner if demand
continues to exceed supply
7. Manage Overflow Parking situation
• What
o Manage of overflow when village and Lionshead Structures fill both
winter and summer
o Improve the overflow experience of users
o Limit the extent of overflow supply
o Determine if additional 3 day or less limited overflow areas are to
be established such as west of Donovan Park
• How
o New equipment and improvements
o Develop the limits of the overflow areas in accordance to CDOT
standards
o Enforce overflow if the limits are exceeded
o Inform Vail Resorts of the limitations and restrictions of the 3 days
or less per year overflow areas established
• When
o CDOT required improvements in place 2012 in front of Lionshead
o Wayfinding improvements in place in 2013
o Equipment improved in 2014
o CDOT 3 day or less limited overflow areas completed from Golf
Course Bridge to Aspen Lane
8. Manage the oversize vehicle parking
• What
o The Lionshead oversize vehicle lot is the only area available for
larger vehicles, alternative locations may be needed in the future to
accommodate the demand
• How
o 2011/2012 implemented a charge for non charter bus users which
decreased the demand
o Utilize the new Lionshead Transit Center for charter bus pick up /drop
off and park the buses in designated areas in the West Vail(Safeway
area) for the day
4 - 1 - 10
8/21/2012
Town of Vail Page 11
o During special events in Lionshead allow overflow of oversize
vehicles to park in the south frontage road parking lane by permit
similar to the Vail Farmers Market
o Town of Vail Construction parking be accommodated at the public
works shop
o Town of Vail special event vehicles be accommodated at the public
works shop
o Private sector construction vehicles will need to find alternative
parking
o Develop pull off lane in front of the Vail Village parking garage to
handle oversized vehicles
• When
o When the demand exceeds the supply
o When more desired uses of parking lot space necessitates the
relocation of the oversize vehicles
VI. STAFF RECOMMENDATIONS
Direct staff to finalize the parking strategies above based on the council discussion
and input as part of the Town of Vail Parking Strategic Plan and prepare for adoption
at an evening meeting.
VII. ATTACHMENTS
a. Town of Vail Public Parking Chart
b. 2007/2008 400 parking space requirement reconciliation to 2012 current
parking space requirement
4 - 1 - 11
8/21/2012
Ungated Free Parking Supply
Total Number
of Spaces in
lot
Number of
Current Spaces
available for day
public parking
All Time or
When
Available
Non Peak
Times M-
TH
Peak Times
F ST SN
Parking Lots17590
Golf Course Clubhouse (110 total)11045X
Municipal Building5545X(St,Sn)
Parks153 135
Donovan Park135120 X(75%)
Red Sandstone Park1815X
Trail Heads107 57
North Trail (NFR OK with CDOT)1212 X
Buffher Creek83X
Red Sandstone Road83X
Spraddle Creek126X
East Vail Interchange1815X
Big Horn Road/ Main Gore Circle2010 X
Pitkin Creek Trail83X
Booth Creek Trail153X
Big Horn Trail62X
North Frontage Road Parking200200
Chamonix Rd –Chamonix Lane1515X
Chamonix Lane- Arosa Drive7575X
Safeway7070X
Middle Creek4040X
Total Free Lots635482
Paid Lots
Soccer Field50
Ford Park East150
Village Structure1300
Lionshead Structure1150
Total Paid Lot2650
Valet Lot
Ford Park West50
Total Other50
Grand Total Publicly Owned3182
Private Public Spaces184
Cascade100
Solaris84
Private Interim Term Public Spaces340
Arrabelle100
Manor Vail40
Solaris200
Private Spaces
350
Golden Peak Passport Club140
Founders Garage110
Vail Mountain Club100
Grand Total Private Spaces874
Availability
4 - 2 - 1
8/21/2012
Master Transportation Plan Required after the 2007-2008 Season 400 spaces
Public Spaces Added 384 spaces 400
• Donovan Park 100 -384
• Solaris 84
• NFR Safeway 70
• NFR Middle Creek 40
• NFR west of WV Frontage Road 90
Spaces lost 183 spaces +183
• Wendy’s 75
• Golf Course Clubhouse Peak times 65
• Trailheads 10
• Parks 33 _____
199 spaces needed
Private spaces added interim term 140 spaces
• Arrabelle 100
• Manor Vail 40
Currently the interim private public spaces are providing -140
59 spaces needed
Currently need 59-199 spaces
We will loose use of 45 spaces for two seasons during municipal building project
We will loose use of the 50 Ford Park Valet lot spaces during the Ford Park Construction Process
4 - 3 - 1
8/21/2012
TO: Town of Vail Council
From: West Vail businesses
DATE: 8/15/12
RE: North Frontage Road Parking options
As businesses in the West Vail area, we would like the Town of Vail Council to
consider continuing the free and/or permitted parking along the North Frontage
Road in West Vail.
We feel these are the benefits of North Frontage Road parking:
1. Less parking pressure on our parking lots that serve our customers and
employees.
2. Less management and oversight of our parking areas
3. Increased customer traffic and sales tax revenues for the West Vail
neighborhood and our businesses
4. Spirit of cooperation shown by TOV to offer Vail Valley residents affordable
and acceptable parking options
5. Affordable food and beverage and consumer services conveniently located
near skier vehicles
6. Very close proximity to TOV bus stops and convenience for skiers
4 - 4 - 1
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Employee housing policy direction for the purpose of developing updates and
amendments for the Town of Vail Employee Housing Strategic Plan
PRESENTER(S): Nina Timm
ACTION REQUESTED OF COUNCIL: Provide staff with housing policy direction so updates
and amendments can be developed for the Employee Housing Strategic Plan.
BACKGROUND: The Town of Vail has recognized the need for deed restricted employee
housing within Vail. The Town quantified the need and set a goal when the Employee Housing
Strategic Plan was adopted on September 8, 2008. The goal is “to ensure there is deed
restricted housing for at least 30% of Vail’s workforce within the Town of Vail.” Since
the Plan has been adopted market conditions have changed throughout Eagle County and
numerous action items from the Plan have been completed. With policy direction from the
Town Council, staff will work with the Vail Local Housing Authority and the Planning and
Environmental Commission, as required, to develop a list of proposed updates and
amendments for Town Council to consider adding to the Plan.
STAFF RECOMMENDATION: Provide staff with direction on the types of policy and housing
the Vail Town Council would like to focus on in order for staff and the Vail Local Housing
Authority to develop updates and amendment recommendations for the Town of Vail
Employee Housing Strategic Plan.
ATTACHMENTS:
Staff Memorandum
8/21/2012
To: Vail Town Council
From: Community Development Department
Date: August 21, 2012
Subject: Updates to the Employee Housing Strategic Plan
I. PURPOSE
The purpose of this memorandum is to request policy direction from the Vail Town
Council in order to develop updates and amendments for the Town of Vail Employee
Housing Strategic Plan.
II. INTRODUCTION
Historically, the Town of Vail has recognized the need for deed restricted employee
housing within Vail. The Town quantified the need and set a goal when the Employee
Housing Strategic Plan (Plan) was adopted on September 8, 2008. The goal is “to
ensure there is deed restricted housing for at least 30% of Vail’s workforce within the
Town of Vail.”
Since the Town adopted the Plan market conditions have changed throughout Eagle
County and numerous action items from the Plan have been completed, including:
• 15 new deed restricted employee housing units (EHU) have been established
• 124 rental beds at First Chair added
• Implementation of the EHU Deed Restriction Exchange Program
o 14 Exchanges have occurred
• Modification of Commercial Linkage and Inclusionary Zoning to require a portion
of required mitigation on-site for demo-rebuilds and new construction
• Rezoning, site planning and civil engineering for up to 48 new EHUs at
Chamonix Commons
• Arosa Duplex – two LEED Silver Certified homes in West Vail
With policy direction from the Town Council, staff will work with the Vail Local Housing
Authority and the Planning and Environmental Commission, as required, to develop a
list of proposed updates and amendments for Town Council to consider adding to the
Plan. The Plan currently has three policy statements:
5 - 1 - 1
8/21/2012
Town of Vail Page 2
• The Town will impose regulatory requirements
o Development will be required to address a portion of its housing demand
within the Town of Vail; and
o New development and redevelopment will be required to address a portion
of its housing at the development site.
• Development and acquisition initiated by the Town
o To address employee housing needs beyond the regulatory requirements
for new development, and
o To respond to the desire to promote a more diverse and vibrant local
community.
• Form regional partnerships
o These efforts will address employee housing needs beyond the regulatory
requirements by actively seeking partnerships, including:
Public/Private, and
Multi-Jurisidictional.
The Vail Local Housing Authority (VLHA) is has completed a study with BBC Research
& Consulting quantifying the Economic Value of the Town of Vail’s Investment in
Employee Housing, dated March 29, 2012. The study enumerated the economic
benefits as well as benefits that go beyond direct economics. It concluded, “Employee
housing is a form of insurance in an uncertain business climate. In light of an uncertain
economy, and the economic benefits of employee housing, the nature and scale of new
employee housing should be part of the ongoing community dialogue about public
investment and the ongoing success of Vail.”
Today, commercial linkage and inclusionary zoning (“keep up”) are designed to
conjunctively ensure there is deed restricted employee housing for at least 30% of new
employees generated by new development and redevelopment. The regulatory
requirements provide multiple methods of mitigation and do not require employee
housing be provided for a specific type of wage earners. The goal is for development to
provide the type(s) of employee housing most suited to the needs of that development’s
future employees.
“Catch Up” is a portion of the Town’s goal that is exclusively within the purview and
control of the Town of Vail. Based on the Town’s goal and existing deed restricted
properties in Vail, the deed restricted EHU gap is currently 677 beds. Entry-level
workers comprise a significant portion of Vail’s workforce based on zoning regulations
(requirement for retail square footage on the first level in Vail’s commercial cores) and
the resort influence on business in Vail.
• Redevelopment of Timber Ridge provides the Town with the most significant
opportunity to provide additional “catch up” affordable rental units that address
the housing needs of Vail’s employees/jobs.
5 - 1 - 2
8/21/2012
Town of Vail Page 3
The remainder of the “Catch Up” opportunities and policies can be focused on for-sale
units and/or a different type of rental product than currently exists in Vail. The land for
large rental development is very limited in Vail and it may not be practical to provide a
“high-end” rental development. With “catch up” being the responsibility of the Town, the
types of housing and demographics served is fully within the control of the Town.
There are opportunities for the Town of Vail to add to the quantity and quality of deed
restricted for-sale housing in Vail, with a particular focus on families earning greater
than 120% of Area Median Income ($101,760 per year for a family of four – down
$2,160 from 2011). Some opportunities to develop for-sale housing on existing Town
owned land could include:
• Chamonix Commons currently has complete civil engineering construction
documents. The site plan calls for a total of up to 48 units. The site plan
includes 5 duplexes (10 units). (approx. 4 acres)
• With zoning in place and civil engineering drawings complete, Chamonix
Commons provides the Town with its largest opportunity to add new
employee housing units.
• 2507 Arosa Drive – a Town owned single-family unit on a lot zoned for a duplex.
Previous studies have shown the Manager’s Residence (built in 1979) could be
redeveloped and an additional new unit could be added. (approx. 0.33 acres)
• Zoning allows two units to exist where today there is only one town-owned
unit. While this location provides a desirable location for a new employee
housing unit, it also requires the Town to build a new town manager’s unit.
• Land Trades – Staff has previously discussed potential land trades with Eagle
River Water and Sanitation District to provide more parcels in Vail for the
development of employee housing.
• While certain parcels of land have been discussed at a staff level, a
partnership agreement would need to identify specific parcels and
potentially rezoned to allow for new employee housing units.
III. OPTIONS
1. Add additional information to the Plan
Adding additional information to the Plan will allow the Town to continue to check its
progress against its desired outcomes, related to employees and housing in Vail.
Since the Plan has been adopted there has been a significant change in the median
price per square foot for real estate in Vail. The median price per square foot reached a
high in 2008 of $897/square foot.
5 - 1 - 3
8/21/2012
Town of Vail Page 4
During this same period of time Area Median Income (AMI) has remained fairly flat. The
following chart illustrates change in 120% of AMI for a two-person household in Eagle
County. AMI has increased approximately 7% from 2007 to 2011.
For reference, a household earning approximately $100,000 per year could “afford” a
$325,000 mortgage or a purchase price of $390,000. This assumes a 20% down
payment ($65,000) and a 6% interest rate (typical average rate).
The Plan currently does not contain an extensive amount of data regarding wages
earned working in the Town of Vail. The Plan does show the wages of existing Vail
households in 2007. The additional job/wage data should be added to the Plan to
ensure the mix of housing options matches the types of jobs/wages earned in Vail.
At the time the Plan was adopted this information was not included because the Town
wanted flexibility to add new housing based on opportunities that became available and
it was understood the private sector would provide the housing most suited to the types
of employees needed (equating to wages paid/earned) for the development that was
providing it.
An example of proposed data that could be added:
$596
$897
$503 $596
$460
$0
$200
$400
$600
$800
$1,000
20072008200920102011
Median $ / Square Foot in Vail
$77,880
$80,400
$83,100
$81,600
$83,700
$74,000
$76,000
$78,000
$80,000
$82,000
$84,000
$86,000
20072008200920102011
120% Area Median Income
2-Person Household
5 - 1 - 4
8/21/2012
Town of Vail Page 5
2000 HH Income Ranges in 2010 $ 2000
2010 2010 HH Income Ranges in 2010 $
$12,500 to $31,249 238
212 $10,000 to $24,999
$31,250 to $62,499 545
68 $25,000 to $49,999
$62,500 to $93,749 541
122 $50,000 to $74,999
$93,750 to $124,999 253
162 $75,000 to $99,999
$125,000 to $187,499 283
274 $100,000 to $149,999
$188,000 to $250,000 98
111 $150,000 to $200,000
Over $250,000 133
165 Over $200,000
Source: US Census 2010 and 2000
The data above illustrates a significant change in the composition of Vail occupied
households from 2000 to 2010. The dollars in 2000 have been adjusted to reflect 2010
dollars.
• Vail had an 82% decrease in the number of households earning $25,000 to
$74,999 from 2000 to 2010
• Vail had a 19% decrease in the number of households earning $75,000 to
$149,999 from 2000 to 2010
• Vail had a 12% increase in the number of households earning $150,000 to
$200,000 from 2000 to 2010
• Vail had a 24% increase in the number of households earning over $200,000
Eagle County including Vail, shown below, did not experience the same changes in
occupied households from 2000 to 2010.
Eagle County
2000 HH Income Ranges in 2010 $ 2000
2010 2010 HH Income Ranges in 2010 $
$12,500 to $31,249 1347 1906 $10,000 to $24,999
$31,250 to $62,499 3633 3284 $25,000 to $49,999
$62,500 to $93,749 3711 3594 $50,000 to $74,999
$93,750 to $124,999 2431 2910 $75,000 to $99,999
$125,000 to $187,499 2047 3390 $100,000 to $149,999
$188,000 to $250,000 608 1109 $150,000 to $200,000
Over $250,000 918 1297 Over $200,000
Source: US Census 2010 and 2000
• Eagle County had a 6% decrease in the number of households earning $25,000
to $74,999 from 2000 to 2010
• Eagle County had a 29% increase in the number of households earning $75,000
to $149,999 from 2000 to 2010
• Eagle County had a 45% increase in the number of households earning
$150,000 to $200,000 from 2000 to 2010
• Eagle County had a 41% increase in the number of households earning over
$200,000
5 - 1 - 5
8/21/2012
Town of Vail Page 6
“The Economic Value of the Town of Vail’s Investment in Employee Housing”, dated
March 29, 2012 could also be added as an addendum to the Employee Housing
Strategic Plan as it provides specific analysis and back ground for decision making
around the value of investing in employee housing.
2. Update the Implementation Matrix of the Plan
Currently the Implementation Matrix has Chamonix Commons as a high priority
item. Neither of the other opportunities listed above (2507 Arosa Drive and Land
Swaps) are included in the Implementation Matrix. With Town Council direction either
of those could be included.
In order to focus on more family oriented housing (larger, more expensive homes) the
Implementation Matrix should be updated to include Town owned parcels of land that
are in locations that are desirable to families. 2507 Arosa Drive is an opportunity to add
a housing unit desirable to families. Eagle River Water and Sanitation District has
expressed a willingness to be partners with the Town to develop additional deed
restricted housing on land they own in Vail. Based on previous analysis there is the
opportunity to construct a number of additional duplexes from East Vail to West Vail.
3. Amend Commercial Linkage and Inclusionary Zoning mitigation methods to
incent certain types of housing
Amendments to the methods of mitigation for Commercial Linkage and Inclusionary
Zoning could be made to incent developers to provide larger employee housing units.
Examples:
Example No. 1
2,000 square feet are required by Inclusionary Zoning
- The developer could provide five 400 square foot units to fulfill their
obligation
- With an incentive the developer could provide one 1,600 square foot unit if
there was a multiplier bonus of 1.25
o The down-side is nothing ensures the 1,600 square foot unit will be
occupied by a family
Example No. 2
4 employees are required by Commercial Linkage
- Currently the maximum number of employees that can be “credited” in a
three or more bedroom unit is 3.5 and the minimum square feet is 1,225
- With an incentive the developer could provide one unit that is at least 1,400
square feet and be given credit for 4 employees rather than a cap at 3.5
employees
o The down-side is nothing ensures the larger unit will be occupied by
a family
4. Zoning Regulation Text Amendments
• Review rezoning certain areas in Vail to incent development of EHUs
• Streamline housing regulations to reduce or eliminate process, as appropriate
5 - 1 - 6
8/21/2012
Town of Vail Page 7
IV. VAIL HOUSING
1. Vail Dwelling Units
• 7,230 total dwelling units in Vail
• 2,604 full-time occupied dwelling units
o 39% of full-time occupied dwelling units are deed restricted
o 52% of full-time occupied dwelling units are renter occupied
Source: US Census 2010
2. Vail Deed Restricted Employee Housing Units
• 725 deed restricted employee housing units in Vail
o 198 rental units at Timber Ridge Village Apartments
o 142 rental units at Middle Creek Village Apartments
o 134 units of required mitigation
o 125 privately owned units
o 81 owner-occupied, appreciation capped units
o 45 Town of Vail owned units
• Approximately 10% of Vail’s EHUs are owner-occupied
Full Time
Occupied
Units, 2,604
Partially
Occupied/
Vacant
Units, 4,626
Total Dwelling Units
1,2631,341
Full-Time Occupied
Dwelling Units in Vail
Full Time
Owner
Occupied Units
Full Time
Renter
Occupied Units
1,877
Free
Market
Units
(61%)
725
EHUS
(39%)
Total Full-Time Occupied
Dwelling Units
2,604
4,626 or sixty-four percent (64%)
of dwelling units in Vail are
partially occupied or vacant units
5 - 1 - 7
8/21/2012
Town of Vail Page 8
Source: Town of Vail Community Development Department
Source: US Census 2010, 2000 and 1990
V. STAFF RECOMMENDATION
Provide staff with direction on the types of policy and housing the Vail Town Council
would like to focus on in order for staff and the Vail Local Housing Authority to develop
updates and amendment recommendations for the Town of Vail Employee Housing
Strategic Plan.
VI. ATTACHMENT
Employee Housing Strategic Plan Implementation Matrix – updated August 21, 2012
0
198205
389
725
0
200
400
600
800
19701980199020002010
Deed Restricted EHUs
1.85
1.90
1.95
2.00
2.05
2.10
2.15
199020002010
1.96
2.07
2.04
1.96
2.11
2.04
Average Household Size
average owner
occupied
household size
average renter
occupied
household size
28% of Vail’s full-time residents live
in deed restricted employee housing
units
5 - 1 - 8
8/21/2012
Town of Vail Page 9
IMPLEMENTATION MATRIX – updates in red (August 21, 2012)
ACTION STEP
WHO
IMPLEMENTS WHEN
ESTIMATED
COST
PROPOSED
PRIORITY
Establish and Fund
VLHA Operating
Budget
Town Council and
VLHA
4th Quarter
2008
To Be
Determined A
Establish Baseline
"Existing
Conditions" for All
Units
Town Council and
VLHA
2009
March, 2010 $20,000
A
Completed
Monitor Existing
Conditions for All
Units
Town Council and
VLHA
1st Quarter of
Each Year
(2010) $5,000 A
Monitor Rental
Vacancy Rates Eagle County Continuous None A
Conduct Housing
Needs Assessment
In conjunction with
Eagle County
2010
County has a
draft report
August, 2012 $10,000 A
Update Fee-in-Lieu
for Commercial
Linkage &
Inclusionary Zoning
Community
Development Dept
and Consultant
1st Quarter of
Each Year
$2,000
None A
Updated Rational
Nexus Study Town of Vail
Every Five
Years (2011)
As Needed $15,000 A
Monitor Total
Number of Jobs in
Town of Vail Town of Vail
1st Quarter of
Each Year $2,000 A
Host Finance/
Home Buyer
Education Classes VLHA Two Per Year $500 A
Buy Down Units
Town Council and
VLHA Continuous
$1,000,000 / year
Purchased 3
Units A
Establish Buy Down
Unit Criteria
Town Council and
VLHA
4th Quarter
2008 None
A
Completed
Develop New For-
Sale Housing at
Chamonix
Town Council and
VLHA 2010
Potentially more
than the value of
the land A
5 - 1 - 9
8/21/2012
Town of Vail Page 10
ACTION STEP
WHO
IMPLEMENTS WHEN
ESTIMATED
COST
PROPOSED
PRIORITY
Develop Additional
Rental Housing at
Timber Ridge
Town Council and
VLHA 2011
Potentially the
value of the land A
Establish an EHU
Exchange Program
Town Council -
Com Dev Dept -
VLHA
Recommendation
4th Quarter
2008
January, 2009
$10,000 for legal
review
A
Completed
Implement the EHU
Exchange Program
Com Development
Dept. and VLHA
Continuous
Amended
March, 2011 None A
Review &
Potentially Modify
Commercial Linkage
Town Council -
Com Dev Dept -
VLHA
Recommendation
1st Quarter of
Each Year
Amended
May, 2008 None A
Review &
Potentially Modify
Inclusionary Zoning
Town Council -
Com Dev Dept -
VLHA
Recommendation
1st Quarter of
Each Year
Amended
May, 2008 None A
Identify
Land/Development
Opportunities
Town Council -
Com Dev Dept -
VLHA
Recommendation
2nd Quarter of
Each Year None A
Prioritize
Land/Development
Opportunities
Town Council -
Com Dev Dept -
VLHA
Recommendation
2nd Quarter of
Each Year
Acquisition of
Property A
Develop Arosa
Duplex Site
Town Council –
VLHA –
Com Dev Dept.
Completed
June, 2010 None
A
Completed
Propose
Development
and/or Rezoning
Town Council and
VLHA
2nd Quarter
of Each Year Development B
Review Housing
Zone District
Town Council -
Com Dev Dept -
VLHA
Recommendation
2nd Quarter
of Each Year None B
Establish Incentive
Zoning to Ensure
No Net Loss of
Rental Housing
Town Council -
Com Dev Dept -
VLHA
Recommendation
2nd Quarter
of Each Year
Amended
May, 2008 None B
5 - 1 - 10
8/21/2012
Town of Vail Page 11
ACTION STEP
WHO
IMPLEMENTS WHEN
ESTIMATED
COST
PROPOSED
PRIORITY
Pursue a Dedicated
Funding Source
Town Council and
VLHA
Begin 1st
Quarter 2009
None in 2009
Marketing in
2010 B
Monitor Free Market
Real Estate
Transactions
VLHA and
Consultant
Com Dev Dept
1st Quarter of
Each Year
$5,000
None B
Establish List of
Essential Service
Providers
Town Council and
Town Staff
4th Quarter
2008 None C
Create Partnerships
with Essential
Service Providers
Town Council and
VLHA Continuous None C
5 - 1 - 11
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Ordinance No. 2, Series of 2012, an ordinance amending Chapter 12-6,
Residential Districts, Vail Town Code, pursuant to Section 12-3-7, Amendment, Vail Town
Code, to establish a new zone district, Vail Village Townhouse (VVT) District, and setting forth
details in regard thereto; and Resolution No. 7, Series of 2012, amending Chapter VII, Vail
Village Sub-Areas, East Gore Creek Sub-Area (#6), Vail Village Master Plan, pursuant to
Chapter VIII, Implementation and Amendment, Vail Village Master Plan, to include
recommendations related to a new Vail Village Townhouse (VVT) District, and setting forth
details in regard thereto. (PEC110040, PEC110041)
PRESENTER(S): Bill Gibson, Community Development Department
ACTION REQUESTED OF COUNCIL: The applicant requests that the Vail Town Council
approves Ordinance No. 2, Series of 2012, on second reading. The applicant also requests
that the Vail Town Council approves Resolution No. 7, Series of 2012.
BACKGROUND: On November 14, 2011, the Planning and Environmental Commission
forwarded a recommendation of approval, with modifications, to the Vail Town Council for the
proposed Ordinance No. 2, Series of 2012, and , Resolution No. 7, Series of 2012, by a vote
of 4-1-1 (Rediker opposed and Pratt recused). The purpose of the proposed ordinance is to
establish a new zone district, the Vail Village Townhouse (VVT) District; and the purpose of
the proposed resolution is to establish related design guidelines as part of the Vail Village
Master Plan. The policy objectives of the new zone district and related design guidelines are
as follows: - Streamlining the development review process by establishing a new zone district
to specifically address townhouse properties.- Create incentives for redevelopment of existing
townhouse properties. - Preserve the existing residential character of the townhouse
properties and the neighborhood. On May 1, 2012, the Vail Town Council approved the first
reading of Ordinance No. 2, Series of 2012, by a vote of 6-0-1 (Foley opposed), with the
modifications that Section 12-6J-9 allows not more than one hundred twenty five square feet of
GRFA for each one hundred square feet of total site area (i.e. 1.25 GRFA ratio). The Vail
Town Council tabled Resolution No. 7, Series of 2012, to correspond with the second reading
of Ordinance No. 2, Series of 2012. The Vail Town Council held a subsequent public hearing
on May 15th and a work session on July 17th to further deliberate the proposed new zone
district. On August 7, 2012, the Vail Town Council tabled the proposed ordinance and
resolution, and directed Staff to prepare amendments to the proposed new zone district to
allow an unlimited amount of GRFA, a lower building height limit of 38 feet, maintain the
current 30% landscape area requirements, and to add additional front yard landscaping
guidelines in the new zone district.
STAFF RECOMMENDATION: The Planning and Environmental Commission recommends
the Vail Town Council approves the second reading of Ordinance No. 2, Series of 2012. The
Planning and Environmental Commission also recommends the Vail Town Council approves
Resolution No. 7, Series of 2012.
8/21/2012
ATTACHMENTS:
Memorandum
Attachment A Ordinance No. 2, Series of 2012
Attachment B Resolution No. 7, Series of 2012
8/21/2012
TO: Vail Town Council
FROM: Community Development Department
DATE: August 21, 2012
SUBJECT: Ordinance No. 2, Series of 2012, an ordinance amending Chapter 12-6,
Residential Districts, Vail Town Code, pursuant to Section 12-3-7, Amendment,
Vail Town Code, to establish a new zone district, Vail Village Townhouse (VVT)
District, and setting forth details in regard thereto; and Resolution No. 7, Series of
2012, amending Chapter VII, Vail Village Sub-Areas, East Gore Creek Sub-Area
(#6), Vail Village Master Plan, pursuant to Chapter VIII, Implementation and
Amendment, Vail Village Master Plan, to include recommendations related to a
new Vail Village Townhouse (VVT) District, and setting forth details in regard
thereto. (PEC110040, PEC110041)
Applicant: Town of Vail
Planner: Bill Gibson
I. SUMMARY
Ordinance No. 2, Series of 2012, establishes a new zone district, the Vail Village
Townhouse District. Resolution No. 7, Series of 2012, amends the Vail Village Master
Plan related to the new zone district and includes new design guidelines specifically
tailored for the townhouse properties in the proposed zone district. The proposed
Ordinance No. 2, Series of 2012, (Attachment A) and Resolution No. 7, Series of 2012,
(Attachment B) have been attached for review. The proposed new zone district and
associated master plan amendments are anticipated to be applied to the existing
townhouse properties located within Vail Village.
II. DESCRIPTION OF THE REQUEST
On August 7, 2012, the Vail Town Council tabled the proposed ordinance and
resolution, and directed Staff to prepare amendments to the proposed new zone district
to allow an unlimited amount of GRFA, a lower building height limit of 38 feet, maintain
the current 30% landscape area requirements, and to add additional front yard
landscaping guidelines in the new zone district.
6 - 1 - 1
8/21/2012
Town of Vail Page 2
The Community Development Department recommends the following amendments to
Ordinance No. 2, Series of 2012 (text deleted is in strikethrough and text added is bold
red):
12-6J-1: PURPOSE:
The Vail Village Townhouse District is intended to provide sites for, and maintain the
unique residential character of, existing townhouse properties in the East Gore Creek
Sub-Area of the Vail Village Master Plan area of the Town of Vail. The Vail Village
Townhouse district is intended to ensure adequate light, air, open space, and other
amenities commensurate with townhomes, and to maintain the desirable residential and
resort qualities of the zone district by establishing appropriate site development
standards. Certain nonresidential uses are permitted as conditional uses, which relate
to the nature of Vail as a winter and summer recreation and year-round community and,
where permitted, are intended to blend harmoniously with the residential character of the
zone district.
This zone district was established to regulate existing townhome properties that were
legally nonconforming in the High Density Multiple Family District. The Vail Village
Townhouse District is meant to encourage and provide incentives for redevelopment of
existing townhouse properties in accordance with the Vail Village Master Plan. The
incentives in this zone district include addressing both townhouse projects and
individually platted townhouse lots, reductions in lot area standards, reductions in
setbacks, increases in density, increases in gross residential floor area (GRFA),
reductions in landscaping area, and changes in parking design requirements. More
restrictive design considerations have been applied to these properties in accordance
with the Vail Village Master Plan to maintain the unique residential character of existing
townhouse developments in Vail Village.
12-6J-7: HEIGHT:
For a flat roof, the height of buildings shall not exceed forty feet (40) thirty feet (35). For
a sloping roof, the height of buildings shall not exceed forty three feet (43) thirty eight
feet (38).
12-6J-9: GROSS RESIDENTIAL FLOOR AREA:
Not more than one hundred twenty five (125) square feet of gross residential floor area
(GRFA) shall be permitted for each one hundred (100) square feet of total site area.
Dwelling units in this zone district shall not be entitled to additional gross residential floor
area under Section 12-15-5: Additional Gross Residential Floor Area (250 Ordinance), or
Section 12-15-4: Interior Conversions of this title. There shall be no exclusion to gross
residential floor area granted for enclosed garage space within individual dwelling units
as referenced in Chapter 15 Gross Residential Floor Area. An unlimited amount of
gross residential floor area (GRFA) shall be permitted on each site.
12-6J-11: LANDSCAPING AND SITE DEVELOPMENT:
At least twenty percent (20%) thirty percent (30%) of the total site area shall be
landscaped.
The Community Development Department recommends the following amendments to
Resolution No. 7, Series of 2012 (text deleted is in strikethrough and text added is bold
red):
6 - 1 - 2
8/21/2012
Town of Vail Page 3
K. Landscaping: Landscaping Trees, shrubs, and other plant materials shall be
located in the front portion of the site should be used to create privacy and to soften
the visual transition from roadways and parking areas to the building façades.
III. DISCUSSION ITEMS
HOW DOES ALLOWING UNLIMITED GRFA IN THE VAIL VILLAGE TOWNHOUSE
DISTRICT ACHIEVE THE ADOPTED POLICY OBJECTIVES?
Allowable gross residential floor area (GRFA) has been a primary point of
deliberation and debate associated with the proposed new Vail Village Townhouse
District. Proponents of redevelopment have argued that the new zone district should
allow more GRFA than the current High Density Multiple-Family District zoning to
achieve the adopted policy object of encouraging redevelopment. Meanwhile,
advocates for preservation have argued that the proposed new zone district should
allow no more GRFA than is currently allowed under High Density Multiple-Family
District zoning to achieve the adopted policy object of maintaining the residential
character of the neighborhood.
As discussed in past Town Council hearings, quantifying how much GRFA is
currently allowed under High Density Multiple-Family District zoning is also a subject
of debate. The Town’s adopted zoning regulations include numerous GRFA
deductions which do not result in a simple floor-area-ratio calculation for residential
buildings. Additionally, the Town’s adopted zoning regulations also includes the 250
Ordinance GRFA bonus which grants additional GRFA to some, not all, existing
dwelling units regardless of existing non-conformities. The Town’s adopted zoning
regulations also include the Interior Conversion GRFA bonus with grants unlimited
additional GRFA to some, not all, dwelling units to capture existing building volume
such as crawlspaces and attics for additional floor area, again regardless on existing
non-conformities. Any consolidation of these policies to establish an “existing
allowed GRFA ratio” involves a variety of approximations and assumptions. The
various combinations of approximations and assumptions used to quantify the
existing allowable GRFA limits yield various results. Allowing an unlimited amount of
GRFA in the proposed Vail Village Townhouse District will eliminate the need, and
debate over how, to quantify the various GRFA policies into a single ratio for the new
district.
Allowing an unlimited amount of GRFA in the proposed Vail Village Townhouse
District will streamline the development review process in that applicants will no
longer need to demonstrate, and Staff will no longer need to verify, compliance with
a floor area limit in this zone district. However, concerns have been expressed that
allowing unlimited GRFA in only one zone district, without a comprehensive review
of all the Town’s adopted GRFA policies, creates a unique condition in one specific
area of town that further confuses and complicates the Town’s development review
process.
6 - 1 - 3
8/21/2012
Town of Vail Page 4
Allowing an unlimited amount of GRFA in the proposed new zone district does not
streamline the development review process by eliminating an applicant’s
requirement to provide GRFA calculations for the Town’s review with every
proposed addition and new construction development application. The Town’s
adopted parking regulations utilize GRFA to quantify the parking requirements for
residential dwellings outside the designated commercial core parking areas. Today,
the Vail Townhouse Condominiums and the Vail Row Houses are within the core
area designation and are required 1.4 parking spaces per dwelling unit. However,
Vail Trails Chalets, Vail Trails East, and the Texas Townhomes are outside the core
area designation and their required parking is based upon how much GRFA is
constructed (<500 sq.ft. = 1.5 parking spaces, 500 to <2,000 sq.ft. = 2 parking
spaces, 2,000 and greater = 2.5 parking spaces).
Today properties located within the High Density Multiple-Family District are subject
to the employee housing mitigation requirements of the Town’s adopted Inclusionary
Zoning regulations. The Vail Village Townhouse District is proposed to be subject to
these same requirements. The employee housing mitigation requirements of the
Town’s adopted Inclusionary Zoning regulations are based upon GRFA. Every
residential addition and new construction project under the current and proposed
zone districts must mitigate the direct and secondary employee housing impacts on
the community by mitigating 10% of the total new GRFA associated with that project.
GRFA calculations will be required to quantify this mitigation requirement.
Allowing an unlimited amount of GRFA in the proposed Vail Village Townhouse
District will achieve the adopted policy objective of creating an incentive for
redevelopment. However, the other development standards of the proposed district
(height, setbacks, site coverage, landscape area, etc.) and the proposed design
guidelines associated with the new district will be more heavily relied upon to
achieve the adopted policy objective of maintaining the existing residential character
of the neighborhood.
HOW DOES LOWERING THE PROPOSED BUILDING HEIGHT LIMIT FROM 43 FEET
TO 38 FEET ACHIEVE THE ADOPTED POLICY OBJECTIVES?
Amending the allowable building height limits from one height to another height has
no impact on streamlining the development review process.
The building height limit in the High Density Multiple-Family District is 48 feet;
however, none of the existing properties anticipated to be rezoned to the new Vail
Village Townhouse District are currently built to that height. The tallest existing
dwelling unit anticipated to be rezoned to the new district is Vail Row House #7,
which is approximately 38.5 feet in height based upon the interpolated natural grade
of the site. Therefore, only one existing property may be rendered legally non-
conforming by this amended height limit regulation.
On first reading of the proposed new Vail Village Townhouse District, the building
height limit was approved to be 43 feet to match the maximum building height limit of
6 - 1 - 4
8/21/2012
Town of Vail Page 5
the adjacent Commercial Core 1 District zoned properties in Vail Village. A height
limit of 43 feet or 38 feet still allows most of the subject properties the ability to
expand upward from their current built conditions which accomplishes the adopted
policy objective of creating incentives for redevelopment. However, this incentive is
less than the incentive provided by the current zoning.
Lowering the allowable building height in the new zone district from 43 feet to 38 feet
to more closely match the maximum height of the existing built conditions better
achieves the adopted policy objective of preserving the existing residential character
of the neighborhood.
HOW IS LANDSCAPING IN FRONT OF THE TOWNHOUSE BUILDINGS
ADDRESSED BY THE PROPOSED NEW ZONE DISTRICT?
The High Density Multiple-Family District requires a minimum of 30% of a site to be
landscape area. On first reading, the proposed Vail Village Townhouse District was
approved with a landscape area requirement of 20% to address the various existing
non-conforming properties. Based upon the Vail Town Council’s August 7, 2012,
deliberations, the attached ordinance has been amended to require 30% landscape
area as required by the current zoning.
This amendment will have a negative effect on the adopted policy objective of
streamlining the development review process since more properties will be non-
conforming related to landscape area with a 30% requirement than a 20%
requirement. Additionally, a 30% landscape area requirement is less of an incentive
for redevelopment than a 20% requirement. However, the amended 30% landscape
area requirement will better achieve the adopted policy objective of preserving the
existing residential character of the neighborhood.
The proposed amendments to the Vail Village Master Plan reviewed at the Council’s
previous hearings included a design guideline for landscaping to create privacy and
to soften the transition from parking areas and streets to the building façade. As
defined by the adopted Vail Town Code, hardscape areas such as patios, sidewalks,
etc. are defined as landscape area. Based upon the Town Council’s August 7th
deliberations, Staff recommends modification to the proposed guideline that more
clearly identify the need for landscape plantings, not only hardscape, at the front of
townhouse buildings. Under both the current and proposed zoning, townhouse
properties are subject to the adopted, general landscaping design guidelines of Title
14, Development Standards, Vail Town Code.
WHY IS STAFF PROPOSING AMENDMENTS TO THE PURPOPSE SECTION OF
THE NEW ZONE DISTRICT?
Throughout the review of the proposed Vail Village Townhouse District all
discussions and deliberations have been grounded in the understanding that the
proposed district is intended to address specific existing townhouse properties in
Vail Village: Vail Townhouse Condominiums, Vail Row Houses, Vail Trails Chalet,
6 - 1 - 5
8/21/2012
Town of Vail Page 6
Vail Trails East and Texas Townhomes. The proposed new district is not intended
to be applied to other existing or proposed townhouse properties located within or
outside of Vail Village. The proposed amendments to the Vail Village Master Plan
recommend the proposed new zone district and associated design guidelines be
applied to the discussed specific properties which are located within the East Gore
Creek sub-area of the Vail Village Master Plan. Staff recommends amending the
purpose statement of the Vail Village Townhouse District to further clarify which
specific properties this district is intended to be applied.
IV. BACKGROUND
On November 14, 2011, the Planning and Environmental Commission forwarded a
recommendation of approval, with modifications, to the Vail Town Council for the
proposed Ordinance No. 2, Series of 2012, and , Resolution No. 7, Series of 2012, by a
vote of 4-1-1 (Rediker opposed and Pratt recused).
On February 21, 2012, the Vail Town Council held a work session to discuss the
proposed ordinance and resolution establishing the Vail Village Townhouse District and
the associated Vail Village Master Plan amendments. At that hearing the Council asked
questions concerning the heights of nearby buildings, how the existing GRFA
development potential was calculated, and how changes to the GRFA ratios could affect
the massing of the subject townhouse buildings.
On April 3, 2012, the Vail Town Council held a public hearing to discuss the proposed
ordinance and resolution. The Vail Town Council tabled these items to its May 1, 2012,
hearing to provide the former applicants, Mauriello Planning Group and KH Webb
Architects, an opportunity to construct additional visual models illustrating the various
considered GRFA ratios (1.25, 1.35, 1.50, etc.)
On May 1, 2012, the Vail Town Council approved the first reading of Ordinance No. 2,
Series of 2012, by a vote of 6-0-1 (Foley opposed), with the modification that Section
12-6J-9 allows not more than one hundred twenty five square feet of GRFA for each
one hundred square feet of total site area (i.e. 1.25 GRFA ratio).
On May 15, 2012, the Vail Town Council held another public hearing on the proposed
new zone district. The Council tabled the application for further deliberation.
On July 17, 2012, the Vail Town Council held a work session to discuss the proposed
new zone district. A majority of the Vail Town Council re-affirmed:
• the problems associated with existing townhouse properties being zoned High
Density Multiple-Family District
• a new zone district should be established to address the problems associated
with the current zoning of townhouse properties
• one policy objective of the new district is to streamline the development review
process
6 - 1 - 6
8/21/2012
Town of Vail Page 7
• one policy objective of the new district is to create incentives for redevelopment
of existing townhouse properties
• another policy objective of the new district is to preserve the existing residential
character of the townhouse properties and the neighborhood
The Council’s work session included a general discussion about the Town’s adopted
gross residential floor area (GRFA) regulations and a discussion about the appropriate
GRFA limits in the proposed new zone district including the options of a GRFA ratio of
1.25, a ratio of 1.50, and eliminating GRFA in this new district.
On August 7, 2012, the Vail Town Council tabled the proposed ordinance and
resolution, and directed Staff to prepare amendments to the proposed new zone district
to allow an unlimited amount of GRFA, a lower building height limit of 38 feet, maintain
the current 30% landscape area requirements, and to add additional front yard
landscaping guidelines in the new zone district.
V. ACTION REQUESTED OF THE COUNCIL
The applicant requests that the Vail Town Council approves Ordinance No. 2, Series of
2012, on second reading. The applicant also requests that the Vail Town Council
approves Resolution No. 7, Series of 2012.
VI. RECOMMENDATION
Ordinance No. 2, Series of 2012
On November 14, 2011, the Planning and Environmental Commission forwarded a
recommendation of approval, with modifications, to the Vail Town Council for the
proposed ordinance. Should the Vail Town Council choose to approve Ordinance No.
2, Series of 2012; the Planning and Environmental Commission recommends the
Council pass the following motion:
“The Vail Town Council approves, on second reading, Ordinance No. 2, Series of
2012, an ordinance amending Chapter 12-6, Residential Districts, Vail Town
Code, pursuant to Section 12-3-7, Amendment, Vail Town Code, to establish a
new zone district, Vail Village Townhouse (VVT) District, and setting forth details
in regard thereto.”
Should the Vail Town Council choose to approve this ordinance, the Planning and
Environmental Commission recommends the Vail Town Council makes the following
findings:
“Based upon the review of the criteria outlined in Section V of Staff’s November
14, 2011, memorandum to the Planning and Environmental Commission, and the
evidence and testimony presented, the Vail Town Council finds:
6 - 1 - 7
8/21/2012
Town of Vail Page 8
1. That the amendment is consistent with the applicable elements of the adopted
goals, objectives and policies outlined in the Vail comprehensive plan and is
compatible with the development objectives of the town; and
2. That the amendment furthers the general and specific purposes of the zoning
regulations; and
3. That the amendment promotes the health, safety, morals, and general welfare
of the town and promotes the coordinated and harmonious development of the
town in a manner that conserves and enhances its natural environment and its
established character as a resort and residential community of the highest
quality.”
Resolution No. 7, Series of 2012
On November 14, 2011, the Planning and Environmental Commission forwarded a
recommendation of approval, with modifications, to the Vail Town Council for the
proposed resolution. Should the Vail Town Council choose to approve Resolution No.
7, Series of 2012; the Planning and Environmental Commission recommends the
Council pass the following motion:
“The Vail Town Council approves Resolution No. 7, Series of 2012, a resolution
amending Chapter VII, Vail Village Sub-Areas, East Gore Creek Sub-Area (#6),
Vail Village Master Plan, pursuant to Chapter VIII, Implementation and
Amendment, Vail Village Master Plan, to include recommendations related to a
new Vail Village Townhouse (VVT) District, and setting forth details in regard
thereto.”
Should the Vail Town Council choose to approve this resolution, the Planning and
Environmental Commission recommends the Vail Town Council makes the following
findings:
“Based upon the review of the criteria outlined in Section V of Staff’s November
14, 2011, memorandum to the Planning and Environmental Commission, and the
evidence and testimony presented, the Vail Town Council finds:
1. That the amendment is consistent with the applicable elements of the adopted
goals, objectives and policies outlined in the Vail comprehensive plan and is
compatible with the development objectives of the town; and
2. That the amendment furthers the general and specific purposes of the zoning
regulations; and
3. That the amendment promotes the health, safety, morals, and general welfare
of the town and promotes the coordinated and harmonious development of the
town in a manner that conserves and enhances its natural environment and its
6 - 1 - 8
8/21/2012
Town of Vail Page 9
established character as a resort and residential community of the highest
quality.”
VII. ATTACHMENTS
A. Ordinance No. 2, Series of 2012
B. Resolution No. 7, Series of 2012
6 - 1 - 9
8/21/2012
Ordinance No. 2, Series of 2012 1
ORDINANCE NO. 2
Series of 2012
AN ORDINANCE AMENDING CHAPTER 12-6, RESIDENTIAL DISTRICTS, VAIL TOWN
CODE, TO ESTABLISH THE VAIL VILLAGE TOWNHOUSE (VVT) DISTRICT, AND
SETTING FORTH DETAILS IN REGARD THERETO.
WHEREAS, Section 12-3-7, Amendment, Vail Town Code, sets forth the procedures
for amending the Town’s Zoning Regulations; and,
WHEREAS, the purpose of the amendments is to establish a new zone district to
regulate existing townhouse properties in Vail Village that were legally non-conforming in
regard to the provisions of the High Density Multiple-Family District; and,
WHEREAS, the purpose of the amendments is to establish incentives for the
redevelopment of existing townhouse properties in Vail Village; and,
WHEREAS, the purpose of the amendments is to preserve the existing character of
the townhouse properties in Vail Village and to preserve the existing character of the
neighborhood; and,
WHEREAS, on November 14, 2011, the Town of Vail Planning and Environmental
Commission held a public hearing on the application to amend the Town’s Zoning
Regulations and establish the Vail Village Townhouse District, in accordance with the
provisions of the Vail Town Code; and,
WHEREAS, the Town of Vail Planning and Environmental Commission forwarded a
recommendation of approval, with modifications, for the proposed Zoning Regulation
amendments to the Vail Town Council; and,
WHEREAS, the Vail Town Council finds and determines that the amendment is
consistent with the applicable elements of the adopted goals, objectives and policies
outlined in the Vail Comprehensive Plan and is compatible with the development objectives
of the town; and,
WHEREAS, the Vail Town Council finds and determines that the amendment to the
Town Code furthers the general and specific purposes of the Zoning Regulations; and,
WHEREAS, the Vail Town Council finds and determines that the amendment
promotes the health, safety, morals, and general welfare of the town and promote the
coordinated and harmonious development of the town in a manner that conserves and
enhances its natural environment and its established character as a resort and residential
community of the highest quality.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN
OF VAIL, COLORADO, THAT:
6 - 2 - 1
8/21/2012
Ordinance No. 2, Series of 2012 2
SECTION 1. Table of Contents, Title 12, Zoning Regulations, Vail Town Code, is
hereby amended in part as follows (text to be deleted is in strikethrough, text that is
to be added is bold, and sections of text that are not amended have been omitted):
Vail Village Townhouse (VVT) District 6J
SECTION 2. Section 12-2-2, Definitions, Vail Town Code, is hereby amended in
part as follows (text to be deleted is in strikethrough, text that is to be added is bold,
and sections of text that are not amended have been omitted):
TOWNHOUSE PROJECT: A building or group of associated buildings
consisting of multiple-family dwelling units designed as attached or
row dwellings that are treated as one entity for zoning purposes.
INDIVIDUALLY PLATTED TOWNHOUSE LOT: A portion of a townhouse
project that is subdivided and for zoning purposes is treated as a
separate entity from the remainder of the project.
SECTION 3. Section 12-4-1, Designated, Vail Town Code, is hereby amended in
part as follows (text to be deleted is in strikethrough, text that is to be added is bold,
and sections of text that are not amended have been omitted):
The following zone districts are established:
Vail Village Townhouse (VVT) District
SECTION 4. Chapter 12-6, Residential Districts, Vail Town Code, is hereby
established as follows (text that is to be added is bold):
ARTICLE J. VAIL VILLAGE TOWNHOUSE (VVT) DISTRICT
12-6J-1: PURPOSE:
The Vail Village Townhouse District is intended to provide sites for, and
maintain the unique residential character of, existing townhouse
properties in the East Gore Creek Sub-Area of the Vail Village Master
Plan area. The Vail Village Townhouse district is intended to ensure
adequate light, air, open space, and other amenities commensurate
with townhomes, and to maintain the desirable residential and resort
qualities of the zone district by establishing appropriate site
development standards. Certain nonresidential uses are permitted as
conditional uses, which relate to the nature of Vail as a winter and
summer recreation and year-round community and, where permitted,
are intended to blend harmoniously with the residential character of the
zone district.
6 - 2 - 2
8/21/2012
Ordinance No. 2, Series of 2012 3
This zone district was established to regulate existing townhome
properties that were legally nonconforming in the High Density Multiple
Family District. The Vail Village Townhouse District is meant to
encourage and provide incentives for redevelopment of existing
townhouse properties in accordance with the Vail Village Master Plan.
The incentives in this zone district include addressing both townhouse
projects and individually platted townhouse lots, reductions in lot area
standards, reductions in setbacks, increases in density, increases in
gross residential floor area (GRFA), and changes in parking design
requirements. More restrictive design considerations have been
applied to these properties in accordance with the Vail Village Master
Plan to maintain the unique residential character of existing townhouse
developments in Vail Village.
12-6J-2: PERMITTED USES:
The following uses shall be permitted in the VVT district:
Employee housing units, as further regulated by chapter 13 of
this title.
Multiple-family residential dwellings, including attached and row
dwellings and condominium dwellings.
12-6J-3: CONDITIONAL USES:
The following conditional uses shall be permitted in the VVT district,
subject to issuance of a conditional use permit in accordance with the
provisions of chapter 16 of this title:
Bed and breakfasts, as further regulated by section 12-14-18 of
this title.
Home child daycare facilities, as further regulated by section 12-
14-12 of this title.
Public buildings, grounds and facilities.
Public utility and public service uses.
Timeshare units.
12-6J-4: ACCESSORY USES:
The following accessory uses shall be permitted in the VVT district:
Home occupations, subject to issuance of a home occupation
permit in accordance with the provisions of section 12-14-12 of
6 - 2 - 3
8/21/2012
Ordinance No. 2, Series of 2012 4
this title.
Other uses customarily incidental and accessory to permitted or
conditional uses, and necessary for the operation thereof.
12-6J-5: LOT AREA AND SITE DIMENSIONS:
The minimum lot or site area for a townhouse project shall be ten
thousand (10,000) square feet of total site area. Each site shall have a
minimum frontage of twenty feet (20’).
The minimum lot or site area for individually platted townhouse lots
shall be two thousand (2,000) square feet of total site area, each site
shall have a minimum frontage of twenty feet (20’).
12-6J-6: SETBACKS:
The minimum setback shall be twenty feet (20’) from the front and rear
property lines. The minimum setback shall be twenty feet (20’) from the
side property lines, except the setback shall be zero feet (0’) from the
side property lines between attached dwelling units.
12-6J-7: HEIGHT:
For a flat roof, the height of buildings shall not exceed thirty feet (35).
For a sloping roof, the height of buildings shall not exceed thirty eight
feet (38).
12-6J-8: DENSITY CONTROL:
The existing number of legally established units on a development site
or twenty-five dwelling units per acre of total site area, whichever is
greater, shall be allowed. A dwelling unit may include one attached
accommodation unit no larger than one-third (1/3) of the total floor area
of the dwelling.
12-6J-9: GROSS RESIDENTIAL FLOOR AREA:
An unlimited amount of gross residential floor area (GRFA) shall be
permitted on each site.
12-6J-10: SITE COVERAGE:
Site coverage shall not exceed fifty five (55%) of the total site area.
12-6J-11: LANDSCAPING AND SITE DEVELOPMENT:
At least thirty percent (30%) of the total site area shall be landscaped.
12-6J-12: PARKING AND LOADING:
Off street parking and loading shall be provided in accordance with
chapter 10 of this title. Required parking legally established within the
6 - 2 - 4
8/21/2012
Ordinance No. 2, Series of 2012 5
street right-of-way may be continued subject to a revocable right-of-way
permit issued by the Town of Vail.
12-6J-13: COMPLIANCE BURDEN:
It shall be the burden of the applicant to prove by a preponderance of
the evidence before the Design Review Board and/or Administrator that
the proposed new construction, addition, or minor exterior alteration is
in compliance with the applicable elements of the Vail Village Master
Plan, Vail Village Urban Design Guide Plan, and the Vail Village Design
Considerations.
SECTION 5. Section 12-10-17-B, Lease Qualifications, Vail Town Code, is hereby
amended in part as follows (text to be deleted is in strikethrough, text that is to be
added is bold, and sections of text that are not amended have been omitted):
1. Any owner, occupant or building manager who owns, occupies or
manages ten (10) or more private parking spaces located in commercial core
1, commercial core 2, commercial core 3, high density multiple-family, Vail
Village Townhouse, public accommodations, Lionshead mixed use 1,
Lionshead mixed use 2, or special development zone districts and provides
sufficient parking for use by employees may apply to the administrator of the
town for a permit to lease parking spaces.
SECTION 6. Section 12-13-4, Requirements by Employee Housing Unit (EHU)
Type , Vail Town Code, is hereby amended in part as follows (text to be deleted is in
strikethrough, text that is to be added is bold, and sections of text that are not
amended have been omitted):
Type
III
Residential cluster
Low density multiple-family
Medium density multiple-
family
High density multiple-family
Vail Village Townhouse
Public accommodation
Commercial core 1
Commercial core 2
Commercial core 3
Commercial service center
Arterial business
Heavy service
Lionshead mixed use 1
Lionshead mixed use 2
Public accommodation 2
Ski base/recreation
Ski base/recreation 2
Special development district
Parking district
General use
The EHU
may be
sold or
transferred
separately.
The EHU
is
excluded
from the
calculatio
n of
GRFA.
n/a
n/a
Per
chapter
10 of
this title
as a
dwelling
unit.
A. Dwelling
unit: 300 sq.
ft. minimum
and 1,200
sq. ft.
maximum.
B. Dormitory
unit: 200 sq.
ft. minimum
for each
person
occupying
the EHU.
The EHU is
excluded
from the
calculation
of density.
SECTION 7. Section 12-15-2, GRFA Requirements By Zone District, Vail Town
6 - 2 - 5
8/21/2012
Ordinance No. 2, Series of 2012 6
Code, is hereby amended in part as follows (text to be deleted is in strikethrough,
text that is to be added is bold, and sections of text that are not amended have
been omitted):
Zone Districts
GRFA Ratio
GRFA Credits
(Added To Results Of
Application Of Percentage)
VVT
Vail Village Townhouse
Unlimited None
SECTION 8. Section 12-15-3, Definition, Calculation, and Exclusions, Vail Town
Code, is hereby amended in part as follows (text to be deleted is in strikethrough,
text that is to be added is bold, and sections of text that are not amended have
been omitted):
B. Within The Residential Cluster (RC), Low Density Multiple-Family (LDMF),
Medium Density Multiple-Family (MDMF), High Density Multiple-Family
(HDMF), And Housing (H), and Vail Village Townhouse (VVT) Districts:
SECTION 9. Section 12-15-3, Definition, Calculation, and Exclusions, Vail Town
Code, is hereby amended in part as follows (text to be deleted is in strikethrough,
text that is to be added is bold, and sections of text that are not amended have
been omitted):
C. Within All Districts Except The Hillside Residential (HR), Single-Family
Residential (SFR), Two-Family Residential (R), Two-Family
Primary/Secondary (PS), Residential Cluster (RC), Low Density Multiple-
Family (LDMF), Medium Density Multiple-Family (MDMF), High Density
Multiple-Family (HDMF), And Housing (H), and Vail Village Townhouse
(VVT) Districts:
SECTION 10. Section 12-15-4, Interior Conversions, Vail Town Code, is
hereby amended in part as follows (text to be deleted is in strikethrough, text that is
to be added is bold, and sections of text that are not amended have been omitted):
B. Applicability: Within all zone districts except the single-family residential
(SFR), two-family residential (R), and two-family primary/secondary
residential (PS), and Vail Village Townhouse (VVT) districts, dwelling
units that meet or exceed allowable GRFA will be eligible to make interior
conversions provided the following criteria are satisfied:
1. Any existing dwelling unit shall be eligible to add GRFA, via the "interior
space conversion" provision in excess of existing or allowable GRFA
including such units located in a special development district; provided,
that such GRFA complies with the standards outlined herein.
6 - 2 - 6
8/21/2012
Ordinance No. 2, Series of 2012 7
2. For the purpose of this section, "existing unit" shall mean any dwelling
unit that has been constructed prior to August 5, 1997, and has received a
certificate of occupancy, or has been issued a building permit prior to
August 5, 1997, or has received final design review board approval prior
to August 5, 1997.
SECTION 11. Section 12-15-5, Additional Gross Residential Floor Area (250
Ordinance), Vail Town Code, is hereby amended in part as follows (text to be
deleted is in strikethrough, text that is to be added is bold, and sections of text that
are not amended have been omitted):
B. Applicability: The provisions of this section shall apply to dwelling units in
all zone districts except the single-family residential (SFR), two-family
residential (R), and two-family primary/secondary residential (PS), and Vail
Village Townhouse (VVT) districts.
SECTION 12. Section 12-24-1, Inclusionary Zoning, Vail Town Code, is
hereby amended in part as follows (text to be deleted is in strikethrough, text that is
to be added is bold, and sections of text that are not amended have been omitted):
B. This chapter shall apply to all new residential development and
redevelopment located within the following zone districts, except as provided
in section 12-24-5 of this chapter:
2. Vail Village Townhouse (VVT)
SECTION 13. Section 14-8-1 Site Development Standards, Inclusionary
Zoning, Vail Town Code, is hereby amended in part as follows (text to be deleted is
in strikethrough, text that is to be added is bold, and sections of text that are not
amended have been omitted):
6 - 2 - 7
8/21/2012
Ordinance No. 2, Series of 2012
8
Zone Districts
Max.
Density
EHU
Allowance
Min.
Building
Setbacks
Min. Deck (Ground Level)
Setback
Min. Deck
(Not Ground
Level)
Setback
Max.
Architectural
Projection
Into Setback
Max. Site
Coverage
Min.
Land-
scape Area
Min. Lot Size
(Buildable Area In Sq. Ft.)
Min.
Frontage
Min.
Square Area
Max.
Building Height
Parking And Loading
Location
Residential Districts VVT Vail Village Townhouse
Existing number of legally established units or 25 per acre of total site area.
Type III and Type IV, Type IV-IZ, Type VII-IZ
20’ front 20’ rear 20’ sides 0’ between attached dwelling units
May project not more than the lesser of 10' or 1
/2
the required setback
May project
not more than the lesser of 5' or 1
/2
the required setback
4’ 55% 30% 10,000 sq. ft. for comprehensive development site; 2,000 sq. ft. for individually platted townhouse lots
20’ n/a 40' flat roof 43' sloping roof
See title 12, chapter 10 of this code. Existing parking in street right-of-way may continue subject a revocable right-of-way permit.
6 - 2 - 8
8/21/2012
Ordinance No. 2, Series of 2012 9
SECTION 14. If any part, section, subsection, sentence, clause or phrase of
this ordinance is for any reason held to be invalid, such decision shall not effect the
validity of the remaining portions of this ordinance; and the Vail Town Council
hereby declares it would have passed this ordinance, and each part, section,
subsection, sentence, clause or phrase thereof, regardless of the fact that any one
or more parts, sections, subsections, sentences, clauses or phrases be declared
invalid.
SECTION 15. The Vail Town Council hereby finds, determines and declares
that this ordinance is necessary and proper for the health, safety and welfare of the
Town of Vail and the inhabitants thereof. The Council’s finding, determination and
declaration is based upon the review of the criteria prescribed by the Town Code of
Vail and the evidence and testimony presented in consideration of this ordinance.
SECTION 16. The amendment of any provision of the Town Code of Vail as
provided in this ordinance shall not affect any right which has accrued, any duty
imposed, any violation that occurred prior to the effective date hereof, any
prosecution commenced, nor any other action or proceeding as commenced under
or by virtue of the provision amended. The amendment of any provision hereby
shall not revive any provision or any ordinance previously repealed or superseded
unless expressly stated herein.
SECTION 17. All bylaws, orders, resolutions and ordinances, or parts thereof,
inconsistent herewith are repealed to the extent only of such inconsistency. This
repealer shall not be construed to revise any bylaw, order, resolution or ordinance,
or part thereof, theretofore repealed.
INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED
PUBLISHED ONCE IN FULL ON FIRST READING this 1st day of May, 2012 and a
public hearing for second reading of this Ordinance set for the 21st day of August,
2012, at 6:00 p.m. in the Council Chambers of the Vail Municipal Building, Vail,
Colorado.
__________________
Andrew P. Daly, Mayor
ATTEST:
_________________________
Lorelei Donaldson, Town Clerk
INTRODUCED, READ, ADOPTED AND ENACTED ON SECOND READING AND
ORDERED PUBLISHED IN FULL this 21st day of August, 2012.
6 - 2 - 9
8/21/2012
Ordinance No. 2, Series of 2012 10
__________________
Andrew P. Daly, Mayor
ATTEST:
_________________________
Lorelei Donaldson, Town Clerk
6 - 2 - 10
8/21/2012
1
Resolution No. 7, Series of 2012
RESOLUTION NO. 7
Series of 2012
A RESOLUTION AMENDING CHAPTER VII, VAIL VILLAGE SUB-AREAS, EAST
GORE CREEK SUB-AREA (#6), VAIL VILLAGE MASTER PLAN TO INCLUDE
RECOMMENDATIONS RELATED TO A NEW VAIL VILLAGE TOWNHOUSE (VVT)
DISTRICT, AND SETTING FORTH DETAILS IN REGARD THERETO.
WHEREAS, Chapter VIII, Implementation and Amendment, Vail Village Master
Plan, sets forth the procedures for amending the Town’s Zoning Regulations; and,
WHEREAS, the adoption of the Vail Village Townhouse (VVT) District
necessitates associated updates to the Vail Village Master Plan; and,
WHEREAS, the purpose of the amendments is to establish recommendations
and design considerations for the redevelopment of existing townhouse properties in
Vail Village; and,
WHEREAS, the purpose of the amendments is to preserve the existing character
of the townhouse properties in Vail Village and to preserve the existing character of the
neighborhood; and,
WHEREAS, on November 14, 2011 the Town of Vail Planning and
Environmental Commission held a public hearing on the application to amend the
Town’s Zoning Regulations and establish the Vail Village Townhouse District and
associated amendments to the Vail Village Master Plan; and,
WHEREAS, the Town of Vail Planning and Environmental Commission
forwarded a recommendation of approval, with modifications, for the proposed Vail
Village Master Plan amendments to the Vail Town Council; and,
WHEREAS, the Vail Town Council finds and determines that the amendments
are consistent with the applicable elements of the adopted goals, objectives and policies
outlined in the Vail Comprehensive Plan and is compatible with the development
objectives of the town; and,
WHEREAS, the Vail Town Council finds and determines that the amendment to
the Vail Village Master Plan furthers the general and specific purposes of the plan; and,
WHEREAS, the Vail Town Council finds and determines that the amendments
promote the health, safety, morals, and general welfare of the town and promote the
coordinated and harmonious development of the town in a manner that conserves and
enhances its natural environment and its established character as a resort and
residential community of the highest quality.
6 - 3 - 1
8/21/2012
2
Resolution No. 7, Series of 2012
NOW THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE
TOWN OF VAIL, COLORADO THAT:
SECTION 1. Chapter VII, Vail Village Sub-Areas, East Gore Creek Sub-Area
(#6), Vail Village Master Plan, is hereby amended in part as follows (text to be
deleted is in strikethrough, text that is to be added is bold, and sections of text
that are not amended have been omitted):
EAST GORE CREEK SUB AREA (#6)
A number of the earliest projects developed in Vail are located in the East
Gore Creek Sub-Area. Development in this area is exclusively multi-family
condominium and townhouse projects with a very limited amount of
support commercial. Surface parking is found at each site, which creates a
very dominant visual impression of the sub-area.
While the level of development in East Gore Creek is generally greater
than that allowed under existing zoning, this area has the potential to
absorb density without compromising the character of the Village. These
This developments could be accommodated by partial infills of existing
parking areas balanced by greenspace additions or through increasing the
height of existing buildings (generally one story over existing heights). In
order to maintain the architectural continuity of projects, additional density
should be considered only in conjunction with the comprehensive
redevelopment of projects or individual units. There are several
townhouse properties within this sub-area which were platted and/or
constructed under Eagle County jurisdiction. These townhouse
properties are nonconforming with the many of development
standards (including, but not limited to density, gross residential
floor area, setbacks, site coverage, landscape area) of the High
Density Multiple Family (HDMF) District. It is recommended that
greater flexibility with the development standards may be necessary
to allow these townhouse projects to redevelop. This flexibility may
be achieved through the rezoning to the Vail Village Townhouse
(VVT) District. However, the granting of variances from the HDMF
District or rezoning to the Vail Village Townhouse (VVT) District
should consider potential impacts to the character of the
neighborhood.
Clearly, one of the main objectives to consider in the redevelopment of
any property should be to improve existing parking facilities. This includes
satisfying parking demands for existing and additional development as
well as design considerations relative to redevelopment proposals. The
opportunity to introduce below grade structured parking will greatly
improve pedestrianization and landscape features in this area. This should
be considered a goal of any redevelopment proposal in this sub-area.
6 - 3 - 2
8/21/2012
3
Resolution No. 7, Series of 2012
Development or redevelopment of this sub-area may will attract additional
traffic and population into this area and may have significant impacts upon
portions of Sub-Areas 7 and 10.
There are several existing townhouse properties in the East Gore
Creek Sub-Area, including the Vail Townhouse Condominiums, Vail
Row Houses, Vail Trails Chalet, Vail Trails East, and Texas
Townhomes. These design considerations provide
recommendations for the redevelopment of these properties. The
purpose of these design considerations is to preserve the unique
character of the existing townhouse properties in Vail Village.
Redevelopment should be consistent with the existing pedestrian-
oriented, urban character of Vail Village. All demo/rebuild and new
construction projects in the Vail Village Townhouse District shall
comply with these guidelines. It is understood that renovations to
existing buildings may be unable to fully comply with some of these
design considerations. Redevelopment to existing buildings will be
evaluated on a case-by-case basis, with determination of compliance
based upon whether the renovation to an existing building meets the
general intent of these design considerations.
A. Zoning: The existing townhouse properties in the East Gore Creek
Sub-Area including the Vail Townhouse Condominiums, Vail Row
Houses, Vail Trails Chalet, Vail Trails East, and Texas Townhomes
should be rezoned from the High Density Multiple-Family (HDMF)
District to the Vail Village Townhouse (VVT) District.
B. Development Pattern: Townhouse properties in the East Gore
Creek Sub-Area should exhibit the appearance and characteristics of
a residential row style development. Buildings should face the street
and appear to be a series of proportionally sized, individual dwelling
units occupying the space from the ground to the roof that are
attached inline by shared side walls. Buildings should exhibit these
characteristics regardless of ownership patterns or the horizontal
and vertical subdivision of properties, and should create a perceived
dwelling unit occupying the space within a building from the ground
to the roof.
C. Architectural Theme: The existing architectural and aesthetic
character of the townhouse properties in Vail Village shall be
preserved.
1. Units: The architectural theme of each dwelling unit or
perceived dwelling unit (occupying the space within a building
6 - 3 - 3
8/21/2012
4
Resolution No. 7, Series of 2012
from the ground to the roof) shall be expressed on all sides of
that unit to create an architecturally integrated unit.
2. Buildings: Townhouse buildings shall express an
architectural theme of either uniformity or individuality. To
portray architectural and aesthetic integrity, a combination of
both themes within a single building is discouraged.
a. Uniformity: Townhouse buildings may express a
singular, unified architectural theme in which every
perceived dwelling unit (occupying the space from
ground to the roof) in a building is composed of
substantially the same exterior design, materials,
textures, and colors.
b. Individuality: Townhouse buildings may express an
individualistic architectural theme in which each
perceived dwelling unit (occupying the space from
ground to the roof) in a building varies in exterior
design, materials, textures, and colors; so that abutting
units do not have the same architectural treatment. This
expression of individuality among units must be
balanced with the character of the adjacent units and
the building as a whole.
D. Building Form and Massing: Buildings shall step back from the
front property line to create the appearance of a two-story façade
along the street. For the purposes of these design considerations, a
story is considered the space between the surface of any floor and
the next floor or ceiling above, not exceeding 11 feet in height.
The front façade of the first floor or street level and the second floor
shall be located within 20 to 28 feet of the front property line. The
front façade of the third floor and any floors above shall step back 6
to 10 feet from the façade of the second floor below.
E. Street Edge: Front façade shall be generally parallel to the street
and form a strong, but irregular edge to the street. Front façades
shall generally align with adjacent units and buildings to create a
sense of street enclosure and continuity, but shall have enough
offset between units and buildings to create visual interest.
F. Façade: To reduce the appearance of building height and mass,
and to create a residential scale and character, all façades shall
incorporate vertical and horizontal articulation to reduce the
appearance of building height and mass and to foster the
6 - 3 - 4
8/21/2012
5
Resolution No. 7, Series of 2012
appearance of a residential neighborhood. Façades should
incorporate doors, decks, porches, balconies, fenestration, recesses,
bay windows, ornamentation, and other traditional residential
architectural elements. No façade shall appear to be a large
unbroken plane. To preserve the existing pedestrian scale and
residential character of the neighborhood, dwelling unit entries are
encouraged on the front of the building; however, garage entries are
strongly discouraged on the front façade.
G. Cantilevers: On the front façade, floor area cantilevered more than
three feet beyond the level below is strongly discouraged.
Cantilevered floor areas shall not be stacked or cantilevered atop
one another.
H. Roof Pitch: The primary roof form should be sloping with pitches
from 3:12 to 4:12. Secondary roofs should be sloping with pitches
from 6:12 to 9:12. Flat roofs may have limited use as secondary
roofs for decks and mechanical equipment areas. Mansard roofs
create the perception of additional bulk and mass and are
inconsistent with the architectural character of the existing
townhouse properties and the existing neighborhood. Therefore,
mansard roofs are discouraged.
I. Roof Ridge: The primary roof ridges shall be parallel with the front
façade of the building and should be oriented to not shed snow or
rain onto adjacent properties. To create visual interest and to reduce
the perception of building bulk and mass, roofs shall not create the
appearance of continuous ridges between units or buildings. Roof
ridges should be articulated by stepping in elevation and varying
from front to rear. Dormers and other secondary roof forms may
also be used minimize the perception of a continuous ridge.
J. Fences and Site Walls: Privacy fences and walls along the street
are discouraged, except to screen trash areas, utility equipment, and
other similar items.
K. Landscaping: Trees, shrubs, and other plant materials shall be
located in the front portion of the site to create privacy and to soften
the visual transition from roadways and parking areas to the building
façades.
L. Deck Rails: Deck rails shall be designed to minimize the
perception of additional building bulk and mass. Deck rails should
incorporate transparency, material changes, and stepping in
alignment from other building elements. Solid railings that appear to
extend the exterior wall material from below are discouraged.
6 - 3 - 5
8/21/2012
6
Resolution No. 7, Series of 2012
M. Parking: Off-street parking should be located on at-grade surface
driveways or in below grade shared parking structures. Off-street
parking should not be accommodated with individual or shared
garages, carports, or parking structures on the first floor or street
level.
#6-1 Residential Infill Texas Townhomes/Vail Trails
Additional floor or residential development over what is existing. Additional
density to be considered only in conjunction with a comprehensive
redevelopment of each project. To encourage redevelopment and to
maintain the existing character of the neighborhood, the Vail Village
Townhouse (VVT) District was established to grant additional gross
residential floor area over what was allowed under High Density
Multiple Family (HDMF) District zoning. A key factor in the
redevelopment of these properties will be to relocate required parking in
underground structures or a single unified structure serving all
adjacent properties. This will allow for increased landscaping and overall
improvements to pedestrian ways to create a park-like setting on the
surface in this area. Redevelopment shall maintain the existing
character of the neighborhood, with the appearance of two to three
story buildings along the street elevation. In all cases, the mature
pines along Gore Creek shall be maintained. Stream impact must be
considered. Special emphasis on 1.2, 2.3, 2.6, 3.1, 5.1, 6.2.
#6-2 Manor Vail
Possible residential infill on portions of existing surface parking area and
additional floor to the two northern most buildings adjacent to Gore Creek.
Infill project must include addition of greenspace adjacent to East Mill
Creek and other adjoining pedestrian areas. Height of structure shall be
limited to prevent impacts on view to the Gore Range from Village core
and Vail Valley Drive. Present and future parking demand to be met on
site. Traffic considerations must be addressed. Special emphasis on 1.2,
2.3, 2.6, 3.1, 4.1, 5.1, 6.1
#6-3 Vail Row Houses
To encourage redevelopment, the Vail Village Townhouse (VVT)
District was established to grant additional gross residential floor
area over what was allowed under High Density Multiple Family
(HDMF) District zoning. Where possible, driveway widths shall be
minimized and areas for landscaping increased. Surface parking
shall be improved when redevelopment occurs using high quality
landscape paver treatments and the current post and chain parking
delineation shall be replaced with other methods to identify private
parking. Redevelopment shall maintain the existing character of the
6 - 3 - 6
8/21/2012
7
Resolution No. 7, Series of 2012
neighborhood, with the appearance of two to three story buildings
along the street elevation. Improvements to the Gore Creek stream
corridor, consistent with Town policies, shall be considered with
redevelopment applications. Special emphasis on 1.2, 2.3, 2.6, 3.1,
5.1, 6.2.
INTRODUCED, PASSED AND ADOPTED at a regular meeting of the
Town Council of the Town of Vail held this 21st day of August, 2012.
__________________
Andrew P. Daly, Mayor
ATTEST:
_________________________
Lorelei Donaldson, Town Clerk
6-3
6 - 3 - 7
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Information Update and Attachments:
1) VEAC August 14, 2012 Meeting Minutes (Kelli McDonald);
2) June 2012 Vail Business Review (Sally Lorton)
PRESENTER(S): Various
ATTACHMENTS:
VEAC 081412 minutes
June 2nd QTR 2012 VBR
8/21/2012
Vail Economic Advisory Council (VEAC)
August 14, 2012
MEETING NOTES
• VEAC Members Present:
Rayla Kundolf; Chris Jarnot; Michael Kurz; Steve Kaufman; Mark Gordon; Chris Romer; Paul
Wible; Mike Ortiz; Bob Boselli; Laurie Mullen, Mia Vlaar; Andy Daly; Greg Moffet; Joe McHugh;
Rob Levine; Brian Nolan; Matt Morgan; Brett Schoenfield
• Others Present:
Jim Lamont; Connie Woodberry; Mark Woodberry; Kristin Williams; Lauren Glendenning; Mary
McDougall
• TOV Staff Present:
Town Manager Stan Zemler; Finance Director Judy Camp; Economic Development Manager Kelli
McDonald; Executive Assistant Tammy Nagel
• Vail Mountain Summer Activities:
Chris Jarnot, Vail Resorts, presented to the members a PowerPoint introducing new summer
activities coming to the mountain. Last year legislation was passed allowing more summer
activities on the mountain. Jarnot stated Vail Mountain will lead the industry and set the
standards. The new summer activities will promote environmental education and forest
stewardship, mix eco discovery zones with fun activities, make the National Forest accessible to
everyone and give kids and families a unique way to experience the mountains. Vail Resorts will
use existing infrastructure and developed parts of the mountain and all activities will blend
seamlessly with the natural environment. Appropriate mountain activities include Zip Lines,
Forest Flyers, Rope Courses and Adventure Tours. Vail Resorts will donate 1% of summer
activity revenue to The Nature Conservancy for forest restoration; Jarnot estimated the new
attractions will generate $21 million in summer revenue. The new mountain activities will benefit
the community by creating new jobs for construction and operations, support a healthier year-
round employment and visitation and attract I-70 summer travelers to experience Vail for a day.
Jarnot stated the Lionshead Gondola currently has 100,000 summer riders and predicts 350,000
visits over 100 days of summer. Adventure Ridge will be the “hub” of the activities. More hiking
and mountain biking will be available and more accessible. Zip line construction will start this fall
and opening spring 2013 all activities operating by 2015.
Jim Lamont asked if there will be opportunity for community input and Kristin Williams stated
there are two separate times in the process the community will have an opportunity to have input.
Lamont also inquired if there has been any talk with the Town concerning possible issues such as
parking? Jarnot responded by saying the town already has had 3500 on peak summer days, but
there has been informal conversations.
Jarnot also provided a construction update on the new gondola by saying the process is going
great. Terminal pads have been built and storage buildings will start to be constructed. Towers
will be going up early October, terminals will also be in October and 111 cabins will be shipped
from France this month.
• Elevate Vail 2012:
Connie Woodberry, spoke to the members about the 2nd Annual Creating and Sustaining Special
Places Global Symposium that is being held in Vail on September 25 – 27, 2012. This highly
interactive symposium presents a mix of speakers whose accomplishments are testimony to the
value of their insights into the complexity of special places. The Elevate Vail 2012 will discuss
sustainable development and sustainable tourism in special places. Woodberry said Elevate/Vail
2012 will employ a holistic approach to creating and sustaining special places and will include
The Five Pillars (Cultural Connection to Country, Economic Sustainability, Built Environment,
7 - 1 - 1
8/21/2012
Natural Environment and Governance, Leadership and Engagement) as the starting point.
Woodberry invited all members to attend.
• Vail Group Sales Update:
Chris Romer, Vail Valley Partnership, presented Group Sales Update to the members. Romer
reviewed the group sales objectives with members, which are to drive up group sales leads from
key markets and industry segments, develop focused direct sales and marketing effort to attract
targeted group and meeting business to Vail with increased focus on sports and events, medical
meetings and traditional corporate/association business and to work closely with VLMD vendors
to increase partnership opportunities. Romer stated the strategies are to focus on smaller, more
targeted trade shows, events and educational programs, but still maintain a presence in the
incentive and high end Corporate markets. To effectively sell Vail as a meeting destination to
qualified meeting planners while focusing on one-on-one meeting planner events. As of year to
date, the medical groups make up 28% in group sales, corporate groups are 27% with sports and
events being the lowest of the group sales at 14%. Romer said the field, venue and calendar
limitations in Vail make it difficult to increase group sales of participatory sports and events. Vail
Valley Partnership increased group sales focus on medical meetings and Continuing Medical
Education programs in early 2011 with positive results. Group sales trends are showing the
length of group stay is decreasing, creating mid-week opportunities, the average booking lead
time continues to decrease and Associations report higher meeting attendance for Vail meetings
compared to Denver or western slope locations.
• Business Retention Visits:
Boselli reported he visited with corporate stores on Bridge Street who reported overall business is
good and this last winter they did better than they thought with the lack of snow. The businesses
would like to see more events in Vail Village be on Bridge Street. The corporate stores also
stated they were doing more commercial giveaways to attract business.
Nolan visited with merchants in Lionshead who requested more events in the Lionshead area.
The merchants reported an increase in family visitors looking for deals.
Mullen spoke with West Vail merchants who said family business is up but the stores are
basically flat. The businesses reported troubles in hiring staff. Mullen also stated there were a
few empty store fronts and some businesses are under renovation with plans of reopening in time
for football. Service businesses are down to lack of construction work in the Valley. Mullen also
commented parking on the north frontage road helps West Vail retail by taking the pressure
from skier parking off their parking lots and also brings in people who park on the road.
Wibel spoke with a few owners of businesses in the Vail Village who like the events but would like
to see more events in the fall and mid-January. The business owners also thought the parking
structures are too dark and dirty.
Kundolf met with Meadow Drive merchants who stated financially they are up. The merchants
complained they were not notified in a timely manner concerning the construction on Meadow
Drive, but did appreciate Town Manager, Stan Zemler, visiting with each of them and listening to
their concerns. The merchants felt they were heard. Merchants also would like to see more way
finding signage to assist guests in getting to their destinations.
McDonald reported on Levine’s visit with the lodging community. Condominium properties are up
between 5-10% and also reported their International guest numbers are also higher.
• Financial Reports:
The financial reports were provided in the committees’ packets.
• Town Manager Report:
Zemler informed the members that parking will be discussed at the next Council meeting on
August 21, 2012.
• Citizen Input:
None.
7 - 1 - 2
8/21/2012
• Other Business:
McDonald reminded members of the Town picnic today at Donovan Pavilion.
Moffet requested Ortiz to provide an update on VRD numbers.
Kurz complimented VRD presenting an understandable presentation on water usage prior and
post golf course at the last PEC meeting.
Mark Gordon requested the VHA board members come to a VEAC meeting to discuss the article
in the most recent VHA newsletter referencing the work of the VEAC.
• Next Meeting:
The next meeting is scheduled for Tuesday, September 11, 2012 at The Antlers.
7 - 1 - 3
8/21/2012
7 - 2 - 1
8/21/2012
June 2012 Sales Tax
VAIL VILLAGE
June June June
2011 2012 %
Collections Collections Change
Retail 91,844 98,101 6.8%
Lodging 92,038 115,058 25.0%
Food &
Beverage 164,515 195,706 19.0%
Other 1,545 2,021 30.8%
Total 349,942 410,886 17.4%
LIONSHEAD
June June June
2011 2012 %
Collections Collections Change
.
Retail 28,791 33,577 16.6%
Lodging 64,143 68,956 7.5%
Food &
Beverage 54,250 61,828 14.0%
Other 5,866 3,322 -43.4%
Total 153,050 167,683 9.6%
7 - 2 - 2
8/21/2012
June 2012 Sales Tax
CASCADE VILLAGE/EAST VAIL/SANDSTONE/WEST VAIL
June June June
2011 2012 %
Collections Collections Change
Retail 113,448 117,986 4.0%
Lodging 50,739 49,812 -1.8%
Food &
Beverage 52,003 54,642 5.1%
Other 5,749 6,332 10.1%
Total 221,939 228,772 3.1%
OUT OF TOWN
June June June
2011 2012 %
Collections Collections Change
Retail 47,934 56,306 17.5%
Lodging 3,939 4,077 3.5%
Food &
Beverage 275 482 75.3%
Utilities & 121,191 91,207 -24.7%
Other
Total 173,339 152,072 -12.3%
7 - 2 - 3
8/21/2012
June 2012 Sales Tax
TOTAL
June June June
2011 2012 %
Collections Collections Change
Retail 282,017 305,970 8.5%
Lodging 210,859 237,903 12.8%
Food &
Beverage 271,043 312,658 15.4%
Utilities & 134,351 102,882 -23.4%
Other
Total 898,270 959,413 6.8%
7 - 2 - 4
8/21/2012
RETAIL SUMMARY
June June June
2011 2012 %
Collections Collections Change
FOOD 85,659 92,419 7.9%
LIQUOR 23,502 27,010 14.9%
APPAREL 36,833 43,597 18.4%
SPORT 49,070 48,924 -0.3%
JEWELRY 11,914 12,451 4.5%
GIFT 6,885 5,080 -26.2%
GALLERY 2,182 3,979 82.4%
OTHER 65,552 72,244 10.2%
HOME
OCCUPATION
420 266 -36.7%
TOTAL 282,017 305,970
8.5%
7 - 2 - 5
8/21/2012
YTD 2nd Quarter 2012
VAIL VILLAGE
YTD 2nd Qtr YTD 2nd Qtr YTD 2nd Qtr
2011 2012 %
Collections Collections Change
Retail 1,476,786 1,561,484 5.7%
Lodging 1,780,522 1,991,949 11.9%
Food &
Beverage 1,737,539 1,909,135 9.9%
Other 54,321 59,172 8.9%
Total 5,049,168 5,521,740 9.4%
LIONSHEAD
YTD 2nd Qtr YTD 2nd Qtr YTD 2nd Qtr
2011 2012 %
Collections Collections Change
.
Retail 739,977 702,910 -5.0%
Lodging 1,369,459 1,418,348 3.6%
Food &
Beverage 532,956 554,233 4.0%
Other 31,594 31,117 -1.5%
Total 2,673,986 2,706,608 1.2%
7 - 2 - 6
8/21/2012
YTD 2nd Quarter 2012
CASCADE VILLAGE/EAST VAIL/SANDSTONE/WEST VAIL
YTD 2nd Qtr YTD 2nd Qtr YTD 2nd Qtr
2011 2012 %
Collections Collections Change
Retail 928,798 931,210 0.3%
Lodging 698,409 694,862 -0.5%
Food &
Beverage 345,582 333,020 -3.6%
Other 30,529 31,021 1.6%
Total 2,003,318 1,990,113 -0.7%
OUT OF TOWN
YTD 2nd Qtr YTD 2nd Qtr YTD 2nd Qtr
2011 2012 %
Collections Collections Change
Retail 297,111 294,054 -1.0%
Lodging 149,602 157,162 5.1%
Food &
Beverage 5,784 6,157 6.4%
Utilities & 1,127,595 981,948 -12.9%
Other
Total 1,580,092 1,439,321 -8.9%
7 - 2 - 7
8/21/2012
YTD 2nd Quarter 2012
TOTAL
YTD 2nd Qtr YTD 2nd Qtr YTD 2nd Qtr
2011 2012 %
Collections Collections Change
Retail 3,442,672 3,489,658 1.4%
Lodging 3,997,992 4,262,321 6.6%
Food &
Beverage 2,621,861 2,802,545 6.9%
Utilities & 1,244,039 1,103,258 -11.3%
Other
Total 11,306,564 11,657,782 3.1%
7 - 2 - 8
8/21/2012
RETAIL SUMMARY
YTD 2nd Qtr YTD 2nd Qtr YTD 2nd Qtr
2011 2012 %
Collections Collections Change
FOOD 666,232 674,839 1.3%
LIQUOR 224,458 241,709 7.7%
APPAREL 405,592 450,918 11.2%
SPORT 1,516,402 1,474,642 -2.8%
JEWELRY 101,027 92,219 -8.7%
GIFT 47,024 38,057 -19.1%
GALLERY 23,165 27,888 20.4%
OTHER 455,735
486,635 6.8%
HOME
OCCUPATION
3,037
2,751 -9.4%
TOTAL 3,442,672 3,489,658 1.4%
7 - 2 - 9
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Matters from Mayor and Council
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Executive Session, pursuant to: 1) C.R.S. §24-6-402(4)(a)(b)(e) - to discuss the
purchase, acquisition, lease, transfer, or sale of property interests; to receive legal advice on
specific legal questions; and to determine positions, develop a strategy and instruct
negotiators, Regarding: Discussion concerning negotiations regarding Ever Vail
redevelopment and Fire Station #2 redevelopment; 2) C.R.S. §24-6-402(4)(b) - to receive legal
advice on specific legal questions, regarding: proposed Charter amendment ballot questions.
PRESENTER(S): Matt Mire
8/21/2012
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: August 21, 2012
ITEM/TOPIC: Adjournment (4:15 p.m.)
NOTE: UPCOMING MEETING START TIMES BELOW (ALL ARE APPROXIMATE DATES
AND TIMES AND SUBJECT TO CHANGE)
---------------------------------------------------------------------------------------------------------
THE NEXT REGULAR VAIL TOWN COUNCIL REGULAR WORK SESSION WILL BEGIN AT
APPROXIMATELY 12:30 P.M. (or TBD), TUESDAY, SEPTEMBER 4, 2012 IN THE VAIL
TOWN COUNCIL CHAMBERS
FUTURE AGENDA ITEMS:
Ongoing agenda items TBD: DRB/PEC updates - Warren - WS - 15 min.; Information
Updates Attachments: WS - 15 min.; Executive Session items: 30 min.; Consent Agenda: 5
min.; Town Manager Report: Fire and ERWSD updates - 5 min.
TBD:
Information Update and Attachments for 9/4: Event Promoter process (Kelli)
Ford Park discussion re: noise - Todd O./Greg Hall - WS - 30 min. - 9/4
Combined Ambulance District Presentation - Fred Morrison w/ Eagle Cty Ambi. Dist. & Chris
Montera w/ Western Eagle Cty Ambi Dist - WS - 20 min - 9/4
Summer Activity Update - Chris Jarnot - ES - 15 min. - 9/4
View Corridor Amendments - George - ES - 30 min. - 9/4
Site Visit - Library - Pam Brandmeyer - WS - 10/?
Site Visit - Sundial Plaza - Gregg B. - WS - 30 min. - TBD
Ever Vail - George - 30 min. - ES - TBD
Recycling discussion - Kristen B - 30 min. - WS - TBD
Open Space Discussion with Toby Sprunk, Eagle County Open Space Director - TBD
Housing Fee in Lieu Discussion – TBD
Gore Creek Water Quality Update - Bill Carlson - TBD
Outdoor Display Goods - George Ruther - TBD
Historic District - George Ruther - TBD
Sister City discussion - TBD